Introduction
Closing a project is a process of finalizing all activities across all the project
management groups to formally close the project or a project phase or this is the
last phase of a construction project and is as important as any other phase in the
project.
This is a process of completing and documenting all the construction tasks
required to complete the project.
A poor project closure (or close-out, as it is referred to sometimes) leaves the
client unsatisfied and may prove to be a cause for not getting repeat business.
Thus, project closure should be meticulously planned.
2
Closing a Project:
3
 Project closure consists of a number of tasks. The project closure phase can be
divided into the following broad headings:
i. Construction closure or Closing Procurements
ii. Financial closure
iii. Contract closure
iv. Project manager’s closure
v. Lessons learned from the project
vi. Closing Project or Phase(Administrative Closure)
The process also includes activities to investigate and document the reasons
if a project is terminated before completion.
Procurement Closure
This involves preparation of the project punch list, which is a list of deficiencies
identified during the combined inspection of constructed facilities by the
representatives of client, contractor, consultant.
 During the regular inspection also, deficiencies are reported to the contractor by
the consultant, and the client’s representative.
The punch list is prepared usually towards the end of the project when all major
construction activities are completed.
The punch list is formally handed over to the contractor, who takes steps to rectify
the deficiencies thus pointed out.
There may be a situation in which some of the deficiencies pointed out in the
punch list may not be part of the contract, and the contractor in such cases usually
asks the owner for extra payment.
4
Certificate of Substantial Completion
5
For a contractor, obtaining the certificate of substantial completion is an important
milestone event as it ends the contractor’s liability for liquidated damages (LD).
Substantial completion refers to a situation in which the project is sufficiently
completed.
In other words, even though some minor deficiencies may be present (all the
deficiencies pointed out in the punch list may not have been attended to), the
constructed facility can now be used for its intended function.
Certificate of Occupancy
6
This is usually issued by the municipality under whose jurisdiction the project
location falls.
It indicates that the constructed facility complies with the entire codal requirement
and is safe to be occupied.
Demobilization or Release of Resources
7
This consists of demobilization (release) of resources such as staff and workers, and is
as important as their mobilization.
The closure of office, removal of unused materials lying in store, and disconnecting
water, electricity and sewerage lines are all part of the demobilization process.
Financial Closure:
8
Financial closure consists of writing applications for final payment, release of various
bank guarantees, and settlement of any change order issued by the client.
Final Payment
The contractor has to apply for the release of final payment after he has attended to
all the deficiencies pointed out in the punch list. The request for release of retention
money is also made.
Release of Various Bank Guarantees
During the course of execution of project, the contractor submits a number of bank
guarantees to the owner. A written request is made to the client to release the bank
guarantees.
Contract Closure:
9
Construction contract usually specifies the requirement of contract closure and, thus,
the contractor should prepare a list of requirements for contract closure as per the
contract between him and the owner.
Submission of As-built Drawings
i. During the project execution process, due to site constraint there might be some
changes in the as-built facility from that as specified in the contract drawings.
ii. it is very important to prepare the as-built drawings by estimating the actual
dimension and condition of the constructed facility.
iii. The as-built drawings of all the trades such as civil, electrical and mechanical
disciplines should be compiled and submitted to the owner.
10
Submission of Operation and Maintenance Manual
i. Modern projects involve a number of mechanical and electrical appliances—for example, elevator,
cooling tower, air-handling unit and diesel-generator set.
ii. The manufacturers of these appliances provide operation and maintenance manual associated with
these appliances.
iii. These should be handed over to the owner.
Submission of Warranties
i. It is the duty of the contractor to collect all the warranties and guarantees from vendors,
subcontractors and suppliers, and submit these to the owner.
Submission of Test Reports
i. During the execution of project, a number of tests are conducted on materials, appliances and
systems that are installed in the project.
ii. The test records need to be compiled and submitted to the owner for future reference.
Project Manager’s Closure
11
This includes tasks such as preparation of an as-built estimate, analysis of actual cost
versus estimated cost, analysis of items where cost overrun was high etc.
conduct of meetings with external agencies such as client, architect and consultants
for understanding their feedback on various project management aspects.
Meetings with own staff and subcontractor should also be held to get their feedback
on various issues.
Lessons Learned From The Project
12
This involves collection and compilation of all records associated with the project, and
preparing archives of important project records.
It also involves documenting the important issues faced in the project and their
resolution.
This helps in planning for such type of issues in the early stages of other projects.
i. Did the project meet its requirements and objectives?
ii. Was the customer satisfied?
iii. Was the project schedule met? Was the project completed within the stipulated cost?
iv. Was the level of achieved quality acceptable?
v. Were the risks identified and appropriately mitigated?
vi. What better ways can be employed to improve project execution and its
management?
Administrative Closure:
13
Administrative closure includes:
 Close each phase of the project
 Collect and summarize project results, compare to plan time, cost, scope and
technical approach.
 Gathering the lessons learned.
 Formal documented acceptance by customer.
 Archive and index project records for future reference.
Project Closure:
The data to be documented includes:
Administrative closure
Product verification
Early contract termination conditions
Payment terms
Formal acceptance documentation
Project files
Project closure documents
Historical information
14
Thank You

More Related Content

What's hot

Project Scope Management,PMP Chapter 5,PMBOK,PMP Exam Preparation training
Project Scope Management,PMP Chapter 5,PMBOK,PMP Exam Preparation trainingProject Scope Management,PMP Chapter 5,PMBOK,PMP Exam Preparation training
Project Scope Management,PMP Chapter 5,PMBOK,PMP Exam Preparation trainingJustAcademy
 
Pmp chapter(5) Scope Management
Pmp chapter(5) Scope ManagementPmp chapter(5) Scope Management
Pmp chapter(5) Scope ManagementHisham Ali,PMP
 
01 pmp introduct to project management exam
01 pmp introduct to project management exam01 pmp introduct to project management exam
01 pmp introduct to project management examJamil Faraj , PMP
 
Pmi - Project Management Professional (Pmp) Certification Study Guide
Pmi - Project Management Professional (Pmp)   Certification Study GuidePmi - Project Management Professional (Pmp)   Certification Study Guide
Pmi - Project Management Professional (Pmp) Certification Study Guiderobsonnasc
 
PMP NOTES Based on PMBOK Guide 5th Edition and updated PMP syllabus after 11 ...
PMP NOTES Based on PMBOK Guide 5th Edition and updated PMP syllabus after 11 ...PMP NOTES Based on PMBOK Guide 5th Edition and updated PMP syllabus after 11 ...
PMP NOTES Based on PMBOK Guide 5th Edition and updated PMP syllabus after 11 ...JustAcademy
 
Lec 03 project life cycle
Lec 03 project life cycleLec 03 project life cycle
Lec 03 project life cycleSAJID ALI RUK
 
PMP Chap 4 - Project Integration Management - Part1
PMP Chap 4 - Project Integration Management - Part1PMP Chap 4 - Project Integration Management - Part1
PMP Chap 4 - Project Integration Management - Part1Anand Bobade
 
Avoiding unrealistic schedules
Avoiding unrealistic schedulesAvoiding unrealistic schedules
Avoiding unrealistic schedulesHatem Hegazi
 
Project, Program & Portfolio Management
Project, Program & Portfolio ManagementProject, Program & Portfolio Management
Project, Program & Portfolio ManagementAnand Subramaniam
 
Project Manangement Introduction
Project Manangement IntroductionProject Manangement Introduction
Project Manangement Introductionasim78
 
Project planning and scheduling techniques
Project planning and scheduling techniquesProject planning and scheduling techniques
Project planning and scheduling techniquesShivangi Saini
 
Schedule Development
Schedule DevelopmentSchedule Development
Schedule DevelopmentChris Carson
 
Project management
Project managementProject management
Project managementSimran Kaur
 
Project Schedule Management - PMBOK6
Project Schedule Management - PMBOK6Project Schedule Management - PMBOK6
Project Schedule Management - PMBOK6Agus Suhanto
 

What's hot (20)

Project Scope Management,PMP Chapter 5,PMBOK,PMP Exam Preparation training
Project Scope Management,PMP Chapter 5,PMBOK,PMP Exam Preparation trainingProject Scope Management,PMP Chapter 5,PMBOK,PMP Exam Preparation training
Project Scope Management,PMP Chapter 5,PMBOK,PMP Exam Preparation training
 
Introduction to project management
Introduction to project managementIntroduction to project management
Introduction to project management
 
Pmp chapter(5) Scope Management
Pmp chapter(5) Scope ManagementPmp chapter(5) Scope Management
Pmp chapter(5) Scope Management
 
Project management
Project managementProject management
Project management
 
01 pmp introduct to project management exam
01 pmp introduct to project management exam01 pmp introduct to project management exam
01 pmp introduct to project management exam
 
Project milestone
Project milestoneProject milestone
Project milestone
 
Final Project Closing
Final Project ClosingFinal Project Closing
Final Project Closing
 
Pmi - Project Management Professional (Pmp) Certification Study Guide
Pmi - Project Management Professional (Pmp)   Certification Study GuidePmi - Project Management Professional (Pmp)   Certification Study Guide
Pmi - Project Management Professional (Pmp) Certification Study Guide
 
PMP NOTES Based on PMBOK Guide 5th Edition and updated PMP syllabus after 11 ...
PMP NOTES Based on PMBOK Guide 5th Edition and updated PMP syllabus after 11 ...PMP NOTES Based on PMBOK Guide 5th Edition and updated PMP syllabus after 11 ...
PMP NOTES Based on PMBOK Guide 5th Edition and updated PMP syllabus after 11 ...
 
Earned Value Management
Earned Value ManagementEarned Value Management
Earned Value Management
 
Lec 03 project life cycle
Lec 03 project life cycleLec 03 project life cycle
Lec 03 project life cycle
 
PMP Chap 4 - Project Integration Management - Part1
PMP Chap 4 - Project Integration Management - Part1PMP Chap 4 - Project Integration Management - Part1
PMP Chap 4 - Project Integration Management - Part1
 
07 project cost management
07 project cost management07 project cost management
07 project cost management
 
Avoiding unrealistic schedules
Avoiding unrealistic schedulesAvoiding unrealistic schedules
Avoiding unrealistic schedules
 
Project, Program & Portfolio Management
Project, Program & Portfolio ManagementProject, Program & Portfolio Management
Project, Program & Portfolio Management
 
Project Manangement Introduction
Project Manangement IntroductionProject Manangement Introduction
Project Manangement Introduction
 
Project planning and scheduling techniques
Project planning and scheduling techniquesProject planning and scheduling techniques
Project planning and scheduling techniques
 
Schedule Development
Schedule DevelopmentSchedule Development
Schedule Development
 
Project management
Project managementProject management
Project management
 
Project Schedule Management - PMBOK6
Project Schedule Management - PMBOK6Project Schedule Management - PMBOK6
Project Schedule Management - PMBOK6
 

Similar to Project closure

projectclosure-rutik.pptx project management
projectclosure-rutik.pptx project managementprojectclosure-rutik.pptx project management
projectclosure-rutik.pptx project managementakashdhewale87
 
The Final Activity in Project Management
The Final Activity in Project ManagementThe Final Activity in Project Management
The Final Activity in Project ManagementCIToolkit
 
Construction process
Construction processConstruction process
Construction processMazen Al-Qadi
 
IRJET- Delay in Construction its Causes and Mitigation: A Review
IRJET-  	  Delay in Construction its Causes and Mitigation: A ReviewIRJET-  	  Delay in Construction its Causes and Mitigation: A Review
IRJET- Delay in Construction its Causes and Mitigation: A ReviewIRJET Journal
 
PROJECT MANAGEMENT AND FINANCE
PROJECT MANAGEMENT AND FINANCE PROJECT MANAGEMENT AND FINANCE
PROJECT MANAGEMENT AND FINANCE S. Sathishkumar
 
Mr Bolaji Johnson Paper.pptx
Mr Bolaji Johnson Paper.pptxMr Bolaji Johnson Paper.pptx
Mr Bolaji Johnson Paper.pptxssusercdf134
 
Project management in practice - world cement magazine nov 2016
Project management in practice - world cement magazine nov 2016Project management in practice - world cement magazine nov 2016
Project management in practice - world cement magazine nov 2016Gregoire Lesecq
 
Advanced Training for Construction Management: CONTRACTS MANAGEMENT part1
Advanced Training for Construction Management: CONTRACTS MANAGEMENT part1Advanced Training for Construction Management: CONTRACTS MANAGEMENT part1
Advanced Training for Construction Management: CONTRACTS MANAGEMENT part1Antonio Coladarce
 
05 Contract Management.pptx . DEFINITION
05 Contract Management.pptx . DEFINITION05 Contract Management.pptx . DEFINITION
05 Contract Management.pptx . DEFINITIONByishimoBTCChef
 
Project management-project life cycle-pdf
Project management-project life cycle-pdfProject management-project life cycle-pdf
Project management-project life cycle-pdfAditi Garg
 
Arega Siyum D/r revised
Arega  Siyum D/r revisedArega  Siyum D/r revised
Arega Siyum D/r revisedFiker Love
 
1-7Projectmanagement-120312002842-Phpapp01
1-7Projectmanagement-120312002842-Phpapp011-7Projectmanagement-120312002842-Phpapp01
1-7Projectmanagement-120312002842-Phpapp01Amy Roman
 
1.7 project management
1.7 project management1.7 project management
1.7 project managementexemplar2401
 
Unit 1 basics of construction
Unit 1 basics of constructionUnit 1 basics of construction
Unit 1 basics of constructionSANJEEV Wazir
 
C. Site managment chapter 5.pptx
C. Site managment chapter 5.pptxC. Site managment chapter 5.pptx
C. Site managment chapter 5.pptxEdenBekele5
 

Similar to Project closure (20)

projectclosure-rutik.pptx project management
projectclosure-rutik.pptx project managementprojectclosure-rutik.pptx project management
projectclosure-rutik.pptx project management
 
The Final Activity in Project Management
The Final Activity in Project ManagementThe Final Activity in Project Management
The Final Activity in Project Management
 
Construction management
Construction managementConstruction management
Construction management
 
Construction process
Construction processConstruction process
Construction process
 
IRJET- Delay in Construction its Causes and Mitigation: A Review
IRJET-  	  Delay in Construction its Causes and Mitigation: A ReviewIRJET-  	  Delay in Construction its Causes and Mitigation: A Review
IRJET- Delay in Construction its Causes and Mitigation: A Review
 
PROJECT MANAGEMENT AND FINANCE
PROJECT MANAGEMENT AND FINANCE PROJECT MANAGEMENT AND FINANCE
PROJECT MANAGEMENT AND FINANCE
 
MODULE 5.pptx
MODULE 5.pptxMODULE 5.pptx
MODULE 5.pptx
 
Mr Bolaji Johnson Paper.pptx
Mr Bolaji Johnson Paper.pptxMr Bolaji Johnson Paper.pptx
Mr Bolaji Johnson Paper.pptx
 
Ch1 introduction
Ch1 introductionCh1 introduction
Ch1 introduction
 
Project management in practice - world cement magazine nov 2016
Project management in practice - world cement magazine nov 2016Project management in practice - world cement magazine nov 2016
Project management in practice - world cement magazine nov 2016
 
Advanced Training for Construction Management: CONTRACTS MANAGEMENT part1
Advanced Training for Construction Management: CONTRACTS MANAGEMENT part1Advanced Training for Construction Management: CONTRACTS MANAGEMENT part1
Advanced Training for Construction Management: CONTRACTS MANAGEMENT part1
 
Pm chapter 7
Pm chapter 7Pm chapter 7
Pm chapter 7
 
Pm chapter 7...
Pm chapter 7...Pm chapter 7...
Pm chapter 7...
 
05 Contract Management.pptx . DEFINITION
05 Contract Management.pptx . DEFINITION05 Contract Management.pptx . DEFINITION
05 Contract Management.pptx . DEFINITION
 
Project management-project life cycle-pdf
Project management-project life cycle-pdfProject management-project life cycle-pdf
Project management-project life cycle-pdf
 
Arega Siyum D/r revised
Arega  Siyum D/r revisedArega  Siyum D/r revised
Arega Siyum D/r revised
 
1-7Projectmanagement-120312002842-Phpapp01
1-7Projectmanagement-120312002842-Phpapp011-7Projectmanagement-120312002842-Phpapp01
1-7Projectmanagement-120312002842-Phpapp01
 
1.7 project management
1.7 project management1.7 project management
1.7 project management
 
Unit 1 basics of construction
Unit 1 basics of constructionUnit 1 basics of construction
Unit 1 basics of construction
 
C. Site managment chapter 5.pptx
C. Site managment chapter 5.pptxC. Site managment chapter 5.pptx
C. Site managment chapter 5.pptx
 

Recently uploaded

VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxhumanexperienceaaa
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 

Recently uploaded (20)

VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 

Project closure

  • 2. Introduction Closing a project is a process of finalizing all activities across all the project management groups to formally close the project or a project phase or this is the last phase of a construction project and is as important as any other phase in the project. This is a process of completing and documenting all the construction tasks required to complete the project. A poor project closure (or close-out, as it is referred to sometimes) leaves the client unsatisfied and may prove to be a cause for not getting repeat business. Thus, project closure should be meticulously planned. 2
  • 3. Closing a Project: 3  Project closure consists of a number of tasks. The project closure phase can be divided into the following broad headings: i. Construction closure or Closing Procurements ii. Financial closure iii. Contract closure iv. Project manager’s closure v. Lessons learned from the project vi. Closing Project or Phase(Administrative Closure) The process also includes activities to investigate and document the reasons if a project is terminated before completion.
  • 4. Procurement Closure This involves preparation of the project punch list, which is a list of deficiencies identified during the combined inspection of constructed facilities by the representatives of client, contractor, consultant.  During the regular inspection also, deficiencies are reported to the contractor by the consultant, and the client’s representative. The punch list is prepared usually towards the end of the project when all major construction activities are completed. The punch list is formally handed over to the contractor, who takes steps to rectify the deficiencies thus pointed out. There may be a situation in which some of the deficiencies pointed out in the punch list may not be part of the contract, and the contractor in such cases usually asks the owner for extra payment. 4
  • 5. Certificate of Substantial Completion 5 For a contractor, obtaining the certificate of substantial completion is an important milestone event as it ends the contractor’s liability for liquidated damages (LD). Substantial completion refers to a situation in which the project is sufficiently completed. In other words, even though some minor deficiencies may be present (all the deficiencies pointed out in the punch list may not have been attended to), the constructed facility can now be used for its intended function.
  • 6. Certificate of Occupancy 6 This is usually issued by the municipality under whose jurisdiction the project location falls. It indicates that the constructed facility complies with the entire codal requirement and is safe to be occupied.
  • 7. Demobilization or Release of Resources 7 This consists of demobilization (release) of resources such as staff and workers, and is as important as their mobilization. The closure of office, removal of unused materials lying in store, and disconnecting water, electricity and sewerage lines are all part of the demobilization process.
  • 8. Financial Closure: 8 Financial closure consists of writing applications for final payment, release of various bank guarantees, and settlement of any change order issued by the client. Final Payment The contractor has to apply for the release of final payment after he has attended to all the deficiencies pointed out in the punch list. The request for release of retention money is also made. Release of Various Bank Guarantees During the course of execution of project, the contractor submits a number of bank guarantees to the owner. A written request is made to the client to release the bank guarantees.
  • 9. Contract Closure: 9 Construction contract usually specifies the requirement of contract closure and, thus, the contractor should prepare a list of requirements for contract closure as per the contract between him and the owner. Submission of As-built Drawings i. During the project execution process, due to site constraint there might be some changes in the as-built facility from that as specified in the contract drawings. ii. it is very important to prepare the as-built drawings by estimating the actual dimension and condition of the constructed facility. iii. The as-built drawings of all the trades such as civil, electrical and mechanical disciplines should be compiled and submitted to the owner.
  • 10. 10 Submission of Operation and Maintenance Manual i. Modern projects involve a number of mechanical and electrical appliances—for example, elevator, cooling tower, air-handling unit and diesel-generator set. ii. The manufacturers of these appliances provide operation and maintenance manual associated with these appliances. iii. These should be handed over to the owner. Submission of Warranties i. It is the duty of the contractor to collect all the warranties and guarantees from vendors, subcontractors and suppliers, and submit these to the owner. Submission of Test Reports i. During the execution of project, a number of tests are conducted on materials, appliances and systems that are installed in the project. ii. The test records need to be compiled and submitted to the owner for future reference.
  • 11. Project Manager’s Closure 11 This includes tasks such as preparation of an as-built estimate, analysis of actual cost versus estimated cost, analysis of items where cost overrun was high etc. conduct of meetings with external agencies such as client, architect and consultants for understanding their feedback on various project management aspects. Meetings with own staff and subcontractor should also be held to get their feedback on various issues.
  • 12. Lessons Learned From The Project 12 This involves collection and compilation of all records associated with the project, and preparing archives of important project records. It also involves documenting the important issues faced in the project and their resolution. This helps in planning for such type of issues in the early stages of other projects. i. Did the project meet its requirements and objectives? ii. Was the customer satisfied? iii. Was the project schedule met? Was the project completed within the stipulated cost? iv. Was the level of achieved quality acceptable? v. Were the risks identified and appropriately mitigated? vi. What better ways can be employed to improve project execution and its management?
  • 13. Administrative Closure: 13 Administrative closure includes:  Close each phase of the project  Collect and summarize project results, compare to plan time, cost, scope and technical approach.  Gathering the lessons learned.  Formal documented acceptance by customer.  Archive and index project records for future reference.
  • 14. Project Closure: The data to be documented includes: Administrative closure Product verification Early contract termination conditions Payment terms Formal acceptance documentation Project files Project closure documents Historical information 14