Environmental Impact Assessment (EIA)
• EIA is a systematic process to identify, predict and
evaluate the environmental effects of proposed actions
and projects.
• A broad definition of environment is adopted.
Whenever appropriate social, cultural and health
effects are also considered as an integral part of EIA.
• Finally, particular attention is given in EIA for
preventing, mitigating and offsetting the significant
adverse effects of proposed undertakings
Definition
It is a planning and management tool for sustainable
development that seeks to identify the type, magnitude
and probability of environmental and social changes
likely to occur as direct or indirect result of a project or
policy and to design the possible mitigation procedure.
EIA is a tool that is applied…
 before major decisions are taken and when all alternatives are
still open;
 to inform all stages of decision making, including final
approval and the establishment of conditions for project
implementation;
 with public participation and consultation; and
 to integrate environmental considerations and safeguards into
all phases of project design, construction and operation
Various activities are completed during the project cycle, which are identified
in the Table
EIA…. When?
• EIA regulations define two schedules of developments.
• For Schedule 1 projects an EIA must always be carried out.
• For Schedule 2 projects an EIA must be carried out if the development
is likely to have a significant impact on the environment by virtue of
its nature, size or location.
Examples of Schedule 1 projects include:
• Major power plants
• Chemical works
• Waste disposal incineration
• Major Roads Schemes
Examples of Schedule 2 Projects include:
• Quarries and opencast
• Some intensive livestock rearing
• Overhead transmission lines
About Schedule 2 projects
• All Schedule 2 developments are based on thresholds. A proposed
development only becomes a Schedule 2 development where it
exceeds the threshold.
• For example a ‘shipyard’ development only falls within Schedule 2
where ‘the area of new floor space exceeds 1,000 square meters’
• Just because a project falls within one of the categories set out in
Schedule 2 and exceeds the Schedule 2 threshold does not mean that
EIA is required.
Three stage process is as follows:
1. Is the proposed development within a category set out in Schedule 2?
2. If so, either: a. does it exceed the threshold set out for that category in
Schedule 2? Or b. is it in a ‘sensitive area’ such as a SSSI, SPA, national park,
AONB etc.?
3. If so, it is likely to have a significant effect on the environment by virtue of
its nature, size or location?
• If the answer to all three of those questions is ‘yes’ then an EIA is
required.
• If the answer to any of those questions is ‘no’ then an EIA is not required.
Steps in EIA
*Public involvement typically
occurs at these points.
It may also occur at any
other stage of the EIA Process
Information fromthis process
contributes to effective EIA in the future
No EIA
Initial
environmental
examination
EIA required
Approved
Not approved
Redesign
Resubmit
Proposal
identification
*Public involvement
Screening
Scoping
Impact analysis
Mitigation
and impact
management
EIA report
Review
Decision-making
Implementation
and post-EIA
monitoring
FIGURE 1: Generalized EIA Process Flow-Chart
Screening
 This step determines:
• whether or not EIA is required for a particular project
• what level of EIA is required
 Often there is some uncertainty and an environmental assessment specialist may
be required to help advise on which of the following is applied:
 Environmental Appraisal
 Environmental Impact Assessment
 Environmental Audit
Screening Process
Mandatory EIA
Case-by-case
consideration
of requirement
for EIA
EIA ruled out
Inclusive threshold
Indicative threshold
Exclusive threshold
• The Screening Process results in the production of the Environmental
Screening Summary Note (ESSN) which include -
• Brief project description
• Environmental issues apparent at screening
• Significance of environmental impacts, risks and/or benefits
• Environmental investigation proposed
• Other issues
• Actions to be taken
Scoping
The specific objectives of the process are
• To enhance the environmental benefits
• To ensure compliance with relevant UK, EC and local legislation
• To consider the alternatives to the proposal that should be examined
• To identify any significant adverse environmental effects, and identify action
• To provide for public consultation and input to the identification of issues to be examined
• To define the data assembly needs and field survey activities
• To determine the predictive techniques
Outcome:
• identifies key issues and impacts to be considered
• lays the foundation of an effective process, saves time and money, and reduces conflict
The scoping process
• prepare a scope outline
• develop the outline through informal consultation with environmental and health
authorities
• make the outline available
• compile an extensive list of concerns
• evaluate relevant concerns to establish key issues
• organise key issues into impact categories (study list)
• amend the outline accordingly
• develop ‘Terms of reference’ (ToR) for impact analysis
• monitor progress against the ToR, revising as necessary
Impact Analysis
→ Type biophysical, social, health or economic
→ Nature direct or indirect, cumulative, etc.
→ Magnitude or
severity
high, moderate, low
→ Extent local, regional, trans-boundary or global
→ Timing immediate/long term
→ Duration temporary/permanent
→ Uncertainty low likelihood/high probability
→ Reversibility reversible/irreversible
→ Significance* unimportant/important
checklists, matrix, geographical information systems (GIS),expert systems, professional
judgement are used as tool for impact identification.
Impact Mitigation
• Fundamental part of project design
• Simple design changes can have a dramatic effect upon improving
environmental performance
• to avoid, minimise or remedy adverse impacts
• to ensure that residual impacts are within acceptable levels
• to enhance environmental and social benefits
Framework for Impact Mitigation
Common (desirable)
Rare (undesirable)
Alternative sites or
technologyto
eliminate habitat loss
Actions during
design, construction and
operation to minimise
or eliminate habitat
loss
Used as a last resort
to offset habitat loss
Avoidance
Mitigation
Compensation
Reporting
• Purpose- to improve the project design prior to its submission
• Focused upon the key issues that the decision maker should
appreciate
• Different name of EIA reports
 Environmental Impact Statement (EIS)
 Environmental Statement (ES)
 Environmental Assessment Report (EA Report)
Contents of the Report
 a description of the project;
• an outline of the main alternatives studied by the developer, and an indication of the main
reasons for this choice,
• a description of the aspects of the environment likely to be significantly affected by the
proposed project;
• a description of the likely significant environmental effects of the proposed project;
• measures to prevent, reduce and possibly offset adverse
environmental effects;
• a non-technical summary;
• an indication of any difficulties (technical deficiencies or
lack of know-how) encountered while compiling the required information.
Environmental Management Plan (EMP):
• Environmental issues are incorporated into the implementation phase of
the project cycle
• Consists of:-
• Mitigation measures to minimise adverse impacts
• Measures to enhance environmental benefits
• Identified risks and uncertainties
• Institutional support required for effective monitoring
• Monitoring and auditing programme details
• Environmental legislation and standards which apply
• Resources, funds, contractual and management
arrangements
Screening Checklists:
Environmental Features:
• Areas containing rare or endangered species
• National parks, nature reserves, Etc.
• Habitats providing important resources for vulnerable groups
• Moist or dry tropical and sub-tropical forest
Development Features
• Important policy changes likely to affect the environment
• Major changes in land tenure or use
• Substantial changes in water use
• Large infrastructure projects
Screening Checklists:
Potential adverse and beneficial effects:
• Livelihoods
• Culture
• Land management
• Water quality and quantity
• Local air quality
• Global impacts
• Conservation
Screening Checklists:
Impact characterisation:
• Is the impact beneficial, benign or harmful?
• What is the scale and intensity of impact?
• Are effects irreversible?
• Are the effects due to construction and/or operations?
• Are the effects likely to be politically or socially controversial?
• Will there be different effects on different members of society?
• What are the timescales of impact?
• Checklists for Policy Approvers and Decision-makers
Screening Checklists:
Project setting:
• Have underlying causes of environmental damage been considered?
• Would these underlying causes be better addressed by other means?
Impact identification
• Is there any effect on environmentally sensitive or important areas?
• Have the environmental and social risks been evaluated?
• Have indirect effects been addressed?
Mitigation measures:
• What mitigation measures are proposed?
• What measures will be taken to enhance environmental benefits?
• What consultation was there with concerned stakeholders?
Screening Checklists:
Procedures:
• Have appropriate guidelines been followed?
• Have the beneficial and adverse environmental effects been integrated into
the economic analysis?
• Have the appropriate authorities been consulted?
Implementation:
• Do local institutions need strengthening in order to effect the
environmental measures?
• Who will monitor the environmental impact?
• Have environmental measures been costed, and funds allocated?
Environmental Impact of Rural Transport
Development:
• Encroachment into precious ecological resources, including forests
and swamps.
Encroachment into historical areas and cultural monuments.
• Impairment of fisheries, aquatic ecology and other beneficial water
uses, due to changes in surface hydrology.
• Erosion and silt runoff from exposed areas, which may also cause
impairment of downstream water quality and damage to land values.
• Dust nuisances caused by both the road usage and during
construction.
Case study of an EIA in Finland, development of Highway 1
Introduction
• The national Highway 1 is part of the European road E18, which
is the most important east-west road corridor in Finland.
• The section of Highway 1 between Salo and Lohja (63 km) is
narrow, winding and unsafe
• According to the Finnish Road Administration, the road is
running short of capacity. Already in the 1960s, the Road
Administration began planning to develop this highway to a
motorway standard
Environmental Impact Assessment procedure
Identification and scoping
• The new road would pass through important natural areas and would
cause changes to both the natural landscape and cultural landscape
areas
• The scoping was focused on identifying the most sensitive and
important areas and on analysing the changes that would result
because of the building of the road
• The most important goal was to determine the impacts of a new
motorway and the impacts of just upgrading the existing roads
• According to the Finnish legislation on EIA, the EIA procedure is also
subject to public participation.
Baseline data
• The earlier investigations and traffic forecasts done during the
feasibility study were updated and some new supplementary
surveys were made
• Potential impacts from noise and emissions were assessed
closely and there were inquiries and interviews of local people
to assess social impacts
• Different scenarios were used to look at impacts on community
structure and economics
Impact study and assessment
• The EIA report covered the environmental aspects that were
determined to be the most significant during the scoping phase
• A new motorway has significant advantages and disadvantages.
• In general, the upgrading of existing roads means that the
already existing problems will increase and the people living
next to the roads will suffer even more.
• In economic terms, the new motorway was seen to be the
better solution
Disadvantages of new motorway
• Loss of biodiversity
• The new motorway will also cause fragmentation in some lake
areas, as well as in one important recreation area
• Some areas that are now quiet areas will be affected by the
traffic noise from the new motorway
When completed, the assessment report was subject to
public comments
After the EIA
• The EIA was completed in 1996. The Finnish Road Administration
proceeded to work on the final design of the project
• Some local people found evidence of flying squirrels, close to the
planned motorway.
• The Road Administration ordered a report on flying squirrels for the
entire road section. According to the report, 47 occurrences of flying
squirrels close to the planned motorway were recorded, of which 29
were in the immediate vicinity of the road.
• This resulted in a long legal process that delayed even further the
construction of the new motorway
• It was also found that a shooting range is located in an area of a
proposed interchange
• A high concentration of lead was detected in the soil
• According to the amended EIA decree, the disposal of heavily
leaded soil is subject to a mandatory EIA
• This meant a new EIA procedure for the cleaning up and
disposal of the leaded soil, which resulted in even more delays.
Benefits of the EIA
• EIA ensured that environmental issues were taken into account
in the planning procedures and the decision-making process
• In this case the EIA helped to identify environmentally sensitive
areas and significant issues so that they could be taken into
account and the adverse impacts could be reduced to an
acceptable level
Some positive outcomes of the EIA are :-
• an important recreation area was saved by building a tunnel
• most habitats of the flying squirrel were saved by small changes
in design
• groundwater areas were protected
• long sections of the road run through deep rock cuttings and
the planned primary measure for noise control
THANKS..

More Related Content

What's hot

ENVIRONMENTAL IMPACT ASSESSMENT - EIA
ENVIRONMENTAL IMPACT ASSESSMENT - EIAENVIRONMENTAL IMPACT ASSESSMENT - EIA
ENVIRONMENTAL IMPACT ASSESSMENT - EIA
Sakthivel R
 
Environmental Impact Assessment and Environmental Audit- Unit III
Environmental Impact Assessment and Environmental Audit- Unit IIIEnvironmental Impact Assessment and Environmental Audit- Unit III
Environmental Impact Assessment and Environmental Audit- Unit III
GAURAV. H .TANDON
 
Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact Assessment
Prateek Bansal
 
Environmental impact assessment methodology
Environmental impact assessment methodologyEnvironmental impact assessment methodology
Environmental impact assessment methodology
Justin Joy
 
Eia methodogies
Eia methodogiesEia methodogies
Eia methodogies
Meenal Gupta
 
Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact AssessmentNigel Gardner
 
Environmental impact assessment (EIA)
Environmental impact assessment (EIA)Environmental impact assessment (EIA)
Environmental impact assessment (EIA)
School of planning and architecture
 
Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact AssessmentPrithvi Ghag
 
ENVIRONMENTAL IMPACTS ASSESMENT (EIA)
ENVIRONMENTAL  IMPACTS ASSESMENT (EIA)ENVIRONMENTAL  IMPACTS ASSESMENT (EIA)
ENVIRONMENTAL IMPACTS ASSESMENT (EIA)
Lucasrukona
 
Environmental impact assessment
Environmental impact assessmentEnvironmental impact assessment
Environmental impact assessment
Sayyid Ina
 
Environmental Impact Assessment, Initial Environmental Examination
Environmental Impact Assessment, Initial Environmental ExaminationEnvironmental Impact Assessment, Initial Environmental Examination
Environmental Impact Assessment, Initial Environmental Examination
Nabin Lamichhane
 
Unit 7 eia and sd
Unit 7 eia and sd Unit 7 eia and sd
Unit 7 eia and sd Kumar
 
ENVIRONMENTAL IMPACT ASSESSMENT (EIA)
ENVIRONMENTAL IMPACT ASSESSMENT (EIA)ENVIRONMENTAL IMPACT ASSESSMENT (EIA)
ENVIRONMENTAL IMPACT ASSESSMENT (EIA)
eAmbiente
 
What is eia
What is eiaWhat is eia
Environmental Impact Assessment on Dams
Environmental Impact Assessment on Dams  Environmental Impact Assessment on Dams
Environmental Impact Assessment on Dams Sodiq Rasaq
 
environmental impact assessment
environmental impact assessment environmental impact assessment
environmental impact assessment
Pramoda Raj
 
Baseline study for EIA
Baseline study for EIABaseline study for EIA
Baseline study for EIA
Jenson Samraj
 
Economic valuation and Payment for Ecosystem Services
Economic valuation and Payment for Ecosystem ServicesEconomic valuation and Payment for Ecosystem Services
Economic valuation and Payment for Ecosystem Services
Iwl Pcu
 
EIA Methods
EIA MethodsEIA Methods
Environmental impact assessment m5
Environmental impact assessment m5Environmental impact assessment m5
Environmental impact assessment m5Bibhabasu Mohanty
 

What's hot (20)

ENVIRONMENTAL IMPACT ASSESSMENT - EIA
ENVIRONMENTAL IMPACT ASSESSMENT - EIAENVIRONMENTAL IMPACT ASSESSMENT - EIA
ENVIRONMENTAL IMPACT ASSESSMENT - EIA
 
Environmental Impact Assessment and Environmental Audit- Unit III
Environmental Impact Assessment and Environmental Audit- Unit IIIEnvironmental Impact Assessment and Environmental Audit- Unit III
Environmental Impact Assessment and Environmental Audit- Unit III
 
Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact Assessment
 
Environmental impact assessment methodology
Environmental impact assessment methodologyEnvironmental impact assessment methodology
Environmental impact assessment methodology
 
Eia methodogies
Eia methodogiesEia methodogies
Eia methodogies
 
Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact Assessment
 
Environmental impact assessment (EIA)
Environmental impact assessment (EIA)Environmental impact assessment (EIA)
Environmental impact assessment (EIA)
 
Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact Assessment
 
ENVIRONMENTAL IMPACTS ASSESMENT (EIA)
ENVIRONMENTAL  IMPACTS ASSESMENT (EIA)ENVIRONMENTAL  IMPACTS ASSESMENT (EIA)
ENVIRONMENTAL IMPACTS ASSESMENT (EIA)
 
Environmental impact assessment
Environmental impact assessmentEnvironmental impact assessment
Environmental impact assessment
 
Environmental Impact Assessment, Initial Environmental Examination
Environmental Impact Assessment, Initial Environmental ExaminationEnvironmental Impact Assessment, Initial Environmental Examination
Environmental Impact Assessment, Initial Environmental Examination
 
Unit 7 eia and sd
Unit 7 eia and sd Unit 7 eia and sd
Unit 7 eia and sd
 
ENVIRONMENTAL IMPACT ASSESSMENT (EIA)
ENVIRONMENTAL IMPACT ASSESSMENT (EIA)ENVIRONMENTAL IMPACT ASSESSMENT (EIA)
ENVIRONMENTAL IMPACT ASSESSMENT (EIA)
 
What is eia
What is eiaWhat is eia
What is eia
 
Environmental Impact Assessment on Dams
Environmental Impact Assessment on Dams  Environmental Impact Assessment on Dams
Environmental Impact Assessment on Dams
 
environmental impact assessment
environmental impact assessment environmental impact assessment
environmental impact assessment
 
Baseline study for EIA
Baseline study for EIABaseline study for EIA
Baseline study for EIA
 
Economic valuation and Payment for Ecosystem Services
Economic valuation and Payment for Ecosystem ServicesEconomic valuation and Payment for Ecosystem Services
Economic valuation and Payment for Ecosystem Services
 
EIA Methods
EIA MethodsEIA Methods
EIA Methods
 
Environmental impact assessment m5
Environmental impact assessment m5Environmental impact assessment m5
Environmental impact assessment m5
 

Viewers also liked

Environmental impact assessment
Environmental impact assessmentEnvironmental impact assessment
Environmental impact assessment
Nanyang Technological University, Singapore
 
Seminar on Environmental Impact Assessment
Seminar on Environmental Impact AssessmentSeminar on Environmental Impact Assessment
Seminar on Environmental Impact Assessment
ashwinpand90
 
13 environmental impact assessment
13 environmental impact assessment13 environmental impact assessment
13 environmental impact assessment
Prabha Panth
 
Environmental impact assessment concept
Environmental impact assessment conceptEnvironmental impact assessment concept
Environmental impact assessment conceptIntan Ayuna
 
Environmental impact assessment (eia) By Mr Allah Dad Khan Visiting Professor...
Environmental impact assessment (eia) By Mr Allah Dad Khan Visiting Professor...Environmental impact assessment (eia) By Mr Allah Dad Khan Visiting Professor...
Environmental impact assessment (eia) By Mr Allah Dad Khan Visiting Professor...
Mr.Allah Dad Khan
 
Environmental Audit and Environmental Impact Assessment
Environmental Audit and Environmental Impact AssessmentEnvironmental Audit and Environmental Impact Assessment
Environmental Audit and Environmental Impact Assessment
Effah Effervescence
 
Imelda Winters Presentation Environmental Impact Assessment
Imelda Winters Presentation Environmental Impact AssessmentImelda Winters Presentation Environmental Impact Assessment
Imelda Winters Presentation Environmental Impact AssessmentImelda Winters
 
Environmental impact assessment
Environmental impact assessmentEnvironmental impact assessment
Environmental impact assessment
Jini Rajendran
 
Environmental impact assessment and life cycle assessment and their role in s...
Environmental impact assessment and life cycle assessment and their role in s...Environmental impact assessment and life cycle assessment and their role in s...
Environmental impact assessment and life cycle assessment and their role in s...
Arvind Kumar
 
Developing Guidelines for Public Participation on Environmental Impact Assess...
Developing Guidelines for Public Participation on Environmental Impact Assess...Developing Guidelines for Public Participation on Environmental Impact Assess...
Developing Guidelines for Public Participation on Environmental Impact Assess...
Ethical Sector
 
Environmental Impact Assessment in Water Resources Projects
Environmental Impact Assessment in Water Resources ProjectsEnvironmental Impact Assessment in Water Resources Projects
Environmental Impact Assessment in Water Resources Projects
National Institute of Technology Hamirpur
 
Pytorch for tf_developers
Pytorch for tf_developersPytorch for tf_developers
Pytorch for tf_developers
Abdul Muneer
 
Summarization of Environmental Impact Assessment Methodology by Dr. I.M. Mis...
Summarization of Environmental Impact  Assessment Methodology by Dr. I.M. Mis...Summarization of Environmental Impact  Assessment Methodology by Dr. I.M. Mis...
Summarization of Environmental Impact Assessment Methodology by Dr. I.M. Mis...
Arvind Kumar
 
Deep learning an Introduction with Competitive Landscape
Deep learning an Introduction with Competitive LandscapeDeep learning an Introduction with Competitive Landscape
Deep learning an Introduction with Competitive Landscape
Shivaji Dutta
 
1시간만에 GAN(Generative Adversarial Network) 완전 정복하기
1시간만에 GAN(Generative Adversarial Network) 완전 정복하기1시간만에 GAN(Generative Adversarial Network) 완전 정복하기
1시간만에 GAN(Generative Adversarial Network) 완전 정복하기
NAVER Engineering
 
Environmental impact assessment methodology by Dr. I.M. Mishra Professor, Dep...
Environmental impact assessment methodology by Dr. I.M. Mishra Professor, Dep...Environmental impact assessment methodology by Dr. I.M. Mishra Professor, Dep...
Environmental impact assessment methodology by Dr. I.M. Mishra Professor, Dep...
Arvind Kumar
 
Methods of eia(environmental impact assessment)
Methods of eia(environmental impact assessment)Methods of eia(environmental impact assessment)
Methods of eia(environmental impact assessment)
Akhil Chibber
 
Environmental Impact Assessment - University of Winnipeg
Environmental Impact Assessment - University of WinnipegEnvironmental Impact Assessment - University of Winnipeg
Environmental Impact Assessment - University of Winnipeg
John Gunter
 
PyTorch Tutorial for NTU Machine Learing Course 2017
PyTorch Tutorial for NTU Machine Learing Course 2017PyTorch Tutorial for NTU Machine Learing Course 2017
PyTorch Tutorial for NTU Machine Learing Course 2017
Yu-Hsun (lymanblue) Lin
 
Deep Learning with PyTorch
Deep Learning with PyTorchDeep Learning with PyTorch
Deep Learning with PyTorch
Mayur Bhangale
 

Viewers also liked (20)

Environmental impact assessment
Environmental impact assessmentEnvironmental impact assessment
Environmental impact assessment
 
Seminar on Environmental Impact Assessment
Seminar on Environmental Impact AssessmentSeminar on Environmental Impact Assessment
Seminar on Environmental Impact Assessment
 
13 environmental impact assessment
13 environmental impact assessment13 environmental impact assessment
13 environmental impact assessment
 
Environmental impact assessment concept
Environmental impact assessment conceptEnvironmental impact assessment concept
Environmental impact assessment concept
 
Environmental impact assessment (eia) By Mr Allah Dad Khan Visiting Professor...
Environmental impact assessment (eia) By Mr Allah Dad Khan Visiting Professor...Environmental impact assessment (eia) By Mr Allah Dad Khan Visiting Professor...
Environmental impact assessment (eia) By Mr Allah Dad Khan Visiting Professor...
 
Environmental Audit and Environmental Impact Assessment
Environmental Audit and Environmental Impact AssessmentEnvironmental Audit and Environmental Impact Assessment
Environmental Audit and Environmental Impact Assessment
 
Imelda Winters Presentation Environmental Impact Assessment
Imelda Winters Presentation Environmental Impact AssessmentImelda Winters Presentation Environmental Impact Assessment
Imelda Winters Presentation Environmental Impact Assessment
 
Environmental impact assessment
Environmental impact assessmentEnvironmental impact assessment
Environmental impact assessment
 
Environmental impact assessment and life cycle assessment and their role in s...
Environmental impact assessment and life cycle assessment and their role in s...Environmental impact assessment and life cycle assessment and their role in s...
Environmental impact assessment and life cycle assessment and their role in s...
 
Developing Guidelines for Public Participation on Environmental Impact Assess...
Developing Guidelines for Public Participation on Environmental Impact Assess...Developing Guidelines for Public Participation on Environmental Impact Assess...
Developing Guidelines for Public Participation on Environmental Impact Assess...
 
Environmental Impact Assessment in Water Resources Projects
Environmental Impact Assessment in Water Resources ProjectsEnvironmental Impact Assessment in Water Resources Projects
Environmental Impact Assessment in Water Resources Projects
 
Pytorch for tf_developers
Pytorch for tf_developersPytorch for tf_developers
Pytorch for tf_developers
 
Summarization of Environmental Impact Assessment Methodology by Dr. I.M. Mis...
Summarization of Environmental Impact  Assessment Methodology by Dr. I.M. Mis...Summarization of Environmental Impact  Assessment Methodology by Dr. I.M. Mis...
Summarization of Environmental Impact Assessment Methodology by Dr. I.M. Mis...
 
Deep learning an Introduction with Competitive Landscape
Deep learning an Introduction with Competitive LandscapeDeep learning an Introduction with Competitive Landscape
Deep learning an Introduction with Competitive Landscape
 
1시간만에 GAN(Generative Adversarial Network) 완전 정복하기
1시간만에 GAN(Generative Adversarial Network) 완전 정복하기1시간만에 GAN(Generative Adversarial Network) 완전 정복하기
1시간만에 GAN(Generative Adversarial Network) 완전 정복하기
 
Environmental impact assessment methodology by Dr. I.M. Mishra Professor, Dep...
Environmental impact assessment methodology by Dr. I.M. Mishra Professor, Dep...Environmental impact assessment methodology by Dr. I.M. Mishra Professor, Dep...
Environmental impact assessment methodology by Dr. I.M. Mishra Professor, Dep...
 
Methods of eia(environmental impact assessment)
Methods of eia(environmental impact assessment)Methods of eia(environmental impact assessment)
Methods of eia(environmental impact assessment)
 
Environmental Impact Assessment - University of Winnipeg
Environmental Impact Assessment - University of WinnipegEnvironmental Impact Assessment - University of Winnipeg
Environmental Impact Assessment - University of Winnipeg
 
PyTorch Tutorial for NTU Machine Learing Course 2017
PyTorch Tutorial for NTU Machine Learing Course 2017PyTorch Tutorial for NTU Machine Learing Course 2017
PyTorch Tutorial for NTU Machine Learing Course 2017
 
Deep Learning with PyTorch
Deep Learning with PyTorchDeep Learning with PyTorch
Deep Learning with PyTorch
 

Similar to Environmental Impact Assessment

Procedure for EIA.pptx
Procedure for EIA.pptxProcedure for EIA.pptx
Procedure for EIA.pptx
thanga2
 
Procedure for EIA.pptx
Procedure for EIA.pptxProcedure for EIA.pptx
Procedure for EIA.pptx
thanga2
 
Ecw 579 week 13
Ecw 579 week 13Ecw 579 week 13
Ecw 579 week 13
Adilah Anuar
 
NALINI ( topic for M. Sc Ag. Agroforestry assigment EIA and ERA.pptx)
NALINI ( topic for M. Sc Ag. Agroforestry assigment EIA and ERA.pptx)NALINI ( topic for M. Sc Ag. Agroforestry assigment EIA and ERA.pptx)
NALINI ( topic for M. Sc Ag. Agroforestry assigment EIA and ERA.pptx)
HNaliniNirala
 
Environment impact assessment
Environment impact assessmentEnvironment impact assessment
Environment impact assessment
Vinod Burdak
 
EHS 504 - Environmental Impact Assessment - Lecture 3.ppt
EHS 504  - Environmental Impact Assessment - Lecture 3.pptEHS 504  - Environmental Impact Assessment - Lecture 3.ppt
EHS 504 - Environmental Impact Assessment - Lecture 3.ppt
AbdulmuizzMuktar1
 
PEISS
PEISSPEISS
PEISS
Mk Blanco
 
Environmental Impact Assignment
Environmental Impact Assignment Environmental Impact Assignment
Environmental Impact Assignment
Hemant Thakur
 
EIA-process
 EIA-process EIA-process
EIA-process
Oshal Khan
 
EIA Concept Process Core Skills.pdf
EIA Concept Process Core Skills.pdfEIA Concept Process Core Skills.pdf
EIA Concept Process Core Skills.pdf
Hoshyar Rasul
 
ENVIRONMENT IMPACT ASSESSMENT
ENVIRONMENT IMPACT ASSESSMENTENVIRONMENT IMPACT ASSESSMENT
ENVIRONMENT IMPACT ASSESSMENT
goswamikusum
 
environmentalimpactassessmenteia-210826024951.pdf
environmentalimpactassessmenteia-210826024951.pdfenvironmentalimpactassessmenteia-210826024951.pdf
environmentalimpactassessmenteia-210826024951.pdf
ssusereef268
 
Environmental impact assessment (eia)
Environmental impact assessment (eia)Environmental impact assessment (eia)
Environmental impact assessment (eia)
SANDEEP PATRE
 
Environment impact Assessment (EIA) in Uganda
Environment impact Assessment (EIA) in UgandaEnvironment impact Assessment (EIA) in Uganda
Environment impact Assessment (EIA) in Uganda
kayondo alex
 
manunath1-copy-170405123133 (1).pdf
manunath1-copy-170405123133 (1).pdfmanunath1-copy-170405123133 (1).pdf
manunath1-copy-170405123133 (1).pdf
ChandanLawrence
 
Lecture 3-4 EIA-process EIA EIA EIA EIA EIA
Lecture 3-4 EIA-process EIA EIA EIA EIA EIALecture 3-4 EIA-process EIA EIA EIA EIA EIA
Lecture 3-4 EIA-process EIA EIA EIA EIA EIA
IlyasKhan84634
 
Environmental Impact Assessment (EIA).pdf
Environmental Impact Assessment (EIA).pdfEnvironmental Impact Assessment (EIA).pdf
Environmental Impact Assessment (EIA).pdf
Dr. Subramanyam Revanuru
 
Coastal Road Project
Coastal Road ProjectCoastal Road Project
Coastal Road Project
Ekonnect Knowledge Foundation
 

Similar to Environmental Impact Assessment (20)

Procedure for EIA.pptx
Procedure for EIA.pptxProcedure for EIA.pptx
Procedure for EIA.pptx
 
Procedure for EIA.pptx
Procedure for EIA.pptxProcedure for EIA.pptx
Procedure for EIA.pptx
 
Ecw 579 week 13
Ecw 579 week 13Ecw 579 week 13
Ecw 579 week 13
 
NALINI ( topic for M. Sc Ag. Agroforestry assigment EIA and ERA.pptx)
NALINI ( topic for M. Sc Ag. Agroforestry assigment EIA and ERA.pptx)NALINI ( topic for M. Sc Ag. Agroforestry assigment EIA and ERA.pptx)
NALINI ( topic for M. Sc Ag. Agroforestry assigment EIA and ERA.pptx)
 
Environment impact assessment
Environment impact assessmentEnvironment impact assessment
Environment impact assessment
 
eia.ppt
eia.ppteia.ppt
eia.ppt
 
eia.ppt
eia.ppteia.ppt
eia.ppt
 
EHS 504 - Environmental Impact Assessment - Lecture 3.ppt
EHS 504  - Environmental Impact Assessment - Lecture 3.pptEHS 504  - Environmental Impact Assessment - Lecture 3.ppt
EHS 504 - Environmental Impact Assessment - Lecture 3.ppt
 
PEISS
PEISSPEISS
PEISS
 
Environmental Impact Assignment
Environmental Impact Assignment Environmental Impact Assignment
Environmental Impact Assignment
 
EIA-process
 EIA-process EIA-process
EIA-process
 
EIA Concept Process Core Skills.pdf
EIA Concept Process Core Skills.pdfEIA Concept Process Core Skills.pdf
EIA Concept Process Core Skills.pdf
 
ENVIRONMENT IMPACT ASSESSMENT
ENVIRONMENT IMPACT ASSESSMENTENVIRONMENT IMPACT ASSESSMENT
ENVIRONMENT IMPACT ASSESSMENT
 
environmentalimpactassessmenteia-210826024951.pdf
environmentalimpactassessmenteia-210826024951.pdfenvironmentalimpactassessmenteia-210826024951.pdf
environmentalimpactassessmenteia-210826024951.pdf
 
Environmental impact assessment (eia)
Environmental impact assessment (eia)Environmental impact assessment (eia)
Environmental impact assessment (eia)
 
Environment impact Assessment (EIA) in Uganda
Environment impact Assessment (EIA) in UgandaEnvironment impact Assessment (EIA) in Uganda
Environment impact Assessment (EIA) in Uganda
 
manunath1-copy-170405123133 (1).pdf
manunath1-copy-170405123133 (1).pdfmanunath1-copy-170405123133 (1).pdf
manunath1-copy-170405123133 (1).pdf
 
Lecture 3-4 EIA-process EIA EIA EIA EIA EIA
Lecture 3-4 EIA-process EIA EIA EIA EIA EIALecture 3-4 EIA-process EIA EIA EIA EIA EIA
Lecture 3-4 EIA-process EIA EIA EIA EIA EIA
 
Environmental Impact Assessment (EIA).pdf
Environmental Impact Assessment (EIA).pdfEnvironmental Impact Assessment (EIA).pdf
Environmental Impact Assessment (EIA).pdf
 
Coastal Road Project
Coastal Road ProjectCoastal Road Project
Coastal Road Project
 

Recently uploaded

space technology lecture notes on satellite
space technology lecture notes on satellitespace technology lecture notes on satellite
space technology lecture notes on satellite
ongomchris
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
VENKATESHvenky89705
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
Pipe Restoration Solutions
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
AhmedHussein950959
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
Pratik Pawar
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
Jayaprasanna4
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
Divya Somashekar
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
gerogepatton
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
ydteq
 
Investor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptxInvestor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptx
AmarGB2
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
manasideore6
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
seandesed
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
TeeVichai
 

Recently uploaded (20)

space technology lecture notes on satellite
space technology lecture notes on satellitespace technology lecture notes on satellite
space technology lecture notes on satellite
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
 
Investor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptxInvestor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptx
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
 

Environmental Impact Assessment

  • 1. MEL422 Environmental Impact Assessment Presented By: Bahadur Prasad (2010ME10662) Jasbir Singh (2010ME10682) Ram Bihari (2010ME10715) Ankur Rana (2010ME10654) Rajveer Singh (2010ME10714) Arla Sagar (2010ME1010657)
  • 2. Environmental Impact Assessment (EIA) • EIA is a systematic process to identify, predict and evaluate the environmental effects of proposed actions and projects. • A broad definition of environment is adopted. Whenever appropriate social, cultural and health effects are also considered as an integral part of EIA. • Finally, particular attention is given in EIA for preventing, mitigating and offsetting the significant adverse effects of proposed undertakings
  • 3. Definition It is a planning and management tool for sustainable development that seeks to identify the type, magnitude and probability of environmental and social changes likely to occur as direct or indirect result of a project or policy and to design the possible mitigation procedure.
  • 4. EIA is a tool that is applied…  before major decisions are taken and when all alternatives are still open;  to inform all stages of decision making, including final approval and the establishment of conditions for project implementation;  with public participation and consultation; and  to integrate environmental considerations and safeguards into all phases of project design, construction and operation
  • 5. Various activities are completed during the project cycle, which are identified in the Table
  • 6. EIA…. When? • EIA regulations define two schedules of developments. • For Schedule 1 projects an EIA must always be carried out. • For Schedule 2 projects an EIA must be carried out if the development is likely to have a significant impact on the environment by virtue of its nature, size or location.
  • 7. Examples of Schedule 1 projects include: • Major power plants • Chemical works • Waste disposal incineration • Major Roads Schemes
  • 8. Examples of Schedule 2 Projects include: • Quarries and opencast • Some intensive livestock rearing • Overhead transmission lines
  • 9. About Schedule 2 projects • All Schedule 2 developments are based on thresholds. A proposed development only becomes a Schedule 2 development where it exceeds the threshold. • For example a ‘shipyard’ development only falls within Schedule 2 where ‘the area of new floor space exceeds 1,000 square meters’ • Just because a project falls within one of the categories set out in Schedule 2 and exceeds the Schedule 2 threshold does not mean that EIA is required.
  • 10. Three stage process is as follows: 1. Is the proposed development within a category set out in Schedule 2? 2. If so, either: a. does it exceed the threshold set out for that category in Schedule 2? Or b. is it in a ‘sensitive area’ such as a SSSI, SPA, national park, AONB etc.? 3. If so, it is likely to have a significant effect on the environment by virtue of its nature, size or location? • If the answer to all three of those questions is ‘yes’ then an EIA is required. • If the answer to any of those questions is ‘no’ then an EIA is not required.
  • 11. Steps in EIA *Public involvement typically occurs at these points. It may also occur at any other stage of the EIA Process Information fromthis process contributes to effective EIA in the future No EIA Initial environmental examination EIA required Approved Not approved Redesign Resubmit Proposal identification *Public involvement Screening Scoping Impact analysis Mitigation and impact management EIA report Review Decision-making Implementation and post-EIA monitoring FIGURE 1: Generalized EIA Process Flow-Chart
  • 12. Screening  This step determines: • whether or not EIA is required for a particular project • what level of EIA is required  Often there is some uncertainty and an environmental assessment specialist may be required to help advise on which of the following is applied:  Environmental Appraisal  Environmental Impact Assessment  Environmental Audit
  • 13. Screening Process Mandatory EIA Case-by-case consideration of requirement for EIA EIA ruled out Inclusive threshold Indicative threshold Exclusive threshold
  • 14. • The Screening Process results in the production of the Environmental Screening Summary Note (ESSN) which include - • Brief project description • Environmental issues apparent at screening • Significance of environmental impacts, risks and/or benefits • Environmental investigation proposed • Other issues • Actions to be taken
  • 15. Scoping The specific objectives of the process are • To enhance the environmental benefits • To ensure compliance with relevant UK, EC and local legislation • To consider the alternatives to the proposal that should be examined • To identify any significant adverse environmental effects, and identify action • To provide for public consultation and input to the identification of issues to be examined • To define the data assembly needs and field survey activities • To determine the predictive techniques Outcome: • identifies key issues and impacts to be considered • lays the foundation of an effective process, saves time and money, and reduces conflict
  • 16. The scoping process • prepare a scope outline • develop the outline through informal consultation with environmental and health authorities • make the outline available • compile an extensive list of concerns • evaluate relevant concerns to establish key issues • organise key issues into impact categories (study list) • amend the outline accordingly • develop ‘Terms of reference’ (ToR) for impact analysis • monitor progress against the ToR, revising as necessary
  • 17. Impact Analysis → Type biophysical, social, health or economic → Nature direct or indirect, cumulative, etc. → Magnitude or severity high, moderate, low → Extent local, regional, trans-boundary or global → Timing immediate/long term → Duration temporary/permanent → Uncertainty low likelihood/high probability → Reversibility reversible/irreversible → Significance* unimportant/important checklists, matrix, geographical information systems (GIS),expert systems, professional judgement are used as tool for impact identification.
  • 18. Impact Mitigation • Fundamental part of project design • Simple design changes can have a dramatic effect upon improving environmental performance • to avoid, minimise or remedy adverse impacts • to ensure that residual impacts are within acceptable levels • to enhance environmental and social benefits
  • 19. Framework for Impact Mitigation Common (desirable) Rare (undesirable) Alternative sites or technologyto eliminate habitat loss Actions during design, construction and operation to minimise or eliminate habitat loss Used as a last resort to offset habitat loss Avoidance Mitigation Compensation
  • 20. Reporting • Purpose- to improve the project design prior to its submission • Focused upon the key issues that the decision maker should appreciate • Different name of EIA reports  Environmental Impact Statement (EIS)  Environmental Statement (ES)  Environmental Assessment Report (EA Report)
  • 21. Contents of the Report  a description of the project; • an outline of the main alternatives studied by the developer, and an indication of the main reasons for this choice, • a description of the aspects of the environment likely to be significantly affected by the proposed project; • a description of the likely significant environmental effects of the proposed project; • measures to prevent, reduce and possibly offset adverse environmental effects; • a non-technical summary; • an indication of any difficulties (technical deficiencies or lack of know-how) encountered while compiling the required information.
  • 22. Environmental Management Plan (EMP): • Environmental issues are incorporated into the implementation phase of the project cycle • Consists of:- • Mitigation measures to minimise adverse impacts • Measures to enhance environmental benefits • Identified risks and uncertainties • Institutional support required for effective monitoring • Monitoring and auditing programme details • Environmental legislation and standards which apply • Resources, funds, contractual and management arrangements
  • 23. Screening Checklists: Environmental Features: • Areas containing rare or endangered species • National parks, nature reserves, Etc. • Habitats providing important resources for vulnerable groups • Moist or dry tropical and sub-tropical forest Development Features • Important policy changes likely to affect the environment • Major changes in land tenure or use • Substantial changes in water use • Large infrastructure projects
  • 24. Screening Checklists: Potential adverse and beneficial effects: • Livelihoods • Culture • Land management • Water quality and quantity • Local air quality • Global impacts • Conservation
  • 25. Screening Checklists: Impact characterisation: • Is the impact beneficial, benign or harmful? • What is the scale and intensity of impact? • Are effects irreversible? • Are the effects due to construction and/or operations? • Are the effects likely to be politically or socially controversial? • Will there be different effects on different members of society? • What are the timescales of impact? • Checklists for Policy Approvers and Decision-makers
  • 26. Screening Checklists: Project setting: • Have underlying causes of environmental damage been considered? • Would these underlying causes be better addressed by other means? Impact identification • Is there any effect on environmentally sensitive or important areas? • Have the environmental and social risks been evaluated? • Have indirect effects been addressed? Mitigation measures: • What mitigation measures are proposed? • What measures will be taken to enhance environmental benefits? • What consultation was there with concerned stakeholders?
  • 27. Screening Checklists: Procedures: • Have appropriate guidelines been followed? • Have the beneficial and adverse environmental effects been integrated into the economic analysis? • Have the appropriate authorities been consulted? Implementation: • Do local institutions need strengthening in order to effect the environmental measures? • Who will monitor the environmental impact? • Have environmental measures been costed, and funds allocated?
  • 28. Environmental Impact of Rural Transport Development: • Encroachment into precious ecological resources, including forests and swamps. Encroachment into historical areas and cultural monuments. • Impairment of fisheries, aquatic ecology and other beneficial water uses, due to changes in surface hydrology. • Erosion and silt runoff from exposed areas, which may also cause impairment of downstream water quality and damage to land values. • Dust nuisances caused by both the road usage and during construction.
  • 29. Case study of an EIA in Finland, development of Highway 1
  • 30. Introduction • The national Highway 1 is part of the European road E18, which is the most important east-west road corridor in Finland. • The section of Highway 1 between Salo and Lohja (63 km) is narrow, winding and unsafe • According to the Finnish Road Administration, the road is running short of capacity. Already in the 1960s, the Road Administration began planning to develop this highway to a motorway standard
  • 32. Identification and scoping • The new road would pass through important natural areas and would cause changes to both the natural landscape and cultural landscape areas • The scoping was focused on identifying the most sensitive and important areas and on analysing the changes that would result because of the building of the road • The most important goal was to determine the impacts of a new motorway and the impacts of just upgrading the existing roads • According to the Finnish legislation on EIA, the EIA procedure is also subject to public participation.
  • 33. Baseline data • The earlier investigations and traffic forecasts done during the feasibility study were updated and some new supplementary surveys were made • Potential impacts from noise and emissions were assessed closely and there were inquiries and interviews of local people to assess social impacts • Different scenarios were used to look at impacts on community structure and economics
  • 34. Impact study and assessment • The EIA report covered the environmental aspects that were determined to be the most significant during the scoping phase • A new motorway has significant advantages and disadvantages. • In general, the upgrading of existing roads means that the already existing problems will increase and the people living next to the roads will suffer even more. • In economic terms, the new motorway was seen to be the better solution
  • 35. Disadvantages of new motorway • Loss of biodiversity • The new motorway will also cause fragmentation in some lake areas, as well as in one important recreation area • Some areas that are now quiet areas will be affected by the traffic noise from the new motorway When completed, the assessment report was subject to public comments
  • 36. After the EIA • The EIA was completed in 1996. The Finnish Road Administration proceeded to work on the final design of the project • Some local people found evidence of flying squirrels, close to the planned motorway. • The Road Administration ordered a report on flying squirrels for the entire road section. According to the report, 47 occurrences of flying squirrels close to the planned motorway were recorded, of which 29 were in the immediate vicinity of the road. • This resulted in a long legal process that delayed even further the construction of the new motorway
  • 37. • It was also found that a shooting range is located in an area of a proposed interchange • A high concentration of lead was detected in the soil • According to the amended EIA decree, the disposal of heavily leaded soil is subject to a mandatory EIA • This meant a new EIA procedure for the cleaning up and disposal of the leaded soil, which resulted in even more delays.
  • 38. Benefits of the EIA • EIA ensured that environmental issues were taken into account in the planning procedures and the decision-making process • In this case the EIA helped to identify environmentally sensitive areas and significant issues so that they could be taken into account and the adverse impacts could be reduced to an acceptable level
  • 39. Some positive outcomes of the EIA are :- • an important recreation area was saved by building a tunnel • most habitats of the flying squirrel were saved by small changes in design • groundwater areas were protected • long sections of the road run through deep rock cuttings and the planned primary measure for noise control