Sustainable Urban
Development
Piter Biswas
piterbiswas11@gmail.com
A PROCESS for decision-making, not a formula for preparing a document.
What is the purpose of EIA?
Here are a few answers—for example:
1. “To encourage productive and enjoyable harmony between man and his
environment; to promote efforts which will prevent or eliminate damage
to the environment and biosphere and stimulate the health and welfare
of man; to enrich the understanding of the ecological systems and
natural resources important to the Nation.”
2. “To implement a strategy of sustainable development, prevent adverse
impact on the environment after the implementation of plans and
construction projects, and promote coordinated development of the
economy, society, and environment.”
3. “To allow government officials, business leaders, and all concerned
citizens to understand the likely environmental consequences of
proposed actions, and to cooperate in making wise decisions that
restore and maintain the quality of our shared environment for future
generations.”
4. “To LOOK before you LEAP!”
The effects of actions that are not accounted for in the
normal market transactions need to be considered
explicitly in the decision-making processes on projects.
These effects are to be identified, assessed, and
evaluated against the economic advantages arising out
of the given action.
In this context, the EIA studies are considered to
be the first step in this process because they
give an opportunity to man to consider the
effects of his actions on the environment.
Introduction
The Goal of EIA is to harmonise developmental
activities with the environmental concerns.
The EIA process allows for the communication of
potential environmental problems to:
(a) the project proponent
(b) the regulatory agencies
(c) all stakeholders and interest groups
To foresee the potential environmental problems that would
arise out of a proposed development and address them in the
planning and design stage of the Project.
Objectives of EIA
1- What will happen as a result of the project?
2- What will be the extent of the changes?
3- Do the changes matter?
4- What can be done about them?
5- How can decision makers be informed of what
needs to be done?
The EIA becomes a cyclic process of asking and
further asking the first four questions until
decision makers can be offered workable
solutions.
Evolution & History of EIA
Development of EIA
Pre-1970  Limited consideration given to environmental consequences
Early/ Mid 1970’s  EIA introduced by NEPA in 1970 in US
 Standard methodologies for impact analysis developed
 During 1973-1974 Canada, Australia and New Zealand too adopted
EIA
 Australia legislated whereas Canada and New Zealand followed
administrative procedures
Late 1970 & Early 1980’s  Other Industrial and Developing countries introduced formal EIA
requirements
 France in 1976, Philippines in 1977, Netherlands in 1978 introduced
EIA
 Use of EA by developing countries( Brazil, China & Indonesia)
 Coordination of EA with land use planning process
Mid 1980’s to end of
decade
 European council directive on EIA establishes procedural requirements
must for all its member states
 Spread of EIA in Asia
 World Bank and other leading aid agencies establishes EIA
requirements
1990’s  Increase use of GIS and other information technologies
 India adopted EIA formally
 Formulation EA legislation by many developing countries
1. Human health and safety
2. Flora, fauna, ecosystems and
biodiversity
3. Soil, water, air, climate and
landscape
4. Use of land, natural resources
and raw materials
5. Protected areas and sites of
special significance
6. Heritage, recreation and amenity
assets
7. Livelihood, lifestyle and well
being of affected communities
Environment refers to the surroundings in which a
project is planned, implemented and operates
The Term environment includes
Environmental
Attributes
Land & Soil
Archeological
Assets
Religious &
Cultural
Properties
Forests or other
Eco-sensitive
Areas
Water
Bodies
Hydrology
& Drainage
Air Quality
1. EIA must be undertaken EARLY in the development of proposed projects, plans,
and programs, and must be completed BEFORE a decision to proceed is made.
2. EIA must be an OBJECTIVE, IMPARTIAL analytical process, not a way of
promoting or “selling” a proposal to decision-makers—it must use accepted
scientific principles and methods.
3. EIA must analyze all REASONABLY FORESEEABLE environmental impacts or
effects of a proposed action— effects may be short-term, long-term, direct, or
indirect.
4. The process of EIA must be OPEN – to government officials at all levels, to
potential stakeholders (those with direct interests in the proposed action), and
to the PUBLIC.
5. There must be an early, public SCOPING stage in EIA to consider
ALTERNATIVES and to help focus subsequent analysis on the MORE
SIGNIFICANT potential impacts – rather than studying all possible
environmental effects—the GOAL is to reach a decision.
6. Government officials responsible for implementing EIA must ENCOURAGE
(not just tolerate) PUBLIC PARTICIPATION in the process from the scoping
stage forward.
7. In all EIA processes, effective MITIGATION MEASURES must be identified and
included—to avoid, minimize, or reduce the adverse effects of all potentially
significant impacts.
8. EIA reports must include an ENVIRONMENTAL MANAGEMENT SYSTEM (EMS)
or Action Plan to MONITOR the implementation phase of the project, plan, or
program and provide for CORRECTIVE actions—such action plans must have
assured FUNDING and be legally enforceable.
1. Start with a COOPERATIVE attitude: your goal is to HELP the persons
responsible to use the EIA process to benefit BOTH environment and
development.
2. LEARN as much as possible about the proposal before forming your opinions;
IDENTIFY the responsible persons and agencies; ASK them for all available
information so that you are well-informed.
3. IDENTIFY yourself and your organization; tell officials that you want to
participate in the EIA process as soon as it begins—also tell them WHY you
want to participate and HOW you can contribute to making the process
USEFUL for them.
4. Be polite, but also be persistent—the new EIA law gives you both the RIGHT
and the RESPONSIBILITY to be a participant.
5. Do not claim to be an expert on complex issues if you are not—try to
CONSULT OTHERS who have special knowledge and skills.
6. Whenever you raise an environmental PROBLEM, offer a possible
SOLUTION —an alternative strategy, or location, or design, etc.
7. Provide officials with specific COMMENTS and RECOMMENDATIONS from
your NGO in writing, as EARLY in the decision process as possible.
8. STAY INVOLVED in the process, even if your position and your
recommendations are not initially accepted. Continue to make your
concerns known to all in a RESPECTFUL but PERSUASIVE manner.
Environmental clearance from the Central Government is required for 32
categories of developmental projects broadly categorized under the
following industrial sectors
EIA Scenario in India
1. Mining
2. Thermal power plants
3. River valley
4. Infrastructure (road, highway, ports, harbours and airports)
5. Industries including very small electroplating or foundry units
Certain activities permissible under the Coastal Regulation Zone Act, 1991 also
require similar clearance.
Donor agencies operating in India like the World Bank and the ADB have a different
set of requirements for giving environmental clearance to projects that are funded
by them.
Physical components:
 Land
 Air
 Water
 Energy
Bio-Cultural components:
Nature
Culture
People
Access
List of projects requiring environmental clearance
1. Nuclear power and related projects such as heavy water plants, nuclear fuel complex, rare
earths.
2. River valley projects including hydro power, major irrigation and their combination
including flood control (even if investment is less than 100 cr but command area is
more than 10,000 ha).
3. Ports, harbours and airports (except minor ports and harbours).
4. Petroleum refineries including crude and product pipelines.
5. Chemical fertilizers (nitrogenous and phosphatic other than single super phosphate).
6. Pesticides (technical) and intermediates.
7. Petrochemical complexes (both Olefinic and Aromatic) and petro-chemical intermediates
such as DMT, Caprolactam, LAB, etc., and production of basic plastics such as LLDPE,
HDPE, PP, PVC.
8. Bulk drugs and pharmaceuticals and intermediates.
9. Exploration for oil and gas and their production, transportation and storage.
10. Synthetic rubber.
11. Asbestos and asbestos products.
12. Hydrocyanic acid and its derivatives.
13. (a) Primary metallurgical industries (such as production of Iron and Steel, Aluminum,
Copper, Zinc, Lead and Ferro Alloys), (b) Electric arc furnaces (Mini steel plants).
14. Chloral alkali industry.
15. Integrated paint complex including manufacture of resins and basic raw materials required
in the manufacture of paints.
16. Viscose staple fibred and filament yarn.
17. Storage batteries integrated with manufacture of oxides of Lead and Lead Antimony alloys.
18. All tourism projects between 200 m and 500 m of high water line and at locations with an
elevation of more than 1000 m with investment of more than Rs. 5 cr.
19. Thermal power plants.
20. Mining projects (major minerals) with leases more than 5 ha.
21. Highway projects (except projects relating to improvement work including widening and
strengthening of roads with marginal land acquisition along the existing alignments
provided it does not pass through ecologically sensitive areas such as national parks,
sanctuaries, tiger reserves and reserve forests).
23. Distilleries.
24. Raw skins and hides
25. Pulp, paper and newsprint.
26. Dyes and intermediates.
27. Cement.
28. Foundries (individual).
29. Electroplating.
30. Meta amino phenol (added in 2000).
31. New townships, industrial townships, settlement colonies, commercial complexes, hotel
complexes, hospitals, office complexes for 1000 persons and above or discharging sewage
of 50,000 l/day and above or with an investment of Rs. 50 cr and above (added in
2004).
32. New industrial estates having an area of 50 ha and above and the industrial estates
irrespective of area if their pollution potential is high (added in 2004).2. Tarred roads in the
Himalayas and or forest areas.
Continued..
1. Screening
2. Scoping and consideration of alternatives
3. Baseline data collection
4. Impact prediction
5. Assessment of alternatives, delineation of mitigation measures
and environmental impact statement
6. Public hearing
7. Environment Management Plan
8. Decision making
9. Monitoring the clearance conditions
EIA Process in India
Schedule III of EIA Notification, 1994
Composition of the expert committees for EIA
1. The committee will consist of experts in the following fields:
i. Eco-system management
ii. Air/water pollution control
iii. Water resource management
iv. Flora/fauna conservation and management
v. Land use planning
vi. Social sciences/rehabilitation
vii. Project appraisal
viii. Ecology
ix. Environmental health
x. Subject area specialist
xi. Representatives of NGOs/persons concerned with environmental issues
2. The chairman will be an outstanding and experienced ecologist or environmentalist
or technical professional with wide managerial experience in relevant development sector.
3. The representative of IA will act as a member secretary.
4. Chairman and members will serve in their individual capacities except those
specifically nominated as representative.
5. The membership of the committee shall not exceed.
EIA Process
References
Suggested Reading
Centre for Science and Environment, 2006, Introduction to Environment Impact Assessment, Industry &
Environment Unit report, New Delhi, India
Jay, S, Jones, C, Slinn, P & Wood, C, 2007, ‘Environmental impact assessment :retrospect and prospect’,
Environmental Impact Assessment Review, vol 27, pp 287-300
Murthy, A & Patra, HS, 2005, Environment impact assessment process in India and the drawbacks,
Environment conservation team report, Bhubaneshwar, India
Sinha,S,1998, ‘Environmental impact assessment: an effective management tool’, TERI Information Monitor
on Environmental Science, vol 3, pp 1-7
George, C,1999, ‘Testing for sustainable development through environmental assessment’, Environmental
Impact Assessment Review, vol 19, pp 175-200
Lawrence,DP, 2007, ‘Impact significance determination—Back to basics, Environmental Impact
Assessment Review, vol 27, pp 755-769
McCaig, K,2005, ‘Canadian insights: The challenges of an integrated environmental assessment
framework’, Environmental Impact Assessment Review, vol 25, pp 737-746
Paliwal,R,2006, ‘EIA practice in India and its evaluation using precaution and efficiency?’, Environmental
Impact Assessment Review, vol 26, pp 359-376
Snell, T & Cowell, R,2006, ‘Scoping in environmental impact assessment: Balancing SWOT analysis’,
Environmental Impact Assessment Review, vol 26, pp 492-510
Thank You…

More Related Content

What's hot

Environmental impact assessment
Environmental impact assessmentEnvironmental impact assessment
Environmental impact assessmentJini Rajendran
 
ENVIRONMENT IMPACT ASSESSMENT
ENVIRONMENT IMPACT ASSESSMENTENVIRONMENT IMPACT ASSESSMENT
ENVIRONMENT IMPACT ASSESSMENTgoswamikusum
 
Environmental impact assessment (EIA)
Environmental impact assessment (EIA)Environmental impact assessment (EIA)
Environmental impact assessment (EIA)KASHYAP V
 
Environmental impact assessment
Environmental impact assessmentEnvironmental impact assessment
Environmental impact assessmentSamanth kumar
 
Environmental Management Plan
Environmental Management PlanEnvironmental Management Plan
Environmental Management PlanShehab Sajeeb
 
Environmental impact assessment
Environmental impact assessmentEnvironmental impact assessment
Environmental impact assessmentKashmeera N.A.
 
Environmental impact assessment (eia)
Environmental impact assessment (eia)Environmental impact assessment (eia)
Environmental impact assessment (eia)SANDEEP PATRE
 
Impact prediction, evaluation and mitigation in eia
Impact prediction, evaluation and mitigation in eiaImpact prediction, evaluation and mitigation in eia
Impact prediction, evaluation and mitigation in eiaMizanur R. Shohel
 
EIA for Major development projects - Mining projects
EIA for Major development projects - Mining projectsEIA for Major development projects - Mining projects
EIA for Major development projects - Mining projectsJenson Samraj
 

What's hot (20)

Environmental impact assessment (EIA)
Environmental impact assessment (EIA)Environmental impact assessment (EIA)
Environmental impact assessment (EIA)
 
EIA-process
 EIA-process EIA-process
EIA-process
 
EIA Process
EIA ProcessEIA Process
EIA Process
 
EIA
EIAEIA
EIA
 
Environmental impact assessment
Environmental impact assessmentEnvironmental impact assessment
Environmental impact assessment
 
ENVIRONMENT IMPACT ASSESSMENT
ENVIRONMENT IMPACT ASSESSMENTENVIRONMENT IMPACT ASSESSMENT
ENVIRONMENT IMPACT ASSESSMENT
 
EIA Methodologies
EIA MethodologiesEIA Methodologies
EIA Methodologies
 
Environmental impact assessment (EIA)
Environmental impact assessment (EIA)Environmental impact assessment (EIA)
Environmental impact assessment (EIA)
 
Eia methodogies
Eia methodogiesEia methodogies
Eia methodogies
 
Environmental impact assessment
Environmental impact assessmentEnvironmental impact assessment
Environmental impact assessment
 
Environmental impact assessment
Environmental impact assessmentEnvironmental impact assessment
Environmental impact assessment
 
Environmental Management Plan
Environmental Management PlanEnvironmental Management Plan
Environmental Management Plan
 
Presentation 4: Mitigation Strategies
Presentation 4: Mitigation StrategiesPresentation 4: Mitigation Strategies
Presentation 4: Mitigation Strategies
 
Tools of environmental management
Tools of environmental managementTools of environmental management
Tools of environmental management
 
EIA TECHNIQUES.pptx
EIA TECHNIQUES.pptxEIA TECHNIQUES.pptx
EIA TECHNIQUES.pptx
 
Environmental impact assessment
Environmental impact assessmentEnvironmental impact assessment
Environmental impact assessment
 
Environmental impact assessment (eia)
Environmental impact assessment (eia)Environmental impact assessment (eia)
Environmental impact assessment (eia)
 
EIA
EIAEIA
EIA
 
Impact prediction, evaluation and mitigation in eia
Impact prediction, evaluation and mitigation in eiaImpact prediction, evaluation and mitigation in eia
Impact prediction, evaluation and mitigation in eia
 
EIA for Major development projects - Mining projects
EIA for Major development projects - Mining projectsEIA for Major development projects - Mining projects
EIA for Major development projects - Mining projects
 

Viewers also liked

Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact AssessmentNigel Gardner
 
Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact AssessmentPrithvi Ghag
 
EIA for development projects
EIA for development projectsEIA for development projects
EIA for development projectsAnchal Garg
 
EIA Tool for Evaluating Pre & Post Impacts of Development Projects
EIA Tool for Evaluating Pre & Post Impacts of Development ProjectsEIA Tool for Evaluating Pre & Post Impacts of Development Projects
EIA Tool for Evaluating Pre & Post Impacts of Development ProjectsOsada Vishvajith
 
Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact AssessmentBahadur Prasad
 
EIA thermal power plant
EIA thermal power plantEIA thermal power plant
EIA thermal power plantvandana bharti
 
EIA practice: a global review
EIA practice: a global reviewEIA practice: a global review
EIA practice: a global reviewMichael Asigbaase
 
Intergrated Models U N C C
Intergrated  Models  U N C CIntergrated  Models  U N C C
Intergrated Models U N C Cdelmelle
 
Preview Of “Earths Spheres”
Preview Of “Earths Spheres”Preview Of “Earths Spheres”
Preview Of “Earths Spheres”sbrumber
 
Oil and Gas Experts Offer Industry Insight at 2015 EIA Conference
Oil and Gas Experts Offer Industry Insight at 2015 EIA ConferenceOil and Gas Experts Offer Industry Insight at 2015 EIA Conference
Oil and Gas Experts Offer Industry Insight at 2015 EIA ConferenceSentry Energy Production
 
Earth as a system - Environmental Science
Earth as a system - Environmental ScienceEarth as a system - Environmental Science
Earth as a system - Environmental ScienceMaraia Angelic Lopez
 
2 spheres of the_earth
2 spheres of the_earth2 spheres of the_earth
2 spheres of the_earthMoudud Hasan
 
Percy Sledge Soul Icon: A Life in Pictures
Percy Sledge Soul Icon:  A Life in PicturesPercy Sledge Soul Icon:  A Life in Pictures
Percy Sledge Soul Icon: A Life in Picturesmaditabalnco
 
Introduction to environment
Introduction to environmentIntroduction to environment
Introduction to environmentDhwani Shah
 
Environmental clearance for construction projects optima
Environmental clearance for construction projects optimaEnvironmental clearance for construction projects optima
Environmental clearance for construction projects optimaSiddharth Choksi
 

Viewers also liked (20)

Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact Assessment
 
Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact Assessment
 
EIA for development projects
EIA for development projectsEIA for development projects
EIA for development projects
 
EIA Methods
EIA MethodsEIA Methods
EIA Methods
 
EIA Tool for Evaluating Pre & Post Impacts of Development Projects
EIA Tool for Evaluating Pre & Post Impacts of Development ProjectsEIA Tool for Evaluating Pre & Post Impacts of Development Projects
EIA Tool for Evaluating Pre & Post Impacts of Development Projects
 
Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact Assessment
 
Eia stages
Eia stagesEia stages
Eia stages
 
EIA thermal power plant
EIA thermal power plantEIA thermal power plant
EIA thermal power plant
 
EIA practice: a global review
EIA practice: a global reviewEIA practice: a global review
EIA practice: a global review
 
Intergrated Models U N C C
Intergrated  Models  U N C CIntergrated  Models  U N C C
Intergrated Models U N C C
 
Preview Of “Earths Spheres”
Preview Of “Earths Spheres”Preview Of “Earths Spheres”
Preview Of “Earths Spheres”
 
Earth Science
Earth ScienceEarth Science
Earth Science
 
Oil and Gas Experts Offer Industry Insight at 2015 EIA Conference
Oil and Gas Experts Offer Industry Insight at 2015 EIA ConferenceOil and Gas Experts Offer Industry Insight at 2015 EIA Conference
Oil and Gas Experts Offer Industry Insight at 2015 EIA Conference
 
Environmental Science
Environmental ScienceEnvironmental Science
Environmental Science
 
Earth as a system - Environmental Science
Earth as a system - Environmental ScienceEarth as a system - Environmental Science
Earth as a system - Environmental Science
 
2 spheres of the_earth
2 spheres of the_earth2 spheres of the_earth
2 spheres of the_earth
 
Percy Sledge Soul Icon: A Life in Pictures
Percy Sledge Soul Icon:  A Life in PicturesPercy Sledge Soul Icon:  A Life in Pictures
Percy Sledge Soul Icon: A Life in Pictures
 
Introduction to environment
Introduction to environmentIntroduction to environment
Introduction to environment
 
Environmental clearance for construction projects optima
Environmental clearance for construction projects optimaEnvironmental clearance for construction projects optima
Environmental clearance for construction projects optima
 
The earth system
The earth systemThe earth system
The earth system
 

Similar to EIA Introduction

Environmental impact assessment
Environmental impact assessment Environmental impact assessment
Environmental impact assessment BiplobDas38
 
Environment management Tools : EIA & Environmetal Audit
Environment management Tools : EIA & Environmetal AuditEnvironment management Tools : EIA & Environmetal Audit
Environment management Tools : EIA & Environmetal AuditKANTHARAJAN GANESAN
 
Environmental Impact Assessment (EIA)
Environmental Impact Assessment (EIA)Environmental Impact Assessment (EIA)
Environmental Impact Assessment (EIA)Palash Mehar
 
HOW PROJECT IMPACT ASSESSMENT OF THE ENVIRONMENT OF AN ORGANIZATION AND STAK...
 HOW PROJECT IMPACT ASSESSMENT OF THE ENVIRONMENT OF AN ORGANIZATION AND STAK... HOW PROJECT IMPACT ASSESSMENT OF THE ENVIRONMENT OF AN ORGANIZATION AND STAK...
HOW PROJECT IMPACT ASSESSMENT OF THE ENVIRONMENT OF AN ORGANIZATION AND STAK...Abraham Ncunge
 
Environment Impact Assessment: Significance, Process And Problems
Environment Impact Assessment: Significance, Process And ProblemsEnvironment Impact Assessment: Significance, Process And Problems
Environment Impact Assessment: Significance, Process And Problemsinventionjournals
 
EIA FE COURSE Lecture for Aspiring Field Engineers in the Philippines
EIA FE COURSE Lecture for Aspiring Field Engineers in the PhilippinesEIA FE COURSE Lecture for Aspiring Field Engineers in the Philippines
EIA FE COURSE Lecture for Aspiring Field Engineers in the PhilippinesMakrisMontejoMalinam
 
BasConcept of Eic nvironmental Impact Assessment-pages-2-13,18-65.pdf
BasConcept of  Eic nvironmental Impact Assessment-pages-2-13,18-65.pdfBasConcept of  Eic nvironmental Impact Assessment-pages-2-13,18-65.pdf
BasConcept of Eic nvironmental Impact Assessment-pages-2-13,18-65.pdfTausifAhmad53
 
Public participation in eia
Public participation in eiaPublic participation in eia
Public participation in eiaJoseph Asem
 
Environmental impact assessment and importance of effective application in ba...
Environmental impact assessment and importance of effective application in ba...Environmental impact assessment and importance of effective application in ba...
Environmental impact assessment and importance of effective application in ba...MdHaque78
 
Environment impact Assessment (EIA) in Uganda
Environment impact Assessment (EIA) in UgandaEnvironment impact Assessment (EIA) in Uganda
Environment impact Assessment (EIA) in Ugandakayondo alex
 
Environment impact assessment in environment impact assessment
Environment impact assessment in environment impact assessmentEnvironment impact assessment in environment impact assessment
Environment impact assessment in environment impact assessmentArunAngadi5
 
Environmental impact assessment m5
Environmental impact assessment m5Environmental impact assessment m5
Environmental impact assessment m5Bibhabasu Mohanty
 
Environmental Impact Assessment(EIA)
Environmental Impact Assessment(EIA)Environmental Impact Assessment(EIA)
Environmental Impact Assessment(EIA)Deepika Verma
 
PPT presentation ESIAF1.pptx
PPT presentation ESIAF1.pptxPPT presentation ESIAF1.pptx
PPT presentation ESIAF1.pptxyonas513377
 
Concept of Environmental impact assessment - Stages, Parameters, and Benefits...
Concept of Environmental impact assessment - Stages, Parameters, and Benefits...Concept of Environmental impact assessment - Stages, Parameters, and Benefits...
Concept of Environmental impact assessment - Stages, Parameters, and Benefits...Jagriti Agarwal
 
EIA-GeES 3112 Chapter 1.ppt Basic Concept of Environmental Impact Assessment...
EIA-GeES 3112 Chapter 1.ppt Basic Concept of  Environmental Impact Assessment...EIA-GeES 3112 Chapter 1.ppt Basic Concept of  Environmental Impact Assessment...
EIA-GeES 3112 Chapter 1.ppt Basic Concept of Environmental Impact Assessment...AbdirahmanYusufAli1
 
Environmental Impact Assessment, Initial Environmental Examination
Environmental Impact Assessment, Initial Environmental ExaminationEnvironmental Impact Assessment, Initial Environmental Examination
Environmental Impact Assessment, Initial Environmental ExaminationNabin Lamichhane
 
Environmental Impact Assessment for the marine environment
Environmental Impact Assessment for the marine environmentEnvironmental Impact Assessment for the marine environment
Environmental Impact Assessment for the marine environmentDr. Felicia Chinwe Mogo
 
manunath1-copy-170405123133 (1).pdf
manunath1-copy-170405123133 (1).pdfmanunath1-copy-170405123133 (1).pdf
manunath1-copy-170405123133 (1).pdfChandanLawrence
 

Similar to EIA Introduction (20)

Environmental impact assessment
Environmental impact assessment Environmental impact assessment
Environmental impact assessment
 
Environment management Tools : EIA & Environmetal Audit
Environment management Tools : EIA & Environmetal AuditEnvironment management Tools : EIA & Environmetal Audit
Environment management Tools : EIA & Environmetal Audit
 
Environmental Impact Assessment (EIA)
Environmental Impact Assessment (EIA)Environmental Impact Assessment (EIA)
Environmental Impact Assessment (EIA)
 
HOW PROJECT IMPACT ASSESSMENT OF THE ENVIRONMENT OF AN ORGANIZATION AND STAK...
 HOW PROJECT IMPACT ASSESSMENT OF THE ENVIRONMENT OF AN ORGANIZATION AND STAK... HOW PROJECT IMPACT ASSESSMENT OF THE ENVIRONMENT OF AN ORGANIZATION AND STAK...
HOW PROJECT IMPACT ASSESSMENT OF THE ENVIRONMENT OF AN ORGANIZATION AND STAK...
 
Environmental Impact Assessment (EIA).pdf
Environmental Impact Assessment (EIA).pdfEnvironmental Impact Assessment (EIA).pdf
Environmental Impact Assessment (EIA).pdf
 
Environment Impact Assessment: Significance, Process And Problems
Environment Impact Assessment: Significance, Process And ProblemsEnvironment Impact Assessment: Significance, Process And Problems
Environment Impact Assessment: Significance, Process And Problems
 
EIA FE COURSE Lecture for Aspiring Field Engineers in the Philippines
EIA FE COURSE Lecture for Aspiring Field Engineers in the PhilippinesEIA FE COURSE Lecture for Aspiring Field Engineers in the Philippines
EIA FE COURSE Lecture for Aspiring Field Engineers in the Philippines
 
BasConcept of Eic nvironmental Impact Assessment-pages-2-13,18-65.pdf
BasConcept of  Eic nvironmental Impact Assessment-pages-2-13,18-65.pdfBasConcept of  Eic nvironmental Impact Assessment-pages-2-13,18-65.pdf
BasConcept of Eic nvironmental Impact Assessment-pages-2-13,18-65.pdf
 
Public participation in eia
Public participation in eiaPublic participation in eia
Public participation in eia
 
Environmental impact assessment and importance of effective application in ba...
Environmental impact assessment and importance of effective application in ba...Environmental impact assessment and importance of effective application in ba...
Environmental impact assessment and importance of effective application in ba...
 
Environment impact Assessment (EIA) in Uganda
Environment impact Assessment (EIA) in UgandaEnvironment impact Assessment (EIA) in Uganda
Environment impact Assessment (EIA) in Uganda
 
Environment impact assessment in environment impact assessment
Environment impact assessment in environment impact assessmentEnvironment impact assessment in environment impact assessment
Environment impact assessment in environment impact assessment
 
Environmental impact assessment m5
Environmental impact assessment m5Environmental impact assessment m5
Environmental impact assessment m5
 
Environmental Impact Assessment(EIA)
Environmental Impact Assessment(EIA)Environmental Impact Assessment(EIA)
Environmental Impact Assessment(EIA)
 
PPT presentation ESIAF1.pptx
PPT presentation ESIAF1.pptxPPT presentation ESIAF1.pptx
PPT presentation ESIAF1.pptx
 
Concept of Environmental impact assessment - Stages, Parameters, and Benefits...
Concept of Environmental impact assessment - Stages, Parameters, and Benefits...Concept of Environmental impact assessment - Stages, Parameters, and Benefits...
Concept of Environmental impact assessment - Stages, Parameters, and Benefits...
 
EIA-GeES 3112 Chapter 1.ppt Basic Concept of Environmental Impact Assessment...
EIA-GeES 3112 Chapter 1.ppt Basic Concept of  Environmental Impact Assessment...EIA-GeES 3112 Chapter 1.ppt Basic Concept of  Environmental Impact Assessment...
EIA-GeES 3112 Chapter 1.ppt Basic Concept of Environmental Impact Assessment...
 
Environmental Impact Assessment, Initial Environmental Examination
Environmental Impact Assessment, Initial Environmental ExaminationEnvironmental Impact Assessment, Initial Environmental Examination
Environmental Impact Assessment, Initial Environmental Examination
 
Environmental Impact Assessment for the marine environment
Environmental Impact Assessment for the marine environmentEnvironmental Impact Assessment for the marine environment
Environmental Impact Assessment for the marine environment
 
manunath1-copy-170405123133 (1).pdf
manunath1-copy-170405123133 (1).pdfmanunath1-copy-170405123133 (1).pdf
manunath1-copy-170405123133 (1).pdf
 

More from Piter Biswas

Mumbai Urban Transport Project Study
Mumbai Urban Transport Project StudyMumbai Urban Transport Project Study
Mumbai Urban Transport Project StudyPiter Biswas
 
Slum and urban infrastructure
Slum and urban infrastructureSlum and urban infrastructure
Slum and urban infrastructurePiter Biswas
 
Disaster management
Disaster managementDisaster management
Disaster managementPiter Biswas
 
Urban transportation planning
Urban transportation planningUrban transportation planning
Urban transportation planningPiter Biswas
 
Transportation planning
Transportation planningTransportation planning
Transportation planningPiter Biswas
 
Sustainable development
Sustainable developmentSustainable development
Sustainable developmentPiter Biswas
 
Sight distance and road allignment
Sight distance and road allignmentSight distance and road allignment
Sight distance and road allignmentPiter Biswas
 
Role of metro for traffic in kolkata
Role of metro for traffic in kolkataRole of metro for traffic in kolkata
Role of metro for traffic in kolkataPiter Biswas
 
Locational aspects of property in real estate
Locational aspects of property in real estateLocational aspects of property in real estate
Locational aspects of property in real estatePiter Biswas
 
Evolution of technology
Evolution of technologyEvolution of technology
Evolution of technologyPiter Biswas
 
Cuttack-Bhubaneswar-Puri
Cuttack-Bhubaneswar-PuriCuttack-Bhubaneswar-Puri
Cuttack-Bhubaneswar-PuriPiter Biswas
 
Collaborative Planning & Poltical Economy
Collaborative Planning & Poltical EconomyCollaborative Planning & Poltical Economy
Collaborative Planning & Poltical EconomyPiter Biswas
 
Collaborative Planning Model
Collaborative Planning ModelCollaborative Planning Model
Collaborative Planning ModelPiter Biswas
 

More from Piter Biswas (20)

Mumbai Urban Transport Project Study
Mumbai Urban Transport Project StudyMumbai Urban Transport Project Study
Mumbai Urban Transport Project Study
 
Slum and urban infrastructure
Slum and urban infrastructureSlum and urban infrastructure
Slum and urban infrastructure
 
Disaster management
Disaster managementDisaster management
Disaster management
 
Bogota city
Bogota cityBogota city
Bogota city
 
Urban transportation planning
Urban transportation planningUrban transportation planning
Urban transportation planning
 
Transportation planning
Transportation planningTransportation planning
Transportation planning
 
Sustainable development
Sustainable developmentSustainable development
Sustainable development
 
Sight distance and road allignment
Sight distance and road allignmentSight distance and road allignment
Sight distance and road allignment
 
Role of metro for traffic in kolkata
Role of metro for traffic in kolkataRole of metro for traffic in kolkata
Role of metro for traffic in kolkata
 
Regional planing
Regional planingRegional planing
Regional planing
 
Real estate
Real estateReal estate
Real estate
 
Planning theory 1
Planning theory 1Planning theory 1
Planning theory 1
 
Locational aspects of property in real estate
Locational aspects of property in real estateLocational aspects of property in real estate
Locational aspects of property in real estate
 
Hydrology
HydrologyHydrology
Hydrology
 
Global city index
Global city indexGlobal city index
Global city index
 
Evolution of technology
Evolution of technologyEvolution of technology
Evolution of technology
 
Cuttack-Bhubaneswar-Puri
Cuttack-Bhubaneswar-PuriCuttack-Bhubaneswar-Puri
Cuttack-Bhubaneswar-Puri
 
Collaborative Planning & Poltical Economy
Collaborative Planning & Poltical EconomyCollaborative Planning & Poltical Economy
Collaborative Planning & Poltical Economy
 
Collaborative Planning Model
Collaborative Planning ModelCollaborative Planning Model
Collaborative Planning Model
 
CDP Amritsar
CDP AmritsarCDP Amritsar
CDP Amritsar
 

Recently uploaded

Hot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night Stand
Hot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night StandHot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night Stand
Hot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night Standkumarajju5765
 
VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...
VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...
VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...Suhani Kapoor
 
webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...
webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...
webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...Cluster TWEED
 
Call Girls Mumbai Gayatri 8617697112 Independent Escort Service Mumbai
Call Girls Mumbai Gayatri 8617697112 Independent Escort Service MumbaiCall Girls Mumbai Gayatri 8617697112 Independent Escort Service Mumbai
Call Girls Mumbai Gayatri 8617697112 Independent Escort Service MumbaiCall girls in Ahmedabad High profile
 
BOOK Call Girls in (Dwarka) CALL | 8377087607 Delhi Escorts Services
BOOK Call Girls in (Dwarka) CALL | 8377087607 Delhi Escorts ServicesBOOK Call Girls in (Dwarka) CALL | 8377087607 Delhi Escorts Services
BOOK Call Girls in (Dwarka) CALL | 8377087607 Delhi Escorts Servicesdollysharma2066
 
Spiders by Slidesgo - an introduction to arachnids
Spiders by Slidesgo - an introduction to arachnidsSpiders by Slidesgo - an introduction to arachnids
Spiders by Slidesgo - an introduction to arachnidsprasan26
 
(DIYA) Call Girls Sinhagad Road ( 7001035870 ) HI-Fi Pune Escorts Service
(DIYA) Call Girls Sinhagad Road ( 7001035870 ) HI-Fi Pune Escorts Service(DIYA) Call Girls Sinhagad Road ( 7001035870 ) HI-Fi Pune Escorts Service
(DIYA) Call Girls Sinhagad Road ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000Sapana Sha
 
Call Girls Service Nagpur Aditi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Aditi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Aditi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Aditi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
VIP Call Girls Mahadevpur Colony ( Hyderabad ) Phone 8250192130 | ₹5k To 25k ...
VIP Call Girls Mahadevpur Colony ( Hyderabad ) Phone 8250192130 | ₹5k To 25k ...VIP Call Girls Mahadevpur Colony ( Hyderabad ) Phone 8250192130 | ₹5k To 25k ...
VIP Call Girls Mahadevpur Colony ( Hyderabad ) Phone 8250192130 | ₹5k To 25k ...Suhani Kapoor
 
(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service
(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service
(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Call Girls South Delhi Delhi reach out to us at ☎ 9711199012
Call Girls South Delhi Delhi reach out to us at ☎ 9711199012Call Girls South Delhi Delhi reach out to us at ☎ 9711199012
Call Girls South Delhi Delhi reach out to us at ☎ 9711199012sapnasaifi408
 
(ANAYA) Call Girls Hadapsar ( 7001035870 ) HI-Fi Pune Escorts Service
(ANAYA) Call Girls Hadapsar ( 7001035870 ) HI-Fi Pune Escorts Service(ANAYA) Call Girls Hadapsar ( 7001035870 ) HI-Fi Pune Escorts Service
(ANAYA) Call Girls Hadapsar ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Low Rate Call Girls Bikaner Anika 8250192130 Independent Escort Service Bikaner
Low Rate Call Girls Bikaner Anika 8250192130 Independent Escort Service BikanerLow Rate Call Girls Bikaner Anika 8250192130 Independent Escort Service Bikaner
Low Rate Call Girls Bikaner Anika 8250192130 Independent Escort Service BikanerSuhani Kapoor
 

Recently uploaded (20)

Call Girls In Yamuna Vihar꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
Call Girls In Yamuna Vihar꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCeCall Girls In Yamuna Vihar꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
Call Girls In Yamuna Vihar꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
 
Hot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night Stand
Hot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night StandHot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night Stand
Hot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night Stand
 
VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...
VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...
VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...
 
Green Banking
Green Banking Green Banking
Green Banking
 
webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...
webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...
webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...
 
E Waste Management
E Waste ManagementE Waste Management
E Waste Management
 
Call Girls In R.K. Puram 9953056974 Escorts ServiCe In Delhi Ncr
Call Girls In R.K. Puram 9953056974 Escorts ServiCe In Delhi NcrCall Girls In R.K. Puram 9953056974 Escorts ServiCe In Delhi Ncr
Call Girls In R.K. Puram 9953056974 Escorts ServiCe In Delhi Ncr
 
Call Girls Mumbai Gayatri 8617697112 Independent Escort Service Mumbai
Call Girls Mumbai Gayatri 8617697112 Independent Escort Service MumbaiCall Girls Mumbai Gayatri 8617697112 Independent Escort Service Mumbai
Call Girls Mumbai Gayatri 8617697112 Independent Escort Service Mumbai
 
BOOK Call Girls in (Dwarka) CALL | 8377087607 Delhi Escorts Services
BOOK Call Girls in (Dwarka) CALL | 8377087607 Delhi Escorts ServicesBOOK Call Girls in (Dwarka) CALL | 8377087607 Delhi Escorts Services
BOOK Call Girls in (Dwarka) CALL | 8377087607 Delhi Escorts Services
 
Spiders by Slidesgo - an introduction to arachnids
Spiders by Slidesgo - an introduction to arachnidsSpiders by Slidesgo - an introduction to arachnids
Spiders by Slidesgo - an introduction to arachnids
 
(DIYA) Call Girls Sinhagad Road ( 7001035870 ) HI-Fi Pune Escorts Service
(DIYA) Call Girls Sinhagad Road ( 7001035870 ) HI-Fi Pune Escorts Service(DIYA) Call Girls Sinhagad Road ( 7001035870 ) HI-Fi Pune Escorts Service
(DIYA) Call Girls Sinhagad Road ( 7001035870 ) HI-Fi Pune Escorts Service
 
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000
 
Call Girls Service Nagpur Aditi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Aditi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Aditi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Aditi Call 7001035870 Meet With Nagpur Escorts
 
VIP Call Girls Mahadevpur Colony ( Hyderabad ) Phone 8250192130 | ₹5k To 25k ...
VIP Call Girls Mahadevpur Colony ( Hyderabad ) Phone 8250192130 | ₹5k To 25k ...VIP Call Girls Mahadevpur Colony ( Hyderabad ) Phone 8250192130 | ₹5k To 25k ...
VIP Call Girls Mahadevpur Colony ( Hyderabad ) Phone 8250192130 | ₹5k To 25k ...
 
(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service
(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service
(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service
 
Call Girls In Pratap Nagar꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
Call Girls In Pratap Nagar꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCeCall Girls In Pratap Nagar꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
Call Girls In Pratap Nagar꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
 
Call Girls South Delhi Delhi reach out to us at ☎ 9711199012
Call Girls South Delhi Delhi reach out to us at ☎ 9711199012Call Girls South Delhi Delhi reach out to us at ☎ 9711199012
Call Girls South Delhi Delhi reach out to us at ☎ 9711199012
 
Call Girls In { Delhi } South Extension Whatsup 9873940964 Enjoy Unlimited Pl...
Call Girls In { Delhi } South Extension Whatsup 9873940964 Enjoy Unlimited Pl...Call Girls In { Delhi } South Extension Whatsup 9873940964 Enjoy Unlimited Pl...
Call Girls In { Delhi } South Extension Whatsup 9873940964 Enjoy Unlimited Pl...
 
(ANAYA) Call Girls Hadapsar ( 7001035870 ) HI-Fi Pune Escorts Service
(ANAYA) Call Girls Hadapsar ( 7001035870 ) HI-Fi Pune Escorts Service(ANAYA) Call Girls Hadapsar ( 7001035870 ) HI-Fi Pune Escorts Service
(ANAYA) Call Girls Hadapsar ( 7001035870 ) HI-Fi Pune Escorts Service
 
Low Rate Call Girls Bikaner Anika 8250192130 Independent Escort Service Bikaner
Low Rate Call Girls Bikaner Anika 8250192130 Independent Escort Service BikanerLow Rate Call Girls Bikaner Anika 8250192130 Independent Escort Service Bikaner
Low Rate Call Girls Bikaner Anika 8250192130 Independent Escort Service Bikaner
 

EIA Introduction

  • 2. A PROCESS for decision-making, not a formula for preparing a document. What is the purpose of EIA? Here are a few answers—for example: 1. “To encourage productive and enjoyable harmony between man and his environment; to promote efforts which will prevent or eliminate damage to the environment and biosphere and stimulate the health and welfare of man; to enrich the understanding of the ecological systems and natural resources important to the Nation.” 2. “To implement a strategy of sustainable development, prevent adverse impact on the environment after the implementation of plans and construction projects, and promote coordinated development of the economy, society, and environment.” 3. “To allow government officials, business leaders, and all concerned citizens to understand the likely environmental consequences of proposed actions, and to cooperate in making wise decisions that restore and maintain the quality of our shared environment for future generations.” 4. “To LOOK before you LEAP!”
  • 3. The effects of actions that are not accounted for in the normal market transactions need to be considered explicitly in the decision-making processes on projects. These effects are to be identified, assessed, and evaluated against the economic advantages arising out of the given action. In this context, the EIA studies are considered to be the first step in this process because they give an opportunity to man to consider the effects of his actions on the environment. Introduction The Goal of EIA is to harmonise developmental activities with the environmental concerns.
  • 4. The EIA process allows for the communication of potential environmental problems to: (a) the project proponent (b) the regulatory agencies (c) all stakeholders and interest groups To foresee the potential environmental problems that would arise out of a proposed development and address them in the planning and design stage of the Project. Objectives of EIA
  • 5. 1- What will happen as a result of the project? 2- What will be the extent of the changes? 3- Do the changes matter? 4- What can be done about them? 5- How can decision makers be informed of what needs to be done? The EIA becomes a cyclic process of asking and further asking the first four questions until decision makers can be offered workable solutions.
  • 6. Evolution & History of EIA Development of EIA Pre-1970  Limited consideration given to environmental consequences Early/ Mid 1970’s  EIA introduced by NEPA in 1970 in US  Standard methodologies for impact analysis developed  During 1973-1974 Canada, Australia and New Zealand too adopted EIA  Australia legislated whereas Canada and New Zealand followed administrative procedures Late 1970 & Early 1980’s  Other Industrial and Developing countries introduced formal EIA requirements  France in 1976, Philippines in 1977, Netherlands in 1978 introduced EIA  Use of EA by developing countries( Brazil, China & Indonesia)  Coordination of EA with land use planning process Mid 1980’s to end of decade  European council directive on EIA establishes procedural requirements must for all its member states  Spread of EIA in Asia  World Bank and other leading aid agencies establishes EIA requirements 1990’s  Increase use of GIS and other information technologies  India adopted EIA formally  Formulation EA legislation by many developing countries
  • 7. 1. Human health and safety 2. Flora, fauna, ecosystems and biodiversity 3. Soil, water, air, climate and landscape 4. Use of land, natural resources and raw materials 5. Protected areas and sites of special significance 6. Heritage, recreation and amenity assets 7. Livelihood, lifestyle and well being of affected communities Environment refers to the surroundings in which a project is planned, implemented and operates The Term environment includes Environmental Attributes Land & Soil Archeological Assets Religious & Cultural Properties Forests or other Eco-sensitive Areas Water Bodies Hydrology & Drainage Air Quality
  • 8. 1. EIA must be undertaken EARLY in the development of proposed projects, plans, and programs, and must be completed BEFORE a decision to proceed is made. 2. EIA must be an OBJECTIVE, IMPARTIAL analytical process, not a way of promoting or “selling” a proposal to decision-makers—it must use accepted scientific principles and methods. 3. EIA must analyze all REASONABLY FORESEEABLE environmental impacts or effects of a proposed action— effects may be short-term, long-term, direct, or indirect. 4. The process of EIA must be OPEN – to government officials at all levels, to potential stakeholders (those with direct interests in the proposed action), and to the PUBLIC. 5. There must be an early, public SCOPING stage in EIA to consider ALTERNATIVES and to help focus subsequent analysis on the MORE SIGNIFICANT potential impacts – rather than studying all possible environmental effects—the GOAL is to reach a decision. 6. Government officials responsible for implementing EIA must ENCOURAGE (not just tolerate) PUBLIC PARTICIPATION in the process from the scoping stage forward. 7. In all EIA processes, effective MITIGATION MEASURES must be identified and included—to avoid, minimize, or reduce the adverse effects of all potentially significant impacts. 8. EIA reports must include an ENVIRONMENTAL MANAGEMENT SYSTEM (EMS) or Action Plan to MONITOR the implementation phase of the project, plan, or program and provide for CORRECTIVE actions—such action plans must have assured FUNDING and be legally enforceable.
  • 9. 1. Start with a COOPERATIVE attitude: your goal is to HELP the persons responsible to use the EIA process to benefit BOTH environment and development. 2. LEARN as much as possible about the proposal before forming your opinions; IDENTIFY the responsible persons and agencies; ASK them for all available information so that you are well-informed. 3. IDENTIFY yourself and your organization; tell officials that you want to participate in the EIA process as soon as it begins—also tell them WHY you want to participate and HOW you can contribute to making the process USEFUL for them. 4. Be polite, but also be persistent—the new EIA law gives you both the RIGHT and the RESPONSIBILITY to be a participant. 5. Do not claim to be an expert on complex issues if you are not—try to CONSULT OTHERS who have special knowledge and skills. 6. Whenever you raise an environmental PROBLEM, offer a possible SOLUTION —an alternative strategy, or location, or design, etc. 7. Provide officials with specific COMMENTS and RECOMMENDATIONS from your NGO in writing, as EARLY in the decision process as possible. 8. STAY INVOLVED in the process, even if your position and your recommendations are not initially accepted. Continue to make your concerns known to all in a RESPECTFUL but PERSUASIVE manner.
  • 10. Environmental clearance from the Central Government is required for 32 categories of developmental projects broadly categorized under the following industrial sectors EIA Scenario in India 1. Mining 2. Thermal power plants 3. River valley 4. Infrastructure (road, highway, ports, harbours and airports) 5. Industries including very small electroplating or foundry units Certain activities permissible under the Coastal Regulation Zone Act, 1991 also require similar clearance. Donor agencies operating in India like the World Bank and the ADB have a different set of requirements for giving environmental clearance to projects that are funded by them.
  • 11. Physical components:  Land  Air  Water  Energy Bio-Cultural components: Nature Culture People Access
  • 12. List of projects requiring environmental clearance 1. Nuclear power and related projects such as heavy water plants, nuclear fuel complex, rare earths. 2. River valley projects including hydro power, major irrigation and their combination including flood control (even if investment is less than 100 cr but command area is more than 10,000 ha). 3. Ports, harbours and airports (except minor ports and harbours). 4. Petroleum refineries including crude and product pipelines. 5. Chemical fertilizers (nitrogenous and phosphatic other than single super phosphate). 6. Pesticides (technical) and intermediates. 7. Petrochemical complexes (both Olefinic and Aromatic) and petro-chemical intermediates such as DMT, Caprolactam, LAB, etc., and production of basic plastics such as LLDPE, HDPE, PP, PVC. 8. Bulk drugs and pharmaceuticals and intermediates. 9. Exploration for oil and gas and their production, transportation and storage. 10. Synthetic rubber. 11. Asbestos and asbestos products. 12. Hydrocyanic acid and its derivatives. 13. (a) Primary metallurgical industries (such as production of Iron and Steel, Aluminum, Copper, Zinc, Lead and Ferro Alloys), (b) Electric arc furnaces (Mini steel plants). 14. Chloral alkali industry. 15. Integrated paint complex including manufacture of resins and basic raw materials required in the manufacture of paints. 16. Viscose staple fibred and filament yarn.
  • 13. 17. Storage batteries integrated with manufacture of oxides of Lead and Lead Antimony alloys. 18. All tourism projects between 200 m and 500 m of high water line and at locations with an elevation of more than 1000 m with investment of more than Rs. 5 cr. 19. Thermal power plants. 20. Mining projects (major minerals) with leases more than 5 ha. 21. Highway projects (except projects relating to improvement work including widening and strengthening of roads with marginal land acquisition along the existing alignments provided it does not pass through ecologically sensitive areas such as national parks, sanctuaries, tiger reserves and reserve forests). 23. Distilleries. 24. Raw skins and hides 25. Pulp, paper and newsprint. 26. Dyes and intermediates. 27. Cement. 28. Foundries (individual). 29. Electroplating. 30. Meta amino phenol (added in 2000). 31. New townships, industrial townships, settlement colonies, commercial complexes, hotel complexes, hospitals, office complexes for 1000 persons and above or discharging sewage of 50,000 l/day and above or with an investment of Rs. 50 cr and above (added in 2004). 32. New industrial estates having an area of 50 ha and above and the industrial estates irrespective of area if their pollution potential is high (added in 2004).2. Tarred roads in the Himalayas and or forest areas. Continued..
  • 14. 1. Screening 2. Scoping and consideration of alternatives 3. Baseline data collection 4. Impact prediction 5. Assessment of alternatives, delineation of mitigation measures and environmental impact statement 6. Public hearing 7. Environment Management Plan 8. Decision making 9. Monitoring the clearance conditions EIA Process in India
  • 15. Schedule III of EIA Notification, 1994 Composition of the expert committees for EIA 1. The committee will consist of experts in the following fields: i. Eco-system management ii. Air/water pollution control iii. Water resource management iv. Flora/fauna conservation and management v. Land use planning vi. Social sciences/rehabilitation vii. Project appraisal viii. Ecology ix. Environmental health x. Subject area specialist xi. Representatives of NGOs/persons concerned with environmental issues 2. The chairman will be an outstanding and experienced ecologist or environmentalist or technical professional with wide managerial experience in relevant development sector. 3. The representative of IA will act as a member secretary. 4. Chairman and members will serve in their individual capacities except those specifically nominated as representative. 5. The membership of the committee shall not exceed.
  • 17. References Suggested Reading Centre for Science and Environment, 2006, Introduction to Environment Impact Assessment, Industry & Environment Unit report, New Delhi, India Jay, S, Jones, C, Slinn, P & Wood, C, 2007, ‘Environmental impact assessment :retrospect and prospect’, Environmental Impact Assessment Review, vol 27, pp 287-300 Murthy, A & Patra, HS, 2005, Environment impact assessment process in India and the drawbacks, Environment conservation team report, Bhubaneshwar, India Sinha,S,1998, ‘Environmental impact assessment: an effective management tool’, TERI Information Monitor on Environmental Science, vol 3, pp 1-7 George, C,1999, ‘Testing for sustainable development through environmental assessment’, Environmental Impact Assessment Review, vol 19, pp 175-200 Lawrence,DP, 2007, ‘Impact significance determination—Back to basics, Environmental Impact Assessment Review, vol 27, pp 755-769 McCaig, K,2005, ‘Canadian insights: The challenges of an integrated environmental assessment framework’, Environmental Impact Assessment Review, vol 25, pp 737-746 Paliwal,R,2006, ‘EIA practice in India and its evaluation using precaution and efficiency?’, Environmental Impact Assessment Review, vol 26, pp 359-376 Snell, T & Cowell, R,2006, ‘Scoping in environmental impact assessment: Balancing SWOT analysis’, Environmental Impact Assessment Review, vol 26, pp 492-510