SlideShare a Scribd company logo
CHAPTER 08:
PROJECT QUALITY
MANAGEMENT
Giovanni Bambaren
QUALITY
Quality is the degree to which a set of inherent
characteristics fulfills requirements.
A project is said to meet quality expectations, when all
the project requirements agreed in the beginning of the
project are met, and the resulting product is usable.
CONCEPTS RELATED TO
QUALITY
 Prevention over Inspection
 Is it better to inspect work to find problems or to prevent
them in the first place? Which takes less effort and is less
costly? Remember that quality must be planned in, not
inspected in! The concept of prevention over inspection
was advocated by quality theorist Philip Crosby. You may
see exam questions that test your understanding that
failure to plan quality into a project will lead to problems
later in the project.
8.1 PLAN QUALITY MANAGEMENT
8.1.1 PLAN QUALITY
MANAGEMENT: INPUTS
1. Project Charter
2. Project Management Plan (PMP)
 Requirements Management Plan
 Risk Management Plan
 Stakeholder Engagement Plan
 Scope baseline (Statement, WBS, Work Package)
3. Project Documents (Assumption Log, Requirements Documentation, RTM, Risk Register,
Stakeholder Register)
4. EEFs
5. OPAs
8.1.2 PLAN QUALITY MANAGEMENT:
TOOLS AND TECHNIQUES
1. Expert Judgment
2. Data Gathering (Benchmarking, Brainstorming, Interviews)
3. Data Analysis
 Cost Benefit Analysis
 Cost of Quality (Conformance, or Non conformance)
8.1.2 PLAN
QUALITY
MANAGEMENT:
TOOLS AND
TECHNIQUES
Cost of Quality (COQ)
8.1.2 PLAN QUALITY MANAGEMENT:
TOOLS AND TECHNIQUES
4. Decision Making
5. Data Representation
 Flowcharts
 Logical Data Model
 Matrix Diagrams
 Mind mapping
6. Test and Inspection Planning
7. Meetings
8.1.3 PLAN QUALITY
MANAGEMENT: OUTPUTS
1. Quality Management Plan
2. Quality Metrics
3. Project Management Plan Updates
 Risk Management Plan
 Scope Baseline
4. Project Documents Updates
 Lessons Learned Register
 RTM
 Risk Register
 Stakeholder Register
8.1.4 PLAN
QUALITY
MANAGEMENT:
QUESTIONS
The degree to which a set of inherent characteristics fulfill the
requirements is referred to as:
To compare with best practices and to generate ideas for
improvement, we can use:
The technique which includes all failure, prevention, and
appraisal costs is called:
Which of the following is an
External Failure Cost?
Rework
Loss of customer
Which of the following is an
Appraisal Cost?
Audit
Employee Training
8.2 MANAGE QUALITY
8.2.1
MANAGE
QUALITY:
INPUTS
1. Project Management Plan
2. Project Documents (Lessons Learned
Quality control measurements, Quality metrics,
Risk report)
3. OPAs
8.2.2
MANAGE
QUALITY:
TOOLS AND
TECHNIQUES
1. Data Gathering
(Checklists)
2. Data Analysis
Alternative Analysis
Document Analysis
Process Analysis
Root cause analysis
(RCA)
8.2.2
MANAGE
QUALITY:
TOOLS AND
TECHNIQUES
3. Decision Making
4. Data Representation
Affinity Diagram
Cause and effect
Diagram
Flowcharts
Histograms
Matrix diagrams
Scatter diagrams
8.2.2 MANAGE
QUALITY:
TOOLS AND
TECHNIQUES
8.2.2 MANAGE QUALITY: TOOLS AND
TECHNIQUES
8.2.2 MANAGE QUALITY: TOOLS AND TECHNIQUES
Pareto Diagram
Histogram
8.2.2 MANAGE QUALITY: TOOLS AND TECHNIQUES
Control Chart
Scatter Diagram
8.2.2 MANAGE QUALITY: TOOLS AND TECHNIQUES
Flow Chart
8.2.2 MANAGE QUALITY: TOOLS AND TECHNIQUES
Run Chart
8.2.2 MANAGE
QUALITY: TOOLS
AND
TECHNIQUES
5. Audits
 Quality Audit is a structured, independent process
to determine if project activities comply with
organizational and project policies, processes, and
procedures. Quality Audits are typically performed
by individuals outside of the project, such as
internal or external auditors.
6. Design for X (DfX)
 Includes a set of technical guidelines applied
during design of a product to optimize a specific
design aspect (e.g. reliability, assembly, usability,
safety).
8.2.2 MANAGE
QUALITY: TOOLS
AND
TECHNIQUES
7. Problem Solving
 Defining the problem
 Identifying the root-cause
 Generating possible solutions
 Choosing the best solution
 Implementing the solution
 Verifying solution effectiveness
8. Quality Improvements Methods
8.2.3 MANAGE
QUALITY:
OUTPUTS
1. Quality Reports
2. Test and Evaluation documents
3. Change Requests
4. Project Management Plan Updates
 Quality Management Plan, Scope Baseline,
Schedule Baseline, Cost Baseline
5. Project Documents Updates
 Issue Log
 Lessons Learned Register
 Risk Register
8.2.4
MANAGE
QUALITY:
QUESTIONS
A structured, independent process to determine if project activities comply with
organizational and project policies, processes, and procedures is called:
To identify needed improvements by examining problems, constraints, and non-value-
added activities during process operations, you can use:
The process of translating the quality management plan into executable quality activities
that incorporate the organization's quality policies into the project is called:
Some key tools used when managing quality are:
Which project document presents quality issues, information from quality control
activities, and recommendations for corrective actions or quality improvements?
8.3 CONTROL QUALITY
8.3.1 CONTROL
QUALITY:
INPUTS
1. Project Management Plan
2. Project Documents (Lessons Learned Register,
Quality metrics, Test and evaluation documents)
3. Approved Change Requests
4. Deliverables
5. WPD (Work Performance Data)
6. EEFs
7. OPAs
8.3.2 CONTROL QUALITY: TOOLS AND
TECHNIQUES
1. Data Gathering
 Checklist
 Check sheets
 Statistical Sampling
 Questionnaires and Surveys
2. Data Analysis
 Performance Reviews
 Root-cause analysis
3. Inspection
8.3.2 CONTROL
QUALITY: TOOLS
AND
TECHNIQUES
4. Testing / Product Evaluations
5. Data Representation
 Cause-and-effect diagrams
 Control charts
 Histograms
 Scatter diagrams
6. Meetings
 Approved change requests review
 Retrospectives / lessons learned
8.3.3 CONTROL
QUALITY:
OUTPUTS
1. Quality Control Measurements
2. Verified Deliverables
3. WPI (Work Performance Information)
4. Change Requests
5. Project Management Plan Updates
6. Project Documents Updates (Issue Log,
Lessons Learned Register, Risk Register, Test
and evaluation documents)
8.3.4
CONTROL
QUALITY:
QUESTIONS
To determine whether a process is stable or not, we can use a:
To assess the correlation between two variables, we can use a:
A Fishbone Diagram is also called a Cause-and-Effect or:
Is it acceptable to have a product with low quality?
Is it acceptable to have a product with low grade?
A vertical bar chart showing number of defects by source is called
The key benefits of Statistical Sampling are that it can:
SUMMARY
8.1 Plan Quality Management
8.2 Manage Quality
8.3 Control Quality
Quality Mind Map
8.1
Plan Quality
Management
Project
Documents
PMP
Project
Charter
Quality Mgmt.
Plan
- Exp. Judg.
- Data Gathering
- Data Analysis
(COQ)
- Decision Making
- Data Rep.
- Test & Inspection
Planning
- Meetings
Quality
Metrics
8.2
Manage
Quality
- Data Gathering
- Data Analysis
- Decision Making
- Data Rep.
- Audits
- Design for X
- Problem Solving
- Quality
Improvements
Methods
Quality Report
Test & Eval.
Docs
Change
Request
8.3
Control
Quality
Deliverables
Approved
Change Request
WPD
- Data Gathering
- Data Analysis
- Inspection
- Testing/Product
Eval.
- Data Rep.
- Meetings
Verified
Deliverables
WPI
Change
Requests
Quality Control
Measurements

More Related Content

Similar to Chapter 08 - Updated

Quality assurance
Quality assuranceQuality assurance
Quality assuranceSahil Shah
 
Quality management slides
Quality management slidesQuality management slides
Quality management slidesSaba Afaq
 
Core tools apqp, ppap, fmea, spc and msa
Core tools   apqp, ppap, fmea, spc and msa Core tools   apqp, ppap, fmea, spc and msa
Core tools apqp, ppap, fmea, spc and msa Mouhcine Nahal
 
2.08 quality management 1
2.08 quality management 12.08 quality management 1
2.08 quality management 1reddvise
 
Develop quality characteristics
Develop quality characteristicsDevelop quality characteristics
Develop quality characteristicscsandit
 
Quality management in construction
Quality management in constructionQuality management in construction
Quality management in constructionIsidro Sid Calayag
 
Project management assignment slides
Project management assignment slidesProject management assignment slides
Project management assignment slidesDoreen Yeo
 
08 projectqualitymanagement
08 projectqualitymanagement08 projectqualitymanagement
08 projectqualitymanagementDhamo daran
 
Project Quality Management powerpoint
Project Quality Management powerpointProject Quality Management powerpoint
Project Quality Management powerpointDjamadaMuhamedKAGUSU
 
L07 quality management
L07 quality managementL07 quality management
L07 quality managementAsa Chan
 
Episode 24 : Project Quality Management
Episode 24 :  Project Quality ManagementEpisode 24 :  Project Quality Management
Episode 24 : Project Quality ManagementSAJJAD KHUDHUR ABBAS
 
Software Quality Analyst and Software Quality Management
Software Quality Analyst and Software Quality ManagementSoftware Quality Analyst and Software Quality Management
Software Quality Analyst and Software Quality Managementنور شزننا
 
22317-DIPLOMA_SEM4_software_engg-chap-06.ppt
22317-DIPLOMA_SEM4_software_engg-chap-06.ppt22317-DIPLOMA_SEM4_software_engg-chap-06.ppt
22317-DIPLOMA_SEM4_software_engg-chap-06.pptDeepgaichor1
 

Similar to Chapter 08 - Updated (20)

PMP_Project Quality Management
PMP_Project Quality ManagementPMP_Project Quality Management
PMP_Project Quality Management
 
Quality assurance
Quality assuranceQuality assurance
Quality assurance
 
Quality management slides
Quality management slidesQuality management slides
Quality management slides
 
Core tools apqp, ppap, fmea, spc and msa
Core tools   apqp, ppap, fmea, spc and msa Core tools   apqp, ppap, fmea, spc and msa
Core tools apqp, ppap, fmea, spc and msa
 
Pmb
PmbPmb
Pmb
 
2.08 quality management 1
2.08 quality management 12.08 quality management 1
2.08 quality management 1
 
Pmp quality chapter 8
Pmp quality chapter 8Pmp quality chapter 8
Pmp quality chapter 8
 
Develop quality characteristics
Develop quality characteristicsDevelop quality characteristics
Develop quality characteristics
 
Quality management in construction
Quality management in constructionQuality management in construction
Quality management in construction
 
Project management assignment slides
Project management assignment slidesProject management assignment slides
Project management assignment slides
 
08 projectqualitymanagement
08 projectqualitymanagement08 projectqualitymanagement
08 projectqualitymanagement
 
Project Quality Management powerpoint
Project Quality Management powerpointProject Quality Management powerpoint
Project Quality Management powerpoint
 
CAPM Week 3 Chapter 8
CAPM Week 3 Chapter 8CAPM Week 3 Chapter 8
CAPM Week 3 Chapter 8
 
Session 12 4th edition PMP
Session  12 4th edition PMPSession  12 4th edition PMP
Session 12 4th edition PMP
 
L07 quality management
L07 quality managementL07 quality management
L07 quality management
 
Episode 24 : Project Quality Management
Episode 24 :  Project Quality ManagementEpisode 24 :  Project Quality Management
Episode 24 : Project Quality Management
 
Software Quality Analyst and Software Quality Management
Software Quality Analyst and Software Quality ManagementSoftware Quality Analyst and Software Quality Management
Software Quality Analyst and Software Quality Management
 
Softwaretesting
SoftwaretestingSoftwaretesting
Softwaretesting
 
22317-DIPLOMA_SEM4_software_engg-chap-06.ppt
22317-DIPLOMA_SEM4_software_engg-chap-06.ppt22317-DIPLOMA_SEM4_software_engg-chap-06.ppt
22317-DIPLOMA_SEM4_software_engg-chap-06.ppt
 
Project managment 7
Project managment  7Project managment  7
Project managment 7
 

More from KareemBullard1

Azure-Interview-Questions.pptx
Azure-Interview-Questions.pptxAzure-Interview-Questions.pptx
Azure-Interview-Questions.pptxKareemBullard1
 
Azure_DP_300_Vocabulary_Cards.pptx
Azure_DP_300_Vocabulary_Cards.pptxAzure_DP_300_Vocabulary_Cards.pptx
Azure_DP_300_Vocabulary_Cards.pptxKareemBullard1
 
Azure-Interview-Questions-Slides.pptx
Azure-Interview-Questions-Slides.pptxAzure-Interview-Questions-Slides.pptx
Azure-Interview-Questions-Slides.pptxKareemBullard1
 
01_DP-300T00A-Intro.pptx
01_DP-300T00A-Intro.pptx01_DP-300T00A-Intro.pptx
01_DP-300T00A-Intro.pptxKareemBullard1
 
02_DP_300T00A_Plan_implement.pptx
02_DP_300T00A_Plan_implement.pptx02_DP_300T00A_Plan_implement.pptx
02_DP_300T00A_Plan_implement.pptxKareemBullard1
 
07_DP_300T00A_HA_Disaster_Recovery.pptx
07_DP_300T00A_HA_Disaster_Recovery.pptx07_DP_300T00A_HA_Disaster_Recovery.pptx
07_DP_300T00A_HA_Disaster_Recovery.pptxKareemBullard1
 
06_DP_300T00A_Automate.pptx
06_DP_300T00A_Automate.pptx06_DP_300T00A_Automate.pptx
06_DP_300T00A_Automate.pptxKareemBullard1
 
05_DP_300T00A_Optimize.pptx
05_DP_300T00A_Optimize.pptx05_DP_300T00A_Optimize.pptx
05_DP_300T00A_Optimize.pptxKareemBullard1
 
04_DP_300T00A_Monitor.pptx
04_DP_300T00A_Monitor.pptx04_DP_300T00A_Monitor.pptx
04_DP_300T00A_Monitor.pptxKareemBullard1
 
03_DP_300T00A_Secure_Environment.pptx
03_DP_300T00A_Secure_Environment.pptx03_DP_300T00A_Secure_Environment.pptx
03_DP_300T00A_Secure_Environment.pptxKareemBullard1
 
DP-300 Administering Relational Databases Azure_Oct2020
DP-300 Administering Relational Databases Azure_Oct2020DP-300 Administering Relational Databases Azure_Oct2020
DP-300 Administering Relational Databases Azure_Oct2020KareemBullard1
 
PMP Mind Maps Complete
PMP Mind Maps CompletePMP Mind Maps Complete
PMP Mind Maps CompleteKareemBullard1
 
Pmp Questions Complete
Pmp Questions CompletePmp Questions Complete
Pmp Questions CompleteKareemBullard1
 
Pmp Extrenal Documents
Pmp Extrenal DocumentsPmp Extrenal Documents
Pmp Extrenal DocumentsKareemBullard1
 

More from KareemBullard1 (20)

Azure-Interview-Questions.pptx
Azure-Interview-Questions.pptxAzure-Interview-Questions.pptx
Azure-Interview-Questions.pptx
 
Azure_DP_300_Vocabulary_Cards.pptx
Azure_DP_300_Vocabulary_Cards.pptxAzure_DP_300_Vocabulary_Cards.pptx
Azure_DP_300_Vocabulary_Cards.pptx
 
Azure-Interview-Questions-Slides.pptx
Azure-Interview-Questions-Slides.pptxAzure-Interview-Questions-Slides.pptx
Azure-Interview-Questions-Slides.pptx
 
01_DP-300T00A-Intro.pptx
01_DP-300T00A-Intro.pptx01_DP-300T00A-Intro.pptx
01_DP-300T00A-Intro.pptx
 
02_DP_300T00A_Plan_implement.pptx
02_DP_300T00A_Plan_implement.pptx02_DP_300T00A_Plan_implement.pptx
02_DP_300T00A_Plan_implement.pptx
 
07_DP_300T00A_HA_Disaster_Recovery.pptx
07_DP_300T00A_HA_Disaster_Recovery.pptx07_DP_300T00A_HA_Disaster_Recovery.pptx
07_DP_300T00A_HA_Disaster_Recovery.pptx
 
06_DP_300T00A_Automate.pptx
06_DP_300T00A_Automate.pptx06_DP_300T00A_Automate.pptx
06_DP_300T00A_Automate.pptx
 
05_DP_300T00A_Optimize.pptx
05_DP_300T00A_Optimize.pptx05_DP_300T00A_Optimize.pptx
05_DP_300T00A_Optimize.pptx
 
04_DP_300T00A_Monitor.pptx
04_DP_300T00A_Monitor.pptx04_DP_300T00A_Monitor.pptx
04_DP_300T00A_Monitor.pptx
 
03_DP_300T00A_Secure_Environment.pptx
03_DP_300T00A_Secure_Environment.pptx03_DP_300T00A_Secure_Environment.pptx
03_DP_300T00A_Secure_Environment.pptx
 
DP-300 Administering Relational Databases Azure_Oct2020
DP-300 Administering Relational Databases Azure_Oct2020DP-300 Administering Relational Databases Azure_Oct2020
DP-300 Administering Relational Databases Azure_Oct2020
 
Pmp Complete Notes
Pmp Complete NotesPmp Complete Notes
Pmp Complete Notes
 
Pmp Complete Diagrams
Pmp Complete DiagramsPmp Complete Diagrams
Pmp Complete Diagrams
 
Pmp Complete Notes
Pmp Complete NotesPmp Complete Notes
Pmp Complete Notes
 
Pmp Complete Diagrams
Pmp Complete DiagramsPmp Complete Diagrams
Pmp Complete Diagrams
 
Pmp ITTO Complete
Pmp ITTO CompletePmp ITTO Complete
Pmp ITTO Complete
 
PMP Mind Maps Complete
PMP Mind Maps CompletePMP Mind Maps Complete
PMP Mind Maps Complete
 
Pmp Questions Complete
Pmp Questions CompletePmp Questions Complete
Pmp Questions Complete
 
Pmp Test Complete
Pmp Test CompletePmp Test Complete
Pmp Test Complete
 
Pmp Extrenal Documents
Pmp Extrenal DocumentsPmp Extrenal Documents
Pmp Extrenal Documents
 

Recently uploaded

Maximizing Efficiency Migrating AccountEdge Data to QuickBooks.pdf
Maximizing Efficiency Migrating AccountEdge Data to QuickBooks.pdfMaximizing Efficiency Migrating AccountEdge Data to QuickBooks.pdf
Maximizing Efficiency Migrating AccountEdge Data to QuickBooks.pdfPaulBryant58
 
Filing Your Delaware Franchise Tax A Detailed Guide
Filing Your Delaware Franchise Tax A Detailed GuideFiling Your Delaware Franchise Tax A Detailed Guide
Filing Your Delaware Franchise Tax A Detailed GuideYourLegal Accounting
 
IPTV Subscription UK: Your Guide to Choosing the Best Service
IPTV Subscription UK: Your Guide to Choosing the Best ServiceIPTV Subscription UK: Your Guide to Choosing the Best Service
IPTV Subscription UK: Your Guide to Choosing the Best ServiceDragon Dream Bar
 
G-Mica Wood Chip Particle board Table Design
G-Mica Wood Chip Particle board Table DesignG-Mica Wood Chip Particle board Table Design
G-Mica Wood Chip Particle board Table Designgmicaprelamdigital
 
Business Valuation Principles for Entrepreneurs
Business Valuation Principles for EntrepreneursBusiness Valuation Principles for Entrepreneurs
Business Valuation Principles for EntrepreneursBen Wann
 
Team-Spandex-Northern University-CS1035.
Team-Spandex-Northern University-CS1035.Team-Spandex-Northern University-CS1035.
Team-Spandex-Northern University-CS1035.smalmahmud11
 
The-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic managementThe-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic managementBojamma2
 
Improving profitability for small business
Improving profitability for small businessImproving profitability for small business
Improving profitability for small businessBen Wann
 
New Product Development.kjiy7ggbfdsddggo9lo
New Product Development.kjiy7ggbfdsddggo9loNew Product Development.kjiy7ggbfdsddggo9lo
New Product Development.kjiy7ggbfdsddggo9logalbokkahewagenitash
 
NewBase 24 May 2024 Energy News issue - 1727 by Khaled Al Awadi_compresse...
NewBase   24 May  2024  Energy News issue - 1727 by Khaled Al Awadi_compresse...NewBase   24 May  2024  Energy News issue - 1727 by Khaled Al Awadi_compresse...
NewBase 24 May 2024 Energy News issue - 1727 by Khaled Al Awadi_compresse...Khaled Al Awadi
 
Taurus Zodiac Sign_ Personality Traits and Sign Dates.pptx
Taurus Zodiac Sign_ Personality Traits and Sign Dates.pptxTaurus Zodiac Sign_ Personality Traits and Sign Dates.pptx
Taurus Zodiac Sign_ Personality Traits and Sign Dates.pptxmy Pandit
 
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-indiafalcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-indiaFalcon Invoice Discounting
 
Pitch Deck Teardown: RAW Dating App's $3M Angel deck
Pitch Deck Teardown: RAW Dating App's $3M Angel deckPitch Deck Teardown: RAW Dating App's $3M Angel deck
Pitch Deck Teardown: RAW Dating App's $3M Angel deckHajeJanKamps
 
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...BBPMedia1
 
Global Interconnection Group Joint Venture[960] (1).pdf
Global Interconnection Group Joint Venture[960] (1).pdfGlobal Interconnection Group Joint Venture[960] (1).pdf
Global Interconnection Group Joint Venture[960] (1).pdfHenry Tapper
 
Strategy Analysis and Selecting ( Space Matrix)
Strategy Analysis and Selecting ( Space Matrix)Strategy Analysis and Selecting ( Space Matrix)
Strategy Analysis and Selecting ( Space Matrix)RidaKhan334971
 
What are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdfWhat are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdfHumanResourceDimensi1
 
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBdCree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBdcreerey
 

Recently uploaded (20)

Maximizing Efficiency Migrating AccountEdge Data to QuickBooks.pdf
Maximizing Efficiency Migrating AccountEdge Data to QuickBooks.pdfMaximizing Efficiency Migrating AccountEdge Data to QuickBooks.pdf
Maximizing Efficiency Migrating AccountEdge Data to QuickBooks.pdf
 
Filing Your Delaware Franchise Tax A Detailed Guide
Filing Your Delaware Franchise Tax A Detailed GuideFiling Your Delaware Franchise Tax A Detailed Guide
Filing Your Delaware Franchise Tax A Detailed Guide
 
IPTV Subscription UK: Your Guide to Choosing the Best Service
IPTV Subscription UK: Your Guide to Choosing the Best ServiceIPTV Subscription UK: Your Guide to Choosing the Best Service
IPTV Subscription UK: Your Guide to Choosing the Best Service
 
G-Mica Wood Chip Particle board Table Design
G-Mica Wood Chip Particle board Table DesignG-Mica Wood Chip Particle board Table Design
G-Mica Wood Chip Particle board Table Design
 
Business Valuation Principles for Entrepreneurs
Business Valuation Principles for EntrepreneursBusiness Valuation Principles for Entrepreneurs
Business Valuation Principles for Entrepreneurs
 
Team-Spandex-Northern University-CS1035.
Team-Spandex-Northern University-CS1035.Team-Spandex-Northern University-CS1035.
Team-Spandex-Northern University-CS1035.
 
Sustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & EconomySustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & Economy
 
The-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic managementThe-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic management
 
Improving profitability for small business
Improving profitability for small businessImproving profitability for small business
Improving profitability for small business
 
New Product Development.kjiy7ggbfdsddggo9lo
New Product Development.kjiy7ggbfdsddggo9loNew Product Development.kjiy7ggbfdsddggo9lo
New Product Development.kjiy7ggbfdsddggo9lo
 
NewBase 24 May 2024 Energy News issue - 1727 by Khaled Al Awadi_compresse...
NewBase   24 May  2024  Energy News issue - 1727 by Khaled Al Awadi_compresse...NewBase   24 May  2024  Energy News issue - 1727 by Khaled Al Awadi_compresse...
NewBase 24 May 2024 Energy News issue - 1727 by Khaled Al Awadi_compresse...
 
Taurus Zodiac Sign_ Personality Traits and Sign Dates.pptx
Taurus Zodiac Sign_ Personality Traits and Sign Dates.pptxTaurus Zodiac Sign_ Personality Traits and Sign Dates.pptx
Taurus Zodiac Sign_ Personality Traits and Sign Dates.pptx
 
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-indiafalcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
 
Pitch Deck Teardown: RAW Dating App's $3M Angel deck
Pitch Deck Teardown: RAW Dating App's $3M Angel deckPitch Deck Teardown: RAW Dating App's $3M Angel deck
Pitch Deck Teardown: RAW Dating App's $3M Angel deck
 
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
 
Global Interconnection Group Joint Venture[960] (1).pdf
Global Interconnection Group Joint Venture[960] (1).pdfGlobal Interconnection Group Joint Venture[960] (1).pdf
Global Interconnection Group Joint Venture[960] (1).pdf
 
Strategy Analysis and Selecting ( Space Matrix)
Strategy Analysis and Selecting ( Space Matrix)Strategy Analysis and Selecting ( Space Matrix)
Strategy Analysis and Selecting ( Space Matrix)
 
Communicative rationality and the evolution of business ethics: corporate soc...
Communicative rationality and the evolution of business ethics: corporate soc...Communicative rationality and the evolution of business ethics: corporate soc...
Communicative rationality and the evolution of business ethics: corporate soc...
 
What are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdfWhat are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdf
 
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBdCree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
 

Chapter 08 - Updated

  • 2. QUALITY Quality is the degree to which a set of inherent characteristics fulfills requirements. A project is said to meet quality expectations, when all the project requirements agreed in the beginning of the project are met, and the resulting product is usable.
  • 3. CONCEPTS RELATED TO QUALITY  Prevention over Inspection  Is it better to inspect work to find problems or to prevent them in the first place? Which takes less effort and is less costly? Remember that quality must be planned in, not inspected in! The concept of prevention over inspection was advocated by quality theorist Philip Crosby. You may see exam questions that test your understanding that failure to plan quality into a project will lead to problems later in the project.
  • 4. 8.1 PLAN QUALITY MANAGEMENT
  • 5. 8.1.1 PLAN QUALITY MANAGEMENT: INPUTS 1. Project Charter 2. Project Management Plan (PMP)  Requirements Management Plan  Risk Management Plan  Stakeholder Engagement Plan  Scope baseline (Statement, WBS, Work Package) 3. Project Documents (Assumption Log, Requirements Documentation, RTM, Risk Register, Stakeholder Register) 4. EEFs 5. OPAs
  • 6. 8.1.2 PLAN QUALITY MANAGEMENT: TOOLS AND TECHNIQUES 1. Expert Judgment 2. Data Gathering (Benchmarking, Brainstorming, Interviews) 3. Data Analysis  Cost Benefit Analysis  Cost of Quality (Conformance, or Non conformance)
  • 8. 8.1.2 PLAN QUALITY MANAGEMENT: TOOLS AND TECHNIQUES 4. Decision Making 5. Data Representation  Flowcharts  Logical Data Model  Matrix Diagrams  Mind mapping 6. Test and Inspection Planning 7. Meetings
  • 9. 8.1.3 PLAN QUALITY MANAGEMENT: OUTPUTS 1. Quality Management Plan 2. Quality Metrics 3. Project Management Plan Updates  Risk Management Plan  Scope Baseline 4. Project Documents Updates  Lessons Learned Register  RTM  Risk Register  Stakeholder Register
  • 10. 8.1.4 PLAN QUALITY MANAGEMENT: QUESTIONS The degree to which a set of inherent characteristics fulfill the requirements is referred to as: To compare with best practices and to generate ideas for improvement, we can use: The technique which includes all failure, prevention, and appraisal costs is called: Which of the following is an External Failure Cost? Rework Loss of customer Which of the following is an Appraisal Cost? Audit Employee Training
  • 12. 8.2.1 MANAGE QUALITY: INPUTS 1. Project Management Plan 2. Project Documents (Lessons Learned Quality control measurements, Quality metrics, Risk report) 3. OPAs
  • 13. 8.2.2 MANAGE QUALITY: TOOLS AND TECHNIQUES 1. Data Gathering (Checklists) 2. Data Analysis Alternative Analysis Document Analysis Process Analysis Root cause analysis (RCA)
  • 14. 8.2.2 MANAGE QUALITY: TOOLS AND TECHNIQUES 3. Decision Making 4. Data Representation Affinity Diagram Cause and effect Diagram Flowcharts Histograms Matrix diagrams Scatter diagrams
  • 16. 8.2.2 MANAGE QUALITY: TOOLS AND TECHNIQUES
  • 17. 8.2.2 MANAGE QUALITY: TOOLS AND TECHNIQUES Pareto Diagram Histogram
  • 18. 8.2.2 MANAGE QUALITY: TOOLS AND TECHNIQUES Control Chart Scatter Diagram
  • 19. 8.2.2 MANAGE QUALITY: TOOLS AND TECHNIQUES Flow Chart
  • 20. 8.2.2 MANAGE QUALITY: TOOLS AND TECHNIQUES Run Chart
  • 21. 8.2.2 MANAGE QUALITY: TOOLS AND TECHNIQUES 5. Audits  Quality Audit is a structured, independent process to determine if project activities comply with organizational and project policies, processes, and procedures. Quality Audits are typically performed by individuals outside of the project, such as internal or external auditors. 6. Design for X (DfX)  Includes a set of technical guidelines applied during design of a product to optimize a specific design aspect (e.g. reliability, assembly, usability, safety).
  • 22. 8.2.2 MANAGE QUALITY: TOOLS AND TECHNIQUES 7. Problem Solving  Defining the problem  Identifying the root-cause  Generating possible solutions  Choosing the best solution  Implementing the solution  Verifying solution effectiveness 8. Quality Improvements Methods
  • 23. 8.2.3 MANAGE QUALITY: OUTPUTS 1. Quality Reports 2. Test and Evaluation documents 3. Change Requests 4. Project Management Plan Updates  Quality Management Plan, Scope Baseline, Schedule Baseline, Cost Baseline 5. Project Documents Updates  Issue Log  Lessons Learned Register  Risk Register
  • 24. 8.2.4 MANAGE QUALITY: QUESTIONS A structured, independent process to determine if project activities comply with organizational and project policies, processes, and procedures is called: To identify needed improvements by examining problems, constraints, and non-value- added activities during process operations, you can use: The process of translating the quality management plan into executable quality activities that incorporate the organization's quality policies into the project is called: Some key tools used when managing quality are: Which project document presents quality issues, information from quality control activities, and recommendations for corrective actions or quality improvements?
  • 26. 8.3.1 CONTROL QUALITY: INPUTS 1. Project Management Plan 2. Project Documents (Lessons Learned Register, Quality metrics, Test and evaluation documents) 3. Approved Change Requests 4. Deliverables 5. WPD (Work Performance Data) 6. EEFs 7. OPAs
  • 27. 8.3.2 CONTROL QUALITY: TOOLS AND TECHNIQUES 1. Data Gathering  Checklist  Check sheets  Statistical Sampling  Questionnaires and Surveys 2. Data Analysis  Performance Reviews  Root-cause analysis 3. Inspection
  • 28. 8.3.2 CONTROL QUALITY: TOOLS AND TECHNIQUES 4. Testing / Product Evaluations 5. Data Representation  Cause-and-effect diagrams  Control charts  Histograms  Scatter diagrams 6. Meetings  Approved change requests review  Retrospectives / lessons learned
  • 29. 8.3.3 CONTROL QUALITY: OUTPUTS 1. Quality Control Measurements 2. Verified Deliverables 3. WPI (Work Performance Information) 4. Change Requests 5. Project Management Plan Updates 6. Project Documents Updates (Issue Log, Lessons Learned Register, Risk Register, Test and evaluation documents)
  • 30. 8.3.4 CONTROL QUALITY: QUESTIONS To determine whether a process is stable or not, we can use a: To assess the correlation between two variables, we can use a: A Fishbone Diagram is also called a Cause-and-Effect or: Is it acceptable to have a product with low quality? Is it acceptable to have a product with low grade? A vertical bar chart showing number of defects by source is called The key benefits of Statistical Sampling are that it can:
  • 31. SUMMARY 8.1 Plan Quality Management 8.2 Manage Quality 8.3 Control Quality
  • 32. Quality Mind Map 8.1 Plan Quality Management Project Documents PMP Project Charter Quality Mgmt. Plan - Exp. Judg. - Data Gathering - Data Analysis (COQ) - Decision Making - Data Rep. - Test & Inspection Planning - Meetings Quality Metrics 8.2 Manage Quality - Data Gathering - Data Analysis - Decision Making - Data Rep. - Audits - Design for X - Problem Solving - Quality Improvements Methods Quality Report Test & Eval. Docs Change Request 8.3 Control Quality Deliverables Approved Change Request WPD - Data Gathering - Data Analysis - Inspection - Testing/Product Eval. - Data Rep. - Meetings Verified Deliverables WPI Change Requests Quality Control Measurements

Editor's Notes

  1. Identify quality requirements and/or standards for the Project and its deliverables, and documenting how the Project will demonstrate compliance with relevant quality requirements
  2. Destructive Testing: The purpose of destructive testing is to determine service life and to detect design weaknesses that may not show up under normal working conditions.
  3. CheckLists: It’s a list of ítems to inspect. Metrics: Project specific data that should be measured to check the status of the Project. Could be cost and Schedule.
  4. Quality Benchmarking Cost of Quality (COQ) Loss of customer (Non-conformance) Audit (Conformance)
  5. Quality Audit. Process Analysis. Manage Quality. Quality Audits, Process Analysis, Root Cause Analysis, Flowcharts, Checklists, Design for X. Quality Reports.
  6. Control Chart. Scatter Diagram. Ishikawa Diagram. No. Yes. Histogram. Reduce costs.