• TRAINING OVERVIEW 
• INTRODUCTION 
• BASIC PRINCIPAL OF PLCC 
• SIGNALS FOR PLCC 
• COMPONENTS 
• PLCC STATION 
• BLOCK DIAGRAM OF 
CIRCUIT 
• BASIC COUPLING 
ARRANGEMENT 
• MAINTAINENCE AND 
FAULT TRACKING 
• ADVANTAGE 
• LIMITATIONS 
• CONCLUSION
TRAINING OVERVIEW 
 Name Of Industry : Rajasthan Rajya Vidyut Prasaran Nigam 
Limited 
 Location: 220KV GSS PREMISES, RIICO INDUSTRIAL 
AREA, BHARATPUR 
 Reporting Officer: A. K. MITTAL 
 Duration of training : 3rd June to 18th July, 2014 
 Department of training :Electronics & Communication
INTRODUCTION 
 PLCC is the method of transmitting information 
using power network. 
 Its equipment are used for point-to-point 
communication over high voltage power lines 
 It’s equipments are used to send/receive 
speech/data/teleprotection signals. 
 It’s the most economical and reliable method of 
communication for medium or long distance.
BASIC PRINCIPAL OF PLCC 
 The telephone communication system cannot be 
directly connected to the high voltage lines so, 
we use suitably designed coupling devices for 
communication. 
 These usually consist of high voltage capacitor 
used in conjunction with suitable line matching 
unit (LMU) for matching the impedance of line 
to that of the coaxial cable connecting the unit 
to the PLC transmiter-receiver equipment.
SIGNALS FOR PLCC 
The signal that can be transmitted over the PLCC 
include 
 Speech signal (300-2000Hz ) 
 Data signal (2000-3000Hz)
Components 
• PLCC station 
• Line matching Unit 
• CVT/CC 
• Earth Switch 
• Lightening Arrestor 
• Wave Trap 
• Co axial Cable 
7 
EPAX 
RF carrier 
(40-500kHz) 
Power Line 
(50Hz) 
C.C 
RTU 
L.T 
PLCC TERMINAL
PLCC station 
• It is the station where (modulation)Transmission , 
Receiving (Demodulation ) , Amplification and 
Filtration are performed. 
• Transmitter : 
8
Receiver :
CVT/CC 
• It is Control Voltage transformer/ Coupling capacitor. 
• This is used for blocking the high voltage entering 
to the PLCC equipment. 
Earth Switch 
• This is used at the time of maintenance of LMU.
Lightening Arrestor 
• Used to protect the system from the 
damaging effect of lightening. 
• It works as an insulator between light 
and the power line. 
Co axial Cable 
• This is used for inter connection 
between PLCC & L.M.U for carrying the 
high frequency signal.
Line Matching Unit 
The out-put of PLCC is connected to the matching unit 
before the power lines to achieve the proper impedance 
matching and protection in between PLCC Equipments 
and power line. 
Module Cabinet
Wave Trap 
• Consists of a number choke 
coils connected in series. 
• It is connected in series with the 
power line and prevents carrier 
current from 
entering to the power 
equipment. 
• Offer negligible impedance to 
power frequency & high 
impedance to carrier frequency. 
PLC signal 
Blocking 
HV Line 
Substation 
Power 
energy 
PLC 
Signal
Block diagram 0f Circuit
BASIC COUPLING ARRANGEMENT 
 The power frequency and radio frequency currents are 
sorted by this arrangement . 
 Carrier currents are prevented to enter station bus by 
wave trap & power frequency current is blocked by 
coupling capacitor, from the PLC equipment. 
 Hence we get power current at the bus & carrier current 
at PLC equipment.
BATTERY CHARGER 
• PLCC work on rectified AC or main supply, when supply 
goes off, we make use of a device for proper functioning 
of PLCC called battery charger. 
• This is the device that provide supply to the PLCC 
equipment for uninterrupted working. 
• It provide DC to the panel by battery. 
16
Maintenance & Fault Tracking 
• FAULT ANALYSIS 
In fault analysis the faulty devices are checked in 
this serial or manner:- 
1. Telephone or tale operation signal 
2. Cabling low frequency circuit or DC power supply 
3. PLC equipment 
4. HF transmission path
MAINTAINANCE AND FAULT TRACING 
PROCEDURE 
1. The control circuit boards should be inserted far 
firmly. 
2. The charger should be switch off once in every 
month. 
3. The battery terminal should be connected first and 
the AC input after that. 
4. All mounting bolts should be checked before 
energizing.
Advantages 
 No separate wires are needed for 
communication purpose. 
 Both communication and power transfer can 
be possible on same circuit. 
 Power lines provides the shortest route 
between the power station. 
 Increased reliability. 
 Lower attenuation over long distance. 
 Implementation cost is reduced.
Limitations 
 Reflection are produced on spur lines connected 
to high voltage line. This increased attenuation 
and create other problem. 
 High voltage lines have transformer connections, 
which attenuate carrier currents. 
 Noise introduced by power lines is far more than 
in case of telephone lines.
Key learning 
• PLCC is mainly used for telecommunication, tele-protection 
and tele-monitoring between electrical 
substations through power lines. 
• In a PLCC system the communication is established 
through the power line. 
• The carrier frequency range is allocated to include 
the audio signal, protection and the pilot frequency.
CONCLUSION 
The Training was based on communication over 
existing power line.
ANY QUERIES ?

More Related Content

What's hot

Electrical substations: 132 KV
Electrical substations: 132 KV Electrical substations: 132 KV
Electrical substations: 132 KV
Girish Gupta
 
220KV Substation Training Report
220KV Substation Training Report220KV Substation Training Report
220KV Substation Training Report
SWAPNILKUMARGUPTA
 
Power Line Carrier Communication
Power Line Carrier CommunicationPower Line Carrier Communication
Power Line Carrier CommunicationBiswajit Pratihari
 
Power Line Carrier Communication
Power Line Carrier CommunicationPower Line Carrier Communication
Power Line Carrier Communication
Neha Gethe
 
Generation of High D.C. Voltage (HVDC generation)
Generation of High D.C. Voltage (HVDC generation)Generation of High D.C. Voltage (HVDC generation)
Generation of High D.C. Voltage (HVDC generation)
RP6997
 
132kV GSS ppt
132kV GSS ppt132kV GSS ppt
132kV GSS ppt
Abhishek Dosaya
 
Report on 220kv substation at Jassure
Report on 220kv substation at JassureReport on 220kv substation at Jassure
Report on 220kv substation at Jassure
Shuvam Pathania
 
PPT ON SUMMER TRAINING FROM UPPCL 132/33 KV SUB STATION
PPT ON SUMMER TRAINING FROM UPPCL 132/33 KV SUB STATIONPPT ON SUMMER TRAINING FROM UPPCL 132/33 KV SUB STATION
PPT ON SUMMER TRAINING FROM UPPCL 132/33 KV SUB STATION
Swatantra SwAt
 
220 kv Sub-station Summer Training ppt
220 kv Sub-station Summer Training ppt220 kv Sub-station Summer Training ppt
220 kv Sub-station Summer Training ppt
Shubham Patel
 
presentation on substation layout and BUS bar arrangement.
presentation on substation layout and BUS bar arrangement.presentation on substation layout and BUS bar arrangement.
presentation on substation layout and BUS bar arrangement.
Hemendra Kumar Rajput
 
PPt on 220 kV substation
PPt on 220 kV substationPPt on 220 kV substation
PPt on 220 kV substationIshank Ranjan
 
Substation overview
Substation overviewSubstation overview
Substation overview
BHAGWAN PRASAD
 
132 kv GSS Mahaveer Nagar Kota
132 kv GSS Mahaveer Nagar Kota 132 kv GSS Mahaveer Nagar Kota
132 kv GSS Mahaveer Nagar Kota
PramodNagar5
 
Report on industrial summer training on 220 kv substation
Report  on industrial summer training on 220 kv substationReport  on industrial summer training on 220 kv substation
Report on industrial summer training on 220 kv substation
Ashutosh Srivastava
 
A Training Report Of Saltlake 132/33kv Substation
A Training Report Of Saltlake 132/33kv SubstationA Training Report Of Saltlake 132/33kv Substation
A Training Report Of Saltlake 132/33kv Substation
Subhrajit Ghosh
 
Power Line Carrier Communication seminar
Power Line Carrier Communication seminarPower Line Carrier Communication seminar
Power Line Carrier Communication seminarAishwary Verma
 
ppt on summer training on uppcl
ppt on summer training on uppclppt on summer training on uppcl
ppt on summer training on uppcl
Sunny Daksh
 
Automatic power factor correction
Automatic power factor correctionAutomatic power factor correction
Automatic power factor correction
VIKAS KUMAR MANJHI
 
Electric substation
Electric substation Electric substation
Electric substation
ANNU KUMAR
 

What's hot (20)

Plcc ppt1
Plcc ppt1Plcc ppt1
Plcc ppt1
 
Electrical substations: 132 KV
Electrical substations: 132 KV Electrical substations: 132 KV
Electrical substations: 132 KV
 
220KV Substation Training Report
220KV Substation Training Report220KV Substation Training Report
220KV Substation Training Report
 
Power Line Carrier Communication
Power Line Carrier CommunicationPower Line Carrier Communication
Power Line Carrier Communication
 
Power Line Carrier Communication
Power Line Carrier CommunicationPower Line Carrier Communication
Power Line Carrier Communication
 
Generation of High D.C. Voltage (HVDC generation)
Generation of High D.C. Voltage (HVDC generation)Generation of High D.C. Voltage (HVDC generation)
Generation of High D.C. Voltage (HVDC generation)
 
132kV GSS ppt
132kV GSS ppt132kV GSS ppt
132kV GSS ppt
 
Report on 220kv substation at Jassure
Report on 220kv substation at JassureReport on 220kv substation at Jassure
Report on 220kv substation at Jassure
 
PPT ON SUMMER TRAINING FROM UPPCL 132/33 KV SUB STATION
PPT ON SUMMER TRAINING FROM UPPCL 132/33 KV SUB STATIONPPT ON SUMMER TRAINING FROM UPPCL 132/33 KV SUB STATION
PPT ON SUMMER TRAINING FROM UPPCL 132/33 KV SUB STATION
 
220 kv Sub-station Summer Training ppt
220 kv Sub-station Summer Training ppt220 kv Sub-station Summer Training ppt
220 kv Sub-station Summer Training ppt
 
presentation on substation layout and BUS bar arrangement.
presentation on substation layout and BUS bar arrangement.presentation on substation layout and BUS bar arrangement.
presentation on substation layout and BUS bar arrangement.
 
PPt on 220 kV substation
PPt on 220 kV substationPPt on 220 kV substation
PPt on 220 kV substation
 
Substation overview
Substation overviewSubstation overview
Substation overview
 
132 kv GSS Mahaveer Nagar Kota
132 kv GSS Mahaveer Nagar Kota 132 kv GSS Mahaveer Nagar Kota
132 kv GSS Mahaveer Nagar Kota
 
Report on industrial summer training on 220 kv substation
Report  on industrial summer training on 220 kv substationReport  on industrial summer training on 220 kv substation
Report on industrial summer training on 220 kv substation
 
A Training Report Of Saltlake 132/33kv Substation
A Training Report Of Saltlake 132/33kv SubstationA Training Report Of Saltlake 132/33kv Substation
A Training Report Of Saltlake 132/33kv Substation
 
Power Line Carrier Communication seminar
Power Line Carrier Communication seminarPower Line Carrier Communication seminar
Power Line Carrier Communication seminar
 
ppt on summer training on uppcl
ppt on summer training on uppclppt on summer training on uppcl
ppt on summer training on uppcl
 
Automatic power factor correction
Automatic power factor correctionAutomatic power factor correction
Automatic power factor correction
 
Electric substation
Electric substation Electric substation
Electric substation
 

Viewers also liked

Power Line Communication
Power Line CommunicationPower Line Communication
Power Line Communication
Piyush Chand
 
powerline communication system
powerline communication systempowerline communication system
powerline communication systemAhmed Hassan
 
Power line carrier communication
Power  line  carrier  communicationPower  line  carrier  communication
Power line carrier communication
Rahul Mehta
 
Plcc
PlccPlcc
Power Line carrier communication
Power Line carrier communicationPower Line carrier communication
Power Line carrier communication
Poornima institute of engineering and technology
 
Plcc
PlccPlcc
Smart Metering - Power Management & Power Line Communications
Smart Metering - Power Management & Power Line CommunicationsSmart Metering - Power Management & Power Line Communications
Smart Metering - Power Management & Power Line Communications
ON Semiconductor
 
switching substation, plcc and scada
switching substation, plcc and scadaswitching substation, plcc and scada
switching substation, plcc and scada
Hemendra Kumar Rajput
 
220 kv gss renwal ppt
220 kv gss renwal ppt220 kv gss renwal ppt
220 kv gss renwal ppt
अनिल कुमावत
 
Ultrasonic motor
Ultrasonic motorUltrasonic motor
Ultrasonic motor
Pintu Khan
 
Power theft detection via plc
Power theft detection via plcPower theft detection via plc
Power theft detection via plcbbshashanka
 
Wireless power transmission
Wireless power transmissionWireless power transmission
Wireless power transmissionrakeshkk
 
Ruby onrails overview
Ruby onrails overviewRuby onrails overview
Ruby onrails overview
Piyush Chand
 
Rrvpnl summer-industrial-training-ajmer-in-power-line-carrier-communication
Rrvpnl summer-industrial-training-ajmer-in-power-line-carrier-communicationRrvpnl summer-industrial-training-ajmer-in-power-line-carrier-communication
Rrvpnl summer-industrial-training-ajmer-in-power-line-carrier-communication
Dushyant Singh Chouhan
 
Communication & Your Career
Communication & Your CareerCommunication & Your Career
Communication & Your Career
M.T.H Group
 

Viewers also liked (20)

Power Line Communication
Power Line CommunicationPower Line Communication
Power Line Communication
 
powerline communication system
powerline communication systempowerline communication system
powerline communication system
 
Power line carrier communication
Power  line  carrier  communicationPower  line  carrier  communication
Power line carrier communication
 
Power line communication
Power line communicationPower line communication
Power line communication
 
Plcc
PlccPlcc
Plcc
 
Power Line carrier communication
Power Line carrier communicationPower Line carrier communication
Power Line carrier communication
 
Plcc
PlccPlcc
Plcc
 
Smart Metering - Power Management & Power Line Communications
Smart Metering - Power Management & Power Line CommunicationsSmart Metering - Power Management & Power Line Communications
Smart Metering - Power Management & Power Line Communications
 
POWER LINE COMMUNICATION
POWER LINE COMMUNICATIONPOWER LINE COMMUNICATION
POWER LINE COMMUNICATION
 
Final rohit bpl
Final rohit bplFinal rohit bpl
Final rohit bpl
 
switching substation, plcc and scada
switching substation, plcc and scadaswitching substation, plcc and scada
switching substation, plcc and scada
 
220 kv gss renwal ppt
220 kv gss renwal ppt220 kv gss renwal ppt
220 kv gss renwal ppt
 
Presentation of bpl
Presentation of bplPresentation of bpl
Presentation of bpl
 
Ultra sonic motor
Ultra sonic motorUltra sonic motor
Ultra sonic motor
 
Ultrasonic motor
Ultrasonic motorUltrasonic motor
Ultrasonic motor
 
Power theft detection via plc
Power theft detection via plcPower theft detection via plc
Power theft detection via plc
 
Wireless power transmission
Wireless power transmissionWireless power transmission
Wireless power transmission
 
Ruby onrails overview
Ruby onrails overviewRuby onrails overview
Ruby onrails overview
 
Rrvpnl summer-industrial-training-ajmer-in-power-line-carrier-communication
Rrvpnl summer-industrial-training-ajmer-in-power-line-carrier-communicationRrvpnl summer-industrial-training-ajmer-in-power-line-carrier-communication
Rrvpnl summer-industrial-training-ajmer-in-power-line-carrier-communication
 
Communication & Your Career
Communication & Your CareerCommunication & Your Career
Communication & Your Career
 

Similar to Power line carrier communication(with awesome animation work)

Presentation on power line career communication by ramanand sagar
Presentation on power line career communication by ramanand sagarPresentation on power line career communication by ramanand sagar
Presentation on power line career communication by ramanand sagar
Ramanand Sagar
 
Power_Line_Carrier_Communication.pptx
Power_Line_Carrier_Communication.pptxPower_Line_Carrier_Communication.pptx
Power_Line_Carrier_Communication.pptx
Vara Prasad
 
Ppt.aslam
Ppt.aslamPpt.aslam
Ppt.aslam
Aslam Atif
 
Power_LIne_Communication_Basics.pptx
Power_LIne_Communication_Basics.pptxPower_LIne_Communication_Basics.pptx
Power_LIne_Communication_Basics.pptx
NashiIhsan
 
Power line carrier communication
Power line carrier communicationPower line carrier communication
Power line carrier communication
uttarakhatik
 
CSPTCL DANGANIYA RAIPUR (C.G.)
CSPTCL   DANGANIYA RAIPUR (C.G.)CSPTCL   DANGANIYA RAIPUR (C.G.)
CSPTCL DANGANIYA RAIPUR (C.G.)
Government Engineering College, Raipur
 
Presentation on Dehar power house(DPH), slapper
Presentation on Dehar power house(DPH), slapperPresentation on Dehar power house(DPH), slapper
Presentation on Dehar power house(DPH), slapper
Jyoti Rawat
 
132 kv seminar ppt
132 kv seminar ppt132 kv seminar ppt
132 kv seminar ppt
Sourabh Bhattacharya
 
Communicating to Your Meters
Communicating to Your MetersCommunicating to Your Meters
Communicating to Your Meters
TESCO - The Eastern Specialty Company
 
Wireless Charging
Wireless ChargingWireless Charging
Wireless Charging
Seminar Links
 
20BEE042 5th semester Internship PPT.pptx
20BEE042 5th semester Internship PPT.pptx20BEE042 5th semester Internship PPT.pptx
20BEE042 5th semester Internship PPT.pptx
SumitRajput83
 
TESCO Tuesday: Communication Equipment
TESCO Tuesday: Communication EquipmentTESCO Tuesday: Communication Equipment
TESCO Tuesday: Communication Equipment
TESCO - The Eastern Specialty Company
 
ppt of Three phase fault analysis with auto reset for temporary fault and tri...
ppt of Three phase fault analysis with auto reset for temporary fault and tri...ppt of Three phase fault analysis with auto reset for temporary fault and tri...
ppt of Three phase fault analysis with auto reset for temporary fault and tri...
Vikram Rawani
 
A new approach to motor condition monitoring
A new approach to motor condition monitoringA new approach to motor condition monitoring
A new approach to motor condition monitoring
UFRN
 
SEG 3 unit ppt.pptx
SEG 3 unit ppt.pptxSEG 3 unit ppt.pptx
SEG 3 unit ppt.pptx
IshuIswarya3
 
16928 6274 1
16928 6274 116928 6274 1
16928 6274 1
kibet sang
 
Abhishek scada ppt
Abhishek scada pptAbhishek scada ppt
Abhishek scada ppt
anilakib
 
Abhishek scada ppt
Abhishek scada pptAbhishek scada ppt
Abhishek scada ppt
anilakib
 

Similar to Power line carrier communication(with awesome animation work) (20)

Ppt
PptPpt
Ppt
 
Presentation on power line career communication by ramanand sagar
Presentation on power line career communication by ramanand sagarPresentation on power line career communication by ramanand sagar
Presentation on power line career communication by ramanand sagar
 
Power_Line_Carrier_Communication.pptx
Power_Line_Carrier_Communication.pptxPower_Line_Carrier_Communication.pptx
Power_Line_Carrier_Communication.pptx
 
Ppt.aslam
Ppt.aslamPpt.aslam
Ppt.aslam
 
Power_LIne_Communication_Basics.pptx
Power_LIne_Communication_Basics.pptxPower_LIne_Communication_Basics.pptx
Power_LIne_Communication_Basics.pptx
 
Power line carrier communication
Power line carrier communicationPower line carrier communication
Power line carrier communication
 
CSPTCL DANGANIYA RAIPUR (C.G.)
CSPTCL   DANGANIYA RAIPUR (C.G.)CSPTCL   DANGANIYA RAIPUR (C.G.)
CSPTCL DANGANIYA RAIPUR (C.G.)
 
Presentation on Dehar power house(DPH), slapper
Presentation on Dehar power house(DPH), slapperPresentation on Dehar power house(DPH), slapper
Presentation on Dehar power house(DPH), slapper
 
132 kv seminar ppt
132 kv seminar ppt132 kv seminar ppt
132 kv seminar ppt
 
132 kv
132 kv132 kv
132 kv
 
Communicating to Your Meters
Communicating to Your MetersCommunicating to Your Meters
Communicating to Your Meters
 
Wireless Charging
Wireless ChargingWireless Charging
Wireless Charging
 
20BEE042 5th semester Internship PPT.pptx
20BEE042 5th semester Internship PPT.pptx20BEE042 5th semester Internship PPT.pptx
20BEE042 5th semester Internship PPT.pptx
 
TESCO Tuesday: Communication Equipment
TESCO Tuesday: Communication EquipmentTESCO Tuesday: Communication Equipment
TESCO Tuesday: Communication Equipment
 
ppt of Three phase fault analysis with auto reset for temporary fault and tri...
ppt of Three phase fault analysis with auto reset for temporary fault and tri...ppt of Three phase fault analysis with auto reset for temporary fault and tri...
ppt of Three phase fault analysis with auto reset for temporary fault and tri...
 
A new approach to motor condition monitoring
A new approach to motor condition monitoringA new approach to motor condition monitoring
A new approach to motor condition monitoring
 
SEG 3 unit ppt.pptx
SEG 3 unit ppt.pptxSEG 3 unit ppt.pptx
SEG 3 unit ppt.pptx
 
16928 6274 1
16928 6274 116928 6274 1
16928 6274 1
 
Abhishek scada ppt
Abhishek scada pptAbhishek scada ppt
Abhishek scada ppt
 
Abhishek scada ppt
Abhishek scada pptAbhishek scada ppt
Abhishek scada ppt
 

Recently uploaded

J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
Kamal Acharya
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Sreedhar Chowdam
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
VENKATESHvenky89705
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
Pipe Restoration Solutions
 
Vaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdfVaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdf
Kamal Acharya
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
R&R Consult
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
ankuprajapati0525
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
Pratik Pawar
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
Jayaprasanna4
 
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfCOLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
Kamal Acharya
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
karthi keyan
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
abh.arya
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 

Recently uploaded (20)

J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
 
Vaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdfVaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdf
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
 
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfCOLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 

Power line carrier communication(with awesome animation work)

  • 1. POWER LINE CARRIER COMMUNICATION PRESENTED BY MOHIT AGARWAL CGI/ECE/ 7TH SEM/15
  • 2. INDEX • TRAINING OVERVIEW • INTRODUCTION • BASIC PRINCIPAL OF PLCC • SIGNALS FOR PLCC • COMPONENTS • PLCC STATION • BLOCK DIAGRAM OF CIRCUIT • BASIC COUPLING ARRANGEMENT • MAINTAINENCE AND FAULT TRACKING • ADVANTAGE • LIMITATIONS • CONCLUSION
  • 3. TRAINING OVERVIEW  Name Of Industry : Rajasthan Rajya Vidyut Prasaran Nigam Limited  Location: 220KV GSS PREMISES, RIICO INDUSTRIAL AREA, BHARATPUR  Reporting Officer: A. K. MITTAL  Duration of training : 3rd June to 18th July, 2014  Department of training :Electronics & Communication
  • 4. INTRODUCTION  PLCC is the method of transmitting information using power network.  Its equipment are used for point-to-point communication over high voltage power lines  It’s equipments are used to send/receive speech/data/teleprotection signals.  It’s the most economical and reliable method of communication for medium or long distance.
  • 5. BASIC PRINCIPAL OF PLCC  The telephone communication system cannot be directly connected to the high voltage lines so, we use suitably designed coupling devices for communication.  These usually consist of high voltage capacitor used in conjunction with suitable line matching unit (LMU) for matching the impedance of line to that of the coaxial cable connecting the unit to the PLC transmiter-receiver equipment.
  • 6. SIGNALS FOR PLCC The signal that can be transmitted over the PLCC include  Speech signal (300-2000Hz )  Data signal (2000-3000Hz)
  • 7. Components • PLCC station • Line matching Unit • CVT/CC • Earth Switch • Lightening Arrestor • Wave Trap • Co axial Cable 7 EPAX RF carrier (40-500kHz) Power Line (50Hz) C.C RTU L.T PLCC TERMINAL
  • 8. PLCC station • It is the station where (modulation)Transmission , Receiving (Demodulation ) , Amplification and Filtration are performed. • Transmitter : 8
  • 10. CVT/CC • It is Control Voltage transformer/ Coupling capacitor. • This is used for blocking the high voltage entering to the PLCC equipment. Earth Switch • This is used at the time of maintenance of LMU.
  • 11. Lightening Arrestor • Used to protect the system from the damaging effect of lightening. • It works as an insulator between light and the power line. Co axial Cable • This is used for inter connection between PLCC & L.M.U for carrying the high frequency signal.
  • 12. Line Matching Unit The out-put of PLCC is connected to the matching unit before the power lines to achieve the proper impedance matching and protection in between PLCC Equipments and power line. Module Cabinet
  • 13. Wave Trap • Consists of a number choke coils connected in series. • It is connected in series with the power line and prevents carrier current from entering to the power equipment. • Offer negligible impedance to power frequency & high impedance to carrier frequency. PLC signal Blocking HV Line Substation Power energy PLC Signal
  • 14. Block diagram 0f Circuit
  • 15. BASIC COUPLING ARRANGEMENT  The power frequency and radio frequency currents are sorted by this arrangement .  Carrier currents are prevented to enter station bus by wave trap & power frequency current is blocked by coupling capacitor, from the PLC equipment.  Hence we get power current at the bus & carrier current at PLC equipment.
  • 16. BATTERY CHARGER • PLCC work on rectified AC or main supply, when supply goes off, we make use of a device for proper functioning of PLCC called battery charger. • This is the device that provide supply to the PLCC equipment for uninterrupted working. • It provide DC to the panel by battery. 16
  • 17. Maintenance & Fault Tracking • FAULT ANALYSIS In fault analysis the faulty devices are checked in this serial or manner:- 1. Telephone or tale operation signal 2. Cabling low frequency circuit or DC power supply 3. PLC equipment 4. HF transmission path
  • 18. MAINTAINANCE AND FAULT TRACING PROCEDURE 1. The control circuit boards should be inserted far firmly. 2. The charger should be switch off once in every month. 3. The battery terminal should be connected first and the AC input after that. 4. All mounting bolts should be checked before energizing.
  • 19. Advantages  No separate wires are needed for communication purpose.  Both communication and power transfer can be possible on same circuit.  Power lines provides the shortest route between the power station.  Increased reliability.  Lower attenuation over long distance.  Implementation cost is reduced.
  • 20. Limitations  Reflection are produced on spur lines connected to high voltage line. This increased attenuation and create other problem.  High voltage lines have transformer connections, which attenuate carrier currents.  Noise introduced by power lines is far more than in case of telephone lines.
  • 21. Key learning • PLCC is mainly used for telecommunication, tele-protection and tele-monitoring between electrical substations through power lines. • In a PLCC system the communication is established through the power line. • The carrier frequency range is allocated to include the audio signal, protection and the pilot frequency.
  • 22. CONCLUSION The Training was based on communication over existing power line.

Editor's Notes

  1. This template can be used as a starter file for presenting training materials in a group setting. Sections Right-click on a slide to add sections. Sections can help to organize your slides or facilitate collaboration between multiple authors. Notes Use the Notes section for delivery notes or to provide additional details for the audience. View these notes in Presentation View during your presentation. Keep in mind the font size (important for accessibility, visibility, videotaping, and online production) Coordinated colors Pay particular attention to the graphs, charts, and text boxes. Consider that attendees will print in black and white or grayscale. Run a test print to make sure your colors work when printed in pure black and white and grayscale. Graphics, tables, and graphs Keep it simple: If possible, use consistent, non-distracting styles and colors. Label all graphs and tables.
  2. What will the audience be able to do after this training is complete? Briefly describe each objective how the audience will benefit from this presentation.
  3. Microsoft Confidential