SlideShare a Scribd company logo
Name: ANDREW TAYLOR
Address: 6 Walls Place, Dunfermline, Fife KY11 4RF
Phone: (M): 07710 490 425 / (H): 01383 727 387
Email: andy.taylor58@icloud.com
PROFILE
A confident and accomplished Project Co-ordinator and Senior Buyer with experience in production control /
procurement and material planning, all in various sectors: construction, energy technologies, telecoms, chemical
manufacturing and construction components.
Possesses extensive knowledge in dealing with project and inter-company assignments. Attained a progressive record of
success through dealing with these projects whilst successfully honing managerial and negotiation skills.
A committed and motivational leader who fully embraces the principles of ‘HPO’ to add value to business through tight cost
control and a focus on profit – proven ability to meet strict budgetary targets by turning a 7 figure loss into a 4 figure profit
IT / systems analysis – highly computer literate with over 10 years’ experience of Microsoft Office as well as a range of
scheduling and business management systems and extensive knowledge of SAP
KEY SKILLS
• Skilled in wide-ranging procurement across different sectors and project types
• Managed 7 years’ projects resulting in 80% - 100% on time, all within strict budget guidelines and with less than
1% Quality Notifications as well as no reported HSE incidents
• Assured in the delivery of project budget proposals and presentations to any audience
• Processes expert: always familiar with all areas of the programme, ensuring delivery of best practices
• Expert in managing successful implementation of complex broad-ranging projects across the whole business
• Ensures that the production is cost effective and that products are produced on time and are of good quality
• Works out the human and material resources needed and drafting a timescale for the job
• Monitors the production processes and adjusting schedules as needed and that product standards are as
required
CAREER HISTORY
FMC Technologies https://www.fmctechnologies.com/ 2005 - Date
Rental Co-ordinator (Aberdeen) 2013 - Date
Responsibilities
• Coordinated all tooling requirements required for offshore use by hiring and off hiring tools using SAP
• Working with Norway site using SAP to ensure all new tooling needs were met through AFE and RFQ
processes
• Liaised with all departments to ensure corrective actions required to ensure quality of rental products were
retained
• Raised work/service orders for workshop using SAP, in accordance with latest engineering standards
• Reviewed vendor quotes to assess whether these were cost effective and met company’s budget constraints
• Implemented any safety alerts for affected inventory
• Liaising with Global sites to satisfy customer demands and raising purchase requisitions in SAP to support this
function
Achievements
• Managing 4 support staff, produced 100% delivery of equipment for offshore and onshore requirements
Project Co-ordinator (Tooling CoE) 2007 - 2013
Responsibilities
• Project-planned and co-ordinated all project and sister plant tooling, using Primavera P6
• Significant part in the successful execution of several major projects including Ekofisk, BP Atlantis and Pazflor
• Coordinated and planned for the manufacture of over 350 tools as well as ensuring all arrangements required to
perform manufacture were in place, and interchangeability and stack testing of the tools for the Pazflor project
• Reviewed vendor quotes to assess whether these were cost effective and met company’s budget constraints
• Identified all deviations to agreed work scopes and raised and submitted appropriate variation orders
Andrew Taylor Page 1
• Managed, through appropriate departments, changes to ECN process and concurrent engineered parts,
sending appropriate internal variation forms. This allowed set margins of 10 - 21% to be kept on various projects
• Managed all project financial functions - preparation of variation orders, registers, budgets and forecasts,
reviewing w/i/p and expediting quotation and PO processes
• Monitored inter-company costs through quotation and ECN processes, continuously updating Supply Chain and
Assembly and Test departments
Achievements
• Awarded Quality Achiever of the Month and Global Quality Achievement
• Project-managed the FMC Houston order for Tullow project 122 tools on an accelerated lead time. Ensured
100% H&S-compliant delivery within budget, no QNs. Led to Houston receiving a $1M bonus from the customer
• Project-managed, with 2 support staff, all product and documentation for an FMC Kongsberg placed an order
for SSP3 Project 22 tools. This specifically ensured project’s on-time, on budget completion
Project Planner (Tooling CoE) 2005 - 2007
Responsibilities
• Monitored full project lifecycle progression including inter-company tooling
• Liaised with projects teams to ensure early recognition of tooling requirements
• Progressed project engineering requirements on any concurrent engineering tooling
• Prepared and carried out daily reporting of the status of all tools on order, using Primavera P6
• Progressed tool / components through production control, test and assembly
• Created delivery notes and liaised with shipping department
Achievements
• Key member of the tooling team that successfully executed large budget projects for Shell Prelude, Hibernia,
Laggen Tormore, Clov and various AFEs
Daw Tech http://www.dawtech.com/ 1999 - 2005
Senior Buyer
Responsibilities
• Managed procurement of all materials required for the supply and installation of “Clean Rooms” within the semi-
conductor and pharmaceutical industries
• Managed daily procurement of direct and indirect products required for the business
• Managed Administration Assistant in completion of all daily tasks
• Managed stock levels, setting up supplier discounts and agreements to ensure appropriate stockholding
• Managed importation and exportation of all products within Europe, the USA and the Far East
Achievements
• Championed the introduction of Sage 100 and, later, Visual Purchasing modules. These were pivotal in the
reduction of costs of 30% equating to an approximate value of £800K
• Was rapidly promoted through the business as a result of recognised track-record: became responsible for the
ownership and management of all freight-forwarding requirements
• Implemented changes resulting in increased efficiency with an approximate saving of £100K in the first two
years
Alexander Ross Holdings http://www.alexanderross.co.uk/ 1998 - 1999
Project Co-ordinator
Achievements
• Created a database allowing more accurate purchasing for lead times and stock levels for janitorial supplies,
allowing the smooth implementation of process of reducing redundant stock, enabling faster customer
responses
• Removed a 4-month backlog in the planning department thus ensuring better stock records and better flow of
free issue materials for sub-contract suppliers
Havelock Europa PLC http://www.havelockeuropa.com/ 1996 - 1998
Sub-Contract Buyer
Responsibilities
• Managed time-sensitive and cost effective procurement (avg monthly spend £75k) for all projects across timber
and metal components, working with outside contractors
• Co-ordinated procurement of components required for fast-track shop fitting contracts using MRP MM and
manual requisition systems
Motorola Mobility LLC https://www.motorola.co.uk/home - Buyer 1996 - 1997
FMC Technologies – Buyer/Expediter 1994 - 1996
Andrew Taylor Page 2
TK Valve Industrial Co. Ltd http://www.tk-valve.com/ - Stores/Project Management 1979 - 1994
CERTIFICATIONS
Studying towards MCIPS Level foundation 4 Qualification
Certificate in TQM – Ernst and Young
Andrew Taylor Page 3

More Related Content

What's hot

Compliance_Manager_C.V.
Compliance_Manager_C.V.Compliance_Manager_C.V.
Compliance_Manager_C.V.Douglas Lee
 
Sumit Joshi[622]
Sumit Joshi[622]Sumit Joshi[622]
Sumit Joshi[622]sumit joshi
 
Varun singh knowledge_management
Varun singh knowledge_managementVarun singh knowledge_management
Varun singh knowledge_management
Varun Singh
 
Andy Sabia Resume
Andy Sabia ResumeAndy Sabia Resume
Andy Sabia ResumeAndy Sabia
 
Quality Manager-Damon Goodwin
Quality Manager-Damon GoodwinQuality Manager-Damon Goodwin
Quality Manager-Damon GoodwinDamon Goodwin
 
Musiel Jodi Resume Materials Planning (2)
Musiel Jodi Resume Materials Planning (2)Musiel Jodi Resume Materials Planning (2)
Musiel Jodi Resume Materials Planning (2)jmusiel
 
Perez, Nelson Res 11 1 2010 2
Perez, Nelson Res 11 1 2010 2Perez, Nelson Res 11 1 2010 2
Perez, Nelson Res 11 1 2010 2
Nelson Perez
 
Resume_2016_full
Resume_2016_fullResume_2016_full
Resume_2016_fullJason Cole
 
Perdue Farms Experience
Perdue Farms ExperiencePerdue Farms Experience
Perdue Farms ExperienceClarence Bell
 
Ramanujan
RamanujanRamanujan
Ramanujan
ANANTHAMPILLAI
 

What's hot (20)

Compliance_Manager_C.V.
Compliance_Manager_C.V.Compliance_Manager_C.V.
Compliance_Manager_C.V.
 
Sumit Joshi[622]
Sumit Joshi[622]Sumit Joshi[622]
Sumit Joshi[622]
 
Varun singh knowledge_management
Varun singh knowledge_managementVarun singh knowledge_management
Varun singh knowledge_management
 
vikas goel
vikas goelvikas goel
vikas goel
 
Resume_JMD_ 01-14-17
Resume_JMD_ 01-14-17Resume_JMD_ 01-14-17
Resume_JMD_ 01-14-17
 
Andy Sabia Resume
Andy Sabia ResumeAndy Sabia Resume
Andy Sabia Resume
 
Quality Manager-Damon Goodwin
Quality Manager-Damon GoodwinQuality Manager-Damon Goodwin
Quality Manager-Damon Goodwin
 
Kanakappa Hallikeri_Resume
Kanakappa Hallikeri_ResumeKanakappa Hallikeri_Resume
Kanakappa Hallikeri_Resume
 
PRADIPTA BHATTACHARYA_resume(L)
PRADIPTA BHATTACHARYA_resume(L)PRADIPTA BHATTACHARYA_resume(L)
PRADIPTA BHATTACHARYA_resume(L)
 
Musiel Jodi Resume Materials Planning (2)
Musiel Jodi Resume Materials Planning (2)Musiel Jodi Resume Materials Planning (2)
Musiel Jodi Resume Materials Planning (2)
 
Perez, Nelson Res 11 1 2010 2
Perez, Nelson Res 11 1 2010 2Perez, Nelson Res 11 1 2010 2
Perez, Nelson Res 11 1 2010 2
 
Resum
ResumResum
Resum
 
Resume_2016_full
Resume_2016_fullResume_2016_full
Resume_2016_full
 
Varun Garg_CV
Varun Garg_CVVarun Garg_CV
Varun Garg_CV
 
GLH resume 2016
GLH resume 2016GLH resume 2016
GLH resume 2016
 
Perdue Farms Experience
Perdue Farms ExperiencePerdue Farms Experience
Perdue Farms Experience
 
Adinarayana S profile
Adinarayana S profileAdinarayana S profile
Adinarayana S profile
 
Ramanujan
RamanujanRamanujan
Ramanujan
 
Resume
ResumeResume
Resume
 
my Job profile and responsabilities
my Job profile and responsabilitiesmy Job profile and responsabilities
my Job profile and responsabilities
 

Viewers also liked

Study Explores Exercises to Improve Cognition in People with MS
Study Explores Exercises to Improve Cognition in People with MSStudy Explores Exercises to Improve Cognition in People with MS
Study Explores Exercises to Improve Cognition in People with MSJohn Guandolo
 
Resuscitation Council UK - Advanced Life Support Course
Resuscitation Council UK - Advanced Life Support Course Resuscitation Council UK - Advanced Life Support Course
Resuscitation Council UK - Advanced Life Support Course Anna Kulik-Ford
 
Proroga spesometro
Proroga spesometroProroga spesometro
Proroga spesometro
Antonio Palmieri
 
Plugusor traieste romaneste
Plugusor traieste romanestePlugusor traieste romaneste
Plugusor traieste romaneste
www.experiente.traiesteromaneste.ro
 
Ppt Shalat jamak &; qasar
Ppt Shalat jamak &; qasarPpt Shalat jamak &; qasar
Ppt Shalat jamak &; qasar
miftaalamin23
 
Jesús continúa enseñando a sus discípulos
Jesús continúa enseñando a sus discípulosJesús continúa enseñando a sus discípulos
Jesús continúa enseñando a sus discípulos
Coke Neto
 
Digital Health at UNC Chapel Hill CaDHRI Needs Assessment Report
Digital Health at UNC Chapel Hill CaDHRI Needs Assessment ReportDigital Health at UNC Chapel Hill CaDHRI Needs Assessment Report
Digital Health at UNC Chapel Hill CaDHRI Needs Assessment Report
cadhri_unc
 
Bonus sud circolare inps
Bonus sud circolare inpsBonus sud circolare inps
Bonus sud circolare inps
Antonio Palmieri
 
Vida e Ambiente
Vida e AmbienteVida e Ambiente
Vida e Ambiente
SMEdeItabaianinha
 
Las fiestas judías. Alfonso. Escolapios. 3ºA
Las fiestas judías. Alfonso. Escolapios. 3ºALas fiestas judías. Alfonso. Escolapios. 3ºA
Las fiestas judías. Alfonso. Escolapios. 3ºA
alfonrga
 
Curitiba/ BRASIL
Curitiba/ BRASILCuritiba/ BRASIL
Curitiba/ BRASIL
Irene Aguiar
 
A alma ferida
A alma feridaA alma ferida
A alma ferida
pietra bravo
 
GATE 2017 solution for computer science
GATE 2017 solution for computer scienceGATE 2017 solution for computer science
GATE 2017 solution for computer science
Engineers Institute of India
 
Hermanas Misioneras de Nuestra Señora de los Apostoles
Hermanas Misioneras de Nuestra Señora de los ApostolesHermanas Misioneras de Nuestra Señora de los Apostoles
Hermanas Misioneras de Nuestra Señora de los Apostoles
Lilian Gonzalez
 
1 em 100000
1 em 1000001 em 100000
1 em 100000
pietra bravo
 

Viewers also liked (17)

Study Explores Exercises to Improve Cognition in People with MS
Study Explores Exercises to Improve Cognition in People with MSStudy Explores Exercises to Improve Cognition in People with MS
Study Explores Exercises to Improve Cognition in People with MS
 
Daftar tabel AKPER PEMKAB MUNA
Daftar tabel AKPER PEMKAB MUNA Daftar tabel AKPER PEMKAB MUNA
Daftar tabel AKPER PEMKAB MUNA
 
Resuscitation Council UK - Advanced Life Support Course
Resuscitation Council UK - Advanced Life Support Course Resuscitation Council UK - Advanced Life Support Course
Resuscitation Council UK - Advanced Life Support Course
 
Proroga spesometro
Proroga spesometroProroga spesometro
Proroga spesometro
 
Plugusor traieste romaneste
Plugusor traieste romanestePlugusor traieste romaneste
Plugusor traieste romaneste
 
Ppt Shalat jamak &; qasar
Ppt Shalat jamak &; qasarPpt Shalat jamak &; qasar
Ppt Shalat jamak &; qasar
 
Jesús continúa enseñando a sus discípulos
Jesús continúa enseñando a sus discípulosJesús continúa enseñando a sus discípulos
Jesús continúa enseñando a sus discípulos
 
Digital Health at UNC Chapel Hill CaDHRI Needs Assessment Report
Digital Health at UNC Chapel Hill CaDHRI Needs Assessment ReportDigital Health at UNC Chapel Hill CaDHRI Needs Assessment Report
Digital Health at UNC Chapel Hill CaDHRI Needs Assessment Report
 
Bonus sud circolare inps
Bonus sud circolare inpsBonus sud circolare inps
Bonus sud circolare inps
 
Slides semana pedagógica
Slides  semana pedagógicaSlides  semana pedagógica
Slides semana pedagógica
 
Vida e Ambiente
Vida e AmbienteVida e Ambiente
Vida e Ambiente
 
Las fiestas judías. Alfonso. Escolapios. 3ºA
Las fiestas judías. Alfonso. Escolapios. 3ºALas fiestas judías. Alfonso. Escolapios. 3ºA
Las fiestas judías. Alfonso. Escolapios. 3ºA
 
Curitiba/ BRASIL
Curitiba/ BRASILCuritiba/ BRASIL
Curitiba/ BRASIL
 
A alma ferida
A alma feridaA alma ferida
A alma ferida
 
GATE 2017 solution for computer science
GATE 2017 solution for computer scienceGATE 2017 solution for computer science
GATE 2017 solution for computer science
 
Hermanas Misioneras de Nuestra Señora de los Apostoles
Hermanas Misioneras de Nuestra Señora de los ApostolesHermanas Misioneras de Nuestra Señora de los Apostoles
Hermanas Misioneras de Nuestra Señora de los Apostoles
 
1 em 100000
1 em 1000001 em 100000
1 em 100000
 

Similar to Andrew taylor cv march 2016.doc

Nihal Kamal Othman Final CV
Nihal Kamal Othman Final CVNihal Kamal Othman Final CV
Nihal Kamal Othman Final CVNihal kamal
 
CV_Alana Miles-2015-
CV_Alana Miles-2015-CV_Alana Miles-2015-
CV_Alana Miles-2015-Alana Miles
 
Sherif Yehia CV updated DV
Sherif Yehia CV updated DVSherif Yehia CV updated DV
Sherif Yehia CV updated DVSherif Yehia
 
Yehia Negm Resume Functional
Yehia Negm Resume  FunctionalYehia Negm Resume  Functional
Yehia Negm Resume FunctionalYehia Negm
 
Vignesh Kumar C- TPI Coordinator
Vignesh Kumar C- TPI CoordinatorVignesh Kumar C- TPI Coordinator
Vignesh Kumar C- TPI CoordinatorVignesh Kumar C
 
Perez, Nelson Res Jan 2011
Perez, Nelson Res Jan  2011Perez, Nelson Res Jan  2011
Perez, Nelson Res Jan 2011
Nelson Perez
 
paul_jubb cv 16May15
paul_jubb cv  16May15paul_jubb cv  16May15
paul_jubb cv 16May15Paul Jubb
 
Resume updated (083117)
Resume updated (083117)Resume updated (083117)
Resume updated (083117)
Joey Sorallo
 
OLA CV doc NRx (1)
OLA CV doc NRx (1)OLA CV doc NRx (1)
OLA CV doc NRx (1)Saheed Taiwo
 
Darren Walsh medical device
Darren Walsh medical deviceDarren Walsh medical device
Darren Walsh medical deviceDarren Walsh
 
CV ISMAIL SHAIKH-31.10.2015
CV ISMAIL SHAIKH-31.10.2015CV ISMAIL SHAIKH-31.10.2015
CV ISMAIL SHAIKH-31.10.2015Ismail Shaikh
 
Samarth_Kumar_Resume_Jul_2016
Samarth_Kumar_Resume_Jul_2016Samarth_Kumar_Resume_Jul_2016
Samarth_Kumar_Resume_Jul_2016SAMARTH_KUMAR2002
 
Umar inam karim CV
Umar inam karim  CVUmar inam karim  CV
Umar inam karim CV
Umar Karim (PMP)
 
ERP II Overview.ppt
ERP II Overview.pptERP II Overview.ppt
ERP II Overview.ppt
FirasAlhilu
 

Similar to Andrew taylor cv march 2016.doc (20)

Sharmillah CV Feb 2016
Sharmillah CV Feb 2016Sharmillah CV Feb 2016
Sharmillah CV Feb 2016
 
Nihal Kamal Othman Final CV
Nihal Kamal Othman Final CVNihal Kamal Othman Final CV
Nihal Kamal Othman Final CV
 
Gregory_Hawkins-3-3 doc
Gregory_Hawkins-3-3 docGregory_Hawkins-3-3 doc
Gregory_Hawkins-3-3 doc
 
CV_Alana Miles-2015-
CV_Alana Miles-2015-CV_Alana Miles-2015-
CV_Alana Miles-2015-
 
Sherif Yehia CV updated DV
Sherif Yehia CV updated DVSherif Yehia CV updated DV
Sherif Yehia CV updated DV
 
Yehia Negm Resume Functional
Yehia Negm Resume  FunctionalYehia Negm Resume  Functional
Yehia Negm Resume Functional
 
Vignesh Kumar C- TPI Coordinator
Vignesh Kumar C- TPI CoordinatorVignesh Kumar C- TPI Coordinator
Vignesh Kumar C- TPI Coordinator
 
Perez, Nelson Res Jan 2011
Perez, Nelson Res Jan  2011Perez, Nelson Res Jan  2011
Perez, Nelson Res Jan 2011
 
Girish Mishra-R
Girish Mishra-RGirish Mishra-R
Girish Mishra-R
 
CT CV (6)
CT CV (6)CT CV (6)
CT CV (6)
 
paul_jubb cv 16May15
paul_jubb cv  16May15paul_jubb cv  16May15
paul_jubb cv 16May15
 
Resume updated (083117)
Resume updated (083117)Resume updated (083117)
Resume updated (083117)
 
OLA CV doc NRx (1)
OLA CV doc NRx (1)OLA CV doc NRx (1)
OLA CV doc NRx (1)
 
Darren Walsh medical device
Darren Walsh medical deviceDarren Walsh medical device
Darren Walsh medical device
 
CV ISMAIL SHAIKH-31.10.2015
CV ISMAIL SHAIKH-31.10.2015CV ISMAIL SHAIKH-31.10.2015
CV ISMAIL SHAIKH-31.10.2015
 
Resume
ResumeResume
Resume
 
Samarth_Kumar_Resume_Jul_2016
Samarth_Kumar_Resume_Jul_2016Samarth_Kumar_Resume_Jul_2016
Samarth_Kumar_Resume_Jul_2016
 
Umar inam karim CV
Umar inam karim  CVUmar inam karim  CV
Umar inam karim CV
 
ERP II Overview.ppt
ERP II Overview.pptERP II Overview.ppt
ERP II Overview.ppt
 
resume4-28
resume4-28resume4-28
resume4-28
 

Recently uploaded

Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
seandesed
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
R&R Consult
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
Kamal Acharya
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Sreedhar Chowdam
 
LIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.pptLIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.ppt
ssuser9bd3ba
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
gdsczhcet
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
AhmedHussein950959
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
abh.arya
 
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfCOLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
Kamal Acharya
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
obonagu
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
AafreenAbuthahir2
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
Robbie Edward Sayers
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
Intella Parts
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
karthi keyan
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
Divya Somashekar
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 

Recently uploaded (20)

Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
 
LIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.pptLIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.ppt
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
 
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfCOLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 

Andrew taylor cv march 2016.doc

  • 1. Name: ANDREW TAYLOR Address: 6 Walls Place, Dunfermline, Fife KY11 4RF Phone: (M): 07710 490 425 / (H): 01383 727 387 Email: andy.taylor58@icloud.com PROFILE A confident and accomplished Project Co-ordinator and Senior Buyer with experience in production control / procurement and material planning, all in various sectors: construction, energy technologies, telecoms, chemical manufacturing and construction components. Possesses extensive knowledge in dealing with project and inter-company assignments. Attained a progressive record of success through dealing with these projects whilst successfully honing managerial and negotiation skills. A committed and motivational leader who fully embraces the principles of ‘HPO’ to add value to business through tight cost control and a focus on profit – proven ability to meet strict budgetary targets by turning a 7 figure loss into a 4 figure profit IT / systems analysis – highly computer literate with over 10 years’ experience of Microsoft Office as well as a range of scheduling and business management systems and extensive knowledge of SAP KEY SKILLS • Skilled in wide-ranging procurement across different sectors and project types • Managed 7 years’ projects resulting in 80% - 100% on time, all within strict budget guidelines and with less than 1% Quality Notifications as well as no reported HSE incidents • Assured in the delivery of project budget proposals and presentations to any audience • Processes expert: always familiar with all areas of the programme, ensuring delivery of best practices • Expert in managing successful implementation of complex broad-ranging projects across the whole business • Ensures that the production is cost effective and that products are produced on time and are of good quality • Works out the human and material resources needed and drafting a timescale for the job • Monitors the production processes and adjusting schedules as needed and that product standards are as required CAREER HISTORY FMC Technologies https://www.fmctechnologies.com/ 2005 - Date Rental Co-ordinator (Aberdeen) 2013 - Date Responsibilities • Coordinated all tooling requirements required for offshore use by hiring and off hiring tools using SAP • Working with Norway site using SAP to ensure all new tooling needs were met through AFE and RFQ processes • Liaised with all departments to ensure corrective actions required to ensure quality of rental products were retained • Raised work/service orders for workshop using SAP, in accordance with latest engineering standards • Reviewed vendor quotes to assess whether these were cost effective and met company’s budget constraints • Implemented any safety alerts for affected inventory • Liaising with Global sites to satisfy customer demands and raising purchase requisitions in SAP to support this function Achievements • Managing 4 support staff, produced 100% delivery of equipment for offshore and onshore requirements Project Co-ordinator (Tooling CoE) 2007 - 2013 Responsibilities • Project-planned and co-ordinated all project and sister plant tooling, using Primavera P6 • Significant part in the successful execution of several major projects including Ekofisk, BP Atlantis and Pazflor • Coordinated and planned for the manufacture of over 350 tools as well as ensuring all arrangements required to perform manufacture were in place, and interchangeability and stack testing of the tools for the Pazflor project • Reviewed vendor quotes to assess whether these were cost effective and met company’s budget constraints • Identified all deviations to agreed work scopes and raised and submitted appropriate variation orders Andrew Taylor Page 1
  • 2. • Managed, through appropriate departments, changes to ECN process and concurrent engineered parts, sending appropriate internal variation forms. This allowed set margins of 10 - 21% to be kept on various projects • Managed all project financial functions - preparation of variation orders, registers, budgets and forecasts, reviewing w/i/p and expediting quotation and PO processes • Monitored inter-company costs through quotation and ECN processes, continuously updating Supply Chain and Assembly and Test departments Achievements • Awarded Quality Achiever of the Month and Global Quality Achievement • Project-managed the FMC Houston order for Tullow project 122 tools on an accelerated lead time. Ensured 100% H&S-compliant delivery within budget, no QNs. Led to Houston receiving a $1M bonus from the customer • Project-managed, with 2 support staff, all product and documentation for an FMC Kongsberg placed an order for SSP3 Project 22 tools. This specifically ensured project’s on-time, on budget completion Project Planner (Tooling CoE) 2005 - 2007 Responsibilities • Monitored full project lifecycle progression including inter-company tooling • Liaised with projects teams to ensure early recognition of tooling requirements • Progressed project engineering requirements on any concurrent engineering tooling • Prepared and carried out daily reporting of the status of all tools on order, using Primavera P6 • Progressed tool / components through production control, test and assembly • Created delivery notes and liaised with shipping department Achievements • Key member of the tooling team that successfully executed large budget projects for Shell Prelude, Hibernia, Laggen Tormore, Clov and various AFEs Daw Tech http://www.dawtech.com/ 1999 - 2005 Senior Buyer Responsibilities • Managed procurement of all materials required for the supply and installation of “Clean Rooms” within the semi- conductor and pharmaceutical industries • Managed daily procurement of direct and indirect products required for the business • Managed Administration Assistant in completion of all daily tasks • Managed stock levels, setting up supplier discounts and agreements to ensure appropriate stockholding • Managed importation and exportation of all products within Europe, the USA and the Far East Achievements • Championed the introduction of Sage 100 and, later, Visual Purchasing modules. These were pivotal in the reduction of costs of 30% equating to an approximate value of £800K • Was rapidly promoted through the business as a result of recognised track-record: became responsible for the ownership and management of all freight-forwarding requirements • Implemented changes resulting in increased efficiency with an approximate saving of £100K in the first two years Alexander Ross Holdings http://www.alexanderross.co.uk/ 1998 - 1999 Project Co-ordinator Achievements • Created a database allowing more accurate purchasing for lead times and stock levels for janitorial supplies, allowing the smooth implementation of process of reducing redundant stock, enabling faster customer responses • Removed a 4-month backlog in the planning department thus ensuring better stock records and better flow of free issue materials for sub-contract suppliers Havelock Europa PLC http://www.havelockeuropa.com/ 1996 - 1998 Sub-Contract Buyer Responsibilities • Managed time-sensitive and cost effective procurement (avg monthly spend £75k) for all projects across timber and metal components, working with outside contractors • Co-ordinated procurement of components required for fast-track shop fitting contracts using MRP MM and manual requisition systems Motorola Mobility LLC https://www.motorola.co.uk/home - Buyer 1996 - 1997 FMC Technologies – Buyer/Expediter 1994 - 1996 Andrew Taylor Page 2
  • 3. TK Valve Industrial Co. Ltd http://www.tk-valve.com/ - Stores/Project Management 1979 - 1994 CERTIFICATIONS Studying towards MCIPS Level foundation 4 Qualification Certificate in TQM – Ernst and Young Andrew Taylor Page 3