SlideShare a Scribd company logo
Curriculum Vitae
Name: Syed Suhebulla.
Civil Engineer (B.E), 10 years of experience (Karnataka India.)
Mobile: +971524461754(Dubai)
E-mail: ssuhebulla85@gmail.com,suheb_85@rediffmail.com.
--------------------------------------------------------------------------------------------------------
Objective:
To work in an innovative and competitive environment with committed and dedicated people,
which will help me to explore myself fully and realize my potential, and work heard to the
betterment of the company within time, with high quality,time within the given cost.
ExperienceSummary: 10 years of experience in construction industry
• Working as a Project Engineer in BUHALEEBA Contracting Dubai ( UAE)
• Duration - Aug 2015- Till date
• Worked as a Senior Site Engineer in Sobha Developers(Selected at
campus interview)
• Duration-June2007-Dec2009
• Worked as a PM in Synergy one infrastructures
• Duration Jan 2010-March 2013
• Worked as PM in DS Max propertis
• Duration- April 2013- July 2014
• Worked as a Project Manager in KNK Group
• Duration - Aug 2014- July 2015.
Project Background in Buhaleeba contracting LLC:
Bu Haleeba Contracting has earned an unmatched reputation for creating high quality prestigious
engineering projects such as multistory buildings, classy hotels and elegant commercial and
residential complexes. The company has carved a niche for itself in the contracting business
through its years of operation in the local market carrying out most important projects like Creek
park, LeMeridian , Royal Mirage, Mankhool Tower, Gulf Towers and many other prestigious
projects
with Presently i am involved in one of the biggest residential projects of Buhaleeba 5 Emirates
towers located in Silicon Oasis(Dubai) having built up area of around 1900000 sqft
consisting of 685 flats having 137 flats in each tower presently i am incharge of one of the
Towers .
Roles and Responsibilitiesin BuhaleenaContracting:
• Mobilisation of whole site at the begining of the project.
• Detailed study of archietectural and structural drawings.
• Co ordinating with consultant with various construction issues.
• Cordinating with the concerned project manager with various construction issues .
• Planning the resources and allocating it properly to get the work done with time quality
and cost
• Planning the required material plant and machinery to receive on time to get the work
done smoothly on time.
• Planning the materail at the right time and putting the material indent to run the project
smoothly.
• Raising the IR of the activities at the right time and get inspected by the consultant with
high quality standards.
• co ordinating with the MEP subcontractor to get the clearences to proceed with civil
activities
• co ordinating with the false ceiling and joinary contractor to get the work done on time
• co ordinating with the subcontractors to get the clearences to execute the work as per
schedule
• Raising the technical querries at the right time to execute the work on time
• Organising the daily and weekly meeting with the site staff to guide the staff to get the
work done with quality time and cost
• organising daily and weekly meeting with the subcontractors to get the workdone on time
• issuing the site memos if required to site staff and subcontractors of various contruction
issues and making sure to complete the project with time quality and cost.
• checking the bills of subcontractors and passing them as per Boq qty
• coordinating with the planning and costing engineer to get the work ontime within the
tendered cost.
Project Background in Sobha developers:
Sobha developers are one of the renowned real estate developers in India with 30% market share.
They are known for the quality of work which is as per German standards. I was involved in one
of the biggest residential project of Sobha developers “Sobha Chrysanthemum” with the buildup
area of about 9,08,892 Sq ft,509 Flats ,8 wings, 3 towers. I was involved from the start of the
project from mobilization, Excavation, marking, PCC, Footing reinforcement etc till finishing.
http://www.sobhadevelopers.com/projects/chrysanthemum/
Project Background in Synergyone Infrastructures:
Synergy one Infrastructures are the renowed form in India, basically they are concentrating on
layouts and villa of around 1500 acres in Bangalore, presently they have 2 projects in Bangalore
one is Woods ville which have area of around 100 acres in which they have launched 60 acres in
which 803 plots are already sold, another they have Synergy one icon city which have area of
around 76 acre in which 23 acres development is done and remaining area development is going
on. Presently I am in charge of both the projects from the beginning .
http://www.synergyone.in
Project Background in Ds max properties pvt ltd:
DS max properties is the leading developer in Bangalore presently around 50 projects Are going
on in and around Bangalore, of which I am in charge of 3 residential of south Bangalore having
total flats of around 200 i.e Serene ,Sunscape, Suncrest in which 2 projects are in the finishing
stage and one in the structure stage, looking after the project to run smoothly with high
quality,cost and time
http://www.dsgroupworld.in
Project Background in KNK Group:
KNK group is the renowned contracting firm in India (Bangalore) started in 1975 sucessfully
completed more than 1000 projects across india on time, they are known to handover the
projects on time or with in the stipulated time, i was incharge of one of the fast track projects of
KNK by the name Decathlon near Airport road of sqft area of around 2 lac sqft which we have
completed successfully in 8 months with high quality,cost & time.
http://www.Knkgroup.com
Roles and Responsibilitiesin Sobha Developers Ltd:
Worked as project in charge of 3 wings which has 150 flats, under me 4
supervisors and 2 junior engineer were working
• Mobilization of the whole site in the beginning of the project
• Setting out of whole site with reference of permanent bench mark
• Marking in the site with reference to the grid pillars
•Looking after reinforcement i.e. collecting drawings, preparing bar bending schedule,
executing in site, preparing checklist, coordinating with the structural consultants,
coordinating with QC with various issues.
• Looking after shuttering i.e. collecting drawings, calculating the exact quantity according
to drawing,. executing in site, preparing checklist, coordinating with the structural
consultants, coordinating with QC with various issues.
• Looking after block work, plastering, screeding, tiling, door &window fixing, grill fixing,
painting and preparing the bills for all the above quantity.
• Preparation of bills for all the above activities with a given rate index.
• Coordinating with planning engineer & costing engineer to get the exact date and cost for
the completion of activity with high quality standards.
• Roles and Responsibilitiesin Synergyone Infrastructures :
• Coordinating with architects with various construction issues
• Preparing rate Analysis for the different activities
• Preparing bill of quantities for the assigned work with ISO
• Planning the project with Primavera & weekly tracking of the project.
• Monitoring of whole site, regarding requirement of the materials, rising PR at the right
time
• Frequent checking at the site, monitoring at the site to get the work done in high quality
Standards.
• Frequent checking of quality by doing testing in the lab (i.e. finding compressive strength
of grade concrete, finding silt content for sand, and finding unit wt for steel).
• Frequent checking of layouts whether the drainage, water line slope is properly there are
not
• Frequent checking WMM for roads whether proper compaction is done are not
• Maintaining the site in a way that there should be no issues regarding the technicality
• Maintaining safety at the site to get work done in smooth manner
• Weekly checking of bills and passing the bills with standard rate index.
• Monitoring at the site to execute the site work in a smooth manner.
• Roles and Responsibilitiesin Ds max propertiespvtltd :
• Coordinating with architects with various construction issues
• Planning the project with Primavera & weekly tracking of the project.
• Monitoring of whole site, regarding requirement of the materials, rising PR at the right
time
• Frequent checking at the site, monitoring at the site to get the work done in high quality
Standards.
• Frequent checking of quality by doing testing in the lab (i.e. finding compressive strength
of grade concrete, finding silt content for sand, and finding unit wt for steel).
• Co-ordinating the consultant to get the inspection done and proceed with the activities
• Frequent checking of the project to get the work done in given and with high standards
• Maintaining the site in a way that there should be no issues regarding the technicality
• Maintaining safety at the site to get work done in smooth manner
• Weekly checking of bills and passing the bills with standard rate index.
• Monitoring at the site to execute the site work in a smooth manner.
• Roles and Responsibilitiesin KNK Group:
• Coordinating with architects with various construction issues
• Planning the project with Primavera & weekly tracking of the project.
• Monitoring of whole site, regarding requirement of the materials, rising PR at the right
time
• Frequent checking at the site, monitoring at the site to get the work done in high quality
Standards.
• Conducting meeting with the site staff and giving the targets to complete the activities on
time and guiding them to finish the activities with high quality standards.
• Frequent checking of layouts whether the drainage, water line slope is properly there are
not
• Frequent checking of the project to get the work done in given and with high standards
• Maintaining the site in a way that there should be no issues regarding the technicality
• Maintaining safety at the site to get work done in smooth manner
• Weekly checking of bills and passing the bills with standard rate index.
• Monitoring at the site to execute the site work in a smooth manner.
SoftwareCredentialsand Soft skills:
Programming Languages: C,
Operating Systems: Window & XP.
Design Tools: Primavera, AUTOCAD with new BOQ software certified in CADD center, MS-
Office,MSP,Excel,Ms- word
Educational Qualifications:
Bachelors in Civil Engineering.
Malnad College of Engineering
Hassan. Karnataka - India
Aggregate percentage - 64.37%
Year of Completion –June 2007
Other Achievements:
•Have got Certification from 'CIDARC' (Construction Industry Development And Research
Center).
•Have got the 'Best Project of the month' award in Sobha Developers.
•I actively participated and organized several events in the College.
•Has been promoted to senior site engineer within one year in Sobha developers.
Hobbies:
Swimming, Novels, Volley ball, Cricket and Traveling.
Key Strengths:
Optimistic, Ability and willingness to learn new technology and deliver results in a timely
manner, Enthusiastic and driven by the work and challenge.
Personal Details:
Name : Syed Suhebulla
Father Name : Syed Mir Mahmood
Gender: male
Nationality: Indian
Marital Status: Married
Languages Known: English, Kannada, Urdu and Hindi.
Phone No: +971524461754
Passport no: G4178671.
I here by declare that all the details furnished above are true to my knowledge and belief.
Syed Suhebulla

More Related Content

What's hot

CV_PARTHA_PRATIM_GORAIN_18th_dec_2015
CV_PARTHA_PRATIM_GORAIN_18th_dec_2015CV_PARTHA_PRATIM_GORAIN_18th_dec_2015
CV_PARTHA_PRATIM_GORAIN_18th_dec_2015Partha Gorain
 
ANBU DURAI VEERANARAYANAN
ANBU DURAI VEERANARAYANANANBU DURAI VEERANARAYANAN
ANBU DURAI VEERANARAYANANVeera Narayanan
 
SFK_ Resume-jobchange_dec2016
SFK_ Resume-jobchange_dec2016SFK_ Resume-jobchange_dec2016
SFK_ Resume-jobchange_dec2016Fazlullah Khan
 
Jha Ajachi_NIT Jamshedpur_CV
Jha Ajachi_NIT Jamshedpur_CVJha Ajachi_NIT Jamshedpur_CV
Jha Ajachi_NIT Jamshedpur_CVAjachi Jha
 
Airservices
Airservices Airservices
Airservices
Od Solutions
 
ENGINEERING PROJECTS 1
ENGINEERING PROJECTS 1ENGINEERING PROJECTS 1
ENGINEERING PROJECTS 1uche ibekwe
 

What's hot (20)

CV_PARTHA_PRATIM_GORAIN_18th_dec_2015
CV_PARTHA_PRATIM_GORAIN_18th_dec_2015CV_PARTHA_PRATIM_GORAIN_18th_dec_2015
CV_PARTHA_PRATIM_GORAIN_18th_dec_2015
 
ANBU DURAI VEERANARAYANAN
ANBU DURAI VEERANARAYANANANBU DURAI VEERANARAYANAN
ANBU DURAI VEERANARAYANAN
 
SFK_ Resume-jobchange_dec2016
SFK_ Resume-jobchange_dec2016SFK_ Resume-jobchange_dec2016
SFK_ Resume-jobchange_dec2016
 
CV_SUMAN MUKHERJEE- JULY-16
CV_SUMAN MUKHERJEE- JULY-16CV_SUMAN MUKHERJEE- JULY-16
CV_SUMAN MUKHERJEE- JULY-16
 
SANPPT
SANPPTSANPPT
SANPPT
 
B_Naik-CV1
B_Naik-CV1B_Naik-CV1
B_Naik-CV1
 
Resume of R N Chaudhuri
Resume of R N ChaudhuriResume of R N Chaudhuri
Resume of R N Chaudhuri
 
Josefino Waje cv 2
Josefino Waje cv 2Josefino Waje cv 2
Josefino Waje cv 2
 
resumelarry
resumelarryresumelarry
resumelarry
 
Jha Ajachi_NIT Jamshedpur_CV
Jha Ajachi_NIT Jamshedpur_CVJha Ajachi_NIT Jamshedpur_CV
Jha Ajachi_NIT Jamshedpur_CV
 
CV M.Ilyas - 1
CV M.Ilyas - 1CV M.Ilyas - 1
CV M.Ilyas - 1
 
Steven qaqc insp
Steven qaqc inspSteven qaqc insp
Steven qaqc insp
 
Airservices
Airservices Airservices
Airservices
 
Ryan Arendse
Ryan ArendseRyan Arendse
Ryan Arendse
 
GMR
GMRGMR
GMR
 
Resume Jaime Lopez 2016
Resume Jaime Lopez 2016Resume Jaime Lopez 2016
Resume Jaime Lopez 2016
 
Resume_Pramod
Resume_PramodResume_Pramod
Resume_Pramod
 
QAQC Engineer
QAQC EngineerQAQC Engineer
QAQC Engineer
 
Appli. for the Const. Mngr
Appli. for the Const. MngrAppli. for the Const. Mngr
Appli. for the Const. Mngr
 
ENGINEERING PROJECTS 1
ENGINEERING PROJECTS 1ENGINEERING PROJECTS 1
ENGINEERING PROJECTS 1
 

Viewers also liked

Body toning workout slide
Body toning workout slideBody toning workout slide
Body toning workout slide
Ungku OmarPolytechnic
 
La campaña de Chris Christie
La campaña de Chris ChristieLa campaña de Chris Christie
La campaña de Chris Christie
Julio Otero Santamaría
 
Aspix user manual_sp
Aspix user manual_spAspix user manual_sp
Aspix user manual_sp
Jose Dariel Arcila
 
Experiencias en el nuevo mercado laboral para ingenieros
Experiencias en el nuevo mercado laboral para ingenierosExperiencias en el nuevo mercado laboral para ingenieros
Experiencias en el nuevo mercado laboral para ingenieros
Pablo García Ansola
 
Home Owners Guide To Flood Resilience
Home Owners Guide To Flood ResilienceHome Owners Guide To Flood Resilience
Home Owners Guide To Flood Resilience
John Garvey
 
Tehilim 929 #24 מזמור כ 201611123 ftw
Tehilim 929 #24 מזמור כ 201611123  ftwTehilim 929 #24 מזמור כ 201611123  ftw
Tehilim 929 #24 מזמור כ 201611123 ftw
Eliyahu Schuman
 
әлифба байрамы
әлифба байрамыәлифба байрамы
әлифба байрамы
Fanur Bayazitov
 
Hormonal problemlerin-ses-üzerine-etkisi
Hormonal problemlerin-ses-üzerine-etkisiHormonal problemlerin-ses-üzerine-etkisi
Hormonal problemlerin-ses-üzerine-etkisi
enisalpinguneri
 
мархамова милена, 4 класс
мархамова милена, 4 классмархамова милена, 4 класс
мархамова милена, 4 класс
Fanur Bayazitov
 
IT140_IP2_JasonLopomo_SlidePresentation
IT140_IP2_JasonLopomo_SlidePresentationIT140_IP2_JasonLopomo_SlidePresentation
IT140_IP2_JasonLopomo_SlidePresentationjason lopomo
 
Sharpening revenue assurance_july 2015
Sharpening revenue assurance_july 2015Sharpening revenue assurance_july 2015
Sharpening revenue assurance_july 2015
Silas Musakali
 
Prueba lenguaje la maravillosa macedonia
Prueba lenguaje la maravillosa macedoniaPrueba lenguaje la maravillosa macedonia
Prueba lenguaje la maravillosa macedonia
Paulina Alejandra
 
Oriana delgado proceso manufactura
Oriana delgado  proceso manufactura Oriana delgado  proceso manufactura
Oriana delgado proceso manufactura
Ori Delgado
 
New Items available
New Items availableNew Items available
New Items available
Gretchen Guinazzo
 
Factorización
FactorizaciónFactorización
Primer trabajo
Primer trabajoPrimer trabajo
Primer trabajo
odinyonito2345
 
Primer trabajo
Primer trabajoPrimer trabajo
Primer trabajo
odinyonito2345
 
Portfolio2
Portfolio2Portfolio2
Portfolio2Amy Leat
 
Presentacion jorge franco
Presentacion jorge francoPresentacion jorge franco
Presentacion jorge franco
Jjfranco1
 
Canvas
CanvasCanvas
Canvas
Luis Kau
 

Viewers also liked (20)

Body toning workout slide
Body toning workout slideBody toning workout slide
Body toning workout slide
 
La campaña de Chris Christie
La campaña de Chris ChristieLa campaña de Chris Christie
La campaña de Chris Christie
 
Aspix user manual_sp
Aspix user manual_spAspix user manual_sp
Aspix user manual_sp
 
Experiencias en el nuevo mercado laboral para ingenieros
Experiencias en el nuevo mercado laboral para ingenierosExperiencias en el nuevo mercado laboral para ingenieros
Experiencias en el nuevo mercado laboral para ingenieros
 
Home Owners Guide To Flood Resilience
Home Owners Guide To Flood ResilienceHome Owners Guide To Flood Resilience
Home Owners Guide To Flood Resilience
 
Tehilim 929 #24 מזמור כ 201611123 ftw
Tehilim 929 #24 מזמור כ 201611123  ftwTehilim 929 #24 מזמור כ 201611123  ftw
Tehilim 929 #24 מזמור כ 201611123 ftw
 
әлифба байрамы
әлифба байрамыәлифба байрамы
әлифба байрамы
 
Hormonal problemlerin-ses-üzerine-etkisi
Hormonal problemlerin-ses-üzerine-etkisiHormonal problemlerin-ses-üzerine-etkisi
Hormonal problemlerin-ses-üzerine-etkisi
 
мархамова милена, 4 класс
мархамова милена, 4 классмархамова милена, 4 класс
мархамова милена, 4 класс
 
IT140_IP2_JasonLopomo_SlidePresentation
IT140_IP2_JasonLopomo_SlidePresentationIT140_IP2_JasonLopomo_SlidePresentation
IT140_IP2_JasonLopomo_SlidePresentation
 
Sharpening revenue assurance_july 2015
Sharpening revenue assurance_july 2015Sharpening revenue assurance_july 2015
Sharpening revenue assurance_july 2015
 
Prueba lenguaje la maravillosa macedonia
Prueba lenguaje la maravillosa macedoniaPrueba lenguaje la maravillosa macedonia
Prueba lenguaje la maravillosa macedonia
 
Oriana delgado proceso manufactura
Oriana delgado  proceso manufactura Oriana delgado  proceso manufactura
Oriana delgado proceso manufactura
 
New Items available
New Items availableNew Items available
New Items available
 
Factorización
FactorizaciónFactorización
Factorización
 
Primer trabajo
Primer trabajoPrimer trabajo
Primer trabajo
 
Primer trabajo
Primer trabajoPrimer trabajo
Primer trabajo
 
Portfolio2
Portfolio2Portfolio2
Portfolio2
 
Presentacion jorge franco
Presentacion jorge francoPresentacion jorge franco
Presentacion jorge franco
 
Canvas
CanvasCanvas
Canvas
 

Similar to Suheb resume

Resume
ResumeResume
Resume New 2016- Mustapha A. Jubeily
Resume New 2016- Mustapha A. JubeilyResume New 2016- Mustapha A. Jubeily
Resume New 2016- Mustapha A. JubeilyMustapha Jubeily
 
Resume New 2016- Mustapha A. Jubeily
Resume New 2016- Mustapha A. JubeilyResume New 2016- Mustapha A. Jubeily
Resume New 2016- Mustapha A. JubeilyMustapha Jubeily
 
cv of galisa
cv of galisacv of galisa
cv of galisashas gaib
 
Quantity Surveyor 5+ Yrs Exp
Quantity Surveyor 5+ Yrs ExpQuantity Surveyor 5+ Yrs Exp
Quantity Surveyor 5+ Yrs ExpMubarak Ali
 
Civil engineer1(2
Civil engineer1(2Civil engineer1(2
Civil engineer1(2
ahmed sirajuddin
 
engr ijaz 1 qc civil engineer I did civil engineering from University peshawar
engr ijaz 1 qc  civil engineer I did civil engineering from University peshawarengr ijaz 1 qc  civil engineer I did civil engineering from University peshawar
engr ijaz 1 qc civil engineer I did civil engineering from University peshawar
engrijaz727
 
AJIN VIJAY_CV.
AJIN VIJAY_CV.AJIN VIJAY_CV.
AJIN VIJAY_CV.AJIN VIJAY
 
Updated Architecture Portfolio 2020
Updated Architecture Portfolio 2020Updated Architecture Portfolio 2020
Updated Architecture Portfolio 2020
MTAF
 
TCF Resume UPDATED 05 APRIL, 2015
TCF Resume UPDATED 05 APRIL, 2015TCF Resume UPDATED 05 APRIL, 2015
TCF Resume UPDATED 05 APRIL, 2015Teddy Fernando
 
Waji Ul Hassan_original
Waji Ul Hassan_originalWaji Ul Hassan_original
Waji Ul Hassan_originalwaji waji
 

Similar to Suheb resume (20)

Resume
ResumeResume
Resume
 
CV Project Manager
CV Project ManagerCV Project Manager
CV Project Manager
 
Civil Engineer 2
Civil Engineer 2Civil Engineer 2
Civil Engineer 2
 
Resume New 2016- Mustapha A. Jubeily
Resume New 2016- Mustapha A. JubeilyResume New 2016- Mustapha A. Jubeily
Resume New 2016- Mustapha A. Jubeily
 
Resume New 2016- Mustapha A. Jubeily
Resume New 2016- Mustapha A. JubeilyResume New 2016- Mustapha A. Jubeily
Resume New 2016- Mustapha A. Jubeily
 
Umar
UmarUmar
Umar
 
UCM-CV
UCM-CVUCM-CV
UCM-CV
 
cv of galisa
cv of galisacv of galisa
cv of galisa
 
Sunil Final Resume
Sunil Final ResumeSunil Final Resume
Sunil Final Resume
 
Humayun Akhtar Resume
Humayun Akhtar ResumeHumayun Akhtar Resume
Humayun Akhtar Resume
 
CV Dip 03-11-15
CV Dip 03-11-15CV Dip 03-11-15
CV Dip 03-11-15
 
Quantity Surveyor 5+ Yrs Exp
Quantity Surveyor 5+ Yrs ExpQuantity Surveyor 5+ Yrs Exp
Quantity Surveyor 5+ Yrs Exp
 
Civil engineer1(2
Civil engineer1(2Civil engineer1(2
Civil engineer1(2
 
ac (1)
ac (1)ac (1)
ac (1)
 
engr ijaz 1 qc civil engineer I did civil engineering from University peshawar
engr ijaz 1 qc  civil engineer I did civil engineering from University peshawarengr ijaz 1 qc  civil engineer I did civil engineering from University peshawar
engr ijaz 1 qc civil engineer I did civil engineering from University peshawar
 
AJIN VIJAY_CV.
AJIN VIJAY_CV.AJIN VIJAY_CV.
AJIN VIJAY_CV.
 
Updated Architecture Portfolio 2020
Updated Architecture Portfolio 2020Updated Architecture Portfolio 2020
Updated Architecture Portfolio 2020
 
TCF Resume UPDATED 05 APRIL, 2015
TCF Resume UPDATED 05 APRIL, 2015TCF Resume UPDATED 05 APRIL, 2015
TCF Resume UPDATED 05 APRIL, 2015
 
MOSTAFA IBRAHIM2
MOSTAFA IBRAHIM2MOSTAFA IBRAHIM2
MOSTAFA IBRAHIM2
 
Waji Ul Hassan_original
Waji Ul Hassan_originalWaji Ul Hassan_original
Waji Ul Hassan_original
 

Suheb resume

  • 1. Curriculum Vitae Name: Syed Suhebulla. Civil Engineer (B.E), 10 years of experience (Karnataka India.) Mobile: +971524461754(Dubai) E-mail: ssuhebulla85@gmail.com,suheb_85@rediffmail.com. -------------------------------------------------------------------------------------------------------- Objective: To work in an innovative and competitive environment with committed and dedicated people, which will help me to explore myself fully and realize my potential, and work heard to the betterment of the company within time, with high quality,time within the given cost. ExperienceSummary: 10 years of experience in construction industry • Working as a Project Engineer in BUHALEEBA Contracting Dubai ( UAE) • Duration - Aug 2015- Till date • Worked as a Senior Site Engineer in Sobha Developers(Selected at campus interview) • Duration-June2007-Dec2009 • Worked as a PM in Synergy one infrastructures • Duration Jan 2010-March 2013 • Worked as PM in DS Max propertis • Duration- April 2013- July 2014 • Worked as a Project Manager in KNK Group • Duration - Aug 2014- July 2015. Project Background in Buhaleeba contracting LLC: Bu Haleeba Contracting has earned an unmatched reputation for creating high quality prestigious engineering projects such as multistory buildings, classy hotels and elegant commercial and residential complexes. The company has carved a niche for itself in the contracting business through its years of operation in the local market carrying out most important projects like Creek
  • 2. park, LeMeridian , Royal Mirage, Mankhool Tower, Gulf Towers and many other prestigious projects with Presently i am involved in one of the biggest residential projects of Buhaleeba 5 Emirates towers located in Silicon Oasis(Dubai) having built up area of around 1900000 sqft consisting of 685 flats having 137 flats in each tower presently i am incharge of one of the Towers . Roles and Responsibilitiesin BuhaleenaContracting: • Mobilisation of whole site at the begining of the project. • Detailed study of archietectural and structural drawings. • Co ordinating with consultant with various construction issues. • Cordinating with the concerned project manager with various construction issues . • Planning the resources and allocating it properly to get the work done with time quality and cost • Planning the required material plant and machinery to receive on time to get the work done smoothly on time. • Planning the materail at the right time and putting the material indent to run the project smoothly. • Raising the IR of the activities at the right time and get inspected by the consultant with high quality standards. • co ordinating with the MEP subcontractor to get the clearences to proceed with civil activities • co ordinating with the false ceiling and joinary contractor to get the work done on time • co ordinating with the subcontractors to get the clearences to execute the work as per schedule • Raising the technical querries at the right time to execute the work on time • Organising the daily and weekly meeting with the site staff to guide the staff to get the work done with quality time and cost • organising daily and weekly meeting with the subcontractors to get the workdone on time • issuing the site memos if required to site staff and subcontractors of various contruction issues and making sure to complete the project with time quality and cost. • checking the bills of subcontractors and passing them as per Boq qty • coordinating with the planning and costing engineer to get the work ontime within the tendered cost. Project Background in Sobha developers:
  • 3. Sobha developers are one of the renowned real estate developers in India with 30% market share. They are known for the quality of work which is as per German standards. I was involved in one of the biggest residential project of Sobha developers “Sobha Chrysanthemum” with the buildup area of about 9,08,892 Sq ft,509 Flats ,8 wings, 3 towers. I was involved from the start of the project from mobilization, Excavation, marking, PCC, Footing reinforcement etc till finishing. http://www.sobhadevelopers.com/projects/chrysanthemum/ Project Background in Synergyone Infrastructures: Synergy one Infrastructures are the renowed form in India, basically they are concentrating on layouts and villa of around 1500 acres in Bangalore, presently they have 2 projects in Bangalore one is Woods ville which have area of around 100 acres in which they have launched 60 acres in which 803 plots are already sold, another they have Synergy one icon city which have area of around 76 acre in which 23 acres development is done and remaining area development is going on. Presently I am in charge of both the projects from the beginning . http://www.synergyone.in Project Background in Ds max properties pvt ltd: DS max properties is the leading developer in Bangalore presently around 50 projects Are going on in and around Bangalore, of which I am in charge of 3 residential of south Bangalore having total flats of around 200 i.e Serene ,Sunscape, Suncrest in which 2 projects are in the finishing stage and one in the structure stage, looking after the project to run smoothly with high quality,cost and time http://www.dsgroupworld.in Project Background in KNK Group: KNK group is the renowned contracting firm in India (Bangalore) started in 1975 sucessfully completed more than 1000 projects across india on time, they are known to handover the projects on time or with in the stipulated time, i was incharge of one of the fast track projects of KNK by the name Decathlon near Airport road of sqft area of around 2 lac sqft which we have completed successfully in 8 months with high quality,cost & time. http://www.Knkgroup.com Roles and Responsibilitiesin Sobha Developers Ltd: Worked as project in charge of 3 wings which has 150 flats, under me 4 supervisors and 2 junior engineer were working • Mobilization of the whole site in the beginning of the project
  • 4. • Setting out of whole site with reference of permanent bench mark • Marking in the site with reference to the grid pillars •Looking after reinforcement i.e. collecting drawings, preparing bar bending schedule, executing in site, preparing checklist, coordinating with the structural consultants, coordinating with QC with various issues. • Looking after shuttering i.e. collecting drawings, calculating the exact quantity according to drawing,. executing in site, preparing checklist, coordinating with the structural consultants, coordinating with QC with various issues. • Looking after block work, plastering, screeding, tiling, door &window fixing, grill fixing, painting and preparing the bills for all the above quantity. • Preparation of bills for all the above activities with a given rate index. • Coordinating with planning engineer & costing engineer to get the exact date and cost for the completion of activity with high quality standards. • Roles and Responsibilitiesin Synergyone Infrastructures : • Coordinating with architects with various construction issues • Preparing rate Analysis for the different activities • Preparing bill of quantities for the assigned work with ISO • Planning the project with Primavera & weekly tracking of the project. • Monitoring of whole site, regarding requirement of the materials, rising PR at the right time • Frequent checking at the site, monitoring at the site to get the work done in high quality Standards. • Frequent checking of quality by doing testing in the lab (i.e. finding compressive strength of grade concrete, finding silt content for sand, and finding unit wt for steel). • Frequent checking of layouts whether the drainage, water line slope is properly there are not • Frequent checking WMM for roads whether proper compaction is done are not • Maintaining the site in a way that there should be no issues regarding the technicality • Maintaining safety at the site to get work done in smooth manner • Weekly checking of bills and passing the bills with standard rate index. • Monitoring at the site to execute the site work in a smooth manner. • Roles and Responsibilitiesin Ds max propertiespvtltd : • Coordinating with architects with various construction issues • Planning the project with Primavera & weekly tracking of the project.
  • 5. • Monitoring of whole site, regarding requirement of the materials, rising PR at the right time • Frequent checking at the site, monitoring at the site to get the work done in high quality Standards. • Frequent checking of quality by doing testing in the lab (i.e. finding compressive strength of grade concrete, finding silt content for sand, and finding unit wt for steel). • Co-ordinating the consultant to get the inspection done and proceed with the activities • Frequent checking of the project to get the work done in given and with high standards • Maintaining the site in a way that there should be no issues regarding the technicality • Maintaining safety at the site to get work done in smooth manner • Weekly checking of bills and passing the bills with standard rate index. • Monitoring at the site to execute the site work in a smooth manner. • Roles and Responsibilitiesin KNK Group: • Coordinating with architects with various construction issues • Planning the project with Primavera & weekly tracking of the project. • Monitoring of whole site, regarding requirement of the materials, rising PR at the right time • Frequent checking at the site, monitoring at the site to get the work done in high quality Standards. • Conducting meeting with the site staff and giving the targets to complete the activities on time and guiding them to finish the activities with high quality standards. • Frequent checking of layouts whether the drainage, water line slope is properly there are not • Frequent checking of the project to get the work done in given and with high standards • Maintaining the site in a way that there should be no issues regarding the technicality • Maintaining safety at the site to get work done in smooth manner • Weekly checking of bills and passing the bills with standard rate index. • Monitoring at the site to execute the site work in a smooth manner. SoftwareCredentialsand Soft skills: Programming Languages: C, Operating Systems: Window & XP.
  • 6. Design Tools: Primavera, AUTOCAD with new BOQ software certified in CADD center, MS- Office,MSP,Excel,Ms- word Educational Qualifications: Bachelors in Civil Engineering. Malnad College of Engineering Hassan. Karnataka - India Aggregate percentage - 64.37% Year of Completion –June 2007 Other Achievements: •Have got Certification from 'CIDARC' (Construction Industry Development And Research Center). •Have got the 'Best Project of the month' award in Sobha Developers. •I actively participated and organized several events in the College. •Has been promoted to senior site engineer within one year in Sobha developers. Hobbies: Swimming, Novels, Volley ball, Cricket and Traveling. Key Strengths: Optimistic, Ability and willingness to learn new technology and deliver results in a timely manner, Enthusiastic and driven by the work and challenge. Personal Details: Name : Syed Suhebulla Father Name : Syed Mir Mahmood Gender: male Nationality: Indian Marital Status: Married Languages Known: English, Kannada, Urdu and Hindi. Phone No: +971524461754 Passport no: G4178671. I here by declare that all the details furnished above are true to my knowledge and belief. Syed Suhebulla