1
Career
Engineer with working experience of 14 years in the field of Nuclear power plant & Oil and gas fields services, multistory buildings,
Factories, malls, Terminal Ports, Infra Structure and Water structure Maintenance
Qualification
B.SC. degree in civil engineering – Ain Shams University-2001
Good:Graduation Grade
Excellent:Project Grade
Experience (13 Years, 6 Months)
CM CIVIL
Descon Engineering Abu Dhabi
Location: Abu Dhabi, United Arab Emirates, Baraka nuclear power plant
Company Industry: Construction
Job Role: Management
November 2014 - Present
In charge for all Civil work and Responsible of Sea Water By Bass Pump House,
Job Description-
1. Ensure that all civil activities within the designated areas are well planned, coordinated and be able to utilize all
available resources in coordination with other functional Managers in directing and supervising all involved site
personnel and subcontractors.
2. Leads and ensure all work groups are properly guided, in close cooperation with the Project Manager, in
assembling and controlling the required resources (manpower, equipment, materials and tools required)to start and
sustain the work efficiency and productivity until the completion of the project.
3. Inspects work in progress to ensure conformity with QA/Q C specifications and requirements, Industry Codes,
Standards and Procedures, and provides technical advices to resolve problems.
4. Advises the Project Manager in determining and procurement of tools and materials to be delivered at specific
times in order to conform to the workloads, plans and schedules.
5. Interact with other construction areas and Superintendent, discusses and reviews with Project Manager the project
Key Performance Indicators to determine accurate status of the project, making tactical decisions for allocating
resources, and assigning staff requirements, to maintain project on target.
6. Review reports from Superintendents, and forwards to Project Manager for corrective actions if project becomes
behind schedule or over the budget.
7. Performs department on‐boarding and induction relevant to procedures, guidelines, policies, etc.
8. Complies with the highest level of health, safety and zero accident during all stages of project execution and pro‐
active with safety groups and subcontractors to promote safe and hazardous free work within the designated area.
9. Support and assist staff with skills training programs (if requires), with the aim of increasing worker skills and
personnel development.
Cell phone: (+20)-01067664547
(+971) 056 -3290420
moh_kha742000@yahoo.comE mail
Cairo, Egypt
Mohammed Khalaf Ebrahim
2
Mechanical Completion Manager
Descon Engineering Abu Dhabi
Location: Abu Dhabi, United Arab Emirates, SHAH GAS DEVELOPMENT Project
Company Industry: Construction
Job Role: Management
April 2012 - November 2014
Job Description-
1. Implement the appropriate work processes as per the Turn over procedure.
2. Ensure all quality control records for the work are progressively accumulated, indexed & available to support a
phased systematic acceptance & handover of the plant to the Client in accordance with the project Acceptance of the
Work Plan.
3. Maintain PCOS (Project Control System) population data base used to track project phase to completion and
handover.
4. Compile & consolidate punch lists, & provide auditable trail to ensure that all punch list items are recorded &
signed off by authorized personnel upon completion.
5. Completion of projects & provide progress & status reports as required.
6. Set up, populate & maintain the turnover & Acceptance of the Work database system or other data base
engineering information systems used to track progress & store handover data.
7. Ensure the Acceptance of the Work processes is clearly specified & agreed with Commissioning before
implementation; ensure compliance with these requirements thereafter.
8. Coordinate with the Construction Contractor to assure Mechanical Completions/RFS packages are Completed in
time to support the Mechanical completion schedule milestone for each system.
9. Compile handover dossiers in formats agreed with Client.
____________________________________________________________________________________________
Mechanical Completion Deputy Manager
Descon Engineering Abu Dhabi
Location: Abu Dhabi, United Arab Emirates, Air Separation Plant For Nitrogen Generation
Company Industry: Construction
Job Role: Management
December 2009 - April 2012
Job Description-
1. Implement the appropriate work processes as per the Turn over procedure.
2. Ensure all quality control records for the work are progressively accumulated, indexed & available to support a
phased systematic acceptance & handover of the plant to the Client in accordance with the project Acceptance
of the Work Plan.
3. Maintain PCOS (Project Control System) population data base used to track project phase to completion and
handover.
4. Compile & consolidate punch lists, & provide auditable trail to ensure that all punch list items are recorded &
signed off by authorized personnel upon completion.
5. Completion of projects & provide progress & status reports as required.
6. Set up, populate & maintain the turnover & Acceptance of the Work database system or other data base
engineering information systems used to track progress & store handover data.
7. Ensure the Acceptance of the Work processes is clearly specified & agreed with Commissioning before
implementation; ensure compliance with these requirements thereafter.
8. Coordinate with the Construction Contractor to assure Mechanical Completions/RFS packages are Completed
in time to support the Mechanical completion schedule milestone for each system.
9. Compile handover dossiers in formats agreed with Client.
____________________________________________________________________________________________
Civil Deputy Manger
Descon Engineering Abu Dhabi
Location: Abu Dhabi, United Arab Emirates, Urea Debottlenecking Project (Ruwis)
Company Industry: Construction
Job Role: Management
March 2008 - December 2009
3
Job Description-
1. Acting as the main technical adviser on a construction site for subcontractors, crafts people and operatives.
2. Overseeing setting out, leveling and surveying the site.
3. Checking plans, drawings and quantities for accuracy of calculations.
4. Ensuring all materials used and work performed are as per specifications.
5. Overseeing the selection and requisition of materials and plant.
6. Agreeing a price for materials, and making cost-effective solutions and proposals for the intended project.
7. Managing, monitoring and interpreting the contract design documents supplied by the client/architect.
8. Liaising with any consultants, sub-contractors, supervisors, planners, quantity surveyors and the general workforce
involved in the project.
9. liaising with clients and their representatives (architects, engineers and surveyors), including attending regular
meetings to keep them informed of progress.
10. Day-to-day management of the site, including supervising and monitoring the site labour force and the work of
any subcontractors.
11. Planning the work and efficiently organizing the plant and site facilities in order to meet agreed deadlines.
12. Overseeing quality control, health and safety matters on site.
13. Preparing reports as required.
14. Resolving any unexpected technical difficulties, and other problems that may arise.
15. Reviewing bar bending schedule.
____________________________________________________________________________________________
Senior Site Engineer
ORASCOM CONSTRUCTION INDUSTRIES - MISR SONSDEVELOPMENT (HASSAN ALLAM SONS.)O.C.I /
H.A.S J.V
Location: Cairo, Egypt, Mall of Arab (Cairo)
Company Industry: Construction
Job Role: Engineering
October 2007 - March 2008
1. Acting as the main technical adviser on a construction site for subcontractors, crafts people and operatives.
2. Overseeing setting out, leveling and surveying the site.
3. Checking plans, drawings and quantities for accuracy of calculations.
4. Ensuring all materials used and work performed are as per specifications.
5. Overseeing the selection and requisition of materials and plant.
6. Agreeing a price for materials, and making cost-effective solutions and proposals for the intended project.
7. Managing, monitoring and interpreting the contract design documents supplied by the client/architect.
8. Liaising with any consultants, sub-contractors, supervisors, planners, quantity surveyors and the general workforce
involved in the project.
9. Liaising with clients and their representatives (architects, engineers and surveyors), including attending regular
meetings to keep them informed of progress.
10. Day-to-day management of the site, including supervising and monitoring the site labour force and the work of
any subcontractors.
11. Planning the work and efficiently organizing the plant and site facilities in order to meet agreed deadlines.
12. Overseeing quality control, health and safety matters on site.
13. Preparing reports as required.
14. Resolving any unexpected technical difficulties, and other problems that may arise.
15. Reviewing bar bending schedule.
____________________________________________________________________________________________
Senior Site Engineer
Orascom Construction Industry
Location: Alexandria, Egypt, Dekhila Terminal Ports
Company Industry: Construction
Job Role: Engineering
August 2006 - October 2007
Job Description-
1. Acting as the main technical adviser on a construction site for subcontractors, crafts people and operatives.
2. Overseeing setting out, leveling and surveying the site.
3. Checking plans, drawings and quantities for accuracy of calculations.
4
4. Ensuring all materials used and work performed are as per specifications.
5. Overseeing the selection and requisition of materials and plant.
6. Agreeing a price for materials, and making cost-effective solutions and proposals for the intended project.
7. Managing, monitoring and interpreting the contract design documents supplied by the client/architect.
8. Liaising with any consultants, sub-contractors, supervisors, planners, quantity surveyors and the general workforce
involved in the project.
9. Liaising with clients and their representatives (architects, engineers and surveyors), including attending regular
meetings to keep them informed of progress.
10. Day-to-day management of the site, including supervising and monitoring the site labour force and the work of
any subcontractors.
11. Planning the work and efficiently organizing the plant and site facilities in order to meet agreed deadlines.
12. Overseeing quality control, health and safety matters on site.
13. Preparing reports as required.
14. Resolving any unexpected technical difficulties, and other problems that may arise.
15. Reviewing bar bending schedule.
____________________________________________________________________________________________
Site Engineer
ORASCOM CONSTRUCTION INDUSTRIES (O.C.I)
Location: Cairo, Egypt, Tobacco preparation Factory
Company Industry: Construction/Civil Engineering
Job Role: Engineering
July 2005 - August 2006
1. Acting as the main technical adviser on a construction site for subcontractors, crafts people and operatives.
2. Overseeing setting out, leveling and surveying the site.
3. Checking plans, drawings and quantities for accuracy of calculations.
4. Ensuring all materials used and work performed are as per specifications.
5. Overseeing the selection and requisition of materials and plant.
6. Agreeing a price for materials, and making cost-effective solutions and proposals for the intended project.
7. Managing, monitoring and interpreting the contract design documents supplied by the client/architect.
8. Liaising with any consultants, sub-contractors, supervisors, planners, quantity surveyors and the general workforce
involved in the project.
9. Liaising with clients and their representatives (architects, engineers and surveyors), including attending regular
meetings to keep them informed of progress.
10. Day-to-day management of the site, including supervising and monitoring the site labour force and the work of
any subcontractors.
11. Planning the work and efficiently organizing the plant and site facilities in order to meet agreed deadlines.
12. Overseeing quality control, health and safety matters on site.
13. Preparing reports as required.
14. Resolving any unexpected technical difficulties, and other problems that may arise.
15. Reviewing bar bending schedule.
____________________________________________________________________________________________
Site Engineer
Orascom Construction Industry
Location: Cairo, Egypt, Eastern Company Integrated Industrial Complex
Company Industry: Construction/Civil Engineering
Job Role: Engineering
September 2001 - July 2005
Job Description-
1.Acting as the main technical adviser on a construction site for subcontractors, crafts people and operatives.
2. Overseeing setting out, leveling and surveying the site.
3. Checking plans, drawings and quantities for accuracy of calculations.
4. Ensuring all materials used and work performed are as per specifications.
5. Overseeing the selection and requisition of materials and plant.
6. Agreeing a price for materials, and making cost-effective solutions and proposals for the intended project.
7. Managing, monitoring and interpreting the contract design documents supplied by the client/architect.
8. Liaising with any consultants, sub-contractors, supervisors, planners, quantity surveyors and the general
workforce involved in the project.
5
9. Liaising with clients and their representatives (architects, engineers and surveyors), including attending regular
meetings to keep them informed of progress.
10. Day-to-day management of the site, including supervising and monitoring the site labour force and the work
of any subcontractors.
11. Planning the work and efficiently organizing the plant and site facilities in order to meet agreed deadlines.
12. Overseeing quality control, health and safety matters on site.
13. Preparing reports as required.
14. Resolving any unexpected technical difficulties, and other problems that may arise.
15. Reviewing bar bending schedule.
Special Skill
:Computer skills
Good operating knowledge of AutoCAD, MS Office
ICM (Integrated Completion Management)
PCOS (project Completion System)
:skillsLanguage
Native language: Arabic.
V. Good command of both written and spoken English.
Personal Information
Cairo, Egypt:Place Of BirthEgyptian:Nationality
Free.:Military StatusJuly 26, 1979.:Date Of Birth
Married.:Marital Status

Moh CV Updated

  • 1.
    1 Career Engineer with workingexperience of 14 years in the field of Nuclear power plant & Oil and gas fields services, multistory buildings, Factories, malls, Terminal Ports, Infra Structure and Water structure Maintenance Qualification B.SC. degree in civil engineering – Ain Shams University-2001 Good:Graduation Grade Excellent:Project Grade Experience (13 Years, 6 Months) CM CIVIL Descon Engineering Abu Dhabi Location: Abu Dhabi, United Arab Emirates, Baraka nuclear power plant Company Industry: Construction Job Role: Management November 2014 - Present In charge for all Civil work and Responsible of Sea Water By Bass Pump House, Job Description- 1. Ensure that all civil activities within the designated areas are well planned, coordinated and be able to utilize all available resources in coordination with other functional Managers in directing and supervising all involved site personnel and subcontractors. 2. Leads and ensure all work groups are properly guided, in close cooperation with the Project Manager, in assembling and controlling the required resources (manpower, equipment, materials and tools required)to start and sustain the work efficiency and productivity until the completion of the project. 3. Inspects work in progress to ensure conformity with QA/Q C specifications and requirements, Industry Codes, Standards and Procedures, and provides technical advices to resolve problems. 4. Advises the Project Manager in determining and procurement of tools and materials to be delivered at specific times in order to conform to the workloads, plans and schedules. 5. Interact with other construction areas and Superintendent, discusses and reviews with Project Manager the project Key Performance Indicators to determine accurate status of the project, making tactical decisions for allocating resources, and assigning staff requirements, to maintain project on target. 6. Review reports from Superintendents, and forwards to Project Manager for corrective actions if project becomes behind schedule or over the budget. 7. Performs department on‐boarding and induction relevant to procedures, guidelines, policies, etc. 8. Complies with the highest level of health, safety and zero accident during all stages of project execution and pro‐ active with safety groups and subcontractors to promote safe and hazardous free work within the designated area. 9. Support and assist staff with skills training programs (if requires), with the aim of increasing worker skills and personnel development. Cell phone: (+20)-01067664547 (+971) 056 -3290420 moh_kha742000@yahoo.comE mail Cairo, Egypt Mohammed Khalaf Ebrahim
  • 2.
    2 Mechanical Completion Manager DesconEngineering Abu Dhabi Location: Abu Dhabi, United Arab Emirates, SHAH GAS DEVELOPMENT Project Company Industry: Construction Job Role: Management April 2012 - November 2014 Job Description- 1. Implement the appropriate work processes as per the Turn over procedure. 2. Ensure all quality control records for the work are progressively accumulated, indexed & available to support a phased systematic acceptance & handover of the plant to the Client in accordance with the project Acceptance of the Work Plan. 3. Maintain PCOS (Project Control System) population data base used to track project phase to completion and handover. 4. Compile & consolidate punch lists, & provide auditable trail to ensure that all punch list items are recorded & signed off by authorized personnel upon completion. 5. Completion of projects & provide progress & status reports as required. 6. Set up, populate & maintain the turnover & Acceptance of the Work database system or other data base engineering information systems used to track progress & store handover data. 7. Ensure the Acceptance of the Work processes is clearly specified & agreed with Commissioning before implementation; ensure compliance with these requirements thereafter. 8. Coordinate with the Construction Contractor to assure Mechanical Completions/RFS packages are Completed in time to support the Mechanical completion schedule milestone for each system. 9. Compile handover dossiers in formats agreed with Client. ____________________________________________________________________________________________ Mechanical Completion Deputy Manager Descon Engineering Abu Dhabi Location: Abu Dhabi, United Arab Emirates, Air Separation Plant For Nitrogen Generation Company Industry: Construction Job Role: Management December 2009 - April 2012 Job Description- 1. Implement the appropriate work processes as per the Turn over procedure. 2. Ensure all quality control records for the work are progressively accumulated, indexed & available to support a phased systematic acceptance & handover of the plant to the Client in accordance with the project Acceptance of the Work Plan. 3. Maintain PCOS (Project Control System) population data base used to track project phase to completion and handover. 4. Compile & consolidate punch lists, & provide auditable trail to ensure that all punch list items are recorded & signed off by authorized personnel upon completion. 5. Completion of projects & provide progress & status reports as required. 6. Set up, populate & maintain the turnover & Acceptance of the Work database system or other data base engineering information systems used to track progress & store handover data. 7. Ensure the Acceptance of the Work processes is clearly specified & agreed with Commissioning before implementation; ensure compliance with these requirements thereafter. 8. Coordinate with the Construction Contractor to assure Mechanical Completions/RFS packages are Completed in time to support the Mechanical completion schedule milestone for each system. 9. Compile handover dossiers in formats agreed with Client. ____________________________________________________________________________________________ Civil Deputy Manger Descon Engineering Abu Dhabi Location: Abu Dhabi, United Arab Emirates, Urea Debottlenecking Project (Ruwis) Company Industry: Construction Job Role: Management March 2008 - December 2009
  • 3.
    3 Job Description- 1. Actingas the main technical adviser on a construction site for subcontractors, crafts people and operatives. 2. Overseeing setting out, leveling and surveying the site. 3. Checking plans, drawings and quantities for accuracy of calculations. 4. Ensuring all materials used and work performed are as per specifications. 5. Overseeing the selection and requisition of materials and plant. 6. Agreeing a price for materials, and making cost-effective solutions and proposals for the intended project. 7. Managing, monitoring and interpreting the contract design documents supplied by the client/architect. 8. Liaising with any consultants, sub-contractors, supervisors, planners, quantity surveyors and the general workforce involved in the project. 9. liaising with clients and their representatives (architects, engineers and surveyors), including attending regular meetings to keep them informed of progress. 10. Day-to-day management of the site, including supervising and monitoring the site labour force and the work of any subcontractors. 11. Planning the work and efficiently organizing the plant and site facilities in order to meet agreed deadlines. 12. Overseeing quality control, health and safety matters on site. 13. Preparing reports as required. 14. Resolving any unexpected technical difficulties, and other problems that may arise. 15. Reviewing bar bending schedule. ____________________________________________________________________________________________ Senior Site Engineer ORASCOM CONSTRUCTION INDUSTRIES - MISR SONSDEVELOPMENT (HASSAN ALLAM SONS.)O.C.I / H.A.S J.V Location: Cairo, Egypt, Mall of Arab (Cairo) Company Industry: Construction Job Role: Engineering October 2007 - March 2008 1. Acting as the main technical adviser on a construction site for subcontractors, crafts people and operatives. 2. Overseeing setting out, leveling and surveying the site. 3. Checking plans, drawings and quantities for accuracy of calculations. 4. Ensuring all materials used and work performed are as per specifications. 5. Overseeing the selection and requisition of materials and plant. 6. Agreeing a price for materials, and making cost-effective solutions and proposals for the intended project. 7. Managing, monitoring and interpreting the contract design documents supplied by the client/architect. 8. Liaising with any consultants, sub-contractors, supervisors, planners, quantity surveyors and the general workforce involved in the project. 9. Liaising with clients and their representatives (architects, engineers and surveyors), including attending regular meetings to keep them informed of progress. 10. Day-to-day management of the site, including supervising and monitoring the site labour force and the work of any subcontractors. 11. Planning the work and efficiently organizing the plant and site facilities in order to meet agreed deadlines. 12. Overseeing quality control, health and safety matters on site. 13. Preparing reports as required. 14. Resolving any unexpected technical difficulties, and other problems that may arise. 15. Reviewing bar bending schedule. ____________________________________________________________________________________________ Senior Site Engineer Orascom Construction Industry Location: Alexandria, Egypt, Dekhila Terminal Ports Company Industry: Construction Job Role: Engineering August 2006 - October 2007 Job Description- 1. Acting as the main technical adviser on a construction site for subcontractors, crafts people and operatives. 2. Overseeing setting out, leveling and surveying the site. 3. Checking plans, drawings and quantities for accuracy of calculations.
  • 4.
    4 4. Ensuring allmaterials used and work performed are as per specifications. 5. Overseeing the selection and requisition of materials and plant. 6. Agreeing a price for materials, and making cost-effective solutions and proposals for the intended project. 7. Managing, monitoring and interpreting the contract design documents supplied by the client/architect. 8. Liaising with any consultants, sub-contractors, supervisors, planners, quantity surveyors and the general workforce involved in the project. 9. Liaising with clients and their representatives (architects, engineers and surveyors), including attending regular meetings to keep them informed of progress. 10. Day-to-day management of the site, including supervising and monitoring the site labour force and the work of any subcontractors. 11. Planning the work and efficiently organizing the plant and site facilities in order to meet agreed deadlines. 12. Overseeing quality control, health and safety matters on site. 13. Preparing reports as required. 14. Resolving any unexpected technical difficulties, and other problems that may arise. 15. Reviewing bar bending schedule. ____________________________________________________________________________________________ Site Engineer ORASCOM CONSTRUCTION INDUSTRIES (O.C.I) Location: Cairo, Egypt, Tobacco preparation Factory Company Industry: Construction/Civil Engineering Job Role: Engineering July 2005 - August 2006 1. Acting as the main technical adviser on a construction site for subcontractors, crafts people and operatives. 2. Overseeing setting out, leveling and surveying the site. 3. Checking plans, drawings and quantities for accuracy of calculations. 4. Ensuring all materials used and work performed are as per specifications. 5. Overseeing the selection and requisition of materials and plant. 6. Agreeing a price for materials, and making cost-effective solutions and proposals for the intended project. 7. Managing, monitoring and interpreting the contract design documents supplied by the client/architect. 8. Liaising with any consultants, sub-contractors, supervisors, planners, quantity surveyors and the general workforce involved in the project. 9. Liaising with clients and their representatives (architects, engineers and surveyors), including attending regular meetings to keep them informed of progress. 10. Day-to-day management of the site, including supervising and monitoring the site labour force and the work of any subcontractors. 11. Planning the work and efficiently organizing the plant and site facilities in order to meet agreed deadlines. 12. Overseeing quality control, health and safety matters on site. 13. Preparing reports as required. 14. Resolving any unexpected technical difficulties, and other problems that may arise. 15. Reviewing bar bending schedule. ____________________________________________________________________________________________ Site Engineer Orascom Construction Industry Location: Cairo, Egypt, Eastern Company Integrated Industrial Complex Company Industry: Construction/Civil Engineering Job Role: Engineering September 2001 - July 2005 Job Description- 1.Acting as the main technical adviser on a construction site for subcontractors, crafts people and operatives. 2. Overseeing setting out, leveling and surveying the site. 3. Checking plans, drawings and quantities for accuracy of calculations. 4. Ensuring all materials used and work performed are as per specifications. 5. Overseeing the selection and requisition of materials and plant. 6. Agreeing a price for materials, and making cost-effective solutions and proposals for the intended project. 7. Managing, monitoring and interpreting the contract design documents supplied by the client/architect. 8. Liaising with any consultants, sub-contractors, supervisors, planners, quantity surveyors and the general workforce involved in the project.
  • 5.
    5 9. Liaising withclients and their representatives (architects, engineers and surveyors), including attending regular meetings to keep them informed of progress. 10. Day-to-day management of the site, including supervising and monitoring the site labour force and the work of any subcontractors. 11. Planning the work and efficiently organizing the plant and site facilities in order to meet agreed deadlines. 12. Overseeing quality control, health and safety matters on site. 13. Preparing reports as required. 14. Resolving any unexpected technical difficulties, and other problems that may arise. 15. Reviewing bar bending schedule. Special Skill :Computer skills Good operating knowledge of AutoCAD, MS Office ICM (Integrated Completion Management) PCOS (project Completion System) :skillsLanguage Native language: Arabic. V. Good command of both written and spoken English. Personal Information Cairo, Egypt:Place Of BirthEgyptian:Nationality Free.:Military StatusJuly 26, 1979.:Date Of Birth Married.:Marital Status