Contents:
Introduction
Factors affecting load shedding
Consideration for industrial system
conclusion
introduction
Load shedding :
To disconnect the load automatically by frequency
sensetive relay termed as load shedding.
Under frequency load shedding
Object :
To balance the load and the genaration .
The load is shed a block at a time untill the frequency
stabilize.
Factors affecting load shedding
 Maximum anticipated overload
• load reduction factor (d)
• For safest d=0;
Number of load shedding steps
 Most utilities use between 2 to 5 load shedding step.
 3 is the most common.
Size of load shed at each step
• Express as % of overload
• % overload = (load-power input/power output)*100
Frequency setting
Time delay
 Location of the frequency relay
Consideration for industrial system
Conclusion:
load shedding

More Related Content

What's hot

ETAP - Short circuit ansi standard
ETAP - Short circuit ansi standardETAP - Short circuit ansi standard
ETAP - Short circuit ansi standardHimmelstern
 
automatic phase changer in three phase supply
automatic phase changer in three phase supplyautomatic phase changer in three phase supply
automatic phase changer in three phase supplyamaljo joju e
 
Understanding transformer vector group
Understanding transformer vector groupUnderstanding transformer vector group
Understanding transformer vector groupShyamkant Vasekar
 
Power line carrier communication(with awesome animation work)
Power line carrier communication(with awesome animation work)Power line carrier communication(with awesome animation work)
Power line carrier communication(with awesome animation work)Mohit Agarwal
 
Presentation topic is transmission line
Presentation topic is transmission linePresentation topic is transmission line
Presentation topic is transmission linemd muzahidul haque
 
Power Quality Measurement Devices & Monotoring
Power Quality Measurement Devices & MonotoringPower Quality Measurement Devices & Monotoring
Power Quality Measurement Devices & MonotoringParth Patel
 
Vacuum circuit breaker selection of circuit breakers
Vacuum circuit breaker selection of circuit breakersVacuum circuit breaker selection of circuit breakers
Vacuum circuit breaker selection of circuit breakersshubham_bharadia
 
Transient in Power system
Transient in Power systemTransient in Power system
Transient in Power systemPreet_patel
 
Fundamentals of transformer inrush
Fundamentals of transformer inrushFundamentals of transformer inrush
Fundamentals of transformer inrushmichaeljmack
 
Load dispatch center
Load dispatch centerLoad dispatch center
Load dispatch centerddxdharmesh
 
Extra high voltage long ac transmission lines
Extra high voltage long ac transmission linesExtra high voltage long ac transmission lines
Extra high voltage long ac transmission linesShivagee Raj
 
Sag in overhead transmission line, sag calculation & string chart
Sag in overhead transmission line, sag   calculation & string chartSag in overhead transmission line, sag   calculation & string chart
Sag in overhead transmission line, sag calculation & string chartvishalgohel12195
 
Ppt on protection of power transformers
Ppt on protection of power transformersPpt on protection of power transformers
Ppt on protection of power transformerssiddharam kantoli
 
POWER QUALITY IMPROVEMENT
POWER QUALITY IMPROVEMENTPOWER QUALITY IMPROVEMENT
POWER QUALITY IMPROVEMENTUday Wankar
 

What's hot (20)

ETAP - Short circuit ansi standard
ETAP - Short circuit ansi standardETAP - Short circuit ansi standard
ETAP - Short circuit ansi standard
 
automatic phase changer in three phase supply
automatic phase changer in three phase supplyautomatic phase changer in three phase supply
automatic phase changer in three phase supply
 
Understanding transformer vector group
Understanding transformer vector groupUnderstanding transformer vector group
Understanding transformer vector group
 
Restructuring of power grid
Restructuring of power gridRestructuring of power grid
Restructuring of power grid
 
Power line carrier communication(with awesome animation work)
Power line carrier communication(with awesome animation work)Power line carrier communication(with awesome animation work)
Power line carrier communication(with awesome animation work)
 
Presentation topic is transmission line
Presentation topic is transmission linePresentation topic is transmission line
Presentation topic is transmission line
 
Faults on Power System
Faults on Power SystemFaults on Power System
Faults on Power System
 
Power Quality Measurement Devices & Monotoring
Power Quality Measurement Devices & MonotoringPower Quality Measurement Devices & Monotoring
Power Quality Measurement Devices & Monotoring
 
Lightning arrester
Lightning arresterLightning arrester
Lightning arrester
 
Vacuum circuit breaker selection of circuit breakers
Vacuum circuit breaker selection of circuit breakersVacuum circuit breaker selection of circuit breakers
Vacuum circuit breaker selection of circuit breakers
 
Transient in Power system
Transient in Power systemTransient in Power system
Transient in Power system
 
Fundamentals of transformer inrush
Fundamentals of transformer inrushFundamentals of transformer inrush
Fundamentals of transformer inrush
 
Protection of alternator
Protection of alternatorProtection of alternator
Protection of alternator
 
Fault level calculations
Fault level calculationsFault level calculations
Fault level calculations
 
Load dispatch center
Load dispatch centerLoad dispatch center
Load dispatch center
 
Extra high voltage long ac transmission lines
Extra high voltage long ac transmission linesExtra high voltage long ac transmission lines
Extra high voltage long ac transmission lines
 
Faults in Power System
Faults in Power SystemFaults in Power System
Faults in Power System
 
Sag in overhead transmission line, sag calculation & string chart
Sag in overhead transmission line, sag   calculation & string chartSag in overhead transmission line, sag   calculation & string chart
Sag in overhead transmission line, sag calculation & string chart
 
Ppt on protection of power transformers
Ppt on protection of power transformersPpt on protection of power transformers
Ppt on protection of power transformers
 
POWER QUALITY IMPROVEMENT
POWER QUALITY IMPROVEMENTPOWER QUALITY IMPROVEMENT
POWER QUALITY IMPROVEMENT
 

Similar to load shedding

ECE4762011_Lect22.ppt
ECE4762011_Lect22.pptECE4762011_Lect22.ppt
ECE4762011_Lect22.pptSekar80689
 
Optimal load scheduling
Optimal load schedulingOptimal load scheduling
Optimal load schedulingMayank Sharma
 
Selectivity and Coodination
Selectivity and CoodinationSelectivity and Coodination
Selectivity and Coodinationmichaeljmack
 
Lecture no 1 switchgears bt255 converted
Lecture no 1 switchgears bt255 convertedLecture no 1 switchgears bt255 converted
Lecture no 1 switchgears bt255 convertedFazal Ur Rehman
 
Ece4762011 lect22
Ece4762011 lect22Ece4762011 lect22
Ece4762011 lect22ajsatienza
 
04 ptcc protection feautres
04 ptcc protection feautres04 ptcc protection feautres
04 ptcc protection feautresduytn1
 
7SR23 High Impedance Bus Bar Protection Relay
7SR23 High Impedance Bus Bar Protection Relay7SR23 High Impedance Bus Bar Protection Relay
7SR23 High Impedance Bus Bar Protection Relayashwini reliserv
 
A Fuzzy Logic controller based Multifunctional Dynamic Voltage restorer in Di...
A Fuzzy Logic controller based Multifunctional Dynamic Voltage restorer in Di...A Fuzzy Logic controller based Multifunctional Dynamic Voltage restorer in Di...
A Fuzzy Logic controller based Multifunctional Dynamic Voltage restorer in Di...IOSR Journals
 
Acoustics & Generator Ratings
Acoustics & Generator RatingsAcoustics & Generator Ratings
Acoustics & Generator RatingsJonny Rodgers
 
The iot academy_embeddedsystems_training_circuitdesignpart3
The iot academy_embeddedsystems_training_circuitdesignpart3The iot academy_embeddedsystems_training_circuitdesignpart3
The iot academy_embeddedsystems_training_circuitdesignpart3The IOT Academy
 
Equipments in distribution system
Equipments in distribution systemEquipments in distribution system
Equipments in distribution systemEranga Pathiranage
 
Design and Simulation of Dynamic Voltage Restorer Based on Fuzzy Controller O...
Design and Simulation of Dynamic Voltage Restorer Based on Fuzzy Controller O...Design and Simulation of Dynamic Voltage Restorer Based on Fuzzy Controller O...
Design and Simulation of Dynamic Voltage Restorer Based on Fuzzy Controller O...IJPEDS-IAES
 
To Diminish the Voltage Sag Replaced DVR with Generalized Modulation Strategy...
To Diminish the Voltage Sag Replaced DVR with Generalized Modulation Strategy...To Diminish the Voltage Sag Replaced DVR with Generalized Modulation Strategy...
To Diminish the Voltage Sag Replaced DVR with Generalized Modulation Strategy...IRJET Journal
 
Backup fault protection for generators in case of a failure at the generation...
Backup fault protection for generators in case of a failure at the generation...Backup fault protection for generators in case of a failure at the generation...
Backup fault protection for generators in case of a failure at the generation...Mohammad Raza
 

Similar to load shedding (20)

ECE4762011_Lect22.ppt
ECE4762011_Lect22.pptECE4762011_Lect22.ppt
ECE4762011_Lect22.ppt
 
Economic load dispatch
Economic load  dispatchEconomic load  dispatch
Economic load dispatch
 
Optimal load scheduling
Optimal load schedulingOptimal load scheduling
Optimal load scheduling
 
Selectivity and Coodination
Selectivity and CoodinationSelectivity and Coodination
Selectivity and Coodination
 
Lecture no 1 switchgears bt255 converted
Lecture no 1 switchgears bt255 convertedLecture no 1 switchgears bt255 converted
Lecture no 1 switchgears bt255 converted
 
Ece4762011 lect22
Ece4762011 lect22Ece4762011 lect22
Ece4762011 lect22
 
Protective relay.pptx
Protective relay.pptxProtective relay.pptx
Protective relay.pptx
 
04 ptcc protection feautres
04 ptcc protection feautres04 ptcc protection feautres
04 ptcc protection feautres
 
diversity
diversitydiversity
diversity
 
7SR23 High Impedance Bus Bar Protection Relay
7SR23 High Impedance Bus Bar Protection Relay7SR23 High Impedance Bus Bar Protection Relay
7SR23 High Impedance Bus Bar Protection Relay
 
A Fuzzy Logic controller based Multifunctional Dynamic Voltage restorer in Di...
A Fuzzy Logic controller based Multifunctional Dynamic Voltage restorer in Di...A Fuzzy Logic controller based Multifunctional Dynamic Voltage restorer in Di...
A Fuzzy Logic controller based Multifunctional Dynamic Voltage restorer in Di...
 
UNIT2-PQ-PPT.ppt
UNIT2-PQ-PPT.pptUNIT2-PQ-PPT.ppt
UNIT2-PQ-PPT.ppt
 
Acoustics & Generator Ratings
Acoustics & Generator RatingsAcoustics & Generator Ratings
Acoustics & Generator Ratings
 
The iot academy_embeddedsystems_training_circuitdesignpart3
The iot academy_embeddedsystems_training_circuitdesignpart3The iot academy_embeddedsystems_training_circuitdesignpart3
The iot academy_embeddedsystems_training_circuitdesignpart3
 
K2917.pptx
K2917.pptxK2917.pptx
K2917.pptx
 
A04420107
A04420107A04420107
A04420107
 
Equipments in distribution system
Equipments in distribution systemEquipments in distribution system
Equipments in distribution system
 
Design and Simulation of Dynamic Voltage Restorer Based on Fuzzy Controller O...
Design and Simulation of Dynamic Voltage Restorer Based on Fuzzy Controller O...Design and Simulation of Dynamic Voltage Restorer Based on Fuzzy Controller O...
Design and Simulation of Dynamic Voltage Restorer Based on Fuzzy Controller O...
 
To Diminish the Voltage Sag Replaced DVR with Generalized Modulation Strategy...
To Diminish the Voltage Sag Replaced DVR with Generalized Modulation Strategy...To Diminish the Voltage Sag Replaced DVR with Generalized Modulation Strategy...
To Diminish the Voltage Sag Replaced DVR with Generalized Modulation Strategy...
 
Backup fault protection for generators in case of a failure at the generation...
Backup fault protection for generators in case of a failure at the generation...Backup fault protection for generators in case of a failure at the generation...
Backup fault protection for generators in case of a failure at the generation...
 

More from Rakshita Upadhyay

More from Rakshita Upadhyay (9)

Rs methodologyandreliability
Rs methodologyandreliabilityRs methodologyandreliability
Rs methodologyandreliability
 
Optimal control system
Optimal control systemOptimal control system
Optimal control system
 
Insulation coordination
Insulation coordinationInsulation coordination
Insulation coordination
 
Fc tcr.newpptx
Fc tcr.newpptxFc tcr.newpptx
Fc tcr.newpptx
 
Dom
DomDom
Dom
 
Plc and hmi based stenter machine poster
Plc and hmi based stenter machine posterPlc and hmi based stenter machine poster
Plc and hmi based stenter machine poster
 
Plc and hmi baed stenter machine01
Plc and hmi baed stenter machine01Plc and hmi baed stenter machine01
Plc and hmi baed stenter machine01
 
Induction machine modelling
Induction machine modelling Induction machine modelling
Induction machine modelling
 
Reneable energy
Reneable energyReneable energy
Reneable energy
 

load shedding