The document discusses factors that affect load shedding, which is the process of automatically disconnecting electrical load to match generation when there is a frequency drop in the power system. It notes that the key factors include the anticipated maximum overload, load reduction factor, number of load shedding steps, size of load shed at each step, frequency and time settings of relays, and location of relays. The document also mentions considerations for load shedding of industrial systems and provides an introduction and conclusion.