International
Delay Analysis
Approaches
WhatsApp: +201153408493
Facebook: Frontiers International
Website: https://portal.frontierspm.com/ Email: info@frontierspm.com
2
@magedkom /in/magedkom ArabPlanners @profplanner
Mohamed Maged Hegazy
Project Management Consultant
LLM, MBA, PMP, CCP, P3O
• Master in Construction Law – Salford University, Manchester, UK
• Master of Business Administration – UoPeople, US
• B.Sc. Civil Engineering – Ain Shams University, Egypt
• Consultant – Saudi Council of Engineers, Saudi Arabia
• CCP, Certified Cost Professional credential – AACE International, US
• PMP, Project Management Professional credential – PMI, US
• P3O, Portfolio, Programme and Projects Offices credential – AXELOS, UK
• FIDIC Contracts Consultant, AIA (Brussels) Fellow
• Author of 50 Planning fundamentals & Fundamentals of Construction Contracts
• Experience more than 21 years in mega-projects (Buildings, Infrastructure & Roads)
WhatsApp: +201153408493
Facebook: Frontiers International
Website: https://portal.frontierspm.com/ Email: info@frontierspm.com
3
My Related Publications
Project Planning and Scheduling Delay Analysis Contractual and Legal Aspects
@magedkom /in/magedkom ArabPlanners @profplanner
2020
@magedkom /in/magedkom ArabPlanners @profplanner
International Delay Analysis Perspectives
1) RICS Guidance
2) Delay Analysis Categories.
3) ASCE Perspective
4) Source Data.
5) AACE RPs
WhatsApp: +201153408493
Facebook: Frontiers International
Website: https://portal.frontierspm.com/ Email: info@frontierspm.com
5
•
‫م‬
‫الموضوع؟‬ ‫هذا‬ ‫تناولت‬ ‫التي‬ ‫الهامة‬ ‫المراجع‬ ‫هي‬ ‫ا‬
‫وهي‬ ‫التأخير‬ ‫تحليل‬ ‫موضوع‬ ‫في‬ ‫تكلمت‬ ‫التي‬ ‫المفيدة‬ ‫المراجع‬ ‫من‬ ‫بعض‬ ‫إليكم‬
:
References
WhatsApp: +201153408493
Facebook: Frontiers International
Website: https://portal.frontierspm.com/ Email: info@frontierspm.com
6
•
‫الكتب‬ ‫بعض‬
:
‫و‬ ‫التأخير‬ ‫وتحليل‬ ‫التمديد‬ ‫مطالبات‬ ‫موضوع‬ ‫في‬ ‫تكلمت‬ ‫التي‬ ‫الكتب‬ ‫من‬ ‫بعض‬ ‫إليكم‬
‫هي‬
:
More References
WhatsApp: +201153408493
Facebook: Frontiers International
Website: https://portal.frontierspm.com/ Email: info@frontierspm.com
7
Prospective Delay Analysis:
Analysis of facts associated with delay events during
construction of a project and the estimation of their effect
upon the planned completion date of a project. (Interim
Extension of Time).
Retrospective Delay Analysis:
Analysis of facts associated with delay events after
completion of the construction period of a project. (Final
Extension of Time).
Interim vs Final Extension of Time
WhatsApp: +201153408493
Facebook: Frontiers International
Website: https://portal.frontierspm.com/ Email: info@frontierspm.com
8
Categories
WhatsApp: +201153408493
Facebook: Frontiers International
Website: https://portal.frontierspm.com/ Email: info@frontierspm.com
9
Theoretical Based Methods
Global Impact method
Considers an increase in work scope as directly proportional to time
and ignores timing, concurrency and own delays.
As-planned impacted method
Impacts delays upon the original baseline and does not consider
mistakes in the baseline or events at the time of the delay.
As-built “but for”
Inconsistent with the facts and relies upon the as built programme
demonstrating that all delay is excusable.
WhatsApp: +201153408493
Facebook: Frontiers International
Website: https://portal.frontierspm.com/ Email: info@frontierspm.com
10
Actual Based Methods
As-planned -v- as built method
Simple and visible in a single window but not suitable for complex
projects with competing and concurrent delay.
Windows/snap shot or update method
The use of electronic progress reports to analyse incrementally the
changes to the as planned programme with as built assistance.
Impact/Update – Timeslices
Driven by a delay schedule and subject to time slices within which the
anticipated and actual progress is analysed. Strong in addressing
mitigation and concurrent delays.
WhatsApp: +201153408493
Facebook: Frontiers International
Website: https://portal.frontierspm.com/ Email: info@frontierspm.com
11
RICS Professional Guidance
General Principles (Level 1 - Knowing):
- Costs of Delay: LDs vs Prolongation/time-related costs.
Practical Application (Level 2 - Doing):
- Measurement of Delay.
- Methods of Delay Analysis.
Practical Considerations (Level 3 - Advising):
- Which Method should be adopted?
- Strength and Weakness of each Method.
- Concurrent Liability of Delay.
If a delay has been caused by EE, then in general, the
contractor will be entitled to EOT. In order to decide whether a
contractor is entitled to an extension of time, it is necessary to
establish the cause of the delay and the period of delay. In
some cases this will be very easy but in many cases it will be
very difficult and can be controversial.
WhatsApp: +201153408493
Facebook: Frontiers International
Website: https://portal.frontierspm.com/ Email: info@frontierspm.com
12
Measurement of Delay: form contract completion date to the actual completion date (retrospective),
or form the current contract completion date to the projected completion date (prospective). It’s
important to agree on the benchmark programme that will be used (BIM can help) to carry out the
reviews to resolve questions of culpability for delay or to estimate the likely delay period.
Methods of Delay Analysis
Methods of delay analysis:
-Simple and relatively simple
1. Overview of the facts: It deals with relatively straight forward
claims when the cause and delay are apparent.
2. Comparing actual and planned progress: It’s comparing the
activities timing using the contemporaneous documents to
review the reasons of discrepancies/ delay.
-Detailed, forensic and more reliable
3. Critical path analysis (CPA): Based on the logic-link using either
planned (prospect. or retrosp.) or as-built programme.
4. Focused methods of analysis: Over shorter periods using an
updated programme (prospective: TIA), or particular periods
with as-built data (Retrospective: window or time slice).
WhatsApp: +201153408493
Facebook: Frontiers International
Website: https://portal.frontierspm.com/ Email: info@frontierspm.com
13
Records / Source Data
Main Course References
WhatsApp: +201153408493
Facebook: Frontiers International
Website: https://portal.frontierspm.com/ Email: info@frontierspm.com
15
Delay Analysis Approaches - AACE
Prospective Retrospective
Insert a modeled
fragnet into the
schedule, then check
logic and duration,
and finally recalculate
the CPM to measure
the time impact.
The appropriate
update schedule is the
most recently
reviewed schedule
update before the
event (unimpacted
schedule).
1. Classification and
Principles
2. Source Validation
3. Method
Implementation
4. Analysis Evaluation
5. CHOOSING A
METHOD
@magedkom /in/magedkom ArabPlanners @profplanner
WhatsApp: +201153408493
Facebook: Frontiers International
Website: https://portal.frontierspm.com/ Email: info@frontierspm.com
16
Classification
Observational: Examining the schedule itself without changes.
Static: Same network - Dynamic: updates with variations.
Modeled: Representing delay events in schedule.
Additive: add to a base - Subtractive: from as-built.
@magedkom /in/magedkom ArabPlanners @profplanner
Thank You
17
Don’t Hesitate to contact….
M.Maged Hegazy
mm.hegazy@ppmconference.net
Mobile : 00966 (0) 58 0264 968

More Related Content

What's hot

Eot claims hr__may2012
Eot claims hr__may2012Eot claims hr__may2012
Eot claims hr__may2012
McLachlan Lister Pty Limited
 
Cl presentation
Cl presentationCl presentation
Cl presentation
lucaschinsheng
 
Performing against the wall - SPI after completion
Performing against the wall - SPI after completionPerforming against the wall - SPI after completion
Performing against the wall - SPI after completion
M Maged Hegazy, LLM, MBA, CCP, P3O
 
Fidic law1
Fidic law1Fidic law1
Fidic law1
dhiraj.gaur
 
Introduction to construction contracts fundamentals
Introduction to construction contracts fundamentalsIntroduction to construction contracts fundamentals
Introduction to construction contracts fundamentals
M Maged Hegazy, LLM, MBA, CCP, P3O
 
Delay, dispute (1st annual conf. of planning in cairo 23-8-2014) engr. m maged
Delay, dispute  (1st annual conf. of planning in cairo 23-8-2014) engr. m magedDelay, dispute  (1st annual conf. of planning in cairo 23-8-2014) engr. m maged
Delay, dispute (1st annual conf. of planning in cairo 23-8-2014) engr. m maged
M Maged Hegazy, LLM, MBA, CCP, P3O
 
Fundamentals of Construction Contracts - English, ver. 2021
Fundamentals of Construction Contracts - English, ver. 2021Fundamentals of Construction Contracts - English, ver. 2021
Fundamentals of Construction Contracts - English, ver. 2021
M Maged Hegazy, LLM, MBA, CCP, P3O
 
Bim arabia red fidic
Bim arabia red fidicBim arabia red fidic
Bim arabia red fidic
Moustafa Ismail Abu Dief
 
Fidic contracts management introduction
Fidic contracts management introductionFidic contracts management introduction
Fidic contracts management introduction
Essam Lotffy, PMP®, CCP®
 
CONTRACT ADMINISTRATION- Presentation dated 22.11.16
CONTRACT ADMINISTRATION- Presentation dated 22.11.16CONTRACT ADMINISTRATION- Presentation dated 22.11.16
CONTRACT ADMINISTRATION- Presentation dated 22.11.16
Arvind Solanki
 
Training fidic moustafa ismail 2017 _ lec 4
Training fidic moustafa ismail  2017 _  lec 4Training fidic moustafa ismail  2017 _  lec 4
Training fidic moustafa ismail 2017 _ lec 4
Moustafa Ismail Abu Dief
 
Delay Analysis and Concurrent Delay
Delay Analysis and Concurrent DelayDelay Analysis and Concurrent Delay
Delay Analysis and Concurrent Delay
M Maged Hegazy, LLM, MBA, CCP, P3O
 
Time management in fidic red book 2017(prmg080 project)
Time management in fidic red book 2017(prmg080 project)Time management in fidic red book 2017(prmg080 project)
Time management in fidic red book 2017(prmg080 project)
mohamed Ismail
 
Baseline schedule review and analysis
Baseline schedule review and analysisBaseline schedule review and analysis
Baseline schedule review and analysis
ADITYA GHUMARE
 
Extension of time (E.O.T) By Ahmed Ibarhim
Extension of time (E.O.T) By Ahmed IbarhimExtension of time (E.O.T) By Ahmed Ibarhim
Extension of time (E.O.T) By Ahmed Ibarhim
Ahmed Al-Senosy Ph.D(cand),MSc,PMP,RMP
 
#FIDIC Understanding Basics# By SN Panigrahi
#FIDIC Understanding Basics# By SN Panigrahi#FIDIC Understanding Basics# By SN Panigrahi
#FIDIC Understanding Basics# By SN Panigrahi
SN Panigrahi, PMP
 
FIDIC Presentation-2016.pdf
FIDIC Presentation-2016.pdfFIDIC Presentation-2016.pdf
FIDIC Presentation-2016.pdf
PachyCarmona1
 
Standard Forms of Construction Contracts
Standard Forms of Construction ContractsStandard Forms of Construction Contracts
Standard Forms of Construction Contracts
M Maged Hegazy, LLM, MBA, CCP, P3O
 
FIDIC 2016 Day01-1450 Managing Claims Under FIDIC, PPT Adrias Tan
FIDIC 2016 Day01-1450 Managing Claims Under FIDIC, PPT Adrias TanFIDIC 2016 Day01-1450 Managing Claims Under FIDIC, PPT Adrias Tan
FIDIC 2016 Day01-1450 Managing Claims Under FIDIC, PPT Adrias Tan
Adrias TAN
 
Earned Value Management - Leading & Misleading in Project Control
Earned Value Management - Leading & Misleading in Project ControlEarned Value Management - Leading & Misleading in Project Control
Earned Value Management - Leading & Misleading in Project Control
M Maged Hegazy, LLM, MBA, CCP, P3O
 

What's hot (20)

Eot claims hr__may2012
Eot claims hr__may2012Eot claims hr__may2012
Eot claims hr__may2012
 
Cl presentation
Cl presentationCl presentation
Cl presentation
 
Performing against the wall - SPI after completion
Performing against the wall - SPI after completionPerforming against the wall - SPI after completion
Performing against the wall - SPI after completion
 
Fidic law1
Fidic law1Fidic law1
Fidic law1
 
Introduction to construction contracts fundamentals
Introduction to construction contracts fundamentalsIntroduction to construction contracts fundamentals
Introduction to construction contracts fundamentals
 
Delay, dispute (1st annual conf. of planning in cairo 23-8-2014) engr. m maged
Delay, dispute  (1st annual conf. of planning in cairo 23-8-2014) engr. m magedDelay, dispute  (1st annual conf. of planning in cairo 23-8-2014) engr. m maged
Delay, dispute (1st annual conf. of planning in cairo 23-8-2014) engr. m maged
 
Fundamentals of Construction Contracts - English, ver. 2021
Fundamentals of Construction Contracts - English, ver. 2021Fundamentals of Construction Contracts - English, ver. 2021
Fundamentals of Construction Contracts - English, ver. 2021
 
Bim arabia red fidic
Bim arabia red fidicBim arabia red fidic
Bim arabia red fidic
 
Fidic contracts management introduction
Fidic contracts management introductionFidic contracts management introduction
Fidic contracts management introduction
 
CONTRACT ADMINISTRATION- Presentation dated 22.11.16
CONTRACT ADMINISTRATION- Presentation dated 22.11.16CONTRACT ADMINISTRATION- Presentation dated 22.11.16
CONTRACT ADMINISTRATION- Presentation dated 22.11.16
 
Training fidic moustafa ismail 2017 _ lec 4
Training fidic moustafa ismail  2017 _  lec 4Training fidic moustafa ismail  2017 _  lec 4
Training fidic moustafa ismail 2017 _ lec 4
 
Delay Analysis and Concurrent Delay
Delay Analysis and Concurrent DelayDelay Analysis and Concurrent Delay
Delay Analysis and Concurrent Delay
 
Time management in fidic red book 2017(prmg080 project)
Time management in fidic red book 2017(prmg080 project)Time management in fidic red book 2017(prmg080 project)
Time management in fidic red book 2017(prmg080 project)
 
Baseline schedule review and analysis
Baseline schedule review and analysisBaseline schedule review and analysis
Baseline schedule review and analysis
 
Extension of time (E.O.T) By Ahmed Ibarhim
Extension of time (E.O.T) By Ahmed IbarhimExtension of time (E.O.T) By Ahmed Ibarhim
Extension of time (E.O.T) By Ahmed Ibarhim
 
#FIDIC Understanding Basics# By SN Panigrahi
#FIDIC Understanding Basics# By SN Panigrahi#FIDIC Understanding Basics# By SN Panigrahi
#FIDIC Understanding Basics# By SN Panigrahi
 
FIDIC Presentation-2016.pdf
FIDIC Presentation-2016.pdfFIDIC Presentation-2016.pdf
FIDIC Presentation-2016.pdf
 
Standard Forms of Construction Contracts
Standard Forms of Construction ContractsStandard Forms of Construction Contracts
Standard Forms of Construction Contracts
 
FIDIC 2016 Day01-1450 Managing Claims Under FIDIC, PPT Adrias Tan
FIDIC 2016 Day01-1450 Managing Claims Under FIDIC, PPT Adrias TanFIDIC 2016 Day01-1450 Managing Claims Under FIDIC, PPT Adrias Tan
FIDIC 2016 Day01-1450 Managing Claims Under FIDIC, PPT Adrias Tan
 
Earned Value Management - Leading & Misleading in Project Control
Earned Value Management - Leading & Misleading in Project ControlEarned Value Management - Leading & Misleading in Project Control
Earned Value Management - Leading & Misleading in Project Control
 

Similar to International Delay Analysis Approaches

CCP Course - Introduction.pdf
CCP Course - Introduction.pdfCCP Course - Introduction.pdf
CCP Course - Introduction.pdf
M Maged Hegazy, LLM, MBA, CCP, P3O
 
Schedule Integrity - The Key to Successful Project Management
Schedule Integrity - The Key to Successful Project ManagementSchedule Integrity - The Key to Successful Project Management
Schedule Integrity - The Key to Successful Project Management
Association for Project Management
 
PERT
PERTPERT
Web Application Technical & Financial Proposal
Web Application Technical & Financial ProposalWeb Application Technical & Financial Proposal
Web Application Technical & Financial Proposal
Md.Abu Taher (Rujel)
 
MoneySafe-FinalReport
MoneySafe-FinalReportMoneySafe-FinalReport
MoneySafe-FinalReport
Shaun Michael Stone
 
Analyzing data, performance and impacts in construction
Analyzing data, performance and impacts in constructionAnalyzing data, performance and impacts in construction
Analyzing data, performance and impacts in construction
Michael Pink
 
45ef51191315a8630a639ff030b4cb67a3df6f49-1657701254277.ppt
45ef51191315a8630a639ff030b4cb67a3df6f49-1657701254277.ppt45ef51191315a8630a639ff030b4cb67a3df6f49-1657701254277.ppt
45ef51191315a8630a639ff030b4cb67a3df6f49-1657701254277.ppt
TinotendaChivese
 
IRJET- Schedule Delay Analysis in Construction Management using Primavera P6
IRJET- Schedule Delay Analysis in Construction Management using Primavera P6IRJET- Schedule Delay Analysis in Construction Management using Primavera P6
IRJET- Schedule Delay Analysis in Construction Management using Primavera P6
IRJET Journal
 
Agile pgm
Agile pgmAgile pgm
Agile pgm
Dr. Frank Stumpe
 
169960087 j2 ee-project-report
169960087 j2 ee-project-report169960087 j2 ee-project-report
169960087 j2 ee-project-report
homeworkping8
 
Project mangment
Project mangmentProject mangment
Project mangment
Hemant Srivastava
 
Regatta UniversityIT Project Charter ForStudent De.docx
Regatta UniversityIT Project Charter ForStudent De.docxRegatta UniversityIT Project Charter ForStudent De.docx
Regatta UniversityIT Project Charter ForStudent De.docx
audeleypearl
 
project-management-office-critical-to-successful-project-completion- cuneiform
project-management-office-critical-to-successful-project-completion- cuneiformproject-management-office-critical-to-successful-project-completion- cuneiform
project-management-office-critical-to-successful-project-completion- cuneiform
Cuneiform Consulting Pvt Ltd.
 
Chap 5.pdf
Chap 5.pdfChap 5.pdf
Chap 5.pdf
YogeshKherde2
 
Chap 5.pdf
Chap 5.pdfChap 5.pdf
Chap 5.pdf
YogeshKherde2
 
Chap 5.pdf
Chap 5.pdfChap 5.pdf
Chap 5.pdf
YogeshKherde2
 
Project Management Best Practices
Project Management Best PracticesProject Management Best Practices
Project Management Best Practices
Rohana K Amarakoon
 
PMP Exam Preparation - 200 Questions
PMP Exam Preparation - 200 QuestionsPMP Exam Preparation - 200 Questions
PMP Exam Preparation - 200 Questions
Flevy.com Best Practices
 
Planning & Scheduling of Commercial Building using Microsoft Project & Applic...
Planning & Scheduling of Commercial Building using Microsoft Project & Applic...Planning & Scheduling of Commercial Building using Microsoft Project & Applic...
Planning & Scheduling of Commercial Building using Microsoft Project & Applic...
IRJET Journal
 
Project cost management a simplified approach white paper - Oracle Primaver...
Project cost management   a simplified approach white paper - Oracle Primaver...Project cost management   a simplified approach white paper - Oracle Primaver...
Project cost management a simplified approach white paper - Oracle Primaver...
p6academy
 

Similar to International Delay Analysis Approaches (20)

CCP Course - Introduction.pdf
CCP Course - Introduction.pdfCCP Course - Introduction.pdf
CCP Course - Introduction.pdf
 
Schedule Integrity - The Key to Successful Project Management
Schedule Integrity - The Key to Successful Project ManagementSchedule Integrity - The Key to Successful Project Management
Schedule Integrity - The Key to Successful Project Management
 
PERT
PERTPERT
PERT
 
Web Application Technical & Financial Proposal
Web Application Technical & Financial ProposalWeb Application Technical & Financial Proposal
Web Application Technical & Financial Proposal
 
MoneySafe-FinalReport
MoneySafe-FinalReportMoneySafe-FinalReport
MoneySafe-FinalReport
 
Analyzing data, performance and impacts in construction
Analyzing data, performance and impacts in constructionAnalyzing data, performance and impacts in construction
Analyzing data, performance and impacts in construction
 
45ef51191315a8630a639ff030b4cb67a3df6f49-1657701254277.ppt
45ef51191315a8630a639ff030b4cb67a3df6f49-1657701254277.ppt45ef51191315a8630a639ff030b4cb67a3df6f49-1657701254277.ppt
45ef51191315a8630a639ff030b4cb67a3df6f49-1657701254277.ppt
 
IRJET- Schedule Delay Analysis in Construction Management using Primavera P6
IRJET- Schedule Delay Analysis in Construction Management using Primavera P6IRJET- Schedule Delay Analysis in Construction Management using Primavera P6
IRJET- Schedule Delay Analysis in Construction Management using Primavera P6
 
Agile pgm
Agile pgmAgile pgm
Agile pgm
 
169960087 j2 ee-project-report
169960087 j2 ee-project-report169960087 j2 ee-project-report
169960087 j2 ee-project-report
 
Project mangment
Project mangmentProject mangment
Project mangment
 
Regatta UniversityIT Project Charter ForStudent De.docx
Regatta UniversityIT Project Charter ForStudent De.docxRegatta UniversityIT Project Charter ForStudent De.docx
Regatta UniversityIT Project Charter ForStudent De.docx
 
project-management-office-critical-to-successful-project-completion- cuneiform
project-management-office-critical-to-successful-project-completion- cuneiformproject-management-office-critical-to-successful-project-completion- cuneiform
project-management-office-critical-to-successful-project-completion- cuneiform
 
Chap 5.pdf
Chap 5.pdfChap 5.pdf
Chap 5.pdf
 
Chap 5.pdf
Chap 5.pdfChap 5.pdf
Chap 5.pdf
 
Chap 5.pdf
Chap 5.pdfChap 5.pdf
Chap 5.pdf
 
Project Management Best Practices
Project Management Best PracticesProject Management Best Practices
Project Management Best Practices
 
PMP Exam Preparation - 200 Questions
PMP Exam Preparation - 200 QuestionsPMP Exam Preparation - 200 Questions
PMP Exam Preparation - 200 Questions
 
Planning & Scheduling of Commercial Building using Microsoft Project & Applic...
Planning & Scheduling of Commercial Building using Microsoft Project & Applic...Planning & Scheduling of Commercial Building using Microsoft Project & Applic...
Planning & Scheduling of Commercial Building using Microsoft Project & Applic...
 
Project cost management a simplified approach white paper - Oracle Primaver...
Project cost management   a simplified approach white paper - Oracle Primaver...Project cost management   a simplified approach white paper - Oracle Primaver...
Project cost management a simplified approach white paper - Oracle Primaver...
 

More from M Maged Hegazy, LLM, MBA, CCP, P3O

Variation Orders – Types, Permission and Consequences
Variation Orders – Types, Permission and ConsequencesVariation Orders – Types, Permission and Consequences
Variation Orders – Types, Permission and Consequences
M Maged Hegazy, LLM, MBA, CCP, P3O
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
M Maged Hegazy, LLM, MBA, CCP, P3O
 
Concurrent Delay in Construction
Concurrent Delay in ConstructionConcurrent Delay in Construction
Concurrent Delay in Construction
M Maged Hegazy, LLM, MBA, CCP, P3O
 
Essentials of EOT Claims
Essentials of EOT ClaimsEssentials of EOT Claims
Essentials of EOT Claims
M Maged Hegazy, LLM, MBA, CCP, P3O
 
Performance Measurement and Weightage Systems
Performance Measurement and Weightage SystemsPerformance Measurement and Weightage Systems
Performance Measurement and Weightage Systems
M Maged Hegazy, LLM, MBA, CCP, P3O
 
Project Schedule Management
Project Schedule ManagementProject Schedule Management
Project Schedule Management
M Maged Hegazy, LLM, MBA, CCP, P3O
 
Missing and modern necessary skills
Missing and modern necessary skillsMissing and modern necessary skills
Missing and modern necessary skills
M Maged Hegazy, LLM, MBA, CCP, P3O
 
Procurement negotiation tips and phases
Procurement negotiation tips and phasesProcurement negotiation tips and phases
Procurement negotiation tips and phases
M Maged Hegazy, LLM, MBA, CCP, P3O
 
أسس علم التخطيط في 50 سؤال وجواب - الاصدار الخامس
أسس علم التخطيط في 50 سؤال وجواب - الاصدار الخامسأسس علم التخطيط في 50 سؤال وجواب - الاصدار الخامس
أسس علم التخطيط في 50 سؤال وجواب - الاصدار الخامس
M Maged Hegazy, LLM, MBA, CCP, P3O
 
50 Planning Fundamentals V5.0 - procedures only
50 Planning Fundamentals V5.0 - procedures only50 Planning Fundamentals V5.0 - procedures only
50 Planning Fundamentals V5.0 - procedures only
M Maged Hegazy, LLM, MBA, CCP, P3O
 
5th Anniversary of Planning & Project Control Group
5th Anniversary of Planning & Project Control Group5th Anniversary of Planning & Project Control Group
5th Anniversary of Planning & Project Control Group
M Maged Hegazy, LLM, MBA, CCP, P3O
 
26 مؤتمر ادارة المشروعات contract relations management
26 مؤتمر ادارة المشروعات contract relations management26 مؤتمر ادارة المشروعات contract relations management
26 مؤتمر ادارة المشروعات contract relations management
M Maged Hegazy, LLM, MBA, CCP, P3O
 
4 أعوام الصفحة الرئيسية التابع لها جروبات Best Advice
4 أعوام الصفحة الرئيسية التابع لها جروبات Best Advice4 أعوام الصفحة الرئيسية التابع لها جروبات Best Advice
4 أعوام الصفحة الرئيسية التابع لها جروبات Best Advice
M Maged Hegazy, LLM, MBA, CCP, P3O
 
3 years acheivements
3 years acheivements3 years acheivements
PMP integration review
PMP integration reviewPMP integration review
PMP integration review
M Maged Hegazy, LLM, MBA, CCP, P3O
 
Pmp procurement rev
Pmp procurement revPmp procurement rev
Pmp Final Review - M Maged
Pmp Final Review - M MagedPmp Final Review - M Maged
Pmp Final Review - M Maged
M Maged Hegazy, LLM, MBA, CCP, P3O
 

More from M Maged Hegazy, LLM, MBA, CCP, P3O (17)

Variation Orders – Types, Permission and Consequences
Variation Orders – Types, Permission and ConsequencesVariation Orders – Types, Permission and Consequences
Variation Orders – Types, Permission and Consequences
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
Concurrent Delay in Construction
Concurrent Delay in ConstructionConcurrent Delay in Construction
Concurrent Delay in Construction
 
Essentials of EOT Claims
Essentials of EOT ClaimsEssentials of EOT Claims
Essentials of EOT Claims
 
Performance Measurement and Weightage Systems
Performance Measurement and Weightage SystemsPerformance Measurement and Weightage Systems
Performance Measurement and Weightage Systems
 
Project Schedule Management
Project Schedule ManagementProject Schedule Management
Project Schedule Management
 
Missing and modern necessary skills
Missing and modern necessary skillsMissing and modern necessary skills
Missing and modern necessary skills
 
Procurement negotiation tips and phases
Procurement negotiation tips and phasesProcurement negotiation tips and phases
Procurement negotiation tips and phases
 
أسس علم التخطيط في 50 سؤال وجواب - الاصدار الخامس
أسس علم التخطيط في 50 سؤال وجواب - الاصدار الخامسأسس علم التخطيط في 50 سؤال وجواب - الاصدار الخامس
أسس علم التخطيط في 50 سؤال وجواب - الاصدار الخامس
 
50 Planning Fundamentals V5.0 - procedures only
50 Planning Fundamentals V5.0 - procedures only50 Planning Fundamentals V5.0 - procedures only
50 Planning Fundamentals V5.0 - procedures only
 
5th Anniversary of Planning & Project Control Group
5th Anniversary of Planning & Project Control Group5th Anniversary of Planning & Project Control Group
5th Anniversary of Planning & Project Control Group
 
26 مؤتمر ادارة المشروعات contract relations management
26 مؤتمر ادارة المشروعات contract relations management26 مؤتمر ادارة المشروعات contract relations management
26 مؤتمر ادارة المشروعات contract relations management
 
4 أعوام الصفحة الرئيسية التابع لها جروبات Best Advice
4 أعوام الصفحة الرئيسية التابع لها جروبات Best Advice4 أعوام الصفحة الرئيسية التابع لها جروبات Best Advice
4 أعوام الصفحة الرئيسية التابع لها جروبات Best Advice
 
3 years acheivements
3 years acheivements3 years acheivements
3 years acheivements
 
PMP integration review
PMP integration reviewPMP integration review
PMP integration review
 
Pmp procurement rev
Pmp procurement revPmp procurement rev
Pmp procurement rev
 
Pmp Final Review - M Maged
Pmp Final Review - M MagedPmp Final Review - M Maged
Pmp Final Review - M Maged
 

Recently uploaded

Null Bangalore | Pentesters Approach to AWS IAM
Null Bangalore | Pentesters Approach to AWS IAMNull Bangalore | Pentesters Approach to AWS IAM
Null Bangalore | Pentesters Approach to AWS IAM
Divyanshu
 
Pressure Relief valve used in flow line to release the over pressure at our d...
Pressure Relief valve used in flow line to release the over pressure at our d...Pressure Relief valve used in flow line to release the over pressure at our d...
Pressure Relief valve used in flow line to release the over pressure at our d...
cannyengineerings
 
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by AnantLLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
Anant Corporation
 
Mechanical Engineering on AAI Summer Training Report-003.pdf
Mechanical Engineering on AAI Summer Training Report-003.pdfMechanical Engineering on AAI Summer Training Report-003.pdf
Mechanical Engineering on AAI Summer Training Report-003.pdf
21UME003TUSHARDEB
 
一比一原版(USF毕业证)旧金山大学毕业证如何办理
一比一原版(USF毕业证)旧金山大学毕业证如何办理一比一原版(USF毕业证)旧金山大学毕业证如何办理
一比一原版(USF毕业证)旧金山大学毕业证如何办理
uqyfuc
 
Call For Paper -3rd International Conference on Artificial Intelligence Advan...
Call For Paper -3rd International Conference on Artificial Intelligence Advan...Call For Paper -3rd International Conference on Artificial Intelligence Advan...
Call For Paper -3rd International Conference on Artificial Intelligence Advan...
ijseajournal
 
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
upoux
 
Height and depth gauge linear metrology.pdf
Height and depth gauge linear metrology.pdfHeight and depth gauge linear metrology.pdf
Height and depth gauge linear metrology.pdf
q30122000
 
Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...
Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...
Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...
PriyankaKilaniya
 
ITSM Integration with MuleSoft.pptx
ITSM  Integration with MuleSoft.pptxITSM  Integration with MuleSoft.pptx
ITSM Integration with MuleSoft.pptx
VANDANAMOHANGOUDA
 
Transformers design and coooling methods
Transformers design and coooling methodsTransformers design and coooling methods
Transformers design and coooling methods
Roger Rozario
 
SENTIMENT ANALYSIS ON PPT AND Project template_.pptx
SENTIMENT ANALYSIS ON PPT AND Project template_.pptxSENTIMENT ANALYSIS ON PPT AND Project template_.pptx
SENTIMENT ANALYSIS ON PPT AND Project template_.pptx
b0754201
 
一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理
一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理
一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理
nedcocy
 
2. protection of river banks and bed erosion protection works.ppt
2. protection of river banks and bed erosion protection works.ppt2. protection of river banks and bed erosion protection works.ppt
2. protection of river banks and bed erosion protection works.ppt
abdatawakjira
 
AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...
AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...
AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...
Paris Salesforce Developer Group
 
NATURAL DEEP EUTECTIC SOLVENTS AS ANTI-FREEZING AGENT
NATURAL DEEP EUTECTIC SOLVENTS AS ANTI-FREEZING AGENTNATURAL DEEP EUTECTIC SOLVENTS AS ANTI-FREEZING AGENT
NATURAL DEEP EUTECTIC SOLVENTS AS ANTI-FREEZING AGENT
Addu25809
 
Accident detection system project report.pdf
Accident detection system project report.pdfAccident detection system project report.pdf
Accident detection system project report.pdf
Kamal Acharya
 
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
ydzowc
 
An Introduction to the Compiler Designss
An Introduction to the Compiler DesignssAn Introduction to the Compiler Designss
An Introduction to the Compiler Designss
ElakkiaU
 
Blood finder application project report (1).pdf
Blood finder application project report (1).pdfBlood finder application project report (1).pdf
Blood finder application project report (1).pdf
Kamal Acharya
 

Recently uploaded (20)

Null Bangalore | Pentesters Approach to AWS IAM
Null Bangalore | Pentesters Approach to AWS IAMNull Bangalore | Pentesters Approach to AWS IAM
Null Bangalore | Pentesters Approach to AWS IAM
 
Pressure Relief valve used in flow line to release the over pressure at our d...
Pressure Relief valve used in flow line to release the over pressure at our d...Pressure Relief valve used in flow line to release the over pressure at our d...
Pressure Relief valve used in flow line to release the over pressure at our d...
 
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by AnantLLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
 
Mechanical Engineering on AAI Summer Training Report-003.pdf
Mechanical Engineering on AAI Summer Training Report-003.pdfMechanical Engineering on AAI Summer Training Report-003.pdf
Mechanical Engineering on AAI Summer Training Report-003.pdf
 
一比一原版(USF毕业证)旧金山大学毕业证如何办理
一比一原版(USF毕业证)旧金山大学毕业证如何办理一比一原版(USF毕业证)旧金山大学毕业证如何办理
一比一原版(USF毕业证)旧金山大学毕业证如何办理
 
Call For Paper -3rd International Conference on Artificial Intelligence Advan...
Call For Paper -3rd International Conference on Artificial Intelligence Advan...Call For Paper -3rd International Conference on Artificial Intelligence Advan...
Call For Paper -3rd International Conference on Artificial Intelligence Advan...
 
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
 
Height and depth gauge linear metrology.pdf
Height and depth gauge linear metrology.pdfHeight and depth gauge linear metrology.pdf
Height and depth gauge linear metrology.pdf
 
Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...
Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...
Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...
 
ITSM Integration with MuleSoft.pptx
ITSM  Integration with MuleSoft.pptxITSM  Integration with MuleSoft.pptx
ITSM Integration with MuleSoft.pptx
 
Transformers design and coooling methods
Transformers design and coooling methodsTransformers design and coooling methods
Transformers design and coooling methods
 
SENTIMENT ANALYSIS ON PPT AND Project template_.pptx
SENTIMENT ANALYSIS ON PPT AND Project template_.pptxSENTIMENT ANALYSIS ON PPT AND Project template_.pptx
SENTIMENT ANALYSIS ON PPT AND Project template_.pptx
 
一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理
一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理
一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理
 
2. protection of river banks and bed erosion protection works.ppt
2. protection of river banks and bed erosion protection works.ppt2. protection of river banks and bed erosion protection works.ppt
2. protection of river banks and bed erosion protection works.ppt
 
AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...
AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...
AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...
 
NATURAL DEEP EUTECTIC SOLVENTS AS ANTI-FREEZING AGENT
NATURAL DEEP EUTECTIC SOLVENTS AS ANTI-FREEZING AGENTNATURAL DEEP EUTECTIC SOLVENTS AS ANTI-FREEZING AGENT
NATURAL DEEP EUTECTIC SOLVENTS AS ANTI-FREEZING AGENT
 
Accident detection system project report.pdf
Accident detection system project report.pdfAccident detection system project report.pdf
Accident detection system project report.pdf
 
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
 
An Introduction to the Compiler Designss
An Introduction to the Compiler DesignssAn Introduction to the Compiler Designss
An Introduction to the Compiler Designss
 
Blood finder application project report (1).pdf
Blood finder application project report (1).pdfBlood finder application project report (1).pdf
Blood finder application project report (1).pdf
 

International Delay Analysis Approaches

  • 1. WhatsApp: +201153408493 Facebook: Frontiers International Website: https://portal.frontierspm.com/ Email: info@frontierspm.com 1 Facebook: Frontiers International Website: https://portal.frontierspm.com/ Email: info@frontierspm.com WhatsApp: +201153408493 International Delay Analysis Approaches
  • 2. WhatsApp: +201153408493 Facebook: Frontiers International Website: https://portal.frontierspm.com/ Email: info@frontierspm.com 2 @magedkom /in/magedkom ArabPlanners @profplanner Mohamed Maged Hegazy Project Management Consultant LLM, MBA, PMP, CCP, P3O • Master in Construction Law – Salford University, Manchester, UK • Master of Business Administration – UoPeople, US • B.Sc. Civil Engineering – Ain Shams University, Egypt • Consultant – Saudi Council of Engineers, Saudi Arabia • CCP, Certified Cost Professional credential – AACE International, US • PMP, Project Management Professional credential – PMI, US • P3O, Portfolio, Programme and Projects Offices credential – AXELOS, UK • FIDIC Contracts Consultant, AIA (Brussels) Fellow • Author of 50 Planning fundamentals & Fundamentals of Construction Contracts • Experience more than 21 years in mega-projects (Buildings, Infrastructure & Roads)
  • 3. WhatsApp: +201153408493 Facebook: Frontiers International Website: https://portal.frontierspm.com/ Email: info@frontierspm.com 3 My Related Publications Project Planning and Scheduling Delay Analysis Contractual and Legal Aspects @magedkom /in/magedkom ArabPlanners @profplanner
  • 4. 2020 @magedkom /in/magedkom ArabPlanners @profplanner International Delay Analysis Perspectives 1) RICS Guidance 2) Delay Analysis Categories. 3) ASCE Perspective 4) Source Data. 5) AACE RPs
  • 5. WhatsApp: +201153408493 Facebook: Frontiers International Website: https://portal.frontierspm.com/ Email: info@frontierspm.com 5 • ‫م‬ ‫الموضوع؟‬ ‫هذا‬ ‫تناولت‬ ‫التي‬ ‫الهامة‬ ‫المراجع‬ ‫هي‬ ‫ا‬ ‫وهي‬ ‫التأخير‬ ‫تحليل‬ ‫موضوع‬ ‫في‬ ‫تكلمت‬ ‫التي‬ ‫المفيدة‬ ‫المراجع‬ ‫من‬ ‫بعض‬ ‫إليكم‬ : References
  • 6. WhatsApp: +201153408493 Facebook: Frontiers International Website: https://portal.frontierspm.com/ Email: info@frontierspm.com 6 • ‫الكتب‬ ‫بعض‬ : ‫و‬ ‫التأخير‬ ‫وتحليل‬ ‫التمديد‬ ‫مطالبات‬ ‫موضوع‬ ‫في‬ ‫تكلمت‬ ‫التي‬ ‫الكتب‬ ‫من‬ ‫بعض‬ ‫إليكم‬ ‫هي‬ : More References
  • 7. WhatsApp: +201153408493 Facebook: Frontiers International Website: https://portal.frontierspm.com/ Email: info@frontierspm.com 7 Prospective Delay Analysis: Analysis of facts associated with delay events during construction of a project and the estimation of their effect upon the planned completion date of a project. (Interim Extension of Time). Retrospective Delay Analysis: Analysis of facts associated with delay events after completion of the construction period of a project. (Final Extension of Time). Interim vs Final Extension of Time
  • 8. WhatsApp: +201153408493 Facebook: Frontiers International Website: https://portal.frontierspm.com/ Email: info@frontierspm.com 8 Categories
  • 9. WhatsApp: +201153408493 Facebook: Frontiers International Website: https://portal.frontierspm.com/ Email: info@frontierspm.com 9 Theoretical Based Methods Global Impact method Considers an increase in work scope as directly proportional to time and ignores timing, concurrency and own delays. As-planned impacted method Impacts delays upon the original baseline and does not consider mistakes in the baseline or events at the time of the delay. As-built “but for” Inconsistent with the facts and relies upon the as built programme demonstrating that all delay is excusable.
  • 10. WhatsApp: +201153408493 Facebook: Frontiers International Website: https://portal.frontierspm.com/ Email: info@frontierspm.com 10 Actual Based Methods As-planned -v- as built method Simple and visible in a single window but not suitable for complex projects with competing and concurrent delay. Windows/snap shot or update method The use of electronic progress reports to analyse incrementally the changes to the as planned programme with as built assistance. Impact/Update – Timeslices Driven by a delay schedule and subject to time slices within which the anticipated and actual progress is analysed. Strong in addressing mitigation and concurrent delays.
  • 11. WhatsApp: +201153408493 Facebook: Frontiers International Website: https://portal.frontierspm.com/ Email: info@frontierspm.com 11 RICS Professional Guidance General Principles (Level 1 - Knowing): - Costs of Delay: LDs vs Prolongation/time-related costs. Practical Application (Level 2 - Doing): - Measurement of Delay. - Methods of Delay Analysis. Practical Considerations (Level 3 - Advising): - Which Method should be adopted? - Strength and Weakness of each Method. - Concurrent Liability of Delay. If a delay has been caused by EE, then in general, the contractor will be entitled to EOT. In order to decide whether a contractor is entitled to an extension of time, it is necessary to establish the cause of the delay and the period of delay. In some cases this will be very easy but in many cases it will be very difficult and can be controversial.
  • 12. WhatsApp: +201153408493 Facebook: Frontiers International Website: https://portal.frontierspm.com/ Email: info@frontierspm.com 12 Measurement of Delay: form contract completion date to the actual completion date (retrospective), or form the current contract completion date to the projected completion date (prospective). It’s important to agree on the benchmark programme that will be used (BIM can help) to carry out the reviews to resolve questions of culpability for delay or to estimate the likely delay period. Methods of Delay Analysis Methods of delay analysis: -Simple and relatively simple 1. Overview of the facts: It deals with relatively straight forward claims when the cause and delay are apparent. 2. Comparing actual and planned progress: It’s comparing the activities timing using the contemporaneous documents to review the reasons of discrepancies/ delay. -Detailed, forensic and more reliable 3. Critical path analysis (CPA): Based on the logic-link using either planned (prospect. or retrosp.) or as-built programme. 4. Focused methods of analysis: Over shorter periods using an updated programme (prospective: TIA), or particular periods with as-built data (Retrospective: window or time slice).
  • 13. WhatsApp: +201153408493 Facebook: Frontiers International Website: https://portal.frontierspm.com/ Email: info@frontierspm.com 13 Records / Source Data
  • 15. WhatsApp: +201153408493 Facebook: Frontiers International Website: https://portal.frontierspm.com/ Email: info@frontierspm.com 15 Delay Analysis Approaches - AACE Prospective Retrospective Insert a modeled fragnet into the schedule, then check logic and duration, and finally recalculate the CPM to measure the time impact. The appropriate update schedule is the most recently reviewed schedule update before the event (unimpacted schedule). 1. Classification and Principles 2. Source Validation 3. Method Implementation 4. Analysis Evaluation 5. CHOOSING A METHOD @magedkom /in/magedkom ArabPlanners @profplanner
  • 16. WhatsApp: +201153408493 Facebook: Frontiers International Website: https://portal.frontierspm.com/ Email: info@frontierspm.com 16 Classification Observational: Examining the schedule itself without changes. Static: Same network - Dynamic: updates with variations. Modeled: Representing delay events in schedule. Additive: add to a base - Subtractive: from as-built. @magedkom /in/magedkom ArabPlanners @profplanner
  • 17. Thank You 17 Don’t Hesitate to contact…. M.Maged Hegazy mm.hegazy@ppmconference.net Mobile : 00966 (0) 58 0264 968