SlideShare a Scribd company logo
1 of 6
Download to read offline
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 10 | Oct 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 707
Generation and Control of Transient Overvoltages in Power
System Networks
Dr. T. Murali Mohan1, T. Ramya Durga2
1Dr. T. Murali Mohan, Associative Professor, Electrical and Electronics Engineering & Jntuk University of College,
Kakinada& India
2T.Ramya Durga, M.Tech Student, Electrical and Electronics Engineering & Jntuk University of College,
Kakinada & India
---------------------------------------------------------------------***----------------------------------------------------------------------
Abstract –This paper presents the increase ofpowerfactor
and reduces the power quality problems such as the
generation of transient overvoltages and harmonics on the
power distribution system side. Among these problems, the
effects of generating transients and controlling the transients
using the various mitigating techniquesareusedtocontrolthe
transients in a specific distribution feeder line and also
calculate the mathematicalcomputationsof quantitiessuchas
peak transient overvoltages, high-frequency inrush currents
occur in each case. Mitigating values in each case is compared
to other cases using MATLAB/Simulink Software.
Key Words: Capacitor bank switching (CBS), current
limiting reactor, Harmonic analysis, Inrush current,
Power quality, Pre-insertion resistor, Surge arresters,
Transient Overvoltages.
1. INTRODUCTION
The main cause for the generationoftransientovervoltages
is due to capacitor bank switching, which is identified in the
19th century. In those days a power quality problem is the
main issue and it is increasing on day by day basis. The
generation of power was insufficient, so the production of
electric power mostly depending on the thermal and few
watts of electric power generating in the hydroelectric
power. At that time the population was increasing and the
usage of electronic equipment for the household also
increasing. In U.S & U.S.A the usage of electronic equipment
is more and the generation is less.
The Power quality problems are raises due to high voltages,
low voltages (fluctuations) and these types of fluctuations
must be reduced and the power factor must be improved.
This can be done using a capacitorswitchingbank whichalso
reduces the reactive power. Capacitor banks will hold
reactive power whenever reactive power needs release.
Capacitor switching is one of the most important sources of
generating transient overvoltages and inrush currents in
electrical power systems. But because of switching
operations, the electronic equipment will damage. In order
to overcome this problem, a fixed capacitor is used. In 1954
large capacitor banks are used and in 1974 small size
capacitor banks are used which reduces cost. Capacitor
banks control the ON & OFF positions of the switch. If
energization of capacitor banks is done, a switch will get
closed automatically and peak transient overvoltages will
occur in the range of 2to 3p.u which produces transient
overvoltages, inrush currents and if de-energizationisdone,
a switch will get open and minor transients will occur below
2p.u.
In this paper, these transients can be controlled using some
mitigation techniques and FFT analysis of harmonic
distortion of peak voltage is calculated.
2. GENERATING TRANSIENT OVERVOLTAGES
2.1 Basic Concept of Energizing Capacitor Bank
Switching Transients
Fig.1 represents a single line circuit diagramof energizing
capacitor bank switching transient. This circuit will be
connected to the distribution side feeder lineandusedinthe
utility consumer side. The network provides a visionary
introduction about the Energization CBS transients. Rs and
Ls represent the resistance and inductance of source with a
frequency of 60 Hz and also fixed capacitor banks are used.
In this circuit, the load is connected after the VCB switch.
Fig -1: Single line diagram of energizing capacitor bank
switching transient
Where:
f = frequency in Hz.
L =source inductance, H.
C = capacitance of the capacitor bank, F.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 10 | Oct 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 708
Vpk = peak voltage.
Ipk = peak inrush current.
Z0 =Surge impedance.
f =
Ipeak =
Z0 =
The generated transientovervoltagesarecomputedbyusing
distorted harmonics waveforms generated by the
consumer’s nonlinear loads and gets amplified. In this
harmonic distortion is reduced using the FFT analysis and
also the calculation is done at the different loads near the
transients and at different capacitorbank sizes.Thesevalues
are compared to obtain values from simulations of eachcase
study and the high magnitude of peak transient overvoltage
and high frequency of inrush currents areobserved. When Is
>>1 and ωls<< l/ωc, the current is leadingthesupplyvoltage
by 90°and energizing transients 2.5 P.U to 3.0 P.U are at the
peak. In this case, less is more so a reduction of loss is done
using many topologies and techniques available by
controlling the transients such as a pre-insertion resistor,
current limiting reactor and surge arresters. These
techniques are used to mitigating the generating transient
overvoltages.
2.2 System Circuit Representation
Fig.2: Simulink Model of Generating and control of
transient overvoltages in distribution
Table -1: Circuit parameters
Parameters values
Three-phase source 220 kV
Three Phase transformer 220/33 kV
Power factor 0.9 p.f
load 64 MVA
Capacitor bank 14.7 MVAR
These values are used to simulate the circuit using
MATLAB/Simulink software and the values used in the
model are resistance, reactance, and capacitance. These
values are important which are usedinthethree-phasefixed
Capacitor bank, connected in series with the feederlinewith
a frequency of 60 Hz. The capacitor bank produces a high
magnitude of transient overvoltages and inrush currents.
3. CONTROLLING OF TRANSIENT OVERVOLTAGES
Generating transient overvoltages is reduced using many
techniques but only three mitigation techniques are
considered.
3.1 pre-insertion resistor
There are various techniques for controlling the generating
transient overvoltages and currents in the distribution
feeder line. The pre-insertion resistor is known as an old
classical method. In this circuit, the pre-insertion resistor
switched before the CBS and connected in series to the
feeder line with frequency 50 Hz. The pre-insertion resistor
controls the high magnitude of transient overvoltage and
high frequency of inrush currents.
3.2 Current limiting reactor
The second controlling technique used is the Current
limiting reactor also called a series reactor. High inductive
reactance is produced in this reactor. It is correlated withits
resistance. The current limiting reactor reduces the short
circuit currents in the power systemnetworksandincreases
the magnitude of surge impedance and reduces the peak
inrush currents and transient overvoltages.
3.3 Surge arresters
Surge arresters are considered as third controlling
technique. Surge arresters are used for the primary
protection and designed with high resistance for normal
systems and low resistance for transient overvoltages. MOV
type arresters are used to reduce the transient overvoltages
and they are of two types: gap type and gapless surge
arresters
4. SIMULATION AND RESULT ANALYSIS
4.1 Base Case-1
The base case circuit diagram is shown in Fig.2. When the
capacitor bank starts, energizing voltage is pulled to zero or
voltage is overshoot or reboundcompleteandtheswitchwill
get closed. At that time the high magnitude peak transient
overvoltages (2.5P.u) and high-frequency peak inrush
current (2.7 KA) will produce but at phase A high transients
and high inrush currents occurs and closing of switch
happens at 6.5ms.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 10 | Oct 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 709
Fig.3 (a): Transient observed near the Energization of
Capacitor Bank at peak Voltage
Fig 3(b): Transient observed near the Energization of
Capacitor Bank at peak inrush Current.
Table 2: Transient Observed Energization of capacitor
bank at the phase a voltage and current
Fig.3 (a) and Fig. 3(b) shows the 3 phase Energization of
capacitor switching transient disturbance.
4.2 Capacitor bank Energization and FFT Analysis
of Fundamental Harmonic distortion calculation.
Fig.2 shows harmonic contentpresentinthevoltagenear the
capacitor bank. Fig.3(c) shows the histogramrepresentation
of the harmonic content present in the voltage waveform
concerning the magnitude (%of fundamental harmonics).
Figure 3(c): Harmonic Content Present in the Voltage
Waveform
Phase A peak voltage is calculated using FFT analysis to
produce the fundamental harmonicsduringthe energization
of the capacitor bank as shown in fig.3(c).
Fig.2 shows harmonic contentpresentinthevoltagenear the
capacitor bank. Fig. 3(d) shows the scatter diagram
representation of the harmonic content present in the
current waveform concerning the magnitude (% of
fundamental harmonics).
Figure 3(d): Harmonic Content Present in the Current
Waveform
Phase A peak inrush currents are calculated using FFT
analysis to produce the fundamental harmonics during the
energization of the capacitor bank as shown in fig.3 (d).
These Harmonics are calculated at different time intervals
because FFT analysis calculations are done based on the
frequency-time domains.
4.3 Simulations using the pre-insertion resistors
Case-2
To Control the transient overvoltages and inrush currents
many techniques are used but the preinsertion method is an
old and classical method so the first mitigating technique
chosen is a pre-insertion resistor. The pre-insertion resistor
Phase A The maximum peak observed near the
Capacitor bank when switching at
t=peak
Voltage 2.5P.u
Current 2.7 KA
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 10 | Oct 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 710
is connected in series with a capacitor bank and before the
pre-insertion resistor a switch is connectedknownas“2step
switching” and the switch gets closed at 0.25s and resistor
value used is 7.35ohms. These values are used to reduce the
high-frequency inrush currents (1.78 P.U) and high
magnitude of transient overvoltages (1.35 P.U).
Fig 4 (a): Energization of capacitor bank in the peak
voltage nearby VCB using pre insert resistors
Fig 4 (b): Energization of capacitor bank in the peak
inrush current nearby VCB using pre-insertion resistors.
Table 3: Transient Observed Energization of capacitor
bank at the phase A voltage and current in pre-insertion
resistor switched into the capacitor bank
Phase A The maximum peak observed near
the Capacitor bank when the switch
at t=peak
Voltage 1.35 P.U
Current 1.78 KA
Fig.4 (a) and Fig. 4(b) show the Pre-insertion resistance of
controlling the high magnitude transient overvoltages (1.35
P.u). The pre-insertion resistor reduces the transient
overvoltages more than a current limiting reactor and high-
frequency inrush currents (1.78 KA) will get reduced by the
current limiting reactor more compared to thepre-insertion
resistor.
4.4 Simulations using the current limiting reactors
Case-3
The current limiting reactor is connected in series with a
capacitor bank. This reactor can effectively reduce the peak
value of inrush current (1.5 KA) but can't change instantly
and also reduce transient overvoltages.
Fig.5 (a): Voltages at the when capacitor bank energizing
it along with the current limiting.
Fig.5 (b): Inrush current at the when capacitor bank
energizing it along with the current limiting
Ztotal.new = = 15 ohm
Ltotal, new= (Ceq) =8.537mH
Lreactors = Ltotal - LCap bank
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 10 | Oct 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 711
Lreactors = 8.537 mH - 5.6mH = 2.937 mH
Table 4: Transient Observed Energization of capacitor
bank at the phase A voltage and current in current limiting
reactor switched long the capacitor bank
Fig.5 (a) and Fig. 5(b) show the Current limiting reactor of
controlling the high magnitude transient overvoltages (1.45
P.u). The pre-insertion resistor reduces the transient
overvoltages more than a current limiting reactor and high-
frequency inrush currents (1.78 KA) will get reduced by the
current limiting reactor more compared to thepre-insertion
resistor.
4.5 Simulations using the surge arrester Case-4
Surge arresters are considered in controlling the transient
overvoltages and inrush currents providing primary
protection. The MOV gapless type arrestersdo notdischarge
the capacitor bank switching and these areconnectedacross
the capacitor bank phase to phase and phase to neutral.
Fig 6(a): Voltages at the controlled Energization of
capacitor bank used in the surge arrester.
Fig 6(b): Current at the controlled Energization of
capacitor bank using the surge arrester.
Table 5: Transient Observed Energization of capacitor
bank at the phase A voltage and current in surge arresters
connected Phase-Phase in the capacitor bank
The surge, arresters reduces the high magnitudeoftransient
overvoltages shown in fig .6(a) with transient overvoltage
value (0.8 P.U) and in fig.6 (b) high frequency of inrush
currents (1.1 KA) connected in phase to phase.
Fig 6(c): Voltages at the controlled capacitor bank using
the surge arresters
Phase A The maximum peak observed near
the Capacitor bank when the switch
at t=peak
Voltage 1.45 P.U
Current 1.5 KA
Phase A The maximum peak observed near the
Capacitor bank when the switch at
t=peak
Voltage 0.8 P.U
Current 1.1KA
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 10 | Oct 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 712
Fig 6(d): Current at the controlled capacitor bank using
the surge arrester.
Table 6: Transient Observed Energization of capacitor
bank at the phase A voltage and current in surge arresters
connected Phase-Neutral in the capacitor bank
In this case surge arresters are connected to the phase to
neutral reduces the transient overvoltages shown in fig.6(c)
with transient overvoltage value (0.64 P.U) and in fig.6 (d)
inrush current values (0.794 KA) and these values are less
than the phase-phase values.
These controlling techniques are used to mitigating the
generating transient overvoltages and inrush currents and
improve the power factor and to reduce the power losses.
5. CONCLUSION
In this paper, the main purpose is to identify the effects and
causes of transient overvoltages and methodsforsolvingthe
transients and the energization of CBS is the most important
to initiate the transients. The generation of peak transient
overvoltages and inrush currents are produced in this case,
the switch will get closed at the peak value ofTOV2.5p.uand
inrush current 2.7 KA. In order to reduce these peak values,
some controlling techniques are used, which are a pre-
insertion resistor, Current limiting reactor, and surge
arresters. In this pre-insertion resistor controls the high
magnitude overvoltages and high-frequency currents. But if
transients produce in second’s, the pre-insertion resistor
doesn’t respond instantly and damage of equipment
happens, this can be overcome by Current limiting reactors
which effectively reduces the inrush currents but the cost is
high, but it takes few seconds. The surge arresters provide
the protection of the primary side and it responds in a
fraction of seconds and it is most efficient and the cost is
very low. So surge arresters are used in controlling the
generation of transient overvoltages.
REFERENCES
[1] L. Van Der Sluis, Transients in Power Systems John
Wiley &Sons, 200l. ISBNs: 0-471-48639-6;
[2] 2. Grebe, T.E., "Application of Distribution System
Capacitor Banks and Their Impact on Power Quality".
IEEE TransactionsonIndustryApplications,1996.32(3):
P. 714-719.
[3] 3. Sahib Abdoolwadood Ali, “Capacitor Banks Switching
Transient In Power System" Canada ISSN 1923-8460,
2011.
[4] 4.Cipcigan L., Chandraďż˝ M., and Rusu A., A transient
study for shunt capacitor applications, JUKO CIRED
Conference, 5-8 October 2004, Herceg Novi, Serbia, and
Montenegro.
[5] 5.Coury D., Jose dos Santos C., Oleskovicz M., and
Tavares M., 2„Transient analysis concerning capacitor
bank switching in a distribution System”, ELSEVIER
Electric Power Systems Research, 2002, Vol.6513-21,
pp.13-21.
[6] 6. Girgis A., Fallon C., Rubino J., and CatoeR.,"Harmonics
and Transient OvervoltagesduetoCapacitorSwitching",
IEEE Trans. on Industry Application, Vol. 29,
Nov./Dec.1993, pp.1184-1188
Phase A The maximum peak observed near
the Capacitor bank when the switch
at t=peak
Voltage 0.64 P.U
Current 0.794KA

More Related Content

What's hot

Performance Analysis of Constant-K Low-Pass and Band-Pass Filters in a Uni-Po...
Performance Analysis of Constant-K Low-Pass and Band-Pass Filters in a Uni-Po...Performance Analysis of Constant-K Low-Pass and Band-Pass Filters in a Uni-Po...
Performance Analysis of Constant-K Low-Pass and Band-Pass Filters in a Uni-Po...
paperpublications3
 
final year project report
final year project reportfinal year project report
final year project report
Anuj Kumar
 
bi directional intelligent semiconductor transformer P
bi directional intelligent semiconductor transformer Pbi directional intelligent semiconductor transformer P
bi directional intelligent semiconductor transformer P
pranavchathannoor
 

What's hot (20)

Performance Analysis of Constant-K Low-Pass and Band-Pass Filters in a Uni-Po...
Performance Analysis of Constant-K Low-Pass and Band-Pass Filters in a Uni-Po...Performance Analysis of Constant-K Low-Pass and Band-Pass Filters in a Uni-Po...
Performance Analysis of Constant-K Low-Pass and Band-Pass Filters in a Uni-Po...
 
Contemporary Control of DG Integrated DVR for Sag, Swell and Harmonic Mitigat...
Contemporary Control of DG Integrated DVR for Sag, Swell and Harmonic Mitigat...Contemporary Control of DG Integrated DVR for Sag, Swell and Harmonic Mitigat...
Contemporary Control of DG Integrated DVR for Sag, Swell and Harmonic Mitigat...
 
Simulation of Power Electronic Converter Circuits Using COM3LAB Learning Soft...
Simulation of Power Electronic Converter Circuits Using COM3LAB Learning Soft...Simulation of Power Electronic Converter Circuits Using COM3LAB Learning Soft...
Simulation of Power Electronic Converter Circuits Using COM3LAB Learning Soft...
 
IRJET- Implementation of Modified H-Bridge Multilevel Inverter Topology f...
IRJET-  	  Implementation of Modified H-Bridge Multilevel Inverter Topology f...IRJET-  	  Implementation of Modified H-Bridge Multilevel Inverter Topology f...
IRJET- Implementation of Modified H-Bridge Multilevel Inverter Topology f...
 
Design and Simulation of Generation of High DC Voltage using Cockcroft Walton...
Design and Simulation of Generation of High DC Voltage using Cockcroft Walton...Design and Simulation of Generation of High DC Voltage using Cockcroft Walton...
Design and Simulation of Generation of High DC Voltage using Cockcroft Walton...
 
final year project report
final year project reportfinal year project report
final year project report
 
Dr34722727
Dr34722727Dr34722727
Dr34722727
 
Transient overvoltages and currents: ferroresonance effects
Transient overvoltages and currents: ferroresonance effectsTransient overvoltages and currents: ferroresonance effects
Transient overvoltages and currents: ferroresonance effects
 
Vivek harmonics
Vivek harmonicsVivek harmonics
Vivek harmonics
 
Introduction to Transient Disturbances of power system and its types
Introduction to Transient Disturbances of power system and its typesIntroduction to Transient Disturbances of power system and its types
Introduction to Transient Disturbances of power system and its types
 
IRJET- Wireless Power Theft Monitoring System using Zigbee
IRJET- Wireless Power Theft Monitoring System using ZigbeeIRJET- Wireless Power Theft Monitoring System using Zigbee
IRJET- Wireless Power Theft Monitoring System using Zigbee
 
Hormonics impact and_mitigation
Hormonics impact and_mitigationHormonics impact and_mitigation
Hormonics impact and_mitigation
 
IRJET- Improved Transformerless Inverter with Common Mode Leakage Current Eli...
IRJET- Improved Transformerless Inverter with Common Mode Leakage Current Eli...IRJET- Improved Transformerless Inverter with Common Mode Leakage Current Eli...
IRJET- Improved Transformerless Inverter with Common Mode Leakage Current Eli...
 
Analysis of harmonic at different level on distribution system ,its effect a...
Analysis of harmonic at different level on distribution system ,its effect  a...Analysis of harmonic at different level on distribution system ,its effect  a...
Analysis of harmonic at different level on distribution system ,its effect a...
 
Comparative Analysis of Linear Controllers used for Grid Connected PV System
Comparative Analysis of Linear Controllers used for Grid Connected PV System Comparative Analysis of Linear Controllers used for Grid Connected PV System
Comparative Analysis of Linear Controllers used for Grid Connected PV System
 
FEEDER AND BUS BAR PROTECTION
FEEDER AND BUS BAR PROTECTION FEEDER AND BUS BAR PROTECTION
FEEDER AND BUS BAR PROTECTION
 
ArvindP2
ArvindP2ArvindP2
ArvindP2
 
Tan Delta on MV Cables (Megger)
Tan Delta on MV Cables (Megger)Tan Delta on MV Cables (Megger)
Tan Delta on MV Cables (Megger)
 
bi directional intelligent semiconductor transformer P
bi directional intelligent semiconductor transformer Pbi directional intelligent semiconductor transformer P
bi directional intelligent semiconductor transformer P
 
IRJET- Mollification Parameter Control by Dynamic Voltage Restorer (DVR)
IRJET-  	  Mollification Parameter Control by Dynamic Voltage Restorer (DVR)IRJET-  	  Mollification Parameter Control by Dynamic Voltage Restorer (DVR)
IRJET- Mollification Parameter Control by Dynamic Voltage Restorer (DVR)
 

Similar to IRJET- Generation and Control of Transient Overvoltages in Power System Networks

Chapter 8 (synny katyara-ashfaq hashmani-bs chowdhry)(1)
Chapter 8 (synny katyara-ashfaq hashmani-bs chowdhry)(1)Chapter 8 (synny katyara-ashfaq hashmani-bs chowdhry)(1)
Chapter 8 (synny katyara-ashfaq hashmani-bs chowdhry)(1)
sunny katyara
 

Similar to IRJET- Generation and Control of Transient Overvoltages in Power System Networks (20)

IRJET- Simulation of Energization and De-Energization of Capacitor Banks and ...
IRJET- Simulation of Energization and De-Energization of Capacitor Banks and ...IRJET- Simulation of Energization and De-Energization of Capacitor Banks and ...
IRJET- Simulation of Energization and De-Energization of Capacitor Banks and ...
 
IRJET- Automated Energy Monitering System and Power Factor Improvement
IRJET-  	  Automated Energy Monitering System and Power Factor ImprovementIRJET-  	  Automated Energy Monitering System and Power Factor Improvement
IRJET- Automated Energy Monitering System and Power Factor Improvement
 
IRJET-Management of power factor and harmonic
IRJET-Management of power factor and harmonicIRJET-Management of power factor and harmonic
IRJET-Management of power factor and harmonic
 
E044043336
E044043336E044043336
E044043336
 
IRJET- Optimal Control of Multilevel Inverter to Minimize Harmonic Distortion...
IRJET- Optimal Control of Multilevel Inverter to Minimize Harmonic Distortion...IRJET- Optimal Control of Multilevel Inverter to Minimize Harmonic Distortion...
IRJET- Optimal Control of Multilevel Inverter to Minimize Harmonic Distortion...
 
Dp35648654
Dp35648654Dp35648654
Dp35648654
 
Differential Protection of Power Transformer in Substation
Differential Protection of Power Transformer in SubstationDifferential Protection of Power Transformer in Substation
Differential Protection of Power Transformer in Substation
 
IRJET- Comparison of H5 and HERIC Trasformerless Inverter Topology Conserning...
IRJET- Comparison of H5 and HERIC Trasformerless Inverter Topology Conserning...IRJET- Comparison of H5 and HERIC Trasformerless Inverter Topology Conserning...
IRJET- Comparison of H5 and HERIC Trasformerless Inverter Topology Conserning...
 
Chapter 8 (synny katyara-ashfaq hashmani-bs chowdhry)(1)
Chapter 8 (synny katyara-ashfaq hashmani-bs chowdhry)(1)Chapter 8 (synny katyara-ashfaq hashmani-bs chowdhry)(1)
Chapter 8 (synny katyara-ashfaq hashmani-bs chowdhry)(1)
 
1.compensation of reactive power using d statcom in grid interfaced pv system
1.compensation of reactive power using d statcom in grid interfaced pv system1.compensation of reactive power using d statcom in grid interfaced pv system
1.compensation of reactive power using d statcom in grid interfaced pv system
 
Pi controller based of multi level upqc using dq0 transformation to improve p...
Pi controller based of multi level upqc using dq0 transformation to improve p...Pi controller based of multi level upqc using dq0 transformation to improve p...
Pi controller based of multi level upqc using dq0 transformation to improve p...
 
Inrush current reduction in three phase power transformer by using prefluxing...
Inrush current reduction in three phase power transformer by using prefluxing...Inrush current reduction in three phase power transformer by using prefluxing...
Inrush current reduction in three phase power transformer by using prefluxing...
 
Reliability improvement of micro inverter through ac-ripples voltage compensator
Reliability improvement of micro inverter through ac-ripples voltage compensatorReliability improvement of micro inverter through ac-ripples voltage compensator
Reliability improvement of micro inverter through ac-ripples voltage compensator
 
Power system harmonic reduction using shunt active filter
Power system harmonic reduction using shunt active filterPower system harmonic reduction using shunt active filter
Power system harmonic reduction using shunt active filter
 
A DAPTIVE S UPPLY V OLTAGE M ANAGEMENT F OR L OW P OWER L OGIC C IRCU...
A DAPTIVE  S UPPLY  V OLTAGE  M ANAGEMENT  F OR  L OW  P OWER  L OGIC  C IRCU...A DAPTIVE  S UPPLY  V OLTAGE  M ANAGEMENT  F OR  L OW  P OWER  L OGIC  C IRCU...
A DAPTIVE S UPPLY V OLTAGE M ANAGEMENT F OR L OW P OWER L OGIC C IRCU...
 
Design and Mitigation Techniques of MV Capacitor Bank Switching Transients on...
Design and Mitigation Techniques of MV Capacitor Bank Switching Transients on...Design and Mitigation Techniques of MV Capacitor Bank Switching Transients on...
Design and Mitigation Techniques of MV Capacitor Bank Switching Transients on...
 
IRJET- PI Controller based Shunt Connected Three Phase Active Power Filter
IRJET- PI Controller based Shunt Connected Three Phase Active Power FilterIRJET- PI Controller based Shunt Connected Three Phase Active Power Filter
IRJET- PI Controller based Shunt Connected Three Phase Active Power Filter
 
Distribution Network Power Quality Improvement by D-STATCOM & DVR Under Vario...
Distribution Network Power Quality Improvement by D-STATCOM & DVR Under Vario...Distribution Network Power Quality Improvement by D-STATCOM & DVR Under Vario...
Distribution Network Power Quality Improvement by D-STATCOM & DVR Under Vario...
 
IRJET- Simulation & Hardware Implementation of APFC Meter to Boost Up Power F...
IRJET- Simulation & Hardware Implementation of APFC Meter to Boost Up Power F...IRJET- Simulation & Hardware Implementation of APFC Meter to Boost Up Power F...
IRJET- Simulation & Hardware Implementation of APFC Meter to Boost Up Power F...
 
Harmonic Compensation for Non Linear Load Using PWM Based Active Filter
Harmonic Compensation for Non Linear Load Using PWM Based Active FilterHarmonic Compensation for Non Linear Load Using PWM Based Active Filter
Harmonic Compensation for Non Linear Load Using PWM Based Active Filter
 

More from IRJET Journal

More from IRJET Journal (20)

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web application
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
 

Recently uploaded

1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
AldoGarca30
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
MayuraD1
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ssuser89054b
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
Kamal Acharya
 

Recently uploaded (20)

AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Basic Electronics for diploma students as per technical education Kerala Syll...
Basic Electronics for diploma students as per technical education Kerala Syll...Basic Electronics for diploma students as per technical education Kerala Syll...
Basic Electronics for diploma students as per technical education Kerala Syll...
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
 
Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
Computer Graphics Introduction To Curves
Computer Graphics Introduction To CurvesComputer Graphics Introduction To Curves
Computer Graphics Introduction To Curves
 

IRJET- Generation and Control of Transient Overvoltages in Power System Networks

  • 1. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 10 | Oct 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 707 Generation and Control of Transient Overvoltages in Power System Networks Dr. T. Murali Mohan1, T. Ramya Durga2 1Dr. T. Murali Mohan, Associative Professor, Electrical and Electronics Engineering & Jntuk University of College, Kakinada& India 2T.Ramya Durga, M.Tech Student, Electrical and Electronics Engineering & Jntuk University of College, Kakinada & India ---------------------------------------------------------------------***---------------------------------------------------------------------- Abstract –This paper presents the increase ofpowerfactor and reduces the power quality problems such as the generation of transient overvoltages and harmonics on the power distribution system side. Among these problems, the effects of generating transients and controlling the transients using the various mitigating techniquesareusedtocontrolthe transients in a specific distribution feeder line and also calculate the mathematicalcomputationsof quantitiessuchas peak transient overvoltages, high-frequency inrush currents occur in each case. Mitigating values in each case is compared to other cases using MATLAB/Simulink Software. Key Words: Capacitor bank switching (CBS), current limiting reactor, Harmonic analysis, Inrush current, Power quality, Pre-insertion resistor, Surge arresters, Transient Overvoltages. 1. INTRODUCTION The main cause for the generationoftransientovervoltages is due to capacitor bank switching, which is identified in the 19th century. In those days a power quality problem is the main issue and it is increasing on day by day basis. The generation of power was insufficient, so the production of electric power mostly depending on the thermal and few watts of electric power generating in the hydroelectric power. At that time the population was increasing and the usage of electronic equipment for the household also increasing. In U.S & U.S.A the usage of electronic equipment is more and the generation is less. The Power quality problems are raises due to high voltages, low voltages (fluctuations) and these types of fluctuations must be reduced and the power factor must be improved. This can be done using a capacitorswitchingbank whichalso reduces the reactive power. Capacitor banks will hold reactive power whenever reactive power needs release. Capacitor switching is one of the most important sources of generating transient overvoltages and inrush currents in electrical power systems. But because of switching operations, the electronic equipment will damage. In order to overcome this problem, a fixed capacitor is used. In 1954 large capacitor banks are used and in 1974 small size capacitor banks are used which reduces cost. Capacitor banks control the ON & OFF positions of the switch. If energization of capacitor banks is done, a switch will get closed automatically and peak transient overvoltages will occur in the range of 2to 3p.u which produces transient overvoltages, inrush currents and if de-energizationisdone, a switch will get open and minor transients will occur below 2p.u. In this paper, these transients can be controlled using some mitigation techniques and FFT analysis of harmonic distortion of peak voltage is calculated. 2. GENERATING TRANSIENT OVERVOLTAGES 2.1 Basic Concept of Energizing Capacitor Bank Switching Transients Fig.1 represents a single line circuit diagramof energizing capacitor bank switching transient. This circuit will be connected to the distribution side feeder lineandusedinthe utility consumer side. The network provides a visionary introduction about the Energization CBS transients. Rs and Ls represent the resistance and inductance of source with a frequency of 60 Hz and also fixed capacitor banks are used. In this circuit, the load is connected after the VCB switch. Fig -1: Single line diagram of energizing capacitor bank switching transient Where: f = frequency in Hz. L =source inductance, H. C = capacitance of the capacitor bank, F.
  • 2. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 10 | Oct 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 708 Vpk = peak voltage. Ipk = peak inrush current. Z0 =Surge impedance. f = Ipeak = Z0 = The generated transientovervoltagesarecomputedbyusing distorted harmonics waveforms generated by the consumer’s nonlinear loads and gets amplified. In this harmonic distortion is reduced using the FFT analysis and also the calculation is done at the different loads near the transients and at different capacitorbank sizes.Thesevalues are compared to obtain values from simulations of eachcase study and the high magnitude of peak transient overvoltage and high frequency of inrush currents areobserved. When Is >>1 and ωls<< l/ωc, the current is leadingthesupplyvoltage by 90°and energizing transients 2.5 P.U to 3.0 P.U are at the peak. In this case, less is more so a reduction of loss is done using many topologies and techniques available by controlling the transients such as a pre-insertion resistor, current limiting reactor and surge arresters. These techniques are used to mitigating the generating transient overvoltages. 2.2 System Circuit Representation Fig.2: Simulink Model of Generating and control of transient overvoltages in distribution Table -1: Circuit parameters Parameters values Three-phase source 220 kV Three Phase transformer 220/33 kV Power factor 0.9 p.f load 64 MVA Capacitor bank 14.7 MVAR These values are used to simulate the circuit using MATLAB/Simulink software and the values used in the model are resistance, reactance, and capacitance. These values are important which are usedinthethree-phasefixed Capacitor bank, connected in series with the feederlinewith a frequency of 60 Hz. The capacitor bank produces a high magnitude of transient overvoltages and inrush currents. 3. CONTROLLING OF TRANSIENT OVERVOLTAGES Generating transient overvoltages is reduced using many techniques but only three mitigation techniques are considered. 3.1 pre-insertion resistor There are various techniques for controlling the generating transient overvoltages and currents in the distribution feeder line. The pre-insertion resistor is known as an old classical method. In this circuit, the pre-insertion resistor switched before the CBS and connected in series to the feeder line with frequency 50 Hz. The pre-insertion resistor controls the high magnitude of transient overvoltage and high frequency of inrush currents. 3.2 Current limiting reactor The second controlling technique used is the Current limiting reactor also called a series reactor. High inductive reactance is produced in this reactor. It is correlated withits resistance. The current limiting reactor reduces the short circuit currents in the power systemnetworksandincreases the magnitude of surge impedance and reduces the peak inrush currents and transient overvoltages. 3.3 Surge arresters Surge arresters are considered as third controlling technique. Surge arresters are used for the primary protection and designed with high resistance for normal systems and low resistance for transient overvoltages. MOV type arresters are used to reduce the transient overvoltages and they are of two types: gap type and gapless surge arresters 4. SIMULATION AND RESULT ANALYSIS 4.1 Base Case-1 The base case circuit diagram is shown in Fig.2. When the capacitor bank starts, energizing voltage is pulled to zero or voltage is overshoot or reboundcompleteandtheswitchwill get closed. At that time the high magnitude peak transient overvoltages (2.5P.u) and high-frequency peak inrush current (2.7 KA) will produce but at phase A high transients and high inrush currents occurs and closing of switch happens at 6.5ms.
  • 3. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 10 | Oct 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 709 Fig.3 (a): Transient observed near the Energization of Capacitor Bank at peak Voltage Fig 3(b): Transient observed near the Energization of Capacitor Bank at peak inrush Current. Table 2: Transient Observed Energization of capacitor bank at the phase a voltage and current Fig.3 (a) and Fig. 3(b) shows the 3 phase Energization of capacitor switching transient disturbance. 4.2 Capacitor bank Energization and FFT Analysis of Fundamental Harmonic distortion calculation. Fig.2 shows harmonic contentpresentinthevoltagenear the capacitor bank. Fig.3(c) shows the histogramrepresentation of the harmonic content present in the voltage waveform concerning the magnitude (%of fundamental harmonics). Figure 3(c): Harmonic Content Present in the Voltage Waveform Phase A peak voltage is calculated using FFT analysis to produce the fundamental harmonicsduringthe energization of the capacitor bank as shown in fig.3(c). Fig.2 shows harmonic contentpresentinthevoltagenear the capacitor bank. Fig. 3(d) shows the scatter diagram representation of the harmonic content present in the current waveform concerning the magnitude (% of fundamental harmonics). Figure 3(d): Harmonic Content Present in the Current Waveform Phase A peak inrush currents are calculated using FFT analysis to produce the fundamental harmonics during the energization of the capacitor bank as shown in fig.3 (d). These Harmonics are calculated at different time intervals because FFT analysis calculations are done based on the frequency-time domains. 4.3 Simulations using the pre-insertion resistors Case-2 To Control the transient overvoltages and inrush currents many techniques are used but the preinsertion method is an old and classical method so the first mitigating technique chosen is a pre-insertion resistor. The pre-insertion resistor Phase A The maximum peak observed near the Capacitor bank when switching at t=peak Voltage 2.5P.u Current 2.7 KA
  • 4. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 10 | Oct 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 710 is connected in series with a capacitor bank and before the pre-insertion resistor a switch is connectedknownas“2step switching” and the switch gets closed at 0.25s and resistor value used is 7.35ohms. These values are used to reduce the high-frequency inrush currents (1.78 P.U) and high magnitude of transient overvoltages (1.35 P.U). Fig 4 (a): Energization of capacitor bank in the peak voltage nearby VCB using pre insert resistors Fig 4 (b): Energization of capacitor bank in the peak inrush current nearby VCB using pre-insertion resistors. Table 3: Transient Observed Energization of capacitor bank at the phase A voltage and current in pre-insertion resistor switched into the capacitor bank Phase A The maximum peak observed near the Capacitor bank when the switch at t=peak Voltage 1.35 P.U Current 1.78 KA Fig.4 (a) and Fig. 4(b) show the Pre-insertion resistance of controlling the high magnitude transient overvoltages (1.35 P.u). The pre-insertion resistor reduces the transient overvoltages more than a current limiting reactor and high- frequency inrush currents (1.78 KA) will get reduced by the current limiting reactor more compared to thepre-insertion resistor. 4.4 Simulations using the current limiting reactors Case-3 The current limiting reactor is connected in series with a capacitor bank. This reactor can effectively reduce the peak value of inrush current (1.5 KA) but can't change instantly and also reduce transient overvoltages. Fig.5 (a): Voltages at the when capacitor bank energizing it along with the current limiting. Fig.5 (b): Inrush current at the when capacitor bank energizing it along with the current limiting Ztotal.new = = 15 ohm Ltotal, new= (Ceq) =8.537mH Lreactors = Ltotal - LCap bank
  • 5. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 10 | Oct 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 711 Lreactors = 8.537 mH - 5.6mH = 2.937 mH Table 4: Transient Observed Energization of capacitor bank at the phase A voltage and current in current limiting reactor switched long the capacitor bank Fig.5 (a) and Fig. 5(b) show the Current limiting reactor of controlling the high magnitude transient overvoltages (1.45 P.u). The pre-insertion resistor reduces the transient overvoltages more than a current limiting reactor and high- frequency inrush currents (1.78 KA) will get reduced by the current limiting reactor more compared to thepre-insertion resistor. 4.5 Simulations using the surge arrester Case-4 Surge arresters are considered in controlling the transient overvoltages and inrush currents providing primary protection. The MOV gapless type arrestersdo notdischarge the capacitor bank switching and these areconnectedacross the capacitor bank phase to phase and phase to neutral. Fig 6(a): Voltages at the controlled Energization of capacitor bank used in the surge arrester. Fig 6(b): Current at the controlled Energization of capacitor bank using the surge arrester. Table 5: Transient Observed Energization of capacitor bank at the phase A voltage and current in surge arresters connected Phase-Phase in the capacitor bank The surge, arresters reduces the high magnitudeoftransient overvoltages shown in fig .6(a) with transient overvoltage value (0.8 P.U) and in fig.6 (b) high frequency of inrush currents (1.1 KA) connected in phase to phase. Fig 6(c): Voltages at the controlled capacitor bank using the surge arresters Phase A The maximum peak observed near the Capacitor bank when the switch at t=peak Voltage 1.45 P.U Current 1.5 KA Phase A The maximum peak observed near the Capacitor bank when the switch at t=peak Voltage 0.8 P.U Current 1.1KA
  • 6. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 10 | Oct 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 712 Fig 6(d): Current at the controlled capacitor bank using the surge arrester. Table 6: Transient Observed Energization of capacitor bank at the phase A voltage and current in surge arresters connected Phase-Neutral in the capacitor bank In this case surge arresters are connected to the phase to neutral reduces the transient overvoltages shown in fig.6(c) with transient overvoltage value (0.64 P.U) and in fig.6 (d) inrush current values (0.794 KA) and these values are less than the phase-phase values. These controlling techniques are used to mitigating the generating transient overvoltages and inrush currents and improve the power factor and to reduce the power losses. 5. CONCLUSION In this paper, the main purpose is to identify the effects and causes of transient overvoltages and methodsforsolvingthe transients and the energization of CBS is the most important to initiate the transients. The generation of peak transient overvoltages and inrush currents are produced in this case, the switch will get closed at the peak value ofTOV2.5p.uand inrush current 2.7 KA. In order to reduce these peak values, some controlling techniques are used, which are a pre- insertion resistor, Current limiting reactor, and surge arresters. In this pre-insertion resistor controls the high magnitude overvoltages and high-frequency currents. But if transients produce in second’s, the pre-insertion resistor doesn’t respond instantly and damage of equipment happens, this can be overcome by Current limiting reactors which effectively reduces the inrush currents but the cost is high, but it takes few seconds. The surge arresters provide the protection of the primary side and it responds in a fraction of seconds and it is most efficient and the cost is very low. So surge arresters are used in controlling the generation of transient overvoltages. REFERENCES [1] L. Van Der Sluis, Transients in Power Systems John Wiley &Sons, 200l. ISBNs: 0-471-48639-6; [2] 2. Grebe, T.E., "Application of Distribution System Capacitor Banks and Their Impact on Power Quality". IEEE TransactionsonIndustryApplications,1996.32(3): P. 714-719. [3] 3. Sahib Abdoolwadood Ali, “Capacitor Banks Switching Transient In Power System" Canada ISSN 1923-8460, 2011. [4] 4.Cipcigan L., Chandraďż˝ M., and Rusu A., A transient study for shunt capacitor applications, JUKO CIRED Conference, 5-8 October 2004, Herceg Novi, Serbia, and Montenegro. [5] 5.Coury D., Jose dos Santos C., Oleskovicz M., and Tavares M., 2„Transient analysis concerning capacitor bank switching in a distribution System”, ELSEVIER Electric Power Systems Research, 2002, Vol.6513-21, pp.13-21. [6] 6. Girgis A., Fallon C., Rubino J., and CatoeR.,"Harmonics and Transient OvervoltagesduetoCapacitorSwitching", IEEE Trans. on Industry Application, Vol. 29, Nov./Dec.1993, pp.1184-1188 Phase A The maximum peak observed near the Capacitor bank when the switch at t=peak Voltage 0.64 P.U Current 0.794KA