1. Gursharan Kumar Choudhary
Contact: +91-09878917087, +974- 33473499 (M)
E- Mail: gursharan.choudhary@yahoo.com
CAREER OVERVIEW
Electrical Engineer with 13 years of rich experience in reputed Companies. Having knowledge of
Execution, Project Coordination and Project planning in Underground Metro, NATM Projects, Road
Highways project, Hydro Power Projects.
Resource planning and execution of the project to
meet the Project deadlines.
Interaction with Consultants & Clients in detailed
engineering and audits
Installation, testing and commissioning of D.G Sets
(3*500 KVA + 1000 KVA) with synchronizing panels
(routine checking and maintenance of synchronizing
panels, Circuit breakers of synchronizing panels).
Cable Laying, Power supply (HT, LT) and Lightning in
the tunnel.
As per technical drawings, specifications of electrical
systems, and topographical maps to ensure that
installation and operations conform to standards
and customer requirements.
Ensuring implementation and adherence to the
requirements of the HSE management System
including notify management of unsafe working
conditions and Support HSE with risk assessments
during commissioning phase
Develop/share best practices, work processes,
system and tools, based on experience gained in a
portfolio of independent projects.
Routine checking and maintenance of Distribution
Boards of Lighting, Jumbo, Shotcrete machine etc.
Proper Earthing and safety precautions like Lock out
and Tag out system, permit to work system
implemented in the tunnel as well as outside the
tunnel
Installation, testing and commissioning of 33/11 KV
switch yard and HT panels.
2. EMPLOYMENT HIGHLIGHTS
Experience
For each of the companies that I have worked:
Tenure Name of the Organization Designation
April 2015 to till date Porr-HBK-Saudi bin Laden JV Electrical Supervisor
Dec.2010 to March 2015 Leighton India Contractors Pvt. Ltd. Sr. Electrical Engineer
April 2010 to Dec.2010 Coastal Projects Ltd. Deputy Manager Electrical
June 2008 to April 2010 Alpine HCC JV Electrical Engineer
May 2006 to June 2008 Coastal Projects Ltd. Deputy Manager Electrical
Dec 2002 to May 2006 Coastal Projects Ltd Assistant Manager Electrical
Achievements in Each Organization
• Ensuring total safety measure in the work premises
• A dynamic individual with excellent communication, organizational and interpersonal skills.
• Committed and willing to do whatever it takes to make the company successful.
• Able to use positive interactions with others to create powerful teams.
• Want to do well and contribute positively
• Ability to plan work well, and to be well-organized, and prepared for responsibility and decision
making
• Excellent communication and interpersonal skills.
• Numerate with good IT skills.
• Good troubleshooting and problem solving skills.
• Familiarity with building and health and safety regulations, as well as other relevant legislation.
• Strong people skills, able to communicate with people at all levels
• All these companies I have earned a good name, and also respected as Self Disciplined, Expert in
Time and Project Management skills.
• Achieved the target of executing given work in allowed time limits within budgeted cost.
• Maintaining quality from the very beginning with optimum resources.
• Positively considered for mid-way appraisals.
• Reduced the responsibilities of the site management in areas of my scope by being independently
accountable for execution done by me.
3. PROJECT DETAILS
• Green Line Underground Metro Project Doha-Qatar(April 2015 to Till date)
• Name of the Project – Green Line Metro, Doha Qatar
• Client – Qatar Rail
• Name of the Company – Porr-HBK-Saudi Bin Laden Joint Venture
• Designation – Electrical Supervisor
The Project is a joint venture between Porr-HBK-Saudi Bin Laden Group who are the main contractors for the
green line of the new Doha Metro Project in Qatar. This project consists of 16.6 KM of Twin bored tunnels,8
underground stations, build at a depth of 20 meters. This project spans from Mushreib(central station ) through
to Education city and on to Al Rayyan. This Project is essential in the delivery of the 2022 FIFA world cup and is a
key contributor to Qatar's 2030 Vision. The contract comprises the Design and Build of all works, The 6 TBM's all
of which are Earth Pressure boring machines with a diameter of more than 7 M will mine simultaneously and 37
cross passages by NATM (New Austrian Tunneling Method)
Chenani Nashri National Highway Four Lane Road &Tunnel Project J&K - IL&FS
India’s Longest Highway Road & Tunnel Project in J&K, INDIA (December 2010 to March 2015)
• Name of the Project – Chenani Nashri Tunnel Project
• Client – NHAI
• Concessionaire – IL&FS
• Name of the Company – Leighton India Contractors Pvt. Ltd.
• Project value – USD 482 Millions
• Design consultant – Geo Data/SMEC
• Designation – Sr. Electrical Engineer
Project includes Design and Construction of National Highway Four lane having length 45 Km including Main
Tunnel 9km long having dia. 15mtr & Escape Tunnel 9km long having dia. 6.5 mtrs. with NATM method.
• Reason for Change - Project is on completion stage.
M/s Coastal Projects Ltd. in connection with construction of DEWAS -II water
Resource Projects which includes 11Km Tunnel, 3 Shafts. (April 2010 to Dec.2010)
• Name of the Project – DEWAS -II water Resource Projects
• Client – Irrigation Deptt. Rajastan
• Name of the Company – Coastal Projects Ltd.
• Project value – INR 450 Crore
• Designation – Deputy Manager Electrical
• Reason for Change - For better Opportunity in Underground works
4. Airport Metro Express Line (AMEL C6)
Worked in Delhi Metro Project, INDIA (June 2008 to March 2010)
• Name of the Project – Airport metro Express Line C6
• Client – Delhi Metro Rail Corporation
• Name of the Company – ALPINE- HCC JV
• Project value – INR 3600 Millions
• Consultant – ALC (OC-PBI-JARTS-TONICHI-RITES)
• Design consultant – Mott Donald; I-Built
• Designation – Electrical Engineer
Project includes Design and Construct of Circular and Rectangular Vertical Shafts 2.3 Km NATM Tunnel
portion of Delhi metro (Talkatora Garden to Budha Garden).The work volume includes 2.3 Km long NATM
tunnel and Switchover Ramp, Cut and Cover 600 M long & Internal Road Networking to connect the
different faces having length 15 Km.
• Reason for Change - Project successfully completed.
M/s Coastal Projects Pvt. Ltd.- for construction of Budhil hydroelectric Power project (70MW)
Bharmour, Distt-Chamba (H.P) (May 2006 to June 2008)
• Name of the Project – Budhil hydro-electric Power project (70MW)
• Client – Lanco Infratech Ltd
• Name of the Company – Coastal Projects Pvt. Ltd
• Project value – INR 350 Crore
• Designation – Deputy Manager Electrical
• Reason for Change - Project successfully completed
M/s Coastal Projects Pvt. Ltd. in connection with construction of Maneri Bhali H.E.P. Stage –II (304
Mw) Uttarkashi (Uttarakhand). (Dec 2002 to May 2006)
• Name of the Project – Maneri Bhali H.E.P. Stage –II (304 Mw) Uttarkashi (Uttarakhand).
• Client – Irrigation Deptt. Uttarakhand
• Name of the Company – Coastal Projects Pvt. Ltd.
• Project value – INR 225 Crore
• Designation – Assistant Manager Electrical
• Reason for Change - Project successfully completed
5. Roles and Responsibilities:
• Site management, which include getting the job done as per specifications by utilizing minimum
resources so as to complete the job within budgeted cost, time and without compromising Quality &
Safety.
• Preparing Work Methodology in order to have a control over resources and finishing the job on time.
• Installation of DG Sets (125 KVA – 1010 KVA), routine checking and maintenance of synchronizing
panels, Circuit breakers of synchronizing panels.
• Installation and maintenance of Compact sub stations (250 KVA-500KVA), Transformers (250 KVA-3.15
MVA).
• Installation of 33 KV/11 KV Switch yard.
• Perform all internal and external audits on behalf of the companies management
• Verify contractor quality requirements are specified to vendors and contractor documentation
submittals.
• Monitor the disposition of all issued nonconformance reports.
• Coordinate all Execution related correspondence with the Client’s representatives.
• Action and close all Client complaints
• Attend the Project weekly management meetings to resolve the issues.
• Maintenance, Trouble shooting and Erection of HT/LT control panels.
• Dewatering Pumps (Electrical Maintenance of submersible pumps, mono block pumps).
• Cable Laying, Power supply and Lightning.
• Proper earthing and proper safety precautions like Lock out and Tag out system implemented.
• Goliath Crane (12 Ton & 25 ton) Maintenance and troubleshooting.
EDUCATION
4 Years regular degree in Electrical Engineering in 2002 with 1st division from
Punjab Technical University (India)
6. PERSONAL DETAILS
Languages Known English, Hindi & Punjabi.
Passport Number KO 006084 (Valid up to Jan 2022)
Marital Status Married.
IT Skills Basic & M.S. Office
Permanent Address Vill. Bhabour Sahib, P.O. Bass Tehsil – Nangal Distt. Ropar (Punjab)
Pin 140126
References Available on request
Notice Period 1 Month Only
Skype Id gursharan.choudhary2
Place: Gursharan Kumar Choudhary
Date:
7. PERSONAL DETAILS
Languages Known English, Hindi & Punjabi.
Passport Number KO 006084 (Valid up to Jan 2022)
Marital Status Married.
IT Skills Basic & M.S. Office
Permanent Address Vill. Bhabour Sahib, P.O. Bass Tehsil – Nangal Distt. Ropar (Punjab)
Pin 140126
References Available on request
Notice Period 1 Month Only
Skype Id gursharan.choudhary2
Place: Gursharan Kumar Choudhary
Date: