STAKEHOLDERS
IDENTIFICATION
OLIVER C. SISON
JOVELYN C. NAZARITA
MPA STUDENTS
DR. JO BITONIO
Professor
Stakeholders are persons, groups or
institutions with interests in a project or
program.
Primary stakeholders are those ultimately
affected either positively (beneficiaries) or
negatively (for example, for those
involuntarily resettled).
Secondary stakeholders are the
intermediaries. Those that are not directly
affected.
In every undertaking/project there
are parties with vested interest in
either the activities and / or the
result.
The World Bank (2000) defines
stakeholders as those effecting change
in the community and those affected by
it.
STAKEHOLDERS
 Customers/users
 Sponsor
 Portfolio manager/portfolio Review board
 Program managers
 Project Management Office
 Program Managers
 Project Team
 Functional managers
 Operations Management
 Vendors/business partners
 Performing Organization and the public
THE PROCESSES INVOLVE:
Identifying the stakeholders
Analyze them, and
Developing a strategy to manage
them
WHEN SHOULD IT BE DONE?
Stakeholder identification and analysis should always be done at
the beginning of a project, even if it is a quick list of stakeholders
and their interest.
OBJECTIVES OF STAKEHOLDER IDENTIFICATION
1. to get a clear understanding as to who the main
stakeholders are and
2. to understand their values, beliefs, problems and
attitudes towards the project.
IDENTIFYING STAKEHOLDERS
 Documenting relevant information regarding their:
 interests
 Involvement and
 Impact on project success
 Identifying stakeholders Increase likelihood of
project success, Identify them early and
make an analysis on their
- level of interest
- expectation
- importance
- attitude and influence
STAKEHOLDER CATEGORIZATION
Tuman J. (1993) categorized stakeholders into
four main groups. These include:
1. Project champions
2. Project participants
3. Community participants
3. Parasitic participants
1.PROJECT CHAMPIONS
Are those who have some reason to
bring a project into being. These
stakeholders include the developers,
investors, and entrepreneurs
motivated by profit.
2. PROJECT PARTICIPANTS
 The project participants group includes
organizations and individuals who are
responsible for planning and executing the
project. Typically this include the Project
manager and project team, engineers,
constructors, vendors, suppliers, crafts
people, and regulatory agencies at the
local, slate, and national levels.
3. COMMUNITY PARTICIPANTS
 Community participants include groups
or individuals who are directly affected
by the project. Community participants
create the environment that surrounds
the project. The group can materialize
because of environmental, social,
political, economic, health, or safety
concerns.
4. THE PASSIVE/PARASITIC PARTICIPANTS
 The parasitic participants presents
an interesting and vital works for
project managers. Parasitic
participants consist of organizations
and individuals who do not have a
direct stake in projects. In this
group we find the opportunities,
the activists and other who are
looking for a focal point for their
energies, internal drives and to
promote their personal
philosophies and views.
STAKEHOLDER CATEGORIZATION
PROJECT CHAMPION PROJECT
PARTICIPANT
COMMUNITY
PARTICIPANT
PARASITIC/PASSIVE
PARTICIPANT
- DEVELOPERS
- CLIENTS/CUTOMER
S
- POLITICIANS
- COMMUNITY
LEADERS-CHIEFS,
OPINION LEADERS
- VISIONARIES
- PROJECT MGT.
TEAM
- CONTRACTORS
- VENDORS
- CONSTRUCTORS
- The Community
- Special interest
groups-churches,
women and men’s
group
- environmentalist
- Media
- Activist
CHECKLIST FOR IDENTIFYING STAKEHOLDERS
1. Have all primary and secondary stakeholders been listed?
2. Have all categories been identified?
3. Have all potential supporters and opponents of the project been
identified?
4. Have primary stakeholders been divided into user, occupational
groups /income groups?
5. Are there any new primary or secondary stakeholders that are likely
to emerge as a result of the project?
IDENTIFYING STAKEHOLDERS
INPUTS
TOOLS AND
TECHNIQUES
OUTPUTS
INPUTS
 1. PROJECT CHARTER – can provide information about internal and
external parties involved in and affected by the project.
 2.PROCUREMENT DOCUMENTS – if project is based on procurement
activity or is based on an established contract, the legal parties in the
documents become stakeholders including suppliers subcontractors
etc.
 3. ENTERPRISE ENVIRONMENTAL FACTORS (EEF’S) - includes
organizational or company culture and structure. Or and
Governmental or industry standards such as regulations, and product
standards.
 4. ORGANIZATIONAL PROCESS ASSETS (OPA’S) – includes stakeholder
register templates, lessons learned from previous projects and
stakeholder register from previous projects.
TOOLS AND TECHNIQUES
 Stakeholder analysis- a technique
to identify and analyze the
stakeholders surrounding a project.
 STAKEHOLDER ANALYSIS – is a
process of systemically gathering
and analyzing quantitative and
qualitative information to
determine whose interests should
be taken into accountability
throughout the project.
Process of Stakeholder Analysis
First, the project manager has to build a project team
that has the skill to address all stakeholder
requirements and concerns.
Second, the team must develop strategies for dealing
with the different levels of power.
Finally, resources must be obtained to deal with
stakeholder issues that are beyond normal project
demands.
Stakeholder analysis generally follow the steps
described below:
1. identify all potential project stakeholders and relevant
information.
2. identify the potential impact or support each stakeholder
could generate, and classify them so as to define an
approach strategy.
3. assess how key stakeholders are likely to react on the
respond in various situations, in order to plan how to win
or enhance their support an mitigate negative impacts.
Stakeholder Analysis Information Finding
The process can be used by a single person. It works
better, however, if a diverse small group does it.
1. Draw up chart
2. List Stakeholders
3. Estimate Attitude and influence
4. Plan strategy
1. DRAW UP THE CHART
 Prepare a chart on electronic whiteboard, or perhaps butcher paper like this.
 Att- attitude Inf- influence E- estimate C-confidence
(Write goal here)
Stakeholders Att Inf Actions
E C E C
2. List Stakeholders
Identify and list the stakeholders. These may be individuals
or stakeholder groups, or some combination. If stakeholders
can be treated as a group or use groups. The most effective
way of doing this is to list as many stakeholders as you can
on a working sheet of paper. The transfer them to the left
hand column of the chart. It may help to list them in rough
order of importance.
3. ESTIMATE ATTITUDE & CONFIDENCE
For column 2 to 5 work across the page. Record you estimate of the four
columns. In order, they are:
Column 2- you best estimate of the stakeholder’s attitude from supportive
opposed. Usually find it is adequate to use a 5-category code.
Column 3- how confident you are about your estimate in column 2.
Column 4- your best estimate of the influence of the stakeholder. A three
code is usually enough.
Column 5- how confident you are about your estimate in column 4.
4. Plan Strategies
 I general, question marks indicate a need for more information. The
more question marks, and the more influence the person has, the
greater the need. On some occasions you will choose to approach the
person concerned. On the other occasions you may instead approach
someone else who can be assumed to know about the person’s attitude
pr influence. (on occasion, you may want to obtain some of this
information before completing the analysis).
 In general, high influence indicates a need to involve the person in
some way. (or, if you chose not to do this, and they are opposite, you
may choose to find some way to neutralize their influence).
USING THE FINDINGS OF A STAKEHOLDER ANALYSIS
 The Project Concept Note- the main findings of a stakeholder analysis should be
included in the project concept note. Such a summary needs to be brief because (a)
of the nature of concept notes, and (b) the analysis will probably be revised as the
project design develops, interest change, and more information becomes available.
 The Project Document- all project documents will need more details than the
concept note, drawing on both the stakeholder analysis and any revisions arising
out of appraisal. PAD submissions are likely to require more detail of key secondary
and primary stakeholders, their various interests, and their relative influence and
importance. This information should appear in summary form in the Social and
institutional section of the project document.
EXPERT JUDGMENT (TOOLS AND TECHNIQUES)
 To ensure comprehensive identification and listing of
stakeholders, judgment and expertise should be sought from
groups or individuals with specialized training or knowledge
on the subject area such as:
1. Senior management
2. Other units within the organization
3. Identified key stakeholders
OUTPUT
1. STAKEHOLDER REGISTER- the main output of the identify
stakeholder is the stakeholder register, which includes details
relative to identified stakeholders:
A. identification information- name, organizational position,
role in the project, contact information
B. assessment information- major requirements, main
expectations and potential influence in the project
C. stakeholder classification- internal / external, supporter,
neutral / resistor, etc.
2. STAKEHOLDER MANAGEMENT STRATEGY
 The stakeholder management strategy defines an
approach to increase the support and minimize negative
impacts of stakeholders throughout the entire project life
cycle. It includes elements such as:
 A. key stakeholders who can significantly impact the
project
 B. level of participation in the project desired for each
identified stakeholder
 C. stakeholder groups and their management (as
groups).
 D. a common way of representing the stakeholder
management strategy is a stakeholder analysis matrix
below
SAMPLE OF A BLANK STAKEHOLDER ANALYSIS
MATRIX
STAKEHOLDER STAKEHOLDER Interest
in the project
Assessment of impact Potential Strategies for
Gaining Support or
reducing obstacle
INITIATION PHASE OUTPUT CHARTER INPUT PLANNING PHASE
REFERENCE:
 Stakeholder identification analysis and management. Published by Josephine
Thornton
 Slideplayer.com
 Pdf doc.ifc.org

More Related Content

What's hot (20)

Resource allocation
Resource allocationResource allocation
Resource allocation
 
Project Implementation
Project ImplementationProject Implementation
Project Implementation
 
Stakeholder Mapping
Stakeholder MappingStakeholder Mapping
Stakeholder Mapping
 
Project Stakeholder Management - PMBOK6
Project Stakeholder Management - PMBOK6Project Stakeholder Management - PMBOK6
Project Stakeholder Management - PMBOK6
 
Project evaluation
Project evaluationProject evaluation
Project evaluation
 
Stakeholder Analysis
Stakeholder AnalysisStakeholder Analysis
Stakeholder Analysis
 
Some Challenges of M&E
Some Challenges of M&ESome Challenges of M&E
Some Challenges of M&E
 
Project management tools and techniques
Project management tools and techniquesProject management tools and techniques
Project management tools and techniques
 
Cost benefit analysis
Cost benefit analysis Cost benefit analysis
Cost benefit analysis
 
Work breakdown structure
Work breakdown structureWork breakdown structure
Work breakdown structure
 
PROJECT SCHEDULE
PROJECT SCHEDULEPROJECT SCHEDULE
PROJECT SCHEDULE
 
Goal directed project management
Goal directed project managementGoal directed project management
Goal directed project management
 
Project communication management
Project communication  managementProject communication  management
Project communication management
 
Project life cycle
Project life cycleProject life cycle
Project life cycle
 
Project Evaluation, Recycling and Closing
Project Evaluation, Recycling and ClosingProject Evaluation, Recycling and Closing
Project Evaluation, Recycling and Closing
 
Stages of Project Development
Stages of Project Development Stages of Project Development
Stages of Project Development
 
Project planning
Project planning Project planning
Project planning
 
Project Planning | Accounting
Project Planning | AccountingProject Planning | Accounting
Project Planning | Accounting
 
Termination.project management
Termination.project managementTermination.project management
Termination.project management
 
Project evaluation
Project evaluationProject evaluation
Project evaluation
 

Similar to STAKEHOLDER-IDENTIFICATION.pptx

Final Class Presentation on Determining Project Stakeholders & Risks.pptx
Final Class Presentation on Determining Project Stakeholders & Risks.pptxFinal Class Presentation on Determining Project Stakeholders & Risks.pptx
Final Class Presentation on Determining Project Stakeholders & Risks.pptxGeorgeKabongah2
 
Stakeholder Analysis
Stakeholder AnalysisStakeholder Analysis
Stakeholder AnalysisAsraHafeez
 
Stakeholder analysis-toolkit-v3
Stakeholder analysis-toolkit-v3Stakeholder analysis-toolkit-v3
Stakeholder analysis-toolkit-v3andre rahman
 
1 1 stakeholder_analysis_11_01_05
1 1 stakeholder_analysis_11_01_051 1 stakeholder_analysis_11_01_05
1 1 stakeholder_analysis_11_01_05Mohammadsadegh1365
 
1 1 stakeholder_analysis_11_01_05
1 1 stakeholder_analysis_11_01_051 1 stakeholder_analysis_11_01_05
1 1 stakeholder_analysis_11_01_05kbharadwaj811
 
10. PMP Project Stakeholder Management.ppt
10. PMP Project Stakeholder Management.ppt10. PMP Project Stakeholder Management.ppt
10. PMP Project Stakeholder Management.pptItcHcm1
 
MPA Lecture on Stakeholder Analysis.pptx
MPA Lecture on Stakeholder Analysis.pptxMPA Lecture on Stakeholder Analysis.pptx
MPA Lecture on Stakeholder Analysis.pptxJo Balucanag - Bitonio
 
Bsr stakeholder engagement_stakeholder_mapping.final
Bsr stakeholder engagement_stakeholder_mapping.finalBsr stakeholder engagement_stakeholder_mapping.final
Bsr stakeholder engagement_stakeholder_mapping.finalJukka Virkkunen
 
HHL 360 stakeholder analysis - systematic process in identifying strategic bl...
HHL 360 stakeholder analysis - systematic process in identifying strategic bl...HHL 360 stakeholder analysis - systematic process in identifying strategic bl...
HHL 360 stakeholder analysis - systematic process in identifying strategic bl...Areté Partners
 
Stakeholder mapping
Stakeholder mappingStakeholder mapping
Stakeholder mappinghpinn
 
PLANNING TOOLS : Problem Identification.
PLANNING TOOLS : Problem Identification.PLANNING TOOLS : Problem Identification.
PLANNING TOOLS : Problem Identification.Jo Balucanag - Bitonio
 
Presentation by dhruva sen
Presentation by dhruva senPresentation by dhruva sen
Presentation by dhruva senPMI_IREP_TP
 
Health Systems Identifying and Managing Stakeholders
Health Systems Identifying and Managing Stakeholders Health Systems Identifying and Managing Stakeholders
Health Systems Identifying and Managing Stakeholders Alaa Hamed
 
Presentation manage risk
Presentation manage riskPresentation manage risk
Presentation manage riskMichael Curtis
 
Stakeholder management in Project Management
Stakeholder management in Project ManagementStakeholder management in Project Management
Stakeholder management in Project ManagementMITSDEDistance
 
2.2 skill sh analysis
2.2 skill sh analysis2.2 skill sh analysis
2.2 skill sh analysisNigestAbebaw1
 
ISQS4350-ManagingStakeholderExpectations
ISQS4350-ManagingStakeholderExpectationsISQS4350-ManagingStakeholderExpectations
ISQS4350-ManagingStakeholderExpectationsMichael Punzo
 
ISQS4350-ManagingStakeholderExpectations
ISQS4350-ManagingStakeholderExpectationsISQS4350-ManagingStakeholderExpectations
ISQS4350-ManagingStakeholderExpectationsMichael Punzo
 

Similar to STAKEHOLDER-IDENTIFICATION.pptx (20)

Final Class Presentation on Determining Project Stakeholders & Risks.pptx
Final Class Presentation on Determining Project Stakeholders & Risks.pptxFinal Class Presentation on Determining Project Stakeholders & Risks.pptx
Final Class Presentation on Determining Project Stakeholders & Risks.pptx
 
Stakeholder Analysis
Stakeholder AnalysisStakeholder Analysis
Stakeholder Analysis
 
Stakeholder analysis-toolkit-v3
Stakeholder analysis-toolkit-v3Stakeholder analysis-toolkit-v3
Stakeholder analysis-toolkit-v3
 
1 1 stakeholder_analysis_11_01_05
1 1 stakeholder_analysis_11_01_051 1 stakeholder_analysis_11_01_05
1 1 stakeholder_analysis_11_01_05
 
1 1 stakeholder_analysis_11_01_05
1 1 stakeholder_analysis_11_01_051 1 stakeholder_analysis_11_01_05
1 1 stakeholder_analysis_11_01_05
 
Stages of Project Development
Stages of Project DevelopmentStages of Project Development
Stages of Project Development
 
10. PMP Project Stakeholder Management.ppt
10. PMP Project Stakeholder Management.ppt10. PMP Project Stakeholder Management.ppt
10. PMP Project Stakeholder Management.ppt
 
MPA Lecture on Stakeholder Analysis.pptx
MPA Lecture on Stakeholder Analysis.pptxMPA Lecture on Stakeholder Analysis.pptx
MPA Lecture on Stakeholder Analysis.pptx
 
Bsr stakeholder engagement_stakeholder_mapping.final
Bsr stakeholder engagement_stakeholder_mapping.finalBsr stakeholder engagement_stakeholder_mapping.final
Bsr stakeholder engagement_stakeholder_mapping.final
 
HHL 360 stakeholder analysis - systematic process in identifying strategic bl...
HHL 360 stakeholder analysis - systematic process in identifying strategic bl...HHL 360 stakeholder analysis - systematic process in identifying strategic bl...
HHL 360 stakeholder analysis - systematic process in identifying strategic bl...
 
Stakeholder mapping
Stakeholder mappingStakeholder mapping
Stakeholder mapping
 
PLANNING TOOLS : Problem Identification.
PLANNING TOOLS : Problem Identification.PLANNING TOOLS : Problem Identification.
PLANNING TOOLS : Problem Identification.
 
Presentation by dhruva sen
Presentation by dhruva senPresentation by dhruva sen
Presentation by dhruva sen
 
Health Systems Identifying and Managing Stakeholders
Health Systems Identifying and Managing Stakeholders Health Systems Identifying and Managing Stakeholders
Health Systems Identifying and Managing Stakeholders
 
Presentation manage risk
Presentation manage riskPresentation manage risk
Presentation manage risk
 
Stakeholder management in Project Management
Stakeholder management in Project ManagementStakeholder management in Project Management
Stakeholder management in Project Management
 
2.2 skill sh analysis
2.2 skill sh analysis2.2 skill sh analysis
2.2 skill sh analysis
 
ISQS4350-ManagingStakeholderExpectations
ISQS4350-ManagingStakeholderExpectationsISQS4350-ManagingStakeholderExpectations
ISQS4350-ManagingStakeholderExpectations
 
ISQS4350-ManagingStakeholderExpectations
ISQS4350-ManagingStakeholderExpectationsISQS4350-ManagingStakeholderExpectations
ISQS4350-ManagingStakeholderExpectations
 
D02 Stakeholder
D02 StakeholderD02 Stakeholder
D02 Stakeholder
 

More from Jo Balucanag - Bitonio

Defining Urban, Urbanization & Urbanism
Defining Urban, Urbanization &  UrbanismDefining Urban, Urbanization &  Urbanism
Defining Urban, Urbanization & UrbanismJo Balucanag - Bitonio
 
Lecture on Rural Development Feb 24.pptx
Lecture on Rural Development Feb 24.pptxLecture on Rural Development Feb 24.pptx
Lecture on Rural Development Feb 24.pptxJo Balucanag - Bitonio
 
Lecture Presentation on Project Proposal
Lecture Presentation on Project ProposalLecture Presentation on Project Proposal
Lecture Presentation on Project ProposalJo Balucanag - Bitonio
 
LEC DEVELOPMENT ISSUES AND CONCERNS.pptx
LEC DEVELOPMENT ISSUES AND CONCERNS.pptxLEC DEVELOPMENT ISSUES AND CONCERNS.pptx
LEC DEVELOPMENT ISSUES AND CONCERNS.pptxJo Balucanag - Bitonio
 
Human beings Cause & Consequence of Devt
Human beings Cause & Consequence of DevtHuman beings Cause & Consequence of Devt
Human beings Cause & Consequence of DevtJo Balucanag - Bitonio
 
MPA 212 Lec Training and Development.pdf
MPA 212 Lec Training and Development.pdfMPA 212 Lec Training and Development.pdf
MPA 212 Lec Training and Development.pdfJo Balucanag - Bitonio
 
MPA 213 : LECTURE ON SOCIAL-DEVELOPMENT.
MPA 213 : LECTURE ON SOCIAL-DEVELOPMENT.MPA 213 : LECTURE ON SOCIAL-DEVELOPMENT.
MPA 213 : LECTURE ON SOCIAL-DEVELOPMENT.Jo Balucanag - Bitonio
 
Urban & Metro Admin and Governancges.pdf
Urban & Metro Admin and Governancges.pdfUrban & Metro Admin and Governancges.pdf
Urban & Metro Admin and Governancges.pdfJo Balucanag - Bitonio
 
MPA 210 Lecture : Planning & Budgeting
MPA 210  Lecture :  Planning & BudgetingMPA 210  Lecture :  Planning & Budgeting
MPA 210 Lecture : Planning & BudgetingJo Balucanag - Bitonio
 
SPMS LECTURE :PERFORMANCE AND EVALUATION
SPMS LECTURE :PERFORMANCE AND EVALUATIONSPMS LECTURE :PERFORMANCE AND EVALUATION
SPMS LECTURE :PERFORMANCE AND EVALUATIONJo Balucanag - Bitonio
 
Lecture Maintenance & Development of HR.
Lecture Maintenance & Development of HR.Lecture Maintenance & Development of HR.
Lecture Maintenance & Development of HR.Jo Balucanag - Bitonio
 
Job Analysis, Job Design and Evaluation
Job Analysis, Job Design and  EvaluationJob Analysis, Job Design and  Evaluation
Job Analysis, Job Design and EvaluationJo Balucanag - Bitonio
 
MPA 212 Lecture :COPING WITH STRESS.pptx
MPA 212 Lecture :COPING WITH STRESS.pptxMPA 212 Lecture :COPING WITH STRESS.pptx
MPA 212 Lecture :COPING WITH STRESS.pptxJo Balucanag - Bitonio
 
MPA 212 Lecture : COACHING AND MENTORING
MPA 212 Lecture : COACHING AND MENTORINGMPA 212 Lecture : COACHING AND MENTORING
MPA 212 Lecture : COACHING AND MENTORINGJo Balucanag - Bitonio
 
Lec Volatility, Uncertainty, Complexity
Lec  Volatility, Uncertainty, ComplexityLec  Volatility, Uncertainty, Complexity
Lec Volatility, Uncertainty, ComplexityJo Balucanag - Bitonio
 
HRMD Lec Managing Ethically and Globally
HRMD Lec Managing Ethically and GloballyHRMD Lec Managing Ethically and Globally
HRMD Lec Managing Ethically and GloballyJo Balucanag - Bitonio
 
Lec : Human Resources - Self Confidence
Lec :  Human Resources - Self ConfidenceLec :  Human Resources - Self Confidence
Lec : Human Resources - Self ConfidenceJo Balucanag - Bitonio
 
Lecture : Adaptive Organizational Design
Lecture : Adaptive Organizational DesignLecture : Adaptive Organizational Design
Lecture : Adaptive Organizational DesignJo Balucanag - Bitonio
 
Lecture Presentation on Metro-Governance
Lecture Presentation on Metro-GovernanceLecture Presentation on Metro-Governance
Lecture Presentation on Metro-GovernanceJo Balucanag - Bitonio
 

More from Jo Balucanag - Bitonio (20)

Defining Urban, Urbanization & Urbanism
Defining Urban, Urbanization &  UrbanismDefining Urban, Urbanization &  Urbanism
Defining Urban, Urbanization & Urbanism
 
Lecture on Rural Development Feb 24.pptx
Lecture on Rural Development Feb 24.pptxLecture on Rural Development Feb 24.pptx
Lecture on Rural Development Feb 24.pptx
 
Lecture Presentation on Project Proposal
Lecture Presentation on Project ProposalLecture Presentation on Project Proposal
Lecture Presentation on Project Proposal
 
LEC DEVELOPMENT ISSUES AND CONCERNS.pptx
LEC DEVELOPMENT ISSUES AND CONCERNS.pptxLEC DEVELOPMENT ISSUES AND CONCERNS.pptx
LEC DEVELOPMENT ISSUES AND CONCERNS.pptx
 
Human beings Cause & Consequence of Devt
Human beings Cause & Consequence of DevtHuman beings Cause & Consequence of Devt
Human beings Cause & Consequence of Devt
 
MPA 211: Lecture on WORK ETHICS. pptx
MPA 211:  Lecture  on  WORK ETHICS. pptxMPA 211:  Lecture  on  WORK ETHICS. pptx
MPA 211: Lecture on WORK ETHICS. pptx
 
MPA 212 Lec Training and Development.pdf
MPA 212 Lec Training and Development.pdfMPA 212 Lec Training and Development.pdf
MPA 212 Lec Training and Development.pdf
 
MPA 213 : LECTURE ON SOCIAL-DEVELOPMENT.
MPA 213 : LECTURE ON SOCIAL-DEVELOPMENT.MPA 213 : LECTURE ON SOCIAL-DEVELOPMENT.
MPA 213 : LECTURE ON SOCIAL-DEVELOPMENT.
 
Urban & Metro Admin and Governancges.pdf
Urban & Metro Admin and Governancges.pdfUrban & Metro Admin and Governancges.pdf
Urban & Metro Admin and Governancges.pdf
 
MPA 210 Lecture : Planning & Budgeting
MPA 210  Lecture :  Planning & BudgetingMPA 210  Lecture :  Planning & Budgeting
MPA 210 Lecture : Planning & Budgeting
 
SPMS LECTURE :PERFORMANCE AND EVALUATION
SPMS LECTURE :PERFORMANCE AND EVALUATIONSPMS LECTURE :PERFORMANCE AND EVALUATION
SPMS LECTURE :PERFORMANCE AND EVALUATION
 
Lecture Maintenance & Development of HR.
Lecture Maintenance & Development of HR.Lecture Maintenance & Development of HR.
Lecture Maintenance & Development of HR.
 
Job Analysis, Job Design and Evaluation
Job Analysis, Job Design and  EvaluationJob Analysis, Job Design and  Evaluation
Job Analysis, Job Design and Evaluation
 
MPA 212 Lecture :COPING WITH STRESS.pptx
MPA 212 Lecture :COPING WITH STRESS.pptxMPA 212 Lecture :COPING WITH STRESS.pptx
MPA 212 Lecture :COPING WITH STRESS.pptx
 
MPA 212 Lecture : COACHING AND MENTORING
MPA 212 Lecture : COACHING AND MENTORINGMPA 212 Lecture : COACHING AND MENTORING
MPA 212 Lecture : COACHING AND MENTORING
 
Lec Volatility, Uncertainty, Complexity
Lec  Volatility, Uncertainty, ComplexityLec  Volatility, Uncertainty, Complexity
Lec Volatility, Uncertainty, Complexity
 
HRMD Lec Managing Ethically and Globally
HRMD Lec Managing Ethically and GloballyHRMD Lec Managing Ethically and Globally
HRMD Lec Managing Ethically and Globally
 
Lec : Human Resources - Self Confidence
Lec :  Human Resources - Self ConfidenceLec :  Human Resources - Self Confidence
Lec : Human Resources - Self Confidence
 
Lecture : Adaptive Organizational Design
Lecture : Adaptive Organizational DesignLecture : Adaptive Organizational Design
Lecture : Adaptive Organizational Design
 
Lecture Presentation on Metro-Governance
Lecture Presentation on Metro-GovernanceLecture Presentation on Metro-Governance
Lecture Presentation on Metro-Governance
 

Recently uploaded

Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxthorishapillay1
 
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxEPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxRaymartEstabillo3
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPCeline George
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon AUnboundStockton
 
Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designMIPLM
 
Roles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceRoles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceSamikshaHamane
 
AmericanHighSchoolsprezentacijaoskolama.
AmericanHighSchoolsprezentacijaoskolama.AmericanHighSchoolsprezentacijaoskolama.
AmericanHighSchoolsprezentacijaoskolama.arsicmarija21
 
Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17Celine George
 
DATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersDATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersSabitha Banu
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxpboyjonauth
 
Full Stack Web Development Course for Beginners
Full Stack Web Development Course  for BeginnersFull Stack Web Development Course  for Beginners
Full Stack Web Development Course for BeginnersSabitha Banu
 
Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Celine George
 
How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17Celine George
 
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...JhezDiaz1
 
Romantic Opera MUSIC FOR GRADE NINE pptx
Romantic Opera MUSIC FOR GRADE NINE pptxRomantic Opera MUSIC FOR GRADE NINE pptx
Romantic Opera MUSIC FOR GRADE NINE pptxsqpmdrvczh
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Grade 9 Q4-MELC1-Active and Passive Voice.pptx
Grade 9 Q4-MELC1-Active and Passive Voice.pptxGrade 9 Q4-MELC1-Active and Passive Voice.pptx
Grade 9 Q4-MELC1-Active and Passive Voice.pptxChelloAnnAsuncion2
 
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxMULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxAnupkumar Sharma
 
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...Nguyen Thanh Tu Collection
 

Recently uploaded (20)

Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptx
 
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxEPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERP
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon A
 
Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-design
 
Rapple "Scholarly Communications and the Sustainable Development Goals"
Rapple "Scholarly Communications and the Sustainable Development Goals"Rapple "Scholarly Communications and the Sustainable Development Goals"
Rapple "Scholarly Communications and the Sustainable Development Goals"
 
Roles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceRoles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in Pharmacovigilance
 
AmericanHighSchoolsprezentacijaoskolama.
AmericanHighSchoolsprezentacijaoskolama.AmericanHighSchoolsprezentacijaoskolama.
AmericanHighSchoolsprezentacijaoskolama.
 
Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17
 
DATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersDATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginners
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptx
 
Full Stack Web Development Course for Beginners
Full Stack Web Development Course  for BeginnersFull Stack Web Development Course  for Beginners
Full Stack Web Development Course for Beginners
 
Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17
 
How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17
 
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
 
Romantic Opera MUSIC FOR GRADE NINE pptx
Romantic Opera MUSIC FOR GRADE NINE pptxRomantic Opera MUSIC FOR GRADE NINE pptx
Romantic Opera MUSIC FOR GRADE NINE pptx
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
 
Grade 9 Q4-MELC1-Active and Passive Voice.pptx
Grade 9 Q4-MELC1-Active and Passive Voice.pptxGrade 9 Q4-MELC1-Active and Passive Voice.pptx
Grade 9 Q4-MELC1-Active and Passive Voice.pptx
 
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxMULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
 
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
 

STAKEHOLDER-IDENTIFICATION.pptx

  • 1. STAKEHOLDERS IDENTIFICATION OLIVER C. SISON JOVELYN C. NAZARITA MPA STUDENTS DR. JO BITONIO Professor
  • 2. Stakeholders are persons, groups or institutions with interests in a project or program. Primary stakeholders are those ultimately affected either positively (beneficiaries) or negatively (for example, for those involuntarily resettled). Secondary stakeholders are the intermediaries. Those that are not directly affected. In every undertaking/project there are parties with vested interest in either the activities and / or the result. The World Bank (2000) defines stakeholders as those effecting change in the community and those affected by it.
  • 3.
  • 4. STAKEHOLDERS  Customers/users  Sponsor  Portfolio manager/portfolio Review board  Program managers  Project Management Office  Program Managers  Project Team  Functional managers  Operations Management  Vendors/business partners  Performing Organization and the public THE PROCESSES INVOLVE: Identifying the stakeholders Analyze them, and Developing a strategy to manage them
  • 5.
  • 6.
  • 7. WHEN SHOULD IT BE DONE? Stakeholder identification and analysis should always be done at the beginning of a project, even if it is a quick list of stakeholders and their interest. OBJECTIVES OF STAKEHOLDER IDENTIFICATION 1. to get a clear understanding as to who the main stakeholders are and 2. to understand their values, beliefs, problems and attitudes towards the project.
  • 8. IDENTIFYING STAKEHOLDERS  Documenting relevant information regarding their:  interests  Involvement and  Impact on project success  Identifying stakeholders Increase likelihood of project success, Identify them early and make an analysis on their - level of interest - expectation - importance - attitude and influence
  • 9. STAKEHOLDER CATEGORIZATION Tuman J. (1993) categorized stakeholders into four main groups. These include: 1. Project champions 2. Project participants 3. Community participants 3. Parasitic participants 1.PROJECT CHAMPIONS Are those who have some reason to bring a project into being. These stakeholders include the developers, investors, and entrepreneurs motivated by profit.
  • 10. 2. PROJECT PARTICIPANTS  The project participants group includes organizations and individuals who are responsible for planning and executing the project. Typically this include the Project manager and project team, engineers, constructors, vendors, suppliers, crafts people, and regulatory agencies at the local, slate, and national levels.
  • 11. 3. COMMUNITY PARTICIPANTS  Community participants include groups or individuals who are directly affected by the project. Community participants create the environment that surrounds the project. The group can materialize because of environmental, social, political, economic, health, or safety concerns.
  • 12. 4. THE PASSIVE/PARASITIC PARTICIPANTS  The parasitic participants presents an interesting and vital works for project managers. Parasitic participants consist of organizations and individuals who do not have a direct stake in projects. In this group we find the opportunities, the activists and other who are looking for a focal point for their energies, internal drives and to promote their personal philosophies and views.
  • 13. STAKEHOLDER CATEGORIZATION PROJECT CHAMPION PROJECT PARTICIPANT COMMUNITY PARTICIPANT PARASITIC/PASSIVE PARTICIPANT - DEVELOPERS - CLIENTS/CUTOMER S - POLITICIANS - COMMUNITY LEADERS-CHIEFS, OPINION LEADERS - VISIONARIES - PROJECT MGT. TEAM - CONTRACTORS - VENDORS - CONSTRUCTORS - The Community - Special interest groups-churches, women and men’s group - environmentalist - Media - Activist
  • 14. CHECKLIST FOR IDENTIFYING STAKEHOLDERS 1. Have all primary and secondary stakeholders been listed? 2. Have all categories been identified? 3. Have all potential supporters and opponents of the project been identified? 4. Have primary stakeholders been divided into user, occupational groups /income groups? 5. Are there any new primary or secondary stakeholders that are likely to emerge as a result of the project?
  • 16. INPUTS  1. PROJECT CHARTER – can provide information about internal and external parties involved in and affected by the project.  2.PROCUREMENT DOCUMENTS – if project is based on procurement activity or is based on an established contract, the legal parties in the documents become stakeholders including suppliers subcontractors etc.  3. ENTERPRISE ENVIRONMENTAL FACTORS (EEF’S) - includes organizational or company culture and structure. Or and Governmental or industry standards such as regulations, and product standards.  4. ORGANIZATIONAL PROCESS ASSETS (OPA’S) – includes stakeholder register templates, lessons learned from previous projects and stakeholder register from previous projects.
  • 17. TOOLS AND TECHNIQUES  Stakeholder analysis- a technique to identify and analyze the stakeholders surrounding a project.  STAKEHOLDER ANALYSIS – is a process of systemically gathering and analyzing quantitative and qualitative information to determine whose interests should be taken into accountability throughout the project.
  • 18. Process of Stakeholder Analysis First, the project manager has to build a project team that has the skill to address all stakeholder requirements and concerns. Second, the team must develop strategies for dealing with the different levels of power. Finally, resources must be obtained to deal with stakeholder issues that are beyond normal project demands.
  • 19. Stakeholder analysis generally follow the steps described below: 1. identify all potential project stakeholders and relevant information. 2. identify the potential impact or support each stakeholder could generate, and classify them so as to define an approach strategy. 3. assess how key stakeholders are likely to react on the respond in various situations, in order to plan how to win or enhance their support an mitigate negative impacts.
  • 20. Stakeholder Analysis Information Finding The process can be used by a single person. It works better, however, if a diverse small group does it. 1. Draw up chart 2. List Stakeholders 3. Estimate Attitude and influence 4. Plan strategy
  • 21. 1. DRAW UP THE CHART  Prepare a chart on electronic whiteboard, or perhaps butcher paper like this.  Att- attitude Inf- influence E- estimate C-confidence (Write goal here) Stakeholders Att Inf Actions E C E C
  • 22. 2. List Stakeholders Identify and list the stakeholders. These may be individuals or stakeholder groups, or some combination. If stakeholders can be treated as a group or use groups. The most effective way of doing this is to list as many stakeholders as you can on a working sheet of paper. The transfer them to the left hand column of the chart. It may help to list them in rough order of importance.
  • 23. 3. ESTIMATE ATTITUDE & CONFIDENCE For column 2 to 5 work across the page. Record you estimate of the four columns. In order, they are: Column 2- you best estimate of the stakeholder’s attitude from supportive opposed. Usually find it is adequate to use a 5-category code. Column 3- how confident you are about your estimate in column 2. Column 4- your best estimate of the influence of the stakeholder. A three code is usually enough. Column 5- how confident you are about your estimate in column 4.
  • 24. 4. Plan Strategies  I general, question marks indicate a need for more information. The more question marks, and the more influence the person has, the greater the need. On some occasions you will choose to approach the person concerned. On the other occasions you may instead approach someone else who can be assumed to know about the person’s attitude pr influence. (on occasion, you may want to obtain some of this information before completing the analysis).  In general, high influence indicates a need to involve the person in some way. (or, if you chose not to do this, and they are opposite, you may choose to find some way to neutralize their influence).
  • 25. USING THE FINDINGS OF A STAKEHOLDER ANALYSIS  The Project Concept Note- the main findings of a stakeholder analysis should be included in the project concept note. Such a summary needs to be brief because (a) of the nature of concept notes, and (b) the analysis will probably be revised as the project design develops, interest change, and more information becomes available.  The Project Document- all project documents will need more details than the concept note, drawing on both the stakeholder analysis and any revisions arising out of appraisal. PAD submissions are likely to require more detail of key secondary and primary stakeholders, their various interests, and their relative influence and importance. This information should appear in summary form in the Social and institutional section of the project document.
  • 26. EXPERT JUDGMENT (TOOLS AND TECHNIQUES)  To ensure comprehensive identification and listing of stakeholders, judgment and expertise should be sought from groups or individuals with specialized training or knowledge on the subject area such as: 1. Senior management 2. Other units within the organization 3. Identified key stakeholders
  • 27. OUTPUT 1. STAKEHOLDER REGISTER- the main output of the identify stakeholder is the stakeholder register, which includes details relative to identified stakeholders: A. identification information- name, organizational position, role in the project, contact information B. assessment information- major requirements, main expectations and potential influence in the project C. stakeholder classification- internal / external, supporter, neutral / resistor, etc.
  • 28. 2. STAKEHOLDER MANAGEMENT STRATEGY  The stakeholder management strategy defines an approach to increase the support and minimize negative impacts of stakeholders throughout the entire project life cycle. It includes elements such as:  A. key stakeholders who can significantly impact the project  B. level of participation in the project desired for each identified stakeholder  C. stakeholder groups and their management (as groups).  D. a common way of representing the stakeholder management strategy is a stakeholder analysis matrix below
  • 29. SAMPLE OF A BLANK STAKEHOLDER ANALYSIS MATRIX STAKEHOLDER STAKEHOLDER Interest in the project Assessment of impact Potential Strategies for Gaining Support or reducing obstacle
  • 30. INITIATION PHASE OUTPUT CHARTER INPUT PLANNING PHASE
  • 31. REFERENCE:  Stakeholder identification analysis and management. Published by Josephine Thornton  Slideplayer.com  Pdf doc.ifc.org