Designing Facility Layout and Effective Material Handling for a Ceramic Insulator Plant
•
0 likes
•
131 views
IRJET Journal
Follow
https://irjet.net/archives/V4/i7/IRJET-V4I7358.pdf
Read less
Read more
Engineering
Report
Share
Report
Share
1 of 4
Download now
Download to read offline
Recommended
IRJET- Six Axis Pneumatic Materials Handling Robotic Arm
IRJET- Six Axis Pneumatic Materials Handling Robotic Arm
IRJET Journal
Instrument engineer resume
Instrument engineer resume
Nagadevan Govindan
flexible-manufacturing-systems
flexible-manufacturing-systems
sabry said
Jv 501 computer integrated manufacturing
Jv 501 computer integrated manufacturing
Adib Ezio
30120140504022
30120140504022
IAEME Publication
IRJET- Preventive Maintenance of Utility Equipments at MANMUL, Gejjalagere Ma...
IRJET- Preventive Maintenance of Utility Equipments at MANMUL, Gejjalagere Ma...
IRJET Journal
Group Technology
Group Technology
sgrsoni45
IRJET- A Case Study Approach of Quality Tools in Manufacturing Industry
IRJET- A Case Study Approach of Quality Tools in Manufacturing Industry
IRJET Journal
Recommended
IRJET- Six Axis Pneumatic Materials Handling Robotic Arm
IRJET- Six Axis Pneumatic Materials Handling Robotic Arm
IRJET Journal
Instrument engineer resume
Instrument engineer resume
Nagadevan Govindan
flexible-manufacturing-systems
flexible-manufacturing-systems
sabry said
Jv 501 computer integrated manufacturing
Jv 501 computer integrated manufacturing
Adib Ezio
30120140504022
30120140504022
IAEME Publication
IRJET- Preventive Maintenance of Utility Equipments at MANMUL, Gejjalagere Ma...
IRJET- Preventive Maintenance of Utility Equipments at MANMUL, Gejjalagere Ma...
IRJET Journal
Group Technology
Group Technology
sgrsoni45
IRJET- A Case Study Approach of Quality Tools in Manufacturing Industry
IRJET- A Case Study Approach of Quality Tools in Manufacturing Industry
IRJET Journal
GEOMETRIC MODELING FOR PLANT LAYOUT
GEOMETRIC MODELING FOR PLANT LAYOUT
సుధీర్ నెలకుదిటి
Material handeling in industrial engineering
Material handeling in industrial engineering
ANWER AHMED
My Role In Industry as Process Engineer
My Role In Industry as Process Engineer
Sushant Labhasetwar
Zis layout
Zis layout
zuha handoo
Cellular manufacturing and group technology
Cellular manufacturing and group technology
Hitendrasinh Zala
Review on GROUP TECHNOLOGY & it’s implementation
Review on GROUP TECHNOLOGY & it’s implementation
Manoj Gowda K
Cellular manufacturing group technology
Cellular manufacturing group technology
Hitendrasinh Zala
Plant layout design for safety aspect
Plant layout design for safety aspect
Anurag Singh
Plant layout
Plant layout
imran bakshi
Pharmaceutical plant layout
Pharmaceutical plant layout
Archana Chavhan
Group Technology, coding and cell design
Group Technology, coding and cell design
Nauman khan
Episode 33 : Project Execution Part (4)
Episode 33 : Project Execution Part (4)
SAJJAD KHUDHUR ABBAS
Drying plant layout ,blender ,mixer, emulsification mills, homogenizers
Drying plant layout ,blender ,mixer, emulsification mills, homogenizers
Anshika Saxena
Group Technology (Cell Manufacturing)
Group Technology (Cell Manufacturing)
Aishwary Kumar Gupta
3 4 chemplantdesign-general plant consideration
3 4 chemplantdesign-general plant consideration
ayimsevenfold
P L A Nt Layout1
P L A Nt Layout1
Bob Bin
Design of process layout
Design of process layout
sagar pawar
fruit and vegetable plant location,layout and sanitation
fruit and vegetable plant location,layout and sanitation
Anjali Mehta
Plant site selection and layout
Plant site selection and layout
Robin Gulati
Plant location and Layout
Plant location and Layout
anuragbhai
Productivity improvement in plant by using systematic layout planning (slp) ...
Productivity improvement in plant by using systematic layout planning (slp) ...
eSAT Publishing House
Application of value stream mapping tool to reduce wastes in bearing industry
Application of value stream mapping tool to reduce wastes in bearing industry
ijmech
More Related Content
What's hot
GEOMETRIC MODELING FOR PLANT LAYOUT
GEOMETRIC MODELING FOR PLANT LAYOUT
సుధీర్ నెలకుదిటి
Material handeling in industrial engineering
Material handeling in industrial engineering
ANWER AHMED
My Role In Industry as Process Engineer
My Role In Industry as Process Engineer
Sushant Labhasetwar
Zis layout
Zis layout
zuha handoo
Cellular manufacturing and group technology
Cellular manufacturing and group technology
Hitendrasinh Zala
Review on GROUP TECHNOLOGY & it’s implementation
Review on GROUP TECHNOLOGY & it’s implementation
Manoj Gowda K
Cellular manufacturing group technology
Cellular manufacturing group technology
Hitendrasinh Zala
Plant layout design for safety aspect
Plant layout design for safety aspect
Anurag Singh
Plant layout
Plant layout
imran bakshi
Pharmaceutical plant layout
Pharmaceutical plant layout
Archana Chavhan
Group Technology, coding and cell design
Group Technology, coding and cell design
Nauman khan
Episode 33 : Project Execution Part (4)
Episode 33 : Project Execution Part (4)
SAJJAD KHUDHUR ABBAS
Drying plant layout ,blender ,mixer, emulsification mills, homogenizers
Drying plant layout ,blender ,mixer, emulsification mills, homogenizers
Anshika Saxena
Group Technology (Cell Manufacturing)
Group Technology (Cell Manufacturing)
Aishwary Kumar Gupta
3 4 chemplantdesign-general plant consideration
3 4 chemplantdesign-general plant consideration
ayimsevenfold
P L A Nt Layout1
P L A Nt Layout1
Bob Bin
Design of process layout
Design of process layout
sagar pawar
fruit and vegetable plant location,layout and sanitation
fruit and vegetable plant location,layout and sanitation
Anjali Mehta
Plant site selection and layout
Plant site selection and layout
Robin Gulati
Plant location and Layout
Plant location and Layout
anuragbhai
What's hot
(20)
GEOMETRIC MODELING FOR PLANT LAYOUT
GEOMETRIC MODELING FOR PLANT LAYOUT
Material handeling in industrial engineering
Material handeling in industrial engineering
My Role In Industry as Process Engineer
My Role In Industry as Process Engineer
Zis layout
Zis layout
Cellular manufacturing and group technology
Cellular manufacturing and group technology
Review on GROUP TECHNOLOGY & it’s implementation
Review on GROUP TECHNOLOGY & it’s implementation
Cellular manufacturing group technology
Cellular manufacturing group technology
Plant layout design for safety aspect
Plant layout design for safety aspect
Plant layout
Plant layout
Pharmaceutical plant layout
Pharmaceutical plant layout
Group Technology, coding and cell design
Group Technology, coding and cell design
Episode 33 : Project Execution Part (4)
Episode 33 : Project Execution Part (4)
Drying plant layout ,blender ,mixer, emulsification mills, homogenizers
Drying plant layout ,blender ,mixer, emulsification mills, homogenizers
Group Technology (Cell Manufacturing)
Group Technology (Cell Manufacturing)
3 4 chemplantdesign-general plant consideration
3 4 chemplantdesign-general plant consideration
P L A Nt Layout1
P L A Nt Layout1
Design of process layout
Design of process layout
fruit and vegetable plant location,layout and sanitation
fruit and vegetable plant location,layout and sanitation
Plant site selection and layout
Plant site selection and layout
Plant location and Layout
Plant location and Layout
Similar to Designing Facility Layout and Effective Material Handling for a Ceramic Insulator Plant
Productivity improvement in plant by using systematic layout planning (slp) ...
Productivity improvement in plant by using systematic layout planning (slp) ...
eSAT Publishing House
Application of value stream mapping tool to reduce wastes in bearing industry
Application of value stream mapping tool to reduce wastes in bearing industry
ijmech
Improvement of Process and Product Layout for Metro Coach using Craft Method...
Improvement of Process and Product Layout for Metro Coach using Craft Method...
IRJET Journal
Improvement of Process and Product Layout for Metro Coach using Craft Method...
Improvement of Process and Product Layout for Metro Coach using Craft Method...
IRJET Journal
Sheet Metal Assembly Process Optimization Using Lean Manufacturing Tool
Sheet Metal Assembly Process Optimization Using Lean Manufacturing Tool
IRJET Journal
Application Of Workstudy
Application Of Workstudy
bejayrocks
IRJET-Effective Improvement of a Plant Layout using Pugh Matrix Approach
IRJET-Effective Improvement of a Plant Layout using Pugh Matrix Approach
IRJET Journal
A Review on Implementation of Lean Manufacturing Techniques in Manufacturing ...
A Review on Implementation of Lean Manufacturing Techniques in Manufacturing ...
IRJET Journal
Preliminary Study of an Assembling Plant
Preliminary Study of an Assembling Plant
MustafaElAkkad
Plant layout
Plant layout
Gaurang Joshi
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing Facility
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing Facility
IRJET Journal
IRJET- Single Minute Exchange of Dies (SMED) Concept
IRJET- Single Minute Exchange of Dies (SMED) Concept
IRJET Journal
IRJET - Productivity Improvement by Time Study and Motion Study
IRJET - Productivity Improvement by Time Study and Motion Study
IRJET Journal
IRJET- A Case Study for Overall Equipment Effectiveness Improved in Manufactu...
IRJET- A Case Study for Overall Equipment Effectiveness Improved in Manufactu...
IRJET Journal
5 s implementation and its effect on physical workload
5 s implementation and its effect on physical workload
eSAT Publishing House
Identification of Bottleneck and Reducing Cycle Time of an Industrial Oven by...
Identification of Bottleneck and Reducing Cycle Time of an Industrial Oven by...
IRJET Journal
Application of Lean Concepts in Molding Department
Application of Lean Concepts in Molding Department
IRJET Journal
Facility layout
Facility layout
NIPER hyderabad
Plant layout ppt by me
Plant layout ppt by me
Ankit Walia
Plant layout
Plant layout
Asadurzzaman nur
Similar to Designing Facility Layout and Effective Material Handling for a Ceramic Insulator Plant
(20)
Productivity improvement in plant by using systematic layout planning (slp) ...
Productivity improvement in plant by using systematic layout planning (slp) ...
Application of value stream mapping tool to reduce wastes in bearing industry
Application of value stream mapping tool to reduce wastes in bearing industry
Improvement of Process and Product Layout for Metro Coach using Craft Method...
Improvement of Process and Product Layout for Metro Coach using Craft Method...
Improvement of Process and Product Layout for Metro Coach using Craft Method...
Improvement of Process and Product Layout for Metro Coach using Craft Method...
Sheet Metal Assembly Process Optimization Using Lean Manufacturing Tool
Sheet Metal Assembly Process Optimization Using Lean Manufacturing Tool
Application Of Workstudy
Application Of Workstudy
IRJET-Effective Improvement of a Plant Layout using Pugh Matrix Approach
IRJET-Effective Improvement of a Plant Layout using Pugh Matrix Approach
A Review on Implementation of Lean Manufacturing Techniques in Manufacturing ...
A Review on Implementation of Lean Manufacturing Techniques in Manufacturing ...
Preliminary Study of an Assembling Plant
Preliminary Study of an Assembling Plant
Plant layout
Plant layout
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing Facility
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing Facility
IRJET- Single Minute Exchange of Dies (SMED) Concept
IRJET- Single Minute Exchange of Dies (SMED) Concept
IRJET - Productivity Improvement by Time Study and Motion Study
IRJET - Productivity Improvement by Time Study and Motion Study
IRJET- A Case Study for Overall Equipment Effectiveness Improved in Manufactu...
IRJET- A Case Study for Overall Equipment Effectiveness Improved in Manufactu...
5 s implementation and its effect on physical workload
5 s implementation and its effect on physical workload
Identification of Bottleneck and Reducing Cycle Time of an Industrial Oven by...
Identification of Bottleneck and Reducing Cycle Time of an Industrial Oven by...
Application of Lean Concepts in Molding Department
Application of Lean Concepts in Molding Department
Facility layout
Facility layout
Plant layout ppt by me
Plant layout ppt by me
Plant layout
Plant layout
More from IRJET Journal
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
IRJET Journal
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
IRJET Journal
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
IRJET Journal
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
IRJET Journal
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
IRJET Journal
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
IRJET Journal
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
IRJET Journal
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
IRJET Journal
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
IRJET Journal
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
IRJET Journal
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
IRJET Journal
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
IRJET Journal
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
IRJET Journal
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
IRJET Journal
React based fullstack edtech web application
React based fullstack edtech web application
IRJET Journal
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
IRJET Journal
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
IRJET Journal
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
IRJET Journal
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
IRJET Journal
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
IRJET Journal
More from IRJET Journal
(20)
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
React based fullstack edtech web application
React based fullstack edtech web application
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Recently uploaded
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
soniya singh
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
Tsuyoshi Horigome
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
null - The Open Security Community
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
9953056974 Low Rate Call Girls In Saket, Delhi NCR
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
ranjana rawat
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCL
DeelipZope
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
RajaP95
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
pranjaldaimarysona
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
Suhani Kapoor
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Dr.Costas Sachpazis
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
DeepakSakkari2
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZTE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
SIVASHANKAR N
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
ranjana rawat
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
GDSCAESB
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Dr.Costas Sachpazis
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur High Profile
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur High Profile
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Suman Mia
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
purnimasatapathy1234
Recently uploaded
(20)
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCL
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
Designing Facility Layout and Effective Material Handling for a Ceramic Insulator Plant
1.
International Research Journal
of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 04 Issue: 07 | July -2017 www.irjet.net p-ISSN: 2395-0072 © 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 1675 Designing Facility layout and effective material handling for a ceramic insulator plant Manoj Shanthpure1, M.R Shivakumar2, 1Student,, Department of IEM ,Rit Bangalore-54 Karnataka, India 2Assitant Professor, Department of IEM ,Rit Bangalore-54 Karnataka, India ---------------------------------------------------------------------***--------------------------------------------------------------------- Abstract - Material handling is a necessary andsignificant component of any productive activity. It is something that goes on in every plant all the time. Material handling is the art and science of moving, storing, protecting, and controlling material. Our project focuses on effective material handling, more specifically material movement within the plant. In this regard firstly the whole system was studied and the manufacturing process of insulators was studied in detail from raw materials till finished goods. This system study gave us input for our project as to improve the material movement in glazing, loading and kiln section. As the layout of the plant was the main obstacle in this regard, we thought of designing a new optimum layout which would reduce the material handling effort. The methodology use was systematic layout planning (SLP) given by Richard Muther. This methodology has three stages analysis, search and selection of layout. In analysis stage the inputs were collected, sequence of operation was charted using flow process chart (chart which uses flow process symbols of note the sequence of operations using operation, transportation, inspection, delay and storage) and also flow diagram of the area of consideration was drawn. The relationship between each workstation wasunderstoodand a relationship chart (chart which shows the relationship between each machine with every other machine) was drawn. Using these as basis activity relationship diagram (diagram which shows each activity as a square and their relationship using lines) and space relationship diagram were drawn. Instead of manual placement of departments that is on trial and error method we used ALDEP softwareto get optimum layout. With this as input we have designed three proposed layouts by taking all limitations into consideration. The evaluation is donebya seniormanagerin that origination. Key Words: Facility Layout, Systematic Layout Planning 1. INTRODUCTION It is the physical arrangement of equipment and facilities within a plant. Optimizing the layout of a plant can improve productivity, safety and quality of products. Un-necessary efforts of material handling can be avoided when the plant layout is optimized .Plant layouttechniquesapplytothecase where several physical means have to be located in a certain area, either industrial processes or services. The basic objective is to ensure a smooth flow of work, material, people and information. There are probably two levels at which layouts are required. In one, the various departments have to be sited, and in other the items of equipment within a department need to be located. Criteria for a good layout 1. Maximum flexibility: A good layout will be one which can be rapidlymodifiedto meetchangingcircumstances. 2. Maximum co-ordination: Entry into, and disposal from, any department or functional area should be in such a manner that it is convenient to the issuing or receiving departments. Layout requires to be considered as a whole and not partially. 3. Maximum use of volume: Facilitiesshouldbeconsidered as cubic devices and maximum use made of the volume available. This principle is particularly useful in stores, where goods can be stacked at considerable heights without inconvenience, especially if modern lifting devise are use. In offices, racking can be installed to minimize use of floor space. 4. Maximum visibility: all the people and materials should be readily observable at all the time; there should be no ‘hidden place’ into which goods or information can get mislaid. Criteria for a good layout. 5. Maximum accessibility: All servicing and maintenance points should be readily accessible. For example, equipment should not be placed against a wall in such a manner that necessary maintenance cannot easily be carried out. 6. Minimum distance: All movements should be both necessary and direct. Handing work adds to cost but does not increase value; consequently any unnecessary or indirect movements should be avoided. 1.1 TECHHNOLOGIES- THE STRENGTH OF EPD The manufacturing process of EPD employs state of art technology for insulators. The result of the same is evident wherein, BHEL-EPD indigenously developed the HVDC insulators used in transmission of power at 500kv first time in the county and EPD being only thirdcompanyintheworld to develop.
2.
International Research Journal
of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 04 Issue: 07 | July -2017 www.irjet.net p-ISSN: 2395-0072 © 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 1676 Insulators and certain are manufactured using the classical ceramic processing technologies viz. grinding, dewatering, shaping, dry finishing, glazing, firing and assembly, the equipment and facility control on the process, energy and emission parameters can be controlled for optional performance. 1.2 DATA COLLECTION AND ANALYSIS 1.2.1 SLP METHODOLOGY We followed SLP methodology given by Richard Muther. It has three stagesAnalysis, Search and Selection stages. ANALYSIS STAGE In this stage input data is collected, flow of materials is known by drawing flow process chart and activity relationship chart is drawn. Step 1: Gathering Inputs In this regard BHEL EPD manufacturers a large range of products from 33kV to 800kV insulators. The area we concentrated on, manufactured hollow and station post insulators and also based on the specific orders they manufactured special type of insulators as per the requirements. Quantity of products manufactured was based on the order received and on product availability (stock of finished goods). The routing process of material was understood in the system study wherewestudiedeverysingleoperation which was being carried out. Our area of consideration was from drying chamber to loading to insulators into respective kilns. The activities in this area are dry finishing which required 2 operators for each machine, dust removal requires 1 operator,andglazing operation requires 2 operators for each machine, sanding operation requires 2 operators and stamping operation requires 1 operation. Loading operation requires 3 operators. Time required for each operation from dry finishing till loading to kilns is charted in the flow process chart. Insulators get dried in tunnel dryer, and for every 4hrs one insulator comes out and a new insulatorisputinside. Tunnel drier has a capacity to put 4 insulators at a time. Dry Finishing operation takes 9.1 minutes for one insulator and dust removal operation takes 3.9 mm, glazing operation takes 10.4 mm for one insulator, sanding 12.4 mm and stamping takes 3 mm. insulators are stored in storage room based on the kiln availability Step 2: Determining physical Flow In this step physical flow of material was determined using flow diagram and process steps were studied in detail then charted using material flow process chart. The flow of the materials on the present layout as shown in the Fig 5.1. The flow chart is shown in Fig 5.2. Flow process chartwasdrawn and is as shown in the Fig 5.5. Fig 1.1 Present Layout Step 3: Determining physical requirements As it is improving of present layout the number of machines and workers are fixed by management. The volume of products to be manufactured is based on the orders got. Step 4: Determining support activities required The supporting activities such as maintenance, cleaning, quality control works are done regularly and are scheduled on daily, weekly and on monthly basis. Step 5: Creating Physical flow Relationship Charts The second main phase of SLP is creation of relationship chart. This was drawn as shown in the Fig 5.4. The Figure depicts the sequenced process flow of insulator manufacturing, the close link between each machines and separation of materials which have be kept apart. Step 6: identify physical space requirements The area of each equipment and facilitywasmeasuredand is shown in the table 5.1. The total floor space available from tunnel dryer to assembly section was 5745 square meter as shown in the Fig 5.3. Fig 1.2 : ACTIVITY RELATIONSHIP CHART
3.
International Research Journal
of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 04 Issue: 07 | July -2017 www.irjet.net p-ISSN: 2395-0072 © 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 1677 Based on space relationship diagram, facilities are cut to the scale based on its area on a card board and were manually moved on the layout so as to get proposed layouts. We also took the help of ALDEP software to evaluate therelationship between each department. Based on the output of ALDEP which is shown in the Fig 5.9 we modified the layout taking all building constraints in to account. The total material handling effort of present layout is shown in the table 5.2.., which is the product of frequency and distance travelled. Fig 1.3: A screenshot showing the optimum layout as an output from ALDEP software with closeness rating 698. Step 10: Modify layouts to meet practical limitations. The kilns such as NSK, RK-1, RK-2, RK-4 and BSK cannot be moved as the cost for moving them will be high and there is lot of risk involved. Taking the aforementioned fact “THREE PROPOSED” layouts were designed and modified so as to reduce the material handling effort. The first proposed layout is shown in Fig 5.10. The second proposed layout is shown in the Fig 5.11 and modified second layout is shown in Fig 5.12 and the third proposed layout in Fig 5.13.The material handling efforts of first, second, second modified and third proposed layouts are shown in Table 5.3, 5.4, 5.5, 5.6 respectively. Table 1: Table showing material handling of present layout Fig 1.4: First proposed layout Table 2: Table showing the material handling effort of first proposed layout Fig 1.5: Second proposed layout Table 3: Table showing the material handling effort for second proposed layout
4.
International Research Journal
of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 04 Issue: 07 | July -2017 www.irjet.net p-ISSN: 2395-0072 © 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 1678 Fig 1.6: Modified Second layout Fig 1.7 : Modified second proposed layout Table 4: Table showing material handling effort of modified second proposed layout Fig 1.8: Third proposed layout Table 5: Table showing the material handling effort for third proposed layout 3. CONCLUSIONS Systematic layout planning techniques we were able to design an improved plant layout and were able to overcome all the constraints of the existing plant layout. Hence optimum utilization of the layout and better material handling were achieved. REFERENCES [1]Syed Asad Ali Naqvi, Muhammad Fahad, Muhammad Atierl, Muhammad zubair and Muhammad musharaf shehzad, “Productivity improvement of a manufacturing facility using systematic layout planning. [2]Chandra Pal Singh, Geeta Agnihotri & Dr P.M Mishra, “Design of plant layout using new facility to improve production rate”. [3]Jeff Mohr, CIRAS, and mike willett, CIRAS,” Simplified systematic plant layout”. [4]Asifa Fitriani, Galih prakoso and Anton mulyono Azis,”Facility layout improvement based on safety and health at work and standards of Food production facility. [5]M.r jadhav p.v mulik g.s kamble k.d joshi,”Facility Layout design improvement in Abc industry. [6]Chandra pal singh, geeta agnihotri & Dr. p.m mishra,”Design of plant layout using new facility to improve production rate.
Download now