IRJET- Project on Time Study to Increase the Overall Productivity
•
0 likes
•
16 views
IRJET Journal
Follow
https://www.irjet.net/archives/V6/i4/IRJET-V6I4344.pdf
Read less
Read more
Engineering
Report
Share
Report
Share
1 of 6
Download now
Download to read offline
Recommended
IRJET- Optimization of Cycle Time by using Various Techniques: A Review
IRJET- Optimization of Cycle Time by using Various Techniques: A Review
IRJET Journal
IRJET- Application of Work Study in Construction Project
IRJET- Application of Work Study in Construction Project
IRJET Journal
IRJET- Design of Manufacture of Fixtures for CNC Machine to Improve Productiv...
IRJET- Design of Manufacture of Fixtures for CNC Machine to Improve Productiv...
IRJET Journal
Application of Lean Concepts in Molding Department
Application of Lean Concepts in Molding Department
IRJET Journal
Analysis of sewing section efficiency by using time study technique in Appare...
Analysis of sewing section efficiency by using time study technique in Appare...
Khairul Bashar
project-presentation
project-presentation
ronybste
IRJET- Single Minute Exchange of Dies (SMED) Concept
IRJET- Single Minute Exchange of Dies (SMED) Concept
IRJET Journal
Method study
Method study
Chaudhry Zaghum Chahal
Recommended
IRJET- Optimization of Cycle Time by using Various Techniques: A Review
IRJET- Optimization of Cycle Time by using Various Techniques: A Review
IRJET Journal
IRJET- Application of Work Study in Construction Project
IRJET- Application of Work Study in Construction Project
IRJET Journal
IRJET- Design of Manufacture of Fixtures for CNC Machine to Improve Productiv...
IRJET- Design of Manufacture of Fixtures for CNC Machine to Improve Productiv...
IRJET Journal
Application of Lean Concepts in Molding Department
Application of Lean Concepts in Molding Department
IRJET Journal
Analysis of sewing section efficiency by using time study technique in Appare...
Analysis of sewing section efficiency by using time study technique in Appare...
Khairul Bashar
project-presentation
project-presentation
ronybste
IRJET- Single Minute Exchange of Dies (SMED) Concept
IRJET- Single Minute Exchange of Dies (SMED) Concept
IRJET Journal
Method study
Method study
Chaudhry Zaghum Chahal
IRJET - Productivity Improvement by Time Study and Motion Study
IRJET - Productivity Improvement by Time Study and Motion Study
IRJET Journal
PRODUCTIVITY IMPROVEMENT THROUGH LEAN TOOLS ON ENGINE COOLING ASSEMBLY
PRODUCTIVITY IMPROVEMENT THROUGH LEAN TOOLS ON ENGINE COOLING ASSEMBLY
DIPRANJAN GUPTA
IRJET- A Case Study Approach of Quality Tools in Manufacturing Industry
IRJET- A Case Study Approach of Quality Tools in Manufacturing Industry
IRJET Journal
Designing Facility Layout and Effective Material Handling for a Ceramic Insul...
Designing Facility Layout and Effective Material Handling for a Ceramic Insul...
IRJET Journal
Assistant Manager - Mechanical
Assistant Manager - Mechanical
koteswara Rao Nutalapati
Koti (assistant manager mech)
Koti (assistant manager mech)
koteswara Rao Nutalapati
IRJET - Invistigation and Implement of Six Sigma and Reduce Labour Cost a...
IRJET - Invistigation and Implement of Six Sigma and Reduce Labour Cost a...
IRJET Journal
INDUSTRIAL ENGINEERING DESIGN PROJECT
INDUSTRIAL ENGINEERING DESIGN PROJECT
Amir Mohammad Redzuan
1.1 Work study and method study -Industrial Engineering Basics
1.1 Work study and method study -Industrial Engineering Basics
Dr. Surya Prakash
Design of facilty Layout of a LED bulb Production sysem
Design of facilty Layout of a LED bulb Production sysem
Maheer Sohbat
Production & materials management
Production & materials management
Vaibhav Shah
Implementation of Single Minute Exchange of Die in Motor Manufacturing Unit
Implementation of Single Minute Exchange of Die in Motor Manufacturing Unit
IRJET Journal
Work measurement
Work measurement
Huy Tạ Ngọc
IRJET- Efficiency Enhancement by Reducing Production and Machining Time
IRJET- Efficiency Enhancement by Reducing Production and Machining Time
IRJET Journal
Production and material management
Production and material management
sksbatish
Method Study
Method Study
ajithsrc
IRJET- Maintenance Management of Construction Equipment on Construction P...
IRJET- Maintenance Management of Construction Equipment on Construction P...
IRJET Journal
Modul 1 process planning and standard time calculation
Modul 1 process planning and standard time calculation
Amalia Syafitri
k10798 aaftab alam opc me 6th sem
k10798 aaftab alam opc me 6th sem
Guddu Ali
Resume
Resume
bhupendra deshwal
IRJET- Project on Time Study to Increase the Overall Productivity
IRJET- Project on Time Study to Increase the Overall Productivity
IRJET Journal
IRJET- Productivity Improvement in Manufacturing Industry using Lean Tools
IRJET- Productivity Improvement in Manufacturing Industry using Lean Tools
IRJET Journal
More Related Content
What's hot
IRJET - Productivity Improvement by Time Study and Motion Study
IRJET - Productivity Improvement by Time Study and Motion Study
IRJET Journal
PRODUCTIVITY IMPROVEMENT THROUGH LEAN TOOLS ON ENGINE COOLING ASSEMBLY
PRODUCTIVITY IMPROVEMENT THROUGH LEAN TOOLS ON ENGINE COOLING ASSEMBLY
DIPRANJAN GUPTA
IRJET- A Case Study Approach of Quality Tools in Manufacturing Industry
IRJET- A Case Study Approach of Quality Tools in Manufacturing Industry
IRJET Journal
Designing Facility Layout and Effective Material Handling for a Ceramic Insul...
Designing Facility Layout and Effective Material Handling for a Ceramic Insul...
IRJET Journal
Assistant Manager - Mechanical
Assistant Manager - Mechanical
koteswara Rao Nutalapati
Koti (assistant manager mech)
Koti (assistant manager mech)
koteswara Rao Nutalapati
IRJET - Invistigation and Implement of Six Sigma and Reduce Labour Cost a...
IRJET - Invistigation and Implement of Six Sigma and Reduce Labour Cost a...
IRJET Journal
INDUSTRIAL ENGINEERING DESIGN PROJECT
INDUSTRIAL ENGINEERING DESIGN PROJECT
Amir Mohammad Redzuan
1.1 Work study and method study -Industrial Engineering Basics
1.1 Work study and method study -Industrial Engineering Basics
Dr. Surya Prakash
Design of facilty Layout of a LED bulb Production sysem
Design of facilty Layout of a LED bulb Production sysem
Maheer Sohbat
Production & materials management
Production & materials management
Vaibhav Shah
Implementation of Single Minute Exchange of Die in Motor Manufacturing Unit
Implementation of Single Minute Exchange of Die in Motor Manufacturing Unit
IRJET Journal
Work measurement
Work measurement
Huy Tạ Ngọc
IRJET- Efficiency Enhancement by Reducing Production and Machining Time
IRJET- Efficiency Enhancement by Reducing Production and Machining Time
IRJET Journal
Production and material management
Production and material management
sksbatish
Method Study
Method Study
ajithsrc
IRJET- Maintenance Management of Construction Equipment on Construction P...
IRJET- Maintenance Management of Construction Equipment on Construction P...
IRJET Journal
Modul 1 process planning and standard time calculation
Modul 1 process planning and standard time calculation
Amalia Syafitri
k10798 aaftab alam opc me 6th sem
k10798 aaftab alam opc me 6th sem
Guddu Ali
Resume
Resume
bhupendra deshwal
What's hot
(20)
IRJET - Productivity Improvement by Time Study and Motion Study
IRJET - Productivity Improvement by Time Study and Motion Study
PRODUCTIVITY IMPROVEMENT THROUGH LEAN TOOLS ON ENGINE COOLING ASSEMBLY
PRODUCTIVITY IMPROVEMENT THROUGH LEAN TOOLS ON ENGINE COOLING ASSEMBLY
IRJET- A Case Study Approach of Quality Tools in Manufacturing Industry
IRJET- A Case Study Approach of Quality Tools in Manufacturing Industry
Designing Facility Layout and Effective Material Handling for a Ceramic Insul...
Designing Facility Layout and Effective Material Handling for a Ceramic Insul...
Assistant Manager - Mechanical
Assistant Manager - Mechanical
Koti (assistant manager mech)
Koti (assistant manager mech)
IRJET - Invistigation and Implement of Six Sigma and Reduce Labour Cost a...
IRJET - Invistigation and Implement of Six Sigma and Reduce Labour Cost a...
INDUSTRIAL ENGINEERING DESIGN PROJECT
INDUSTRIAL ENGINEERING DESIGN PROJECT
1.1 Work study and method study -Industrial Engineering Basics
1.1 Work study and method study -Industrial Engineering Basics
Design of facilty Layout of a LED bulb Production sysem
Design of facilty Layout of a LED bulb Production sysem
Production & materials management
Production & materials management
Implementation of Single Minute Exchange of Die in Motor Manufacturing Unit
Implementation of Single Minute Exchange of Die in Motor Manufacturing Unit
Work measurement
Work measurement
IRJET- Efficiency Enhancement by Reducing Production and Machining Time
IRJET- Efficiency Enhancement by Reducing Production and Machining Time
Production and material management
Production and material management
Method Study
Method Study
IRJET- Maintenance Management of Construction Equipment on Construction P...
IRJET- Maintenance Management of Construction Equipment on Construction P...
Modul 1 process planning and standard time calculation
Modul 1 process planning and standard time calculation
k10798 aaftab alam opc me 6th sem
k10798 aaftab alam opc me 6th sem
Resume
Resume
Similar to IRJET- Project on Time Study to Increase the Overall Productivity
IRJET- Project on Time Study to Increase the Overall Productivity
IRJET- Project on Time Study to Increase the Overall Productivity
IRJET Journal
IRJET- Productivity Improvement in Manufacturing Industry using Lean Tools
IRJET- Productivity Improvement in Manufacturing Industry using Lean Tools
IRJET Journal
Sheet Metal Assembly Process Optimization Using Lean Manufacturing Tool
Sheet Metal Assembly Process Optimization Using Lean Manufacturing Tool
IRJET Journal
‘5S’ Implementation in a Fasteners Manufacturing Company
‘5S’ Implementation in a Fasteners Manufacturing Company
IRJET Journal
Success story of Carrier Engineers, an SME Cluster Member of CII
Success story of Carrier Engineers, an SME Cluster Member of CII
Confederation of Indian Industry
Project Report on Textile Industrial Engineering
Project Report on Textile Industrial Engineering
Amanuzzaman Aman
A case study on productivity improvement of wearing insert and cutting ring
A case study on productivity improvement of wearing insert and cutting ring
IJECSJournal
IRJET- A Case Study for Overall Equipment Effectiveness Improved in Manufactu...
IRJET- A Case Study for Overall Equipment Effectiveness Improved in Manufactu...
IRJET Journal
Productivity Enhancement Using Method Study
Productivity Enhancement Using Method Study
IRJET Journal
IRJET- Productivity Improvement by Time Study Analysis Moderate Scale Ind...
IRJET- Productivity Improvement by Time Study Analysis Moderate Scale Ind...
IRJET Journal
LEAN STANDARDIZED WORK TOOL
LEAN STANDARDIZED WORK TOOL
Endashaw Yohannes Hailu
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing Facility
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing Facility
IRJET Journal
IRJET- Last Planner System
IRJET- Last Planner System
IRJET Journal
IRJET- Production Line Optimization using Lean Tools: A Case Study of Automot...
IRJET- Production Line Optimization using Lean Tools: A Case Study of Automot...
IRJET Journal
Development of fixture_to_reduce_the_cycle_time_of_c_8_griding_machine
Development of fixture_to_reduce_the_cycle_time_of_c_8_griding_machine
Laukik Raut
International Journal of Engineering Research and Development
International Journal of Engineering Research and Development
IJERD Editor
IMPLEMENTATION OF LEAN TECHNIQUES IN INDIAN SCEANIRO AND TESTING ITS FITNESS
IMPLEMENTATION OF LEAN TECHNIQUES IN INDIAN SCEANIRO AND TESTING ITS FITNESS
IRJET Journal
IRJET- Productivity Improvement Kaizen of XC-60 Housing
IRJET- Productivity Improvement Kaizen of XC-60 Housing
IRJET Journal
The Impact of Lean Production on the Cycle Time: A Case Study of a Welding As...
The Impact of Lean Production on the Cycle Time: A Case Study of a Welding As...
ijsrd.com
Application of Industrial Engineering to increase the productivity of an E-Ri...
Application of Industrial Engineering to increase the productivity of an E-Ri...
ijtsrd
Similar to IRJET- Project on Time Study to Increase the Overall Productivity
(20)
IRJET- Project on Time Study to Increase the Overall Productivity
IRJET- Project on Time Study to Increase the Overall Productivity
IRJET- Productivity Improvement in Manufacturing Industry using Lean Tools
IRJET- Productivity Improvement in Manufacturing Industry using Lean Tools
Sheet Metal Assembly Process Optimization Using Lean Manufacturing Tool
Sheet Metal Assembly Process Optimization Using Lean Manufacturing Tool
‘5S’ Implementation in a Fasteners Manufacturing Company
‘5S’ Implementation in a Fasteners Manufacturing Company
Success story of Carrier Engineers, an SME Cluster Member of CII
Success story of Carrier Engineers, an SME Cluster Member of CII
Project Report on Textile Industrial Engineering
Project Report on Textile Industrial Engineering
A case study on productivity improvement of wearing insert and cutting ring
A case study on productivity improvement of wearing insert and cutting ring
IRJET- A Case Study for Overall Equipment Effectiveness Improved in Manufactu...
IRJET- A Case Study for Overall Equipment Effectiveness Improved in Manufactu...
Productivity Enhancement Using Method Study
Productivity Enhancement Using Method Study
IRJET- Productivity Improvement by Time Study Analysis Moderate Scale Ind...
IRJET- Productivity Improvement by Time Study Analysis Moderate Scale Ind...
LEAN STANDARDIZED WORK TOOL
LEAN STANDARDIZED WORK TOOL
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing Facility
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing Facility
IRJET- Last Planner System
IRJET- Last Planner System
IRJET- Production Line Optimization using Lean Tools: A Case Study of Automot...
IRJET- Production Line Optimization using Lean Tools: A Case Study of Automot...
Development of fixture_to_reduce_the_cycle_time_of_c_8_griding_machine
Development of fixture_to_reduce_the_cycle_time_of_c_8_griding_machine
International Journal of Engineering Research and Development
International Journal of Engineering Research and Development
IMPLEMENTATION OF LEAN TECHNIQUES IN INDIAN SCEANIRO AND TESTING ITS FITNESS
IMPLEMENTATION OF LEAN TECHNIQUES IN INDIAN SCEANIRO AND TESTING ITS FITNESS
IRJET- Productivity Improvement Kaizen of XC-60 Housing
IRJET- Productivity Improvement Kaizen of XC-60 Housing
The Impact of Lean Production on the Cycle Time: A Case Study of a Welding As...
The Impact of Lean Production on the Cycle Time: A Case Study of a Welding As...
Application of Industrial Engineering to increase the productivity of an E-Ri...
Application of Industrial Engineering to increase the productivity of an E-Ri...
More from IRJET Journal
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
IRJET Journal
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
IRJET Journal
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
IRJET Journal
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
IRJET Journal
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
IRJET Journal
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
IRJET Journal
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
IRJET Journal
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
IRJET Journal
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
IRJET Journal
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
IRJET Journal
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
IRJET Journal
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
IRJET Journal
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
IRJET Journal
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
IRJET Journal
React based fullstack edtech web application
React based fullstack edtech web application
IRJET Journal
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
IRJET Journal
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
IRJET Journal
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
IRJET Journal
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
IRJET Journal
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
IRJET Journal
More from IRJET Journal
(20)
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
React based fullstack edtech web application
React based fullstack edtech web application
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Recently uploaded
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
RajaP95
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
RajkumarAkumalla
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
purnimasatapathy1234
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
Tsuyoshi Horigome
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
rknatarajan
High Profile Call Girls Dahisar Arpita 9907093804 Independent Escort Service ...
High Profile Call Girls Dahisar Arpita 9907093804 Independent Escort Service ...
Call girls in Ahmedabad High profile
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
ranjana rawat
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
ssuser5c9d4b1
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
SIVASHANKAR N
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Call Girls in Nagpur High Profile
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
ranjana rawat
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
M Maged Hegazy, LLM, MBA, CCP, P3O
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
ranjana rawat
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls in Nagpur High Profile
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
rknatarajan
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
ranjana rawat
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur High Profile
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur High Profile
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
ranjana rawat
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Christo Ananth
Recently uploaded
(20)
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
High Profile Call Girls Dahisar Arpita 9907093804 Independent Escort Service ...
High Profile Call Girls Dahisar Arpita 9907093804 Independent Escort Service ...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
IRJET- Project on Time Study to Increase the Overall Productivity
1.
International Research Journal
of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 1618 PROJECT ON TIME STUDY TO INCREASE THE OVERALL PRODUCTIVITY Nikhil Chatap1, Kamalesh Chavan2, Neha Barhate3, Pooja Hirudkar4, Nilesh Chavan5, Prof. V.P.Kulkarni6 (1,2,3,4,5)Students of School of Mechanical and Civil Engineering, MIT Academy of Engineering, Alandi (D). SPPU University (6) Assistant Professor of School of Mechanical and Civil Engineering, MIT Academy of Engineering, Alandi (D). SPPU University -----------------------------------------------------------------------***-------------------------------------------------------------------- Abstract:- This report outlines the results of our observation in small scale industry. It is a small scale industry and machining of forged and casting components is carried out there. We went through various departments, technical and non-technical, and have collected detailed information on their respective functions and their impact on the outcomes of the company. We have made an attempt to describe some of the things we came across during the course of time. As it is a small scale industry so we saw a shortage of labours as well improper working conditions due to which their productivity rate was abating. There were a lot of factors responsible for that which our team comes to know after a detail study of all the processes and time restricted to complete those processes. Keywords- Time study, Daily check sheet, OEE (Over Equipment Efficiency), Overall productivity 1. Introduction: 1.1 About Organization: Organization was established in 2002, i.e. 16 years ago. It is located in Mahalunge MIDC area. It is a small scale industry and machining of a forged and casting components is carried out there. The organization involves 30 members including 2 supervisors, 2 quality person and a plant head. As it is small scale industry it serves many big industries by providing finished parts. The company works in two different shift i.e. Day shift and Night Shift. The industry has 5 CNC machines and 3 VMC machines for machining of a components. There are total 21 types of a parts are machined currently in industry. Some machined components are shown below Before Machining After machining Before Machining After machining
2.
International Research Journal
of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 1619 1.2 About Project: In Time study, our main purpose was to reduce the cycle time and hence increase the productivity. So, initially we have noted down all the minor and major activities of the worker and the time taken by him to complete that work. For this we have prepared a sheet as well. We have match the standard cycle time with the current cycle time. We find a time gap and we work on improvements to improve it. 1.3 Project Details Project title: Time study. Project Outline: Analysis of the work into small, easily measurable components or elements. Measurement of those components Synthesis from measured component to arrive at the time for the complete job. To reduce the time, cycle to increase the productivity. To reduces the breakdowns, minor stoppages due to lack of basic conditions. Project Definitions: In order to increase the overall productivity, the losses need to minimize. Detailed study of the process by using the time study measurement helps to analyse and identify the different types of losses. The major losses can be easily find out by using this method, and improvements in such major losses leads to better and continuous working condition which will help to enhance the overall productivity. During this time study we have divided the main task into different subtasks and noted down the time required to perform each task currently. We recorded the data for 2 weeks continuously from which we identified the major losses and provided the improvements as mentioned below. This improvement resulted into decrease of time cycle. 1.4 Purpose: To decrease the cycle time of the machining of the product and which will result into the overall increase the productivity. 1.5 Significance of study: Machining is completely machine orientated task. Equipment or any product are designed to be reliable but they face the breakdowns due to lack of basic conditions which will decrease the overall productivity. To restore the basic condition operator has to do daily cleaning, inspection, lubrication and refastening of the machining. In order to reduce the time required to restore basic condition need to be minimized to increase the overall efficiency of the equipment. 2. Implementation Details: We have done a time study on a CNC operator who has an experienced of 10 years of working on CNC. The main activities of the worker is to cleaning the interior, loading the job, machining a job, unloading the job and checking the final dimensions of the job. We initially visited the industry, and observed a loss over there. According to that, we have prepared a losses sheet and an activity sheet. In which we have noted down the time required to complete the machining of the job and the losses. The format of the sheet is as shown below.
3.
International Research Journal
of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 1620 Chart No. 1 Daily loss report sheet Chart No. 2 Daily Activity Report
4.
International Research Journal
of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 1621 2.1 Daily Activity chart before : Chart No. 3 Daily Activity Chart Before 2.2 Daily Activity chart after: Chart No. 4 Daily Activity Chart After
5.
International Research Journal
of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 1622 2.3 Improvements Details: Initially the cycle time was 3.5 min as mentioned in the above chart. In order to reduce the cycle time, we have done some improvements as mentioned below: 1) Initially the job was used to be lie on the floor for which operator has to bend down to pick up the job for which he used to take 5 secs to do this. Now, we have arranged a table on the side from where he used to take job now within 3 sec. Here we have save a time of 2 sec. 2) He used to take the air pipe two times for cleaning of the set up first and then for the cleaning up of job. Now, we have change the sequence of action by which the operator has to take the air pipe once firstly he used to have a cleaning of the job and of the set up. Initially he used to take 12 secs to do so and now it comes to the 10 sec only. 3) Initially the operator used to take 9 secs for loading of job as the job were used randomly oriented and now it took only 7 sec as to do so. 4) Initially the operator used to check all the parameters daily as mentioned above, which used to take around 13.5 min daily, for that we have neglected some parameters to check daily as they are not necessary to check on daily basis but can be checked on weekly basis and we reduce it to the 7.5 min. In that we also reduced the set up arrangement time as well. Sr.No Activity Before Time After Time Time saving 1 Daily parameters checking time 13.5 min 7.5 min 6 min 2 Job Picking time 5 sec 3 sec 2 sec 3 Cleaning of job and set up 12 sec 10 sec 2 sec 4 Loading time for job 9 sec 7 sec 2 sec Table No. 1 Cycle time improved chart 3. Result and Calculations: Sr. No Activity Before After 1 Operator duty hours 12 12 2 Daily Target 200 jobs 200 jobs 3 Daily rework time 16 min 16 min 4 Daily Inspection time 13.5 min 7.5 min 5 Weekly Inspection Time 0 7.5 min 6 Non- productive time 65 min 65 min 7 Cycle time for 1 job 210 sec 204 sec 8 Total productive time 625.5 min 631.5 min 9 No. of jobs completed daily 178 jobs 192 jobs 10 Efficiency of operator 89 % 96% Table No. 2 Result Table 3.1 Calculation: Increase in job machined per shift = 185-178 = 7 Increase in productivity percentage for one shift for one CNC m/c = (185-178)/178 = 3.9 %
6.
International Research Journal
of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 1623 Labour cost = 51.28 Rs / Hr Total cost saving for 1 shift = [7/ (3.4*60)] * 51.28 = Rs. 20.34 Total saving per day for 1 m/c = 2*20.34 = Rs. 40.682 Total saving in plant for 1 day = 5 * 40.682 = Rs. 203.4 Total saving per month in plant = 26 * 192.3 = Rs. 5288.667 Total saving per year in plant = 12 * 5288.667 = Rs. 63464.128 Conclusion: It is found that time study is very effective in repetitive job analysis. A small improvement in the cycle processing can save a small time for one small process, as it is a repetitive process the overall impact of the small time improvement is very high and it increases the overall productivity up to large extent. Time study has its several advantages regarding the development of the culture of an organisation. The culture of the continuous improvement gets developed in the organization. Selection of the proper method of doing time study is very important and one should give a complete thought process before doing the time study. The operator selected for the time study should have experienced of doing the same job and should be cooperative towards the time study person. The time study gives the information about the time loss during various operation and the particular area which plays major roles in the losses can be targeted for the improvement. Thus this is how the total productivity of the organization can be improved by conducting the time study at various stages. References: 1. Barnes, R. (1980). Motion and Time Study Design and Measurement of Work (7th ed.). United States: John Wiley & Sons. Inc. 2. Finkler, Steven A., A Comparison of work-sampling and time-and-motion techniques for studies in health services research, Health Service Research, Chicago. Dec 1993. Vol. 28, Issue 5. 3. Marvin E. Mundel and David L. Danner (1994). Motion and Time Study – Improving Productivity, Seventh Edition. 4.http://eprints.utem.edu.my/11217/1/Productivity_Improvement_Through_Motion_And_Time_Study.pdf 5. Niebel, B. W. (1988), Motion and Time Study, Richard D. Irwin, Inc., Homewood, III. 6.http://www.arpnjournals.org/jeas/research_papers/rp_2016/jeas_0116_3387.pdf 7.http://ijaresm.net/Pepar/VOLUME_1/ISSUE_3/7.pdf 8.https://www.ims-productivity.com/page.cfm/content/Time-Study/
Download now