Introduction
During my contract at Enbridge I was responsible for the execution of over 40 pump
stations in the Enbridge Canadian System. Coordinating the on site execution of pump
station construction and ensuring that the project are completed safely, under budget and
within the required standards and regulations.
Details
Responsible to ensure that all work performed by the contractor has been done in a safe,
environmentally acceptable fashion in accordance to the design and to the highest quality.
Responsible to control all the movements of the field staff and schedule inspection to
maintain required installation quality. Ensure that the level of workmanship was maintained
by contractors during the projects in order to meet Company Standards and all Regulatory
requirements.
Responsible to chair meetings that report progress of assigned projects. Identify any and
all issues on the project and identify any risks to the projects that may exists. Create plans
to manage all issues and risks. Managed contractor schedule and communicated any
slippage proactively. Ensured that site quality documents have been timely managed and
that they are accurate.
Managed employment contracts for field staff. Responsible to set field staff budgets and
maintain the budget during the construction period.
Reviewed construction contracts and insured that the contract were executed as per the all
the documents, agreements, drawings, specifications and regulation.
Responsible for developing training programs and execution procedures for the the
surveillance of site work such as, Daily Reporting Hyrotesting, Torquing, NDE ect.
Coaching and Mentoring programs were developed to ensure that all inspection staff
were knowledgable of the requirements of the projects.
John Dawson
587.989.8342 dawson.jl@shaw.ca 9220 81 street Edmonton, Alberta T6C2W3
Liaison with project stakeholder and coordinated requirements therein. Ensured that
stakeholder needs were communicated to the field and actioned as required,
Performed performance evaluations of site inspectors and construction contractors and
culture an environment to enhance performance and growth.
Conclusion
All projects were completed on time and under budget. The Safety performance during
these very good and the we took great steps to ensure that the Environment was
protected. Quality was a priority and a high level of surveillance was applied to ensure
that the work was completed to the highest quality standards.

More Related Content

What's hot

Tony Dickey Resume_3-14-16
Tony Dickey Resume_3-14-16Tony Dickey Resume_3-14-16
Tony Dickey Resume_3-14-16
Tony Dickey
 
Armando Beltran Resume.doc (1) copy updated
Armando Beltran Resume.doc (1) copy updated Armando Beltran Resume.doc (1) copy updated
Armando Beltran Resume.doc (1) copy updated
Armando Beltran
 
Jessica Pennington Resume 2016
Jessica Pennington Resume 2016Jessica Pennington Resume 2016
Jessica Pennington Resume 2016
Jessica Pennington
 
Responsibilities and Projects
Responsibilities and ProjectsResponsibilities and Projects
Responsibilities and Projects
Keith Mc Guigan
 

What's hot (18)

Tony Dickey Resume_3-14-16
Tony Dickey Resume_3-14-16Tony Dickey Resume_3-14-16
Tony Dickey Resume_3-14-16
 
Walid Zaza CV
Walid Zaza CVWalid Zaza CV
Walid Zaza CV
 
resume
resumeresume
resume
 
Armando Beltran Resume.doc (1) copy updated
Armando Beltran Resume.doc (1) copy updated Armando Beltran Resume.doc (1) copy updated
Armando Beltran Resume.doc (1) copy updated
 
CV MUCHLIS.SREGAR
CV  MUCHLIS.SREGARCV  MUCHLIS.SREGAR
CV MUCHLIS.SREGAR
 
Murray_Michaelene-150718
Murray_Michaelene-150718Murray_Michaelene-150718
Murray_Michaelene-150718
 
DUTIES AND RESPONSIBILITIES
DUTIES AND RESPONSIBILITIESDUTIES AND RESPONSIBILITIES
DUTIES AND RESPONSIBILITIES
 
Sr.Hse officer
Sr.Hse officerSr.Hse officer
Sr.Hse officer
 
brinresume[2]
brinresume[2]brinresume[2]
brinresume[2]
 
Succinct Quality Brochure Final 2016
Succinct Quality Brochure Final 2016Succinct Quality Brochure Final 2016
Succinct Quality Brochure Final 2016
 
Resume with System 3
Resume with System 3Resume with System 3
Resume with System 3
 
Jessica Pennington Resume 2016
Jessica Pennington Resume 2016Jessica Pennington Resume 2016
Jessica Pennington Resume 2016
 
Responsibilities and Projects
Responsibilities and ProjectsResponsibilities and Projects
Responsibilities and Projects
 
A4 ppf capability statement
A4 ppf capability statementA4 ppf capability statement
A4 ppf capability statement
 
Muazzam_mirza[1]
Muazzam_mirza[1]Muazzam_mirza[1]
Muazzam_mirza[1]
 
Thomas Maher C.V
Thomas Maher C.VThomas Maher C.V
Thomas Maher C.V
 
krishnajith_original
krishnajith_originalkrishnajith_original
krishnajith_original
 
Stewart joran resume
Stewart joran resumeStewart joran resume
Stewart joran resume
 

Similar to Enbridge Details Document (20)

Sachin parab
Sachin parabSachin parab
Sachin parab
 
towerst-resume-2a
towerst-resume-2atowerst-resume-2a
towerst-resume-2a
 
Raguram palnichamy jun 2019
Raguram palnichamy jun 2019Raguram palnichamy jun 2019
Raguram palnichamy jun 2019
 
Carolyn Stepney Resume
Carolyn Stepney ResumeCarolyn Stepney Resume
Carolyn Stepney Resume
 
Vimal, Civil Engr CV
Vimal, Civil Engr CVVimal, Civil Engr CV
Vimal, Civil Engr CV
 
Philip_Murray_ CV 13-01-16
Philip_Murray_  CV 13-01-16Philip_Murray_  CV 13-01-16
Philip_Murray_ CV 13-01-16
 
CV Clive V2 180612 A
CV Clive V2 180612 ACV Clive V2 180612 A
CV Clive V2 180612 A
 
RESUME
RESUMERESUME
RESUME
 
William Anthony Golding_Resume 2013
William Anthony Golding_Resume 2013William Anthony Golding_Resume 2013
William Anthony Golding_Resume 2013
 
Donald Wilkinson-Resume
Donald Wilkinson-ResumeDonald Wilkinson-Resume
Donald Wilkinson-Resume
 
Psm Cv Presentation Aug 16, 2012
Psm Cv Presentation Aug 16, 2012Psm Cv Presentation Aug 16, 2012
Psm Cv Presentation Aug 16, 2012
 
Psm Cv Presentation Aug 16, 2012
Psm Cv Presentation Aug 16, 2012Psm Cv Presentation Aug 16, 2012
Psm Cv Presentation Aug 16, 2012
 
CHIP WEDEKINDFINALRESUME
CHIP WEDEKINDFINALRESUMECHIP WEDEKINDFINALRESUME
CHIP WEDEKINDFINALRESUME
 
Terry Bradbury CV
Terry Bradbury CVTerry Bradbury CV
Terry Bradbury CV
 
HARDEO SAFI Resume 1
HARDEO SAFI Resume 1HARDEO SAFI Resume 1
HARDEO SAFI Resume 1
 
Resume Craig Edwards 042016
Resume  Craig Edwards 042016Resume  Craig Edwards 042016
Resume Craig Edwards 042016
 
25383_KHALED GHADBAN_SITE ENGINEER_302
25383_KHALED GHADBAN_SITE ENGINEER_30225383_KHALED GHADBAN_SITE ENGINEER_302
25383_KHALED GHADBAN_SITE ENGINEER_302
 
Naim CV
Naim CVNaim CV
Naim CV
 
CV- Abdullah Reddy Baddam
CV- Abdullah Reddy BaddamCV- Abdullah Reddy Baddam
CV- Abdullah Reddy Baddam
 
William keane. 03.25.2016 final
William keane. 03.25.2016 finalWilliam keane. 03.25.2016 final
William keane. 03.25.2016 final
 

Enbridge Details Document

  • 1. Introduction During my contract at Enbridge I was responsible for the execution of over 40 pump stations in the Enbridge Canadian System. Coordinating the on site execution of pump station construction and ensuring that the project are completed safely, under budget and within the required standards and regulations. Details Responsible to ensure that all work performed by the contractor has been done in a safe, environmentally acceptable fashion in accordance to the design and to the highest quality. Responsible to control all the movements of the field staff and schedule inspection to maintain required installation quality. Ensure that the level of workmanship was maintained by contractors during the projects in order to meet Company Standards and all Regulatory requirements. Responsible to chair meetings that report progress of assigned projects. Identify any and all issues on the project and identify any risks to the projects that may exists. Create plans to manage all issues and risks. Managed contractor schedule and communicated any slippage proactively. Ensured that site quality documents have been timely managed and that they are accurate. Managed employment contracts for field staff. Responsible to set field staff budgets and maintain the budget during the construction period. Reviewed construction contracts and insured that the contract were executed as per the all the documents, agreements, drawings, specifications and regulation. Responsible for developing training programs and execution procedures for the the surveillance of site work such as, Daily Reporting Hyrotesting, Torquing, NDE ect. Coaching and Mentoring programs were developed to ensure that all inspection staff were knowledgable of the requirements of the projects. John Dawson 587.989.8342 dawson.jl@shaw.ca 9220 81 street Edmonton, Alberta T6C2W3
  • 2. Liaison with project stakeholder and coordinated requirements therein. Ensured that stakeholder needs were communicated to the field and actioned as required, Performed performance evaluations of site inspectors and construction contractors and culture an environment to enhance performance and growth. Conclusion All projects were completed on time and under budget. The Safety performance during these very good and the we took great steps to ensure that the Environment was protected. Quality was a priority and a high level of surveillance was applied to ensure that the work was completed to the highest quality standards.