FIRE RISK ASSESSMENT
Reference No.: KAFD-RY-RIA1-PGEN-SAB-HSE-RAS-00000
Revision No.: 00
Description: Risk Assessment - Workshop Date: 01/Jul/2020
Source Hazard Impact
Risk Rating
Hazards Controls
Responsible
Person
Final Residual Risk Rating
S L RR Category S L RR Category
1. GENERAL RISK
ASSESSMENT:
1.1 SITE
PREPARATION
➢ No work permit
and/or RAMS
➢ No Safety
induction
➢ Not using basic PPE
such as Head
Protection Helmet,
Eye protection
Safety glasses
(clear inside
building, dark
outside the
building), Safety
Shoes, Visibility
vest w/ logo
➢ Improper manual
handling of
materials
➢ Lone worker
➢ Poor housekeeping
➢ Time Delays,
➢ Financial loss
➢ Aggravate injury
➢
4 4 16
High
Risk
➢ Ensure work permit and
supporting documents are signed
and approved.
➢ Obtain PTW prior to the
commencement of the work and
hard copy to be kept at the work
site and comply with work permit
(PTW) requirements.
➢ Approved RAMS to be made
available at the site and Job
Specific hazards and control
measure to be communicated to
all personnel involved in the job.
➢ Ensure workers were trained
about manual handling
technique.
➢ Avoiding unnecessary heavy
manual handling of materials use
mechanical equipment.
➢ Buddy system must be followed.
Sharing heavy or awkward loads,
which have to be lifted and
distance over which they have to
be carried.
➢ All personnel shall attend safety
induction/training prior to start
any job at site.
➢ Pre-job STARRT/TBT meeting
shall be conducted by job
supervisor to brief workers about
job specific hazards.
➢ Conduct site inspection to ensure
access/egress is adequate for the
task activities. Maintain good
housekeeping of the work area.
➢ Lone worker is not allowed.
➢ Ensure work area housekeeping
is properly maintained.
➢ Ensure that all PPE is assessed for
suitability for job, limitations,
capability, and compatibility with
other PPE.
Job Supervisor
SHE Representative
2 1 2 Low Risk
Page 2 of 8
FIRE RISK ASSESSMENT
Reference No.: KAFD-RY-RIA1-PGEN-SAB-HSE-RAS-00000
Revision No.: 00
Description: Risk Assessment - Workshop Date: 01/Jul/2020
Source Hazard Impact
Risk Rating
Hazards Controls
Responsible
Person
Final Residual Risk Rating
S L RR Category S L RR Category
(Unloading,
shifting, material
handling &
storage)
➢ Hit by equipment
➢ Hit by material
➢ Poor storage area
➢ Improper stacking
of materials
➢ Poor manual
handling
➢ Time Delays,
➢ Financial loss
➢ Product loss
➢ Fire, property
damage
➢ Slips, trips,
abrasions,
strains and
sprains
4 4 16
High
Risk
➢ Access pathways of equipment
must be cleared from any
obstruction.
➢ Lifting equipment will be properly
checked if it is safe to use.
➢ During unloading of materials,
ensure materials are properly
secured.
➢ Ensure workers were trained
about manual handling
technique.
➢ Material shall be stored in a
covered / dry space at all the
time.
➢ Storage should be in a clean, dry,
“NO SMOKING” area and should
be restricted to access by
authorized personnel only.
➢ Storage shall be in cool place and
in condition no humidity and
moisture.
➢ Thermal insulation shall be
transported to the site by the
contractor, in the appropriate
vehicle such that no damage is
done during transportation
➢ The storage area must be flat,
the ground must not be marshy
or unstable and it must not
contain any corrosive material.
Job Supervisor
SHE Representative
2 1 2 Low Risk
3. POWER/HAND
TOOL USAGE
➢ Not inspected or
defective power
tools
➢ Improper
connectors or
damage cables
➢ Using improper
tool for the
job/work and
improper using of
tools
➢ Time Delays,
➢ Financial loss
➢ Product loss
Hand, eye and foot
injury
Back injury, fire,
damage to
property due to
fire.
4 4 16
High
Risk
➢ Use correct tools for the job. Do
not use a tool or attachment for
something it was not designed to.
➢ Inspect tools for visible damage
prior to use.
➢ All power tools undergo a
servicing program in line with
their manufacturer’s guidelines
and must be inspected monthly
by competent person and
suitable storage area shall be
provided.
Job Supervisor
SHE Representative 2 1 2 Low Risk
Page 3 of 8
FIRE RISK ASSESSMENT
Reference No.: KAFD-RY-RIA1-PGEN-SAB-HSE-RAS-00000
Revision No.: 00
Description: Risk Assessment - Workshop Date: 01/Jul/2020
Source Hazard Impact
Risk Rating
Hazards Controls
Responsible
Person
Final Residual Risk Rating
S L RR Category S L RR Category
➢ Injuries due to
sharp object/edges
➢ Trailing cables
Untrained for the
tools
➢ All power tools user must be
trained and proof of training be
kept for reference.
➢ Only trained and competent
persons to use, test, repair and
maintain power tools.
➢ Keep all guards in place. Cover
exposed belts, pulley, gears, and
shafts that could cause injury.
➢ Never reach over equipment
while it is running.
➢ Keep bystanders away from
moving machinery.
➢ Use quality tools in accordance
with the type of work to carry out
(calibrated if required).
➢ When not in use, make sure that
hand or power tools are stored in
a manner unlikely to be
hazardous to others. Use boxes
or other suitable containers.
➢ All electrical power tools must be
double insulated. Power tools
must have handles and fit-for-
purpose working platform for the
operators shall be provided.
PTW/exclusion zones underneath
shall be effectively enforced
where needed.
4. BENDING
ACTIVITY
➢ Inexperience
workers
➢ Slip, trip wet
surface
➢ Equipment failure
➢ Pinch point
➢ Time Delays,
➢ Financial loss
➢ Aggravate injury
➢ Property
Damage
4 4 16
High
Risk
➢ Only competent person shall be
assigned for the task.
➢ Wear steel-toe safety shoes, slip
resistant footwear and keep
areas dry, clean and
unobstructed, as much as
possible
➢ All debris to be put in waste skips
on a continuous basis to avoid
debris blowing around project.
➢ Any obstructions from pathways
must be removed.
Job Supervisor
SHE Representative
2 1 2 Low Risk
Page 4 of 8
FIRE RISK ASSESSMENT
Reference No.: KAFD-RY-RIA1-PGEN-SAB-HSE-RAS-00000
Revision No.: 00
Description: Risk Assessment - Workshop Date: 01/Jul/2020
Source Hazard Impact
Risk Rating
Hazards Controls
Responsible
Person
Final Residual Risk Rating
S L RR Category S L RR Category
➢ Workers in or around the area will
wear dust masks.
➢ Verify all guarding is in place and
effective.
➢ Personal Protective Equipment:
Heavy-duty gloves, metacarpal
guards, forearm guards, etc.
➢ Pre-work inspection: Identify
potential pinch points before
starting work
5. DRILLING
ACTIVITY
➢ Dust
➢ Generation of
Toxic Gases &
Fumes
➢ Electric Shock
➢Noise
➢ Flying Stones
➢ Time Delays,
➢ Financial loss
➢ Aggravate injury
➢ Property
Damage
4 4 16
High
Risk
➢ Only competent person shall be
assigned for the task.
➢ Wear steel-toe safety shoes, slip
resistant footwear and keep
areas dry, clean and
unobstructed, as much as
possible
➢ All debris to be put in waste skips
on a continuous basis to avoid
debris blowing around project.
➢ Any obstructions from pathways
must be removed.
➢ Installer and other workers in or
around the area will wear dust
masks. Proper PPE.
➢ Restrict unauthorized entry.
➢ Keep the area clean.
➢ Ensure equipment in good
condition
➢ Extension cables check for
damage replace if necessary.
➢ Proper cable management shall
be performed.
➢ Protect cables from falling
objects.
➢ Ear protection must be used in
noisy area.
Job Supervisor
SHE Representative
2 1 2 Low Risk
6. CHEMICAL
HANDLING
Spill,
mishandlin
g, contact
with eye
➢ Time Delays,
➢ Financial loss
➢ Product loss
4 4 16
High
Risk
➢ All chemicals shall be supplied
with MSDS and information shall
be shared to the workers.
Job Supervisor
SHE Representative
2 1 2 Low Risk
Page 5 of 8
FIRE RISK ASSESSMENT
Reference No.: KAFD-RY-RIA1-PGEN-SAB-HSE-RAS-00000
Revision No.: 00
Description: Risk Assessment - Workshop Date: 01/Jul/2020
Source Hazard Impact
Risk Rating
Hazards Controls
Responsible
Person
Final Residual Risk Rating
S L RR Category S L RR Category
and skin,
inhalation,
ingestion
Death, skin
irritation, burn,
eye injury
➢ Hazardous substance will be
stored in a safe manner. Handling
and storage to be done according
to Materials Safety Data Sheets
(MSDS).
➢ In case of any spillage, it will be
cleaned immediately.
➢ Handling and storage to be done
according to Materials Safety
Data Sheets (MSDS).
➢ Suitable respiratory protection
and PPEs to be used.
7. COMBUSTIBLE
MATERIALS
Fire, damage to
property due to fire,
Explosion
➢ Time Delays,
➢ Financial loss
➢ Product loss
4 4 16
High
Risk
➢ Combustible material shall not be
stored in boiler rooms,
mechanical rooms, or electrical
equipment rooms.
➢ An adequate and sufficient
amount of relevant firefighting
equipment is to be located on the
area.
➢ No hot work activity will be
permitted on the area.
➢ Materials shall not be stored in
a manner so as to obstruct
access to fire protection
equipment
(detectors/alarms/panels),
firefighting equipment, control
valves, doors, electrical panels,
motors, or aisles and hallways
that serve as a means of
escape
PARCEL
Responsible
Engineer
HSE Representative
2 1 2 Low Risk
8. FLAMMABLE
LIQUID/CHEMICAL
➢ Explosion, Fire,
damage to
property due to
fire
➢ Time Delays,
➢ Financial loss
➢ Product loss
➢
4 4 16
High
Risk
➢ Combustible liquids, including
oil & greases shall be stored in
original containers or in
storage tanks, labeled with
contents and capacity.
➢ Flammable/combustible liquids
and solvents are not to be used
near ignition sources.
➢ Only approved containers,
safety cans and portable tanks
PARCEL
Responsible
Engineer
HSE Representative
2 1 2 Low Risk
Page 6 of 8
FIRE RISK ASSESSMENT
Reference No.: KAFD-RY-RIA1-PGEN-SAB-HSE-RAS-00000
Revision No.: 00
Description: Risk Assessment - Workshop Date: 01/Jul/2020
Source Hazard Impact
Risk Rating
Hazards Controls
Responsible
Person
Final Residual Risk Rating
S L RR Category S L RR Category
shall be used for the storage
and handling of flammable and
combustible liquids.
➢ Approved, properly labeled,
storage cabinets (or properly
labeled drums) shall be used to
store flammable liquids in
excess of 15 US Gallons (57
litres).
➢ Permanent fuel storage tanks
shall be maintained in a bunded
area, with provisions made for
the handling of spills and
groundwater protection.
➢ All fuel lines will be equipped
with valves capable of stopping
the flow of fuel at source, and
all piping valves and fittings
shall be capable of
withstanding working
pressures compatible with the
type of liquid being stored.
➢ All permanent fuel storage
tanks and dispensing units
shall be protected against
collision damage.
➢ Flammable chemicals shall be
stored & handled as per MSDS
recommendations.
Page 7 of 8
FIRE RISK ASSESSMENT
Reference No.: KAFD-RY-RIA1-PGEN-SAB-HSE-RAS-00000
Revision No.: 00
Description: Risk Assessment - Workshop Date: 01/Jul/2020
Source Hazard Impact
Risk Rating
Hazards Controls
Responsible
Person
Final Residual Risk Rating
S L RR Category S L RR Category
EMERGENCY
RESPONSE/ACCESSE
S/ILLUMINATION
➢ Obstructed
accesses
➢ Lack of illumination
and emergency exit
signs
➢ Late response to
victim in case of
emergency
➢ Lack of
communication
➢ Time Delays,
➢ Financial loss
➢ Aggravate
injury
4 4 16
High
Risk
➢ Be familiar with emergency
response procedure.
➢ Any obstructions from pathways
must be removed.
➢ Emergency contact lists shall be
posted at site.
➢ Ensure lightings at the stairways
and emergency exits are working
properly. Emergency lights shall
be installed at stairs to evacuate
in case of power supply failure or
emergency.
➢ Emergency evacuation routes
and procedure shall be reminded
regularly to the site staff by
construction and SHE team.
PARCEL
Responsible
Engineer
HSE Representative
2 1 2 Low Risk
CLASSIFICATION CHART
Likelihood of Risk Description Rating Severity of Risk Description Rating
Unlikely Occurrence close to zero 1 Minor Injury First-Aid On Site 1
May Happen Capable of taking Place 2 Minor Injury Treatment Off Site 2
Likely Tend to or Inclined to Occur 3 Up-to-3 days Injury Limited or no work for three days 3
Very Likely High Inclination of Occurrence 4 Major Injury Reportable 4
Certain
Most Definitely Happen- Not “If but
When”
5 Death 5
Prepared by: Jimvil Villeza Signature:
Date:
01/07/2020 Consultant
Approved by:
Reviewed by: Fahim Shaikh Signature:
Date:
01/07/2020
Page 8 of 8
FIRE RISK ASSESSMENT
Reference No.: KAFD-RY-RIA1-PGEN-SAB-HSE-RAS-00000
Revision No.: 00
Description: Risk Assessment - Workshop Date: 01/Jul/2020
Source Hazard Impact
Risk Rating
Hazards Controls
Responsible
Person
Final Residual Risk Rating
S L RR Category S L RR Category
Approved by: Ekrem Ucar Signature:
Date:
01/07/2020
HSE Manager Date

More Related Content

What's hot

Working at-height
Working at-height Working at-height
Working at-height Reliance
 
Permit to work training
Permit to work trainingPermit to work training
Permit to work trainingKarnav Rana
 
13 initial project site office set up risk assessment templates
13 initial project site office set up risk assessment templates13 initial project site office set up risk assessment templates
13 initial project site office set up risk assessment templatesDwarika Bhushan Sharma
 
HSE-INDUCTION-TRAINING.ppt
HSE-INDUCTION-TRAINING.pptHSE-INDUCTION-TRAINING.ppt
HSE-INDUCTION-TRAINING.pptssuser0ebdc3
 
8 lifting operations with mobile crane risk assessment templates
8 lifting operations with mobile crane risk assessment templates8 lifting operations with mobile crane risk assessment templates
8 lifting operations with mobile crane risk assessment templatesDwarika Bhushan Sharma
 
Safeworkpmits
SafeworkpmitsSafeworkpmits
Safeworkpmitsistrain
 
2 fire risk assessment template risk assessment templates
2 fire risk assessment template risk assessment templates2 fire risk assessment template risk assessment templates
2 fire risk assessment template risk assessment templatesDwarika Bhushan Sharma
 
6 excavations (temporary works) risk assessment templates
6 excavations (temporary works) risk assessment templates6 excavations (temporary works) risk assessment templates
6 excavations (temporary works) risk assessment templatesDwarika Bhushan Sharma
 
19 use of mobile elevated work platforms risk assessment templates
19 use of mobile elevated work platforms risk assessment templates19 use of mobile elevated work platforms risk assessment templates
19 use of mobile elevated work platforms risk assessment templatesDwarika Bhushan Sharma
 
29 workplace temporary lighting risk assessment templates
29 workplace temporary lighting risk assessment templates29 workplace temporary lighting risk assessment templates
29 workplace temporary lighting risk assessment templatesDwarika Bhushan Sharma
 
16 scaffolding (temporary works) risk assessment templates
16 scaffolding (temporary works) risk assessment templates16 scaffolding (temporary works) risk assessment templates
16 scaffolding (temporary works) risk assessment templatesDwarika Bhushan Sharma
 
RA for Hot works at MOE-Ghim Moh (Ceiling support works).pdf
RA for Hot works at MOE-Ghim Moh (Ceiling support works).pdfRA for Hot works at MOE-Ghim Moh (Ceiling support works).pdf
RA for Hot works at MOE-Ghim Moh (Ceiling support works).pdfMohPhoolay
 
27 hydrostatic pressure testing inside buildings risk assessment templates
27 hydrostatic pressure testing inside buildings risk assessment templates27 hydrostatic pressure testing inside buildings risk assessment templates
27 hydrostatic pressure testing inside buildings risk assessment templatesDwarika Bhushan Sharma
 
Overhead crane risk assessment
Overhead crane risk assessmentOverhead crane risk assessment
Overhead crane risk assessmentSimba Zhao
 

What's hot (20)

Working at-height
Working at-height Working at-height
Working at-height
 
Permit to work training
Permit to work trainingPermit to work training
Permit to work training
 
PPT ON PERMIT TO WORK, by Ekemezie E
PPT ON PERMIT TO WORK, by Ekemezie EPPT ON PERMIT TO WORK, by Ekemezie E
PPT ON PERMIT TO WORK, by Ekemezie E
 
13 initial project site office set up risk assessment templates
13 initial project site office set up risk assessment templates13 initial project site office set up risk assessment templates
13 initial project site office set up risk assessment templates
 
HSE-INDUCTION-TRAINING.ppt
HSE-INDUCTION-TRAINING.pptHSE-INDUCTION-TRAINING.ppt
HSE-INDUCTION-TRAINING.ppt
 
8 lifting operations with mobile crane risk assessment templates
8 lifting operations with mobile crane risk assessment templates8 lifting operations with mobile crane risk assessment templates
8 lifting operations with mobile crane risk assessment templates
 
Safeworkpmits
SafeworkpmitsSafeworkpmits
Safeworkpmits
 
2 fire risk assessment template risk assessment templates
2 fire risk assessment template risk assessment templates2 fire risk assessment template risk assessment templates
2 fire risk assessment template risk assessment templates
 
Permit to Work Training
Permit to Work TrainingPermit to Work Training
Permit to Work Training
 
6 excavations (temporary works) risk assessment templates
6 excavations (temporary works) risk assessment templates6 excavations (temporary works) risk assessment templates
6 excavations (temporary works) risk assessment templates
 
19 use of mobile elevated work platforms risk assessment templates
19 use of mobile elevated work platforms risk assessment templates19 use of mobile elevated work platforms risk assessment templates
19 use of mobile elevated work platforms risk assessment templates
 
Roles of standby man
Roles of standby manRoles of standby man
Roles of standby man
 
Amn safety induction j 175 - staff rev 4 - s 14
Amn safety induction  j 175 - staff rev 4 - s 14Amn safety induction  j 175 - staff rev 4 - s 14
Amn safety induction j 175 - staff rev 4 - s 14
 
29 workplace temporary lighting risk assessment templates
29 workplace temporary lighting risk assessment templates29 workplace temporary lighting risk assessment templates
29 workplace temporary lighting risk assessment templates
 
Hot Work Permits Training by ELCOSH
Hot Work Permits Training by ELCOSHHot Work Permits Training by ELCOSH
Hot Work Permits Training by ELCOSH
 
Near Miss Reporting
Near Miss ReportingNear Miss Reporting
Near Miss Reporting
 
16 scaffolding (temporary works) risk assessment templates
16 scaffolding (temporary works) risk assessment templates16 scaffolding (temporary works) risk assessment templates
16 scaffolding (temporary works) risk assessment templates
 
RA for Hot works at MOE-Ghim Moh (Ceiling support works).pdf
RA for Hot works at MOE-Ghim Moh (Ceiling support works).pdfRA for Hot works at MOE-Ghim Moh (Ceiling support works).pdf
RA for Hot works at MOE-Ghim Moh (Ceiling support works).pdf
 
27 hydrostatic pressure testing inside buildings risk assessment templates
27 hydrostatic pressure testing inside buildings risk assessment templates27 hydrostatic pressure testing inside buildings risk assessment templates
27 hydrostatic pressure testing inside buildings risk assessment templates
 
Overhead crane risk assessment
Overhead crane risk assessmentOverhead crane risk assessment
Overhead crane risk assessment
 

Similar to Fire Risk Assessment.pdf

LPG Chloride treaters foundation execution_Rev.00.pdf
LPG Chloride treaters foundation execution_Rev.00.pdfLPG Chloride treaters foundation execution_Rev.00.pdf
LPG Chloride treaters foundation execution_Rev.00.pdfJESUSBASILIOANTONIO
 
JSA01_De-Ethanizer_Foundation_Execution_Rev00.pdf
JSA01_De-Ethanizer_Foundation_Execution_Rev00.pdfJSA01_De-Ethanizer_Foundation_Execution_Rev00.pdf
JSA01_De-Ethanizer_Foundation_Execution_Rev00.pdfJESUSBASILIOANTONIO
 
Iipp haz com-ppe-fp-evac-p65-bp
Iipp haz com-ppe-fp-evac-p65-bpIipp haz com-ppe-fp-evac-p65-bp
Iipp haz com-ppe-fp-evac-p65-bpKJP Consulting
 
Fire Suppression System Risk assessment file
Fire Suppression System Risk assessment fileFire Suppression System Risk assessment file
Fire Suppression System Risk assessment filechopriroti
 
hot works for construction of temporary facilities
hot works for construction of temporary facilitieshot works for construction of temporary facilities
hot works for construction of temporary facilitiesFãrük Ñäzmî
 
JSA of Radiography for Boiler A - Copy.pdf
JSA of Radiography for Boiler A - Copy.pdfJSA of Radiography for Boiler A - Copy.pdf
JSA of Radiography for Boiler A - Copy.pdfWajihAnsari6
 
008-SWMS-GENERAL-ONSITE-ACTIVITIES-AND-REPAIRS.pdf
008-SWMS-GENERAL-ONSITE-ACTIVITIES-AND-REPAIRS.pdf008-SWMS-GENERAL-ONSITE-ACTIVITIES-AND-REPAIRS.pdf
008-SWMS-GENERAL-ONSITE-ACTIVITIES-AND-REPAIRS.pdfFESTUS RICHARD SIAME
 
Risk Assessment (Master).pdf
Risk Assessment (Master).pdfRisk Assessment (Master).pdf
Risk Assessment (Master).pdfRafiullahKhan88
 
DPL-SP - Safety Induction Presentation 00.pptx
DPL-SP - Safety Induction Presentation 00.pptxDPL-SP - Safety Induction Presentation 00.pptx
DPL-SP - Safety Induction Presentation 00.pptxAamirAbbas75
 
AMA 2A SHE Induction 2022....pdf
AMA 2A SHE Induction 2022....pdfAMA 2A SHE Induction 2022....pdf
AMA 2A SHE Induction 2022....pdfIbukunOwolabi4
 
HSE Risk Register | Gaurav Singh Rajput
HSE Risk Register | Gaurav Singh RajputHSE Risk Register | Gaurav Singh Rajput
HSE Risk Register | Gaurav Singh RajputGaurav Singh Rajput
 
HSE Risk Register.docx
HSE Risk Register.docxHSE Risk Register.docx
HSE Risk Register.docxalmamunmolla96
 
JSA-Piling or Concreting for Foundations & Building
JSA-Piling or Concreting for Foundations & Building JSA-Piling or Concreting for Foundations & Building
JSA-Piling or Concreting for Foundations & Building Alvin160771
 
NGI-Safety Induction-English
NGI-Safety Induction-EnglishNGI-Safety Induction-English
NGI-Safety Induction-Englishlifecombo
 
Job Safety Analyses For Energization of Substation..doc
Job Safety Analyses For Energization of Substation..docJob Safety Analyses For Energization of Substation..doc
Job Safety Analyses For Energization of Substation..docAtif767782
 
ACT Environment Induction
ACT Environment InductionACT Environment Induction
ACT Environment InductionDotjo Dev
 

Similar to Fire Risk Assessment.pdf (20)

LPG Chloride treaters foundation execution_Rev.00.pdf
LPG Chloride treaters foundation execution_Rev.00.pdfLPG Chloride treaters foundation execution_Rev.00.pdf
LPG Chloride treaters foundation execution_Rev.00.pdf
 
JSA01_De-Ethanizer_Foundation_Execution_Rev00.pdf
JSA01_De-Ethanizer_Foundation_Execution_Rev00.pdfJSA01_De-Ethanizer_Foundation_Execution_Rev00.pdf
JSA01_De-Ethanizer_Foundation_Execution_Rev00.pdf
 
Iipp haz com-ppe-fp-evac-p65-bp
Iipp haz com-ppe-fp-evac-p65-bpIipp haz com-ppe-fp-evac-p65-bp
Iipp haz com-ppe-fp-evac-p65-bp
 
Fire Suppression System Risk assessment file
Fire Suppression System Risk assessment fileFire Suppression System Risk assessment file
Fire Suppression System Risk assessment file
 
hot works for construction of temporary facilities
hot works for construction of temporary facilitieshot works for construction of temporary facilities
hot works for construction of temporary facilities
 
SITE INDUCTION Version 2
SITE INDUCTION Version 2SITE INDUCTION Version 2
SITE INDUCTION Version 2
 
JSA of Radiography for Boiler A - Copy.pdf
JSA of Radiography for Boiler A - Copy.pdfJSA of Radiography for Boiler A - Copy.pdf
JSA of Radiography for Boiler A - Copy.pdf
 
008-SWMS-GENERAL-ONSITE-ACTIVITIES-AND-REPAIRS.pdf
008-SWMS-GENERAL-ONSITE-ACTIVITIES-AND-REPAIRS.pdf008-SWMS-GENERAL-ONSITE-ACTIVITIES-AND-REPAIRS.pdf
008-SWMS-GENERAL-ONSITE-ACTIVITIES-AND-REPAIRS.pdf
 
Risk Assessment (Master).pdf
Risk Assessment (Master).pdfRisk Assessment (Master).pdf
Risk Assessment (Master).pdf
 
DPL-SP - Safety Induction Presentation 00.pptx
DPL-SP - Safety Induction Presentation 00.pptxDPL-SP - Safety Induction Presentation 00.pptx
DPL-SP - Safety Induction Presentation 00.pptx
 
AMA 2A SHE Induction 2022....pdf
AMA 2A SHE Induction 2022....pdfAMA 2A SHE Induction 2022....pdf
AMA 2A SHE Induction 2022....pdf
 
Hira
HiraHira
Hira
 
HSE Risk Register | Gaurav Singh Rajput
HSE Risk Register | Gaurav Singh RajputHSE Risk Register | Gaurav Singh Rajput
HSE Risk Register | Gaurav Singh Rajput
 
HSE Risk Register.docx
HSE Risk Register.docxHSE Risk Register.docx
HSE Risk Register.docx
 
Construction Safety Training
Construction Safety TrainingConstruction Safety Training
Construction Safety Training
 
JSA-Piling or Concreting for Foundations & Building
JSA-Piling or Concreting for Foundations & Building JSA-Piling or Concreting for Foundations & Building
JSA-Piling or Concreting for Foundations & Building
 
NGI-Safety Induction-English
NGI-Safety Induction-EnglishNGI-Safety Induction-English
NGI-Safety Induction-English
 
Job Safety Analyses For Energization of Substation..doc
Job Safety Analyses For Energization of Substation..docJob Safety Analyses For Energization of Substation..doc
Job Safety Analyses For Energization of Substation..doc
 
Safety.pptx
Safety.pptxSafety.pptx
Safety.pptx
 
ACT Environment Induction
ACT Environment InductionACT Environment Induction
ACT Environment Induction
 

Recently uploaded

Management and managerial skills training manual.pdf
Management and managerial skills training manual.pdfManagement and managerial skills training manual.pdf
Management and managerial skills training manual.pdffillmonipdc
 
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)jennyeacort
 
Motivational theories an leadership skills
Motivational theories an leadership skillsMotivational theories an leadership skills
Motivational theories an leadership skillskristinalimarenko7
 
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why DiagramBeyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why DiagramCIToolkit
 
LPC Operations Review PowerPoint | Operations Review
LPC Operations Review PowerPoint | Operations ReviewLPC Operations Review PowerPoint | Operations Review
LPC Operations Review PowerPoint | Operations Reviewthomas851723
 
Farmer Representative Organization in Lucknow | Rashtriya Kisan Manch
Farmer Representative Organization in Lucknow | Rashtriya Kisan ManchFarmer Representative Organization in Lucknow | Rashtriya Kisan Manch
Farmer Representative Organization in Lucknow | Rashtriya Kisan ManchRashtriya Kisan Manch
 
Board Diversity Initiaive Launch Presentation
Board Diversity Initiaive Launch PresentationBoard Diversity Initiaive Launch Presentation
Board Diversity Initiaive Launch Presentationcraig524401
 
Simplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes ThinkingSimplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes ThinkingCIToolkit
 
Measuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield MetricsMeasuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield MetricsCIToolkit
 
Fifteenth Finance Commission Presentation
Fifteenth Finance Commission PresentationFifteenth Finance Commission Presentation
Fifteenth Finance Commission Presentationmintusiprd
 
Unlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency MatrixUnlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency MatrixCIToolkit
 
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证jdkhjh
 
Introduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-EngineeringIntroduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-Engineeringthomas851723
 
LPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business SectorLPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business Sectorthomas851723
 
From Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
From Goals to Actions: Uncovering the Key Components of Improvement RoadmapsFrom Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
From Goals to Actions: Uncovering the Key Components of Improvement RoadmapsCIToolkit
 
Reflecting, turning experience into insight
Reflecting, turning experience into insightReflecting, turning experience into insight
Reflecting, turning experience into insightWayne Abrahams
 
How-How Diagram: A Practical Approach to Problem Resolution
How-How Diagram: A Practical Approach to Problem ResolutionHow-How Diagram: A Practical Approach to Problem Resolution
How-How Diagram: A Practical Approach to Problem ResolutionCIToolkit
 

Recently uploaded (18)

Management and managerial skills training manual.pdf
Management and managerial skills training manual.pdfManagement and managerial skills training manual.pdf
Management and managerial skills training manual.pdf
 
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
 
Motivational theories an leadership skills
Motivational theories an leadership skillsMotivational theories an leadership skills
Motivational theories an leadership skills
 
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why DiagramBeyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
 
LPC Operations Review PowerPoint | Operations Review
LPC Operations Review PowerPoint | Operations ReviewLPC Operations Review PowerPoint | Operations Review
LPC Operations Review PowerPoint | Operations Review
 
Farmer Representative Organization in Lucknow | Rashtriya Kisan Manch
Farmer Representative Organization in Lucknow | Rashtriya Kisan ManchFarmer Representative Organization in Lucknow | Rashtriya Kisan Manch
Farmer Representative Organization in Lucknow | Rashtriya Kisan Manch
 
Board Diversity Initiaive Launch Presentation
Board Diversity Initiaive Launch PresentationBoard Diversity Initiaive Launch Presentation
Board Diversity Initiaive Launch Presentation
 
Simplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes ThinkingSimplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes Thinking
 
Measuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield MetricsMeasuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield Metrics
 
Fifteenth Finance Commission Presentation
Fifteenth Finance Commission PresentationFifteenth Finance Commission Presentation
Fifteenth Finance Commission Presentation
 
Unlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency MatrixUnlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency Matrix
 
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
 
Introduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-EngineeringIntroduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-Engineering
 
LPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business SectorLPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business Sector
 
From Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
From Goals to Actions: Uncovering the Key Components of Improvement RoadmapsFrom Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
From Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
 
Reflecting, turning experience into insight
Reflecting, turning experience into insightReflecting, turning experience into insight
Reflecting, turning experience into insight
 
How-How Diagram: A Practical Approach to Problem Resolution
How-How Diagram: A Practical Approach to Problem ResolutionHow-How Diagram: A Practical Approach to Problem Resolution
How-How Diagram: A Practical Approach to Problem Resolution
 
sauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Service
sauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Servicesauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Service
sauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Service
 

Fire Risk Assessment.pdf

  • 1. Page 1 of 8 FIRE RISK ASSESSMENT Reference No.: KAFD-RY-RIA1-PGEN-SAB-HSE-RAS-00000 Revision No.: 00 Description: Risk Assessment - Workshop Date: 01/Jul/2020 Source Hazard Impact Risk Rating Hazards Controls Responsible Person Final Residual Risk Rating S L RR Category S L RR Category 1. GENERAL RISK ASSESSMENT: 1.1 SITE PREPARATION ➢ No work permit and/or RAMS ➢ No Safety induction ➢ Not using basic PPE such as Head Protection Helmet, Eye protection Safety glasses (clear inside building, dark outside the building), Safety Shoes, Visibility vest w/ logo ➢ Improper manual handling of materials ➢ Lone worker ➢ Poor housekeeping ➢ Time Delays, ➢ Financial loss ➢ Aggravate injury ➢ 4 4 16 High Risk ➢ Ensure work permit and supporting documents are signed and approved. ➢ Obtain PTW prior to the commencement of the work and hard copy to be kept at the work site and comply with work permit (PTW) requirements. ➢ Approved RAMS to be made available at the site and Job Specific hazards and control measure to be communicated to all personnel involved in the job. ➢ Ensure workers were trained about manual handling technique. ➢ Avoiding unnecessary heavy manual handling of materials use mechanical equipment. ➢ Buddy system must be followed. Sharing heavy or awkward loads, which have to be lifted and distance over which they have to be carried. ➢ All personnel shall attend safety induction/training prior to start any job at site. ➢ Pre-job STARRT/TBT meeting shall be conducted by job supervisor to brief workers about job specific hazards. ➢ Conduct site inspection to ensure access/egress is adequate for the task activities. Maintain good housekeeping of the work area. ➢ Lone worker is not allowed. ➢ Ensure work area housekeeping is properly maintained. ➢ Ensure that all PPE is assessed for suitability for job, limitations, capability, and compatibility with other PPE. Job Supervisor SHE Representative 2 1 2 Low Risk
  • 2. Page 2 of 8 FIRE RISK ASSESSMENT Reference No.: KAFD-RY-RIA1-PGEN-SAB-HSE-RAS-00000 Revision No.: 00 Description: Risk Assessment - Workshop Date: 01/Jul/2020 Source Hazard Impact Risk Rating Hazards Controls Responsible Person Final Residual Risk Rating S L RR Category S L RR Category (Unloading, shifting, material handling & storage) ➢ Hit by equipment ➢ Hit by material ➢ Poor storage area ➢ Improper stacking of materials ➢ Poor manual handling ➢ Time Delays, ➢ Financial loss ➢ Product loss ➢ Fire, property damage ➢ Slips, trips, abrasions, strains and sprains 4 4 16 High Risk ➢ Access pathways of equipment must be cleared from any obstruction. ➢ Lifting equipment will be properly checked if it is safe to use. ➢ During unloading of materials, ensure materials are properly secured. ➢ Ensure workers were trained about manual handling technique. ➢ Material shall be stored in a covered / dry space at all the time. ➢ Storage should be in a clean, dry, “NO SMOKING” area and should be restricted to access by authorized personnel only. ➢ Storage shall be in cool place and in condition no humidity and moisture. ➢ Thermal insulation shall be transported to the site by the contractor, in the appropriate vehicle such that no damage is done during transportation ➢ The storage area must be flat, the ground must not be marshy or unstable and it must not contain any corrosive material. Job Supervisor SHE Representative 2 1 2 Low Risk 3. POWER/HAND TOOL USAGE ➢ Not inspected or defective power tools ➢ Improper connectors or damage cables ➢ Using improper tool for the job/work and improper using of tools ➢ Time Delays, ➢ Financial loss ➢ Product loss Hand, eye and foot injury Back injury, fire, damage to property due to fire. 4 4 16 High Risk ➢ Use correct tools for the job. Do not use a tool or attachment for something it was not designed to. ➢ Inspect tools for visible damage prior to use. ➢ All power tools undergo a servicing program in line with their manufacturer’s guidelines and must be inspected monthly by competent person and suitable storage area shall be provided. Job Supervisor SHE Representative 2 1 2 Low Risk
  • 3. Page 3 of 8 FIRE RISK ASSESSMENT Reference No.: KAFD-RY-RIA1-PGEN-SAB-HSE-RAS-00000 Revision No.: 00 Description: Risk Assessment - Workshop Date: 01/Jul/2020 Source Hazard Impact Risk Rating Hazards Controls Responsible Person Final Residual Risk Rating S L RR Category S L RR Category ➢ Injuries due to sharp object/edges ➢ Trailing cables Untrained for the tools ➢ All power tools user must be trained and proof of training be kept for reference. ➢ Only trained and competent persons to use, test, repair and maintain power tools. ➢ Keep all guards in place. Cover exposed belts, pulley, gears, and shafts that could cause injury. ➢ Never reach over equipment while it is running. ➢ Keep bystanders away from moving machinery. ➢ Use quality tools in accordance with the type of work to carry out (calibrated if required). ➢ When not in use, make sure that hand or power tools are stored in a manner unlikely to be hazardous to others. Use boxes or other suitable containers. ➢ All electrical power tools must be double insulated. Power tools must have handles and fit-for- purpose working platform for the operators shall be provided. PTW/exclusion zones underneath shall be effectively enforced where needed. 4. BENDING ACTIVITY ➢ Inexperience workers ➢ Slip, trip wet surface ➢ Equipment failure ➢ Pinch point ➢ Time Delays, ➢ Financial loss ➢ Aggravate injury ➢ Property Damage 4 4 16 High Risk ➢ Only competent person shall be assigned for the task. ➢ Wear steel-toe safety shoes, slip resistant footwear and keep areas dry, clean and unobstructed, as much as possible ➢ All debris to be put in waste skips on a continuous basis to avoid debris blowing around project. ➢ Any obstructions from pathways must be removed. Job Supervisor SHE Representative 2 1 2 Low Risk
  • 4. Page 4 of 8 FIRE RISK ASSESSMENT Reference No.: KAFD-RY-RIA1-PGEN-SAB-HSE-RAS-00000 Revision No.: 00 Description: Risk Assessment - Workshop Date: 01/Jul/2020 Source Hazard Impact Risk Rating Hazards Controls Responsible Person Final Residual Risk Rating S L RR Category S L RR Category ➢ Workers in or around the area will wear dust masks. ➢ Verify all guarding is in place and effective. ➢ Personal Protective Equipment: Heavy-duty gloves, metacarpal guards, forearm guards, etc. ➢ Pre-work inspection: Identify potential pinch points before starting work 5. DRILLING ACTIVITY ➢ Dust ➢ Generation of Toxic Gases & Fumes ➢ Electric Shock ➢Noise ➢ Flying Stones ➢ Time Delays, ➢ Financial loss ➢ Aggravate injury ➢ Property Damage 4 4 16 High Risk ➢ Only competent person shall be assigned for the task. ➢ Wear steel-toe safety shoes, slip resistant footwear and keep areas dry, clean and unobstructed, as much as possible ➢ All debris to be put in waste skips on a continuous basis to avoid debris blowing around project. ➢ Any obstructions from pathways must be removed. ➢ Installer and other workers in or around the area will wear dust masks. Proper PPE. ➢ Restrict unauthorized entry. ➢ Keep the area clean. ➢ Ensure equipment in good condition ➢ Extension cables check for damage replace if necessary. ➢ Proper cable management shall be performed. ➢ Protect cables from falling objects. ➢ Ear protection must be used in noisy area. Job Supervisor SHE Representative 2 1 2 Low Risk 6. CHEMICAL HANDLING Spill, mishandlin g, contact with eye ➢ Time Delays, ➢ Financial loss ➢ Product loss 4 4 16 High Risk ➢ All chemicals shall be supplied with MSDS and information shall be shared to the workers. Job Supervisor SHE Representative 2 1 2 Low Risk
  • 5. Page 5 of 8 FIRE RISK ASSESSMENT Reference No.: KAFD-RY-RIA1-PGEN-SAB-HSE-RAS-00000 Revision No.: 00 Description: Risk Assessment - Workshop Date: 01/Jul/2020 Source Hazard Impact Risk Rating Hazards Controls Responsible Person Final Residual Risk Rating S L RR Category S L RR Category and skin, inhalation, ingestion Death, skin irritation, burn, eye injury ➢ Hazardous substance will be stored in a safe manner. Handling and storage to be done according to Materials Safety Data Sheets (MSDS). ➢ In case of any spillage, it will be cleaned immediately. ➢ Handling and storage to be done according to Materials Safety Data Sheets (MSDS). ➢ Suitable respiratory protection and PPEs to be used. 7. COMBUSTIBLE MATERIALS Fire, damage to property due to fire, Explosion ➢ Time Delays, ➢ Financial loss ➢ Product loss 4 4 16 High Risk ➢ Combustible material shall not be stored in boiler rooms, mechanical rooms, or electrical equipment rooms. ➢ An adequate and sufficient amount of relevant firefighting equipment is to be located on the area. ➢ No hot work activity will be permitted on the area. ➢ Materials shall not be stored in a manner so as to obstruct access to fire protection equipment (detectors/alarms/panels), firefighting equipment, control valves, doors, electrical panels, motors, or aisles and hallways that serve as a means of escape PARCEL Responsible Engineer HSE Representative 2 1 2 Low Risk 8. FLAMMABLE LIQUID/CHEMICAL ➢ Explosion, Fire, damage to property due to fire ➢ Time Delays, ➢ Financial loss ➢ Product loss ➢ 4 4 16 High Risk ➢ Combustible liquids, including oil & greases shall be stored in original containers or in storage tanks, labeled with contents and capacity. ➢ Flammable/combustible liquids and solvents are not to be used near ignition sources. ➢ Only approved containers, safety cans and portable tanks PARCEL Responsible Engineer HSE Representative 2 1 2 Low Risk
  • 6. Page 6 of 8 FIRE RISK ASSESSMENT Reference No.: KAFD-RY-RIA1-PGEN-SAB-HSE-RAS-00000 Revision No.: 00 Description: Risk Assessment - Workshop Date: 01/Jul/2020 Source Hazard Impact Risk Rating Hazards Controls Responsible Person Final Residual Risk Rating S L RR Category S L RR Category shall be used for the storage and handling of flammable and combustible liquids. ➢ Approved, properly labeled, storage cabinets (or properly labeled drums) shall be used to store flammable liquids in excess of 15 US Gallons (57 litres). ➢ Permanent fuel storage tanks shall be maintained in a bunded area, with provisions made for the handling of spills and groundwater protection. ➢ All fuel lines will be equipped with valves capable of stopping the flow of fuel at source, and all piping valves and fittings shall be capable of withstanding working pressures compatible with the type of liquid being stored. ➢ All permanent fuel storage tanks and dispensing units shall be protected against collision damage. ➢ Flammable chemicals shall be stored & handled as per MSDS recommendations.
  • 7. Page 7 of 8 FIRE RISK ASSESSMENT Reference No.: KAFD-RY-RIA1-PGEN-SAB-HSE-RAS-00000 Revision No.: 00 Description: Risk Assessment - Workshop Date: 01/Jul/2020 Source Hazard Impact Risk Rating Hazards Controls Responsible Person Final Residual Risk Rating S L RR Category S L RR Category EMERGENCY RESPONSE/ACCESSE S/ILLUMINATION ➢ Obstructed accesses ➢ Lack of illumination and emergency exit signs ➢ Late response to victim in case of emergency ➢ Lack of communication ➢ Time Delays, ➢ Financial loss ➢ Aggravate injury 4 4 16 High Risk ➢ Be familiar with emergency response procedure. ➢ Any obstructions from pathways must be removed. ➢ Emergency contact lists shall be posted at site. ➢ Ensure lightings at the stairways and emergency exits are working properly. Emergency lights shall be installed at stairs to evacuate in case of power supply failure or emergency. ➢ Emergency evacuation routes and procedure shall be reminded regularly to the site staff by construction and SHE team. PARCEL Responsible Engineer HSE Representative 2 1 2 Low Risk CLASSIFICATION CHART Likelihood of Risk Description Rating Severity of Risk Description Rating Unlikely Occurrence close to zero 1 Minor Injury First-Aid On Site 1 May Happen Capable of taking Place 2 Minor Injury Treatment Off Site 2 Likely Tend to or Inclined to Occur 3 Up-to-3 days Injury Limited or no work for three days 3 Very Likely High Inclination of Occurrence 4 Major Injury Reportable 4 Certain Most Definitely Happen- Not “If but When” 5 Death 5 Prepared by: Jimvil Villeza Signature: Date: 01/07/2020 Consultant Approved by: Reviewed by: Fahim Shaikh Signature: Date: 01/07/2020
  • 8. Page 8 of 8 FIRE RISK ASSESSMENT Reference No.: KAFD-RY-RIA1-PGEN-SAB-HSE-RAS-00000 Revision No.: 00 Description: Risk Assessment - Workshop Date: 01/Jul/2020 Source Hazard Impact Risk Rating Hazards Controls Responsible Person Final Residual Risk Rating S L RR Category S L RR Category Approved by: Ekrem Ucar Signature: Date: 01/07/2020 HSE Manager Date