Designing Facility layout and effective material handling for a ceramic
insulator plant
Manoj Shanthpure1, M.R Shivakumar2,
1Student,, Department of IEM ,Rit Bangalore-54 Karnataka, India
2Assitant Professor, Department of IEM ,Rit Bangalore-54 Karnataka, India
---------------------------------------------------------------------***---------------------------------------------------------------------
Abstract - Material handling is a necessary andsignificant
component of any productive activity. It is something that
goes on in every plant all the time. Material handling is the
art and science of moving, storing, protecting, and
controlling material.
Our project focuses on effective material handling, more
specifically material movement within the plant. In this
regard firstly the whole system was studied and the
manufacturing process of insulators was studied in detail
from raw materials till finished goods. This system study
gave us input for our project as to improve the material
movement in glazing, loading and kiln section. As the layout
of the plant was the main obstacle in this regard, we thought
of designing a new optimum layout which would reduce the
material handling effort. The methodology use was
systematic layout planning (SLP) given by Richard Muther.
This methodology has three stages analysis, search and
selection of layout. In analysis stage the inputs were
collected, sequence of operation was charted using flow
process chart (chart which uses flow process symbols of
note the sequence of operations using operation,
transportation, inspection, delay and storage) and also flow
diagram of the area of consideration was drawn. The
relationship between each workstation wasunderstoodand
a relationship chart (chart which shows the relationship
between each machine with every other machine) was
drawn. Using these as basis activity relationship diagram
(diagram which shows each activity as a square and their
relationship using lines) and space relationship diagram
were drawn. Instead of manual placement of departments
that is on trial and error method we used ALDEP softwareto
get optimum layout. With this as input we have designed
three proposed layouts by taking all limitations into
consideration. The evaluation is donebya seniormanagerin
that origination.
Key Words: Facility Layout, Systematic Layout Planning
1. INTRODUCTION
It is the physical arrangement of equipment and facilities
within a plant. Optimizing the layout of a plant can improve
productivity, safety and quality of products. Un-necessary
efforts of material handling can be avoided when the plant
layout is optimized .Plant layouttechniquesapplytothecase
where several physical means have to be located in a certain
area, either industrial processes or services. The basic
objective is to ensure a smooth flow of work, material,
people and information. There are probably two levels at
which layouts are required. In one, the various departments
have to be sited, and in other the items of equipment within
a department need to be located.
Criteria for a good layout
1. Maximum flexibility: A good layout will be one which
can be rapidlymodifiedto meetchangingcircumstances.
2. Maximum co-ordination: Entry into, and disposal from,
any department or functional area should be in such a
manner that it is convenient to the issuing or receiving
departments. Layout requires to be considered as a
whole and not partially.
3. Maximum use of volume: Facilitiesshouldbeconsidered
as cubic devices and maximum use made of the volume
available. This principle is particularly useful in stores,
where goods can be stacked at considerable heights
without inconvenience, especially if modern lifting
devise are use. In offices, racking can be installed to
minimize use of floor space.
4. Maximum visibility: all the people and materials should
be readily observable at all the time; there should be no
‘hidden place’ into which goods or information can get
mislaid. Criteria for a good layout.
5. Maximum accessibility: All servicing and maintenance
points should be readily accessible. For example,
equipment should not be placed against a wall in such a
manner that necessary maintenance cannot easily be
carried out.
6. Minimum distance: All movements should be both
necessary and direct. Handing work adds to cost but
does not increase value; consequently any unnecessary
or indirect movements should be avoided.
1.1 TECHHNOLOGIES- THE STRENGTH OF EPD
The manufacturing process of EPD employs state of art
technology for insulators. The result of the same is evident
wherein, BHEL-EPD indigenously developed the HVDC
insulators used in transmission of power at 500kv first time
in the county and EPD being only thirdcompanyintheworld
to develop.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 04 Issue: 07 | July -2017 www.irjet.net p-ISSN: 2395-0072
© 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 1676
Insulators and certain are manufactured using the classical
ceramic processing technologies viz. grinding, dewatering,
shaping, dry finishing, glazing, firing and assembly, the
equipment and facility control on the process, energy and
emission parameters can be controlled for optional
performance.
1.2 DATA COLLECTION AND ANALYSIS
1.2.1 SLP METHODOLOGY
We followed SLP methodology given by Richard Muther. It has three
stagesAnalysis, Search and Selection stages.
ANALYSIS STAGE
In this stage input data is collected, flow of materials is
known by drawing flow process chart and activity
relationship chart is drawn.
Step 1: Gathering Inputs
In this regard BHEL EPD manufacturers a large range of
products from 33kV to 800kV insulators. The area we
concentrated on, manufactured hollow and station post
insulators and also based on the specific orders they
manufactured special type of insulators as per the
requirements.
Quantity of products manufactured was based on the order
received and on product availability (stock of finished
goods).
The routing process of material was understood in the
system study wherewestudiedeverysingleoperation which
was being carried out.
Our area of consideration was from drying chamber to
loading to insulators into respective kilns. The activities in
this area are dry finishing which required 2 operators for
each machine, dust removal requires 1 operator,andglazing
operation requires 2 operators for each machine, sanding
operation requires 2 operators and stamping operation
requires 1 operation. Loading operation requires 3
operators.
Time required for each operation from dry finishing till
loading to kilns is charted in the flow process chart.
Insulators get dried in tunnel dryer, and for every 4hrs one
insulator comes out and a new insulatorisputinside. Tunnel
drier has a capacity to put 4 insulators at a time. Dry
Finishing operation takes 9.1 minutes for one insulator and
dust removal operation takes 3.9 mm, glazing operation
takes 10.4 mm for one insulator, sanding 12.4 mm and
stamping takes 3 mm. insulators are stored in storage room
based on the kiln availability
Step 2: Determining physical Flow
In this step physical flow of material was determined using
flow diagram and process steps were studied in detail then
charted using material flow process chart. The flow of the
materials on the present layout as shown in the Fig 5.1. The
flow chart is shown in Fig 5.2. Flow process chartwasdrawn
and is as shown in the Fig 5.5.
Fig 1.1 Present Layout
Step 3: Determining physical requirements
As it is improving of present layout the number of machines
and workers are fixed by management. The volume of
products to be manufactured is based on the orders got.
Step 4: Determining support activities required
The supporting activities such as maintenance, cleaning,
quality control works are done regularly and are scheduled
on daily, weekly and on monthly basis.
Step 5: Creating Physical flow Relationship Charts
The second main phase of SLP is creation of relationship
chart. This was drawn as shown in the Fig 5.4. The Figure
depicts the sequenced process flow of insulator
manufacturing, the close link between each machines and
separation of materials which have be kept apart.
Step 6: identify physical space requirements
The area of each equipment and facilitywasmeasuredand is
shown in the table 5.1. The total floor space available from
tunnel dryer to assembly section was 5745 square meter as
shown in the Fig 5.3.
Fig 1.2 : ACTIVITY RELATIONSHIP CHART
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 04 Issue: 07 | July -2017 www.irjet.net p-ISSN: 2395-0072
© 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 1677
Based on space relationship diagram, facilities are cut to the
scale based on its area on a card board and were manually
moved on the layout so as to get proposed layouts. We also
took the help of ALDEP software to evaluate therelationship
between each department. Based on the output of ALDEP
which is shown in the Fig 5.9 we modified the layout taking
all building constraints in to account. The total material
handling effort of present layout is shown in the table 5.2..,
which is the product of frequency and distance travelled.
Fig 1.3: A screenshot showing the optimum layout as an
output from ALDEP software with closeness rating 698.
Step 10: Modify layouts to meet practical limitations.
The kilns such as NSK, RK-1, RK-2, RK-4 and BSK cannot be
moved as the cost for moving them will be high and there is
lot of risk involved. Taking the aforementioned fact “THREE
PROPOSED” layouts were designed and modified so as to
reduce the material handling effort. The first proposed
layout is shown in Fig 5.10. The second proposed layout is
shown in the Fig 5.11 and modified second layout is shown
in Fig 5.12 and the third proposed layout in Fig 5.13.The
material handling efforts of first, second, second modified
and third proposed layouts are shown in Table 5.3, 5.4, 5.5,
5.6 respectively.
Table 1: Table showing material handling of present
layout
Fig 1.4: First proposed layout
Table 2: Table showing the material handling effort of
first proposed layout
Fig 1.5: Second proposed layout
Table 3: Table showing the material handling effort for
second proposed layout
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 04 Issue: 07 | July -2017 www.irjet.net p-ISSN: 2395-0072
© 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 1678
Fig 1.6: Modified Second layout
Fig 1.7 : Modified second proposed layout
Table 4: Table showing material handling effort of
modified second proposed layout
Fig 1.8: Third proposed layout
Table 5: Table showing the material handling effort for
third proposed layout
3. CONCLUSIONS
Systematic layout planning techniques we were able to
design an improved plant layout and were able to overcome
all the constraints of the existing plant layout. Hence
optimum utilization of the layout and better material
handling were achieved.
REFERENCES
[1]Syed Asad Ali Naqvi, Muhammad Fahad, Muhammad
Atierl, Muhammad zubair and Muhammad musharaf
shehzad, “Productivity improvement of a manufacturing
facility using systematic layout planning.
[2]Chandra Pal Singh, Geeta Agnihotri & Dr P.M Mishra,
“Design of plant layout using new facility to improve
production rate”.
[3]Jeff Mohr, CIRAS, and mike willett, CIRAS,” Simplified
systematic plant layout”.
[4]Asifa Fitriani, Galih prakoso and Anton mulyono
Azis,”Facility layout improvement based on safety and
health at work and standards of Food production facility.
[5]M.r jadhav p.v mulik g.s kamble k.d joshi,”Facility Layout
design improvement in Abc industry.
[6]Chandra pal singh, geeta agnihotri & Dr. p.m
mishra,”Design of plant layout using new facility to
improve production rate.

More Related Content

What's hot

Material handeling in industrial engineering
Material handeling in industrial engineeringMaterial handeling in industrial engineering
Material handeling in industrial engineeringANWER AHMED
 
My Role In Industry as Process Engineer
My Role In Industry as Process EngineerMy Role In Industry as Process Engineer
My Role In Industry as Process EngineerSushant Labhasetwar
 
Cellular manufacturing and group technology
Cellular manufacturing and group technologyCellular manufacturing and group technology
Cellular manufacturing and group technologyHitendrasinh Zala
 
Review on GROUP TECHNOLOGY & it’s implementation
Review on GROUP TECHNOLOGY & it’s implementationReview on GROUP TECHNOLOGY & it’s implementation
Review on GROUP TECHNOLOGY & it’s implementationManoj Gowda K
 
Cellular manufacturing group technology
Cellular manufacturing group technologyCellular manufacturing group technology
Cellular manufacturing group technologyHitendrasinh Zala
 
Plant layout design for safety aspect
Plant layout design for  safety aspectPlant layout design for  safety aspect
Plant layout design for safety aspectAnurag Singh
 
Pharmaceutical plant layout
Pharmaceutical plant layoutPharmaceutical plant layout
Pharmaceutical plant layoutArchana Chavhan
 
Group Technology, coding and cell design
Group Technology, coding and cell designGroup Technology, coding and cell design
Group Technology, coding and cell designNauman khan
 
Episode 33 : Project Execution Part (4)
Episode 33 :  Project Execution Part (4)Episode 33 :  Project Execution Part (4)
Episode 33 : Project Execution Part (4)SAJJAD KHUDHUR ABBAS
 
Drying plant layout ,blender ,mixer, emulsification mills, homogenizers
Drying plant layout ,blender ,mixer, emulsification mills, homogenizersDrying plant layout ,blender ,mixer, emulsification mills, homogenizers
Drying plant layout ,blender ,mixer, emulsification mills, homogenizersAnshika Saxena
 
Group Technology (Cell Manufacturing)
Group Technology (Cell Manufacturing)Group Technology (Cell Manufacturing)
Group Technology (Cell Manufacturing)Aishwary Kumar Gupta
 
3 4 chemplantdesign-general plant consideration
3 4 chemplantdesign-general plant consideration3 4 chemplantdesign-general plant consideration
3 4 chemplantdesign-general plant considerationayimsevenfold
 
P L A Nt Layout1
P L A Nt  Layout1P L A Nt  Layout1
P L A Nt Layout1Bob Bin
 
Design of process layout
Design of process layoutDesign of process layout
Design of process layoutsagar pawar
 
fruit and vegetable plant location,layout and sanitation
fruit and vegetable plant location,layout and sanitationfruit and vegetable plant location,layout and sanitation
fruit and vegetable plant location,layout and sanitationAnjali Mehta
 
Plant site selection and layout
Plant site selection and layoutPlant site selection and layout
Plant site selection and layoutRobin Gulati
 
Plant location and Layout
Plant location and LayoutPlant location and Layout
Plant location and Layoutanuragbhai
 

What's hot (20)

GEOMETRIC MODELING FOR PLANT LAYOUT
GEOMETRIC MODELING FOR PLANT LAYOUTGEOMETRIC MODELING FOR PLANT LAYOUT
GEOMETRIC MODELING FOR PLANT LAYOUT
 
Material handeling in industrial engineering
Material handeling in industrial engineeringMaterial handeling in industrial engineering
Material handeling in industrial engineering
 
My Role In Industry as Process Engineer
My Role In Industry as Process EngineerMy Role In Industry as Process Engineer
My Role In Industry as Process Engineer
 
Zis layout
Zis  layoutZis  layout
Zis layout
 
Cellular manufacturing and group technology
Cellular manufacturing and group technologyCellular manufacturing and group technology
Cellular manufacturing and group technology
 
Review on GROUP TECHNOLOGY & it’s implementation
Review on GROUP TECHNOLOGY & it’s implementationReview on GROUP TECHNOLOGY & it’s implementation
Review on GROUP TECHNOLOGY & it’s implementation
 
Cellular manufacturing group technology
Cellular manufacturing group technologyCellular manufacturing group technology
Cellular manufacturing group technology
 
Plant layout design for safety aspect
Plant layout design for  safety aspectPlant layout design for  safety aspect
Plant layout design for safety aspect
 
Plant layout
Plant layoutPlant layout
Plant layout
 
Pharmaceutical plant layout
Pharmaceutical plant layoutPharmaceutical plant layout
Pharmaceutical plant layout
 
Group Technology, coding and cell design
Group Technology, coding and cell designGroup Technology, coding and cell design
Group Technology, coding and cell design
 
Episode 33 : Project Execution Part (4)
Episode 33 :  Project Execution Part (4)Episode 33 :  Project Execution Part (4)
Episode 33 : Project Execution Part (4)
 
Drying plant layout ,blender ,mixer, emulsification mills, homogenizers
Drying plant layout ,blender ,mixer, emulsification mills, homogenizersDrying plant layout ,blender ,mixer, emulsification mills, homogenizers
Drying plant layout ,blender ,mixer, emulsification mills, homogenizers
 
Group Technology (Cell Manufacturing)
Group Technology (Cell Manufacturing)Group Technology (Cell Manufacturing)
Group Technology (Cell Manufacturing)
 
3 4 chemplantdesign-general plant consideration
3 4 chemplantdesign-general plant consideration3 4 chemplantdesign-general plant consideration
3 4 chemplantdesign-general plant consideration
 
P L A Nt Layout1
P L A Nt  Layout1P L A Nt  Layout1
P L A Nt Layout1
 
Design of process layout
Design of process layoutDesign of process layout
Design of process layout
 
fruit and vegetable plant location,layout and sanitation
fruit and vegetable plant location,layout and sanitationfruit and vegetable plant location,layout and sanitation
fruit and vegetable plant location,layout and sanitation
 
Plant site selection and layout
Plant site selection and layoutPlant site selection and layout
Plant site selection and layout
 
Plant location and Layout
Plant location and LayoutPlant location and Layout
Plant location and Layout
 

Similar to Designing Facility Layout and Effective Material Handling for a Ceramic Insulator Plant

Productivity improvement in plant by using systematic layout planning (slp) ...
Productivity improvement in plant by using systematic layout planning (slp)  ...Productivity improvement in plant by using systematic layout planning (slp)  ...
Productivity improvement in plant by using systematic layout planning (slp) ...eSAT Publishing House
 
Application of value stream mapping tool to reduce wastes in bearing industry
Application of value stream mapping tool to reduce wastes in bearing industryApplication of value stream mapping tool to reduce wastes in bearing industry
Application of value stream mapping tool to reduce wastes in bearing industryijmech
 
Improvement of Process and Product Layout for Metro Coach using Craft Method...
Improvement of Process and  Product Layout for Metro Coach using Craft Method...Improvement of Process and  Product Layout for Metro Coach using Craft Method...
Improvement of Process and Product Layout for Metro Coach using Craft Method...IRJET Journal
 
Improvement of Process and Product Layout for Metro Coach using Craft Method...
Improvement of Process and  Product Layout for Metro Coach using Craft Method...Improvement of Process and  Product Layout for Metro Coach using Craft Method...
Improvement of Process and Product Layout for Metro Coach using Craft Method...IRJET Journal
 
Sheet Metal Assembly Process Optimization Using Lean Manufacturing Tool
Sheet Metal Assembly Process Optimization Using Lean Manufacturing ToolSheet Metal Assembly Process Optimization Using Lean Manufacturing Tool
Sheet Metal Assembly Process Optimization Using Lean Manufacturing ToolIRJET Journal
 
Application Of Workstudy
Application Of WorkstudyApplication Of Workstudy
Application Of Workstudybejayrocks
 
IRJET-Effective Improvement of a Plant Layout using Pugh Matrix Approach
IRJET-Effective Improvement of a Plant Layout using Pugh Matrix ApproachIRJET-Effective Improvement of a Plant Layout using Pugh Matrix Approach
IRJET-Effective Improvement of a Plant Layout using Pugh Matrix ApproachIRJET Journal
 
A Review on Implementation of Lean Manufacturing Techniques in Manufacturing ...
A Review on Implementation of Lean Manufacturing Techniques in Manufacturing ...A Review on Implementation of Lean Manufacturing Techniques in Manufacturing ...
A Review on Implementation of Lean Manufacturing Techniques in Manufacturing ...IRJET Journal
 
Preliminary Study of an Assembling Plant
Preliminary Study of an Assembling Plant Preliminary Study of an Assembling Plant
Preliminary Study of an Assembling Plant MustafaElAkkad
 
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing Facility
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing FacilityIRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing Facility
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing FacilityIRJET Journal
 
IRJET- Single Minute Exchange of Dies (SMED) Concept
IRJET-  	  Single Minute Exchange of Dies (SMED) ConceptIRJET-  	  Single Minute Exchange of Dies (SMED) Concept
IRJET- Single Minute Exchange of Dies (SMED) ConceptIRJET Journal
 
IRJET - Productivity Improvement by Time Study and Motion Study
IRJET - Productivity Improvement by Time Study and Motion StudyIRJET - Productivity Improvement by Time Study and Motion Study
IRJET - Productivity Improvement by Time Study and Motion StudyIRJET Journal
 
IRJET- A Case Study for Overall Equipment Effectiveness Improved in Manufactu...
IRJET- A Case Study for Overall Equipment Effectiveness Improved in Manufactu...IRJET- A Case Study for Overall Equipment Effectiveness Improved in Manufactu...
IRJET- A Case Study for Overall Equipment Effectiveness Improved in Manufactu...IRJET Journal
 
5 s implementation and its effect on physical workload
5 s implementation and its effect on physical workload5 s implementation and its effect on physical workload
5 s implementation and its effect on physical workloadeSAT Publishing House
 
Identification of Bottleneck and Reducing Cycle Time of an Industrial Oven by...
Identification of Bottleneck and Reducing Cycle Time of an Industrial Oven by...Identification of Bottleneck and Reducing Cycle Time of an Industrial Oven by...
Identification of Bottleneck and Reducing Cycle Time of an Industrial Oven by...IRJET Journal
 
Application of Lean Concepts in Molding Department
Application of Lean Concepts in Molding DepartmentApplication of Lean Concepts in Molding Department
Application of Lean Concepts in Molding DepartmentIRJET Journal
 
Plant layout ppt by me
Plant layout ppt by mePlant layout ppt by me
Plant layout ppt by meAnkit Walia
 

Similar to Designing Facility Layout and Effective Material Handling for a Ceramic Insulator Plant (20)

Productivity improvement in plant by using systematic layout planning (slp) ...
Productivity improvement in plant by using systematic layout planning (slp)  ...Productivity improvement in plant by using systematic layout planning (slp)  ...
Productivity improvement in plant by using systematic layout planning (slp) ...
 
Application of value stream mapping tool to reduce wastes in bearing industry
Application of value stream mapping tool to reduce wastes in bearing industryApplication of value stream mapping tool to reduce wastes in bearing industry
Application of value stream mapping tool to reduce wastes in bearing industry
 
Improvement of Process and Product Layout for Metro Coach using Craft Method...
Improvement of Process and  Product Layout for Metro Coach using Craft Method...Improvement of Process and  Product Layout for Metro Coach using Craft Method...
Improvement of Process and Product Layout for Metro Coach using Craft Method...
 
Improvement of Process and Product Layout for Metro Coach using Craft Method...
Improvement of Process and  Product Layout for Metro Coach using Craft Method...Improvement of Process and  Product Layout for Metro Coach using Craft Method...
Improvement of Process and Product Layout for Metro Coach using Craft Method...
 
Sheet Metal Assembly Process Optimization Using Lean Manufacturing Tool
Sheet Metal Assembly Process Optimization Using Lean Manufacturing ToolSheet Metal Assembly Process Optimization Using Lean Manufacturing Tool
Sheet Metal Assembly Process Optimization Using Lean Manufacturing Tool
 
Application Of Workstudy
Application Of WorkstudyApplication Of Workstudy
Application Of Workstudy
 
IRJET-Effective Improvement of a Plant Layout using Pugh Matrix Approach
IRJET-Effective Improvement of a Plant Layout using Pugh Matrix ApproachIRJET-Effective Improvement of a Plant Layout using Pugh Matrix Approach
IRJET-Effective Improvement of a Plant Layout using Pugh Matrix Approach
 
A Review on Implementation of Lean Manufacturing Techniques in Manufacturing ...
A Review on Implementation of Lean Manufacturing Techniques in Manufacturing ...A Review on Implementation of Lean Manufacturing Techniques in Manufacturing ...
A Review on Implementation of Lean Manufacturing Techniques in Manufacturing ...
 
Preliminary Study of an Assembling Plant
Preliminary Study of an Assembling Plant Preliminary Study of an Assembling Plant
Preliminary Study of an Assembling Plant
 
Plant layout
Plant layout Plant layout
Plant layout
 
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing Facility
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing FacilityIRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing Facility
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing Facility
 
IRJET- Single Minute Exchange of Dies (SMED) Concept
IRJET-  	  Single Minute Exchange of Dies (SMED) ConceptIRJET-  	  Single Minute Exchange of Dies (SMED) Concept
IRJET- Single Minute Exchange of Dies (SMED) Concept
 
IRJET - Productivity Improvement by Time Study and Motion Study
IRJET - Productivity Improvement by Time Study and Motion StudyIRJET - Productivity Improvement by Time Study and Motion Study
IRJET - Productivity Improvement by Time Study and Motion Study
 
IRJET- A Case Study for Overall Equipment Effectiveness Improved in Manufactu...
IRJET- A Case Study for Overall Equipment Effectiveness Improved in Manufactu...IRJET- A Case Study for Overall Equipment Effectiveness Improved in Manufactu...
IRJET- A Case Study for Overall Equipment Effectiveness Improved in Manufactu...
 
5 s implementation and its effect on physical workload
5 s implementation and its effect on physical workload5 s implementation and its effect on physical workload
5 s implementation and its effect on physical workload
 
Identification of Bottleneck and Reducing Cycle Time of an Industrial Oven by...
Identification of Bottleneck and Reducing Cycle Time of an Industrial Oven by...Identification of Bottleneck and Reducing Cycle Time of an Industrial Oven by...
Identification of Bottleneck and Reducing Cycle Time of an Industrial Oven by...
 
Application of Lean Concepts in Molding Department
Application of Lean Concepts in Molding DepartmentApplication of Lean Concepts in Molding Department
Application of Lean Concepts in Molding Department
 
Facility layout
Facility  layoutFacility  layout
Facility layout
 
Plant layout ppt by me
Plant layout ppt by mePlant layout ppt by me
Plant layout ppt by me
 
Plant layout
Plant layoutPlant layout
Plant layout
 

More from IRJET Journal

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...IRJET Journal
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTUREIRJET Journal
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...IRJET Journal
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsIRJET Journal
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...IRJET Journal
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...IRJET Journal
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...IRJET Journal
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...IRJET Journal
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASIRJET Journal
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...IRJET Journal
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProIRJET Journal
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...IRJET Journal
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemIRJET Journal
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesIRJET Journal
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web applicationIRJET Journal
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...IRJET Journal
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.IRJET Journal
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...IRJET Journal
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignIRJET Journal
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...IRJET Journal
 

More from IRJET Journal (20)

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web application
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
 

Recently uploaded

Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLDeelipZope
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZTE
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 

Recently uploaded (20)

Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCL
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 

Designing Facility Layout and Effective Material Handling for a Ceramic Insulator Plant

  • 1. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 04 Issue: 07 | July -2017 www.irjet.net p-ISSN: 2395-0072 © 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 1675 Designing Facility layout and effective material handling for a ceramic insulator plant Manoj Shanthpure1, M.R Shivakumar2, 1Student,, Department of IEM ,Rit Bangalore-54 Karnataka, India 2Assitant Professor, Department of IEM ,Rit Bangalore-54 Karnataka, India ---------------------------------------------------------------------***--------------------------------------------------------------------- Abstract - Material handling is a necessary andsignificant component of any productive activity. It is something that goes on in every plant all the time. Material handling is the art and science of moving, storing, protecting, and controlling material. Our project focuses on effective material handling, more specifically material movement within the plant. In this regard firstly the whole system was studied and the manufacturing process of insulators was studied in detail from raw materials till finished goods. This system study gave us input for our project as to improve the material movement in glazing, loading and kiln section. As the layout of the plant was the main obstacle in this regard, we thought of designing a new optimum layout which would reduce the material handling effort. The methodology use was systematic layout planning (SLP) given by Richard Muther. This methodology has three stages analysis, search and selection of layout. In analysis stage the inputs were collected, sequence of operation was charted using flow process chart (chart which uses flow process symbols of note the sequence of operations using operation, transportation, inspection, delay and storage) and also flow diagram of the area of consideration was drawn. The relationship between each workstation wasunderstoodand a relationship chart (chart which shows the relationship between each machine with every other machine) was drawn. Using these as basis activity relationship diagram (diagram which shows each activity as a square and their relationship using lines) and space relationship diagram were drawn. Instead of manual placement of departments that is on trial and error method we used ALDEP softwareto get optimum layout. With this as input we have designed three proposed layouts by taking all limitations into consideration. The evaluation is donebya seniormanagerin that origination. Key Words: Facility Layout, Systematic Layout Planning 1. INTRODUCTION It is the physical arrangement of equipment and facilities within a plant. Optimizing the layout of a plant can improve productivity, safety and quality of products. Un-necessary efforts of material handling can be avoided when the plant layout is optimized .Plant layouttechniquesapplytothecase where several physical means have to be located in a certain area, either industrial processes or services. The basic objective is to ensure a smooth flow of work, material, people and information. There are probably two levels at which layouts are required. In one, the various departments have to be sited, and in other the items of equipment within a department need to be located. Criteria for a good layout 1. Maximum flexibility: A good layout will be one which can be rapidlymodifiedto meetchangingcircumstances. 2. Maximum co-ordination: Entry into, and disposal from, any department or functional area should be in such a manner that it is convenient to the issuing or receiving departments. Layout requires to be considered as a whole and not partially. 3. Maximum use of volume: Facilitiesshouldbeconsidered as cubic devices and maximum use made of the volume available. This principle is particularly useful in stores, where goods can be stacked at considerable heights without inconvenience, especially if modern lifting devise are use. In offices, racking can be installed to minimize use of floor space. 4. Maximum visibility: all the people and materials should be readily observable at all the time; there should be no ‘hidden place’ into which goods or information can get mislaid. Criteria for a good layout. 5. Maximum accessibility: All servicing and maintenance points should be readily accessible. For example, equipment should not be placed against a wall in such a manner that necessary maintenance cannot easily be carried out. 6. Minimum distance: All movements should be both necessary and direct. Handing work adds to cost but does not increase value; consequently any unnecessary or indirect movements should be avoided. 1.1 TECHHNOLOGIES- THE STRENGTH OF EPD The manufacturing process of EPD employs state of art technology for insulators. The result of the same is evident wherein, BHEL-EPD indigenously developed the HVDC insulators used in transmission of power at 500kv first time in the county and EPD being only thirdcompanyintheworld to develop.
  • 2. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 04 Issue: 07 | July -2017 www.irjet.net p-ISSN: 2395-0072 © 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 1676 Insulators and certain are manufactured using the classical ceramic processing technologies viz. grinding, dewatering, shaping, dry finishing, glazing, firing and assembly, the equipment and facility control on the process, energy and emission parameters can be controlled for optional performance. 1.2 DATA COLLECTION AND ANALYSIS 1.2.1 SLP METHODOLOGY We followed SLP methodology given by Richard Muther. It has three stagesAnalysis, Search and Selection stages. ANALYSIS STAGE In this stage input data is collected, flow of materials is known by drawing flow process chart and activity relationship chart is drawn. Step 1: Gathering Inputs In this regard BHEL EPD manufacturers a large range of products from 33kV to 800kV insulators. The area we concentrated on, manufactured hollow and station post insulators and also based on the specific orders they manufactured special type of insulators as per the requirements. Quantity of products manufactured was based on the order received and on product availability (stock of finished goods). The routing process of material was understood in the system study wherewestudiedeverysingleoperation which was being carried out. Our area of consideration was from drying chamber to loading to insulators into respective kilns. The activities in this area are dry finishing which required 2 operators for each machine, dust removal requires 1 operator,andglazing operation requires 2 operators for each machine, sanding operation requires 2 operators and stamping operation requires 1 operation. Loading operation requires 3 operators. Time required for each operation from dry finishing till loading to kilns is charted in the flow process chart. Insulators get dried in tunnel dryer, and for every 4hrs one insulator comes out and a new insulatorisputinside. Tunnel drier has a capacity to put 4 insulators at a time. Dry Finishing operation takes 9.1 minutes for one insulator and dust removal operation takes 3.9 mm, glazing operation takes 10.4 mm for one insulator, sanding 12.4 mm and stamping takes 3 mm. insulators are stored in storage room based on the kiln availability Step 2: Determining physical Flow In this step physical flow of material was determined using flow diagram and process steps were studied in detail then charted using material flow process chart. The flow of the materials on the present layout as shown in the Fig 5.1. The flow chart is shown in Fig 5.2. Flow process chartwasdrawn and is as shown in the Fig 5.5. Fig 1.1 Present Layout Step 3: Determining physical requirements As it is improving of present layout the number of machines and workers are fixed by management. The volume of products to be manufactured is based on the orders got. Step 4: Determining support activities required The supporting activities such as maintenance, cleaning, quality control works are done regularly and are scheduled on daily, weekly and on monthly basis. Step 5: Creating Physical flow Relationship Charts The second main phase of SLP is creation of relationship chart. This was drawn as shown in the Fig 5.4. The Figure depicts the sequenced process flow of insulator manufacturing, the close link between each machines and separation of materials which have be kept apart. Step 6: identify physical space requirements The area of each equipment and facilitywasmeasuredand is shown in the table 5.1. The total floor space available from tunnel dryer to assembly section was 5745 square meter as shown in the Fig 5.3. Fig 1.2 : ACTIVITY RELATIONSHIP CHART
  • 3. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 04 Issue: 07 | July -2017 www.irjet.net p-ISSN: 2395-0072 © 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 1677 Based on space relationship diagram, facilities are cut to the scale based on its area on a card board and were manually moved on the layout so as to get proposed layouts. We also took the help of ALDEP software to evaluate therelationship between each department. Based on the output of ALDEP which is shown in the Fig 5.9 we modified the layout taking all building constraints in to account. The total material handling effort of present layout is shown in the table 5.2.., which is the product of frequency and distance travelled. Fig 1.3: A screenshot showing the optimum layout as an output from ALDEP software with closeness rating 698. Step 10: Modify layouts to meet practical limitations. The kilns such as NSK, RK-1, RK-2, RK-4 and BSK cannot be moved as the cost for moving them will be high and there is lot of risk involved. Taking the aforementioned fact “THREE PROPOSED” layouts were designed and modified so as to reduce the material handling effort. The first proposed layout is shown in Fig 5.10. The second proposed layout is shown in the Fig 5.11 and modified second layout is shown in Fig 5.12 and the third proposed layout in Fig 5.13.The material handling efforts of first, second, second modified and third proposed layouts are shown in Table 5.3, 5.4, 5.5, 5.6 respectively. Table 1: Table showing material handling of present layout Fig 1.4: First proposed layout Table 2: Table showing the material handling effort of first proposed layout Fig 1.5: Second proposed layout Table 3: Table showing the material handling effort for second proposed layout
  • 4. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 04 Issue: 07 | July -2017 www.irjet.net p-ISSN: 2395-0072 © 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 1678 Fig 1.6: Modified Second layout Fig 1.7 : Modified second proposed layout Table 4: Table showing material handling effort of modified second proposed layout Fig 1.8: Third proposed layout Table 5: Table showing the material handling effort for third proposed layout 3. CONCLUSIONS Systematic layout planning techniques we were able to design an improved plant layout and were able to overcome all the constraints of the existing plant layout. Hence optimum utilization of the layout and better material handling were achieved. REFERENCES [1]Syed Asad Ali Naqvi, Muhammad Fahad, Muhammad Atierl, Muhammad zubair and Muhammad musharaf shehzad, “Productivity improvement of a manufacturing facility using systematic layout planning. [2]Chandra Pal Singh, Geeta Agnihotri & Dr P.M Mishra, “Design of plant layout using new facility to improve production rate”. [3]Jeff Mohr, CIRAS, and mike willett, CIRAS,” Simplified systematic plant layout”. [4]Asifa Fitriani, Galih prakoso and Anton mulyono Azis,”Facility layout improvement based on safety and health at work and standards of Food production facility. [5]M.r jadhav p.v mulik g.s kamble k.d joshi,”Facility Layout design improvement in Abc industry. [6]Chandra pal singh, geeta agnihotri & Dr. p.m mishra,”Design of plant layout using new facility to improve production rate.