Cost Effective Ecological Sanitation
        Toilets(ECOSAN)

                        K.Y.Babu
                      Dean- Training
                     WASH Institute
         ( A Key Resource Centre for MoDWS, GoI)
                5-296, Anathagiri 7th Street, Kodaikanal.
                        babu@washinstitute.org
                        04542-240881,882,883




© Plan
Up scaling
of
ECOSAN
 High Cost is
 one of the
 major
 Hindrance




     © Plan     Gramalaya workshop 9-11 May
                        2012 Tirchy           2
Cost Effective House Hold ECOSAN Design




             Gramalaya workshop 9-11 May 2012 Tirchy
                                                       3
© Plan
Dimensions




          Outer Size : Length 5.9
                        X 4.6
© Plan   Inner Gramalaya workshop 9-11 May 2012:Tirchy
               Chamber Size 1.9
                                                         4
                          X3
Construction of ECOSAN Toilet




    © Plan                      Gramalaya workshop 9-11 May
                                                 2012 Tirchy   5
ECOSAN with Mud Block Super Structure with Plastering
Sn   Items                          Units       Rate in    Amount
o                                               Rs.
1    Earth work excavation *        1           80.00         80.00
2    Boulders *                     40          2.00          80.00
3    Bricks                         433         2.85        1234.00
4    Mud Block Stone                190         8.00        1520.00
                                    Nos
5    Cement                         3 Bags      235.00       705.00

6    Sand 2 bullock cart            1 .5        400.00       600.00
7    Slab cost(squatting ,roof,     6 Nos                   1400.00
     detachable)
8    Door cost 5’ X 2’.6’’          1                        300.00
9    PVC Pipes Materials                                     350.00
10   Mason wages – man days         5           250.00      1250.00

11   Unskilled labours- man                 4      80.00     320.00
     days *

12   Material Transportation                                 100.00
     Total                                                  7939.00



        Total Cost : Rs.7939
    Beneficiary Contribution : Rs.480
© Plan
                                  Gramalaya workshop 9-11 May 2012 Tirchy   6
Double Chamber Bricks Super Structure
           S     Items                        Units    Rate in     Amoun
           n                                           Rs.         t
           o
           1     Earth work excavation *      1        80           80.00
           2     Boulders *                   40       2.00         80.00
           3     Bricks                       850      2.85        2635.00
           4     Cement                       3        235          705.00
           5     Sand                         50 cft   8.00         400.00
           6     Slab cost(squatting ,roof    6 Nos                1400.00
                 ,detachable)

           7     Door cost 5' X 2'.6''        1        300.00       300.00
           8     PVC pipe Material                                  350.00
           9     Mason wages-man days         4        250         1000.00
           1     Unskilled labours- man       4        80           320.00
           0
                 days *

           1     Material Transportation                            100.00
           1
                 Total                                             7370.00

     * Denotes the items contributed by the beneficiaries (Total value R s. 480.00)



© Plan
           Total Cost : Rs. 7370 Beneficiary Contribution
                                         Gramalaya workshop 9-11 May 2012 Tirchy
                                                                                      7

                              :Rs. 480
ECOSAN with Mud Block Super Structure
           Sno   Items                                    Units     Rate in Rs.    Amount

           1     Earth work excavation *                  1                80.00         80.00

           2     Boulders *                               40                2.00         80.00

           3     Bricks                                   433               2.85       1234.00

           4     Mud Block Stone                          190 Nos           8.00       1520.00


           5     Cement                                   2 Bags          235.00        470.00

           6     Sand 2 bullock cart                      1               400.00        400.00

           7     Slab cost(squatting ,roof, detachable)   6 Nos                        1400.00


           8     Door cost 5’ X 2’.6’’                    1                             300.00

           9     PVC Pipes Materials                                                    350.00

           10    Mason wages – man days                   4               250.00       1000.00

           11    Unskilled labours- man days *            3                80.00        240.00
           12    Material Transportation                                                100.00
                 Total                                                                 7174.00



                      Total Cost : Rs.7174
                Beneficiary Contribution : Rs.400
© Plan
                                                                                                 8
                   Gramalaya workshop 9-11 May 2012 Tirchy
Cement Stone Super Structure
Sno           Items                           Units     Rate in       Amount
                                                        Rs.
1             Earth work excavation *         1                            80.00

2             Boulders Stone *                200              2.00       400.00

3             Cement Stone                    190 Nos         10.00      1900.00

4             Cement                          3 Bags       235.00         705.00

5             Sand 1 bullock cart             1            400.00         400.00

6             Slab cost(squatting ,roof       6 Nos                      1400.00
              ,detachable)

7             Door cost 5’ X 2’.6’’           1                           370.00

8             PVC Pipe Materials                                          350.00

9             Mason Wages – man days          4 Nos.       250.00        1000.00


10            Unskilled labours- man days *   4 Nos           80.00       320.00


11            Material Transportation                                     100.00

              Total                                                      7025.00



          Total Cost : Rs.7025                                   Beneficiary Contribution :
     © Plan                                                                        Gramalaya workshop 9-11 May
                                                              Rs. 800                               2012 Tirchy   9
Tin sheet super Structure
  Sn     Items                        Units       Rate in Rs.   Amount
  o
  1      Expense up to squatting                                  3866.00
         level for Bricks masonry
         structure
  2      Tin Sheet                     120 feet            10     1200.00
  3      Bamboo and Accessories                                    222.00
  4      Reaper                        120 feet             2      240.00
  5      Wage for Technician making           2        250.00      500.00
         temporary super structure
  6      Door cost 5’ X 2’.6’’                1                    300.00
  7      Material Transportation                                    50.00
         Total                                                    6378.00


            Total Cost : Rs.5823
          Beneficiary Contribution :
                   Rs.400

© Plan                                                                      Gramalaya workshop
                                                                                                 10
                                                                            9-11 May 2012 Tirchy
COST EFFECTIVE MODELS OF ECOSAN
                                        ECOSAN with Hollow Blocks Super
   Sno        Items                          structure
                                             Units      Rate in      Amount
                                                        Rs.
   1          Earth work excavation *        1           80.00           80.00

   2          Boulders *                     40               2.00       80.00

   3          Hollow block stone 4''         175              9.50     1662.50

   4          Cement                         2.5 Bags         235       587.50

   5          Sand                           50 cft       8 .00         400.00

   6          Slab cost(squatting ,roof,     6 Nos                     1400.00
              detachable)


   7          Door cost 5’ X 2’.6’’          1                300       300.00

   8          PVC Pipe Materials                                        350.00

   9          Mason Wages - man days         4                250      1000.00


   10         Unskilled labour-man days      4                 80       320.00
              *

   11         Material Transportation                                   100.00

              Total                                                    6279.50



       *   Denotes the items contributed by the beneficiaries (Total value R s.
                                           480.00)


   Total Cost : Rs. 6279 Beneficiary Contribution :Rs. 480 11
© Plan                                                                            Gramalaya workshop 9-11 May
                                                                                          2012 Tirchy
Waste Wood Super Structure
Sn    Items                      Units       Rate in     Amount
o                                            Rs.
1     Expense up to squatting                                3866.00
      level for Bricks masonry
      structure
2     Waste wood                 110 Kg           5.00        550.00
3     Tin sheet                  42 Feet                      450.00
4     Bamboo and accessories                    350.00        350.00

5     Door cost 5’ X 2’.6’’                                   300.00

6     Carpenter wages                    2      250.00        500.00
7     Material Transportation                                     50.00

      Total                                                  6066.00




       Total Cost : Rs.6066.                               Beneficiary Contribution :
                                                         Rs.320            Gramalaya workshop 9-11 May
     © Plan
                                                                                            2012 Tirchy 12
Nanal Bamboo Super Structure

   Sn    Items                           Units       Rate in        Amount
   o                                                 Rs.
   1     Expense up to squatting level                               3866.00
         for Bricks masonry structure
   2     Nanal Thatch                     16 Nos               50     900.00
   3     Bamboos and accessories                         327.00       327.00
   4     Palm Leaf                        50 Nos               1       50.00
   5     Door cost 5' X 2'.6‘‘                   1                    300.00
   6     Wage for Technician making              1       250.00       250.00
         temporary super structure
   7     Unskilled labours- man days *           1        80.00        80.00
   8     Material Transportation                                       50.00
         Total                                                       5823.00




                                       Total Cost : Rs.5823
                                 Beneficiary Contribution : Rs.400


© Plan                                                                         Gramalaya workshop
                                                                                                    13
                                                                               9-11 May 2012 Tirchy
Sn   Items
                  Palm Leaf Super Structure
                                   Units       Rate in     Amount
o                                              Rs.
1    Expense up to squatting                                  3866.00
     level for Bricks masonry
     structure

2    Palm Leaf                        150           2.00       300.00
                                     Nos

3    Bamboos and accessories                     327.00        327.00
4    Door cost 5’ X 2’.6’’          1 Nos                      300.00
5    Wage for Technician                   2     250.00        500.00
     making temporary super
     structure

6    Unskilled labours- man days           1       80.00        80.00
     *

7    Material Transportation                                    50.00

     Total                                                    5423.00




         Total Cost : Rs.5423
©
      Beneficiary Contribution :
    Plan                                                                Gramalaya workshop 9-11 May
                                                                                         2012 Tirchy 14
                Rs.400
Coconut Thatches Super Structure
Sno     Items                                Units         Rate in Rs.     Amount


        Expense up to squatting slab level
1       Earth work excavation *                       1           80.00          80.00
2       Boulders *                                   40             2.00         80.00
3       Bricks                                       425            2.85      1211.00
4       Cement                                  1 bag            235.00        235.00
5       Sand                                    25 cft              8.00       200.00
6       Slab cost(squatting ,detachable)       4 Nos             250.00       1000.00

7       PVC pipe Material                                                      350.00
8       Mason wages-man days                          2          250.00        500.00
9       Unskilled labours- man days *                 2           80.00        160.00
10      Material Transportation                                                 50.00
        Sub Total Up to Squatting Level                                       3866.00


        Expenses for super structure
11      Coconut thatches and Bamboos                 300            1.50
        Etc..                                                                  450.00
        Bamboos and accessories                                  327.00        327.00
12      Wage for Technician making                    1          250.00        250.00
        temporary super structure
13      Door cost 5' X 2'.6''                         1          300.00        300.00
14      Unskilled labours- man days *                 1           80.00         80.00
15      Material Transportation                                                 50.00
        Sub Total                                                             1457.00
        Grand Total                                                           5323.00
        *       Denotes the items contributed by the beneficiaries (Total value R s. 480.00)


     © Plan
                   Total Cost : Rs. 5323 Beneficiary Contribution :
                                                                                                                     15
                                        Rs.480                             Gramalaya workshop 9-11 May 2012 Tirchy
Single Chamber Bricks Super Structure
     Sn    Items                           Units       Rate in         Amount
     o                                                 Rs.
     1     Earth work excavation *         1           50.00           50.00
     2     Boulders *                      20          2.00            40.00
     3     Bricks                          350         2.85            998.00
     4     Cement                          2 Bags      235             470.00
     5     Sand 1 bullock cart             1           400             400.00
     6     Slab cost(squatting ,roof       3 Nos                       650.00
           ,detachable)

     7     Door cost 5’ X 2’.6’’           1                           300.00
     8     PVC Pipe Materials                                          175.00
     9     Plastic drum                    2 Nos       175             350.00
     10    Mason wages – man days          2           250             500.00
     11    Unskilled labours- man days *           2           80.00     160.00
     12    Material Transportation                                     100.00

           Total                                                       4193.00



          Total Cost : Rs.4193                               Beneficiary Contribution : Rs.250


© Plan                                                                             Gramalaya workshop 9-11 May
                                                                                                    2012 Tirchy 16
Single Chamber Thatches Super Structure
          Sno   Items                                  Units    Rate in Rs.    Amount
          1     Earth work excavation *                1               50.00          50.00
          2     Boulders *                             20               2.00          40.00
          3     Bricks                                 200              2.85         570.00
          4     Cement                                 1 Bags         235.00         235.00
          5     Sand 1 bullock cart                    1/2            200.00         200.00
          6     Slab cost(squatting ,detachable)       2 Nos                         450.00
          7     Door cost 5’ X 2’.6’’                  1                             300.00
          8     PVC Pipe Materials                                                   175.00
          9     Plastic drum                           2 Nos          175.00         350.00
          10    Mason wages – man days                 1              250.00         250.00
          11    Unskilled labours- man days *          2               80.00         160.00
          12    Coconut Thatches and bamboos and                                     450.00
                accessories
          13    Wage for Technician making temporary   1/2                           125.00
                super structure
          14    Material Transportation                                              100.00
                Total                                                              3455.00


               Total Cost : Rs.3455 Beneficiary
                     Contribution : Rs.250
© Plan                                                                           Gramalaya workshop 9-11 May
                                                                                                  2012 Tirchy 17
Ecosan
                                       Bamboo Model
                                         constructed
                                        byMegh Pyne
                                       Abhiyan (Cloud
                                           Water
                                         Campaign),
                                            Bihar.




© Plan   Gramalaya workshop 9-11 May           18
                 2012 Tirchy
Construction of Chamber and fixing of FRP Pan




© Plan          Gramalaya workshop 9-11 May     19
                        2012 Tirchy
© Plan   Gramalaya workshop 9-11 May   20
                 2012 Tirchy
Tin sheet
  Super
structure
 Tiripura




© Plan      Gramalaya workshop 9-11 May   21
                    2012 Tirchy
© Plan
         Bamboo experimental model
© Plan
         Bamboo reinforcement
© Plan
© Plan
© Plan
© Plan
© Plan
© Plan
© Plan   Two vaults with the access
LEARNINGS from our Experience
Super Structure :

        ECOSAN with Hollow Block Super Structure seems to be
Cost Effective at the same time “pakka” Structure with reasonable
cost withe beneficiaries contributed Rs. 480/- and a subsidy of Rs.
2200/- obtained from TSC and only a sum of Rs.3599/- needed as
out side support.

   Single chamber with temporary Super Structure can be the
lowest cost of ECOSAN with a sum of Rs. 3455/-as construction
expenditure . Beneficiary contribution is Rs. 300/- and the subsidy
from TSC is Rs.2200/- and the rest Rs .955/- is needed as external
support.

    Using Hollow Block instead of Bricks from the basement even
upto squatting level can reduced a sum of Rs.500 in all the Models

  © Plan
                                                                 31
                    Gramalaya workshop 9-11 May 2012 Tirchy
LEARNINGS from our Experience
         Doors :
                Tin Sheet with wooden reapers
         are used for the doors for all the
         ECOSAN Models.       For the temporary
         Super Structure using the same
         material for the doors also can reduce
         another a sum of Rs.250/-.
         Chamber :
             Changing the Brick wall between
         the chambers (Divider) from 9’ to 4’.6’’
         can reduced a sum of Rs.150amount
         Squatting Pan : Avoiding pans made of
         Ceramic or FRP and by using cement
         Mortar with hand finishing
           can reduce a sum of Rs.600- Rs.1750 .



© Plan                     Gramalaya workshop 9-11 May   32
                                   2012 Tirchy
LEARNINGS from our Experience
              Detachable Slab :




      Avoiding     detachable slabs behind the
chamber but constructing with a hole and closing
the hole with bricks and Mud Mortar can reduced
the RCC cost.
© Plan
                                                          33
                Gramalaya workshop 9-11 May 2012 Tirchy
Challenges and Recommendations
Challenges                                     Recommendations
Critical areas like coastal                    Special Policy for the critical area
belt, drought prone and hilly area             to promote ECOSAN

 Hesitation of the community to                Proper allocation for IEC and its
accept ECOSAN                                  implementation

 High unit cost                                Increase of subsidy for the
                                               promotion of ECOSAN

 Lack of technical know -How                   Popularization of ECOSAN
                                               technology, including Equipping
                                               the masons

Difficulty Experienced in -                    Pre and Post Project
Motivating      coastal fishermen              implementation , monitoring and
compare to farming community                   supports need to be extended
© Plan                                                                                34
                   Gramalaya workshop 9-11 May 2012 Tirchy
Benefits of ECOSAN Compost and Urine




© Plan                                  Gramalaya workshop 9-11 May 2012
                                                                   Tirchy
                                                                            35
The book of Deuteronomy (23:11-15)
Out side the camp you shall have a place set aside to be used as a latrine.
 “ You Shall keep a trowel in your equipment and with it,
When you go out side to ease nature, your shall first dig a
      hole and afterward cover up your excrement”



© Plan                    Gramalaya workshop 9-11 May 2012 Tirchy         36
Mahatma Gandhi wrote in 1925

“The cause of many of our
 diseases is the condition of our
 lavatories and our bad habit of
 disposing of excreta anywhere
 and every where.”



                 “Sanitation is more important than
                           Independence”

  © Plan
Changing Mindset


                   • Everything has changed
                    except our way of thinking-
                        --Albert Einstein




© Plan
© Plan   Gramalaya workshop 9-11 May   39
                 2012 Tirchy

More Related Content

What's hot

What's hot (20)

Cost effective construction tech PPT
Cost effective construction tech PPT Cost effective construction tech PPT
Cost effective construction tech PPT
 
architectural design of rural nursery school
architectural design of rural  nursery schoolarchitectural design of rural  nursery school
architectural design of rural nursery school
 
A Slum Redevelopment Project
A Slum Redevelopment ProjectA Slum Redevelopment Project
A Slum Redevelopment Project
 
Potential of bamboo in house building sector in kenya
Potential of bamboo in house building sector in kenyaPotential of bamboo in house building sector in kenya
Potential of bamboo in house building sector in kenya
 
Energy efficiency building code
Energy  efficiency building codeEnergy  efficiency building code
Energy efficiency building code
 
Low cost housing
Low cost housingLow cost housing
Low cost housing
 
Bamboo as a building material
Bamboo as a building materialBamboo as a building material
Bamboo as a building material
 
Cyclone resistant building design
Cyclone resistant building designCyclone resistant building design
Cyclone resistant building design
 
Signage study IIT GANDHINAGAR
Signage study IIT GANDHINAGARSignage study IIT GANDHINAGAR
Signage study IIT GANDHINAGAR
 
Green construction
Green constructionGreen construction
Green construction
 
Rayerbazer slum upgrading
 Rayerbazer slum upgrading  Rayerbazer slum upgrading
Rayerbazer slum upgrading
 
SEMINAR ON GREEN BUILDING
SEMINAR ON GREEN BUILDINGSEMINAR ON GREEN BUILDING
SEMINAR ON GREEN BUILDING
 
Green building notes
Green building notesGreen building notes
Green building notes
 
Green Building Materials
Green Building MaterialsGreen Building Materials
Green Building Materials
 
LOW COST HOUSING
LOW COST HOUSINGLOW COST HOUSING
LOW COST HOUSING
 
low cost housing
low cost housinglow cost housing
low cost housing
 
Green buildings
Green buildingsGreen buildings
Green buildings
 
Eco- friendly building materials and construction techniques in India.
Eco- friendly building materials and construction techniques in India.Eco- friendly building materials and construction techniques in India.
Eco- friendly building materials and construction techniques in India.
 
Low Cost Housing Concept
Low Cost Housing ConceptLow Cost Housing Concept
Low Cost Housing Concept
 
buildings rated by GRIHA and LEED, sustainable buildings around the wold, gre...
buildings rated by GRIHA and LEED, sustainable buildings around the wold, gre...buildings rated by GRIHA and LEED, sustainable buildings around the wold, gre...
buildings rated by GRIHA and LEED, sustainable buildings around the wold, gre...
 

Viewers also liked

Toilet options practised in WaterAid - A presentation by Purna Chandra Mohant...
Toilet options practised in WaterAid - A presentation by Purna Chandra Mohant...Toilet options practised in WaterAid - A presentation by Purna Chandra Mohant...
Toilet options practised in WaterAid - A presentation by Purna Chandra Mohant...
India Water Portal
 

Viewers also liked (8)

Total sanitation campaign_P Veluswamy (UNICEF)_2012
Total sanitation campaign_P Veluswamy (UNICEF)_2012Total sanitation campaign_P Veluswamy (UNICEF)_2012
Total sanitation campaign_P Veluswamy (UNICEF)_2012
 
Low cost sanitation_ A presentation by J Geetha_2012
Low cost sanitation_ A presentation by J Geetha_2012Low cost sanitation_ A presentation by J Geetha_2012
Low cost sanitation_ A presentation by J Geetha_2012
 
Ecological sanitation_M Subburaman (SCOPE)_2012
Ecological sanitation_M Subburaman (SCOPE)_2012Ecological sanitation_M Subburaman (SCOPE)_2012
Ecological sanitation_M Subburaman (SCOPE)_2012
 
Toilet options practised in WaterAid - A presentation by Purna Chandra Mohant...
Toilet options practised in WaterAid - A presentation by Purna Chandra Mohant...Toilet options practised in WaterAid - A presentation by Purna Chandra Mohant...
Toilet options practised in WaterAid - A presentation by Purna Chandra Mohant...
 
How can we reduce open defecation in rural India?
How can we reduce open defecation in rural India?How can we reduce open defecation in rural India?
How can we reduce open defecation in rural India?
 
Swachh Bharat abhiyan (Green and Clean City)
Swachh Bharat abhiyan (Green and Clean City)Swachh Bharat abhiyan (Green and Clean City)
Swachh Bharat abhiyan (Green and Clean City)
 
Pneumatic Sheet Metal Shearing Machine - Project report
Pneumatic Sheet Metal Shearing Machine - Project reportPneumatic Sheet Metal Shearing Machine - Project report
Pneumatic Sheet Metal Shearing Machine - Project report
 
Hygiene & Sanitation Presentation for Hotel & Restaurants by Ravi
Hygiene & Sanitation Presentation for Hotel & Restaurants  by RaviHygiene & Sanitation Presentation for Hotel & Restaurants  by Ravi
Hygiene & Sanitation Presentation for Hotel & Restaurants by Ravi
 

More from India Water Portal

Jal Jeevan Mission, Karnataka
Jal Jeevan Mission, KarnatakaJal Jeevan Mission, Karnataka
Jal Jeevan Mission, Karnataka
India Water Portal
 
Water budgeting – a case study from chhuanthar
Water budgeting – a case study from chhuantharWater budgeting – a case study from chhuanthar
Water budgeting – a case study from chhuanthar
India Water Portal
 
Water quality
Water qualityWater quality
Water quality
India Water Portal
 
Understanding geology
Understanding geologyUnderstanding geology
Understanding geology
India Water Portal
 
Springshed treatment measures
Springshed treatment measuresSpringshed treatment measures
Springshed treatment measures
India Water Portal
 
Participatory research appraisal
Participatory research appraisalParticipatory research appraisal
Participatory research appraisal
India Water Portal
 
Community mobilization and institutional framework including monitoring mecha...
Community mobilization and institutional framework including monitoring mecha...Community mobilization and institutional framework including monitoring mecha...
Community mobilization and institutional framework including monitoring mecha...
India Water Portal
 
Concept and approach of springshed development and management 22 jan 2020
Concept and approach of springshed development and management 22 jan 2020Concept and approach of springshed development and management 22 jan 2020
Concept and approach of springshed development and management 22 jan 2020
India Water Portal
 
Spring mapping manual
Spring mapping manualSpring mapping manual
Spring mapping manual
India Water Portal
 
Spring hydrogeology and its classification
Spring hydrogeology and its classificationSpring hydrogeology and its classification
Spring hydrogeology and its classification
India Water Portal
 
Introduction to aquifers
Introduction to aquifersIntroduction to aquifers
Introduction to aquifers
India Water Portal
 
Introduction: Groundwater aquifers
Introduction: Groundwater aquifersIntroduction: Groundwater aquifers
Introduction: Groundwater aquifers
India Water Portal
 

More from India Water Portal (20)

Case study of Gokarna Multi-village scheme, Kumta, Karnataka_IIM-B_2023.pdf
Case study of Gokarna Multi-village scheme, Kumta, Karnataka_IIM-B_2023.pdfCase study of Gokarna Multi-village scheme, Kumta, Karnataka_IIM-B_2023.pdf
Case study of Gokarna Multi-village scheme, Kumta, Karnataka_IIM-B_2023.pdf
 
Financial sustainability of schemes managed by PHED in Punjab_Krishnakumar Th...
Financial sustainability of schemes managed by PHED in Punjab_Krishnakumar Th...Financial sustainability of schemes managed by PHED in Punjab_Krishnakumar Th...
Financial sustainability of schemes managed by PHED in Punjab_Krishnakumar Th...
 
Functioning of Single Village Drinking Water Supply Schemes in Rural Odisha_G...
Functioning of Single Village Drinking Water Supply Schemes in Rural Odisha_G...Functioning of Single Village Drinking Water Supply Schemes in Rural Odisha_G...
Functioning of Single Village Drinking Water Supply Schemes in Rural Odisha_G...
 
Managing drinking water infrastructure in West Bengal Gram Panchayats_Sujata ...
Managing drinking water infrastructure in West Bengal Gram Panchayats_Sujata ...Managing drinking water infrastructure in West Bengal Gram Panchayats_Sujata ...
Managing drinking water infrastructure in West Bengal Gram Panchayats_Sujata ...
 
Mukhya Mantri Gramin Peyjal Nishchay Yojana (MGPNY) – Bihar_Pankaj Kumar_AKRS...
Mukhya Mantri Gramin Peyjal Nishchay Yojana (MGPNY) – Bihar_Pankaj Kumar_AKRS...Mukhya Mantri Gramin Peyjal Nishchay Yojana (MGPNY) – Bihar_Pankaj Kumar_AKRS...
Mukhya Mantri Gramin Peyjal Nishchay Yojana (MGPNY) – Bihar_Pankaj Kumar_AKRS...
 
Social behavioural change to drive community ownership_ Divyang Waghela_Tata ...
Social behavioural change to drive community ownership_ Divyang Waghela_Tata ...Social behavioural change to drive community ownership_ Divyang Waghela_Tata ...
Social behavioural change to drive community ownership_ Divyang Waghela_Tata ...
 
Suno bolo - standard operating procedure
Suno bolo -  standard operating procedureSuno bolo -  standard operating procedure
Suno bolo - standard operating procedure
 
Jal Jeevan Mission, Karnataka
Jal Jeevan Mission, KarnatakaJal Jeevan Mission, Karnataka
Jal Jeevan Mission, Karnataka
 
Water budgeting – a case study from chhuanthar
Water budgeting – a case study from chhuantharWater budgeting – a case study from chhuanthar
Water budgeting – a case study from chhuanthar
 
Water quality
Water qualityWater quality
Water quality
 
Understanding geology
Understanding geologyUnderstanding geology
Understanding geology
 
Springshed treatment measures
Springshed treatment measuresSpringshed treatment measures
Springshed treatment measures
 
Participatory research appraisal
Participatory research appraisalParticipatory research appraisal
Participatory research appraisal
 
Community mobilization and institutional framework including monitoring mecha...
Community mobilization and institutional framework including monitoring mecha...Community mobilization and institutional framework including monitoring mecha...
Community mobilization and institutional framework including monitoring mecha...
 
Concept and approach of springshed development and management 22 jan 2020
Concept and approach of springshed development and management 22 jan 2020Concept and approach of springshed development and management 22 jan 2020
Concept and approach of springshed development and management 22 jan 2020
 
Spring mapping manual
Spring mapping manualSpring mapping manual
Spring mapping manual
 
Spring hydrogeology and its classification
Spring hydrogeology and its classificationSpring hydrogeology and its classification
Spring hydrogeology and its classification
 
Introduction to aquifers
Introduction to aquifersIntroduction to aquifers
Introduction to aquifers
 
Introduction: Groundwater aquifers
Introduction: Groundwater aquifersIntroduction: Groundwater aquifers
Introduction: Groundwater aquifers
 
Atal Bhujal Yojana: Capacity building
Atal Bhujal Yojana: Capacity buildingAtal Bhujal Yojana: Capacity building
Atal Bhujal Yojana: Capacity building
 

Recently uploaded

Determination of Total Iodine using ICP-MS in Israeli Bottled and Tap Water: ...
Determination of Total Iodine using ICP-MS in Israeli Bottled and Tap Water: ...Determination of Total Iodine using ICP-MS in Israeli Bottled and Tap Water: ...
Determination of Total Iodine using ICP-MS in Israeli Bottled and Tap Water: ...
The Hebrew University of Jerusalem
 
LaPlace Transform Questions.pptjjjjjjjjjx
LaPlace Transform Questions.pptjjjjjjjjjxLaPlace Transform Questions.pptjjjjjjjjjx
LaPlace Transform Questions.pptjjjjjjjjjx
joshuaclack73
 

Recently uploaded (20)

Coastal and mangrove vulnerability assessment In the Northern Coast of Java, ...
Coastal and mangrove vulnerability assessment In the Northern Coast of Java, ...Coastal and mangrove vulnerability assessment In the Northern Coast of Java, ...
Coastal and mangrove vulnerability assessment In the Northern Coast of Java, ...
 
Young & Hot ℂall Girls Hyderabad 8250077686 WhatsApp Number Best Rates of Hyd...
Young & Hot ℂall Girls Hyderabad 8250077686 WhatsApp Number Best Rates of Hyd...Young & Hot ℂall Girls Hyderabad 8250077686 WhatsApp Number Best Rates of Hyd...
Young & Hot ℂall Girls Hyderabad 8250077686 WhatsApp Number Best Rates of Hyd...
 
NO1 Pakistan Black magic In Pakistan Kala Ilam Expert Specialist In UK Kala I...
NO1 Pakistan Black magic In Pakistan Kala Ilam Expert Specialist In UK Kala I...NO1 Pakistan Black magic In Pakistan Kala Ilam Expert Specialist In UK Kala I...
NO1 Pakistan Black magic In Pakistan Kala Ilam Expert Specialist In UK Kala I...
 
EFFLUENT TREATMENT PLANT For PHARMA INDUSTRY
EFFLUENT TREATMENT PLANT For PHARMA INDUSTRYEFFLUENT TREATMENT PLANT For PHARMA INDUSTRY
EFFLUENT TREATMENT PLANT For PHARMA INDUSTRY
 
Travis Hills of Minnesota: Making Livestock Water and Energy the Best in Buil...
Travis Hills of Minnesota: Making Livestock Water and Energy the Best in Buil...Travis Hills of Minnesota: Making Livestock Water and Energy the Best in Buil...
Travis Hills of Minnesota: Making Livestock Water and Energy the Best in Buil...
 
VIP ℂall Girls Chennai 8250077686 WhatsApp: Me All Time Serviℂe Available Day...
VIP ℂall Girls Chennai 8250077686 WhatsApp: Me All Time Serviℂe Available Day...VIP ℂall Girls Chennai 8250077686 WhatsApp: Me All Time Serviℂe Available Day...
VIP ℂall Girls Chennai 8250077686 WhatsApp: Me All Time Serviℂe Available Day...
 
Determination of Total Iodine using ICP-MS in Israeli Bottled and Tap Water: ...
Determination of Total Iodine using ICP-MS in Israeli Bottled and Tap Water: ...Determination of Total Iodine using ICP-MS in Israeli Bottled and Tap Water: ...
Determination of Total Iodine using ICP-MS in Israeli Bottled and Tap Water: ...
 
LaPlace Transform Questions.pptjjjjjjjjjx
LaPlace Transform Questions.pptjjjjjjjjjxLaPlace Transform Questions.pptjjjjjjjjjx
LaPlace Transform Questions.pptjjjjjjjjjx
 
National Tree Planting Day May 2024 Nairobi
National Tree Planting Day May 2024 NairobiNational Tree Planting Day May 2024 Nairobi
National Tree Planting Day May 2024 Nairobi
 
NO1 Best Amil Baba In Pakistan Authentic Amil In pakistan Best Amil In Pakist...
NO1 Best Amil Baba In Pakistan Authentic Amil In pakistan Best Amil In Pakist...NO1 Best Amil Baba In Pakistan Authentic Amil In pakistan Best Amil In Pakist...
NO1 Best Amil Baba In Pakistan Authentic Amil In pakistan Best Amil In Pakist...
 
A Review on Integrated River Basin Management and Development Master Plan of ...
A Review on Integrated River Basin Management and Development Master Plan of ...A Review on Integrated River Basin Management and Development Master Plan of ...
A Review on Integrated River Basin Management and Development Master Plan of ...
 
Presentation on GLOBALISATION IN MBA sem
Presentation on GLOBALISATION IN MBA semPresentation on GLOBALISATION IN MBA sem
Presentation on GLOBALISATION IN MBA sem
 
Global warming, Types, Causes and Effects.
Global warming, Types, Causes and Effects.Global warming, Types, Causes and Effects.
Global warming, Types, Causes and Effects.
 
Rosen 2017 Isranalytica Mg in Tap Water.pdf
Rosen  2017 Isranalytica Mg in Tap Water.pdfRosen  2017 Isranalytica Mg in Tap Water.pdf
Rosen 2017 Isranalytica Mg in Tap Water.pdf
 
Peat land Restoration Project in HLG Londerang
Peat land Restoration Project in HLG LonderangPeat land Restoration Project in HLG Londerang
Peat land Restoration Project in HLG Londerang
 
The Key to Sustainable Energy Optimization: A Data-Driven Approach for Manufa...
The Key to Sustainable Energy Optimization: A Data-Driven Approach for Manufa...The Key to Sustainable Energy Optimization: A Data-Driven Approach for Manufa...
The Key to Sustainable Energy Optimization: A Data-Driven Approach for Manufa...
 
Laplace Transforms.pptxhhhhhhhhhhhhhhhhh
Laplace Transforms.pptxhhhhhhhhhhhhhhhhhLaplace Transforms.pptxhhhhhhhhhhhhhhhhh
Laplace Transforms.pptxhhhhhhhhhhhhhhhhh
 
2024-05-16 Composting at Home 101 without link to voucher
2024-05-16 Composting at Home 101 without link to voucher2024-05-16 Composting at Home 101 without link to voucher
2024-05-16 Composting at Home 101 without link to voucher
 
Palynology: History, branches, basic principles and application, collection o...
Palynology: History, branches, basic principles and application, collection o...Palynology: History, branches, basic principles and application, collection o...
Palynology: History, branches, basic principles and application, collection o...
 
Carbon Stock Assessment in Banten Province and Demak, Central Java, Indonesia
Carbon Stock Assessment in Banten Province and Demak, Central Java, IndonesiaCarbon Stock Assessment in Banten Province and Demak, Central Java, Indonesia
Carbon Stock Assessment in Banten Province and Demak, Central Java, Indonesia
 

Cost effective ecological sanitation toilets_KY Babu (WASH Institute)_2012

  • 1. Cost Effective Ecological Sanitation Toilets(ECOSAN) K.Y.Babu Dean- Training WASH Institute ( A Key Resource Centre for MoDWS, GoI) 5-296, Anathagiri 7th Street, Kodaikanal. babu@washinstitute.org 04542-240881,882,883 © Plan
  • 2. Up scaling of ECOSAN High Cost is one of the major Hindrance © Plan Gramalaya workshop 9-11 May 2012 Tirchy 2
  • 3. Cost Effective House Hold ECOSAN Design Gramalaya workshop 9-11 May 2012 Tirchy 3 © Plan
  • 4. Dimensions Outer Size : Length 5.9 X 4.6 © Plan Inner Gramalaya workshop 9-11 May 2012:Tirchy Chamber Size 1.9 4 X3
  • 5. Construction of ECOSAN Toilet © Plan Gramalaya workshop 9-11 May 2012 Tirchy 5
  • 6. ECOSAN with Mud Block Super Structure with Plastering Sn Items Units Rate in Amount o Rs. 1 Earth work excavation * 1 80.00 80.00 2 Boulders * 40 2.00 80.00 3 Bricks 433 2.85 1234.00 4 Mud Block Stone 190 8.00 1520.00 Nos 5 Cement 3 Bags 235.00 705.00 6 Sand 2 bullock cart 1 .5 400.00 600.00 7 Slab cost(squatting ,roof, 6 Nos 1400.00 detachable) 8 Door cost 5’ X 2’.6’’ 1 300.00 9 PVC Pipes Materials 350.00 10 Mason wages – man days 5 250.00 1250.00 11 Unskilled labours- man 4 80.00 320.00 days * 12 Material Transportation 100.00 Total 7939.00 Total Cost : Rs.7939 Beneficiary Contribution : Rs.480 © Plan Gramalaya workshop 9-11 May 2012 Tirchy 6
  • 7. Double Chamber Bricks Super Structure S Items Units Rate in Amoun n Rs. t o 1 Earth work excavation * 1 80 80.00 2 Boulders * 40 2.00 80.00 3 Bricks 850 2.85 2635.00 4 Cement 3 235 705.00 5 Sand 50 cft 8.00 400.00 6 Slab cost(squatting ,roof 6 Nos 1400.00 ,detachable) 7 Door cost 5' X 2'.6'' 1 300.00 300.00 8 PVC pipe Material 350.00 9 Mason wages-man days 4 250 1000.00 1 Unskilled labours- man 4 80 320.00 0 days * 1 Material Transportation 100.00 1 Total 7370.00 * Denotes the items contributed by the beneficiaries (Total value R s. 480.00) © Plan Total Cost : Rs. 7370 Beneficiary Contribution Gramalaya workshop 9-11 May 2012 Tirchy 7 :Rs. 480
  • 8. ECOSAN with Mud Block Super Structure Sno Items Units Rate in Rs. Amount 1 Earth work excavation * 1 80.00 80.00 2 Boulders * 40 2.00 80.00 3 Bricks 433 2.85 1234.00 4 Mud Block Stone 190 Nos 8.00 1520.00 5 Cement 2 Bags 235.00 470.00 6 Sand 2 bullock cart 1 400.00 400.00 7 Slab cost(squatting ,roof, detachable) 6 Nos 1400.00 8 Door cost 5’ X 2’.6’’ 1 300.00 9 PVC Pipes Materials 350.00 10 Mason wages – man days 4 250.00 1000.00 11 Unskilled labours- man days * 3 80.00 240.00 12 Material Transportation 100.00 Total 7174.00 Total Cost : Rs.7174 Beneficiary Contribution : Rs.400 © Plan 8 Gramalaya workshop 9-11 May 2012 Tirchy
  • 9. Cement Stone Super Structure Sno Items Units Rate in Amount Rs. 1 Earth work excavation * 1 80.00 2 Boulders Stone * 200 2.00 400.00 3 Cement Stone 190 Nos 10.00 1900.00 4 Cement 3 Bags 235.00 705.00 5 Sand 1 bullock cart 1 400.00 400.00 6 Slab cost(squatting ,roof 6 Nos 1400.00 ,detachable) 7 Door cost 5’ X 2’.6’’ 1 370.00 8 PVC Pipe Materials 350.00 9 Mason Wages – man days 4 Nos. 250.00 1000.00 10 Unskilled labours- man days * 4 Nos 80.00 320.00 11 Material Transportation 100.00 Total 7025.00 Total Cost : Rs.7025 Beneficiary Contribution : © Plan Gramalaya workshop 9-11 May Rs. 800 2012 Tirchy 9
  • 10. Tin sheet super Structure Sn Items Units Rate in Rs. Amount o 1 Expense up to squatting 3866.00 level for Bricks masonry structure 2 Tin Sheet 120 feet 10 1200.00 3 Bamboo and Accessories 222.00 4 Reaper 120 feet 2 240.00 5 Wage for Technician making 2 250.00 500.00 temporary super structure 6 Door cost 5’ X 2’.6’’ 1 300.00 7 Material Transportation 50.00 Total 6378.00 Total Cost : Rs.5823 Beneficiary Contribution : Rs.400 © Plan Gramalaya workshop 10 9-11 May 2012 Tirchy
  • 11. COST EFFECTIVE MODELS OF ECOSAN ECOSAN with Hollow Blocks Super Sno Items structure Units Rate in Amount Rs. 1 Earth work excavation * 1 80.00 80.00 2 Boulders * 40 2.00 80.00 3 Hollow block stone 4'' 175 9.50 1662.50 4 Cement 2.5 Bags 235 587.50 5 Sand 50 cft 8 .00 400.00 6 Slab cost(squatting ,roof, 6 Nos 1400.00 detachable) 7 Door cost 5’ X 2’.6’’ 1 300 300.00 8 PVC Pipe Materials 350.00 9 Mason Wages - man days 4 250 1000.00 10 Unskilled labour-man days 4 80 320.00 * 11 Material Transportation 100.00 Total 6279.50 * Denotes the items contributed by the beneficiaries (Total value R s. 480.00) Total Cost : Rs. 6279 Beneficiary Contribution :Rs. 480 11 © Plan Gramalaya workshop 9-11 May 2012 Tirchy
  • 12. Waste Wood Super Structure Sn Items Units Rate in Amount o Rs. 1 Expense up to squatting 3866.00 level for Bricks masonry structure 2 Waste wood 110 Kg 5.00 550.00 3 Tin sheet 42 Feet 450.00 4 Bamboo and accessories 350.00 350.00 5 Door cost 5’ X 2’.6’’ 300.00 6 Carpenter wages 2 250.00 500.00 7 Material Transportation 50.00 Total 6066.00 Total Cost : Rs.6066. Beneficiary Contribution : Rs.320 Gramalaya workshop 9-11 May © Plan 2012 Tirchy 12
  • 13. Nanal Bamboo Super Structure Sn Items Units Rate in Amount o Rs. 1 Expense up to squatting level 3866.00 for Bricks masonry structure 2 Nanal Thatch 16 Nos 50 900.00 3 Bamboos and accessories 327.00 327.00 4 Palm Leaf 50 Nos 1 50.00 5 Door cost 5' X 2'.6‘‘ 1 300.00 6 Wage for Technician making 1 250.00 250.00 temporary super structure 7 Unskilled labours- man days * 1 80.00 80.00 8 Material Transportation 50.00 Total 5823.00 Total Cost : Rs.5823 Beneficiary Contribution : Rs.400 © Plan Gramalaya workshop 13 9-11 May 2012 Tirchy
  • 14. Sn Items Palm Leaf Super Structure Units Rate in Amount o Rs. 1 Expense up to squatting 3866.00 level for Bricks masonry structure 2 Palm Leaf 150 2.00 300.00 Nos 3 Bamboos and accessories 327.00 327.00 4 Door cost 5’ X 2’.6’’ 1 Nos 300.00 5 Wage for Technician 2 250.00 500.00 making temporary super structure 6 Unskilled labours- man days 1 80.00 80.00 * 7 Material Transportation 50.00 Total 5423.00 Total Cost : Rs.5423 © Beneficiary Contribution : Plan Gramalaya workshop 9-11 May 2012 Tirchy 14 Rs.400
  • 15. Coconut Thatches Super Structure Sno Items Units Rate in Rs. Amount Expense up to squatting slab level 1 Earth work excavation * 1 80.00 80.00 2 Boulders * 40 2.00 80.00 3 Bricks 425 2.85 1211.00 4 Cement 1 bag 235.00 235.00 5 Sand 25 cft 8.00 200.00 6 Slab cost(squatting ,detachable) 4 Nos 250.00 1000.00 7 PVC pipe Material 350.00 8 Mason wages-man days 2 250.00 500.00 9 Unskilled labours- man days * 2 80.00 160.00 10 Material Transportation 50.00 Sub Total Up to Squatting Level 3866.00 Expenses for super structure 11 Coconut thatches and Bamboos 300 1.50 Etc.. 450.00 Bamboos and accessories 327.00 327.00 12 Wage for Technician making 1 250.00 250.00 temporary super structure 13 Door cost 5' X 2'.6'' 1 300.00 300.00 14 Unskilled labours- man days * 1 80.00 80.00 15 Material Transportation 50.00 Sub Total 1457.00 Grand Total 5323.00 * Denotes the items contributed by the beneficiaries (Total value R s. 480.00) © Plan Total Cost : Rs. 5323 Beneficiary Contribution : 15 Rs.480 Gramalaya workshop 9-11 May 2012 Tirchy
  • 16. Single Chamber Bricks Super Structure Sn Items Units Rate in Amount o Rs. 1 Earth work excavation * 1 50.00 50.00 2 Boulders * 20 2.00 40.00 3 Bricks 350 2.85 998.00 4 Cement 2 Bags 235 470.00 5 Sand 1 bullock cart 1 400 400.00 6 Slab cost(squatting ,roof 3 Nos 650.00 ,detachable) 7 Door cost 5’ X 2’.6’’ 1 300.00 8 PVC Pipe Materials 175.00 9 Plastic drum 2 Nos 175 350.00 10 Mason wages – man days 2 250 500.00 11 Unskilled labours- man days * 2 80.00 160.00 12 Material Transportation 100.00 Total 4193.00 Total Cost : Rs.4193 Beneficiary Contribution : Rs.250 © Plan Gramalaya workshop 9-11 May 2012 Tirchy 16
  • 17. Single Chamber Thatches Super Structure Sno Items Units Rate in Rs. Amount 1 Earth work excavation * 1 50.00 50.00 2 Boulders * 20 2.00 40.00 3 Bricks 200 2.85 570.00 4 Cement 1 Bags 235.00 235.00 5 Sand 1 bullock cart 1/2 200.00 200.00 6 Slab cost(squatting ,detachable) 2 Nos 450.00 7 Door cost 5’ X 2’.6’’ 1 300.00 8 PVC Pipe Materials 175.00 9 Plastic drum 2 Nos 175.00 350.00 10 Mason wages – man days 1 250.00 250.00 11 Unskilled labours- man days * 2 80.00 160.00 12 Coconut Thatches and bamboos and 450.00 accessories 13 Wage for Technician making temporary 1/2 125.00 super structure 14 Material Transportation 100.00 Total 3455.00 Total Cost : Rs.3455 Beneficiary Contribution : Rs.250 © Plan Gramalaya workshop 9-11 May 2012 Tirchy 17
  • 18. Ecosan Bamboo Model constructed byMegh Pyne Abhiyan (Cloud Water Campaign), Bihar. © Plan Gramalaya workshop 9-11 May 18 2012 Tirchy
  • 19. Construction of Chamber and fixing of FRP Pan © Plan Gramalaya workshop 9-11 May 19 2012 Tirchy
  • 20. © Plan Gramalaya workshop 9-11 May 20 2012 Tirchy
  • 21. Tin sheet Super structure Tiripura © Plan Gramalaya workshop 9-11 May 21 2012 Tirchy
  • 22. © Plan Bamboo experimental model
  • 23. © Plan Bamboo reinforcement
  • 30. © Plan Two vaults with the access
  • 31. LEARNINGS from our Experience Super Structure : ECOSAN with Hollow Block Super Structure seems to be Cost Effective at the same time “pakka” Structure with reasonable cost withe beneficiaries contributed Rs. 480/- and a subsidy of Rs. 2200/- obtained from TSC and only a sum of Rs.3599/- needed as out side support. Single chamber with temporary Super Structure can be the lowest cost of ECOSAN with a sum of Rs. 3455/-as construction expenditure . Beneficiary contribution is Rs. 300/- and the subsidy from TSC is Rs.2200/- and the rest Rs .955/- is needed as external support. Using Hollow Block instead of Bricks from the basement even upto squatting level can reduced a sum of Rs.500 in all the Models © Plan 31 Gramalaya workshop 9-11 May 2012 Tirchy
  • 32. LEARNINGS from our Experience Doors : Tin Sheet with wooden reapers are used for the doors for all the ECOSAN Models. For the temporary Super Structure using the same material for the doors also can reduce another a sum of Rs.250/-. Chamber : Changing the Brick wall between the chambers (Divider) from 9’ to 4’.6’’ can reduced a sum of Rs.150amount Squatting Pan : Avoiding pans made of Ceramic or FRP and by using cement Mortar with hand finishing can reduce a sum of Rs.600- Rs.1750 . © Plan Gramalaya workshop 9-11 May 32 2012 Tirchy
  • 33. LEARNINGS from our Experience Detachable Slab : Avoiding detachable slabs behind the chamber but constructing with a hole and closing the hole with bricks and Mud Mortar can reduced the RCC cost. © Plan 33 Gramalaya workshop 9-11 May 2012 Tirchy
  • 34. Challenges and Recommendations Challenges Recommendations Critical areas like coastal Special Policy for the critical area belt, drought prone and hilly area to promote ECOSAN Hesitation of the community to Proper allocation for IEC and its accept ECOSAN implementation High unit cost Increase of subsidy for the promotion of ECOSAN Lack of technical know -How Popularization of ECOSAN technology, including Equipping the masons Difficulty Experienced in - Pre and Post Project Motivating coastal fishermen implementation , monitoring and compare to farming community supports need to be extended © Plan 34 Gramalaya workshop 9-11 May 2012 Tirchy
  • 35. Benefits of ECOSAN Compost and Urine © Plan Gramalaya workshop 9-11 May 2012 Tirchy 35
  • 36. The book of Deuteronomy (23:11-15) Out side the camp you shall have a place set aside to be used as a latrine. “ You Shall keep a trowel in your equipment and with it, When you go out side to ease nature, your shall first dig a hole and afterward cover up your excrement” © Plan Gramalaya workshop 9-11 May 2012 Tirchy 36
  • 37. Mahatma Gandhi wrote in 1925 “The cause of many of our diseases is the condition of our lavatories and our bad habit of disposing of excreta anywhere and every where.” “Sanitation is more important than Independence” © Plan
  • 38. Changing Mindset • Everything has changed except our way of thinking- --Albert Einstein © Plan
  • 39. © Plan Gramalaya workshop 9-11 May 39 2012 Tirchy