Four types of installation can be used in buildings. Lifts,
escalators, paternosters and travelators.
 Lifts are widely employed to make vertical circulation quicker and
easier and they make possible buildings rising above the four or five
floors which would be a maximum for reasonable access on foot.
 Escalators occupy considerable floor space and being inclined, they
raise people through a limited height, but they will deal with large
numbers (a 900mm wide escalator is capable of handling 6000 people
per hour).
 Paternoster are rare in this country but they are widely
used in Europe. They are particularly appropriate where
internal circulation is the critical feature rather than
inward or outward flow.
 Travelators assist in the movement of large number of
people horizontally or up very limited inclines.
Impact of transportation for building:
 Space
- To house the system/ affect the floor size
 Structure
- Strong enough to support the system
 Design
- Building may be large and tall
 Economic
- Extra cost needed for the installation and
maintenance
- It enhance the selling cost and rental cost
Lift Car
Bubble Lift
Passenger Lift
 Has an important significant impact on the
functioning of the building
 Makes vertical movement, quicker and easier
compare to paternoster
 Makes possible for building to be build height
(more than 5 storeys)
 The number and size of the lifts installation must be
related to:
1. the population of the building;
2. types of building occupancy;
3. the starting finishing times of the population,
whether staggered or unified;
4. number of floors and heights;
5. position of building in relation to public transport
services in which a building near a traffic terminal
generally has high passenger peaks during arrival
hours.
Classification Traveling time
excellent < 45 s
good 45 s - > 55 s
fair 55 s - > 65 s
satisfactory > 65 s
 An escalator is a conveyor transport device for
transporting people, consisting of a staircase
whose steps move up or down on tracks that keep
the surfaces of the individual steps horizontal
Floor Plate
Emergency Stop
Handrail
Steps (grooved)
1. Handrail Inlet
Stops the escalator when an object becomes wedged
between the handrail and the handrail inlet
2. Skirt Guard
Stops the escalator when an object becomes wedged
between a step and the skirt guard panel
3. Step Travel
Stops the escalator when a step is displaced by an up
thrust
4. Emergency Stop
Stops the escalator when pressed
5. Drive Chain
Stops the escalator when the chain becomes
stretched excessively
6. Step Chain
Stops the escalator when the chain becomes
stretched excessively or breaks
7. Overload
Stops the escalator
when a current larger
than the rated value
follows through the
motor
8. Governor
Stops the escalator
when the escalator
speed becomes higher
or lower than the rated
speed
 Can carry travel up to 300m
 Speed range between 0.6 of up to 1.3m/s.
 If combined with walking, the overall pace could
be about 2.5m/s.
 7200 passengers per hour can be carried
 Very much similar to escalator in its component
parts
1 Demarcation Line
2 Inside Deck Cover
3 Pallet Tread
4 Panel
5 Handrail
6 Handrail Frame
7 Skirt Guard
8 Outside Deck Cover
9 Comb
10 Comb Plate
11 Landing Plate
 Also known earlier as the
continuously moving lift.
 Moves people vertically
 Consists of open fronted cars
as in lifts but much smaller in
size
 It does not stop for the
passenger to enter or alight
 It could handle twice as many 'up' passengers as
the most advanced high-speed lifts of its time
 Can cater for a comparable volume of traffic at the
same time on the downward phase of the cycle.
 Its continuous motion allows passengers to travel
without loss of waiting of time.
 Its performance over more than six storey is limited
by its low speed, 0.4 m/s.
 Its maximum carrying capacity is 720 passengers
per hour
System Capacity
per hour
∠ of incline Type of
purpose
Speed
Elevator/Lift
Depend on:
 size
 speed
 pattern
90o
Pedestrian
Goods
1 – 7 m/s
Escalator 5,000 – 8,000 30o
- 35o
Pedestrian
Goods
0.5 m/s
Travelator 5,000 – 8,000 0o
- 15o
Pedestrian
Goods
0.5 m/s
Paternoster 720 90o
Pedestrian 0.35 m/s
 TQ
 1. Explain the circumstances in which lifts are
chosen instead of escalator as mechanical
handling system in a building. (Group 1 & 2)
 2. Briefly explain the types of escalator arrangement
commonly used in commercial building.
(Group 3 & 4)
 3. Discuss the appropriate transport system in
hospital. (Group 5 & 6)
 4. State the advantages and disadvantages of
hydraulic lift and electric lift. (Group 7 & 8)

More Related Content

What's hot

Sistem pencegah kebakaran
Sistem pencegah kebakaranSistem pencegah kebakaran
Sistem pencegah kebakaran
UTHM
 
Air condition system
Air condition system Air condition system
Air condition system
Ungku OmarPolytechnic
 
Pintu dan tingkap
Pintu dan tingkapPintu dan tingkap
Pintu dan tingkap
Ahmad Syawal
 
Struktur dan asas bangunan
Struktur dan asas bangunanStruktur dan asas bangunan
Struktur dan asas bangunan
Elmi Hamid
 
Sistem perlindungan kebakaran aktif
Sistem perlindungan kebakaran  aktifSistem perlindungan kebakaran  aktif
Sistem perlindungan kebakaran aktif
Ungku OmarPolytechnic
 
Sistem bekalan air
Sistem bekalan air Sistem bekalan air
Sistem bekalan air
UTHM
 
Chapter 5 lantai
Chapter 5 lantaiChapter 5 lantai
Chapter 5 lantaiAmiRul AFiq
 
Fire fighting
Fire fightingFire fighting
Fire fighting
Ungku OmarPolytechnic
 
Sistem perlindungan kebakaran pasif
Sistem perlindungan kebakaran pasifSistem perlindungan kebakaran pasif
Sistem perlindungan kebakaran pasif
Ungku OmarPolytechnic
 
Tangga
TanggaTangga
Perpaipan (laksanakan penyambungan paip dan injap)
Perpaipan (laksanakan penyambungan paip dan injap)Perpaipan (laksanakan penyambungan paip dan injap)
Perpaipan (laksanakan penyambungan paip dan injap)
Mohd Norazizi
 
System building management
System building managementSystem building management
System building management
Daus Jai
 
1. kompenan asas penghawa dingin
1. kompenan asas penghawa dingin1. kompenan asas penghawa dingin
1. kompenan asas penghawa dinginAmit Preve
 
Eskalator
EskalatorEskalator
Eskalator
Natalie Ulza
 
Sistem bekalan air di dalam bangunan
Sistem bekalan air di dalam bangunanSistem bekalan air di dalam bangunan
Sistem bekalan air di dalam bangunan
Ungku OmarPolytechnic
 
Building Service Chapter 6
Building Service Chapter 6Building Service Chapter 6
Building Service Chapter 6
Izam Lukman
 
Simbol peralatan kebakaran
Simbol peralatan kebakaranSimbol peralatan kebakaran
Simbol peralatan kebakaran
Eng.MOHAMAD FAISAL
 
2 sistem pengudaraan
2 sistem pengudaraan2 sistem pengudaraan
2 sistem pengudaraanZurainah MS
 

What's hot (20)

Sistem pencegah kebakaran
Sistem pencegah kebakaranSistem pencegah kebakaran
Sistem pencegah kebakaran
 
Air condition system
Air condition system Air condition system
Air condition system
 
Pintu dan tingkap
Pintu dan tingkapPintu dan tingkap
Pintu dan tingkap
 
Struktur dan asas bangunan
Struktur dan asas bangunanStruktur dan asas bangunan
Struktur dan asas bangunan
 
Sistem perlindungan kebakaran aktif
Sistem perlindungan kebakaran  aktifSistem perlindungan kebakaran  aktif
Sistem perlindungan kebakaran aktif
 
Sistem bekalan air
Sistem bekalan air Sistem bekalan air
Sistem bekalan air
 
Chapter 5 lantai
Chapter 5 lantaiChapter 5 lantai
Chapter 5 lantai
 
Fire fighting
Fire fightingFire fighting
Fire fighting
 
Sistem perlindungan kebakaran pasif
Sistem perlindungan kebakaran pasifSistem perlindungan kebakaran pasif
Sistem perlindungan kebakaran pasif
 
Tangga
TanggaTangga
Tangga
 
Perpaipan (laksanakan penyambungan paip dan injap)
Perpaipan (laksanakan penyambungan paip dan injap)Perpaipan (laksanakan penyambungan paip dan injap)
Perpaipan (laksanakan penyambungan paip dan injap)
 
System building management
System building managementSystem building management
System building management
 
1. kompenan asas penghawa dingin
1. kompenan asas penghawa dingin1. kompenan asas penghawa dingin
1. kompenan asas penghawa dingin
 
Eskalator
EskalatorEskalator
Eskalator
 
2.jenis air cond
2.jenis air cond2.jenis air cond
2.jenis air cond
 
Sistem bekalan air di dalam bangunan
Sistem bekalan air di dalam bangunanSistem bekalan air di dalam bangunan
Sistem bekalan air di dalam bangunan
 
Building Service Chapter 6
Building Service Chapter 6Building Service Chapter 6
Building Service Chapter 6
 
Simbol peralatan kebakaran
Simbol peralatan kebakaranSimbol peralatan kebakaran
Simbol peralatan kebakaran
 
2 sistem pengudaraan
2 sistem pengudaraan2 sistem pengudaraan
2 sistem pengudaraan
 
Kayu
KayuKayu
Kayu
 

Viewers also liked

Construction materialsconcrete
Construction materialsconcreteConstruction materialsconcrete
Construction materialsconcreteUTHM
 
Ukur aras-levelling
Ukur aras-levellingUkur aras-levelling
Ukur aras-levelling
UTHM
 
Presentation ibs
Presentation ibsPresentation ibs
Presentation ibsUTHM
 
Fire alarm system (sistem penggera kebakaran)
Fire alarm system (sistem penggera kebakaran)Fire alarm system (sistem penggera kebakaran)
Fire alarm system (sistem penggera kebakaran)
Nurul Husna
 
K4 banjir
K4 banjirK4 banjir
K4 banjir
UTHM
 
Chapter i
Chapter iChapter i
Chapter i
bsgerry2
 
Teknologi alam sekitar
Teknologi alam sekitar Teknologi alam sekitar
Teknologi alam sekitar
UTHM
 
Tariandimalaysia 101001000824-phpapp02
Tariandimalaysia 101001000824-phpapp02Tariandimalaysia 101001000824-phpapp02
Tariandimalaysia 101001000824-phpapp02UTHM
 
Pm pentaksiran kursus (arahan & rubrik e folio&pembentangan)1
Pm pentaksiran kursus (arahan & rubrik e folio&pembentangan)1Pm pentaksiran kursus (arahan & rubrik e folio&pembentangan)1
Pm pentaksiran kursus (arahan & rubrik e folio&pembentangan)1
Anasz Nazri
 
All About Elevator Repair Oregon
All About Elevator Repair OregonAll About Elevator Repair Oregon
All About Elevator Repair Oregon
Jonathanrw
 
Proiectul_Lunar_Elevator_BT_Public_Relations_en (1)
Proiectul_Lunar_Elevator_BT_Public_Relations_en (1)Proiectul_Lunar_Elevator_BT_Public_Relations_en (1)
Proiectul_Lunar_Elevator_BT_Public_Relations_en (1)Geo Scripcariu
 
1q05 performancemonitoring
1q05 performancemonitoring1q05 performancemonitoring
1q05 performancemonitoring
Boulegroune Nabil
 
Design Procedure of Tabletop Foundations for Vibrating Machines
Design Procedure of Tabletop Foundations for Vibrating MachinesDesign Procedure of Tabletop Foundations for Vibrating Machines
Design Procedure of Tabletop Foundations for Vibrating Machines
Kee H. Lee, P.Eng.
 
Seismic Design of Buried Structures in PH and NZ
Seismic Design of Buried Structures in PH and NZSeismic Design of Buried Structures in PH and NZ
Seismic Design of Buried Structures in PH and NZLawrence Galvez
 
Land law cl2012[2]
Land law cl2012[2]Land law cl2012[2]
Land law cl2012[2]UTHM
 
Penilaian projek
Penilaian projekPenilaian projek
Penilaian projek
Adila Dila
 
Brochure BIM
Brochure BIM Brochure BIM
Brochure BIM
UTHM
 
Planning standard
Planning standardPlanning standard
Planning standard
UTHM
 
Body toning workout slide
Body toning workout slideBody toning workout slide
Body toning workout slide
Ungku OmarPolytechnic
 
Vibration analysis of process plant machinery best
Vibration analysis of process plant machinery bestVibration analysis of process plant machinery best
Vibration analysis of process plant machinery best
Boulegroune Nabil
 

Viewers also liked (20)

Construction materialsconcrete
Construction materialsconcreteConstruction materialsconcrete
Construction materialsconcrete
 
Ukur aras-levelling
Ukur aras-levellingUkur aras-levelling
Ukur aras-levelling
 
Presentation ibs
Presentation ibsPresentation ibs
Presentation ibs
 
Fire alarm system (sistem penggera kebakaran)
Fire alarm system (sistem penggera kebakaran)Fire alarm system (sistem penggera kebakaran)
Fire alarm system (sistem penggera kebakaran)
 
K4 banjir
K4 banjirK4 banjir
K4 banjir
 
Chapter i
Chapter iChapter i
Chapter i
 
Teknologi alam sekitar
Teknologi alam sekitar Teknologi alam sekitar
Teknologi alam sekitar
 
Tariandimalaysia 101001000824-phpapp02
Tariandimalaysia 101001000824-phpapp02Tariandimalaysia 101001000824-phpapp02
Tariandimalaysia 101001000824-phpapp02
 
Pm pentaksiran kursus (arahan & rubrik e folio&pembentangan)1
Pm pentaksiran kursus (arahan & rubrik e folio&pembentangan)1Pm pentaksiran kursus (arahan & rubrik e folio&pembentangan)1
Pm pentaksiran kursus (arahan & rubrik e folio&pembentangan)1
 
All About Elevator Repair Oregon
All About Elevator Repair OregonAll About Elevator Repair Oregon
All About Elevator Repair Oregon
 
Proiectul_Lunar_Elevator_BT_Public_Relations_en (1)
Proiectul_Lunar_Elevator_BT_Public_Relations_en (1)Proiectul_Lunar_Elevator_BT_Public_Relations_en (1)
Proiectul_Lunar_Elevator_BT_Public_Relations_en (1)
 
1q05 performancemonitoring
1q05 performancemonitoring1q05 performancemonitoring
1q05 performancemonitoring
 
Design Procedure of Tabletop Foundations for Vibrating Machines
Design Procedure of Tabletop Foundations for Vibrating MachinesDesign Procedure of Tabletop Foundations for Vibrating Machines
Design Procedure of Tabletop Foundations for Vibrating Machines
 
Seismic Design of Buried Structures in PH and NZ
Seismic Design of Buried Structures in PH and NZSeismic Design of Buried Structures in PH and NZ
Seismic Design of Buried Structures in PH and NZ
 
Land law cl2012[2]
Land law cl2012[2]Land law cl2012[2]
Land law cl2012[2]
 
Penilaian projek
Penilaian projekPenilaian projek
Penilaian projek
 
Brochure BIM
Brochure BIM Brochure BIM
Brochure BIM
 
Planning standard
Planning standardPlanning standard
Planning standard
 
Body toning workout slide
Body toning workout slideBody toning workout slide
Body toning workout slide
 
Vibration analysis of process plant machinery best
Vibration analysis of process plant machinery bestVibration analysis of process plant machinery best
Vibration analysis of process plant machinery best
 

Similar to 2014 sistem pengangkutan_dalam_bangunan

Arrangement of Escalators and Elevators
Arrangement of Escalators and ElevatorsArrangement of Escalators and Elevators
Arrangement of Escalators and Elevators
Rohit Khurana
 
Lifts and escalators
Lifts and escalatorsLifts and escalators
Lifts and escalators
Shubham Arora
 
Building services and repairs mumbai university introduction
Building services and repairs mumbai university introductionBuilding services and repairs mumbai university introduction
Building services and repairs mumbai university introduction
wasim shaikh
 
Elevators : Type & Working Principle
Elevators : Type & Working PrincipleElevators : Type & Working Principle
Elevators : Type & Working Principle
Ridwanul Hoque
 
building service - lift and escalators
building service - lift and escalatorsbuilding service - lift and escalators
building service - lift and escalators
rajitk97
 
Vertical communication, lifts, escalators and moving walkways.pdf
Vertical communication, lifts, escalators and moving walkways.pdfVertical communication, lifts, escalators and moving walkways.pdf
Vertical communication, lifts, escalators and moving walkways.pdf
Abdulwalimusemohamed
 
Vertical Circulation and Services of Highrise
Vertical Circulation and Services of HighriseVertical Circulation and Services of Highrise
Vertical Circulation and Services of Highrise
Hajee Mohammad Danesh Science & Technology University, Dinajpur
 
Escalators
Escalators Escalators
Escalators
arwa abu amara
 
TRANSPORTATION SYSTEM IN HIGH RISE BUILDINGS
TRANSPORTATION SYSTEM IN HIGH RISE BUILDINGSTRANSPORTATION SYSTEM IN HIGH RISE BUILDINGS
TRANSPORTATION SYSTEM IN HIGH RISE BUILDINGSNur Murni
 
Building present
Building presentBuilding present
Building presentNur Murni
 
Vertical transportation important
Vertical transportation importantVertical transportation important
Vertical transportation important
Muhammad Muhyuddin
 
Presentation on building service
Presentation on building servicePresentation on building service
Presentation on building service
school of architecture
 
Multiple uses of Inclined Platform Lifts
Multiple uses of Inclined Platform LiftsMultiple uses of Inclined Platform Lifts
Multiple uses of Inclined Platform Lifts
inclinelift
 
BS 2 Escalators arrangement
BS 2 Escalators arrangementBS 2 Escalators arrangement
BS 2 Escalators arrangement
Est
 
Elevators and its types
Elevators and its typesElevators and its types
Elevators and its types
Rajat Nainwal
 
Construction Equipment -Crane - Hoisting equipment
Construction Equipment -Crane - Hoisting equipmentConstruction Equipment -Crane - Hoisting equipment
Construction Equipment -Crane - Hoisting equipment
Construction Tech. and Mgmt., VNIT Nagpur
 
Benefits of installing a passenger lift by Jr One Lifts
Benefits of installing a passenger lift by Jr One LiftsBenefits of installing a passenger lift by Jr One Lifts
Benefits of installing a passenger lift by Jr One Lifts
JR One Lifts
 
STAIRS AND LIFTS IN ARCHIETCTURE
STAIRS AND LIFTS IN ARCHIETCTURESTAIRS AND LIFTS IN ARCHIETCTURE
STAIRS AND LIFTS IN ARCHIETCTURE
SYED PASHA
 
ELEVATORS
ELEVATORSELEVATORS
ELEVATORS
Taha Padrawala
 
Container Handling Equipments
Container Handling EquipmentsContainer Handling Equipments
Container Handling EquipmentsAnuj Gandhi
 

Similar to 2014 sistem pengangkutan_dalam_bangunan (20)

Arrangement of Escalators and Elevators
Arrangement of Escalators and ElevatorsArrangement of Escalators and Elevators
Arrangement of Escalators and Elevators
 
Lifts and escalators
Lifts and escalatorsLifts and escalators
Lifts and escalators
 
Building services and repairs mumbai university introduction
Building services and repairs mumbai university introductionBuilding services and repairs mumbai university introduction
Building services and repairs mumbai university introduction
 
Elevators : Type & Working Principle
Elevators : Type & Working PrincipleElevators : Type & Working Principle
Elevators : Type & Working Principle
 
building service - lift and escalators
building service - lift and escalatorsbuilding service - lift and escalators
building service - lift and escalators
 
Vertical communication, lifts, escalators and moving walkways.pdf
Vertical communication, lifts, escalators and moving walkways.pdfVertical communication, lifts, escalators and moving walkways.pdf
Vertical communication, lifts, escalators and moving walkways.pdf
 
Vertical Circulation and Services of Highrise
Vertical Circulation and Services of HighriseVertical Circulation and Services of Highrise
Vertical Circulation and Services of Highrise
 
Escalators
Escalators Escalators
Escalators
 
TRANSPORTATION SYSTEM IN HIGH RISE BUILDINGS
TRANSPORTATION SYSTEM IN HIGH RISE BUILDINGSTRANSPORTATION SYSTEM IN HIGH RISE BUILDINGS
TRANSPORTATION SYSTEM IN HIGH RISE BUILDINGS
 
Building present
Building presentBuilding present
Building present
 
Vertical transportation important
Vertical transportation importantVertical transportation important
Vertical transportation important
 
Presentation on building service
Presentation on building servicePresentation on building service
Presentation on building service
 
Multiple uses of Inclined Platform Lifts
Multiple uses of Inclined Platform LiftsMultiple uses of Inclined Platform Lifts
Multiple uses of Inclined Platform Lifts
 
BS 2 Escalators arrangement
BS 2 Escalators arrangementBS 2 Escalators arrangement
BS 2 Escalators arrangement
 
Elevators and its types
Elevators and its typesElevators and its types
Elevators and its types
 
Construction Equipment -Crane - Hoisting equipment
Construction Equipment -Crane - Hoisting equipmentConstruction Equipment -Crane - Hoisting equipment
Construction Equipment -Crane - Hoisting equipment
 
Benefits of installing a passenger lift by Jr One Lifts
Benefits of installing a passenger lift by Jr One LiftsBenefits of installing a passenger lift by Jr One Lifts
Benefits of installing a passenger lift by Jr One Lifts
 
STAIRS AND LIFTS IN ARCHIETCTURE
STAIRS AND LIFTS IN ARCHIETCTURESTAIRS AND LIFTS IN ARCHIETCTURE
STAIRS AND LIFTS IN ARCHIETCTURE
 
ELEVATORS
ELEVATORSELEVATORS
ELEVATORS
 
Container Handling Equipments
Container Handling EquipmentsContainer Handling Equipments
Container Handling Equipments
 

More from UTHM

Bab 11 (b) meminimakan sampah
Bab 11 (b)   meminimakan sampahBab 11 (b)   meminimakan sampah
Bab 11 (b) meminimakan sampah
UTHM
 
The strategy formulation_framework_10
The strategy formulation_framework_10The strategy formulation_framework_10
The strategy formulation_framework_10
UTHM
 
Meminimumkan sisa bahan
Meminimumkan sisa bahanMeminimumkan sisa bahan
Meminimumkan sisa bahan
UTHM
 
Kod Etika Kontraktor
Kod Etika Kontraktor Kod Etika Kontraktor
Kod Etika Kontraktor
UTHM
 
Drn bm
Drn bmDrn bm
Drn bm
UTHM
 
Project delay and_cost_overrun-libre
Project delay and_cost_overrun-libreProject delay and_cost_overrun-libre
Project delay and_cost_overrun-libreUTHM
 
Applications of high performance lightweight concrete in a floating barge gate
Applications of high performance lightweight concrete in a floating barge gateApplications of high performance lightweight concrete in a floating barge gate
Applications of high performance lightweight concrete in a floating barge gateUTHM
 
Pembinaanjalan w12
Pembinaanjalan w12Pembinaanjalan w12
Pembinaanjalan w12UTHM
 
Lesson 1-Learning Mandarin Class
Lesson 1-Learning Mandarin ClassLesson 1-Learning Mandarin Class
Lesson 1-Learning Mandarin ClassUTHM
 
Topik 7 kaedah penilaian projek
Topik 7      kaedah penilaian projekTopik 7      kaedah penilaian projek
Topik 7 kaedah penilaian projekUTHM
 
Tembok penahan
Tembok penahanTembok penahan
Tembok penahanUTHM
 
Pile foundation design
Pile foundation designPile foundation design
Pile foundation designUTHM
 

More from UTHM (12)

Bab 11 (b) meminimakan sampah
Bab 11 (b)   meminimakan sampahBab 11 (b)   meminimakan sampah
Bab 11 (b) meminimakan sampah
 
The strategy formulation_framework_10
The strategy formulation_framework_10The strategy formulation_framework_10
The strategy formulation_framework_10
 
Meminimumkan sisa bahan
Meminimumkan sisa bahanMeminimumkan sisa bahan
Meminimumkan sisa bahan
 
Kod Etika Kontraktor
Kod Etika Kontraktor Kod Etika Kontraktor
Kod Etika Kontraktor
 
Drn bm
Drn bmDrn bm
Drn bm
 
Project delay and_cost_overrun-libre
Project delay and_cost_overrun-libreProject delay and_cost_overrun-libre
Project delay and_cost_overrun-libre
 
Applications of high performance lightweight concrete in a floating barge gate
Applications of high performance lightweight concrete in a floating barge gateApplications of high performance lightweight concrete in a floating barge gate
Applications of high performance lightweight concrete in a floating barge gate
 
Pembinaanjalan w12
Pembinaanjalan w12Pembinaanjalan w12
Pembinaanjalan w12
 
Lesson 1-Learning Mandarin Class
Lesson 1-Learning Mandarin ClassLesson 1-Learning Mandarin Class
Lesson 1-Learning Mandarin Class
 
Topik 7 kaedah penilaian projek
Topik 7      kaedah penilaian projekTopik 7      kaedah penilaian projek
Topik 7 kaedah penilaian projek
 
Tembok penahan
Tembok penahanTembok penahan
Tembok penahan
 
Pile foundation design
Pile foundation designPile foundation design
Pile foundation design
 

Recently uploaded

The approach at University of Liverpool.pptx
The approach at University of Liverpool.pptxThe approach at University of Liverpool.pptx
The approach at University of Liverpool.pptx
Jisc
 
Language Across the Curriculm LAC B.Ed.
Language Across the  Curriculm LAC B.Ed.Language Across the  Curriculm LAC B.Ed.
Language Across the Curriculm LAC B.Ed.
Atul Kumar Singh
 
Group Presentation 2 Economics.Ariana Buscigliopptx
Group Presentation 2 Economics.Ariana BuscigliopptxGroup Presentation 2 Economics.Ariana Buscigliopptx
Group Presentation 2 Economics.Ariana Buscigliopptx
ArianaBusciglio
 
Azure Interview Questions and Answers PDF By ScholarHat
Azure Interview Questions and Answers PDF By ScholarHatAzure Interview Questions and Answers PDF By ScholarHat
Azure Interview Questions and Answers PDF By ScholarHat
Scholarhat
 
Home assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdfHome assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdf
Tamralipta Mahavidyalaya
 
Francesca Gottschalk - How can education support child empowerment.pptx
Francesca Gottschalk - How can education support child empowerment.pptxFrancesca Gottschalk - How can education support child empowerment.pptx
Francesca Gottschalk - How can education support child empowerment.pptx
EduSkills OECD
 
Best Digital Marketing Institute In NOIDA
Best Digital Marketing Institute In NOIDABest Digital Marketing Institute In NOIDA
Best Digital Marketing Institute In NOIDA
deeptiverma2406
 
Honest Reviews of Tim Han LMA Course Program.pptx
Honest Reviews of Tim Han LMA Course Program.pptxHonest Reviews of Tim Han LMA Course Program.pptx
Honest Reviews of Tim Han LMA Course Program.pptx
timhan337
 
Unit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdfUnit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdf
Thiyagu K
 
"Protectable subject matters, Protection in biotechnology, Protection of othe...
"Protectable subject matters, Protection in biotechnology, Protection of othe..."Protectable subject matters, Protection in biotechnology, Protection of othe...
"Protectable subject matters, Protection in biotechnology, Protection of othe...
SACHIN R KONDAGURI
 
Digital Tools and AI for Teaching Learning and Research
Digital Tools and AI for Teaching Learning and ResearchDigital Tools and AI for Teaching Learning and Research
Digital Tools and AI for Teaching Learning and Research
Vikramjit Singh
 
Chapter -12, Antibiotics (One Page Notes).pdf
Chapter -12, Antibiotics (One Page Notes).pdfChapter -12, Antibiotics (One Page Notes).pdf
Chapter -12, Antibiotics (One Page Notes).pdf
Kartik Tiwari
 
Normal Labour/ Stages of Labour/ Mechanism of Labour
Normal Labour/ Stages of Labour/ Mechanism of LabourNormal Labour/ Stages of Labour/ Mechanism of Labour
Normal Labour/ Stages of Labour/ Mechanism of Labour
Wasim Ak
 
Model Attribute Check Company Auto Property
Model Attribute  Check Company Auto PropertyModel Attribute  Check Company Auto Property
Model Attribute Check Company Auto Property
Celine George
 
Multithreading_in_C++ - std::thread, race condition
Multithreading_in_C++ - std::thread, race conditionMultithreading_in_C++ - std::thread, race condition
Multithreading_in_C++ - std::thread, race condition
Mohammed Sikander
 
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
MysoreMuleSoftMeetup
 
2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...
Sandy Millin
 
TESDA TM1 REVIEWER FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
TESDA TM1 REVIEWER  FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...TESDA TM1 REVIEWER  FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
TESDA TM1 REVIEWER FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
EugeneSaldivar
 
The Accursed House by Émile Gaboriau.pptx
The Accursed House by Émile Gaboriau.pptxThe Accursed House by Émile Gaboriau.pptx
The Accursed House by Émile Gaboriau.pptx
DhatriParmar
 
CACJapan - GROUP Presentation 1- Wk 4.pdf
CACJapan - GROUP Presentation 1- Wk 4.pdfCACJapan - GROUP Presentation 1- Wk 4.pdf
CACJapan - GROUP Presentation 1- Wk 4.pdf
camakaiclarkmusic
 

Recently uploaded (20)

The approach at University of Liverpool.pptx
The approach at University of Liverpool.pptxThe approach at University of Liverpool.pptx
The approach at University of Liverpool.pptx
 
Language Across the Curriculm LAC B.Ed.
Language Across the  Curriculm LAC B.Ed.Language Across the  Curriculm LAC B.Ed.
Language Across the Curriculm LAC B.Ed.
 
Group Presentation 2 Economics.Ariana Buscigliopptx
Group Presentation 2 Economics.Ariana BuscigliopptxGroup Presentation 2 Economics.Ariana Buscigliopptx
Group Presentation 2 Economics.Ariana Buscigliopptx
 
Azure Interview Questions and Answers PDF By ScholarHat
Azure Interview Questions and Answers PDF By ScholarHatAzure Interview Questions and Answers PDF By ScholarHat
Azure Interview Questions and Answers PDF By ScholarHat
 
Home assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdfHome assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdf
 
Francesca Gottschalk - How can education support child empowerment.pptx
Francesca Gottschalk - How can education support child empowerment.pptxFrancesca Gottschalk - How can education support child empowerment.pptx
Francesca Gottschalk - How can education support child empowerment.pptx
 
Best Digital Marketing Institute In NOIDA
Best Digital Marketing Institute In NOIDABest Digital Marketing Institute In NOIDA
Best Digital Marketing Institute In NOIDA
 
Honest Reviews of Tim Han LMA Course Program.pptx
Honest Reviews of Tim Han LMA Course Program.pptxHonest Reviews of Tim Han LMA Course Program.pptx
Honest Reviews of Tim Han LMA Course Program.pptx
 
Unit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdfUnit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdf
 
"Protectable subject matters, Protection in biotechnology, Protection of othe...
"Protectable subject matters, Protection in biotechnology, Protection of othe..."Protectable subject matters, Protection in biotechnology, Protection of othe...
"Protectable subject matters, Protection in biotechnology, Protection of othe...
 
Digital Tools and AI for Teaching Learning and Research
Digital Tools and AI for Teaching Learning and ResearchDigital Tools and AI for Teaching Learning and Research
Digital Tools and AI for Teaching Learning and Research
 
Chapter -12, Antibiotics (One Page Notes).pdf
Chapter -12, Antibiotics (One Page Notes).pdfChapter -12, Antibiotics (One Page Notes).pdf
Chapter -12, Antibiotics (One Page Notes).pdf
 
Normal Labour/ Stages of Labour/ Mechanism of Labour
Normal Labour/ Stages of Labour/ Mechanism of LabourNormal Labour/ Stages of Labour/ Mechanism of Labour
Normal Labour/ Stages of Labour/ Mechanism of Labour
 
Model Attribute Check Company Auto Property
Model Attribute  Check Company Auto PropertyModel Attribute  Check Company Auto Property
Model Attribute Check Company Auto Property
 
Multithreading_in_C++ - std::thread, race condition
Multithreading_in_C++ - std::thread, race conditionMultithreading_in_C++ - std::thread, race condition
Multithreading_in_C++ - std::thread, race condition
 
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
 
2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...
 
TESDA TM1 REVIEWER FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
TESDA TM1 REVIEWER  FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...TESDA TM1 REVIEWER  FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
TESDA TM1 REVIEWER FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
 
The Accursed House by Émile Gaboriau.pptx
The Accursed House by Émile Gaboriau.pptxThe Accursed House by Émile Gaboriau.pptx
The Accursed House by Émile Gaboriau.pptx
 
CACJapan - GROUP Presentation 1- Wk 4.pdf
CACJapan - GROUP Presentation 1- Wk 4.pdfCACJapan - GROUP Presentation 1- Wk 4.pdf
CACJapan - GROUP Presentation 1- Wk 4.pdf
 

2014 sistem pengangkutan_dalam_bangunan

  • 1.
  • 2. Four types of installation can be used in buildings. Lifts, escalators, paternosters and travelators.  Lifts are widely employed to make vertical circulation quicker and easier and they make possible buildings rising above the four or five floors which would be a maximum for reasonable access on foot.  Escalators occupy considerable floor space and being inclined, they raise people through a limited height, but they will deal with large numbers (a 900mm wide escalator is capable of handling 6000 people per hour).
  • 3.  Paternoster are rare in this country but they are widely used in Europe. They are particularly appropriate where internal circulation is the critical feature rather than inward or outward flow.  Travelators assist in the movement of large number of people horizontally or up very limited inclines.
  • 4. Impact of transportation for building:  Space - To house the system/ affect the floor size  Structure - Strong enough to support the system  Design - Building may be large and tall  Economic - Extra cost needed for the installation and maintenance - It enhance the selling cost and rental cost
  • 6.  Has an important significant impact on the functioning of the building  Makes vertical movement, quicker and easier compare to paternoster  Makes possible for building to be build height (more than 5 storeys)
  • 7.  The number and size of the lifts installation must be related to: 1. the population of the building; 2. types of building occupancy; 3. the starting finishing times of the population, whether staggered or unified; 4. number of floors and heights; 5. position of building in relation to public transport services in which a building near a traffic terminal generally has high passenger peaks during arrival hours.
  • 8. Classification Traveling time excellent < 45 s good 45 s - > 55 s fair 55 s - > 65 s satisfactory > 65 s
  • 9.
  • 10.  An escalator is a conveyor transport device for transporting people, consisting of a staircase whose steps move up or down on tracks that keep the surfaces of the individual steps horizontal
  • 11.
  • 13. 1. Handrail Inlet Stops the escalator when an object becomes wedged between the handrail and the handrail inlet 2. Skirt Guard Stops the escalator when an object becomes wedged between a step and the skirt guard panel 3. Step Travel Stops the escalator when a step is displaced by an up thrust
  • 14. 4. Emergency Stop Stops the escalator when pressed 5. Drive Chain Stops the escalator when the chain becomes stretched excessively 6. Step Chain Stops the escalator when the chain becomes stretched excessively or breaks
  • 15. 7. Overload Stops the escalator when a current larger than the rated value follows through the motor 8. Governor Stops the escalator when the escalator speed becomes higher or lower than the rated speed
  • 16.
  • 17.  Can carry travel up to 300m  Speed range between 0.6 of up to 1.3m/s.  If combined with walking, the overall pace could be about 2.5m/s.  7200 passengers per hour can be carried  Very much similar to escalator in its component parts
  • 18. 1 Demarcation Line 2 Inside Deck Cover 3 Pallet Tread 4 Panel 5 Handrail 6 Handrail Frame 7 Skirt Guard 8 Outside Deck Cover 9 Comb 10 Comb Plate 11 Landing Plate
  • 19.  Also known earlier as the continuously moving lift.  Moves people vertically  Consists of open fronted cars as in lifts but much smaller in size  It does not stop for the passenger to enter or alight
  • 20.
  • 21.
  • 22.  It could handle twice as many 'up' passengers as the most advanced high-speed lifts of its time  Can cater for a comparable volume of traffic at the same time on the downward phase of the cycle.  Its continuous motion allows passengers to travel without loss of waiting of time.  Its performance over more than six storey is limited by its low speed, 0.4 m/s.  Its maximum carrying capacity is 720 passengers per hour
  • 23. System Capacity per hour ∠ of incline Type of purpose Speed Elevator/Lift Depend on:  size  speed  pattern 90o Pedestrian Goods 1 – 7 m/s Escalator 5,000 – 8,000 30o - 35o Pedestrian Goods 0.5 m/s Travelator 5,000 – 8,000 0o - 15o Pedestrian Goods 0.5 m/s Paternoster 720 90o Pedestrian 0.35 m/s
  • 25.  1. Explain the circumstances in which lifts are chosen instead of escalator as mechanical handling system in a building. (Group 1 & 2)  2. Briefly explain the types of escalator arrangement commonly used in commercial building. (Group 3 & 4)  3. Discuss the appropriate transport system in hospital. (Group 5 & 6)  4. State the advantages and disadvantages of hydraulic lift and electric lift. (Group 7 & 8)