SHAPE was engaged by Airservices Australia to complete a seven floor fitout that also included the main foyer and conference spaces. All works were completed within a live environment, which was operational 24 hours a day, seven days a week.
Engineers Australia is the largest and most diverse professional
body of engineers in Australia. It is the national forum for the advancement of engineering and the professional development of its members.
Engineers Australia is the largest and most diverse professional
body of engineers in Australia. It is the national forum for the advancement of engineering and the professional development of its members.
ARC Resources Gains Total Natural Gas Visibility with ConnectedProduction
Continuous improvement initiatives drove ARC Resources, an oil and gas producer out of Alberta, Canada to initiate a pilot to optimize artificial lift and gas flow measurement on aging assets. With a ConnectedProduction solution from Rockwell Automation the ARC team gained visibility across operations, including well pad design up to 32 wells and gas plants. This eliminated the need for multiple remote terminal units and standalone flow computers reducing hardware, training and maintenance costs.
Ivy College is a registered Australian Skills Quality Agency that delivers TAFE equivalent online, flexible courses that are nationally recognised qualifications. The college also provides access to free support workshops, career coaching and work placements.
Alma-nac implemented ARCHICAD in 2014 to offer clients greater collaboration, more iterative design and the many benefits of BIM, illustrating their experiences with case study projects.
This is their presentation from Applecore Designs ‘Working Smarter’ breakfast briefing, focused on how studios can collaborate and benefit from: better efficiency, better information, better decision making and better client interaction.
SHAPE was appointed to deliver the fitout of two and a half floors at Optus’ new office. The 3,700m² project was undertaken across three stages, requiring SHAPE to mobilise the site for each stage. Stages one and three included the fitout of 2,000m² of call centre workstations, with large breakout areas and chill out ones.
ARC Resources Gains Total Natural Gas Visibility with ConnectedProduction
Continuous improvement initiatives drove ARC Resources, an oil and gas producer out of Alberta, Canada to initiate a pilot to optimize artificial lift and gas flow measurement on aging assets. With a ConnectedProduction solution from Rockwell Automation the ARC team gained visibility across operations, including well pad design up to 32 wells and gas plants. This eliminated the need for multiple remote terminal units and standalone flow computers reducing hardware, training and maintenance costs.
Ivy College is a registered Australian Skills Quality Agency that delivers TAFE equivalent online, flexible courses that are nationally recognised qualifications. The college also provides access to free support workshops, career coaching and work placements.
Alma-nac implemented ARCHICAD in 2014 to offer clients greater collaboration, more iterative design and the many benefits of BIM, illustrating their experiences with case study projects.
This is their presentation from Applecore Designs ‘Working Smarter’ breakfast briefing, focused on how studios can collaborate and benefit from: better efficiency, better information, better decision making and better client interaction.
SHAPE was appointed to deliver the fitout of two and a half floors at Optus’ new office. The 3,700m² project was undertaken across three stages, requiring SHAPE to mobilise the site for each stage. Stages one and three included the fitout of 2,000m² of call centre workstations, with large breakout areas and chill out ones.
The Royal Hotel Group wanted to complete an extensive refurbishment to the former Ritz Carlton in Sydney’s Double Bay. The hotel had been unused for over six years and required extensive works to restore it to its former glory, and be re-established as the new five-star InterContinental Sydney Double Bay Hotel.
Extensive experience of project management, design & client liaison. Experience of interpreting specifications and preparing technical proposals. Ability to multi-task in a demanding engineering environment. A strong track record in delivering projects on time and within budget. Able to ensure that all H&S procedures are met and maintained. Resolving complex technical issues and coming up with fast efficient solutions. Ability to assess the financial feasibility and impact of proposed budget items and also alternatives.
O’Sullivan Davies Lawyers and GHD Woodhead engaged SHAPE to complete a modern and contemporary fitout on level 27 at 197 St Georges Terrace, Perth. The client were moving premises from the Esplanade to St Georges Terrace, where they had leased a tenancy that was 850 square metres and over looked the Perth skyline.
Australian Catholic University Package AOd Solutions
The Australian Catholic University (ACU) engaged SHAPE to complete an extensive fitout and refurbishment that comprised a number of separate portions across two buildings. This was a complex multi-faceted project with various separable portions and scopes. The key client value was to ensure minimal disruption to university operations and a seamless transition
for ACU into their new premises by the university.
SHAPE was engaged by Rostrevor College to undertake the first of a four stage upgrade of a number of teaching spaces at the school. Following the successful completion of this component, SHAPE was reengaged to complete the remaining stages (5
to 13), to provide flexible and inspiring teaching and learning spaces for their students and staff. SHAPE completed the
refurbishment works to a number of buildings across the school including the resource/library areas, special needs, student
counselling and school amenities.
John Flynn Private Hospital is a 345 bed, acute care hospital
located on the Gold Coast. SHAPE was engaged by Ramsay
to complete a refurbishment within two separate buildings
concurrently.
University of Queensland Steele Building Od Solutions
The University of Queensland wanted to refurbish two lecture rooms, an interactive and collaborative teaching space and an office space to incorporate an individual office, study halls and a reception area spread over two levels.
The Oyster Bar is ideally located in the Darwin city waterfront precinct. The restaurant offers a casual and friendly environment with a great menu, brilliant service and impeccable views from a new fitout completedby SHAPE.
Bupa Australia wanted to bring together their health insurance
and aged care businesses and had signed a new lease at NAB House, 255 George Street, Sydney, to cater for it's growing their operations.
The Canberra Hospital Building 1, Level 5 Od Solutions
SHAPE was engaged by repeat client, ACT Health to undertake an extensive refurbishment to the existing clinical and office space within Building one, level five at The Canberra Hospital.
Jennifer Schaus and Associates hosts a complimentary webinar series on The FAR in 2024. Join the webinars on Wednesdays and Fridays at noon, eastern.
Recordings are on YouTube and the company website.
https://www.youtube.com/@jenniferschaus/videos
Presentation by Jared Jageler, David Adler, Noelia Duchovny, and Evan Herrnstadt, analysts in CBO’s Microeconomic Studies and Health Analysis Divisions, at the Association of Environmental and Resource Economists Summer Conference.
This session provides a comprehensive overview of the latest updates to the Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards (commonly known as the Uniform Guidance) outlined in the 2 CFR 200.
With a focus on the 2024 revisions issued by the Office of Management and Budget (OMB), participants will gain insight into the key changes affecting federal grant recipients. The session will delve into critical regulatory updates, providing attendees with the knowledge and tools necessary to navigate and comply with the evolving landscape of federal grant management.
Learning Objectives:
- Understand the rationale behind the 2024 updates to the Uniform Guidance outlined in 2 CFR 200, and their implications for federal grant recipients.
- Identify the key changes and revisions introduced by the Office of Management and Budget (OMB) in the 2024 edition of 2 CFR 200.
- Gain proficiency in applying the updated regulations to ensure compliance with federal grant requirements and avoid potential audit findings.
- Develop strategies for effectively implementing the new guidelines within the grant management processes of their respective organizations, fostering efficiency and accountability in federal grant administration.
ZGB - The Role of Generative AI in Government transformation.pdfSaeed Al Dhaheri
This keynote was presented during the the 7th edition of the UAE Hackathon 2024. It highlights the role of AI and Generative AI in addressing government transformation to achieve zero government bureaucracy
Russian anarchist and anti-war movement in the third year of full-scale warAntti Rautiainen
Anarchist group ANA Regensburg hosted my online-presentation on 16th of May 2024, in which I discussed tactics of anti-war activism in Russia, and reasons why the anti-war movement has not been able to make an impact to change the course of events yet. Cases of anarchists repressed for anti-war activities are presented, as well as strategies of support for political prisoners, and modest successes in supporting their struggles.
Thumbnail picture is by MediaZona, you may read their report on anti-war arson attacks in Russia here: https://en.zona.media/article/2022/10/13/burn-map
Links:
Autonomous Action
http://Avtonom.org
Anarchist Black Cross Moscow
http://Avtonom.org/abc
Solidarity Zone
https://t.me/solidarity_zone
Memorial
https://memopzk.org/, https://t.me/pzk_memorial
OVD-Info
https://en.ovdinfo.org/antiwar-ovd-info-guide
RosUznik
https://rosuznik.org/
Uznik Online
http://uznikonline.tilda.ws/
Russian Reader
https://therussianreader.com/
ABC Irkutsk
https://abc38.noblogs.org/
Send mail to prisoners from abroad:
http://Prisonmail.online
YouTube: https://youtu.be/c5nSOdU48O8
Spotify: https://podcasters.spotify.com/pod/show/libertarianlifecoach/episodes/Russian-anarchist-and-anti-war-movement-in-the-third-year-of-full-scale-war-e2k8ai4
A process server is a authorized person for delivering legal documents, such as summons, complaints, subpoenas, and other court papers, to peoples involved in legal proceedings.
Donate to charity during this holiday seasonSERUDS INDIA
For people who have money and are philanthropic, there are infinite opportunities to gift a needy person or child a Merry Christmas. Even if you are living on a shoestring budget, you will be surprised at how much you can do.
Donate Us
https://serudsindia.org/how-to-donate-to-charity-during-this-holiday-season/
#charityforchildren, #donateforchildren, #donateclothesforchildren, #donatebooksforchildren, #donatetoysforchildren, #sponsorforchildren, #sponsorclothesforchildren, #sponsorbooksforchildren, #sponsortoysforchildren, #seruds, #kurnool
Jennifer Schaus and Associates hosts a complimentary webinar series on The FAR in 2024. Join the webinars on Wednesdays and Fridays at noon, eastern.
Recordings are on YouTube and the company website.
https://www.youtube.com/@jenniferschaus/videos
1. Airservices Australia, ACT
Airservices Australia Project Deliverables:
OVERVIEW
SHAPE was engaged by
Airservices Australia to
complete a seven floor fitout
that also included the main
foyer and conference spaces.
All works were completed
within a live environment,
which was operational 24
hours a day, seven days a
week. SHAPE completed the
project in staged handovers,
all of which were completed,
on time, on budget and with
zero defects. The key client
value for this project was
ensure minimal disruption to
Airservices operations and
ensure users were operational
by 9am on move day.
COMMUNICATION AND CO-
ORDINATION
Communication was vital to the
success of this project. SHAPE
had weekly stakeholder
meetings, including the Base
Building representative and
consultants to ensure continuity
and expectations of both clients
were managed. This also
ensured defect management
commenced 2-3 weeks prior
to the handover of each floor,
including defects lists issued
to all and discussions within
the subcontractors and client
meetings. Architect and
engineer inspections were
also arranged weekly leading
up to handover, to ensure no
unexpected defects presented
prior to handover.
STAGING WORKS WITHIN A
LIVE ENVIRONMENT
The project was executed over
stages to enable the client to
continue working in the non-
affected areas and eliminate
any possible downtime. It was
vital to meet the programmed
handovers and therefore
minimise the impact to staff.
SHAPE informed the client well
in advance of any noisy works
that needed to take place
and scheduled works around
non-peak hours. Meticulous
coordination ensured the client
and all stakeholders were kept
well informed of milestones
and ensured that SHAPE
experienced no delays and
was able to deliver each stage
seamlessly.
CLIENT
Airservices Australia
INTERIOR
DESIGNER
Peckvonhartel
PROJECT SIZE
11,000 m²
DELIVERY MODEL
Lump Sum
LOCATION
Canberra, ACT
COMPLETED
June, 2014
DURATION
15 months
Safety Focus Base Building UpgradeBusiness Continuity
“SHAPE understood working in an
occupied environment, and were able to
easily adapt to changing requirements
throughout the build. Maintaining the focus
on agreed Key Client Value throughout the
project ensured a great end result”.
David Robertson, Airservices Australia
Time CriticalOn Budget
SHAPE DELIVERED THIS PROJECT:
• On time
• With zero defects
• With O&M manuals provided within one week of handover
• The project is delivered within budget, on time and with
minimal disruption to operations of the site (the key client
value)