This document summarizes Missouri DOT's experience with unbonded concrete overlays. It discusses early projects from the 1930s-1970s and a 1981 survey of those projects. It also outlines current generation unbonded overlay projects since 1986, including "conventional", "big block", and "ultrathin" types. Two specific conventional overlay projects on I-55 and I-44 are described in detail, noting their design, performance, and lessons learned. The document also provides details on two "big block" overlay projects on Route D and US 61, including design, construction methods, and distress survey results.