Hydrostatic Testing
Best Practices Plan
to
Verify, Trace, & Precisely
Record Documentation
Jared Head
Hydrostatic
Testing
BestPractices
Verify, Trace, & Record PHMSA Best Practice CTA
Test Computations
Test Plan
Test Report
Data Gathering
Final Confirmation
Asset Audits
File Documents
Approvals/Sigs
Reg. Compliance
Lead Time to Plan
Operating Capacity
Asset longevity
Protocol
Hydrostatic test computations
Precise estimations of pipeline features & descriptions
-Diameter, wall thickness, length, pipe grade, age, etc.
-API vs ASME/ANSI Rating on operation pressure
-SMYS: 90%-100% & MOP: 125% for 4 hours
-Accurate elevations of pipeline
-Test medium (water), volume of medium, & temperature
stabilization
Line sections based on elevations and SMYS
Project Manager Verification of job scope
-Project Managing Engineer
-Customer Asset Manager
H y d r o s t a t i c t e s t c o m p u t a t i o n s
MOP validated
by hydro test outcome
Hydrostatic test plan
Follow the PHMSA standard IMP with environmental
compliance
-Environmental questions need to be solved to
obtain permits for compliance: EPA, NEPA, BLM,
SPE, FERC, DOT, OSHA, etc.
-Locate areas that supply water sources, consult
with operators/contractors to solve these issues,
and find discharge areas that are compliant.
Fabricated test = 4 hours | Mainline test = 8 hours
-Long bore hours before pipe install and fabricated test for
HDDs
-Test for mainline once installed to test for HDDs
Hydrostatic test plan
Environment Rules & Regulations
-Water source
-Discharge area
-Quality of water
Order of test plan steps
-Line fill and applying pressure
-Testing
-Data gathering
-Finishing test
-Dewatering the section
-Push slug of water to next section or use new water
-Drying to dewpoint & cleaning
-Final Confirmation with approvals
Hydrostatic test plan
Minimum, Target, & MOP for each section for pressure
DOT/PHMSA Rules
-Test type: spike, strength, leak
-Test medium, equipment,
instruments
-OQ certs of personnel doing test
-Test failures, leaks, blowouts
-Test duration
-Test data & drawings
-Proper approvals from project personnel
-These will be all required to be maintained as part of the test
plan
Hydrostatic test plan
Items needed for approval before starting test
-This should be communicated between asset owner
and contractors/subcontractors before performing the
work so there isn't any delay in the project schedule.
-Emails, drawings, Gantt charts, and conference calls
are a great way to communicate job expectations, area
of concerns, strategies, etc.
Hydrostatic test report
Meeting between job managers to
understand the data found is stored before
job kick-off
According to operating company's
procedures while following DOT/PHMSA
compliance
Thorough, step-by-step program
Hydrostatic test report
Accurate measurements
-Pipe diameter & WT
-Pipe grade & SMYS/ANSI rating
-Line location & elevation
-Test medium: source & volume
-Chemicals: used & volume
-Test schedule (ex: Gantt chart)
-Test pressure: time recorded
-Temperature of pipe & medium
-Weather
-Test lengths per segment
Hydrostatic test report
Accuracy of Recorded data
-All written data must
be transported to digital
format for storage
-Written information can
be lost or misread
-Written information has
a shelf life
Hydrostatic test data gathering
Researching & implementing
Knowing the test reports & records
-Personnel verifying the test data
-Shows those collaborating with the
reports what is mandatory to be
gathered and what steps are needed
to be approved
Make sure all written data
is stored in Final
Confirmation Book
Hydrostatic test data gathering
Equipment & measuring devices are calibrated
-High horse-powered pump with hoses and gauges to fill
the line
-Injection pump for chemicals, dyes, & gases
-Speed pump with volume per stroke & stroke counter
-Pressure sensory instrument or deadweights testing &
recording sheet
-Test medium temperature tracker instrument & recording
sheet
-Your surrounding environment temperature gauge &
recording sheet
-Test medium sampling instrument
-Gas/O2 sensing instrument
Hydrostatic test data gathering
Record all info on the mandatory reports
-Test medium: pressures, time-length,
volume, temperatures
-Environment temperatures & weather
-Pipe quality and pipe specs (wt, OD,
high/low)
-Calibration certs & info
-Blow-outs, leaks, failed test, etc.
-Project leaders signing approvals
Keep records of all engineering designs,
drawings, blue prints, etc.
-Have it in the correct place in the Final Book
Keep all the failed data gathered
Hydrostatic test data gathering
Temperature gauges
-Weather can effect the test medium with
constant pressure on pipeline
-Place temperature bulb against pipe,
insulate, & backfill to surface level 12 hours
before test
-12 hours let test medium, line, surface
temps to stabilize
-Find temp bulbs on pipeline at least 500 feet
from exposed pipe
Hydrostatic test data gathering
Temperature gauges
-Temp increases = pressure increases
-Temp decreases = pressure decreases
-Temp change creates volatility in volume of
test medium in the line
-Avoid testing times with high temperature
gain/loss in the day
Hydrostatic test data gathering
Is it a leak or change in temperature?
-Pipe temp change vs. Weather temp change
-Pipe temp change should run parallel with
environment temp change
-Volume estimations at start & end of test are
taken into play with: pressure change +
temperature change = volume change
-Verified volumes will be recorded on
spreadsheet
Final Confirmation
Get confirmation that the Final Book is complete
and contains the right details in 1 location
-Test plans & correct recordings
-Test specs & descriptions
-Survey info
-Copies of calibrated certs
-Test reports
-Test charts (Gantt, temp. plot, etc.)
Final Confirmation
Since the entire report will be structured in 1 place, it
will be easy to gather the proper documents to give to
auditors
Make sure the following personnel have signed off on
the report & data:
-Anyone who recorded the data
-Supervisor of the test
-Constr. Supervisor
-Engineer
-PM
-Customer project rep.
DOT/PHMSA
Asset audits
-Reviews while constructing to confirm correct
records obtained
-Job docs are the first requirement verified during
a field audit
All records are maintained
-Stored in an area where it easily reachable for
any company personnel to
review the file to give
indications of pipeline
details
Any questions?
Ain't nothing finer,  than being a pipeliner!

More Related Content

What's hot

Industrial Boiler Optimization Toolkit
Industrial Boiler Optimization ToolkitIndustrial Boiler Optimization Toolkit
Industrial Boiler Optimization Toolkit
Power Specialties, Inc.
 
Sizing of relief valves for supercritical fluids
Sizing of relief valves for supercritical fluidsSizing of relief valves for supercritical fluids
Sizing of relief valves for supercritical fluids
Alexis Torreele
 
Ekit (B) Sdn Bhd
Ekit (B) Sdn BhdEkit (B) Sdn Bhd
Ekit (B) Sdn Bhd
Ekit (B) Sdn Bhd
 
API STD 521
API STD 521API STD 521
Hydrotest
HydrotestHydrotest
Hydrotest
Jithu John
 
Pressure Safety Valve Sizing - API 520/521/526
Pressure Safety Valve Sizing - API 520/521/526Pressure Safety Valve Sizing - API 520/521/526
Pressure Safety Valve Sizing - API 520/521/526
Vijay Sarathy
 
Ai Ch E Overpressure Protection Training
Ai Ch E Overpressure Protection TrainingAi Ch E Overpressure Protection Training
Ai Ch E Overpressure Protection Trainingernestvictor
 
Water-Gas-Shift Reactor Loading & Unloading Considerations
Water-Gas-Shift Reactor Loading & Unloading ConsiderationsWater-Gas-Shift Reactor Loading & Unloading Considerations
Water-Gas-Shift Reactor Loading & Unloading Considerations
Gerard B. Hawkins
 
Api 2000 5th vs 6th final
Api 2000 5th vs 6th finalApi 2000 5th vs 6th final
Api 2000 5th vs 6th final
Paulino israel Chavez Muñoz
 
Ijmet 10 01_042
Ijmet 10 01_042Ijmet 10 01_042
Ijmet 10 01_042
IAEME Publication
 
control valve functional testing - Swetha
control valve functional testing - Swethacontrol valve functional testing - Swetha
control valve functional testing - SwethaSwetha Sundaram
 
Testing/Manufacture/Radiaor Leakage Tester
Testing/Manufacture/Radiaor Leakage TesterTesting/Manufacture/Radiaor Leakage Tester
Testing/Manufacture/Radiaor Leakage Tester
fec2020
 
Valve sizing
Valve sizingValve sizing
Valve sizing
Juan Pablo Hernandez
 
Overpressure scenarios overview final
Overpressure scenarios overview finalOverpressure scenarios overview final
Overpressure scenarios overview finalRajiv Natkar
 
Flarenet
FlarenetFlarenet
Line sizing
Line sizingLine sizing
Sop125v3 1
Sop125v3 1Sop125v3 1
Sop125v3 1
djaalab Elbahi
 
Field transmitters
Field transmittersField transmitters
Field transmitters
Prasad Godse
 
Liquid Level Measurement Using the Bubbler Method
Liquid Level Measurement Using the Bubbler MethodLiquid Level Measurement Using the Bubbler Method
Liquid Level Measurement Using the Bubbler Method
Miller Energy, Inc.
 

What's hot (20)

Industrial Boiler Optimization Toolkit
Industrial Boiler Optimization ToolkitIndustrial Boiler Optimization Toolkit
Industrial Boiler Optimization Toolkit
 
Sizing of relief valves for supercritical fluids
Sizing of relief valves for supercritical fluidsSizing of relief valves for supercritical fluids
Sizing of relief valves for supercritical fluids
 
Ekit (B) Sdn Bhd
Ekit (B) Sdn BhdEkit (B) Sdn Bhd
Ekit (B) Sdn Bhd
 
API STD 521
API STD 521API STD 521
API STD 521
 
Hydrotest
HydrotestHydrotest
Hydrotest
 
Pressure Safety Valve Sizing - API 520/521/526
Pressure Safety Valve Sizing - API 520/521/526Pressure Safety Valve Sizing - API 520/521/526
Pressure Safety Valve Sizing - API 520/521/526
 
Ai Ch E Overpressure Protection Training
Ai Ch E Overpressure Protection TrainingAi Ch E Overpressure Protection Training
Ai Ch E Overpressure Protection Training
 
Water-Gas-Shift Reactor Loading & Unloading Considerations
Water-Gas-Shift Reactor Loading & Unloading ConsiderationsWater-Gas-Shift Reactor Loading & Unloading Considerations
Water-Gas-Shift Reactor Loading & Unloading Considerations
 
Api 2000 5th vs 6th final
Api 2000 5th vs 6th finalApi 2000 5th vs 6th final
Api 2000 5th vs 6th final
 
Ijmet 10 01_042
Ijmet 10 01_042Ijmet 10 01_042
Ijmet 10 01_042
 
control valve functional testing - Swetha
control valve functional testing - Swethacontrol valve functional testing - Swetha
control valve functional testing - Swetha
 
Testing/Manufacture/Radiaor Leakage Tester
Testing/Manufacture/Radiaor Leakage TesterTesting/Manufacture/Radiaor Leakage Tester
Testing/Manufacture/Radiaor Leakage Tester
 
Valve sizing
Valve sizingValve sizing
Valve sizing
 
Overpressure scenarios overview final
Overpressure scenarios overview finalOverpressure scenarios overview final
Overpressure scenarios overview final
 
Flarenet
FlarenetFlarenet
Flarenet
 
Line sizing
Line sizingLine sizing
Line sizing
 
Final Expo Poster_Team 24
Final Expo Poster_Team 24Final Expo Poster_Team 24
Final Expo Poster_Team 24
 
Sop125v3 1
Sop125v3 1Sop125v3 1
Sop125v3 1
 
Field transmitters
Field transmittersField transmitters
Field transmitters
 
Liquid Level Measurement Using the Bubbler Method
Liquid Level Measurement Using the Bubbler MethodLiquid Level Measurement Using the Bubbler Method
Liquid Level Measurement Using the Bubbler Method
 

Viewers also liked

Introduction to Hydrostatic Pressure
Introduction to Hydrostatic PressureIntroduction to Hydrostatic Pressure
Introduction to Hydrostatic Pressure
Ari Sudewa
 
Hydrostatics 1 n 2
Hydrostatics 1 n 2 Hydrostatics 1 n 2
Hydrostatics 1 n 2
Muhammad Adli Bin Ja'affar
 
Interstitial fluid hydrostatic pressure
Interstitial fluid hydrostatic pressureInterstitial fluid hydrostatic pressure
Interstitial fluid hydrostatic pressure
Geeky Medico
 
New prsentation 23 9-2010
New prsentation 23 9-2010New prsentation 23 9-2010
New prsentation 23 9-2010zelgharabawi
 
2011 padova
2011 padova2011 padova
Hydrolec
HydrolecHydrolec
Hydrolec
Loai Nadi
 
Buoyancy Demonstration
Buoyancy DemonstrationBuoyancy Demonstration
Buoyancy Demonstration
sciencefix
 
Introduction to Buoyancy
Introduction to BuoyancyIntroduction to Buoyancy
Introduction to Buoyancy
Haileybury
 
Hydraulic system
Hydraulic systemHydraulic system
Hydraulic system
Gopal Carpenter
 
Hydrostatic pressure
Hydrostatic pressureHydrostatic pressure
Hydrostatic pressure
YaoSheng Wong
 
SHIP THEORY : Basics Of Ship Geometry : Lines Plan__by jishnu saji
SHIP THEORY : Basics Of Ship Geometry : Lines Plan__by jishnu sajiSHIP THEORY : Basics Of Ship Geometry : Lines Plan__by jishnu saji
SHIP THEORY : Basics Of Ship Geometry : Lines Plan__by jishnu saji
Jishnu Saji
 
Manometer
ManometerManometer
Manometer
Patel Mit
 
AP Physics 2 - Hydrostatics
AP Physics 2 - HydrostaticsAP Physics 2 - Hydrostatics
AP Physics 2 - Hydrostatics
kampkorten
 
Pressure gauge calibration process
Pressure gauge calibration processPressure gauge calibration process
Pressure gauge calibration process
Edword Simpson
 
Center of pressure and hydrostatic force on a submerged body rev
Center of pressure and hydrostatic force on a submerged body revCenter of pressure and hydrostatic force on a submerged body rev
Center of pressure and hydrostatic force on a submerged body revNatalie Ulza
 
Pipe Hydrotest , Inspection, Visual and Dimensional Inspection & Marking
Pipe Hydrotest , Inspection, Visual and Dimensional Inspection & MarkingPipe Hydrotest , Inspection, Visual and Dimensional Inspection & Marking
Pipe Hydrotest , Inspection, Visual and Dimensional Inspection & Marking
Varun Patel
 
State of Pascal’s law
State of Pascal’s law State of Pascal’s law
State of Pascal’s law
Dhiren Patel
 

Viewers also liked (20)

Introduction to Hydrostatic Pressure
Introduction to Hydrostatic PressureIntroduction to Hydrostatic Pressure
Introduction to Hydrostatic Pressure
 
Hydrostatics 1 n 2
Hydrostatics 1 n 2 Hydrostatics 1 n 2
Hydrostatics 1 n 2
 
Hydrostatics
HydrostaticsHydrostatics
Hydrostatics
 
Interstitial fluid hydrostatic pressure
Interstitial fluid hydrostatic pressureInterstitial fluid hydrostatic pressure
Interstitial fluid hydrostatic pressure
 
New prsentation 23 9-2010
New prsentation 23 9-2010New prsentation 23 9-2010
New prsentation 23 9-2010
 
2011 padova
2011 padova2011 padova
2011 padova
 
Hydrolec
HydrolecHydrolec
Hydrolec
 
Buoyancy Demonstration
Buoyancy DemonstrationBuoyancy Demonstration
Buoyancy Demonstration
 
Introduction to Buoyancy
Introduction to BuoyancyIntroduction to Buoyancy
Introduction to Buoyancy
 
Hydrostatic transmission
Hydrostatic transmissionHydrostatic transmission
Hydrostatic transmission
 
Hydraulic system
Hydraulic systemHydraulic system
Hydraulic system
 
Hydrostatic pressure
Hydrostatic pressureHydrostatic pressure
Hydrostatic pressure
 
Pascal's principle
Pascal's principlePascal's principle
Pascal's principle
 
SHIP THEORY : Basics Of Ship Geometry : Lines Plan__by jishnu saji
SHIP THEORY : Basics Of Ship Geometry : Lines Plan__by jishnu sajiSHIP THEORY : Basics Of Ship Geometry : Lines Plan__by jishnu saji
SHIP THEORY : Basics Of Ship Geometry : Lines Plan__by jishnu saji
 
Manometer
ManometerManometer
Manometer
 
AP Physics 2 - Hydrostatics
AP Physics 2 - HydrostaticsAP Physics 2 - Hydrostatics
AP Physics 2 - Hydrostatics
 
Pressure gauge calibration process
Pressure gauge calibration processPressure gauge calibration process
Pressure gauge calibration process
 
Center of pressure and hydrostatic force on a submerged body rev
Center of pressure and hydrostatic force on a submerged body revCenter of pressure and hydrostatic force on a submerged body rev
Center of pressure and hydrostatic force on a submerged body rev
 
Pipe Hydrotest , Inspection, Visual and Dimensional Inspection & Marking
Pipe Hydrotest , Inspection, Visual and Dimensional Inspection & MarkingPipe Hydrotest , Inspection, Visual and Dimensional Inspection & Marking
Pipe Hydrotest , Inspection, Visual and Dimensional Inspection & Marking
 
State of Pascal’s law
State of Pascal’s law State of Pascal’s law
State of Pascal’s law
 

Similar to 3 Best Practices for 100% Regulatory Compliant Testing

Kobe Galloway2 _10-2014
Kobe Galloway2 _10-2014Kobe Galloway2 _10-2014
Kobe Galloway2 _10-2014Kobe Galloway
 
Resume srivenkatesh instrument engineer
Resume srivenkatesh instrument engineerResume srivenkatesh instrument engineer
Resume srivenkatesh instrument engineer
Srivenkatesh Padmanaban
 
Pipe Support Engineering & Design - June
Pipe Support Engineering & Design - JunePipe Support Engineering & Design - June
Pipe Support Engineering & Design - June
Piping Technology & Products, Inc.
 
Resume srivenkatesh instrumentation engineer
Resume srivenkatesh instrumentation engineerResume srivenkatesh instrumentation engineer
Resume srivenkatesh instrumentation engineer
Srivenkatesh Padmanaban
 
Engineering & Design of Pipe Supports
Engineering & Design of Pipe SupportsEngineering & Design of Pipe Supports
Engineering & Design of Pipe Supports
Piping Technology & Products, Inc.
 
Engineering & Design - April
Engineering & Design - April Engineering & Design - April
Engineering & Design - April
Piping Technology & Products, Inc.
 
BVAA presentation 2015: The Use of CFD to assess valve performance and operat...
BVAA presentation 2015: The Use of CFD to assess valve performance and operat...BVAA presentation 2015: The Use of CFD to assess valve performance and operat...
BVAA presentation 2015: The Use of CFD to assess valve performance and operat...
Linsley Charlton
 
Resume Irshad Ahmed
Resume Irshad AhmedResume Irshad Ahmed
Resume Irshad AhmedIrshad Ahmed
 
Flow assurance and surge analysis
Flow assurance and surge analysisFlow assurance and surge analysis
Flow assurance and surge analysis
John Kingsley
 
Engineering & Design - January
Engineering & Design - JanuaryEngineering & Design - January
Engineering & Design - January
Piping Technology & Products, Inc.
 

Similar to 3 Best Practices for 100% Regulatory Compliant Testing (20)

Kobe Galloway2 _10-2014
Kobe Galloway2 _10-2014Kobe Galloway2 _10-2014
Kobe Galloway2 _10-2014
 
Resume srivenkatesh instrument engineer
Resume srivenkatesh instrument engineerResume srivenkatesh instrument engineer
Resume srivenkatesh instrument engineer
 
Pipe Support Engineering & Design - June
Pipe Support Engineering & Design - JunePipe Support Engineering & Design - June
Pipe Support Engineering & Design - June
 
Riaz Cv
Riaz CvRiaz Cv
Riaz Cv
 
Resume srivenkatesh instrumentation engineer
Resume srivenkatesh instrumentation engineerResume srivenkatesh instrumentation engineer
Resume srivenkatesh instrumentation engineer
 
Engineering & Design of Pipe Supports
Engineering & Design of Pipe SupportsEngineering & Design of Pipe Supports
Engineering & Design of Pipe Supports
 
venkat resume
venkat resumevenkat resume
venkat resume
 
Resume 2016 june
Resume 2016 juneResume 2016 june
Resume 2016 june
 
CV_Chanchalerm
CV_ChanchalermCV_Chanchalerm
CV_Chanchalerm
 
CV_Chanchalerm
CV_ChanchalermCV_Chanchalerm
CV_Chanchalerm
 
CV_Chanchalerm
CV_ChanchalermCV_Chanchalerm
CV_Chanchalerm
 
Engineering & Design - April
Engineering & Design - April Engineering & Design - April
Engineering & Design - April
 
BVAA presentation 2015: The Use of CFD to assess valve performance and operat...
BVAA presentation 2015: The Use of CFD to assess valve performance and operat...BVAA presentation 2015: The Use of CFD to assess valve performance and operat...
BVAA presentation 2015: The Use of CFD to assess valve performance and operat...
 
Mech manager
Mech managerMech manager
Mech manager
 
Resume Irshad Ahmed
Resume Irshad AhmedResume Irshad Ahmed
Resume Irshad Ahmed
 
new_
new_new_
new_
 
Flow assurance and surge analysis
Flow assurance and surge analysisFlow assurance and surge analysis
Flow assurance and surge analysis
 
Engineering & Design - January
Engineering & Design - JanuaryEngineering & Design - January
Engineering & Design - January
 
Instrument engineer CV
Instrument engineer CVInstrument engineer CV
Instrument engineer CV
 
RajeevCV2016
RajeevCV2016RajeevCV2016
RajeevCV2016
 

Recently uploaded

Buy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star ReviewsBuy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star Reviews
usawebmarket
 
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdfikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
agatadrynko
 
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptxCADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
fakeloginn69
 
BeMetals Presentation_May_22_2024 .pdf
BeMetals Presentation_May_22_2024   .pdfBeMetals Presentation_May_22_2024   .pdf
BeMetals Presentation_May_22_2024 .pdf
DerekIwanaka1
 
Unveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdfUnveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdf
Sam H
 
LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024
Lital Barkan
 
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdfMeas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
dylandmeas
 
What are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdfWhat are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdf
HumanResourceDimensi1
 
3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx
tanyjahb
 
Affordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n PrintAffordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n Print
Navpack & Print
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
Cynthia Clay
 
Skye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto AirportSkye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto Airport
marketingjdass
 
Premium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern BusinessesPremium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern Businesses
SynapseIndia
 
Attending a job Interview for B1 and B2 Englsih learners
Attending a job Interview for B1 and B2 Englsih learnersAttending a job Interview for B1 and B2 Englsih learners
Attending a job Interview for B1 and B2 Englsih learners
Erika906060
 
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdfikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
agatadrynko
 
Memorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.pptMemorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.ppt
seri bangash
 
anas about venice for grade 6f about venice
anas about venice for grade 6f about veniceanas about venice for grade 6f about venice
anas about venice for grade 6f about venice
anasabutalha2013
 
Enterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdfEnterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdf
KaiNexus
 
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
BBPMedia1
 
The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...
Adam Smith
 

Recently uploaded (20)

Buy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star ReviewsBuy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star Reviews
 
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdfikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
 
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptxCADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
 
BeMetals Presentation_May_22_2024 .pdf
BeMetals Presentation_May_22_2024   .pdfBeMetals Presentation_May_22_2024   .pdf
BeMetals Presentation_May_22_2024 .pdf
 
Unveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdfUnveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdf
 
LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024
 
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdfMeas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
 
What are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdfWhat are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdf
 
3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx
 
Affordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n PrintAffordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n Print
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
 
Skye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto AirportSkye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto Airport
 
Premium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern BusinessesPremium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern Businesses
 
Attending a job Interview for B1 and B2 Englsih learners
Attending a job Interview for B1 and B2 Englsih learnersAttending a job Interview for B1 and B2 Englsih learners
Attending a job Interview for B1 and B2 Englsih learners
 
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdfikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
 
Memorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.pptMemorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.ppt
 
anas about venice for grade 6f about venice
anas about venice for grade 6f about veniceanas about venice for grade 6f about venice
anas about venice for grade 6f about venice
 
Enterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdfEnterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdf
 
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
 
The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...
 

3 Best Practices for 100% Regulatory Compliant Testing

  • 1. The Hydrostatic Testing Best Practices Plan to Verify, Trace, & Precisely Record Documentation Jared Head
  • 2. Hydrostatic Testing BestPractices Verify, Trace, & Record PHMSA Best Practice CTA Test Computations Test Plan Test Report Data Gathering Final Confirmation Asset Audits File Documents Approvals/Sigs Reg. Compliance Lead Time to Plan Operating Capacity Asset longevity Protocol
  • 3. Hydrostatic test computations Precise estimations of pipeline features & descriptions -Diameter, wall thickness, length, pipe grade, age, etc. -API vs ASME/ANSI Rating on operation pressure -SMYS: 90%-100% & MOP: 125% for 4 hours -Accurate elevations of pipeline -Test medium (water), volume of medium, & temperature stabilization Line sections based on elevations and SMYS Project Manager Verification of job scope -Project Managing Engineer -Customer Asset Manager
  • 4. H y d r o s t a t i c t e s t c o m p u t a t i o n s MOP validated by hydro test outcome
  • 5. Hydrostatic test plan Follow the PHMSA standard IMP with environmental compliance -Environmental questions need to be solved to obtain permits for compliance: EPA, NEPA, BLM, SPE, FERC, DOT, OSHA, etc. -Locate areas that supply water sources, consult with operators/contractors to solve these issues, and find discharge areas that are compliant. Fabricated test = 4 hours | Mainline test = 8 hours -Long bore hours before pipe install and fabricated test for HDDs -Test for mainline once installed to test for HDDs
  • 6. Hydrostatic test plan Environment Rules & Regulations -Water source -Discharge area -Quality of water Order of test plan steps -Line fill and applying pressure -Testing -Data gathering -Finishing test -Dewatering the section -Push slug of water to next section or use new water -Drying to dewpoint & cleaning -Final Confirmation with approvals
  • 7. Hydrostatic test plan Minimum, Target, & MOP for each section for pressure DOT/PHMSA Rules -Test type: spike, strength, leak -Test medium, equipment, instruments -OQ certs of personnel doing test -Test failures, leaks, blowouts -Test duration -Test data & drawings -Proper approvals from project personnel -These will be all required to be maintained as part of the test plan
  • 8. Hydrostatic test plan Items needed for approval before starting test -This should be communicated between asset owner and contractors/subcontractors before performing the work so there isn't any delay in the project schedule. -Emails, drawings, Gantt charts, and conference calls are a great way to communicate job expectations, area of concerns, strategies, etc.
  • 9. Hydrostatic test report Meeting between job managers to understand the data found is stored before job kick-off According to operating company's procedures while following DOT/PHMSA compliance Thorough, step-by-step program
  • 10. Hydrostatic test report Accurate measurements -Pipe diameter & WT -Pipe grade & SMYS/ANSI rating -Line location & elevation -Test medium: source & volume -Chemicals: used & volume -Test schedule (ex: Gantt chart) -Test pressure: time recorded -Temperature of pipe & medium -Weather -Test lengths per segment
  • 11. Hydrostatic test report Accuracy of Recorded data -All written data must be transported to digital format for storage -Written information can be lost or misread -Written information has a shelf life
  • 12. Hydrostatic test data gathering Researching & implementing Knowing the test reports & records -Personnel verifying the test data -Shows those collaborating with the reports what is mandatory to be gathered and what steps are needed to be approved Make sure all written data is stored in Final Confirmation Book
  • 13. Hydrostatic test data gathering Equipment & measuring devices are calibrated -High horse-powered pump with hoses and gauges to fill the line -Injection pump for chemicals, dyes, & gases -Speed pump with volume per stroke & stroke counter -Pressure sensory instrument or deadweights testing & recording sheet -Test medium temperature tracker instrument & recording sheet -Your surrounding environment temperature gauge & recording sheet -Test medium sampling instrument -Gas/O2 sensing instrument
  • 14. Hydrostatic test data gathering Record all info on the mandatory reports -Test medium: pressures, time-length, volume, temperatures -Environment temperatures & weather -Pipe quality and pipe specs (wt, OD, high/low) -Calibration certs & info -Blow-outs, leaks, failed test, etc. -Project leaders signing approvals Keep records of all engineering designs, drawings, blue prints, etc. -Have it in the correct place in the Final Book Keep all the failed data gathered
  • 15. Hydrostatic test data gathering Temperature gauges -Weather can effect the test medium with constant pressure on pipeline -Place temperature bulb against pipe, insulate, & backfill to surface level 12 hours before test -12 hours let test medium, line, surface temps to stabilize -Find temp bulbs on pipeline at least 500 feet from exposed pipe
  • 16. Hydrostatic test data gathering Temperature gauges -Temp increases = pressure increases -Temp decreases = pressure decreases -Temp change creates volatility in volume of test medium in the line -Avoid testing times with high temperature gain/loss in the day
  • 17. Hydrostatic test data gathering Is it a leak or change in temperature? -Pipe temp change vs. Weather temp change -Pipe temp change should run parallel with environment temp change -Volume estimations at start & end of test are taken into play with: pressure change + temperature change = volume change -Verified volumes will be recorded on spreadsheet
  • 18. Final Confirmation Get confirmation that the Final Book is complete and contains the right details in 1 location -Test plans & correct recordings -Test specs & descriptions -Survey info -Copies of calibrated certs -Test reports -Test charts (Gantt, temp. plot, etc.)
  • 19. Final Confirmation Since the entire report will be structured in 1 place, it will be easy to gather the proper documents to give to auditors Make sure the following personnel have signed off on the report & data: -Anyone who recorded the data -Supervisor of the test -Constr. Supervisor -Engineer -PM -Customer project rep.
  • 20. DOT/PHMSA Asset audits -Reviews while constructing to confirm correct records obtained -Job docs are the first requirement verified during a field audit All records are maintained -Stored in an area where it easily reachable for any company personnel to review the file to give indications of pipeline details