Project Name & Details
Project Name & Details
RISK ASSESSMENT FOR GAS WELDING
RISK ASSESSMENT FOR GAS WELDING
REF:
REF:
REV: 00
REV: 00
DATE:
DATE:
S.N
S.N
.
.
A
AC
CT
TI
IV
VI
IT
TY
Y H
HA
AZ
ZA
AR
RD
D
CAUSES OF
CAUSES OF
HAZARD
HAZARD
RISK
RISK
EVALUATION
EVALUATION
RISK
RISK
LEVEL
LEVEL IM
IM LEMENTED
LEMENTED CONTROL
CONTROL
MEASURES
MEASURES
RESIDUAL RISK
RESIDUAL RISK
ACCE
ACCE T
T Y/N?
Y/N?
S
S H
H/
/M
M/
/L
L S
S H
H/
/M
M/
/L
L
1
1
ermitting
ermitting work
work
and preparation
and preparation

 Work condition not
Work condition not
safe
safe

 Procedures and tasks
Procedures and tasks
not clear or respected
not clear or respected

 Lack of supervisory
Lack of supervisory

 Miscommunication
Miscommunication

 Not correct PPE worn
Not correct PPE worn

 Equipment not
Equipment not
inspected and
inspected and
certified
certified
Material
Material
damage
damage
Personnel
Personnel
injury
injury
2
2 4
4 4
4

 HSE team to assess the conditions
HSE team to assess the conditions
of work in the assigned area prior
of work in the assigned area prior
and during the work
and during the work

 Competency of personnel and
Competency of personnel and
supervision for the different
supervision for the different
activities
activities

 Define hierarchy and reporting
Define hierarchy and reporting
flowcharts
flowcharts

 Check inspection certificates of
Check inspection certificates of
equipment for the job
equipment for the job

 CONTRACTOR PTW system should
CONTRACTOR PTW system should
be implemented
be implemented

 Attend CONTRACTOR safety
Attend CONTRACTOR safety
trainings
trainings

 Equipment checklist should be
Equipment checklist should be
made for all new equipment coming
made for all new equipment coming
to site
to site

 Weekly equipment checklist should
Weekly equipment checklist should
be made and kept at engine
be made and kept at engine

 Toolbox talks
Toolbox talks
Define proper PPE to be used for the
Define proper PPE to be used for the
work
work
1
1 1
1 1
1 Y
Y
1
1 Unloading
Unloading
Equipment
Equipment
(Mechanical
(Mechanical

 Dropped object while
Dropped object while
unloading equipments /
unloading equipments /
swinging or tip over of
swinging or tip over of
Personnel
Personnel
injuries/
injuries/
fatalities
fatalities
2
2 4
4 4
4

 lifting/ unloading of material under
lifting/ unloading of material under
PTW / JSA/ TBT/WMS
PTW / JSA/ TBT/WMS
1
1 1
1 1
1 Y
Y
Page1 of 8
Page1 of 8
Project Name & Details
Project Name & Details
RISK ASSESSMENT FOR GAS WELDING
RISK ASSESSMENT FOR GAS WELDING
REF:
REF:
REV: 00
REV: 00
DATE:
DATE:
and manual)
and manual)
load /
load /

 collision between load &
collision between load &
facilities
facilities


Mechanical failure/ fire
Mechanical failure/ fire

 Lifting gears failure
Lifting gears failure 

Operating in a windy
Operating in a windy
weather
weather 
 Spills
Spills 
 Uneven
Uneven
Floor
Floor

 Musculoskeletal
Musculoskeletal
disorder (MSDS) from
disorder (MSDS) from
manual heavy lift
manual heavy lift

 Hands injuries from the
Hands injuries from the
sharp edges
sharp edges

 Pinch Point / dropped
Pinch Point / dropped
loads
loads
Work in classified area
Work in classified area
Material
Material
damage
damage
Environmental
Environmental
impact
impact

 Standard PPE Must Be worn
Standard PPE Must Be worn

 Certified forklift / 70Tcrane
Certified forklift / 70Tcrane

 Weekly checklist for the lifting
Weekly checklist for the lifting
equipment
equipment 
 Certified lifting accessory &
Certified lifting accessory &
gears Coded color ongoing
gears Coded color ongoing

 Visual Inspection for the lifti
Visual Inspection for the lifting gears
ng gears
in prior to start any lift
in prior to start any lifting task
ing task

 Close supervision / QHSE Supervisor
Close supervision / QHSE Supervisor
assigned at site
assigned at site

 Never stand under suspended loads
Never stand under suspended loads

 Respect the radius swing
Respect the radius swing

 Competent & Certified operator
Competent & Certified operator

 No blind lifting
No blind lifting

 Lifting Area barricaded
Lifting Area barricaded

 Certified containers pad eyes
Certified containers pad eyes

 restricted access area (using warning
restricted access area (using warning
tape & safety signs)
tape & safety signs)

 Banks man to guide the lifting
Banks man to guide the lifting
operation
operation

 prohibit the lifting @
prohibit the lifting @ a wind speed
a wind speed
more than of 50 km/h
more than of 50 km/h

 check the ground state
check the ground state

 Apply the right manual handling
Apply the right manual handling
techniques / use a mechanical help if
techniques / use a mechanical help if
required
required

 Use the SMART GRIP Technique
Use the SMART GRIP Technique

 shadowed Shelters to be provided
shadowed Shelters to be provided
Continuous gas monitoring
Continuous gas monitoring
1
1 Dismantling of
Dismantling of 
 Pinch point / hand
Pinch point / hand People
People 2
2 4
4 4
4 
 PTW/JSA/TBT
PTW/JSA/TBT 1
1 1
1 1
1 Y
Y
Page2 of 8
Page2 of 8
Project Name & Details
Project Name & Details
RISK ASSESSMENT FOR GAS WELDING
RISK ASSESSMENT FOR GAS WELDING
REF:
REF:
REV: 00
REV: 00
DATE:
DATE:
the existing
the existing
corroded pipe
corroded pipe
injuries
injuries

 Falling from height
Falling from height

 MSDs(musculoskeleta
MSDs(musculoskeleta
l disorder/wrong
l disorder/wrong
posture)
posture)

 Dropped object
Dropped object

 Potential Sparks
Potential Sparks
ignition
ignition
Work in classified
Work in classified
area
area
assets
assets

 Proper PPE: gloves (EN 388)
Proper PPE: gloves (EN 388)

 Take extra attention when carrying
Take extra attention when carrying
out the dismantling task
out the dismantling task

 Only green Tagged scaffold to be
Only green Tagged scaffold to be
used
used

 Wear personnel fall arrest system if
Wear personnel fall arrest system if
required
required

 Apply the right kinetic postures
Apply the right kinetic postures


Clear and isolate the lower area to
Clear and isolate the lower area to
prevent injuries from falling object
prevent injuries from falling object

 Use only bronze tools
Use only bronze tools
1
1 H
Ho
ot
t w
wo
or
rk
k
(cutting,
(cutting,
grinding and
grinding and
welding)
welding)
Toxic fumes
Toxic fumes
inhalation
inhalation
Eyes irritation
Eyes irritation
Electrocution
Electrocution
/electrical shock
/electrical shock
Fire eruption
Fire eruption
Burns
Burns
Explosion
Explosion
Flying debris broken
Flying debris broken
disc
disc
Naked wires
Naked wires
Noise
Noise
Backfiring
Backfiring
Explosion due to
Explosion due to
overpressure of the
overpressure of the
compressed gas
compressed gas
cylinders
cylinders
Work in classified
Work in classified

 People
People
Asset
Asset
2
2 4
4 4
4

 Hot PTW/JSA/TBT
Hot PTW/JSA/TBT

 Pressurized welding habitat
Pressurized welding habitat

 Fire blanket
Fire blanket

 Atex equipment
Atex equipment


Clear the nearby area from the
Clear the nearby area from the
combustibles
combustibles

 Proper PPE (welding glovesEN
Proper PPE (welding glovesEN
407)/welding mask/face
407)/welding mask/face
shield/welding apron/ear plugs
shield/welding apron/ear plugs

 RPM of the disk should be larger
RPM of the disk should be larger
than the angle grinder RPM
than the angle grinder RPM

 Flashback arrestor
Flashback arrestor

 Compressed gas cylinders should
Compressed gas cylinders should
be kept in upright position and
be kept in upright position and
secured , capped if not in use
secured , capped if not in use

 Pressure gauge should be calibrated
Pressure gauge should be calibrated

 Safety signs in place
Safety signs in place
1
1 1
1 1
1 Y
Y
Page3 of 8
Page3 of 8
Project Name & Details
Project Name & Details
RISK ASSESSMENT FOR GAS WELDING
RISK ASSESSMENT FOR GAS WELDING
REF:
REF:
REV: 00
REV: 00
DATE:
DATE:
area
area 
 Fire watch man in place
Fire watch man in place

 Continuous gas monitoring
Continuous gas monitoring
1
1 V
Ve
eh
hiic
clle
es
s a
an
nd
d
Machinery
Machinery
Moving
Moving

 Road Crossings
Road Crossings

 vehicle crash
vehicle crash
Struck personnel
Struck personnel

 Material
Material
damage
damage

 Personnel
Personnel
injury
injury
2
2 4
4 4
4

 Traffic if necessary will be
Traffic if necessary will be
controlled.
controlled.

 Site drawings are available all the
Site drawings are available all the
time and used when needed
time and used when needed


Roads to be market and
Roads to be market and supervisors
supervisors
to be informed
to be informed

 All crossing with main road should
All crossing with main road should
be secured with hard barriers if not
be secured with hard barriers if not
used or properly identified with
used or properly identified with
adequate road signs when in use.
adequate road signs when in use.

 Permanent presence of the
Permanent presence of the
banksman
banksman

 Speed limit 10km/h in the ROW
Speed limit 10km/h in the ROW

 Warning signs
Warning signs

 Road signs
Road signs

 Correct hand signals
Correct hand signals
1
1 1
1 1
1 Y
Y
1
1 C
Clle
ea
an
niin
ng
g &
&
Housekeeping
Housekeeping
Musculoskeletal from
Musculoskeletal from
repetitive motion including
repetitive motion including
bending, stretching,
bending, stretching,
reaching etc.
reaching etc.
Personnel
Personnel
injury
injury
2
2 4
4 4
4 
 Training for good work practices to
Training for good work practices to
be held on site
be held on site

 TBT in place before job,
TBT in place before job,
housekeeping issues to be
housekeeping issues to be
mentioned in all TBT
mentioned in all TBT

 Personnel to perform cleaning and
Personnel to perform cleaning and
housekeeping without abuse to
housekeeping without abuse to
their bodies
their bodies

 Good lifting practice to be applied
Good lifting practice to be applied
1
1 1
1 1
1 Y
Y
Page4 of 8
Page4 of 8
Project Name & Details
Project Name & Details
RISK ASSESSMENT FOR GAS WELDING
RISK ASSESSMENT FOR GAS WELDING
REF:
REF:
REV: 00
REV: 00
DATE:
DATE:
1
1 C
Clle
ea
an
niin
ng
g &
&
Housekeeping
Housekeeping
Pollution, Waste
Pollution, Waste
Environmental
Environmental
damage
damage
2
2 4
4 4
4

 No waste is tolerated during the job
No waste is tolerated during the job
execution.
execution.

 Personnel to end the day by
Personnel to end the day by
cleaning, inspecting equipment and
cleaning, inspecting equipment and
goodhousekeeping.
goodhousekeeping.

 All waste has to be collected and
All waste has to be collected and
removed to a designated area.
removed to a designated area.

 Any spill is to be contained in time, a
Any spill is to be contained in time, a
report to be issued to HSE
report to be issued to HSE
Manager.
Manager.

 All ground disturbing has to be
All ground disturbing has to be
remained to its normal situation
remained to its normal situation
after work.
after work.

 Any pollution or ground disturbing to
Any pollution or ground disturbing to
be reported directly to HSSE site
be reported directly to HSSE site
Manager and CONTRACTOR
Manager and CONTRACTOR

 Waste disposal unit, containers in
Waste disposal unit, containers in
place
place

 Plastic bags to collect waste
Plastic bags to collect waste

 Waste separation to be applied
Waste separation to be applied
1
1 1
1 1
1 Y
Y
1
1 C
Clle
ea
an
niin
ng
g &
&
Housekeeping
Housekeeping Biological hazard
Biological hazard
Scorpion
Scorpion
stings / vipers
stings / vipers
bites
bites
2
2 4
4 4
4 
 Awareness regarding
Awareness regarding
scorpion/vipers risks.
scorpion/vipers risks.
1
1 1
1 1
1 Y
Y
Page5 of 8
Page5 of 8
Project Name & Details
Project Name & Details
RISK ASSESSMENT FOR GAS WELDING
RISK ASSESSMENT FOR GAS WELDING
REF:
REF:
REV: 00
REV: 00
DATE:
DATE:

 Area inspection before operations to
Area inspection before operations to
ensure no insects.
ensure no insects.

 Equipment appropriately stored after
Equipment appropriately stored after
the end of operations (not left on
the end of operations (not left on
the ground along the night).
the ground along the night).

 Sand bags “under check” before
Sand bags “under check” before
removing.
removing.

 Rests away insects shelters (stones,
Rests away insects shelters (stones,
bushes…)
bushes…)

 PPE.
PPE.

 TBT.
TBT.
ersons
ersons in da
in danger
nger

 Workers undertaking the work
Workers undertaking the work

 Persons passing the site location/ truck routes, e.g. members of the public and persons in the V
Persons passing the site location/ truck routes, e.g. members of the public and persons in the Vehicles.
ehicles.
ersonal
ersonal protective
protective equipment
equipment

 Safety Helmet, Gum Boot, Proper Gloves &
Safety Helmet, Gum Boot, Proper Gloves & Safety Goggles
Safety Goggles
Information, instruction and training
Information, instruction and training

 All personnel in the team are to be made aware of the sa
All personnel in the team are to be made aware of the safe systems of work.
fe systems of work.

 Ensure that good housekeeping standard is maintained t
Ensure that good housekeeping standard is maintained throughout.
hroughout.

 Training and experience for personnel to
Training and experience for personnel to use electrical equipments and vibratory equipments.
use electrical equipments and vibratory equipments.

 Educate the personnel to handle chemicals such
Educate the personnel to handle chemicals such as concrete…
as concrete…
Page6 of 8
Page6 of 8
Project Name & Details
Project Name & Details
RISK ASSESSMENT FOR GAS WELDING
RISK ASSESSMENT FOR GAS WELDING
REF:
REF:
REV: 00
REV: 00
DATE:
DATE:
Emergency procedures
Emergency procedures

 Site emergency procedures should make provision for t
Site emergency procedures should make provision for the rescue of individuals from
he rescue of individuals from heights.
heights.

 First-aid facilities should be available to cope with any
First-aid facilities should be available to cope with any significant injuries that may arise from the work.
significant injuries that may arise from the work.
Monitoring and review
Monitoring and review

 Work should be monitored by Foreman and charge hand who are trained to ensure that any additional
Work should be monitored by Foreman and charge hand who are trained to ensure that any additional
precautions or equipment required are provided.
precautions or equipment required are provided.
RISK ASSESSMENT COMMITTEE
RISK ASSESSMENT COMMITTEE:
: Project
Project Manager/
Manager/ Project
Project Engineer
Engineer
Safety Manager/ Safety Officer
Safety Manager/ Safety Officer
Reviewed by:
Reviewed by: (Safety Officer)
(Safety Officer) Approved by:
Approved by: (Project Manager)
(Project Manager)
RISK MATRIX
RISK MATRIX
Risk Rating (RR) – Severity x Likelihood
Risk Rating (RR) – Severity x Likelihood
LIKELIHOOD
LIKELIHOOD
( ROBABILITY)
( ROBABILITY)
(
( )
)
SEVERITY
SEVERITY
(IM ACT)
(IM ACT)
(S)
(S)
Rare
Rare
Remote possibility
Remote possibility
(once every 3
(once every 3
years or more)
years or more)
1
1
Unlikely
Unlikely
Could happen but
Could happen but
rare (typically once
rare (typically once
in a year)
in a year)
2
2
ossible
ossible
Could happen
Could happen
occasionally (on
occasionally (on
average quarterly)
average quarterly)
3
3
Likely
Likely
Could happen often
Could happen often
(on average once a
(on average once a
month or more)
month or more)
4
4
Almost certain
Almost certain
Could happen
Could happen
frequently (once a
frequently (once a
week or more)
week or more)
5
5
Page7 of 8
Page7 of 8
Project Name & Details
Project Name & Details
RISK ASSESSMENT FOR GAS WELDING
RISK ASSESSMENT FOR GAS WELDING
REF:
REF:
REV: 00
REV: 00
DATE:
DATE:
I
In
ns
siig
gn
niif
fiic
ca
an
nt
t 1
1
Low
Low
1
1
Low
Low
2
2
Low
Low
3
3
Low
Low
4
4
Medium
Medium
5
5
M
Miin
no
or
r 2
2
Low
Low
2
2
Low
Low
4
4
Medium
Medium
6
6
Medium
Medium
8
8
Medium
Medium
10
10
M
Mo
od
de
er
ra
at
te
e 3
3
Low
Low
3
3
Medium
Medium
6
6
Medium
Medium
9
9
Medium
Medium
12
12
High
High
15
15
S
Siig
gn
niif
fiic
ca
an
nt
t 4
4
Low
Low
4
4
Medium
Medium
8
8
Medium
Medium
12
12
High
High
16
16
High
High
20
20
M
Ma
ajjo
or
r 5
5 Medium
Medium
5
5
Medium
Medium
10
10
High
High
15
15
High
High
20
20
High
High
25
25
RISK
RISK BASED
BASED CONTROL
CONTROL LAN
LAN
R
RI
IS
SK
K L
LE
EV
VE
EL
L A
AC
CT
TI
IO
ON
N A
AN
ND
D T
TI
IM
ME
ES
SC
CA
AL
LE
E
1-4
1-4
Low
Low
Quick, easy controls should be implemented immediately and further action planned for when resources permit.
Quick, easy controls should be implemented immediately and further action planned for when resources permit.
Monitoring required ensuring controls are maintained.
Monitoring required ensuring controls are maintained. Manage through routine procedures. Go for economic
Manage through routine procedures. Go for economic
improvements where possible. Incident report must
improvements where possible. Incident report must be completed.
be completed.
5-12
5-12
Medium
Medium
Aim to reduce risks but costs of prevention may be limited. Underta
Aim to reduce risks but costs of prevention may be limited. Undertake a risk assessment of the situation / task and
ke a risk assessment of the situation / task and
implement the appropriate actions. Actions should have a timescale and should be monitored. Where the risk
implement the appropriate actions. Actions should have a timescale and should be monitored. Where the risk
involves work in progress undertake a risk assessment as soon as possible to ensure the safety of the situation or
involves work in progress undertake a risk assessment as soon as possible to ensure the safety of the situation or
task.
task. Work should not start until the risk is
Work should not start until the risk is reduced to an acceptable level.
reduced to an acceptable level. Considerable resources may have to be
Considerable resources may have to be
allocated. Contact your Manager and Risk Manager by telephone about the actions that should be taken to reduce
allocated. Contact your Manager and Risk Manager by telephone about the actions that should be taken to reduce
the risk/s. incident report must be completed. Incident must be added to service risk
the risk/s. incident report must be completed. Incident must be added to service risk register.
register.
15-25
15-25
High
High
Do not commence the activity until
Do not commence the activity until a risk assessment has been completed to ensure the safety of the situation or
a risk assessment has been completed to ensure the safety of the situation or
task. If it is
task. If it is not possible to reduce or eliminate the risk even with
not possible to reduce or eliminate the risk even with unlimited resources, work must remain prohibited.
unlimited resources, work must remain prohibited.
Inform your relevant Director, your Manager and the Risk Manager immediately by telephone. Incident report must be
Inform your relevant Director, your Manager and the Risk Manager immediately by telephone. Incident report must be
completed. Incident must be added to service risk register.
completed. Incident must be added to service risk register.
Page8 of 8
Page8 of 8

More Related Content

What's hot

CONFINED SPACE ENTRY PERMIT Form # HSEQ - CSE Rev 3.docx
CONFINED SPACE ENTRY PERMIT Form # HSEQ - CSE Rev 3.docxCONFINED SPACE ENTRY PERMIT Form # HSEQ - CSE Rev 3.docx
CONFINED SPACE ENTRY PERMIT Form # HSEQ - CSE Rev 3.docx
Dwarika Bhushan Sharma
 

What's hot (20)

11 piling operations with rebar cage installation risk assessment templates
11 piling operations with rebar cage installation risk assessment templates11 piling operations with rebar cage installation risk assessment templates
11 piling operations with rebar cage installation risk assessment templates
 
Fire Risk Assessment.pdf
Fire Risk Assessment.pdfFire Risk Assessment.pdf
Fire Risk Assessment.pdf
 
Permit to work system
Permit to work systemPermit to work system
Permit to work system
 
3 emergency management risk assessment templates
3 emergency management risk assessment templates3 emergency management risk assessment templates
3 emergency management risk assessment templates
 
Job safety analysis
Job safety analysis Job safety analysis
Job safety analysis
 
Safety training observation programme (STOP)
Safety training observation programme (STOP)Safety training observation programme (STOP)
Safety training observation programme (STOP)
 
30 workplace temporary electrical supply risk assessment templates
30 workplace temporary electrical supply risk assessment templates30 workplace temporary electrical supply risk assessment templates
30 workplace temporary electrical supply risk assessment templates
 
Emergency response planning
Emergency response planningEmergency response planning
Emergency response planning
 
15 formwork (temporary works) risk assessment templates
15 formwork (temporary works) risk assessment templates15 formwork (temporary works) risk assessment templates
15 formwork (temporary works) risk assessment templates
 
Emergency spill control drill
Emergency spill control drillEmergency spill control drill
Emergency spill control drill
 
CONFINED SPACE ENTRY PERMIT Form # HSEQ - CSE Rev 3.docx
CONFINED SPACE ENTRY PERMIT Form # HSEQ - CSE Rev 3.docxCONFINED SPACE ENTRY PERMIT Form # HSEQ - CSE Rev 3.docx
CONFINED SPACE ENTRY PERMIT Form # HSEQ - CSE Rev 3.docx
 
8 lifting operations with mobile crane risk assessment templates
8 lifting operations with mobile crane risk assessment templates8 lifting operations with mobile crane risk assessment templates
8 lifting operations with mobile crane risk assessment templates
 
Hira
HiraHira
Hira
 
25 demolition of existing concrete structures risk assessment templates
25 demolition of existing concrete structures risk assessment templates25 demolition of existing concrete structures risk assessment templates
25 demolition of existing concrete structures risk assessment templates
 
Lifting & Rigging Safety.pptx
Lifting & Rigging Safety.pptxLifting & Rigging Safety.pptx
Lifting & Rigging Safety.pptx
 
2 fire risk assessment template risk assessment templates
2 fire risk assessment template risk assessment templates2 fire risk assessment template risk assessment templates
2 fire risk assessment template risk assessment templates
 
Emergency Response Training
Emergency Response TrainingEmergency Response Training
Emergency Response Training
 
HS Project Baseline Risk Assessment.docx
HS Project Baseline Risk Assessment.docxHS Project Baseline Risk Assessment.docx
HS Project Baseline Risk Assessment.docx
 
Incident investigation
Incident investigationIncident investigation
Incident investigation
 
14 use of plant graders and road rollers risk assessment templates
14 use of plant  graders and road rollers risk assessment templates14 use of plant  graders and road rollers risk assessment templates
14 use of plant graders and road rollers risk assessment templates
 

Similar to Gas Welding Risk Assessment.pdf

17 1 Drilling Operations Risk assessment
17 1 Drilling Operations Risk assessment17 1 Drilling Operations Risk assessment
17 1 Drilling Operations Risk assessment
FESTUS RICHARD SIAME
 
3 -industrial safety-pp beura
3 -industrial safety-pp beura3 -industrial safety-pp beura
3 -industrial safety-pp beura
Sivaranjan
 
8.1 ATC-FM-009 - Health and Safety Risk Register, 26th April 2018.docx
8.1 ATC-FM-009 - Health and Safety Risk Register, 26th April 2018.docx8.1 ATC-FM-009 - Health and Safety Risk Register, 26th April 2018.docx
8.1 ATC-FM-009 - Health and Safety Risk Register, 26th April 2018.docx
DanielLove24
 
03-hira-for-welding-work-_compress.pdf
03-hira-for-welding-work-_compress.pdf03-hira-for-welding-work-_compress.pdf
03-hira-for-welding-work-_compress.pdf
RajkumarArikumar
 
JSA01_De-Ethanizer_Foundation_Execution_Rev00.pdf
JSA01_De-Ethanizer_Foundation_Execution_Rev00.pdfJSA01_De-Ethanizer_Foundation_Execution_Rev00.pdf
JSA01_De-Ethanizer_Foundation_Execution_Rev00.pdf
JESUSBASILIOANTONIO
 
Airside Observation Statement -24.12.2015.xlsx(A).xlsx01
Airside Observation Statement -24.12.2015.xlsx(A).xlsx01Airside Observation Statement -24.12.2015.xlsx(A).xlsx01
Airside Observation Statement -24.12.2015.xlsx(A).xlsx01
Andrew Louis
 
LPG Chloride treaters foundation execution_Rev.00.pdf
LPG Chloride treaters foundation execution_Rev.00.pdfLPG Chloride treaters foundation execution_Rev.00.pdf
LPG Chloride treaters foundation execution_Rev.00.pdf
JESUSBASILIOANTONIO
 
hot works for construction of temporary facilities
hot works for construction of temporary facilitieshot works for construction of temporary facilities
hot works for construction of temporary facilities
Fãrük Ñäzmî
 
JHA06_Installation of Transversal beams in Flare Pipe Rack_Rev00.pdf
JHA06_Installation of Transversal beams in Flare Pipe Rack_Rev00.pdfJHA06_Installation of Transversal beams in Flare Pipe Rack_Rev00.pdf
JHA06_Installation of Transversal beams in Flare Pipe Rack_Rev00.pdf
JESUSBASILIOANTONIO
 
ACT Environment Induction
ACT Environment InductionACT Environment Induction
ACT Environment Induction
Dotjo Dev
 
Appendix 23.3 HS-RA-33 Demobilization of Site Offices Welfare Facilities Stor...
Appendix 23.3 HS-RA-33 Demobilization of Site Offices Welfare Facilities Stor...Appendix 23.3 HS-RA-33 Demobilization of Site Offices Welfare Facilities Stor...
Appendix 23.3 HS-RA-33 Demobilization of Site Offices Welfare Facilities Stor...
MohammedAliQazi
 

Similar to Gas Welding Risk Assessment.pdf (20)

17 1 Drilling Operations Risk assessment
17 1 Drilling Operations Risk assessment17 1 Drilling Operations Risk assessment
17 1 Drilling Operations Risk assessment
 
3 -industrial safety-pp beura
3 -industrial safety-pp beura3 -industrial safety-pp beura
3 -industrial safety-pp beura
 
8.1 ATC-FM-009 - Health and Safety Risk Register, 26th April 2018.docx
8.1 ATC-FM-009 - Health and Safety Risk Register, 26th April 2018.docx8.1 ATC-FM-009 - Health and Safety Risk Register, 26th April 2018.docx
8.1 ATC-FM-009 - Health and Safety Risk Register, 26th April 2018.docx
 
Ali farhat resume - updated dec 1, 2015
Ali farhat   resume - updated dec 1, 2015Ali farhat   resume - updated dec 1, 2015
Ali farhat resume - updated dec 1, 2015
 
Ali farhat resume - updated dec 1, 2015
Ali farhat   resume - updated dec 1, 2015Ali farhat   resume - updated dec 1, 2015
Ali farhat resume - updated dec 1, 2015
 
HSE Risk Register.docx
HSE Risk Register.docxHSE Risk Register.docx
HSE Risk Register.docx
 
03-hira-for-welding-work-_compress.pdf
03-hira-for-welding-work-_compress.pdf03-hira-for-welding-work-_compress.pdf
03-hira-for-welding-work-_compress.pdf
 
Risk assessment for testing & commissioning of cranes
Risk assessment for  testing & commissioning of cranesRisk assessment for  testing & commissioning of cranes
Risk assessment for testing & commissioning of cranes
 
JSA01_De-Ethanizer_Foundation_Execution_Rev00.pdf
JSA01_De-Ethanizer_Foundation_Execution_Rev00.pdfJSA01_De-Ethanizer_Foundation_Execution_Rev00.pdf
JSA01_De-Ethanizer_Foundation_Execution_Rev00.pdf
 
Airside Observation Statement -24.12.2015.xlsx(A).xlsx01
Airside Observation Statement -24.12.2015.xlsx(A).xlsx01Airside Observation Statement -24.12.2015.xlsx(A).xlsx01
Airside Observation Statement -24.12.2015.xlsx(A).xlsx01
 
Basic Familiarisation Review
Basic Familiarisation ReviewBasic Familiarisation Review
Basic Familiarisation Review
 
LPG Chloride treaters foundation execution_Rev.00.pdf
LPG Chloride treaters foundation execution_Rev.00.pdfLPG Chloride treaters foundation execution_Rev.00.pdf
LPG Chloride treaters foundation execution_Rev.00.pdf
 
Hira
HiraHira
Hira
 
hot works for construction of temporary facilities
hot works for construction of temporary facilitieshot works for construction of temporary facilities
hot works for construction of temporary facilities
 
JHA06_Installation of Transversal beams in Flare Pipe Rack_Rev00.pdf
JHA06_Installation of Transversal beams in Flare Pipe Rack_Rev00.pdfJHA06_Installation of Transversal beams in Flare Pipe Rack_Rev00.pdf
JHA06_Installation of Transversal beams in Flare Pipe Rack_Rev00.pdf
 
ACT Environment Induction
ACT Environment InductionACT Environment Induction
ACT Environment Induction
 
Appendix 23.3 HS-RA-33 Demobilization of Site Offices Welfare Facilities Stor...
Appendix 23.3 HS-RA-33 Demobilization of Site Offices Welfare Facilities Stor...Appendix 23.3 HS-RA-33 Demobilization of Site Offices Welfare Facilities Stor...
Appendix 23.3 HS-RA-33 Demobilization of Site Offices Welfare Facilities Stor...
 
risk assessment
risk assessment risk assessment
risk assessment
 
Hazardous Waste Operations and Emergency Response
Hazardous Waste Operations and Emergency ResponseHazardous Waste Operations and Emergency Response
Hazardous Waste Operations and Emergency Response
 
JHA HEAVY LIFTING OF VESSEL.pdf
JHA HEAVY LIFTING OF VESSEL.pdfJHA HEAVY LIFTING OF VESSEL.pdf
JHA HEAVY LIFTING OF VESSEL.pdf
 

Recently uploaded

VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
dollysharma2066
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
ankushspencer015
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ssuser89054b
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 

Recently uploaded (20)

Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 

Gas Welding Risk Assessment.pdf

  • 1. Project Name & Details Project Name & Details RISK ASSESSMENT FOR GAS WELDING RISK ASSESSMENT FOR GAS WELDING REF: REF: REV: 00 REV: 00 DATE: DATE: S.N S.N . . A AC CT TI IV VI IT TY Y H HA AZ ZA AR RD D CAUSES OF CAUSES OF HAZARD HAZARD RISK RISK EVALUATION EVALUATION RISK RISK LEVEL LEVEL IM IM LEMENTED LEMENTED CONTROL CONTROL MEASURES MEASURES RESIDUAL RISK RESIDUAL RISK ACCE ACCE T T Y/N? Y/N? S S H H/ /M M/ /L L S S H H/ /M M/ /L L 1 1 ermitting ermitting work work and preparation and preparation   Work condition not Work condition not safe safe   Procedures and tasks Procedures and tasks not clear or respected not clear or respected   Lack of supervisory Lack of supervisory   Miscommunication Miscommunication   Not correct PPE worn Not correct PPE worn   Equipment not Equipment not inspected and inspected and certified certified Material Material damage damage Personnel Personnel injury injury 2 2 4 4 4 4   HSE team to assess the conditions HSE team to assess the conditions of work in the assigned area prior of work in the assigned area prior and during the work and during the work   Competency of personnel and Competency of personnel and supervision for the different supervision for the different activities activities   Define hierarchy and reporting Define hierarchy and reporting flowcharts flowcharts   Check inspection certificates of Check inspection certificates of equipment for the job equipment for the job   CONTRACTOR PTW system should CONTRACTOR PTW system should be implemented be implemented   Attend CONTRACTOR safety Attend CONTRACTOR safety trainings trainings   Equipment checklist should be Equipment checklist should be made for all new equipment coming made for all new equipment coming to site to site   Weekly equipment checklist should Weekly equipment checklist should be made and kept at engine be made and kept at engine   Toolbox talks Toolbox talks Define proper PPE to be used for the Define proper PPE to be used for the work work 1 1 1 1 1 1 Y Y 1 1 Unloading Unloading Equipment Equipment (Mechanical (Mechanical   Dropped object while Dropped object while unloading equipments / unloading equipments / swinging or tip over of swinging or tip over of Personnel Personnel injuries/ injuries/ fatalities fatalities 2 2 4 4 4 4   lifting/ unloading of material under lifting/ unloading of material under PTW / JSA/ TBT/WMS PTW / JSA/ TBT/WMS 1 1 1 1 1 1 Y Y Page1 of 8 Page1 of 8
  • 2. Project Name & Details Project Name & Details RISK ASSESSMENT FOR GAS WELDING RISK ASSESSMENT FOR GAS WELDING REF: REF: REV: 00 REV: 00 DATE: DATE: and manual) and manual) load / load /   collision between load & collision between load & facilities facilities   Mechanical failure/ fire Mechanical failure/ fire   Lifting gears failure Lifting gears failure   Operating in a windy Operating in a windy weather weather   Spills Spills   Uneven Uneven Floor Floor   Musculoskeletal Musculoskeletal disorder (MSDS) from disorder (MSDS) from manual heavy lift manual heavy lift   Hands injuries from the Hands injuries from the sharp edges sharp edges   Pinch Point / dropped Pinch Point / dropped loads loads Work in classified area Work in classified area Material Material damage damage Environmental Environmental impact impact   Standard PPE Must Be worn Standard PPE Must Be worn   Certified forklift / 70Tcrane Certified forklift / 70Tcrane   Weekly checklist for the lifting Weekly checklist for the lifting equipment equipment   Certified lifting accessory & Certified lifting accessory & gears Coded color ongoing gears Coded color ongoing   Visual Inspection for the lifti Visual Inspection for the lifting gears ng gears in prior to start any lift in prior to start any lifting task ing task   Close supervision / QHSE Supervisor Close supervision / QHSE Supervisor assigned at site assigned at site   Never stand under suspended loads Never stand under suspended loads   Respect the radius swing Respect the radius swing   Competent & Certified operator Competent & Certified operator   No blind lifting No blind lifting   Lifting Area barricaded Lifting Area barricaded   Certified containers pad eyes Certified containers pad eyes   restricted access area (using warning restricted access area (using warning tape & safety signs) tape & safety signs)   Banks man to guide the lifting Banks man to guide the lifting operation operation   prohibit the lifting @ prohibit the lifting @ a wind speed a wind speed more than of 50 km/h more than of 50 km/h   check the ground state check the ground state   Apply the right manual handling Apply the right manual handling techniques / use a mechanical help if techniques / use a mechanical help if required required   Use the SMART GRIP Technique Use the SMART GRIP Technique   shadowed Shelters to be provided shadowed Shelters to be provided Continuous gas monitoring Continuous gas monitoring 1 1 Dismantling of Dismantling of   Pinch point / hand Pinch point / hand People People 2 2 4 4 4 4   PTW/JSA/TBT PTW/JSA/TBT 1 1 1 1 1 1 Y Y Page2 of 8 Page2 of 8
  • 3. Project Name & Details Project Name & Details RISK ASSESSMENT FOR GAS WELDING RISK ASSESSMENT FOR GAS WELDING REF: REF: REV: 00 REV: 00 DATE: DATE: the existing the existing corroded pipe corroded pipe injuries injuries   Falling from height Falling from height   MSDs(musculoskeleta MSDs(musculoskeleta l disorder/wrong l disorder/wrong posture) posture)   Dropped object Dropped object   Potential Sparks Potential Sparks ignition ignition Work in classified Work in classified area area assets assets   Proper PPE: gloves (EN 388) Proper PPE: gloves (EN 388)   Take extra attention when carrying Take extra attention when carrying out the dismantling task out the dismantling task   Only green Tagged scaffold to be Only green Tagged scaffold to be used used   Wear personnel fall arrest system if Wear personnel fall arrest system if required required   Apply the right kinetic postures Apply the right kinetic postures   Clear and isolate the lower area to Clear and isolate the lower area to prevent injuries from falling object prevent injuries from falling object   Use only bronze tools Use only bronze tools 1 1 H Ho ot t w wo or rk k (cutting, (cutting, grinding and grinding and welding) welding) Toxic fumes Toxic fumes inhalation inhalation Eyes irritation Eyes irritation Electrocution Electrocution /electrical shock /electrical shock Fire eruption Fire eruption Burns Burns Explosion Explosion Flying debris broken Flying debris broken disc disc Naked wires Naked wires Noise Noise Backfiring Backfiring Explosion due to Explosion due to overpressure of the overpressure of the compressed gas compressed gas cylinders cylinders Work in classified Work in classified   People People Asset Asset 2 2 4 4 4 4   Hot PTW/JSA/TBT Hot PTW/JSA/TBT   Pressurized welding habitat Pressurized welding habitat   Fire blanket Fire blanket   Atex equipment Atex equipment   Clear the nearby area from the Clear the nearby area from the combustibles combustibles   Proper PPE (welding glovesEN Proper PPE (welding glovesEN 407)/welding mask/face 407)/welding mask/face shield/welding apron/ear plugs shield/welding apron/ear plugs   RPM of the disk should be larger RPM of the disk should be larger than the angle grinder RPM than the angle grinder RPM   Flashback arrestor Flashback arrestor   Compressed gas cylinders should Compressed gas cylinders should be kept in upright position and be kept in upright position and secured , capped if not in use secured , capped if not in use   Pressure gauge should be calibrated Pressure gauge should be calibrated   Safety signs in place Safety signs in place 1 1 1 1 1 1 Y Y Page3 of 8 Page3 of 8
  • 4. Project Name & Details Project Name & Details RISK ASSESSMENT FOR GAS WELDING RISK ASSESSMENT FOR GAS WELDING REF: REF: REV: 00 REV: 00 DATE: DATE: area area   Fire watch man in place Fire watch man in place   Continuous gas monitoring Continuous gas monitoring 1 1 V Ve eh hiic clle es s a an nd d Machinery Machinery Moving Moving   Road Crossings Road Crossings   vehicle crash vehicle crash Struck personnel Struck personnel   Material Material damage damage   Personnel Personnel injury injury 2 2 4 4 4 4   Traffic if necessary will be Traffic if necessary will be controlled. controlled.   Site drawings are available all the Site drawings are available all the time and used when needed time and used when needed   Roads to be market and Roads to be market and supervisors supervisors to be informed to be informed   All crossing with main road should All crossing with main road should be secured with hard barriers if not be secured with hard barriers if not used or properly identified with used or properly identified with adequate road signs when in use. adequate road signs when in use.   Permanent presence of the Permanent presence of the banksman banksman   Speed limit 10km/h in the ROW Speed limit 10km/h in the ROW   Warning signs Warning signs   Road signs Road signs   Correct hand signals Correct hand signals 1 1 1 1 1 1 Y Y 1 1 C Clle ea an niin ng g & & Housekeeping Housekeeping Musculoskeletal from Musculoskeletal from repetitive motion including repetitive motion including bending, stretching, bending, stretching, reaching etc. reaching etc. Personnel Personnel injury injury 2 2 4 4 4 4   Training for good work practices to Training for good work practices to be held on site be held on site   TBT in place before job, TBT in place before job, housekeeping issues to be housekeeping issues to be mentioned in all TBT mentioned in all TBT   Personnel to perform cleaning and Personnel to perform cleaning and housekeeping without abuse to housekeeping without abuse to their bodies their bodies   Good lifting practice to be applied Good lifting practice to be applied 1 1 1 1 1 1 Y Y Page4 of 8 Page4 of 8
  • 5. Project Name & Details Project Name & Details RISK ASSESSMENT FOR GAS WELDING RISK ASSESSMENT FOR GAS WELDING REF: REF: REV: 00 REV: 00 DATE: DATE: 1 1 C Clle ea an niin ng g & & Housekeeping Housekeeping Pollution, Waste Pollution, Waste Environmental Environmental damage damage 2 2 4 4 4 4   No waste is tolerated during the job No waste is tolerated during the job execution. execution.   Personnel to end the day by Personnel to end the day by cleaning, inspecting equipment and cleaning, inspecting equipment and goodhousekeeping. goodhousekeeping.   All waste has to be collected and All waste has to be collected and removed to a designated area. removed to a designated area.   Any spill is to be contained in time, a Any spill is to be contained in time, a report to be issued to HSE report to be issued to HSE Manager. Manager.   All ground disturbing has to be All ground disturbing has to be remained to its normal situation remained to its normal situation after work. after work.   Any pollution or ground disturbing to Any pollution or ground disturbing to be reported directly to HSSE site be reported directly to HSSE site Manager and CONTRACTOR Manager and CONTRACTOR   Waste disposal unit, containers in Waste disposal unit, containers in place place   Plastic bags to collect waste Plastic bags to collect waste   Waste separation to be applied Waste separation to be applied 1 1 1 1 1 1 Y Y 1 1 C Clle ea an niin ng g & & Housekeeping Housekeeping Biological hazard Biological hazard Scorpion Scorpion stings / vipers stings / vipers bites bites 2 2 4 4 4 4   Awareness regarding Awareness regarding scorpion/vipers risks. scorpion/vipers risks. 1 1 1 1 1 1 Y Y Page5 of 8 Page5 of 8
  • 6. Project Name & Details Project Name & Details RISK ASSESSMENT FOR GAS WELDING RISK ASSESSMENT FOR GAS WELDING REF: REF: REV: 00 REV: 00 DATE: DATE:   Area inspection before operations to Area inspection before operations to ensure no insects. ensure no insects.   Equipment appropriately stored after Equipment appropriately stored after the end of operations (not left on the end of operations (not left on the ground along the night). the ground along the night).   Sand bags “under check” before Sand bags “under check” before removing. removing.   Rests away insects shelters (stones, Rests away insects shelters (stones, bushes…) bushes…)   PPE. PPE.   TBT. TBT. ersons ersons in da in danger nger   Workers undertaking the work Workers undertaking the work   Persons passing the site location/ truck routes, e.g. members of the public and persons in the V Persons passing the site location/ truck routes, e.g. members of the public and persons in the Vehicles. ehicles. ersonal ersonal protective protective equipment equipment   Safety Helmet, Gum Boot, Proper Gloves & Safety Helmet, Gum Boot, Proper Gloves & Safety Goggles Safety Goggles Information, instruction and training Information, instruction and training   All personnel in the team are to be made aware of the sa All personnel in the team are to be made aware of the safe systems of work. fe systems of work.   Ensure that good housekeeping standard is maintained t Ensure that good housekeeping standard is maintained throughout. hroughout.   Training and experience for personnel to Training and experience for personnel to use electrical equipments and vibratory equipments. use electrical equipments and vibratory equipments.   Educate the personnel to handle chemicals such Educate the personnel to handle chemicals such as concrete… as concrete… Page6 of 8 Page6 of 8
  • 7. Project Name & Details Project Name & Details RISK ASSESSMENT FOR GAS WELDING RISK ASSESSMENT FOR GAS WELDING REF: REF: REV: 00 REV: 00 DATE: DATE: Emergency procedures Emergency procedures   Site emergency procedures should make provision for t Site emergency procedures should make provision for the rescue of individuals from he rescue of individuals from heights. heights.   First-aid facilities should be available to cope with any First-aid facilities should be available to cope with any significant injuries that may arise from the work. significant injuries that may arise from the work. Monitoring and review Monitoring and review   Work should be monitored by Foreman and charge hand who are trained to ensure that any additional Work should be monitored by Foreman and charge hand who are trained to ensure that any additional precautions or equipment required are provided. precautions or equipment required are provided. RISK ASSESSMENT COMMITTEE RISK ASSESSMENT COMMITTEE: : Project Project Manager/ Manager/ Project Project Engineer Engineer Safety Manager/ Safety Officer Safety Manager/ Safety Officer Reviewed by: Reviewed by: (Safety Officer) (Safety Officer) Approved by: Approved by: (Project Manager) (Project Manager) RISK MATRIX RISK MATRIX Risk Rating (RR) – Severity x Likelihood Risk Rating (RR) – Severity x Likelihood LIKELIHOOD LIKELIHOOD ( ROBABILITY) ( ROBABILITY) ( ( ) ) SEVERITY SEVERITY (IM ACT) (IM ACT) (S) (S) Rare Rare Remote possibility Remote possibility (once every 3 (once every 3 years or more) years or more) 1 1 Unlikely Unlikely Could happen but Could happen but rare (typically once rare (typically once in a year) in a year) 2 2 ossible ossible Could happen Could happen occasionally (on occasionally (on average quarterly) average quarterly) 3 3 Likely Likely Could happen often Could happen often (on average once a (on average once a month or more) month or more) 4 4 Almost certain Almost certain Could happen Could happen frequently (once a frequently (once a week or more) week or more) 5 5 Page7 of 8 Page7 of 8
  • 8. Project Name & Details Project Name & Details RISK ASSESSMENT FOR GAS WELDING RISK ASSESSMENT FOR GAS WELDING REF: REF: REV: 00 REV: 00 DATE: DATE: I In ns siig gn niif fiic ca an nt t 1 1 Low Low 1 1 Low Low 2 2 Low Low 3 3 Low Low 4 4 Medium Medium 5 5 M Miin no or r 2 2 Low Low 2 2 Low Low 4 4 Medium Medium 6 6 Medium Medium 8 8 Medium Medium 10 10 M Mo od de er ra at te e 3 3 Low Low 3 3 Medium Medium 6 6 Medium Medium 9 9 Medium Medium 12 12 High High 15 15 S Siig gn niif fiic ca an nt t 4 4 Low Low 4 4 Medium Medium 8 8 Medium Medium 12 12 High High 16 16 High High 20 20 M Ma ajjo or r 5 5 Medium Medium 5 5 Medium Medium 10 10 High High 15 15 High High 20 20 High High 25 25 RISK RISK BASED BASED CONTROL CONTROL LAN LAN R RI IS SK K L LE EV VE EL L A AC CT TI IO ON N A AN ND D T TI IM ME ES SC CA AL LE E 1-4 1-4 Low Low Quick, easy controls should be implemented immediately and further action planned for when resources permit. Quick, easy controls should be implemented immediately and further action planned for when resources permit. Monitoring required ensuring controls are maintained. Monitoring required ensuring controls are maintained. Manage through routine procedures. Go for economic Manage through routine procedures. Go for economic improvements where possible. Incident report must improvements where possible. Incident report must be completed. be completed. 5-12 5-12 Medium Medium Aim to reduce risks but costs of prevention may be limited. Underta Aim to reduce risks but costs of prevention may be limited. Undertake a risk assessment of the situation / task and ke a risk assessment of the situation / task and implement the appropriate actions. Actions should have a timescale and should be monitored. Where the risk implement the appropriate actions. Actions should have a timescale and should be monitored. Where the risk involves work in progress undertake a risk assessment as soon as possible to ensure the safety of the situation or involves work in progress undertake a risk assessment as soon as possible to ensure the safety of the situation or task. task. Work should not start until the risk is Work should not start until the risk is reduced to an acceptable level. reduced to an acceptable level. Considerable resources may have to be Considerable resources may have to be allocated. Contact your Manager and Risk Manager by telephone about the actions that should be taken to reduce allocated. Contact your Manager and Risk Manager by telephone about the actions that should be taken to reduce the risk/s. incident report must be completed. Incident must be added to service risk the risk/s. incident report must be completed. Incident must be added to service risk register. register. 15-25 15-25 High High Do not commence the activity until Do not commence the activity until a risk assessment has been completed to ensure the safety of the situation or a risk assessment has been completed to ensure the safety of the situation or task. If it is task. If it is not possible to reduce or eliminate the risk even with not possible to reduce or eliminate the risk even with unlimited resources, work must remain prohibited. unlimited resources, work must remain prohibited. Inform your relevant Director, your Manager and the Risk Manager immediately by telephone. Incident report must be Inform your relevant Director, your Manager and the Risk Manager immediately by telephone. Incident report must be completed. Incident must be added to service risk register. completed. Incident must be added to service risk register. Page8 of 8 Page8 of 8