Hazard Identification and Risk Assessment
EM / IM/EHS-4.3.1/PR/01 dt. 15.02.2016
E M
Unrestricted Page 1 of 2
Division: - EM BU / BS: - MS PA Project /Factory Name: - 245/33 KV GIS Work at Tata power Versova, Mumbai Doc No: HIRA/VERSOVA/03
Project Site Location/Factory Location: - Versova, Mumbai Rev:
Scope of Work: - Angle, insert plate,EOT Crane, Gantry Girder Fabrication Work Date 30.01.2017
Abhijeet Jaitapkar,Senthil Kumar,Pankaj Yadao, Susanta Kumar Routray,Shrikant Gadade
Hierarchy of Control Measures
Elimination 1
Severity (S) Substitution /Reduction at source 2
OHSAS 18001 : Occu. Health & Safety ISO 14001: Environmental Impact (Scale, Severity & Duration of Impact) 1 2 3 4 3
1 4
2 5
3
4
Sr. No.
Environment (ISO 14001) & Hazard/Risk (OHSAS 18001)
Env.Aspect / OH&S Hazard Env. Impact / OH&S Risk
Severity
Likelihood
Risk/Impact
Severity
Likelihood
1 Prerequistes
OH&S 2 2 4 4 2 1 2 Acceptable & Non-Significant
OH&S
Working without authorization
2 2 4 4 2 1 2 Acceptable & Non-Significant
OH&S 2 2 4 4 2 1 2 Acceptable & Non-Significant
OH&S
Poor Emergency preparedness
2 2 4 4) Strecher & first aid box shall be kept at site 4 2 1 2 Acceptable & Non-Significant
OH&S
Damaged / substandard PPE used
2 2 4 5 2 1 2 Acceptable & Non-Significant
EMS
Damage PPE at site. land pollution
2 2 4 Do's & Don’ts, avoid Dmage PPE>Toolbox talk 5 2 1 2 Acceptable & Non-Significant
OH&S
Improper road condition.
2 3 6 4 2 1 2 Acceptable & Non-Significant
OH &S Risk/Ienvironment mpact Rating Matrix
R = SxL
Likelihood of Occurrence of Hazardous event or exposure (OH&S) & Likelihood
of Env Aspect.
Rare
Could
happen,
but
probably
never
will
(<5
%
possibility)
Unlikely
Could
occur
at
some
time
Likely
Will
probably
occur
at
most
times
Almost
certain
Expected
to
occur
in
most
circumstances.
(>
90%
possibility)
Engineering Controls/
Conservation/Reuse/Recycle/Treatme
nt
First Aid Case/temp Illness/Near Miss Incident of less severe in
nature
Minor environmental incident (lekage, spillage, waste of resource etc) within the workplace
& not lasting for more than 1 shift. Or, conservation of natural resources
(water/fuel/electricity etc) or, business opportunity through waste/scrap/conservation.
Low
(Acceptable & Non-
significant)
Low
(Acceptable & Non-
significant)
Low
(Acceptable & Non-
significant)
Medium
(Acceptable &
Significant)
Admin Controls
(Training/Supervision/Guidemlines/pr
ocedures/PTW/signages/posters/ etc)
Reportable / Loss Time Injury/major fire with injury/Near Miss incident
of high severity/legal approvals about to expire in 2 weeks & no
action taken / the measured parameters(or its exposure) are 10 %
within the permissible limits.
Moderate environmental incident within the workplace/department & not lasting for more
than 1 day and /or waste of natural resources as follows (by judgement): 1) Water: 1 % of
average monthly consumption 2) Diesel/fuel: 0.25 % of avg monthly consumption 3)
Electricity: 1 % of monthly energy consumption 4) 1 % excess of monthly raw material 5)
HW waste or air /water emission or noise very close to permissible limits, or, legal
approvals about to expire in 2 weeks & no action taken in this regard. Interested parties
communication without involvement of legal authorities.
Low
(Acceptable & Non-
significant)
Medium
(Acceptable &
Significant)
Medium (Acceptable
& Significant)
High
(Not acceptable
& Significant)
Personal Protective Equipments /
Proper segregation/ Secondary
containment
Major / Serious Injuries/Occupational Dieases /legal approvals
expired / the measured parameters (or its exposure) are not
complying with the permissible limits.
Reportable environmental incident (fire/major leakage/spillage) within the factory/site.
and /or waste of natural resources as follows (by judgement) :
1) Water: 5 % of average monthly consumption 2) Diesel/fuel: 1 % of avg monthly
consumption 3) Electricity: 5 % of monthly energy consumption 4) 5 % excess of monthly
raw material 5) HW waste or air /water emission or noise exceeding than the permissible
limits, or, legal approvals expired & no action evident.Interested parties communication
with involvement of legal authorities.
Low
(Acceptable & Non-
significant)
Medium
(Acceptable &
Significant)
High
(Not acceptable &
Significant)
High
(Not acceptable
& Significant)
Fatality / Permanent Disability/ Legal approvals not obtained or
measured parameters not meeting the legal requirements for more
than 3 months & actions taken in this regard not evident.
Reportable environmental incident (fire/major leakage/spillage) affecting nearby external
areas & HW waste/ or air or water emission or noise exceeding than the permissible
limits for continuously for 3 months/cycles or received communication from legal authority
on legal non-compliance & actions taken in this regard are not evident.
Medium
(Acceptable &
Significant)
High
(Not acceptable &
Significant)
High
(Not acceptable &
Significant)
High
(Not acceptable
& Significant)
Activities & Sub-activities [Consider
Routine/Normal; Non-
routine/Abnormal; Emergency
activities]
ISO 14001
(EMS) / OHSAS
18001 (OH&S)
relevance
EHS Risk Assessment
(No controls)
Applicable Legal requirement
(Y/N); Provide brief if 'Y'
Controls Measures
( Method statement; site specific controls in
bullet points & environment procedure (if
applicable))
Contro
l Type
Assessment
(Residual Risk/Impact)
Acceptable & Non-signifiacnt;
Acceptable & Significant;
Significant & Not-acceptable
Risk/
Impact
Lack of awareness about safety
procedures
Injury to person due to poor
safety procedures.
Y : BOCW Act, 1996 & Central
Rules 1998. ( SECTION -123)
(Register of employment)
1) Job specific training & induction training shall
be imparted before start of activity & training card
issued
Incident can happen due to
work without authorization.
Y : BOCW Act, 1996 & Central
Rules 1998. ( SECTION -218)
(Entry of unauthorized person to
be restricted)
2) Work permit to be obtained before starting the
activity.
Workmen working without medical
fitness
Aggregation of poor phycial
condition of workers.
Y : BOCW Act, 1996 & Central
Rules 1998. ( SECTION -223)
(Certificate of medical exam in
Form-6)
3) All workmen planned for this work shall be
screened for medical fitness.
Injury to person due to poor
emergency preparedness.
Y : BOCW Act, 1996 & Central
Rules 1998. ( SECTION
-36,231,228)
(Emergency action plan for site)
Injury to person due to
damaged PPE used by work
man.
Y : BOCW Act, 1996 & Central
Rules 1998. ( SECTION -46,54)
(Use of proper PPE's)
5) PPE's i.e. such as Full body harness (work
positioning belt), helmet (chin strap is tied
properly), cotton gloves & safety shoes, welding
apron, face shield, nose mask, ear plugs shall be
used whereever require.
Y : BOCW Act, 1996 & Central
Rules 1998. ( SECTION -46,54)
(Use of proper PPE's)
Toppling of farana.Major
incident.
Y : Building & Other Construction
Workeres (Regulation of
Employment & Conditions of
Service) Act, 1996 & Central
Rules 1998. (BOCWA/R)
2.Road level to be checked if required MS plate
shall be kept on uneven surface/drainage
chamber. A) farana operator shall have
crane license. B)esure safe distance of
farana from excavation built up trench.
SIEMENS
Hazard Identification and Risk Assessment
EM / IM/EHS-4.3.1/PR/01 dt. 15.02.2016
E M
Unrestricted Page 2 of 2
Sr. No.
Environment (ISO 14001) & Hazard/Risk (OHSAS 18001)
Env.Aspect / OH&S Hazard Env. Impact / OH&S Risk
Severity
Likelihood
Risk/Impact
Severity
Likelihood
Activities & Sub-activities [Consider
Routine/Normal; Non-
routine/Abnormal; Emergency
activities]
ISO 14001
(EMS) / OHSAS
18001 (OH&S)
relevance
EHS Risk Assessment
(No controls)
Applicable Legal requirement
(Y/N); Provide brief if 'Y'
Controls Measures
( Method statement; site specific controls in
bullet points & environment procedure (if
applicable))
Contro
l Type
Assessment
(Residual Risk/Impact)
Acceptable & Non-signifiacnt;
Acceptable & Significant;
Significant & Not-acceptable
Risk/
Impact
2 Welding work Operation
OH&S Electric shock /Electrocution
#
2 3 6
3 2 1 2 Acceptable & Non-Significant
OH&S Fire Hazards 2 3 6
4 2 1 2 Acceptable & Non-Significant
OH&S Health & eye Hazards 2 2 4
3 2 1 2 Acceptable & Non-Significant
OH&S Electric shock /Electrocution 2 2 4
3 2 1 2 Acceptable & Non-Significant
OH&S Untrained welder Body injury or burn 2 2 4
3 2 1 2 Acceptable & Non-Significant
OH&S Welding spark and Hot part or Surface burn injury 2 2 4
5 2 1 2 Acceptable & Non-Significant
EMS Welding fumes Air pollution 2 2 4
3 2 1 2 Acceptable & Non-Significant
EMS land pollution 2 2 4
Collection & disposal of waste granules 4 2 1 2 Acceptable & Non-Significant
EMS Welding chipping / hammering noise Noise pollution 2 2 4
3 2 1 2 Acceptable & Non-Significant
EMS Welding sandering dust Air pollution 2 2 4
3 2 1 2 Acceptable & Non-Significant
EMS Welding - Electrical power consumption Resource depletion 2 2 4
4 2 1 2 Acceptable & Non-Significant
Faulty instrument
(Welding m/c)
Y : BOCW Act, 1996 & Central
Rules 1998. ( SECTION -47 & 56)
The Indian Electricity Act, 2003 &
Rules, 1956 & 2005 (EA & ER)
1) Welding machine should be inspected through
checklist.
2) Dedicated connection should be provided for
welding machine.
3) Emergency switch should be provided with
connection.
4) Double Body earthing shall be provided to
welding machine.
5) Double insulation cable shall be used.
6) Supply shall be taken from 30mA ELCB
equipped box
7) Weldind should be done in dry area.
8)Supply cable shall be routed overhead
Welding spark and combustible
material
Y : BOCW Act, 1996 & Central
Rules 1998. ( SECTION -35 & 42)
1.Fire extinguisher & fire bucket should be placed
near hot work area.
2. Site inspection & tagging shall be done prior to
starting the work & combustible material shall be
removed
Foreign particles & Hheat radiation of
welding
Y : BOCW Act, 1996 & Central
Rules 1998. ( SECTION -45)
1.Welding face shield shall be used
2 Helper should be used black goggle .
3.Training to be provided for hot work
Faulty instrument
(Welding Holder)
Y : BOCW Act, 1996 & Central
Rules 1998. ( SECTION -47)
The Indian Electricity Act, 2003 &
Rules, 1956 & 2005 (EA & ER)
1.Electrode holders should be properly insulated
(no exposed metal parts)
2. Welding m/c holders should be kept dried and
properly hung up after use.
3.Welding holder should not in be contact with
metal parts or structure. when not in use.
4. Electrodes should be detached after welding
Y : BOCW Act, 1996 & Central
Rules 1998. ( SECTION -56)
1. Welder should be permit holder to be ensured
by site engineer.
Y : BOCW Act, 1996 & Central
Rules 1998. ( SECTION -218,44)
1.welding should be done by authorised person
only.
2.Hot material shall be kept apart from walkways
or human movement
3. Leather hand gloves & apron shall be used
Y : BOCW Act, 1996 & Central
Rules 1998.
Isolate & enclose area whereever possible with
proper fume exhaust
Welding fluxs layers / molten material
granules
Y : BOCW Act, 1996 & Central
Rules 1998.
Y : BOCW Act, 1996 & Central
Rules 1998.
The Noise Pollution (Regulation &
Isolate & enclose area whereever possible, avoid
unnecessary hammering
Y : BOCW Act, 1996 & Central
Rules 1998.
Isolate & enclose area whereever possible,
sprinkling water
Y : BOCW Act, 1996 & Central
Rules 1998.
The Indian Electricity Act, 2003 &
Rules, 1956 & 2005 (EA & ER)
Optimum use of power,avoid wastages, Sinages
"SAVE ELECTRICITY", awareness to worker &
staff
Prepared by: Mr. Susanta Kumar Routray
Date 30/1/2017
Checked by: Mr. C.Senthil Kumar
Date: 30/1/2017
Approved by: Mr. Nitin Korde
Date: 31.1.2017

More Related Content

What's hot

Working at heights training powerpoint
Working at heights training powerpointWorking at heights training powerpoint
Working at heights training powerpointJomish John
 
Forklift safety
Forklift safetyForklift safety
Forklift safetyshree
 
Job Safety Analysis
Job Safety AnalysisJob Safety Analysis
Job Safety Analysisvtsiri
 
Visitors SHE Induction Presentation 2016
Visitors SHE Induction Presentation 2016Visitors SHE Induction Presentation 2016
Visitors SHE Induction Presentation 2016Chris Morris
 
NGI-Permit to Work
NGI-Permit to WorkNGI-Permit to Work
NGI-Permit to Worklifecombo
 
Toolbox Talk
Toolbox TalkToolbox Talk
Toolbox Talktxheaven
 
Overhead crane risk assessment
Overhead crane risk assessmentOverhead crane risk assessment
Overhead crane risk assessmentSimba Zhao
 
6 excavations (temporary works) risk assessment templates
6 excavations (temporary works) risk assessment templates6 excavations (temporary works) risk assessment templates
6 excavations (temporary works) risk assessment templatesDwarika Bhushan Sharma
 
Basic safety orientation training
Basic safety orientation trainingBasic safety orientation training
Basic safety orientation trainingTony Bertram
 
Lifting equipment at work
Lifting equipment at workLifting equipment at work
Lifting equipment at workPaul Smith
 
Job safety analysis
Job safety analysis Job safety analysis
Job safety analysis soumenmakar
 
New Employee Orientation 05
New Employee Orientation 05New Employee Orientation 05
New Employee Orientation 05txsafety1
 
Health & Safety Induction Training
Health & Safety Induction TrainingHealth & Safety Induction Training
Health & Safety Induction TrainingThe Pathway Group
 
Manual Handling Ppt
Manual Handling PptManual Handling Ppt
Manual Handling Pptvtsiri
 
16 scaffolding (temporary works) risk assessment templates
16 scaffolding (temporary works) risk assessment templates16 scaffolding (temporary works) risk assessment templates
16 scaffolding (temporary works) risk assessment templatesDwarika Bhushan Sharma
 

What's hot (20)

Working at heights training powerpoint
Working at heights training powerpointWorking at heights training powerpoint
Working at heights training powerpoint
 
General HSE Training (Level 1 & 2)
General HSE Training (Level 1 & 2)General HSE Training (Level 1 & 2)
General HSE Training (Level 1 & 2)
 
Working at height slides
Working at height slidesWorking at height slides
Working at height slides
 
Forklift safety
Forklift safetyForklift safety
Forklift safety
 
Job Safety Analysis
Job Safety AnalysisJob Safety Analysis
Job Safety Analysis
 
Hira
HiraHira
Hira
 
Visitors SHE Induction Presentation 2016
Visitors SHE Induction Presentation 2016Visitors SHE Induction Presentation 2016
Visitors SHE Induction Presentation 2016
 
NGI-Permit to Work
NGI-Permit to WorkNGI-Permit to Work
NGI-Permit to Work
 
Toolbox Talk
Toolbox TalkToolbox Talk
Toolbox Talk
 
Overhead crane risk assessment
Overhead crane risk assessmentOverhead crane risk assessment
Overhead crane risk assessment
 
Amn safety induction j 175 - staff rev 4 - s 14
Amn safety induction  j 175 - staff rev 4 - s 14Amn safety induction  j 175 - staff rev 4 - s 14
Amn safety induction j 175 - staff rev 4 - s 14
 
6 excavations (temporary works) risk assessment templates
6 excavations (temporary works) risk assessment templates6 excavations (temporary works) risk assessment templates
6 excavations (temporary works) risk assessment templates
 
safety training
safety training   safety training
safety training
 
Basic safety orientation training
Basic safety orientation trainingBasic safety orientation training
Basic safety orientation training
 
Lifting equipment at work
Lifting equipment at workLifting equipment at work
Lifting equipment at work
 
Job safety analysis
Job safety analysis Job safety analysis
Job safety analysis
 
New Employee Orientation 05
New Employee Orientation 05New Employee Orientation 05
New Employee Orientation 05
 
Health & Safety Induction Training
Health & Safety Induction TrainingHealth & Safety Induction Training
Health & Safety Induction Training
 
Manual Handling Ppt
Manual Handling PptManual Handling Ppt
Manual Handling Ppt
 
16 scaffolding (temporary works) risk assessment templates
16 scaffolding (temporary works) risk assessment templates16 scaffolding (temporary works) risk assessment templates
16 scaffolding (temporary works) risk assessment templates
 

Similar to 03-hira-for-welding-work-_compress.pdf

Aspect Impact Risk Assessment (AIRA).pdf
Aspect Impact Risk Assessment (AIRA).pdfAspect Impact Risk Assessment (AIRA).pdf
Aspect Impact Risk Assessment (AIRA).pdfBLalMughal
 
Strategic approach to managing safety and environmental critical elements (SE...
Strategic approach to managing safety and environmental critical elements (SE...Strategic approach to managing safety and environmental critical elements (SE...
Strategic approach to managing safety and environmental critical elements (SE...Ian Thomas
 
Iso 14001 aspect impact management
Iso 14001 aspect impact managementIso 14001 aspect impact management
Iso 14001 aspect impact managementHpm India
 
Pipeline integrity assessment with LRUT method
Pipeline integrity assessment with LRUT methodPipeline integrity assessment with LRUT method
Pipeline integrity assessment with LRUT methodpaulus konda
 
Strategic approach to managing Environmentally Critical Elements within SECEs.
Strategic approach to managing Environmentally Critical Elements within SECEs.Strategic approach to managing Environmentally Critical Elements within SECEs.
Strategic approach to managing Environmentally Critical Elements within SECEs.Lloyd's Register Energy
 
Soft Gelatin PS risk21-9
Soft Gelatin PS risk21-9Soft Gelatin PS risk21-9
Soft Gelatin PS risk21-9Helmy ismail
 
Iso 14001 aspect impact management
Iso 14001 aspect impact managementIso 14001 aspect impact management
Iso 14001 aspect impact managementHpm India
 
OH&S Audit Report- JSW Nandyal.doc
OH&S Audit Report- JSW Nandyal.docOH&S Audit Report- JSW Nandyal.doc
OH&S Audit Report- JSW Nandyal.docMirza Saifullah Baig
 
Applicable laws or legal requirements for textile unit
Applicable laws or legal requirements for textile unitApplicable laws or legal requirements for textile unit
Applicable laws or legal requirements for textile unitWintry Textile & Engg co.
 
The Importance of Risk Management in the Pipeline Industry
The Importance of Risk Management in the Pipeline IndustryThe Importance of Risk Management in the Pipeline Industry
The Importance of Risk Management in the Pipeline IndustryAudubon Engineering Company
 
A Risk Assessment Study on Occupational Hazards in Cement Industry
A Risk Assessment Study on Occupational Hazards in Cement IndustryA Risk Assessment Study on Occupational Hazards in Cement Industry
A Risk Assessment Study on Occupational Hazards in Cement IndustryIRJET Journal
 
MMT PROCEDURE FOR MINING INDUSTRY
MMT PROCEDURE FOR MINING INDUSTRY  MMT PROCEDURE FOR MINING INDUSTRY
MMT PROCEDURE FOR MINING INDUSTRY ElmerCausing2
 
Environmental Engineering eia report italy 09.pptx
Environmental Engineering eia report italy 09.pptxEnvironmental Engineering eia report italy 09.pptx
Environmental Engineering eia report italy 09.pptxFawadMalik32
 
EHS Review - May 2017 - Vijay West Project
EHS Review - May 2017 - Vijay West ProjectEHS Review - May 2017 - Vijay West Project
EHS Review - May 2017 - Vijay West ProjectTapas Das
 
Multi Objective Optimization of Plastic Welding Parameters in USPW of PMMA CM...
Multi Objective Optimization of Plastic Welding Parameters in USPW of PMMA CM...Multi Objective Optimization of Plastic Welding Parameters in USPW of PMMA CM...
Multi Objective Optimization of Plastic Welding Parameters in USPW of PMMA CM...IRJET Journal
 
Hazard Identification and Risk Assessment
Hazard Identification and Risk AssessmentHazard Identification and Risk Assessment
Hazard Identification and Risk AssessmentMirza Saifullah Baig
 
5 Trial Trenches (Temporary Works) Risk Assessment Templates.docx
5 Trial Trenches (Temporary Works) Risk Assessment Templates.docx5 Trial Trenches (Temporary Works) Risk Assessment Templates.docx
5 Trial Trenches (Temporary Works) Risk Assessment Templates.docxDwarika Bhushan Sharma
 
PSM Process Safety Management.pdf
PSM Process Safety Management.pdfPSM Process Safety Management.pdf
PSM Process Safety Management.pdfssuser2fc67e
 

Similar to 03-hira-for-welding-work-_compress.pdf (20)

Aspect Impact Risk Assessment (AIRA).pdf
Aspect Impact Risk Assessment (AIRA).pdfAspect Impact Risk Assessment (AIRA).pdf
Aspect Impact Risk Assessment (AIRA).pdf
 
Strategic approach to managing safety and environmental critical elements (SE...
Strategic approach to managing safety and environmental critical elements (SE...Strategic approach to managing safety and environmental critical elements (SE...
Strategic approach to managing safety and environmental critical elements (SE...
 
Iso 14001 aspect impact management
Iso 14001 aspect impact managementIso 14001 aspect impact management
Iso 14001 aspect impact management
 
Pipeline integrity assessment with LRUT method
Pipeline integrity assessment with LRUT methodPipeline integrity assessment with LRUT method
Pipeline integrity assessment with LRUT method
 
Strategic approach to managing Environmentally Critical Elements within SECEs.
Strategic approach to managing Environmentally Critical Elements within SECEs.Strategic approach to managing Environmentally Critical Elements within SECEs.
Strategic approach to managing Environmentally Critical Elements within SECEs.
 
Industrial safety unit iii ppt
Industrial safety unit iii pptIndustrial safety unit iii ppt
Industrial safety unit iii ppt
 
Soft Gelatin PS risk21-9
Soft Gelatin PS risk21-9Soft Gelatin PS risk21-9
Soft Gelatin PS risk21-9
 
Iso 14001 aspect impact management
Iso 14001 aspect impact managementIso 14001 aspect impact management
Iso 14001 aspect impact management
 
OH&S Audit Report- JSW Nandyal.doc
OH&S Audit Report- JSW Nandyal.docOH&S Audit Report- JSW Nandyal.doc
OH&S Audit Report- JSW Nandyal.doc
 
Applicable laws or legal requirements for textile unit
Applicable laws or legal requirements for textile unitApplicable laws or legal requirements for textile unit
Applicable laws or legal requirements for textile unit
 
The Importance of Risk Management in the Pipeline Industry
The Importance of Risk Management in the Pipeline IndustryThe Importance of Risk Management in the Pipeline Industry
The Importance of Risk Management in the Pipeline Industry
 
Industrial safety
Industrial safetyIndustrial safety
Industrial safety
 
A Risk Assessment Study on Occupational Hazards in Cement Industry
A Risk Assessment Study on Occupational Hazards in Cement IndustryA Risk Assessment Study on Occupational Hazards in Cement Industry
A Risk Assessment Study on Occupational Hazards in Cement Industry
 
MMT PROCEDURE FOR MINING INDUSTRY
MMT PROCEDURE FOR MINING INDUSTRY  MMT PROCEDURE FOR MINING INDUSTRY
MMT PROCEDURE FOR MINING INDUSTRY
 
Environmental Engineering eia report italy 09.pptx
Environmental Engineering eia report italy 09.pptxEnvironmental Engineering eia report italy 09.pptx
Environmental Engineering eia report italy 09.pptx
 
EHS Review - May 2017 - Vijay West Project
EHS Review - May 2017 - Vijay West ProjectEHS Review - May 2017 - Vijay West Project
EHS Review - May 2017 - Vijay West Project
 
Multi Objective Optimization of Plastic Welding Parameters in USPW of PMMA CM...
Multi Objective Optimization of Plastic Welding Parameters in USPW of PMMA CM...Multi Objective Optimization of Plastic Welding Parameters in USPW of PMMA CM...
Multi Objective Optimization of Plastic Welding Parameters in USPW of PMMA CM...
 
Hazard Identification and Risk Assessment
Hazard Identification and Risk AssessmentHazard Identification and Risk Assessment
Hazard Identification and Risk Assessment
 
5 Trial Trenches (Temporary Works) Risk Assessment Templates.docx
5 Trial Trenches (Temporary Works) Risk Assessment Templates.docx5 Trial Trenches (Temporary Works) Risk Assessment Templates.docx
5 Trial Trenches (Temporary Works) Risk Assessment Templates.docx
 
PSM Process Safety Management.pdf
PSM Process Safety Management.pdfPSM Process Safety Management.pdf
PSM Process Safety Management.pdf
 

More from RajkumarArikumar

More from RajkumarArikumar (7)

IG2.pdf
IG2.pdfIG2.pdf
IG2.pdf
 
LOCKOUT TAGOUT.pdf
LOCKOUT TAGOUT.pdfLOCKOUT TAGOUT.pdf
LOCKOUT TAGOUT.pdf
 
26. Mechanical Handling.docx
26. Mechanical Handling.docx26. Mechanical Handling.docx
26. Mechanical Handling.docx
 
29. Hand tools HIRA.docx
29. Hand tools HIRA.docx29. Hand tools HIRA.docx
29. Hand tools HIRA.docx
 
IG2.pdf
IG2.pdfIG2.pdf
IG2.pdf
 
osha3252.pdf
osha3252.pdfosha3252.pdf
osha3252.pdf
 
osha2226.pdf
osha2226.pdfosha2226.pdf
osha2226.pdf
 

Recently uploaded

ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxiammrhaywood
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...Marc Dusseiller Dusjagr
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Educationpboyjonauth
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon AUnboundStockton
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdfssuser54595a
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Blooming Together_ Growing a Community Garden Worksheet.docx
Blooming Together_ Growing a Community Garden Worksheet.docxBlooming Together_ Growing a Community Garden Worksheet.docx
Blooming Together_ Growing a Community Garden Worksheet.docxUnboundStockton
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxmanuelaromero2013
 
Pharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdfPharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdfMahmoud M. Sallam
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxthorishapillay1
 
Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17Celine George
 
CELL CYCLE Division Science 8 quarter IV.pptx
CELL CYCLE Division Science 8 quarter IV.pptxCELL CYCLE Division Science 8 quarter IV.pptx
CELL CYCLE Division Science 8 quarter IV.pptxJiesonDelaCerna
 
Capitol Tech U Doctoral Presentation - April 2024.pptx
Capitol Tech U Doctoral Presentation - April 2024.pptxCapitol Tech U Doctoral Presentation - April 2024.pptx
Capitol Tech U Doctoral Presentation - April 2024.pptxCapitolTechU
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxSayali Powar
 
Historical philosophical, theoretical, and legal foundations of special and i...
Historical philosophical, theoretical, and legal foundations of special and i...Historical philosophical, theoretical, and legal foundations of special and i...
Historical philosophical, theoretical, and legal foundations of special and i...jaredbarbolino94
 
Gas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptxGas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptxDr.Ibrahim Hassaan
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxpboyjonauth
 

Recently uploaded (20)

ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
 
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Education
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon A
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
 
Blooming Together_ Growing a Community Garden Worksheet.docx
Blooming Together_ Growing a Community Garden Worksheet.docxBlooming Together_ Growing a Community Garden Worksheet.docx
Blooming Together_ Growing a Community Garden Worksheet.docx
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptx
 
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
 
Pharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdfPharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdf
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptx
 
Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17
 
CELL CYCLE Division Science 8 quarter IV.pptx
CELL CYCLE Division Science 8 quarter IV.pptxCELL CYCLE Division Science 8 quarter IV.pptx
CELL CYCLE Division Science 8 quarter IV.pptx
 
Capitol Tech U Doctoral Presentation - April 2024.pptx
Capitol Tech U Doctoral Presentation - April 2024.pptxCapitol Tech U Doctoral Presentation - April 2024.pptx
Capitol Tech U Doctoral Presentation - April 2024.pptx
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
 
Historical philosophical, theoretical, and legal foundations of special and i...
Historical philosophical, theoretical, and legal foundations of special and i...Historical philosophical, theoretical, and legal foundations of special and i...
Historical philosophical, theoretical, and legal foundations of special and i...
 
Gas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptxGas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptx
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptx
 
OS-operating systems- ch04 (Threads) ...
OS-operating systems- ch04 (Threads) ...OS-operating systems- ch04 (Threads) ...
OS-operating systems- ch04 (Threads) ...
 

03-hira-for-welding-work-_compress.pdf

  • 1. SIEMENS Hazard Identification and Risk Assessment EM / IM/EHS-4.3.1/PR/01 dt. 15.02.2016 E M Unrestricted Page 1 of 2 Division: - EM BU / BS: - MS PA Project /Factory Name: - 245/33 KV GIS Work at Tata power Versova, Mumbai Doc No: HIRA/VERSOVA/03 Project Site Location/Factory Location: - Versova, Mumbai Rev: Scope of Work: - Angle, insert plate,EOT Crane, Gantry Girder Fabrication Work Date 30.01.2017 Abhijeet Jaitapkar,Senthil Kumar,Pankaj Yadao, Susanta Kumar Routray,Shrikant Gadade Hierarchy of Control Measures Elimination 1 Severity (S) Substitution /Reduction at source 2 OHSAS 18001 : Occu. Health & Safety ISO 14001: Environmental Impact (Scale, Severity & Duration of Impact) 1 2 3 4 3 1 4 2 5 3 4 Sr. No. Environment (ISO 14001) & Hazard/Risk (OHSAS 18001) Env.Aspect / OH&S Hazard Env. Impact / OH&S Risk Severity Likelihood Risk/Impact Severity Likelihood 1 Prerequistes OH&S 2 2 4 4 2 1 2 Acceptable & Non-Significant OH&S Working without authorization 2 2 4 4 2 1 2 Acceptable & Non-Significant OH&S 2 2 4 4 2 1 2 Acceptable & Non-Significant OH&S Poor Emergency preparedness 2 2 4 4) Strecher & first aid box shall be kept at site 4 2 1 2 Acceptable & Non-Significant OH&S Damaged / substandard PPE used 2 2 4 5 2 1 2 Acceptable & Non-Significant EMS Damage PPE at site. land pollution 2 2 4 Do's & Don’ts, avoid Dmage PPE>Toolbox talk 5 2 1 2 Acceptable & Non-Significant OH&S Improper road condition. 2 3 6 4 2 1 2 Acceptable & Non-Significant OH &S Risk/Ienvironment mpact Rating Matrix R = SxL Likelihood of Occurrence of Hazardous event or exposure (OH&S) & Likelihood of Env Aspect. Rare Could happen, but probably never will (<5 % possibility) Unlikely Could occur at some time Likely Will probably occur at most times Almost certain Expected to occur in most circumstances. (> 90% possibility) Engineering Controls/ Conservation/Reuse/Recycle/Treatme nt First Aid Case/temp Illness/Near Miss Incident of less severe in nature Minor environmental incident (lekage, spillage, waste of resource etc) within the workplace & not lasting for more than 1 shift. Or, conservation of natural resources (water/fuel/electricity etc) or, business opportunity through waste/scrap/conservation. Low (Acceptable & Non- significant) Low (Acceptable & Non- significant) Low (Acceptable & Non- significant) Medium (Acceptable & Significant) Admin Controls (Training/Supervision/Guidemlines/pr ocedures/PTW/signages/posters/ etc) Reportable / Loss Time Injury/major fire with injury/Near Miss incident of high severity/legal approvals about to expire in 2 weeks & no action taken / the measured parameters(or its exposure) are 10 % within the permissible limits. Moderate environmental incident within the workplace/department & not lasting for more than 1 day and /or waste of natural resources as follows (by judgement): 1) Water: 1 % of average monthly consumption 2) Diesel/fuel: 0.25 % of avg monthly consumption 3) Electricity: 1 % of monthly energy consumption 4) 1 % excess of monthly raw material 5) HW waste or air /water emission or noise very close to permissible limits, or, legal approvals about to expire in 2 weeks & no action taken in this regard. Interested parties communication without involvement of legal authorities. Low (Acceptable & Non- significant) Medium (Acceptable & Significant) Medium (Acceptable & Significant) High (Not acceptable & Significant) Personal Protective Equipments / Proper segregation/ Secondary containment Major / Serious Injuries/Occupational Dieases /legal approvals expired / the measured parameters (or its exposure) are not complying with the permissible limits. Reportable environmental incident (fire/major leakage/spillage) within the factory/site. and /or waste of natural resources as follows (by judgement) : 1) Water: 5 % of average monthly consumption 2) Diesel/fuel: 1 % of avg monthly consumption 3) Electricity: 5 % of monthly energy consumption 4) 5 % excess of monthly raw material 5) HW waste or air /water emission or noise exceeding than the permissible limits, or, legal approvals expired & no action evident.Interested parties communication with involvement of legal authorities. Low (Acceptable & Non- significant) Medium (Acceptable & Significant) High (Not acceptable & Significant) High (Not acceptable & Significant) Fatality / Permanent Disability/ Legal approvals not obtained or measured parameters not meeting the legal requirements for more than 3 months & actions taken in this regard not evident. Reportable environmental incident (fire/major leakage/spillage) affecting nearby external areas & HW waste/ or air or water emission or noise exceeding than the permissible limits for continuously for 3 months/cycles or received communication from legal authority on legal non-compliance & actions taken in this regard are not evident. Medium (Acceptable & Significant) High (Not acceptable & Significant) High (Not acceptable & Significant) High (Not acceptable & Significant) Activities & Sub-activities [Consider Routine/Normal; Non- routine/Abnormal; Emergency activities] ISO 14001 (EMS) / OHSAS 18001 (OH&S) relevance EHS Risk Assessment (No controls) Applicable Legal requirement (Y/N); Provide brief if 'Y' Controls Measures ( Method statement; site specific controls in bullet points & environment procedure (if applicable)) Contro l Type Assessment (Residual Risk/Impact) Acceptable & Non-signifiacnt; Acceptable & Significant; Significant & Not-acceptable Risk/ Impact Lack of awareness about safety procedures Injury to person due to poor safety procedures. Y : BOCW Act, 1996 & Central Rules 1998. ( SECTION -123) (Register of employment) 1) Job specific training & induction training shall be imparted before start of activity & training card issued Incident can happen due to work without authorization. Y : BOCW Act, 1996 & Central Rules 1998. ( SECTION -218) (Entry of unauthorized person to be restricted) 2) Work permit to be obtained before starting the activity. Workmen working without medical fitness Aggregation of poor phycial condition of workers. Y : BOCW Act, 1996 & Central Rules 1998. ( SECTION -223) (Certificate of medical exam in Form-6) 3) All workmen planned for this work shall be screened for medical fitness. Injury to person due to poor emergency preparedness. Y : BOCW Act, 1996 & Central Rules 1998. ( SECTION -36,231,228) (Emergency action plan for site) Injury to person due to damaged PPE used by work man. Y : BOCW Act, 1996 & Central Rules 1998. ( SECTION -46,54) (Use of proper PPE's) 5) PPE's i.e. such as Full body harness (work positioning belt), helmet (chin strap is tied properly), cotton gloves & safety shoes, welding apron, face shield, nose mask, ear plugs shall be used whereever require. Y : BOCW Act, 1996 & Central Rules 1998. ( SECTION -46,54) (Use of proper PPE's) Toppling of farana.Major incident. Y : Building & Other Construction Workeres (Regulation of Employment & Conditions of Service) Act, 1996 & Central Rules 1998. (BOCWA/R) 2.Road level to be checked if required MS plate shall be kept on uneven surface/drainage chamber. A) farana operator shall have crane license. B)esure safe distance of farana from excavation built up trench.
  • 2. SIEMENS Hazard Identification and Risk Assessment EM / IM/EHS-4.3.1/PR/01 dt. 15.02.2016 E M Unrestricted Page 2 of 2 Sr. No. Environment (ISO 14001) & Hazard/Risk (OHSAS 18001) Env.Aspect / OH&S Hazard Env. Impact / OH&S Risk Severity Likelihood Risk/Impact Severity Likelihood Activities & Sub-activities [Consider Routine/Normal; Non- routine/Abnormal; Emergency activities] ISO 14001 (EMS) / OHSAS 18001 (OH&S) relevance EHS Risk Assessment (No controls) Applicable Legal requirement (Y/N); Provide brief if 'Y' Controls Measures ( Method statement; site specific controls in bullet points & environment procedure (if applicable)) Contro l Type Assessment (Residual Risk/Impact) Acceptable & Non-signifiacnt; Acceptable & Significant; Significant & Not-acceptable Risk/ Impact 2 Welding work Operation OH&S Electric shock /Electrocution # 2 3 6 3 2 1 2 Acceptable & Non-Significant OH&S Fire Hazards 2 3 6 4 2 1 2 Acceptable & Non-Significant OH&S Health & eye Hazards 2 2 4 3 2 1 2 Acceptable & Non-Significant OH&S Electric shock /Electrocution 2 2 4 3 2 1 2 Acceptable & Non-Significant OH&S Untrained welder Body injury or burn 2 2 4 3 2 1 2 Acceptable & Non-Significant OH&S Welding spark and Hot part or Surface burn injury 2 2 4 5 2 1 2 Acceptable & Non-Significant EMS Welding fumes Air pollution 2 2 4 3 2 1 2 Acceptable & Non-Significant EMS land pollution 2 2 4 Collection & disposal of waste granules 4 2 1 2 Acceptable & Non-Significant EMS Welding chipping / hammering noise Noise pollution 2 2 4 3 2 1 2 Acceptable & Non-Significant EMS Welding sandering dust Air pollution 2 2 4 3 2 1 2 Acceptable & Non-Significant EMS Welding - Electrical power consumption Resource depletion 2 2 4 4 2 1 2 Acceptable & Non-Significant Faulty instrument (Welding m/c) Y : BOCW Act, 1996 & Central Rules 1998. ( SECTION -47 & 56) The Indian Electricity Act, 2003 & Rules, 1956 & 2005 (EA & ER) 1) Welding machine should be inspected through checklist. 2) Dedicated connection should be provided for welding machine. 3) Emergency switch should be provided with connection. 4) Double Body earthing shall be provided to welding machine. 5) Double insulation cable shall be used. 6) Supply shall be taken from 30mA ELCB equipped box 7) Weldind should be done in dry area. 8)Supply cable shall be routed overhead Welding spark and combustible material Y : BOCW Act, 1996 & Central Rules 1998. ( SECTION -35 & 42) 1.Fire extinguisher & fire bucket should be placed near hot work area. 2. Site inspection & tagging shall be done prior to starting the work & combustible material shall be removed Foreign particles & Hheat radiation of welding Y : BOCW Act, 1996 & Central Rules 1998. ( SECTION -45) 1.Welding face shield shall be used 2 Helper should be used black goggle . 3.Training to be provided for hot work Faulty instrument (Welding Holder) Y : BOCW Act, 1996 & Central Rules 1998. ( SECTION -47) The Indian Electricity Act, 2003 & Rules, 1956 & 2005 (EA & ER) 1.Electrode holders should be properly insulated (no exposed metal parts) 2. Welding m/c holders should be kept dried and properly hung up after use. 3.Welding holder should not in be contact with metal parts or structure. when not in use. 4. Electrodes should be detached after welding Y : BOCW Act, 1996 & Central Rules 1998. ( SECTION -56) 1. Welder should be permit holder to be ensured by site engineer. Y : BOCW Act, 1996 & Central Rules 1998. ( SECTION -218,44) 1.welding should be done by authorised person only. 2.Hot material shall be kept apart from walkways or human movement 3. Leather hand gloves & apron shall be used Y : BOCW Act, 1996 & Central Rules 1998. Isolate & enclose area whereever possible with proper fume exhaust Welding fluxs layers / molten material granules Y : BOCW Act, 1996 & Central Rules 1998. Y : BOCW Act, 1996 & Central Rules 1998. The Noise Pollution (Regulation & Isolate & enclose area whereever possible, avoid unnecessary hammering Y : BOCW Act, 1996 & Central Rules 1998. Isolate & enclose area whereever possible, sprinkling water Y : BOCW Act, 1996 & Central Rules 1998. The Indian Electricity Act, 2003 & Rules, 1956 & 2005 (EA & ER) Optimum use of power,avoid wastages, Sinages "SAVE ELECTRICITY", awareness to worker & staff Prepared by: Mr. Susanta Kumar Routray Date 30/1/2017 Checked by: Mr. C.Senthil Kumar Date: 30/1/2017 Approved by: Mr. Nitin Korde Date: 31.1.2017