SlideShare a Scribd company logo
1 of 6
Download to read offline
ACTIVITY-BASED RISK ASSESSMENT FORM NO.OF PAGE:6
Company : Create Logic Pte Ltd RA Leader
Name Signature Approved by
Zabriel
Project: MOE at Ghim Moh
RA Member 1: Vincent Chong Name : Keith Tam
Process/location:
Hot Works
(ceiling support works)
RA Member 2: Chen Liangkuan Designation: (Director)
Original Assessment Date: 24/12/2021 RA Member 3: Qi Huazhi Date: 27/12/2021
Last Review Date: NA RA Member 4: Li Yingwei
Signature:
Next Review Date: 23/12/2024 RA Member 5:
1. Hazard Identification 2. Risk Evaluation 3. Risk Control
1a. 1b. 1c. 1d. 2a. 2b 2c 2d 3a. 3b 3c 3d 4e. 4f.
Ref Work Activity Hazard
Possible Injury /
Ill Health
Existing Risk Controls
Severity
Likelihood
RPN
Additional Controls
Severity
Likelihood
RPN
Implementatio
n Person,
Designation
Remarks
1. Loading /
unloading and
transferring of
materials.
Improper
manual
handling and
lifting
procedures.
Back injury,
Serious Bodily
Injury or
Fatality
Elimination
NA
Substitution
manual handling
Engineering Control
NA
Administrative Control
- Ensure that there are two personnel
to carry the load if it is too heavy or
bulky.
- Reduce the amount of weight
handling at one point.
4 2 8
Elimination
NA
Substitution
NA.
Engineering Control
NA
Administrative Control
- Ensure that proper
manual handling
procedures. Such as
proper posture during
manual lifting.
4 1 4
Site supervisor
Personal Protective Equipment
- NA
Personal Protective
Equipment
- NA
2. Hot Works. Flying Sparks,
Fire and
Explosion.
Eye Injury,
Burns, Serious
Bodily Injury or
Fatality.
Elimination
NA
Substitution
NA
Engineering Control
- Provision of flash back arrestor for
both acetylene cylinder and gas cutting
tool.
Administrative Control
- Implementation of hot work PTW
prior to starting work.
- Ensure that only competent person to
carry out hot work.
- To clear all flammable materials
within the hot work area.
- Provision of fire extinguisher for hot
work area.
- Proper maintenance of hot work
tools.
Personal Protective Equipment
- Ensure proper PPEs are worn during
hot work activity.
4 2 8
Elimination
NA
Substitution
NA
Engineering Control
NA.
Administrative Control
- Deploy supervisor to
supervise the hot work
activity.
Personal Protective
Equipment
NA
4 1 4
Site supervisor
3 Hot Works.
(Arc Welding)
Electrocution,
Flying Sparks,
Fire and
Explosion.
Electrocution,
Eye Injury,
Burns, Serious
Bodily Injury or
Fatality.
Elimination
NA
Substitution
NA
Engineering Control
- All alternating current welding sets
are fitted with an effective voltage
limiting device or shock preventer.
- Ensure that welding sets are properly
well earthed into the ground before
commencing any hot works activity.
- Ensure that the electrode holder shall
be properly insulated before
commencing any hot works activity.
- Ensure all welding cables shall be
continuously insulated before
commencing any hot works activity.
- Proper maintenance of all welding
tools.
Administrative Control
- Implementation of hot work PTW
prior to starting work.
- Ensure that only competent person to
carry out welding work.
- To clear all flammable materials
within the hot work area.
- Provision of fire extinguisher for hot
work area.
Personal Protective Equipment
- Ensure proper PPEs are worn during
welding activity.
4 2 8
Elimination
NA
Substitution
NA
Engineering Control
- Use of overhead cable
hangers to ensure that all
no welding cables are
lying on the ground.
Administrative Control
- Deploy supervisor to
supervise the hot work
activity.
Personal Protective
Equipment
NA 4 1 4
Site supervisor
5 Hot Works.
(Oxy-Fuel Gas
Cutting and
Arc Welding)
Fire and
Explosion
Fatality, serious
bodily burnts
Elimination
NA
Substitution
NA
Engineering Control
- Provision of flash back arrestor for
both acetylene cylinder and gas cutting
tool.
Administrative Control
- Implementation of hot work PTW
prior to starting work.
- Ensure that only competent person to
carry out hot work.
- To clear all flammable materials
within the hot work area.
- Provision of fire extinguisher for hot
work area.
5 2 10
Elimination
NA
Substitution
NA
Engineering Control
NA
Administrative Control
- Refresher training on
how to use a fire
extinguisher during an
emergency situation.
- Daily inspection by SS.
Personal Protective
Equipment
NA
5 1 5
Site supervisor
4 Hot Works.
(Oxy-Fuel Gas
Cutting and
Arc Welding)
Trip and Fall
Hazards.
Bodily Injury Elimination
NA
Substitution
NA
Engineering Control
- Use of overhead cable hangers to
ensure that all no cables and hoses are
lying on the ground.
Administrative Control
- All unused gas hoses and welding
cables shall be properly coiled and
hang up when not in use.
Personal Protective Equipment
NA
3 2 6
Elimination
NA
Substitution
NA
Engineering Control
NA
Administrative Control
- Ensure all materials that
are not in use are
properly kept and not left
lying around at
workplace
Personal Protective
Equipment
NA
3 1 3
Site supervisor
- Proper maintenance of hot work
tools.
(Fire explosion – refer to site ERP)
Ensure that all site personnel are
briefed on the ERP and clear of their
R&R during an emergency.
Personal Protective Equipment
- Ensure proper PPEs are worn during
hot work activity.
Likelihood
Severity
Rare
(1)
Remote
(2)
Occasional
(3)
Frequent
(4)
Almost Certain (5)
Catastrophic (5) 5 10 15 20 25
Major (4) 4 8 12 16 20
Moderate (3) 3 6 9 12 15
Minor (2) 2 4 6 8 10
Negligible (1) 1 2 3 4 5
Risk level Acceptability of risk Recommended actions
Low Risk
(1-3)
Acceptable
No additional risk control measures may be needed.
However, frequent review may be needed to ensure that the risk level assigned is accurate and does not increase over time.
Medium Risk
(4-12)
Moderately
acceptable
A careful evaluation of the hazards should be carried out to ensure that the risk level is reduced to as low as is practicable within a
defined time period.
Interim risk control measures, such as administrative controls, may be implemented. Management attention is required.
Management attention is required
Risk level Acceptability of risk Recommended actions
High Risk
(13-25)
Not acceptable
High Risk level must be reduced to at least Medium Risk before work commences.
There should not be any interim risk control measures and risk control measures should not be overly dependent on
personal protective equipment or appliances. If need be, the hazard should be eliminated before work commences.
Immediate management intervention is required before work commences.

More Related Content

What's hot

Job safety analysis
Job safety analysis Job safety analysis
Job safety analysis soumenmakar
 
27 hydrostatic pressure testing inside buildings risk assessment templates
27 hydrostatic pressure testing inside buildings risk assessment templates27 hydrostatic pressure testing inside buildings risk assessment templates
27 hydrostatic pressure testing inside buildings risk assessment templatesDwarika Bhushan Sharma
 
03-hira-for-welding-work-_compress.pdf
03-hira-for-welding-work-_compress.pdf03-hira-for-welding-work-_compress.pdf
03-hira-for-welding-work-_compress.pdfRajkumarArikumar
 
15 formwork (temporary works) risk assessment templates
15 formwork (temporary works) risk assessment templates15 formwork (temporary works) risk assessment templates
15 formwork (temporary works) risk assessment templatesDwarika Bhushan Sharma
 
Portable tools risk assessment
Portable tools risk assessment Portable tools risk assessment
Portable tools risk assessment Nidhin Sajeevan
 
22 casting of concrete columns risk assessment templates
22 casting of concrete columns risk assessment templates22 casting of concrete columns risk assessment templates
22 casting of concrete columns risk assessment templatesDwarika Bhushan Sharma
 
11 piling operations with rebar cage installation risk assessment templates
11 piling operations with rebar cage installation risk assessment templates11 piling operations with rebar cage installation risk assessment templates
11 piling operations with rebar cage installation risk assessment templatesDwarika Bhushan Sharma
 
10 use of mobile concrete pump risk assessment templates
10 use of mobile concrete pump risk assessment templates10 use of mobile concrete pump risk assessment templates
10 use of mobile concrete pump risk assessment templatesDwarika Bhushan Sharma
 
16 scaffolding (temporary works) risk assessment templates
16 scaffolding (temporary works) risk assessment templates16 scaffolding (temporary works) risk assessment templates
16 scaffolding (temporary works) risk assessment templatesDwarika Bhushan Sharma
 
7 Falsework (Temporary Works) Risk Assessment Templates.docx
7 Falsework (Temporary Works) Risk Assessment Templates.docx7 Falsework (Temporary Works) Risk Assessment Templates.docx
7 Falsework (Temporary Works) Risk Assessment Templates.docxDwarika Bhushan Sharma
 
Risk Assessments 96 pages
Risk Assessments 96 pagesRisk Assessments 96 pages
Risk Assessments 96 pagesDavid H Moloney
 
20 use of suspended access cradles and platforms (temporary works) risk asses...
20 use of suspended access cradles and platforms (temporary works) risk asses...20 use of suspended access cradles and platforms (temporary works) risk asses...
20 use of suspended access cradles and platforms (temporary works) risk asses...Dwarika Bhushan Sharma
 
Work at Height | Safety during work at hight
Work at Height | Safety during work at hightWork at Height | Safety during work at hight
Work at Height | Safety during work at hightGaurav Singh Rajput
 
12 sheet piling operations (temporary works) risk assessment templates
12 sheet piling operations (temporary works) risk assessment templates12 sheet piling operations (temporary works) risk assessment templates
12 sheet piling operations (temporary works) risk assessment templatesDwarika Bhushan Sharma
 
26 storage of substances under co shh risk assessment templates
26 storage of substances under co shh risk assessment templates26 storage of substances under co shh risk assessment templates
26 storage of substances under co shh risk assessment templatesDwarika Bhushan Sharma
 
Flagman-Training.ppt
Flagman-Training.pptFlagman-Training.ppt
Flagman-Training.pptImran Khan
 
9 Lifting Operations with Tower crane Risk Assessment Templates.docx
9 Lifting Operations with Tower crane Risk Assessment Templates.docx9 Lifting Operations with Tower crane Risk Assessment Templates.docx
9 Lifting Operations with Tower crane Risk Assessment Templates.docxDwarika Bhushan Sharma
 
25 demolition of existing concrete structures risk assessment templates
25 demolition of existing concrete structures risk assessment templates25 demolition of existing concrete structures risk assessment templates
25 demolition of existing concrete structures risk assessment templatesDwarika Bhushan Sharma
 
Risk Assessment Example.pdf
Risk Assessment Example.pdfRisk Assessment Example.pdf
Risk Assessment Example.pdfBalamuruganD26
 

What's hot (20)

Job safety analysis
Job safety analysis Job safety analysis
Job safety analysis
 
27 hydrostatic pressure testing inside buildings risk assessment templates
27 hydrostatic pressure testing inside buildings risk assessment templates27 hydrostatic pressure testing inside buildings risk assessment templates
27 hydrostatic pressure testing inside buildings risk assessment templates
 
03-hira-for-welding-work-_compress.pdf
03-hira-for-welding-work-_compress.pdf03-hira-for-welding-work-_compress.pdf
03-hira-for-welding-work-_compress.pdf
 
15 formwork (temporary works) risk assessment templates
15 formwork (temporary works) risk assessment templates15 formwork (temporary works) risk assessment templates
15 formwork (temporary works) risk assessment templates
 
Portable tools risk assessment
Portable tools risk assessment Portable tools risk assessment
Portable tools risk assessment
 
22 casting of concrete columns risk assessment templates
22 casting of concrete columns risk assessment templates22 casting of concrete columns risk assessment templates
22 casting of concrete columns risk assessment templates
 
11 piling operations with rebar cage installation risk assessment templates
11 piling operations with rebar cage installation risk assessment templates11 piling operations with rebar cage installation risk assessment templates
11 piling operations with rebar cage installation risk assessment templates
 
10 use of mobile concrete pump risk assessment templates
10 use of mobile concrete pump risk assessment templates10 use of mobile concrete pump risk assessment templates
10 use of mobile concrete pump risk assessment templates
 
16 scaffolding (temporary works) risk assessment templates
16 scaffolding (temporary works) risk assessment templates16 scaffolding (temporary works) risk assessment templates
16 scaffolding (temporary works) risk assessment templates
 
7 Falsework (Temporary Works) Risk Assessment Templates.docx
7 Falsework (Temporary Works) Risk Assessment Templates.docx7 Falsework (Temporary Works) Risk Assessment Templates.docx
7 Falsework (Temporary Works) Risk Assessment Templates.docx
 
Risk Assessments 96 pages
Risk Assessments 96 pagesRisk Assessments 96 pages
Risk Assessments 96 pages
 
20 use of suspended access cradles and platforms (temporary works) risk asses...
20 use of suspended access cradles and platforms (temporary works) risk asses...20 use of suspended access cradles and platforms (temporary works) risk asses...
20 use of suspended access cradles and platforms (temporary works) risk asses...
 
Work at Height | Safety during work at hight
Work at Height | Safety during work at hightWork at Height | Safety during work at hight
Work at Height | Safety during work at hight
 
12 sheet piling operations (temporary works) risk assessment templates
12 sheet piling operations (temporary works) risk assessment templates12 sheet piling operations (temporary works) risk assessment templates
12 sheet piling operations (temporary works) risk assessment templates
 
26 storage of substances under co shh risk assessment templates
26 storage of substances under co shh risk assessment templates26 storage of substances under co shh risk assessment templates
26 storage of substances under co shh risk assessment templates
 
HSE REPORT 2013-2014.ppt
HSE REPORT 2013-2014.pptHSE REPORT 2013-2014.ppt
HSE REPORT 2013-2014.ppt
 
Flagman-Training.ppt
Flagman-Training.pptFlagman-Training.ppt
Flagman-Training.ppt
 
9 Lifting Operations with Tower crane Risk Assessment Templates.docx
9 Lifting Operations with Tower crane Risk Assessment Templates.docx9 Lifting Operations with Tower crane Risk Assessment Templates.docx
9 Lifting Operations with Tower crane Risk Assessment Templates.docx
 
25 demolition of existing concrete structures risk assessment templates
25 demolition of existing concrete structures risk assessment templates25 demolition of existing concrete structures risk assessment templates
25 demolition of existing concrete structures risk assessment templates
 
Risk Assessment Example.pdf
Risk Assessment Example.pdfRisk Assessment Example.pdf
Risk Assessment Example.pdf
 

Similar to RA for Hot works at MOE-Ghim Moh (Ceiling support works).pdf

JSA Laying of heavy cable.doc
JSA Laying of heavy cable.docJSA Laying of heavy cable.doc
JSA Laying of heavy cable.docRavithokal2
 
17 1 Drilling Operations Risk assessment
17 1 Drilling Operations Risk assessment17 1 Drilling Operations Risk assessment
17 1 Drilling Operations Risk assessmentFESTUS RICHARD SIAME
 
20 Use of Suspended Access cradles and Platforms (Temporary Works) Risk Asses...
20 Use of Suspended Access cradles and Platforms (Temporary Works) Risk Asses...20 Use of Suspended Access cradles and Platforms (Temporary Works) Risk Asses...
20 Use of Suspended Access cradles and Platforms (Temporary Works) Risk Asses...Dwarika Bhushan Sharma
 
07 Manual Handling Assessment - RPS Floor Sorting.pdf
07 Manual Handling Assessment - RPS Floor Sorting.pdf07 Manual Handling Assessment - RPS Floor Sorting.pdf
07 Manual Handling Assessment - RPS Floor Sorting.pdfajengps11
 
Safe work procedure1
Safe work procedure1Safe work procedure1
Safe work procedure1Jahanzeb Khan
 
JHA06_Installation of Transversal beams in Flare Pipe Rack_Rev00.pdf
JHA06_Installation of Transversal beams in Flare Pipe Rack_Rev00.pdfJHA06_Installation of Transversal beams in Flare Pipe Rack_Rev00.pdf
JHA06_Installation of Transversal beams in Flare Pipe Rack_Rev00.pdfJESUSBASILIOANTONIO
 
Fire Suppression System Risk assessment file
Fire Suppression System Risk assessment fileFire Suppression System Risk assessment file
Fire Suppression System Risk assessment filechopriroti
 
Ma 019 preloads dump valves maintenance
Ma 019  preloads dump valves maintenanceMa 019  preloads dump valves maintenance
Ma 019 preloads dump valves maintenanceYousif Fikry
 
LPG Chloride treaters foundation execution_Rev.00.pdf
LPG Chloride treaters foundation execution_Rev.00.pdfLPG Chloride treaters foundation execution_Rev.00.pdf
LPG Chloride treaters foundation execution_Rev.00.pdfJESUSBASILIOANTONIO
 
27 Hydrostatic Pressure Testing inside buildings Risk Assessment Templates.docx
27 Hydrostatic Pressure Testing inside buildings Risk Assessment Templates.docx27 Hydrostatic Pressure Testing inside buildings Risk Assessment Templates.docx
27 Hydrostatic Pressure Testing inside buildings Risk Assessment Templates.docxDwarika Bhushan Sharma
 
008-SWMS-GENERAL-ONSITE-ACTIVITIES-AND-REPAIRS.pdf
008-SWMS-GENERAL-ONSITE-ACTIVITIES-AND-REPAIRS.pdf008-SWMS-GENERAL-ONSITE-ACTIVITIES-AND-REPAIRS.pdf
008-SWMS-GENERAL-ONSITE-ACTIVITIES-AND-REPAIRS.pdfFESTUS RICHARD SIAME
 
Identification of hazard industry and risk assessment
Identification of hazard industry and risk assessment Identification of hazard industry and risk assessment
Identification of hazard industry and risk assessment NishanPrasad1
 
JSA01_De-Ethanizer_Foundation_Execution_Rev00.pdf
JSA01_De-Ethanizer_Foundation_Execution_Rev00.pdfJSA01_De-Ethanizer_Foundation_Execution_Rev00.pdf
JSA01_De-Ethanizer_Foundation_Execution_Rev00.pdfJESUSBASILIOANTONIO
 
Practical assessment 3 - Identify construction work hazards and select risk c...
Practical assessment 3 - Identify construction work hazards and select risk c...Practical assessment 3 - Identify construction work hazards and select risk c...
Practical assessment 3 - Identify construction work hazards and select risk c...Canberra Institute of technology
 
Risk Assessment (Master).pdf
Risk Assessment (Master).pdfRisk Assessment (Master).pdf
Risk Assessment (Master).pdfRafiullahKhan88
 
Boom Lift - working from_2.docx
Boom Lift - working from_2.docxBoom Lift - working from_2.docx
Boom Lift - working from_2.docxolorunyomi wale
 

Similar to RA for Hot works at MOE-Ghim Moh (Ceiling support works).pdf (20)

JSA Laying of heavy cable.doc
JSA Laying of heavy cable.docJSA Laying of heavy cable.doc
JSA Laying of heavy cable.doc
 
17 1 Drilling Operations Risk assessment
17 1 Drilling Operations Risk assessment17 1 Drilling Operations Risk assessment
17 1 Drilling Operations Risk assessment
 
20 Use of Suspended Access cradles and Platforms (Temporary Works) Risk Asses...
20 Use of Suspended Access cradles and Platforms (Temporary Works) Risk Asses...20 Use of Suspended Access cradles and Platforms (Temporary Works) Risk Asses...
20 Use of Suspended Access cradles and Platforms (Temporary Works) Risk Asses...
 
07 Manual Handling Assessment - RPS Floor Sorting.pdf
07 Manual Handling Assessment - RPS Floor Sorting.pdf07 Manual Handling Assessment - RPS Floor Sorting.pdf
07 Manual Handling Assessment - RPS Floor Sorting.pdf
 
Safe work procedure1
Safe work procedure1Safe work procedure1
Safe work procedure1
 
JHA06_Installation of Transversal beams in Flare Pipe Rack_Rev00.pdf
JHA06_Installation of Transversal beams in Flare Pipe Rack_Rev00.pdfJHA06_Installation of Transversal beams in Flare Pipe Rack_Rev00.pdf
JHA06_Installation of Transversal beams in Flare Pipe Rack_Rev00.pdf
 
Fire Suppression System Risk assessment file
Fire Suppression System Risk assessment fileFire Suppression System Risk assessment file
Fire Suppression System Risk assessment file
 
Ma 019 preloads dump valves maintenance
Ma 019  preloads dump valves maintenanceMa 019  preloads dump valves maintenance
Ma 019 preloads dump valves maintenance
 
ACCIDENT - LRF
ACCIDENT - LRFACCIDENT - LRF
ACCIDENT - LRF
 
LPG Chloride treaters foundation execution_Rev.00.pdf
LPG Chloride treaters foundation execution_Rev.00.pdfLPG Chloride treaters foundation execution_Rev.00.pdf
LPG Chloride treaters foundation execution_Rev.00.pdf
 
27 Hydrostatic Pressure Testing inside buildings Risk Assessment Templates.docx
27 Hydrostatic Pressure Testing inside buildings Risk Assessment Templates.docx27 Hydrostatic Pressure Testing inside buildings Risk Assessment Templates.docx
27 Hydrostatic Pressure Testing inside buildings Risk Assessment Templates.docx
 
008-SWMS-GENERAL-ONSITE-ACTIVITIES-AND-REPAIRS.pdf
008-SWMS-GENERAL-ONSITE-ACTIVITIES-AND-REPAIRS.pdf008-SWMS-GENERAL-ONSITE-ACTIVITIES-AND-REPAIRS.pdf
008-SWMS-GENERAL-ONSITE-ACTIVITIES-AND-REPAIRS.pdf
 
Identification of hazard industry and risk assessment
Identification of hazard industry and risk assessment Identification of hazard industry and risk assessment
Identification of hazard industry and risk assessment
 
JSA01_De-Ethanizer_Foundation_Execution_Rev00.pdf
JSA01_De-Ethanizer_Foundation_Execution_Rev00.pdfJSA01_De-Ethanizer_Foundation_Execution_Rev00.pdf
JSA01_De-Ethanizer_Foundation_Execution_Rev00.pdf
 
Nfpa 70 E
Nfpa 70 ENfpa 70 E
Nfpa 70 E
 
3. Assessment Practical.docx
3. Assessment Practical.docx3. Assessment Practical.docx
3. Assessment Practical.docx
 
Practical assessment 3 - Identify construction work hazards and select risk c...
Practical assessment 3 - Identify construction work hazards and select risk c...Practical assessment 3 - Identify construction work hazards and select risk c...
Practical assessment 3 - Identify construction work hazards and select risk c...
 
Risk Assessment (Master).pdf
Risk Assessment (Master).pdfRisk Assessment (Master).pdf
Risk Assessment (Master).pdf
 
HIRA
HIRAHIRA
HIRA
 
Boom Lift - working from_2.docx
Boom Lift - working from_2.docxBoom Lift - working from_2.docx
Boom Lift - working from_2.docx
 

Recently uploaded

Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsApsara Of India
 
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / NcrCall Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncrdollysharma2066
 
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...lizamodels9
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...lizamodels9
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst SummitHolger Mueller
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.Aaiza Hassan
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
Call Girls In ⇛⇛Chhatarpur⇚⇚. Brings Offer Delhi Contact Us 8377877756
Call Girls In ⇛⇛Chhatarpur⇚⇚. Brings Offer Delhi Contact Us 8377877756Call Girls In ⇛⇛Chhatarpur⇚⇚. Brings Offer Delhi Contact Us 8377877756
Call Girls In ⇛⇛Chhatarpur⇚⇚. Brings Offer Delhi Contact Us 8377877756dollysharma2066
 
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
NewBase 22 April 2024 Energy News issue - 1718 by Khaled Al Awadi (AutoRe...
NewBase  22 April  2024  Energy News issue - 1718 by Khaled Al Awadi  (AutoRe...NewBase  22 April  2024  Energy News issue - 1718 by Khaled Al Awadi  (AutoRe...
NewBase 22 April 2024 Energy News issue - 1718 by Khaled Al Awadi (AutoRe...Khaled Al Awadi
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation SlidesKeppelCorporation
 
CATALOG cáp điện Goldcup (bảng giá) 1.4.2024.PDF
CATALOG cáp điện Goldcup (bảng giá) 1.4.2024.PDFCATALOG cáp điện Goldcup (bảng giá) 1.4.2024.PDF
CATALOG cáp điện Goldcup (bảng giá) 1.4.2024.PDFOrient Homes
 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...lizamodels9
 
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… AbridgedLean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… AbridgedKaiNexus
 
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service DewasVip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewasmakika9823
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessAggregage
 
Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailAriel592675
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurSuhani Kapoor
 

Recently uploaded (20)

Best Practices for Implementing an External Recruiting Partnership
Best Practices for Implementing an External Recruiting PartnershipBest Practices for Implementing an External Recruiting Partnership
Best Practices for Implementing an External Recruiting Partnership
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
 
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / NcrCall Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
 
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
 
KestrelPro Flyer Japan IT Week 2024 (English)
KestrelPro Flyer Japan IT Week 2024 (English)KestrelPro Flyer Japan IT Week 2024 (English)
KestrelPro Flyer Japan IT Week 2024 (English)
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst Summit
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
Call Girls In ⇛⇛Chhatarpur⇚⇚. Brings Offer Delhi Contact Us 8377877756
Call Girls In ⇛⇛Chhatarpur⇚⇚. Brings Offer Delhi Contact Us 8377877756Call Girls In ⇛⇛Chhatarpur⇚⇚. Brings Offer Delhi Contact Us 8377877756
Call Girls In ⇛⇛Chhatarpur⇚⇚. Brings Offer Delhi Contact Us 8377877756
 
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
NewBase 22 April 2024 Energy News issue - 1718 by Khaled Al Awadi (AutoRe...
NewBase  22 April  2024  Energy News issue - 1718 by Khaled Al Awadi  (AutoRe...NewBase  22 April  2024  Energy News issue - 1718 by Khaled Al Awadi  (AutoRe...
NewBase 22 April 2024 Energy News issue - 1718 by Khaled Al Awadi (AutoRe...
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
 
CATALOG cáp điện Goldcup (bảng giá) 1.4.2024.PDF
CATALOG cáp điện Goldcup (bảng giá) 1.4.2024.PDFCATALOG cáp điện Goldcup (bảng giá) 1.4.2024.PDF
CATALOG cáp điện Goldcup (bảng giá) 1.4.2024.PDF
 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
 
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… AbridgedLean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
 
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service DewasVip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for Success
 
Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detail
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
 

RA for Hot works at MOE-Ghim Moh (Ceiling support works).pdf

  • 1. ACTIVITY-BASED RISK ASSESSMENT FORM NO.OF PAGE:6 Company : Create Logic Pte Ltd RA Leader Name Signature Approved by Zabriel Project: MOE at Ghim Moh RA Member 1: Vincent Chong Name : Keith Tam Process/location: Hot Works (ceiling support works) RA Member 2: Chen Liangkuan Designation: (Director) Original Assessment Date: 24/12/2021 RA Member 3: Qi Huazhi Date: 27/12/2021 Last Review Date: NA RA Member 4: Li Yingwei Signature: Next Review Date: 23/12/2024 RA Member 5: 1. Hazard Identification 2. Risk Evaluation 3. Risk Control 1a. 1b. 1c. 1d. 2a. 2b 2c 2d 3a. 3b 3c 3d 4e. 4f. Ref Work Activity Hazard Possible Injury / Ill Health Existing Risk Controls Severity Likelihood RPN Additional Controls Severity Likelihood RPN Implementatio n Person, Designation Remarks 1. Loading / unloading and transferring of materials. Improper manual handling and lifting procedures. Back injury, Serious Bodily Injury or Fatality Elimination NA Substitution manual handling Engineering Control NA Administrative Control - Ensure that there are two personnel to carry the load if it is too heavy or bulky. - Reduce the amount of weight handling at one point. 4 2 8 Elimination NA Substitution NA. Engineering Control NA Administrative Control - Ensure that proper manual handling procedures. Such as proper posture during manual lifting. 4 1 4 Site supervisor
  • 2. Personal Protective Equipment - NA Personal Protective Equipment - NA 2. Hot Works. Flying Sparks, Fire and Explosion. Eye Injury, Burns, Serious Bodily Injury or Fatality. Elimination NA Substitution NA Engineering Control - Provision of flash back arrestor for both acetylene cylinder and gas cutting tool. Administrative Control - Implementation of hot work PTW prior to starting work. - Ensure that only competent person to carry out hot work. - To clear all flammable materials within the hot work area. - Provision of fire extinguisher for hot work area. - Proper maintenance of hot work tools. Personal Protective Equipment - Ensure proper PPEs are worn during hot work activity. 4 2 8 Elimination NA Substitution NA Engineering Control NA. Administrative Control - Deploy supervisor to supervise the hot work activity. Personal Protective Equipment NA 4 1 4 Site supervisor
  • 3. 3 Hot Works. (Arc Welding) Electrocution, Flying Sparks, Fire and Explosion. Electrocution, Eye Injury, Burns, Serious Bodily Injury or Fatality. Elimination NA Substitution NA Engineering Control - All alternating current welding sets are fitted with an effective voltage limiting device or shock preventer. - Ensure that welding sets are properly well earthed into the ground before commencing any hot works activity. - Ensure that the electrode holder shall be properly insulated before commencing any hot works activity. - Ensure all welding cables shall be continuously insulated before commencing any hot works activity. - Proper maintenance of all welding tools. Administrative Control - Implementation of hot work PTW prior to starting work. - Ensure that only competent person to carry out welding work. - To clear all flammable materials within the hot work area. - Provision of fire extinguisher for hot work area. Personal Protective Equipment - Ensure proper PPEs are worn during welding activity. 4 2 8 Elimination NA Substitution NA Engineering Control - Use of overhead cable hangers to ensure that all no welding cables are lying on the ground. Administrative Control - Deploy supervisor to supervise the hot work activity. Personal Protective Equipment NA 4 1 4 Site supervisor
  • 4. 5 Hot Works. (Oxy-Fuel Gas Cutting and Arc Welding) Fire and Explosion Fatality, serious bodily burnts Elimination NA Substitution NA Engineering Control - Provision of flash back arrestor for both acetylene cylinder and gas cutting tool. Administrative Control - Implementation of hot work PTW prior to starting work. - Ensure that only competent person to carry out hot work. - To clear all flammable materials within the hot work area. - Provision of fire extinguisher for hot work area. 5 2 10 Elimination NA Substitution NA Engineering Control NA Administrative Control - Refresher training on how to use a fire extinguisher during an emergency situation. - Daily inspection by SS. Personal Protective Equipment NA 5 1 5 Site supervisor 4 Hot Works. (Oxy-Fuel Gas Cutting and Arc Welding) Trip and Fall Hazards. Bodily Injury Elimination NA Substitution NA Engineering Control - Use of overhead cable hangers to ensure that all no cables and hoses are lying on the ground. Administrative Control - All unused gas hoses and welding cables shall be properly coiled and hang up when not in use. Personal Protective Equipment NA 3 2 6 Elimination NA Substitution NA Engineering Control NA Administrative Control - Ensure all materials that are not in use are properly kept and not left lying around at workplace Personal Protective Equipment NA 3 1 3 Site supervisor
  • 5. - Proper maintenance of hot work tools. (Fire explosion – refer to site ERP) Ensure that all site personnel are briefed on the ERP and clear of their R&R during an emergency. Personal Protective Equipment - Ensure proper PPEs are worn during hot work activity. Likelihood Severity Rare (1) Remote (2) Occasional (3) Frequent (4) Almost Certain (5) Catastrophic (5) 5 10 15 20 25 Major (4) 4 8 12 16 20 Moderate (3) 3 6 9 12 15 Minor (2) 2 4 6 8 10 Negligible (1) 1 2 3 4 5 Risk level Acceptability of risk Recommended actions Low Risk (1-3) Acceptable No additional risk control measures may be needed. However, frequent review may be needed to ensure that the risk level assigned is accurate and does not increase over time. Medium Risk (4-12) Moderately acceptable A careful evaluation of the hazards should be carried out to ensure that the risk level is reduced to as low as is practicable within a defined time period. Interim risk control measures, such as administrative controls, may be implemented. Management attention is required. Management attention is required
  • 6. Risk level Acceptability of risk Recommended actions High Risk (13-25) Not acceptable High Risk level must be reduced to at least Medium Risk before work commences. There should not be any interim risk control measures and risk control measures should not be overly dependent on personal protective equipment or appliances. If need be, the hazard should be eliminated before work commences. Immediate management intervention is required before work commences.