HALOL DAHOD PIPELINE PROJECT
HAZARD AND RISK ASSESSMENT FOR THE PIPELINE CONSTRUCTION
Sr.
No.
Activity Hazard & risk
Identified
Risk Level
Before control
Control Measures Action
taken by
Risk level
After control
6 Excavation &
Trenching
Shocked due to
underground electrical
cable (if any)
Falling of object on
head or body
Collapse of trench
traffic hazards /
vehicle movement
Fall of person in The
trench
High
Work to be supervised by experienced &
responsible personnel.
Cordoning the work area by cordoning
tape and appropriate signboards.
Excavation equipments to be well
insulated.
Required persons are present at site.
Use of PPE’s like safety shoe, hardhat
etc.
Trench to be excavated in V shape.
Vehicle traffic to be diverted if required.
Reflective jackets to be worn at heavy
traffic road and all persons should work /
stand with in cordoned area.
Continuous dewatering is required in
high seepages area.
IECCL
Excavation
Sup. / foreman
/ Engineer
Low
HALOL DAHOD PIPELINE PROJECT
HAZARD AND RISK ASSESSMENT FOR THE PIPELINE CONSTRUCTION
Sr.
No.
Activity Hazard & risk
Identified
Risk Level
Before control
Control Measures Action
taken by
Risk level
After control
1 Loading/
Unloading of
pipe
Roll of pipes
Fall of pipe from slings.
Breakage of lifting
accessories like rope
and slings
Electric shock due to
touch of boom to
overhead electrical
cables
High
Work to be supervised by experienced &
responsible personnel.
Cordoning the work area by cordoning
tape and appropriate signboards.
Experienced working crew.
Ensure proper use of slings and ropes
after balancing before lifting the pipes.
Obvious hazards at work place and
surroundings must be observed.
Ensure lifting equipments/device are in
safe condition and follow safe working
load.
In case of using two equipments for lifting
pipe section proper balancing and proper
signal by authorized person is essential.
Use of PPE,s –safety shoe, safety
helmet.
Restrict the personnel movement under
the lifted load.
Crane/lifting equipments to be operated
by authorize person.
IECCL Piping
Sup. / foreman
/ Engineer
Low
HALOL DAHOD PIPELINE PROJECT
HAZARD AND RISK ASSESSMENT FOR THE PIPELINE CONSTRUCTION
Sr.
No.
Activity Hazard & risk
Identified
Risk Level
Before control
Control Measures Action
taken by
Risk level
After control
2 Transportation
of pipe
Roll/ fall of pipes
Road traffic hazard Medium
Load the pipes considering the load
carrying capacity of trailer.
Pipes to be arranged and tightened well
in the trailer.
Warning flag/sign/light to be displayed.
Follow the traffic rules.
IECCL Piping
Sup. /
foreman/
Engineer/trailer
driver
Low
HALOL DAHOD PIPELINE PROJECT
HAZARD AND RISK ASSESSMENT FOR THE PIPELINE CONSTRUCTION
Sr.
No.
Activity Hazard & risk
Identified
Risk Level
Before control
Control Measures Action
taken by
Risk level
After control
3 Material handling-
manual
Fall of object on leg
Injury in hand due
to sharp edge of
object.
Cuts, abrasion
Slips, Trips & Falls
hazard.
Back injury
Medium
Use of PPEs i.e. safety shoe, hardhat,
hand gloves etc.
.Proper communication required when
the object is lifted by more than one
person.
Persons are trained for safe lifting
procedure and aware of hazards.
Good housekeeping
Proper supervision.
IECCL area
incharge Low
HALOL DAHOD PIPELINE PROJECT
HAZARD AND RISK ASSESSMENT FOR THE PIPELINE CONSTRUCTION
Sr.
No.
Activity Hazard & risk
Identified
Risk Level
Before control
Control Measures Action
taken by
Risk level
After control
4. Route Survey Snack / Insect bite
Cut injury
Medium
Extra care shall be taken during line
survey.
Use of PPE’s like Gumboot, safety
shoe, hard hat and hand gloves etc.
First aid kit kept with survey team.
Only experienced personnel shall be
deployed.
IECCL
Survey
incharge
Low
HALOL DAHOD PIPELINE PROJECT
HAZARD AND RISK ASSESSMENT FOR THE PIPELINE CONSTRUCTION
Sr.
No.
Activity Hazard & risk
Identified
Risk Level
Before control
Control Measures Action
taken by
Risk level
After control
5. ROU & Grading Snack / Insect bite
Overhead utilities.
Equipments may
stick in marshy land.
Cutting tree or its
branch may fall on
the machinery like
Grader, Dozer etc
Medium
Extra care shall be taken for snake /
insect bite.
Use of PPE’s like Gumboot, safety
shoe, hard hat and hand gloves etc.
First aid kit kept with crew member.
Only experienced personnel shall be
deployed as a operator.
Avoid go inside the marshy land with
machinery.
Extra care shall be taken to prevent
overhead utilities.
IECCL Job
supervisor. Low
HALOL DAHOD PIPELINE PROJECT
HAZARD AND RISK ASSESSMENT FOR THE PIPELINE CONSTRUCTION
Sr.
No.
Activity Hazard & risk
Identified
Risk Level
Before control
Control Measures Action
taken by
Risk level
After control
6 Excavation &
Trenching
Shocked due to
underground electrical
cable (if any)
Falling of object on
head or body
Collapse of trench
traffic hazards /
vehicle movement
Fall of person in The
trench
High
Work to be supervised by experienced &
responsible personnel.
Cordoning the work area by cordoning
tape and appropriate signboards.
Excavation equipments to be well
insulated.
Required persons are present at site.
Use of PPE’s like safety shoe, hardhat
etc.
Trench to be excavated in V shape.
Vehicle traffic to be diverted if required.
Reflective jackets to be worn at heavy
traffic road and all persons should work /
stand with in cordoned area.
Continuous dewatering is required in
high seepages area.
IECCL
Excavation
Sup. / foreman
/ Engineer
Low
HALOL DAHOD PIPELINE PROJECT
HAZARD AND RISK ASSESSMENT FOR THE PIPELINE CONSTRUCTION
Sr.
No.
Activity Hazard & risk
Identified
Risk Level
Before control
Control Measures Action
taken by
Risk level
After control
7. Stringing Roll / Fall of pipe
Crush of
finger/hand.
Equipments
breakdown.
Swim of pipe and
hit to other adjusting
High
Periodic inspection of slings/wire ropes.
Use of proper capacity slings/ wire
ropes.
Signal to be given by trained person to
hydra/crane operator.
Restricted the personnel movement
under the lifted pipe.
Use adequate sand bags with proper
wooden supports.
Guide line shall be used for control of
pipes.
Only one pipe shall be lifted at a time.
Use of PPE’s like hand gloves, safety
shoe, hardhat etc.
IECCL
stringing
incharge/
supervisor &
maintenance
incharge.
Low
HALOL DAHOD PIPELINE PROJECT
HAZARD AND RISK ASSESSMENT FOR THE PIPELINE CONSTRUCTION
Sr.
No.
Activity Hazard & risk
Identified
Risk Level
Before control
Control Measures Action
taken by
Risk level
After control
8. Cutting / Welding Flying of foreign
particles.
Welding flash.
Burn injury due to
gas cutting/ welding.
Electric shock.
Fire hazard.
Health hazard
High
Minimum person to be kept near work
place.
Use of welding helmet, hand sleeve,
hand gloves, safety shoe by welder.
Use of PPE’s like hand gloves, helmet,
safety shoe, goggles by helper and near
persons.
Inspection of hose connection, flash
back arrestor of gas cutting set.
Ensure electric cables, extension
boards; machines are free from electric
shock hazard.
Flammable materials shall not be
nearby welding & cutting operations.
Earthing shall be checked before starting
the activity.
Suitable fire extinguishers shall be kept
ready.
IECCL
Mainline
incharge/
foreman& HSE
personnel.
Low
HALOL DAHOD PIPELINE PROJECT
HAZARD AND RISK ASSESSMENT FOR THE PIPELINE CONSTRUCTION
Sr.
No.
Activity Hazard & risk
Identified
Risk Level
Before control
Control Measures Action
taken by
Risk level
After control
9. Grinding Entry of flying
particles in eye &
ear
Cut injury(in
overhead grinding).
Electric shock.
Breaking of
grinding wheel/
brush.
Fire hazard.
Noise & health
hazard
High
Ensure guard on grinding machine.
Use of PPE’s like, safety shoe, face
shield, grinding goggles, hand gloves etc.
Special care shall be taken during
overhead grinding.
Work area to be cordoned.
Minimum required persons to be kept
near and eye protection goggles to be
used by them.
Trained and qualified personnel shall be
deployed in such kind of operation.
Flammable materials shall not be
nearby such operations.
IECCL Job
supervisor &
HSE
personnel.
Low
HALOL DAHOD PIPELINE PROJECT
HAZARD AND RISK ASSESSMENT FOR THE PIPELINE CONSTRUCTION
Sr.
No.
Activity Hazard & risk
Identified
Risk Level
Before control
Control Measures Action
taken by
Risk level
After control
10. Lowering
operation / pipe
laying
Collapse of lifted
pipe section.
Collapse of lifting
equipment.
Overhead electric
lines- contact with
crane, lifting
equipment.
Collapse of wooden
planks kept on
trench for sectional
lowering may cause
injury.
Cut, crush,
abrasion injury
Road traffic hazard.
High
Proper balancing to be done, if pipe is
lifted by two slings / wire ropes.
Keep safe distance near trench while
locating the crane, lifting equipment.
Ensure single authorized person gives
signal to lift/lower the pipe section by
observing safety with all respect.
Wooden planks having enough strength
to be placed properly on the trench.
Special care shall be taken while
overhead live cables are there during
such activity.
Use of PPE’s like safety shoe, hardhat
etc
Work area to be cordoned by cordoning
tape and signboard, if such work is being
carried out on/ near road.
IECCL
LOWERING
INCHARGE
& HSE
personnel.
Low
HALOL DAHOD PIPELINE PROJECT
HAZARD AND RISK ASSESSMENT FOR THE PIPELINE CONSTRUCTION
Sr.
No.
Activity Hazard & risk
Identified
Risk Level
Before control
Control Measures Action
taken by
Risk level
After control
11. Tie- in-joints Collapse of trench.
Fall of object.
Cut, crush,
abrasion injury.
Road traffic hazard.
High
Proper balancing to be done, if pipe is
lifted by two slings / wire ropes.
Keep safe distance near trench while
locating the crane, lifting equipment.
Ensure single authorized person gives
signal to lift/lower the pipe section by
observing safety with all respect.
Wooden planks having enough strength
to be placed properly on the trench.
Special care shall be taken while
overhead live cables are there during
such activity.
Use of PPE’s like safety shoe, hardhat
etc
Work area to be cordoned by cordoning
tape and signboard, if such work is being
carried out on/ near road.
IECCL Job
supervisor &
HSE
personnel.
Low
HALOL DAHOD PIPELINE PROJECT
HAZARD AND RISK ASSESSMENT FOR THE PIPELINE CONSTRUCTION
Sr.
No.
Activity Hazard & risk
Identified
Risk Level
Before control
Control Measures Action
taken by
Risk level
After control
12. Holiday test. Electric shock.
High
Trained and experienced person shall
do this work.
Use of appropriate PPE’s.
No one allowed sitting, crossing or
touching the pipe section during test.
Ensure power supply of instrument is off
/ isolated before removing / refitting the
test ring.
Ensure provision of earthing to objects &
instrument..
IECCL Job
supervisor &
HSE
personnel.
Low
HALOL DAHOD PIPELINE PROJECT
HAZARD AND RISK ASSESSMENT FOR THE PIPELINE CONSTRUCTION
Sr.
No.
Activity Hazard & risk
Identified
Risk Level
Before control
Control Measures Action
taken by
Risk level
After control
13. Radiography / X-
Ray.
Ionizing radiation.
Radiation may
react with the skin
and can cause
cancer, skin
irritation, dermatitis,
etc.
High
Ensure safety regulations as per BARC
before commencement of job.
Affected area to be cordoned off,
radiation warning symbols/ signboards to
be displayed.
Avoid radiography in daytime.
Wear appropriate PPE’s and film badges
issued by BARC.
Radiation effect to be measured with
dosimeter before starting the radiography.
Working crew at site must be informed
regarding such activity.
Stay away from radiation sources.
Use the exact source of radiation and
avoid more powerful source.
Experienced and trained persons shall
be deployed.
IECCL NDT
team &
QA/QC
engineer.
Low
HALOL DAHOD PIPELINE PROJECT
HAZARD AND RISK ASSESSMENT FOR THE PIPELINE CONSTRUCTION
Sr.
No.
Activity Hazard & risk
Identified
Risk Level
Before control
Control Measures Action
taken by
Risk level
After control
14. Pipe bending. Personal injury.
Breaking hydraulic
hoses.
Overhead electric
line.
Uneven surface.
Obstruction in free
movement of
machinery and
manpower.
Medium
Use of proper PPE’s like safety shoe,
hard hat, hand gloves, ear plug etc.
Care shall be taken that no sharp edge
shall be contact with hydraulic hoses.
Working surface shall be even and well
maintained.
Good housekeeping shall be maintained
at work place.
Only trained and authorized personnel
shall be deployed.
Pipe bending machine shall not be kept
under the overhead electrical cable.
IECCL
Bending
incharge.
Low
HALOL DAHOD PIPELINE PROJECT
HAZARD AND RISK ASSESSMENT FOR THE PIPELINE CONSTRUCTION
Sr.
No.
Activity Hazard & risk
Identified
Risk Level
Before control
Control Measures Action
taken by
Risk level
After control
15. Horizontal
Direction Drilling
(HDD).
Misuse / abuse of
equipment.
Fall hazard.
Underground
electrical cable,
pipeline damage.
Failure of rig to pill
the pipe section.
.
Medium
Daily user inspection and periodical
checking / recording of equipment to be
ensured. The equipment should be
operated by qualified operator only.
Ensure that a walkover excavation
technique, but still it should be ensured
that the area under which the HDD is
being done should be barricaded.
Higher capacity rig shall be used then
required capacity.
Ensure that no underground utilities
there, if there first conform that the Dept.
of utilities.
IECCL HDD
Incharge /
Job
supervisor.
Low
HALOL DAHOD PIPELINE PROJECT
HAZARD AND RISK ASSESSMENT FOR THE PIPELINE CONSTRUCTION
Sr.
No.
Activity Hazard & risk
Identified
Risk Level
Before control
Control Measures Action
taken by
Risk level
After control
16. Sand Blasting. Health hazard i.e.
lung dieses, silicosis
etc.
.
Asphyxiation due
to lack of air supply.
Body injury
Medium
Proper PPE’s shall be worn like Dust
mask, ear plug and mandatory PPE’s.
Area to appropriately cover to avoid the
spreading of dust in surrounding area.
Minimum person shall be deployed and
movement of vehicle shall be prohibited
where sand blasting carried out.
IECCL Job
supervisor. Low
HALOL DAHOD PIPELINE PROJECT
HAZARD AND RISK ASSESSMENT FOR THE PIPELINE CONSTRUCTION
Sr.
No.
Activity Hazard & risk
Identified
Risk Level
Before control
Control Measures Action
taken by
Risk level
After control
17. Concrete coating
of pipe.
Flying of cement
mixture.
Health hazard due
to cement dust.
Brusting of hoses.
Roll of pipes.
Medium
All persons shall be wear proper PPE’s
like safety shoe, gum boot, rubber gloves,
ear plug, dust mask etc.
Experienced & trained person shall be
deployed.
IECCL Job
supervisor. Low
HALOL DAHOD PIPELINE PROJECT
HAZARD AND RISK ASSESSMENT FOR THE PIPELINE CONSTRUCTION
Sr.
No.
Activity Hazard & risk
Identified
Risk Level
Before control
Control Measures Action
taken by
Risk level
After control
18. Civil work/
working with
cement, sand &
bricks.
Fall of bricks on
person.
Health hazard.
Dusty atmosphere.
Cut and wound
injury
Medium
Use of PPE’s like safety shoe, gum
boot, rubber gloves, ear plug, dust mask
etc.
Experienced & trained person shall be
deployed.
Good housekeeping shall be maintained
at work location.
Throwing of bricks shall be prohibited.
Work supervision shall be done by only
experienced and trained person only.
IECCL Job
supervisor. Low
HALOL DAHOD PIPELINE PROJECT
HAZARD AND RISK ASSESSMENT FOR THE PIPELINE CONSTRUCTION
Sr.
No.
Activity Hazard & risk
Identified
Risk Level
Before control
Control Measures Action
taken by
Risk level
After control
19 Removal of pipe
coating.
Burn hazard.
Fire / explosion
hazard
High
Proper PPE’s i.e. heat retardant hand
gloves, safety goggles, face shield etc.
shall be used.
Use only approved commercial LPG
cylinders.
IECCL Job
supervisor. Low
HALOL DAHOD PIPELINE PROJECT
HAZARD AND RISK ASSESSMENT FOR THE PIPELINE CONSTRUCTION
Sr.
No.
Activity Hazard & risk
Identified
Risk Level
Before control
Control Measures Action
taken by
Risk level
After control
19 Removal of pipe
coating.
Burn hazard.
Fire / explosion
hazard
High
Proper PPE’s i.e. heat retardant hand
gloves, safety goggles, face shield etc.
shall be used.
Use only approved commercial LPG
cylinders.
IECCL Job
supervisor. Low
HALOL DAHOD PIPELINE PROJECT
HAZARD AND RISK ASSESSMENT FOR THE PIPELINE CONSTRUCTION
Sr.
No.
Activity Hazard & risk
Identified
Risk Level
Before control
Control Measures Action
taken by
Risk level
After control
20.
.
Working at Height Fall of personnel
Fall of
material/tools and/or
equipment.
Dizziness-Vertigo
Unsafe scaffolding
Damage or
improper use of
ladders.
High
All personnel shall wear safety harness
if fixed access cannot be provided.
Safety Net shall be provided if required.
Scaffolders shall ensure that access
platforms are constructed in line with all
relevant codes.
Suitable barriers shall be erected below
the work area and signs displayed to
advise personnel of the potential hazards.
Personnel shall ensure that all
materials/tools and /or equipment kept
secure at all times.
Report any sign of dizziness-vertigo,
immediately to the supervisor .
Ensure that damaged ladder shall not
be used.
IECCL Job
supervisor &
HSE
personnel.
Low
HALOL DAHOD PIPELINE PROJECT
HAZARD AND RISK ASSESSMENT FOR THE PIPELINE CONSTRUCTION
Sr.
No.
Activity Hazard & risk
Identified
Risk Level
Before control
Control Measures Action
taken by
Risk level
After control
21.
.
Use of lifting
equipments
Damage of lifting
equipments due to
overload or work in
over SWL.
Sling / chain
damage.
Balancing may fall.
Person may
electrocute due to
crane’s boom
touching with high
tension line.
Due to lack of
knowledge of load
chart, man may lift
things in wrong
radius that may
cause tilt.
High
Check crane/sling/chain pulley
certification for their SWL and testing
date.
SWL must mention on each lifting
devices.
Dual lifting shall be utilized whenever
possible.
Better communication between crane
operator and foreman.
Use only tested lifting tools & tackles.
Use of PPE’s like safety shoe, hard hat,
hand gloves etc
Only trained and experienced operator
shall be operating lifting equipments.
No one shall be passing and stay under
the lifted load and booms.
IECCL Job
supervisor. Low
HALOL DAHOD PIPELINE PROJECT
HAZARD AND RISK ASSESSMENT FOR THE PIPELINE CONSTRUCTION
Sr.
No.
Activity Hazard & risk
Identified
Risk Level
Before control
Control Measures Action
taken by
Risk level
After control
22
.
Working with
Electrical
Equipment
Electrical shock
Electrical burn
Electrical fire/short
circuit.
High
All equipment being used complies with
all relevant safety standards.
All equipment is given through visual
inspection prior to use.
Maintenance schedule is place.
Persons are aware of procedure to use
the equipment.
IECCL
Electrical
incharge &
HSE
personnel.
Low
HALOL DAHOD PIPELINE PROJECT
HAZARD AND RISK ASSESSMENT FOR THE PIPELINE CONSTRUCTION
Sr.
No.
Activity Hazard & risk
Identified
Risk Level
Before control
Control Measures Action
taken by
Risk level
After control
23
.
Working near
object that may
move/slide.
Cut injury.
Body part caught
between moving
objects.
High
Guarding on moving parts.
Compressor to be grounded.
Proper lubrication to be done.
Use of PPE’s.
IECCL Job
supervisor. Low
HALOL DAHOD PIPELINE PROJECT
HAZARD AND RISK ASSESSMENT FOR THE PIPELINE CONSTRUCTION
Sr.
No.
Activity Hazard & risk
Identified
Risk Level
Before control
Control Measures Action
taken by
Risk level
After control
24
.
Pneumatic/
Hydraulic testing.
Bursting of
discharge hose/tube.
Bursting of pipe to
be tested.
Heavy leakage
from valve body/
valve passing.
Slipping of
spanners.
High
Work to be supervised by experienced
& responsible personnel.
Cordoning the work area by cordoning
tape and appropriate signboards.
Minimum required persons to be kept at
site.
Avoid such testing in heavy populated
area.
Periodic inspection / testing of discharge
hose / tube to be carried out.
Skilled workers to be allowed to do so.
Use of PPE’s.
Use standard fitting and calibrated
pressure gauges.
Ensure that no loose fitting placed.
IECCL
Engineer/
HSE
personnel.
Low
HALOL DAHOD PIPELINE PROJECT
HAZARD AND RISK ASSESSMENT FOR THE PIPELINE CONSTRUCTION
Sr.
No.
Activity Hazard & risk
Identified
Risk Level
Before control
Control Measures Action
taken by
Risk level
After control
25
.
Commissioning Fire due to
uncontrolled gas
venting.
Road traffic
hazards.
High
Obtain work permit.
Continuous venting of gas to be
avoided and safe venting procedure to be
followed.
CH4 to be monitored during venting in
the atmosphere.
Fire fighting equipments to be kept
ready.
Vehicular movement to be stopped /
diverted during venting is carried out very
close to the road.
Use of PPE’s.
IECCL
Engineer/
HSE
personnel
Low

More Related Content

What's hot

HSE Annual Performance
HSE Annual PerformanceHSE Annual Performance
HSE Annual PerformanceArun Kumar
 
A Part 1 Safety Induction
A  Part 1 Safety InductionA  Part 1 Safety Induction
A Part 1 Safety InductionJames McCann
 
Scaffolding safety training.ppt
Scaffolding safety training.pptScaffolding safety training.ppt
Scaffolding safety training.pptIrfanAwan25
 
Visitors SHE Induction Presentation 2016
Visitors SHE Induction Presentation 2016Visitors SHE Induction Presentation 2016
Visitors SHE Induction Presentation 2016Chris Morris
 
HSE-INDUCTION-TRAINING.ppt
HSE-INDUCTION-TRAINING.pptHSE-INDUCTION-TRAINING.ppt
HSE-INDUCTION-TRAINING.pptssuser0ebdc3
 
8 lifting operations with mobile crane risk assessment templates
8 lifting operations with mobile crane risk assessment templates8 lifting operations with mobile crane risk assessment templates
8 lifting operations with mobile crane risk assessment templatesDwarika Bhushan Sharma
 
Risk assessment for testing & commissioning of cranes
Risk assessment for  testing & commissioning of cranesRisk assessment for  testing & commissioning of cranes
Risk assessment for testing & commissioning of cranesAzmeel Contracting Company
 
Permit to work training
Permit to work trainingPermit to work training
Permit to work trainingKarnav Rana
 
Work Permit System
Work Permit SystemWork Permit System
Work Permit SystemGagan Tanwar
 
Job safety analysis
Job safety analysis Job safety analysis
Job safety analysis soumenmakar
 
HSE Risk Register | Gaurav Singh Rajput
HSE Risk Register | Gaurav Singh RajputHSE Risk Register | Gaurav Singh Rajput
HSE Risk Register | Gaurav Singh RajputGaurav Singh Rajput
 
working at height
working at heightworking at height
working at heightJYOTHISHKT
 
Safety handbook Saudi Aramco BY Muhammad Fahad Ansari 12IEEM14
Safety handbook Saudi Aramco  BY Muhammad Fahad Ansari  12IEEM14Safety handbook Saudi Aramco  BY Muhammad Fahad Ansari  12IEEM14
Safety handbook Saudi Aramco BY Muhammad Fahad Ansari 12IEEM14fahadansari131
 
Ladder Safety
Ladder SafetyLadder Safety
Ladder SafetyHvacmach
 

What's hot (20)

HSE Annual Performance
HSE Annual PerformanceHSE Annual Performance
HSE Annual Performance
 
A Part 1 Safety Induction
A  Part 1 Safety InductionA  Part 1 Safety Induction
A Part 1 Safety Induction
 
Construction Safety Training
Construction Safety TrainingConstruction Safety Training
Construction Safety Training
 
Work at height safety
Work at height safetyWork at height safety
Work at height safety
 
Scaffolding safety training.ppt
Scaffolding safety training.pptScaffolding safety training.ppt
Scaffolding safety training.ppt
 
Visitors SHE Induction Presentation 2016
Visitors SHE Induction Presentation 2016Visitors SHE Induction Presentation 2016
Visitors SHE Induction Presentation 2016
 
HSE-INDUCTION-TRAINING.ppt
HSE-INDUCTION-TRAINING.pptHSE-INDUCTION-TRAINING.ppt
HSE-INDUCTION-TRAINING.ppt
 
Work safe with grinder
Work safe with grinderWork safe with grinder
Work safe with grinder
 
8 lifting operations with mobile crane risk assessment templates
8 lifting operations with mobile crane risk assessment templates8 lifting operations with mobile crane risk assessment templates
8 lifting operations with mobile crane risk assessment templates
 
Jsa heat-treatment
Jsa  heat-treatmentJsa  heat-treatment
Jsa heat-treatment
 
Risk assessment for testing & commissioning of cranes
Risk assessment for  testing & commissioning of cranesRisk assessment for  testing & commissioning of cranes
Risk assessment for testing & commissioning of cranes
 
Permit to work training
Permit to work trainingPermit to work training
Permit to work training
 
Work Permit System
Work Permit SystemWork Permit System
Work Permit System
 
Working at height slides
Working at height slidesWorking at height slides
Working at height slides
 
Job safety analysis
Job safety analysis Job safety analysis
Job safety analysis
 
Excavation safety
Excavation safetyExcavation safety
Excavation safety
 
HSE Risk Register | Gaurav Singh Rajput
HSE Risk Register | Gaurav Singh RajputHSE Risk Register | Gaurav Singh Rajput
HSE Risk Register | Gaurav Singh Rajput
 
working at height
working at heightworking at height
working at height
 
Safety handbook Saudi Aramco BY Muhammad Fahad Ansari 12IEEM14
Safety handbook Saudi Aramco  BY Muhammad Fahad Ansari  12IEEM14Safety handbook Saudi Aramco  BY Muhammad Fahad Ansari  12IEEM14
Safety handbook Saudi Aramco BY Muhammad Fahad Ansari 12IEEM14
 
Ladder Safety
Ladder SafetyLadder Safety
Ladder Safety
 

Similar to Hira

DPL-SP - Safety Induction Presentation 00.pptx
DPL-SP - Safety Induction Presentation 00.pptxDPL-SP - Safety Induction Presentation 00.pptx
DPL-SP - Safety Induction Presentation 00.pptxAamirAbbas75
 
Fire Suppression System Risk assessment file
Fire Suppression System Risk assessment fileFire Suppression System Risk assessment file
Fire Suppression System Risk assessment filechopriroti
 
Construction site safety
Construction site safetyConstruction site safety
Construction site safetyDebajit Roy
 
Job safety Analysis
Job safety Analysis Job safety Analysis
Job safety Analysis Deepu Rajan
 
Construction site safety
Construction site safetyConstruction site safety
Construction site safetyFroyd Dias
 
constructionsafety-EAA.pdf
constructionsafety-EAA.pdfconstructionsafety-EAA.pdf
constructionsafety-EAA.pdfssuser2c065e
 
Construction safety
Construction  safetyConstruction  safety
Construction safetyRanty Poddar
 
construction site safety.ppt
construction site safety.pptconstruction site safety.ppt
construction site safety.pptmayuray
 
Sydney Gateway Rail Duplication Induction v1.4
Sydney Gateway Rail Duplication Induction v1.4Sydney Gateway Rail Duplication Induction v1.4
Sydney Gateway Rail Duplication Induction v1.4Garry Pepper
 
LPG Chloride treaters foundation execution_Rev.00.pdf
LPG Chloride treaters foundation execution_Rev.00.pdfLPG Chloride treaters foundation execution_Rev.00.pdf
LPG Chloride treaters foundation execution_Rev.00.pdfJESUSBASILIOANTONIO
 
SECONDARY PIPE RACK AND PIG LAUNCHER.docx
SECONDARY PIPE RACK AND PIG LAUNCHER.docxSECONDARY PIPE RACK AND PIG LAUNCHER.docx
SECONDARY PIPE RACK AND PIG LAUNCHER.docxferielvpk
 
Construction Safety Training_Session 04_Working at Heights and Over Water
Construction Safety Training_Session 04_Working at Heights and Over WaterConstruction Safety Training_Session 04_Working at Heights and Over Water
Construction Safety Training_Session 04_Working at Heights and Over WaterMuizz Anibire
 
Sydney gateway rail duplication induction v1.4
Sydney gateway rail duplication induction v1.4Sydney gateway rail duplication induction v1.4
Sydney gateway rail duplication induction v1.4Garry Pepper
 
JHA06_Installation of Transversal beams in Flare Pipe Rack_Rev00.pdf
JHA06_Installation of Transversal beams in Flare Pipe Rack_Rev00.pdfJHA06_Installation of Transversal beams in Flare Pipe Rack_Rev00.pdf
JHA06_Installation of Transversal beams in Flare Pipe Rack_Rev00.pdfJESUSBASILIOANTONIO
 
construction site safety.pptx
construction site safety.pptxconstruction site safety.pptx
construction site safety.pptxHirenThakkar31
 
JSA01_De-Ethanizer_Foundation_Execution_Rev00.pdf
JSA01_De-Ethanizer_Foundation_Execution_Rev00.pdfJSA01_De-Ethanizer_Foundation_Execution_Rev00.pdf
JSA01_De-Ethanizer_Foundation_Execution_Rev00.pdfJESUSBASILIOANTONIO
 
HSE Risk Register.docx
HSE Risk Register.docxHSE Risk Register.docx
HSE Risk Register.docxalmamunmolla96
 
Safety practice ( SWEDISH COLLEGE OF ENGINEERING WAHCANTT)
Safety practice ( SWEDISH COLLEGE OF ENGINEERING WAHCANTT)Safety practice ( SWEDISH COLLEGE OF ENGINEERING WAHCANTT)
Safety practice ( SWEDISH COLLEGE OF ENGINEERING WAHCANTT)Waqas Ahmad
 

Similar to Hira (20)

Construction safety
Construction safetyConstruction safety
Construction safety
 
DPL-SP - Safety Induction Presentation 00.pptx
DPL-SP - Safety Induction Presentation 00.pptxDPL-SP - Safety Induction Presentation 00.pptx
DPL-SP - Safety Induction Presentation 00.pptx
 
CTE Unit 2.pptx
CTE Unit 2.pptxCTE Unit 2.pptx
CTE Unit 2.pptx
 
Fire Suppression System Risk assessment file
Fire Suppression System Risk assessment fileFire Suppression System Risk assessment file
Fire Suppression System Risk assessment file
 
Construction site safety
Construction site safetyConstruction site safety
Construction site safety
 
Job safety Analysis
Job safety Analysis Job safety Analysis
Job safety Analysis
 
Construction site safety
Construction site safetyConstruction site safety
Construction site safety
 
constructionsafety-EAA.pdf
constructionsafety-EAA.pdfconstructionsafety-EAA.pdf
constructionsafety-EAA.pdf
 
Construction safety
Construction  safetyConstruction  safety
Construction safety
 
construction site safety.ppt
construction site safety.pptconstruction site safety.ppt
construction site safety.ppt
 
Sydney Gateway Rail Duplication Induction v1.4
Sydney Gateway Rail Duplication Induction v1.4Sydney Gateway Rail Duplication Induction v1.4
Sydney Gateway Rail Duplication Induction v1.4
 
LPG Chloride treaters foundation execution_Rev.00.pdf
LPG Chloride treaters foundation execution_Rev.00.pdfLPG Chloride treaters foundation execution_Rev.00.pdf
LPG Chloride treaters foundation execution_Rev.00.pdf
 
SECONDARY PIPE RACK AND PIG LAUNCHER.docx
SECONDARY PIPE RACK AND PIG LAUNCHER.docxSECONDARY PIPE RACK AND PIG LAUNCHER.docx
SECONDARY PIPE RACK AND PIG LAUNCHER.docx
 
Construction Safety Training_Session 04_Working at Heights and Over Water
Construction Safety Training_Session 04_Working at Heights and Over WaterConstruction Safety Training_Session 04_Working at Heights and Over Water
Construction Safety Training_Session 04_Working at Heights and Over Water
 
Sydney gateway rail duplication induction v1.4
Sydney gateway rail duplication induction v1.4Sydney gateway rail duplication induction v1.4
Sydney gateway rail duplication induction v1.4
 
JHA06_Installation of Transversal beams in Flare Pipe Rack_Rev00.pdf
JHA06_Installation of Transversal beams in Flare Pipe Rack_Rev00.pdfJHA06_Installation of Transversal beams in Flare Pipe Rack_Rev00.pdf
JHA06_Installation of Transversal beams in Flare Pipe Rack_Rev00.pdf
 
construction site safety.pptx
construction site safety.pptxconstruction site safety.pptx
construction site safety.pptx
 
JSA01_De-Ethanizer_Foundation_Execution_Rev00.pdf
JSA01_De-Ethanizer_Foundation_Execution_Rev00.pdfJSA01_De-Ethanizer_Foundation_Execution_Rev00.pdf
JSA01_De-Ethanizer_Foundation_Execution_Rev00.pdf
 
HSE Risk Register.docx
HSE Risk Register.docxHSE Risk Register.docx
HSE Risk Register.docx
 
Safety practice ( SWEDISH COLLEGE OF ENGINEERING WAHCANTT)
Safety practice ( SWEDISH COLLEGE OF ENGINEERING WAHCANTT)Safety practice ( SWEDISH COLLEGE OF ENGINEERING WAHCANTT)
Safety practice ( SWEDISH COLLEGE OF ENGINEERING WAHCANTT)
 

Recently uploaded

The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxhumanexperienceaaa
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAbhinavSharma374939
 

Recently uploaded (20)

DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog Converter
 

Hira

  • 1. HALOL DAHOD PIPELINE PROJECT HAZARD AND RISK ASSESSMENT FOR THE PIPELINE CONSTRUCTION Sr. No. Activity Hazard & risk Identified Risk Level Before control Control Measures Action taken by Risk level After control 6 Excavation & Trenching Shocked due to underground electrical cable (if any) Falling of object on head or body Collapse of trench traffic hazards / vehicle movement Fall of person in The trench High Work to be supervised by experienced & responsible personnel. Cordoning the work area by cordoning tape and appropriate signboards. Excavation equipments to be well insulated. Required persons are present at site. Use of PPE’s like safety shoe, hardhat etc. Trench to be excavated in V shape. Vehicle traffic to be diverted if required. Reflective jackets to be worn at heavy traffic road and all persons should work / stand with in cordoned area. Continuous dewatering is required in high seepages area. IECCL Excavation Sup. / foreman / Engineer Low
  • 2. HALOL DAHOD PIPELINE PROJECT HAZARD AND RISK ASSESSMENT FOR THE PIPELINE CONSTRUCTION Sr. No. Activity Hazard & risk Identified Risk Level Before control Control Measures Action taken by Risk level After control 1 Loading/ Unloading of pipe Roll of pipes Fall of pipe from slings. Breakage of lifting accessories like rope and slings Electric shock due to touch of boom to overhead electrical cables High Work to be supervised by experienced & responsible personnel. Cordoning the work area by cordoning tape and appropriate signboards. Experienced working crew. Ensure proper use of slings and ropes after balancing before lifting the pipes. Obvious hazards at work place and surroundings must be observed. Ensure lifting equipments/device are in safe condition and follow safe working load. In case of using two equipments for lifting pipe section proper balancing and proper signal by authorized person is essential. Use of PPE,s –safety shoe, safety helmet. Restrict the personnel movement under the lifted load. Crane/lifting equipments to be operated by authorize person. IECCL Piping Sup. / foreman / Engineer Low
  • 3. HALOL DAHOD PIPELINE PROJECT HAZARD AND RISK ASSESSMENT FOR THE PIPELINE CONSTRUCTION Sr. No. Activity Hazard & risk Identified Risk Level Before control Control Measures Action taken by Risk level After control 2 Transportation of pipe Roll/ fall of pipes Road traffic hazard Medium Load the pipes considering the load carrying capacity of trailer. Pipes to be arranged and tightened well in the trailer. Warning flag/sign/light to be displayed. Follow the traffic rules. IECCL Piping Sup. / foreman/ Engineer/trailer driver Low
  • 4. HALOL DAHOD PIPELINE PROJECT HAZARD AND RISK ASSESSMENT FOR THE PIPELINE CONSTRUCTION Sr. No. Activity Hazard & risk Identified Risk Level Before control Control Measures Action taken by Risk level After control 3 Material handling- manual Fall of object on leg Injury in hand due to sharp edge of object. Cuts, abrasion Slips, Trips & Falls hazard. Back injury Medium Use of PPEs i.e. safety shoe, hardhat, hand gloves etc. .Proper communication required when the object is lifted by more than one person. Persons are trained for safe lifting procedure and aware of hazards. Good housekeeping Proper supervision. IECCL area incharge Low
  • 5. HALOL DAHOD PIPELINE PROJECT HAZARD AND RISK ASSESSMENT FOR THE PIPELINE CONSTRUCTION Sr. No. Activity Hazard & risk Identified Risk Level Before control Control Measures Action taken by Risk level After control 4. Route Survey Snack / Insect bite Cut injury Medium Extra care shall be taken during line survey. Use of PPE’s like Gumboot, safety shoe, hard hat and hand gloves etc. First aid kit kept with survey team. Only experienced personnel shall be deployed. IECCL Survey incharge Low
  • 6. HALOL DAHOD PIPELINE PROJECT HAZARD AND RISK ASSESSMENT FOR THE PIPELINE CONSTRUCTION Sr. No. Activity Hazard & risk Identified Risk Level Before control Control Measures Action taken by Risk level After control 5. ROU & Grading Snack / Insect bite Overhead utilities. Equipments may stick in marshy land. Cutting tree or its branch may fall on the machinery like Grader, Dozer etc Medium Extra care shall be taken for snake / insect bite. Use of PPE’s like Gumboot, safety shoe, hard hat and hand gloves etc. First aid kit kept with crew member. Only experienced personnel shall be deployed as a operator. Avoid go inside the marshy land with machinery. Extra care shall be taken to prevent overhead utilities. IECCL Job supervisor. Low
  • 7. HALOL DAHOD PIPELINE PROJECT HAZARD AND RISK ASSESSMENT FOR THE PIPELINE CONSTRUCTION Sr. No. Activity Hazard & risk Identified Risk Level Before control Control Measures Action taken by Risk level After control
  • 8. 6 Excavation & Trenching Shocked due to underground electrical cable (if any) Falling of object on head or body Collapse of trench traffic hazards / vehicle movement Fall of person in The trench High Work to be supervised by experienced & responsible personnel. Cordoning the work area by cordoning tape and appropriate signboards. Excavation equipments to be well insulated. Required persons are present at site. Use of PPE’s like safety shoe, hardhat etc. Trench to be excavated in V shape. Vehicle traffic to be diverted if required. Reflective jackets to be worn at heavy traffic road and all persons should work / stand with in cordoned area. Continuous dewatering is required in high seepages area. IECCL Excavation Sup. / foreman / Engineer Low
  • 9. HALOL DAHOD PIPELINE PROJECT HAZARD AND RISK ASSESSMENT FOR THE PIPELINE CONSTRUCTION Sr. No. Activity Hazard & risk Identified Risk Level Before control Control Measures Action taken by Risk level After control 7. Stringing Roll / Fall of pipe Crush of finger/hand. Equipments breakdown. Swim of pipe and hit to other adjusting High Periodic inspection of slings/wire ropes. Use of proper capacity slings/ wire ropes. Signal to be given by trained person to hydra/crane operator. Restricted the personnel movement under the lifted pipe. Use adequate sand bags with proper wooden supports. Guide line shall be used for control of pipes. Only one pipe shall be lifted at a time. Use of PPE’s like hand gloves, safety shoe, hardhat etc. IECCL stringing incharge/ supervisor & maintenance incharge. Low
  • 10. HALOL DAHOD PIPELINE PROJECT HAZARD AND RISK ASSESSMENT FOR THE PIPELINE CONSTRUCTION Sr. No. Activity Hazard & risk Identified Risk Level Before control Control Measures Action taken by Risk level After control 8. Cutting / Welding Flying of foreign particles. Welding flash. Burn injury due to gas cutting/ welding. Electric shock. Fire hazard. Health hazard High Minimum person to be kept near work place. Use of welding helmet, hand sleeve, hand gloves, safety shoe by welder. Use of PPE’s like hand gloves, helmet, safety shoe, goggles by helper and near persons. Inspection of hose connection, flash back arrestor of gas cutting set. Ensure electric cables, extension boards; machines are free from electric shock hazard. Flammable materials shall not be nearby welding & cutting operations. Earthing shall be checked before starting the activity. Suitable fire extinguishers shall be kept ready. IECCL Mainline incharge/ foreman& HSE personnel. Low
  • 11. HALOL DAHOD PIPELINE PROJECT HAZARD AND RISK ASSESSMENT FOR THE PIPELINE CONSTRUCTION Sr. No. Activity Hazard & risk Identified Risk Level Before control Control Measures Action taken by Risk level After control 9. Grinding Entry of flying particles in eye & ear Cut injury(in overhead grinding). Electric shock. Breaking of grinding wheel/ brush. Fire hazard. Noise & health hazard High Ensure guard on grinding machine. Use of PPE’s like, safety shoe, face shield, grinding goggles, hand gloves etc. Special care shall be taken during overhead grinding. Work area to be cordoned. Minimum required persons to be kept near and eye protection goggles to be used by them. Trained and qualified personnel shall be deployed in such kind of operation. Flammable materials shall not be nearby such operations. IECCL Job supervisor & HSE personnel. Low
  • 12. HALOL DAHOD PIPELINE PROJECT HAZARD AND RISK ASSESSMENT FOR THE PIPELINE CONSTRUCTION Sr. No. Activity Hazard & risk Identified Risk Level Before control Control Measures Action taken by Risk level After control 10. Lowering operation / pipe laying Collapse of lifted pipe section. Collapse of lifting equipment. Overhead electric lines- contact with crane, lifting equipment. Collapse of wooden planks kept on trench for sectional lowering may cause injury. Cut, crush, abrasion injury Road traffic hazard. High Proper balancing to be done, if pipe is lifted by two slings / wire ropes. Keep safe distance near trench while locating the crane, lifting equipment. Ensure single authorized person gives signal to lift/lower the pipe section by observing safety with all respect. Wooden planks having enough strength to be placed properly on the trench. Special care shall be taken while overhead live cables are there during such activity. Use of PPE’s like safety shoe, hardhat etc Work area to be cordoned by cordoning tape and signboard, if such work is being carried out on/ near road. IECCL LOWERING INCHARGE & HSE personnel. Low
  • 13. HALOL DAHOD PIPELINE PROJECT HAZARD AND RISK ASSESSMENT FOR THE PIPELINE CONSTRUCTION Sr. No. Activity Hazard & risk Identified Risk Level Before control Control Measures Action taken by Risk level After control 11. Tie- in-joints Collapse of trench. Fall of object. Cut, crush, abrasion injury. Road traffic hazard. High Proper balancing to be done, if pipe is lifted by two slings / wire ropes. Keep safe distance near trench while locating the crane, lifting equipment. Ensure single authorized person gives signal to lift/lower the pipe section by observing safety with all respect. Wooden planks having enough strength to be placed properly on the trench. Special care shall be taken while overhead live cables are there during such activity. Use of PPE’s like safety shoe, hardhat etc Work area to be cordoned by cordoning tape and signboard, if such work is being carried out on/ near road. IECCL Job supervisor & HSE personnel. Low
  • 14. HALOL DAHOD PIPELINE PROJECT HAZARD AND RISK ASSESSMENT FOR THE PIPELINE CONSTRUCTION Sr. No. Activity Hazard & risk Identified Risk Level Before control Control Measures Action taken by Risk level After control 12. Holiday test. Electric shock. High Trained and experienced person shall do this work. Use of appropriate PPE’s. No one allowed sitting, crossing or touching the pipe section during test. Ensure power supply of instrument is off / isolated before removing / refitting the test ring. Ensure provision of earthing to objects & instrument.. IECCL Job supervisor & HSE personnel. Low
  • 15. HALOL DAHOD PIPELINE PROJECT HAZARD AND RISK ASSESSMENT FOR THE PIPELINE CONSTRUCTION Sr. No. Activity Hazard & risk Identified Risk Level Before control Control Measures Action taken by Risk level After control 13. Radiography / X- Ray. Ionizing radiation. Radiation may react with the skin and can cause cancer, skin irritation, dermatitis, etc. High Ensure safety regulations as per BARC before commencement of job. Affected area to be cordoned off, radiation warning symbols/ signboards to be displayed. Avoid radiography in daytime. Wear appropriate PPE’s and film badges issued by BARC. Radiation effect to be measured with dosimeter before starting the radiography. Working crew at site must be informed regarding such activity. Stay away from radiation sources. Use the exact source of radiation and avoid more powerful source. Experienced and trained persons shall be deployed. IECCL NDT team & QA/QC engineer. Low
  • 16. HALOL DAHOD PIPELINE PROJECT HAZARD AND RISK ASSESSMENT FOR THE PIPELINE CONSTRUCTION Sr. No. Activity Hazard & risk Identified Risk Level Before control Control Measures Action taken by Risk level After control 14. Pipe bending. Personal injury. Breaking hydraulic hoses. Overhead electric line. Uneven surface. Obstruction in free movement of machinery and manpower. Medium Use of proper PPE’s like safety shoe, hard hat, hand gloves, ear plug etc. Care shall be taken that no sharp edge shall be contact with hydraulic hoses. Working surface shall be even and well maintained. Good housekeeping shall be maintained at work place. Only trained and authorized personnel shall be deployed. Pipe bending machine shall not be kept under the overhead electrical cable. IECCL Bending incharge. Low
  • 17. HALOL DAHOD PIPELINE PROJECT HAZARD AND RISK ASSESSMENT FOR THE PIPELINE CONSTRUCTION Sr. No. Activity Hazard & risk Identified Risk Level Before control Control Measures Action taken by Risk level After control 15. Horizontal Direction Drilling (HDD). Misuse / abuse of equipment. Fall hazard. Underground electrical cable, pipeline damage. Failure of rig to pill the pipe section. . Medium Daily user inspection and periodical checking / recording of equipment to be ensured. The equipment should be operated by qualified operator only. Ensure that a walkover excavation technique, but still it should be ensured that the area under which the HDD is being done should be barricaded. Higher capacity rig shall be used then required capacity. Ensure that no underground utilities there, if there first conform that the Dept. of utilities. IECCL HDD Incharge / Job supervisor. Low
  • 18. HALOL DAHOD PIPELINE PROJECT HAZARD AND RISK ASSESSMENT FOR THE PIPELINE CONSTRUCTION Sr. No. Activity Hazard & risk Identified Risk Level Before control Control Measures Action taken by Risk level After control 16. Sand Blasting. Health hazard i.e. lung dieses, silicosis etc. . Asphyxiation due to lack of air supply. Body injury Medium Proper PPE’s shall be worn like Dust mask, ear plug and mandatory PPE’s. Area to appropriately cover to avoid the spreading of dust in surrounding area. Minimum person shall be deployed and movement of vehicle shall be prohibited where sand blasting carried out. IECCL Job supervisor. Low
  • 19. HALOL DAHOD PIPELINE PROJECT HAZARD AND RISK ASSESSMENT FOR THE PIPELINE CONSTRUCTION Sr. No. Activity Hazard & risk Identified Risk Level Before control Control Measures Action taken by Risk level After control 17. Concrete coating of pipe. Flying of cement mixture. Health hazard due to cement dust. Brusting of hoses. Roll of pipes. Medium All persons shall be wear proper PPE’s like safety shoe, gum boot, rubber gloves, ear plug, dust mask etc. Experienced & trained person shall be deployed. IECCL Job supervisor. Low
  • 20. HALOL DAHOD PIPELINE PROJECT HAZARD AND RISK ASSESSMENT FOR THE PIPELINE CONSTRUCTION Sr. No. Activity Hazard & risk Identified Risk Level Before control Control Measures Action taken by Risk level After control 18. Civil work/ working with cement, sand & bricks. Fall of bricks on person. Health hazard. Dusty atmosphere. Cut and wound injury Medium Use of PPE’s like safety shoe, gum boot, rubber gloves, ear plug, dust mask etc. Experienced & trained person shall be deployed. Good housekeeping shall be maintained at work location. Throwing of bricks shall be prohibited. Work supervision shall be done by only experienced and trained person only. IECCL Job supervisor. Low
  • 21. HALOL DAHOD PIPELINE PROJECT HAZARD AND RISK ASSESSMENT FOR THE PIPELINE CONSTRUCTION Sr. No. Activity Hazard & risk Identified Risk Level Before control Control Measures Action taken by Risk level After control 19 Removal of pipe coating. Burn hazard. Fire / explosion hazard High Proper PPE’s i.e. heat retardant hand gloves, safety goggles, face shield etc. shall be used. Use only approved commercial LPG cylinders. IECCL Job supervisor. Low
  • 22. HALOL DAHOD PIPELINE PROJECT HAZARD AND RISK ASSESSMENT FOR THE PIPELINE CONSTRUCTION Sr. No. Activity Hazard & risk Identified Risk Level Before control Control Measures Action taken by Risk level After control 19 Removal of pipe coating. Burn hazard. Fire / explosion hazard High Proper PPE’s i.e. heat retardant hand gloves, safety goggles, face shield etc. shall be used. Use only approved commercial LPG cylinders. IECCL Job supervisor. Low
  • 23. HALOL DAHOD PIPELINE PROJECT HAZARD AND RISK ASSESSMENT FOR THE PIPELINE CONSTRUCTION Sr. No. Activity Hazard & risk Identified Risk Level Before control Control Measures Action taken by Risk level After control 20. . Working at Height Fall of personnel Fall of material/tools and/or equipment. Dizziness-Vertigo Unsafe scaffolding Damage or improper use of ladders. High All personnel shall wear safety harness if fixed access cannot be provided. Safety Net shall be provided if required. Scaffolders shall ensure that access platforms are constructed in line with all relevant codes. Suitable barriers shall be erected below the work area and signs displayed to advise personnel of the potential hazards. Personnel shall ensure that all materials/tools and /or equipment kept secure at all times. Report any sign of dizziness-vertigo, immediately to the supervisor . Ensure that damaged ladder shall not be used. IECCL Job supervisor & HSE personnel. Low
  • 24. HALOL DAHOD PIPELINE PROJECT HAZARD AND RISK ASSESSMENT FOR THE PIPELINE CONSTRUCTION Sr. No. Activity Hazard & risk Identified Risk Level Before control Control Measures Action taken by Risk level After control 21. . Use of lifting equipments Damage of lifting equipments due to overload or work in over SWL. Sling / chain damage. Balancing may fall. Person may electrocute due to crane’s boom touching with high tension line. Due to lack of knowledge of load chart, man may lift things in wrong radius that may cause tilt. High Check crane/sling/chain pulley certification for their SWL and testing date. SWL must mention on each lifting devices. Dual lifting shall be utilized whenever possible. Better communication between crane operator and foreman. Use only tested lifting tools & tackles. Use of PPE’s like safety shoe, hard hat, hand gloves etc Only trained and experienced operator shall be operating lifting equipments. No one shall be passing and stay under the lifted load and booms. IECCL Job supervisor. Low
  • 25. HALOL DAHOD PIPELINE PROJECT HAZARD AND RISK ASSESSMENT FOR THE PIPELINE CONSTRUCTION Sr. No. Activity Hazard & risk Identified Risk Level Before control Control Measures Action taken by Risk level After control 22 . Working with Electrical Equipment Electrical shock Electrical burn Electrical fire/short circuit. High All equipment being used complies with all relevant safety standards. All equipment is given through visual inspection prior to use. Maintenance schedule is place. Persons are aware of procedure to use the equipment. IECCL Electrical incharge & HSE personnel. Low
  • 26. HALOL DAHOD PIPELINE PROJECT HAZARD AND RISK ASSESSMENT FOR THE PIPELINE CONSTRUCTION Sr. No. Activity Hazard & risk Identified Risk Level Before control Control Measures Action taken by Risk level After control 23 . Working near object that may move/slide. Cut injury. Body part caught between moving objects. High Guarding on moving parts. Compressor to be grounded. Proper lubrication to be done. Use of PPE’s. IECCL Job supervisor. Low
  • 27. HALOL DAHOD PIPELINE PROJECT HAZARD AND RISK ASSESSMENT FOR THE PIPELINE CONSTRUCTION Sr. No. Activity Hazard & risk Identified Risk Level Before control Control Measures Action taken by Risk level After control 24 . Pneumatic/ Hydraulic testing. Bursting of discharge hose/tube. Bursting of pipe to be tested. Heavy leakage from valve body/ valve passing. Slipping of spanners. High Work to be supervised by experienced & responsible personnel. Cordoning the work area by cordoning tape and appropriate signboards. Minimum required persons to be kept at site. Avoid such testing in heavy populated area. Periodic inspection / testing of discharge hose / tube to be carried out. Skilled workers to be allowed to do so. Use of PPE’s. Use standard fitting and calibrated pressure gauges. Ensure that no loose fitting placed. IECCL Engineer/ HSE personnel. Low
  • 28. HALOL DAHOD PIPELINE PROJECT HAZARD AND RISK ASSESSMENT FOR THE PIPELINE CONSTRUCTION Sr. No. Activity Hazard & risk Identified Risk Level Before control Control Measures Action taken by Risk level After control 25 . Commissioning Fire due to uncontrolled gas venting. Road traffic hazards. High Obtain work permit. Continuous venting of gas to be avoided and safe venting procedure to be followed. CH4 to be monitored during venting in the atmosphere. Fire fighting equipments to be kept ready. Vehicular movement to be stopped / diverted during venting is carried out very close to the road. Use of PPE’s. IECCL Engineer/ HSE personnel Low