SlideShare a Scribd company logo
1 of 59
4.1 Develop Project Charter
4.2 Develop Project Management Plan
4.3 Direct and Manage Project Work
4.4 Manage Project Knowledge
4.5 Monitor and Control Project Work
4.6 Perform Integrated Change Control
4.7 Close Project or Phase
Integration Mind Map
4.1
Develop
Project
Charter
Business Docs.
Agreements
- Exp. Judg.
- Data Gathering
- ITS
- Meetings
Project Charter
Assumption Log
4.2
Develop
Project
Mgmt Plan
Outputs from
other processes
- Exp. Judg.
- Data Gathering
- ITS
- Meetings
Project Mgmt Plan
4.3
Direct and
Manage
Project
Work
Project
Documents
- Exp. Judg.
- PMIS
- Meetings
Deliverables
Change Requests
Issue Log
WPD
4.4
Manage
Project
Knowledge
- Exp. Judg.
- KnowledgeMgmt
- Info Mgmt.
- ITS
Lessons Learned
Register
4.5
Monitor and
Control
Project
Work
Agreements
WPI
- Exp. Judg.
- Data Analysis
- Decision Making
- Meetings
WPR
Change Requests
4.6
Perform
Integrated
Change
Control
Approved
Change Requests
- Exp. Judg.
- CCT
- Data Analysis
- Decision Making
- Meetings (CCB)
4.7
Close
Project or
Phase
- Exp. Judg.
- Data Analysis
FinalReport
FinalProduct,
Service or Result
Transition
Project Charter
Procurement
Docs
Business docs
Accepted
Deliverables
Agreements
5.1 Plan Scope Management
5.2 Collect Requirements
5.3 Define Scope
5.4 Create WBS
5.5 Validate Scope
5.6 Control Scope
Scope Mind Map
5.1
Plan Scope
Management
5.2
Collect
Requirements
5.3
Define Scope
5.4
CreateWBS
5.5
Validate
Scope
5.6
Control
Scope
- Exp. Judg.
- Data Analysis
- Meetings
Project Charter
Scope Mgmt.
Plan
Requirements
Mgmt. Plan
Business Docs
Agreements
Project
Documents
-Exp. Judg.
- Data Gathering
- Data Analysis
- Decision Making
-Data
Representation
- ITS
- Context Diagram
- Prototypes
Project Charter - Exp. Judg.
- Data Analysis
- Decision Making
- ITS
- Product Analysis
Project Scope
Statement
PMP
- Exp. Judg.
- Decomposition
Scope Baseline
WPD
Verified
Deliverables
- Inspection
- Decision Making
Accepted
Deliverables
WPI
Change
Requests
WPD
- Data Analysis
WPI
Change
Requests
Requirements
docs
Requirements
Traceability
Matrix
6.1 Plan Schedule Management
6.2 Define Activities
6.3 Sequence Activities
6.4 Estimate Activity Durations
6.5 Develop Schedule
6.6 Control Schedule
Schedule Mind Map
6.1
Plan Schedule
Management
Project
Documents
- Exp. Judg.
- Data Analysis
- Meetings Project
Charter
PMP
Schedule
Mgmt. Plan
6.2
Define
Activities
- Exp. Judg.
- Decomposition
- Rolling Wave Planning
- Meetings
Activity List
Activity Attributes
Milestone List
Change
Request
6.3
Sequence
Activities
- PDM
- Dependencydetermination
- Leads and Lags
- PMIS
Project Schedule
Network Diagram
6.4
Estimate
Activity
Durations
- Expert Judg.
- Analogous
- Parametric
- Three Points
- Bottom-Up
- Data Analysis
- Decision Making
- Meetings
Duration
Estimates
Bases of
Estimates
6.5
Develop
Schedule
Agreements
-Schedule
Network Analysis
- CPM
- Resource Opt.
- Data Analysis
- Leads and Lags
- Schedule Comp.
- PMIS
-Agile Release
Plan
Schedule baseline
Project Schedule
Schedule Data
Project Calendars
Change Requests
6.6
Control
Schedule
WPD
- Data Analysis
- CPM
- PMIS
- Resource Opt.
- Leads and Lags
- Schedule Comp.
WPI
Change
Requests
Schedule
Forecast
7.1 Plan Cost Management
7.2 Estimate Costs
7.3 Determine Budget
7.4 Control Costs
Cost Mind Map
7.1
PlanCost
Management
- Exp. Judg.
- Data Analysis
- Meetings
Project
Documents
PMP
Project
Charter
Cost Mgmt.
Plan
7.2
Estimate
Costs
- Exp. Judg.
- Analogous
- Parametric
- Bottom-Up
- Three-points
- Data Analysis
- PMIS
- Decision Making
Cost Estimates
Basis of
estimates
7.3
Determine
Budget
Agreements
Business docs
-Exp. Judg.
- Cost Aggregation
- Data Analysis
- Historical Info.
-FundingLimit
Rec.
- Financing
Cost Baseline
Project Funding
Requirements
7.4
Control
Costs
WPI
WPD
- Exp. Judg.
- Data Analysis (EVA)
- TCPI
- PMIS
Change
Requests
Cost forecasts
8.1 Plan Quality Management
8.2 Manage Quality
8.3 Control Quality
Quality Mind Map
8.1
PlanQuality
Management
Project
Documents
PMP
Project
Charter
Quality Mgmt.
Plan
-Exp. Judg.
- Data Gathering
- Data Analysis
(COQ)
- Decision Making
- Data Rep.
-Test & Inspection
Planning
- Meetings
Quality
Metrics
8.2
Manage
Quality
-Data Gathering
- Data Analysis
- Decision Making
- Data Rep.
- Audits
- Design for X
- Problem Solving
-Quality
Improvements
Methods
Quality Report
Test & Eval.
Docs
Change
Request
8.3
Control
Quality
Deliverables
Approved
Change Request
WPD
-Data Gathering
- Data Analysis
- Inspection
-Testing/Product
Eval.
- Data Rep.
- Meetings
Verified
Deliverables
WPI
Change
Requests
Quality Control
Measurements
9.1 Plan Resource Management
9.2 Estimate Activity Resources
9.3 Acquire Resources
9.4 Develop Team
9.5 Manage Team
9.6 Control Resources
Resources Mind Map
9.1
Plan
Resource
Management
PMP
Project
Documents
Resource
Mgmt. Plan
-Exp. Judg.
-Data
Representation:
RACI, OBS, RBS
-Organizational
Theories
- Meetings
Project
Charter
Team Charter
9.2
Estimate
Activity
Resources
- Exp. Judg.
- Bottom-Up
- Analogous
- Parametric
- Data Analysis
- PMIS
- Meetings
Resource
Requirements
Basis of
estimates
RBS
9.3
Acquire
Resources
- Decision Making
- ITS - Negotiation
- Pre- assignments
- VirtualTeams
Physical Resource
Assignments
Project Team
Assignments
Resource
Calendars
Change
Requests
9.4
Develop
Team
-Colocation
- VirtualTeams
- Comm. Tech.
- ITS
-Recog. and
Rewards
- Training
-Ind. and Team
Assessments
- Meetings
Team Performance
Assessment
Change
Requests
9.5
Manage
Team
WPR
- ITS:
Conflict
Management
- PMIS
Change
Requests
9.6
Control
Resources
WPD
Agreements
- Data Analysis
- Problem Solv.
- ITS
- PMIS
Change
Requests
WPI
10.1 Plan Communications Management
10.2 Manage Communications
10.3 Monitor Communications
Communication Mind Map
10.1
Plan
Comunications
Management
-Exp. Judg.
-Comm.
Requirement
Analysis N(N-1)/2
- Comm. Tech.
- Comm. Model
- Comm. Methods
- ITS
- Data Represent.
- Meetings
Project
Documents
PMP
Project
Charter
Comm. Mgmt.
Plan
10.2
Manage
Comunications
WPR - Comm. Tech.
- Comm. Methods
- Comm. Skills
- PMIS
-Project Reporting
- ITS
- Meetings
Project
Communications
10.3
Monitor
Comunications
WPD
- Exp. Judg.
- PMIS
- Data Analysis
- ITS
- Meetings
WPI
Change Request
11.1 Plan Risk Management
11.2 Identify Risks
11.3 Perform Qualitative Risk Analysis
11.4 Perform Quantitative Risk Analysis
11.5 Plan Risk Responses
11.6 Implement Risk Responses
11.7 Monitor Risks
isk Mind Map
11.3
R
11.1
Plan Risk
Management
PMP
Project
Documents
- Exp. Judg.
- Data Analysis
- Meetings
Risk Mgmt.
Plan
Project Charter
11.2
Identify
Risks
Procurements
Documentation
Agreements
- Exp. Judg.
- Data Gathering
- Data Analysis
- ITS
- Prompt List
- Meetings
Risk Register
Risk Report
Perform
Qualitative
Risk
Analysis
-Exp. Judg.
- Data Gathering
- Data Analysis
- ITS
- Risk Categorization
-Data Representation
(P&I Matrix)
- Meetings
11.4
Perform
Quantitative
Risk Analysis
-Exp. Judg.
- Data Gathering
- ITS
- Rep. of uncertainty
-Data Analysis
Decision Tree
Analysis (EMV)
11.5
Plan Risk
Responses
- Exp. Judg.
- Data Gathering
- ITS
-Strategiesfor threats
-Strategiesfor
opportunities
-ContingentResponse
Strategies
-Strategies for overall
project risks
- Data Analysis
- Decision Making
Change
Requests
11.6
Implement
Risk
Responses
- Exp. Judg.
- ITS
- PMIS
Change
Requests
11.7
Monitor
Risks
WPD
- Data Analysis
- Audits
- Meetings
Change
Requests
WPI
WPR
12.1 Plan Procurement Management
12.2 Conduct Procurements
12.3 Control Procurements
Procurements Mind Map
12.1
Plan
Procurement
Management
PMP
Project
Documents
- Exp. Judg.
- Data Gathering(MktRes.)
- Data Analysis (Make/Buy)
- Source Selection Analysis
- Meetings
Procurement
Mgmt. Plan
Project Charter
Business Docs
Procurement
strategy
Bid docs
Procurement
SOW
Source Selection
Criteria
Make or Buy
Decisions
Independent
cost estimates
Change
Requests
12.2
Conduct
Procurement
OPA (Contract
Types)
Procurement Docs
Seller Proposals - Exp. Judg.
- Advertising
- Bidder conference
- Data Analysis (ProposalEval)
- ITS (Negotiation)
Selected
Sellers
Agreements
Change
Requests
12.3
Control
Procurement
Procurement Docs
Approved Change
Requests
WPD
- Exp. Judg.
- Claims administration
- Data Analysis
- Inspection
- Audits
Closed
Procurements
WPI
Change
Requests
13.1 Identify Stakeholders
13.2 Plan Stakeholder Engagement
13.3 Manage Stakeholder Engagement
13.4 Monitor Stakeholder Engagement
Stakeholders Mind Map
13.1
Identify
Stakeholders
PMP
Project
Documents
- Exp. Judg.
- Data Gathering
- Data Analysis
- Data Representation
- Meetings
Stakeholder
Register
Project Charter
Business Docs
Agreements
Change
Requests
13.2
Plan
Stakeholder
Engagement
- Exp. Judg.
- Data Gathering
- Data Analysis
- Decision Making
- Data Representation (SEA matrix)
- Meetings
Stakeholder
engagement Plan
13.3
Manage
Stakeholder
Engagement
- Exp. Judg.
- Comm. Skills (Feedback)
- ITS
- Ground Rules
- Meetings
Change
Requests
13.4
Monitor
Stakeholder
Engagement
WPD
- Data Analysis
- Decision Making
- Data Representation (SEA matrix)
- Comm. Skills
- ITS
- Meetings
Change
Requests
WPI

More Related Content

What's hot

PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...
PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...
PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...Anand Bobade
 
PMBOK® Guide Processes Flow – 6th Edition
PMBOK® Guide Processes Flow – 6th EditionPMBOK® Guide Processes Flow – 6th Edition
PMBOK® Guide Processes Flow – 6th EditionRicardo Viana Vargas
 
Chap 9.1 Pan Resource Management
Chap 9.1   Pan Resource ManagementChap 9.1   Pan Resource Management
Chap 9.1 Pan Resource ManagementAnand Bobade
 
PMP Lecture 4: Project Integration Management
PMP Lecture 4: Project Integration ManagementPMP Lecture 4: Project Integration Management
PMP Lecture 4: Project Integration ManagementMohamed Loey
 
Pmbok Processes Flow, ALL!
Pmbok Processes Flow, ALL!Pmbok Processes Flow, ALL!
Pmbok Processes Flow, ALL!Sasan Hosseyni
 
PMP Chap 10 - Project Communication Management Details
PMP  Chap 10 - Project Communication Management DetailsPMP  Chap 10 - Project Communication Management Details
PMP Chap 10 - Project Communication Management DetailsAnand Bobade
 
Project Integration Management
Project Integration ManagementProject Integration Management
Project Integration Managementpankajsh10
 
PMBOK(R) sixth edition data flow diagrams r2
PMBOK(R)  sixth edition data flow diagrams r2PMBOK(R)  sixth edition data flow diagrams r2
PMBOK(R) sixth edition data flow diagrams r2Kose Jumnichi
 
13.1 Identify Stakeholders
13.1 Identify Stakeholders13.1 Identify Stakeholders
13.1 Identify StakeholdersDavidMcLachlan1
 
Project Risk Management PMBOK
Project Risk Management PMBOKProject Risk Management PMBOK
Project Risk Management PMBOKGeoDiga
 
13.2 Plan Stakeholder Engagement
13.2 Plan Stakeholder Engagement13.2 Plan Stakeholder Engagement
13.2 Plan Stakeholder EngagementDavidMcLachlan1
 
PgMP Course Training Material Slides PowerPoint Presentation
PgMP Course Training Material Slides PowerPoint PresentationPgMP Course Training Material Slides PowerPoint Presentation
PgMP Course Training Material Slides PowerPoint PresentationOsama Zarzour
 
PMBOK® Guide Processes Flow – 6th Edition (Simplified version)
PMBOK® Guide Processes Flow – 6th Edition (Simplified version)PMBOK® Guide Processes Flow – 6th Edition (Simplified version)
PMBOK® Guide Processes Flow – 6th Edition (Simplified version)Ricardo Viana Vargas
 
PMP Chap 13 - Project stakeholder management Overview
PMP Chap 13 - Project stakeholder management OverviewPMP Chap 13 - Project stakeholder management Overview
PMP Chap 13 - Project stakeholder management OverviewAnand Bobade
 
PMP Lecture 1: Introduction to Project Management
PMP Lecture 1: Introduction to Project ManagementPMP Lecture 1: Introduction to Project Management
PMP Lecture 1: Introduction to Project ManagementMohamed Loey
 
PMP Chap 5 - Project Scope Management - Part1
PMP Chap 5 - Project Scope Management - Part1PMP Chap 5 - Project Scope Management - Part1
PMP Chap 5 - Project Scope Management - Part1Anand Bobade
 

What's hot (20)

Procurement ITTO
Procurement ITTOProcurement ITTO
Procurement ITTO
 
Itto pmbok guide 6th edition
Itto   pmbok guide 6th editionItto   pmbok guide 6th edition
Itto pmbok guide 6th edition
 
PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...
PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...
PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...
 
PMP PMBOK 6th
PMP PMBOK 6thPMP PMBOK 6th
PMP PMBOK 6th
 
PMBOK® Guide Processes Flow – 6th Edition
PMBOK® Guide Processes Flow – 6th EditionPMBOK® Guide Processes Flow – 6th Edition
PMBOK® Guide Processes Flow – 6th Edition
 
Chap 9.1 Pan Resource Management
Chap 9.1   Pan Resource ManagementChap 9.1   Pan Resource Management
Chap 9.1 Pan Resource Management
 
PMP Lecture 4: Project Integration Management
PMP Lecture 4: Project Integration ManagementPMP Lecture 4: Project Integration Management
PMP Lecture 4: Project Integration Management
 
PMP_Project Integration Management
PMP_Project Integration ManagementPMP_Project Integration Management
PMP_Project Integration Management
 
Pmbok Processes Flow, ALL!
Pmbok Processes Flow, ALL!Pmbok Processes Flow, ALL!
Pmbok Processes Flow, ALL!
 
PMP Chap 10 - Project Communication Management Details
PMP  Chap 10 - Project Communication Management DetailsPMP  Chap 10 - Project Communication Management Details
PMP Chap 10 - Project Communication Management Details
 
Project Integration Management
Project Integration ManagementProject Integration Management
Project Integration Management
 
PMBOK(R) sixth edition data flow diagrams r2
PMBOK(R)  sixth edition data flow diagrams r2PMBOK(R)  sixth edition data flow diagrams r2
PMBOK(R) sixth edition data flow diagrams r2
 
13.1 Identify Stakeholders
13.1 Identify Stakeholders13.1 Identify Stakeholders
13.1 Identify Stakeholders
 
Project Risk Management PMBOK
Project Risk Management PMBOKProject Risk Management PMBOK
Project Risk Management PMBOK
 
13.2 Plan Stakeholder Engagement
13.2 Plan Stakeholder Engagement13.2 Plan Stakeholder Engagement
13.2 Plan Stakeholder Engagement
 
PgMP Course Training Material Slides PowerPoint Presentation
PgMP Course Training Material Slides PowerPoint PresentationPgMP Course Training Material Slides PowerPoint Presentation
PgMP Course Training Material Slides PowerPoint Presentation
 
PMBOK® Guide Processes Flow – 6th Edition (Simplified version)
PMBOK® Guide Processes Flow – 6th Edition (Simplified version)PMBOK® Guide Processes Flow – 6th Edition (Simplified version)
PMBOK® Guide Processes Flow – 6th Edition (Simplified version)
 
PMP Chap 13 - Project stakeholder management Overview
PMP Chap 13 - Project stakeholder management OverviewPMP Chap 13 - Project stakeholder management Overview
PMP Chap 13 - Project stakeholder management Overview
 
PMP Lecture 1: Introduction to Project Management
PMP Lecture 1: Introduction to Project ManagementPMP Lecture 1: Introduction to Project Management
PMP Lecture 1: Introduction to Project Management
 
PMP Chap 5 - Project Scope Management - Part1
PMP Chap 5 - Project Scope Management - Part1PMP Chap 5 - Project Scope Management - Part1
PMP Chap 5 - Project Scope Management - Part1
 

Similar to Pmp ITTO Complete

Information Management Practice Overview Pp Presentation
Information Management Practice Overview Pp PresentationInformation Management Practice Overview Pp Presentation
Information Management Practice Overview Pp Presentationrkpradhan
 
Work sample_New Manager Briefing
Work sample_New Manager BriefingWork sample_New Manager Briefing
Work sample_New Manager BriefingEBONYE KAUFMAN
 
Togaf – an overview of enterprise architecture
Togaf – an overview of enterprise architectureTogaf – an overview of enterprise architecture
Togaf – an overview of enterprise architectureKhawar Naseem
 
Pm bok 5 ittos ok - pmbok5-ittos
Pm bok 5 ittos   ok - pmbok5-ittosPm bok 5 ittos   ok - pmbok5-ittos
Pm bok 5 ittos ok - pmbok5-ittosMauricio Campuzano
 
Finance and Accounting BPM
Finance and Accounting BPMFinance and Accounting BPM
Finance and Accounting BPMBob Samuels
 
PMP and Planning Process Equivalents
PMP and Planning Process EquivalentsPMP and Planning Process Equivalents
PMP and Planning Process EquivalentsKevin Pannell
 
PMP: Interaction of Project Documents & PM Plan against various Processes
PMP: Interaction of Project Documents & PM Plan against various ProcessesPMP: Interaction of Project Documents & PM Plan against various Processes
PMP: Interaction of Project Documents & PM Plan against various ProcessesAbhinav Bhardwaj
 
ITIL : Service Lifecycle - Poster ( More ITIL Posters on: https://flevy.com/a...
ITIL : Service Lifecycle - Poster ( More ITIL Posters on: https://flevy.com/a...ITIL : Service Lifecycle - Poster ( More ITIL Posters on: https://flevy.com/a...
ITIL : Service Lifecycle - Poster ( More ITIL Posters on: https://flevy.com/a...Ivana Nissen
 
People supply chain for knowledge based organizations
People supply chain for knowledge based organizationsPeople supply chain for knowledge based organizations
People supply chain for knowledge based organizationsRavi Tirumalai
 

Similar to Pmp ITTO Complete (20)

PMP Mind Maps
PMP Mind MapsPMP Mind Maps
PMP Mind Maps
 
Risk Mind Map
Risk Mind MapRisk Mind Map
Risk Mind Map
 
Integration ITTO
Integration ITTOIntegration ITTO
Integration ITTO
 
Integration Mind Map
Integration Mind MapIntegration Mind Map
Integration Mind Map
 
Schedule Mind Map
Schedule Mind MapSchedule Mind Map
Schedule Mind Map
 
Stakeholder ITTO
Stakeholder ITTOStakeholder ITTO
Stakeholder ITTO
 
Resources Mind Map
Resources Mind MapResources Mind Map
Resources Mind Map
 
Information Management Practice Overview Pp Presentation
Information Management Practice Overview Pp PresentationInformation Management Practice Overview Pp Presentation
Information Management Practice Overview Pp Presentation
 
Work sample_New Manager Briefing
Work sample_New Manager BriefingWork sample_New Manager Briefing
Work sample_New Manager Briefing
 
Togaf – an overview of enterprise architecture
Togaf – an overview of enterprise architectureTogaf – an overview of enterprise architecture
Togaf – an overview of enterprise architecture
 
Pm bok 5 ittos ok - pmbok5-ittos
Pm bok 5 ittos   ok - pmbok5-ittosPm bok 5 ittos   ok - pmbok5-ittos
Pm bok 5 ittos ok - pmbok5-ittos
 
Finance and Accounting BPM
Finance and Accounting BPMFinance and Accounting BPM
Finance and Accounting BPM
 
PMP and Planning Process Equivalents
PMP and Planning Process EquivalentsPMP and Planning Process Equivalents
PMP and Planning Process Equivalents
 
3. mrp1 pgp1
3. mrp1 pgp13. mrp1 pgp1
3. mrp1 pgp1
 
PMP: Interaction of Project Documents & PM Plan against various Processes
PMP: Interaction of Project Documents & PM Plan against various ProcessesPMP: Interaction of Project Documents & PM Plan against various Processes
PMP: Interaction of Project Documents & PM Plan against various Processes
 
ITIL : Service Lifecycle - Poster ( More ITIL Posters on: https://flevy.com/a...
ITIL : Service Lifecycle - Poster ( More ITIL Posters on: https://flevy.com/a...ITIL : Service Lifecycle - Poster ( More ITIL Posters on: https://flevy.com/a...
ITIL : Service Lifecycle - Poster ( More ITIL Posters on: https://flevy.com/a...
 
SAP sample
SAP sampleSAP sample
SAP sample
 
PM process groups and processes
PM process groups and processesPM process groups and processes
PM process groups and processes
 
MuraliShankar
MuraliShankarMuraliShankar
MuraliShankar
 
People supply chain for knowledge based organizations
People supply chain for knowledge based organizationsPeople supply chain for knowledge based organizations
People supply chain for knowledge based organizations
 

More from KareemBullard1

Azure-Interview-Questions.pptx
Azure-Interview-Questions.pptxAzure-Interview-Questions.pptx
Azure-Interview-Questions.pptxKareemBullard1
 
Azure_DP_300_Vocabulary_Cards.pptx
Azure_DP_300_Vocabulary_Cards.pptxAzure_DP_300_Vocabulary_Cards.pptx
Azure_DP_300_Vocabulary_Cards.pptxKareemBullard1
 
Azure-Interview-Questions-Slides.pptx
Azure-Interview-Questions-Slides.pptxAzure-Interview-Questions-Slides.pptx
Azure-Interview-Questions-Slides.pptxKareemBullard1
 
01_DP-300T00A-Intro.pptx
01_DP-300T00A-Intro.pptx01_DP-300T00A-Intro.pptx
01_DP-300T00A-Intro.pptxKareemBullard1
 
02_DP_300T00A_Plan_implement.pptx
02_DP_300T00A_Plan_implement.pptx02_DP_300T00A_Plan_implement.pptx
02_DP_300T00A_Plan_implement.pptxKareemBullard1
 
07_DP_300T00A_HA_Disaster_Recovery.pptx
07_DP_300T00A_HA_Disaster_Recovery.pptx07_DP_300T00A_HA_Disaster_Recovery.pptx
07_DP_300T00A_HA_Disaster_Recovery.pptxKareemBullard1
 
06_DP_300T00A_Automate.pptx
06_DP_300T00A_Automate.pptx06_DP_300T00A_Automate.pptx
06_DP_300T00A_Automate.pptxKareemBullard1
 
05_DP_300T00A_Optimize.pptx
05_DP_300T00A_Optimize.pptx05_DP_300T00A_Optimize.pptx
05_DP_300T00A_Optimize.pptxKareemBullard1
 
04_DP_300T00A_Monitor.pptx
04_DP_300T00A_Monitor.pptx04_DP_300T00A_Monitor.pptx
04_DP_300T00A_Monitor.pptxKareemBullard1
 
03_DP_300T00A_Secure_Environment.pptx
03_DP_300T00A_Secure_Environment.pptx03_DP_300T00A_Secure_Environment.pptx
03_DP_300T00A_Secure_Environment.pptxKareemBullard1
 
DP-300 Administering Relational Databases Azure_Oct2020
DP-300 Administering Relational Databases Azure_Oct2020DP-300 Administering Relational Databases Azure_Oct2020
DP-300 Administering Relational Databases Azure_Oct2020KareemBullard1
 
Pmp Questions Complete
Pmp Questions CompletePmp Questions Complete
Pmp Questions CompleteKareemBullard1
 
Pmp Extrenal Documents
Pmp Extrenal DocumentsPmp Extrenal Documents
Pmp Extrenal DocumentsKareemBullard1
 
Stakeholder Chapter 13
Stakeholder Chapter 13Stakeholder Chapter 13
Stakeholder Chapter 13KareemBullard1
 

More from KareemBullard1 (20)

Azure-Interview-Questions.pptx
Azure-Interview-Questions.pptxAzure-Interview-Questions.pptx
Azure-Interview-Questions.pptx
 
Azure_DP_300_Vocabulary_Cards.pptx
Azure_DP_300_Vocabulary_Cards.pptxAzure_DP_300_Vocabulary_Cards.pptx
Azure_DP_300_Vocabulary_Cards.pptx
 
Azure-Interview-Questions-Slides.pptx
Azure-Interview-Questions-Slides.pptxAzure-Interview-Questions-Slides.pptx
Azure-Interview-Questions-Slides.pptx
 
01_DP-300T00A-Intro.pptx
01_DP-300T00A-Intro.pptx01_DP-300T00A-Intro.pptx
01_DP-300T00A-Intro.pptx
 
02_DP_300T00A_Plan_implement.pptx
02_DP_300T00A_Plan_implement.pptx02_DP_300T00A_Plan_implement.pptx
02_DP_300T00A_Plan_implement.pptx
 
07_DP_300T00A_HA_Disaster_Recovery.pptx
07_DP_300T00A_HA_Disaster_Recovery.pptx07_DP_300T00A_HA_Disaster_Recovery.pptx
07_DP_300T00A_HA_Disaster_Recovery.pptx
 
06_DP_300T00A_Automate.pptx
06_DP_300T00A_Automate.pptx06_DP_300T00A_Automate.pptx
06_DP_300T00A_Automate.pptx
 
05_DP_300T00A_Optimize.pptx
05_DP_300T00A_Optimize.pptx05_DP_300T00A_Optimize.pptx
05_DP_300T00A_Optimize.pptx
 
04_DP_300T00A_Monitor.pptx
04_DP_300T00A_Monitor.pptx04_DP_300T00A_Monitor.pptx
04_DP_300T00A_Monitor.pptx
 
03_DP_300T00A_Secure_Environment.pptx
03_DP_300T00A_Secure_Environment.pptx03_DP_300T00A_Secure_Environment.pptx
03_DP_300T00A_Secure_Environment.pptx
 
DP-300 Administering Relational Databases Azure_Oct2020
DP-300 Administering Relational Databases Azure_Oct2020DP-300 Administering Relational Databases Azure_Oct2020
DP-300 Administering Relational Databases Azure_Oct2020
 
Pmp Complete Notes
Pmp Complete NotesPmp Complete Notes
Pmp Complete Notes
 
Pmp Complete Diagrams
Pmp Complete DiagramsPmp Complete Diagrams
Pmp Complete Diagrams
 
Pmp Complete Notes
Pmp Complete NotesPmp Complete Notes
Pmp Complete Notes
 
Pmp Complete Diagrams
Pmp Complete DiagramsPmp Complete Diagrams
Pmp Complete Diagrams
 
Pmp Questions Complete
Pmp Questions CompletePmp Questions Complete
Pmp Questions Complete
 
Pmp Test Complete
Pmp Test CompletePmp Test Complete
Pmp Test Complete
 
Pmp Extrenal Documents
Pmp Extrenal DocumentsPmp Extrenal Documents
Pmp Extrenal Documents
 
Procurement Mind Map
Procurement Mind MapProcurement Mind Map
Procurement Mind Map
 
Stakeholder Chapter 13
Stakeholder Chapter 13Stakeholder Chapter 13
Stakeholder Chapter 13
 

Recently uploaded

Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation SlidesKeppelCorporation
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communicationskarancommunications
 
GD Birla and his contribution in management
GD Birla and his contribution in managementGD Birla and his contribution in management
GD Birla and his contribution in managementchhavia330
 
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...noida100girls
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.Aaiza Hassan
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfPaul Menig
 
Unlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfUnlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfOnline Income Engine
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear RegressionRavindra Nath Shukla
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsMichael W. Hawkins
 
Best Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in IndiaBest Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in IndiaShree Krishna Exports
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒anilsa9823
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Lviv Startup Club
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetDenis Gagné
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Roomdivyansh0kumar0
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Roland Driesen
 

Recently uploaded (20)

Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
GD Birla and his contribution in management
GD Birla and his contribution in managementGD Birla and his contribution in management
GD Birla and his contribution in management
 
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdf
 
Unlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfUnlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdf
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael Hawkins
 
Best Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in IndiaBest Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in India
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...
 

Pmp ITTO Complete

  • 2. 4.2 Develop Project Management Plan
  • 3. 4.3 Direct and Manage Project Work
  • 4. 4.4 Manage Project Knowledge
  • 5. 4.5 Monitor and Control Project Work
  • 6. 4.6 Perform Integrated Change Control
  • 7. 4.7 Close Project or Phase
  • 8. Integration Mind Map 4.1 Develop Project Charter Business Docs. Agreements - Exp. Judg. - Data Gathering - ITS - Meetings Project Charter Assumption Log 4.2 Develop Project Mgmt Plan Outputs from other processes - Exp. Judg. - Data Gathering - ITS - Meetings Project Mgmt Plan 4.3 Direct and Manage Project Work Project Documents - Exp. Judg. - PMIS - Meetings Deliverables Change Requests Issue Log WPD 4.4 Manage Project Knowledge - Exp. Judg. - KnowledgeMgmt - Info Mgmt. - ITS Lessons Learned Register 4.5 Monitor and Control Project Work Agreements WPI - Exp. Judg. - Data Analysis - Decision Making - Meetings WPR Change Requests 4.6 Perform Integrated Change Control Approved Change Requests - Exp. Judg. - CCT - Data Analysis - Decision Making - Meetings (CCB) 4.7 Close Project or Phase - Exp. Judg. - Data Analysis FinalReport FinalProduct, Service or Result Transition Project Charter Procurement Docs Business docs Accepted Deliverables Agreements
  • 9. 5.1 Plan Scope Management
  • 15. Scope Mind Map 5.1 Plan Scope Management 5.2 Collect Requirements 5.3 Define Scope 5.4 CreateWBS 5.5 Validate Scope 5.6 Control Scope - Exp. Judg. - Data Analysis - Meetings Project Charter Scope Mgmt. Plan Requirements Mgmt. Plan Business Docs Agreements Project Documents -Exp. Judg. - Data Gathering - Data Analysis - Decision Making -Data Representation - ITS - Context Diagram - Prototypes Project Charter - Exp. Judg. - Data Analysis - Decision Making - ITS - Product Analysis Project Scope Statement PMP - Exp. Judg. - Decomposition Scope Baseline WPD Verified Deliverables - Inspection - Decision Making Accepted Deliverables WPI Change Requests WPD - Data Analysis WPI Change Requests Requirements docs Requirements Traceability Matrix
  • 16. 6.1 Plan Schedule Management
  • 22. Schedule Mind Map 6.1 Plan Schedule Management Project Documents - Exp. Judg. - Data Analysis - Meetings Project Charter PMP Schedule Mgmt. Plan 6.2 Define Activities - Exp. Judg. - Decomposition - Rolling Wave Planning - Meetings Activity List Activity Attributes Milestone List Change Request 6.3 Sequence Activities - PDM - Dependencydetermination - Leads and Lags - PMIS Project Schedule Network Diagram 6.4 Estimate Activity Durations - Expert Judg. - Analogous - Parametric - Three Points - Bottom-Up - Data Analysis - Decision Making - Meetings Duration Estimates Bases of Estimates 6.5 Develop Schedule Agreements -Schedule Network Analysis - CPM - Resource Opt. - Data Analysis - Leads and Lags - Schedule Comp. - PMIS -Agile Release Plan Schedule baseline Project Schedule Schedule Data Project Calendars Change Requests 6.6 Control Schedule WPD - Data Analysis - CPM - PMIS - Resource Opt. - Leads and Lags - Schedule Comp. WPI Change Requests Schedule Forecast
  • 23. 7.1 Plan Cost Management
  • 27. Cost Mind Map 7.1 PlanCost Management - Exp. Judg. - Data Analysis - Meetings Project Documents PMP Project Charter Cost Mgmt. Plan 7.2 Estimate Costs - Exp. Judg. - Analogous - Parametric - Bottom-Up - Three-points - Data Analysis - PMIS - Decision Making Cost Estimates Basis of estimates 7.3 Determine Budget Agreements Business docs -Exp. Judg. - Cost Aggregation - Data Analysis - Historical Info. -FundingLimit Rec. - Financing Cost Baseline Project Funding Requirements 7.4 Control Costs WPI WPD - Exp. Judg. - Data Analysis (EVA) - TCPI - PMIS Change Requests Cost forecasts
  • 28. 8.1 Plan Quality Management
  • 31. Quality Mind Map 8.1 PlanQuality Management Project Documents PMP Project Charter Quality Mgmt. Plan -Exp. Judg. - Data Gathering - Data Analysis (COQ) - Decision Making - Data Rep. -Test & Inspection Planning - Meetings Quality Metrics 8.2 Manage Quality -Data Gathering - Data Analysis - Decision Making - Data Rep. - Audits - Design for X - Problem Solving -Quality Improvements Methods Quality Report Test & Eval. Docs Change Request 8.3 Control Quality Deliverables Approved Change Request WPD -Data Gathering - Data Analysis - Inspection -Testing/Product Eval. - Data Rep. - Meetings Verified Deliverables WPI Change Requests Quality Control Measurements
  • 32. 9.1 Plan Resource Management
  • 38. Resources Mind Map 9.1 Plan Resource Management PMP Project Documents Resource Mgmt. Plan -Exp. Judg. -Data Representation: RACI, OBS, RBS -Organizational Theories - Meetings Project Charter Team Charter 9.2 Estimate Activity Resources - Exp. Judg. - Bottom-Up - Analogous - Parametric - Data Analysis - PMIS - Meetings Resource Requirements Basis of estimates RBS 9.3 Acquire Resources - Decision Making - ITS - Negotiation - Pre- assignments - VirtualTeams Physical Resource Assignments Project Team Assignments Resource Calendars Change Requests 9.4 Develop Team -Colocation - VirtualTeams - Comm. Tech. - ITS -Recog. and Rewards - Training -Ind. and Team Assessments - Meetings Team Performance Assessment Change Requests 9.5 Manage Team WPR - ITS: Conflict Management - PMIS Change Requests 9.6 Control Resources WPD Agreements - Data Analysis - Problem Solv. - ITS - PMIS Change Requests WPI
  • 42. Communication Mind Map 10.1 Plan Comunications Management -Exp. Judg. -Comm. Requirement Analysis N(N-1)/2 - Comm. Tech. - Comm. Model - Comm. Methods - ITS - Data Represent. - Meetings Project Documents PMP Project Charter Comm. Mgmt. Plan 10.2 Manage Comunications WPR - Comm. Tech. - Comm. Methods - Comm. Skills - PMIS -Project Reporting - ITS - Meetings Project Communications 10.3 Monitor Comunications WPD - Exp. Judg. - PMIS - Data Analysis - ITS - Meetings WPI Change Request
  • 43. 11.1 Plan Risk Management
  • 45. 11.3 Perform Qualitative Risk Analysis
  • 46. 11.4 Perform Quantitative Risk Analysis
  • 47. 11.5 Plan Risk Responses
  • 48. 11.6 Implement Risk Responses
  • 50. isk Mind Map 11.3 R 11.1 Plan Risk Management PMP Project Documents - Exp. Judg. - Data Analysis - Meetings Risk Mgmt. Plan Project Charter 11.2 Identify Risks Procurements Documentation Agreements - Exp. Judg. - Data Gathering - Data Analysis - ITS - Prompt List - Meetings Risk Register Risk Report Perform Qualitative Risk Analysis -Exp. Judg. - Data Gathering - Data Analysis - ITS - Risk Categorization -Data Representation (P&I Matrix) - Meetings 11.4 Perform Quantitative Risk Analysis -Exp. Judg. - Data Gathering - ITS - Rep. of uncertainty -Data Analysis Decision Tree Analysis (EMV) 11.5 Plan Risk Responses - Exp. Judg. - Data Gathering - ITS -Strategiesfor threats -Strategiesfor opportunities -ContingentResponse Strategies -Strategies for overall project risks - Data Analysis - Decision Making Change Requests 11.6 Implement Risk Responses - Exp. Judg. - ITS - PMIS Change Requests 11.7 Monitor Risks WPD - Data Analysis - Audits - Meetings Change Requests WPI WPR
  • 51. 12.1 Plan Procurement Management
  • 54. Procurements Mind Map 12.1 Plan Procurement Management PMP Project Documents - Exp. Judg. - Data Gathering(MktRes.) - Data Analysis (Make/Buy) - Source Selection Analysis - Meetings Procurement Mgmt. Plan Project Charter Business Docs Procurement strategy Bid docs Procurement SOW Source Selection Criteria Make or Buy Decisions Independent cost estimates Change Requests 12.2 Conduct Procurement OPA (Contract Types) Procurement Docs Seller Proposals - Exp. Judg. - Advertising - Bidder conference - Data Analysis (ProposalEval) - ITS (Negotiation) Selected Sellers Agreements Change Requests 12.3 Control Procurement Procurement Docs Approved Change Requests WPD - Exp. Judg. - Claims administration - Data Analysis - Inspection - Audits Closed Procurements WPI Change Requests
  • 56. 13.2 Plan Stakeholder Engagement
  • 59. Stakeholders Mind Map 13.1 Identify Stakeholders PMP Project Documents - Exp. Judg. - Data Gathering - Data Analysis - Data Representation - Meetings Stakeholder Register Project Charter Business Docs Agreements Change Requests 13.2 Plan Stakeholder Engagement - Exp. Judg. - Data Gathering - Data Analysis - Decision Making - Data Representation (SEA matrix) - Meetings Stakeholder engagement Plan 13.3 Manage Stakeholder Engagement - Exp. Judg. - Comm. Skills (Feedback) - ITS - Ground Rules - Meetings Change Requests 13.4 Monitor Stakeholder Engagement WPD - Data Analysis - Decision Making - Data Representation (SEA matrix) - Comm. Skills - ITS - Meetings Change Requests WPI