International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 07 Issue: 01 | Jan 2019 www.irjet.net p-ISSN: 2395-0072
© 2020, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 24
Analysis of Material Requirement Planning for Construction
Project: Case Study (Residential Building)
Rupesh Hulakant Supe1, Manish D. Mata2
1M-TECH(Construction Technology & Management) Student, Dept. of Civil Engineering, Shri Sant Gadgebaba
College of Engineering & Technology, Bhusawal, Maharashtra, India,425203.
2Assistant Professor , Dept. of Civil Engineering, Shri Sant Gadgebaba College of Engineering & Technology,
Bhusawal, Maharashtra, India, 425203.
----------------------------------------------------------------------------***-----------------------------------------------------------------------------
Abstract – Materials Requirements and Planning (MRP) is a
system of production planning and inventory control, whichis
used to manage manufacturing processes. Most MRP systems
are software-based and are used to ensure that the materials
are available for production, that the products are available
for delivery to customers, thatthelowestpossible materialand
product level is maintained in store, as well as to plan delivery
schedules and purchasing activities. Upon completion of
scheduling, begins the process of follow-up, which includesthe
achievement of the project goals in terms of quantity, quality
and costs in accordance with deadlines.
Key Words:MaterialsRequirementPlanning(MRP),cost,
project management, Material Management, scheduling
process.
1. INTRODUCTION
Construction material constitutesa majorcostcomponentin
any construction project. The total cost of installed material
may be 50% or more of the total cost. The goal of material
management is to ensure that the materials are available at
their point of use when needed hence, efficientprocurement
of material represents a key role in the successful
completion of the work. Materials management is a critical
component of the construction industry. As such,
organizations need to understand the effects of proper
materials management techniques on the effectiveness of
project execution. “Material management is defined as the
process to provide right material at right place at right time
in right quantity so as to minimize the cost of project”.
Material management is concerned with the planning,
identification, procuring, storage, receiving and distribution
of material. The responsibility of Material management
department for the flow of material from the time the
material is ordered, received, and stored until they are used
is the basic responsibilityof material management.Materials
represent a major expense in construction, so minimizing
procurement cost improves opportunities for reducing the
overall project cost.[1]
The material requirement planning (MRP) is a systematic
plan to control inventory. Generally it is a procedure for
planning and controlling the raw material in manufacturing
a product. Materials Requirement Planning (MRP) refers to
production planning, scheduling, and inventory control soft
ware systems used to manage manufacturing processes.
Namely, it aims to enablethe company’smanagementtoplan
the product parts and control the inflow of these parts to
fulfill the service or product within the scheduled time
period.
Material Requirements Planning (MRP) is a time phased
priority planning technique that calculates material
requirements and schedules supply to meet demand across
all products and parts in one or more plants. In conventional
methods, the project budgeted total cost is determined by
the difference, between the actual cost, and planned cost.
That means the project manager’s focus was on only for
planned cost and expenditure cost as actual cost. In modern
days many schedule properties and costparametersonlyfor
planned cost and expenditure cost as actual cost. In modern
days many schedule properties and cost parameters are
considered. Because it is very important in every
construction project, losses are due to inadequate
construction management and cost performances done by
the contracts in the road construction projects. So it is
necessary to develop the planning technique to easy the
works and risks arises in the projects.
1.1 Objectives
1. To study the concept of MRP
2. To identify the factors affecting MRP
3. To conduct case study for above studies
4. Analysis on the above same
1.2 Scope of the study:
To improve material management in the
construction project as well as with proper management of
material reduced the tatal cost of the project.
2. STUDY OF MATERIAL REQUIREMENT PLANNING
2.1 Introduction
This chapter deals with the study of material requirement
planning at construction site, Basically function of the
material requirement planning. It includes Planning,
purchasing, transportation, storage, controlling, directing,
receiving etc. To reduce duration of the projects it is
important to understand the concept of material
requirements at site & function of material requirement
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 07 Issue: 01 | Jan 2019 www.irjet.net p-ISSN: 2395-0072
© 2020, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 25
planning. These chapters also study the objectiveofmaterial
requirement plan. Purpose of this chapter to understand
knowledge of material requirementplanning andfunctionof
material requirement planning.
2.2 Concept of Material Requirement Planning
Materials Management is related to planning, procuring,
storing and providing the appropriate material of right
quality, right quantity at right place in right time so as to co-
ordinate and schedule the production activity in an
integrative way for an industrial undertaking. Effective
management of materials can reduce these costs and
contribute significantly to the success of the project.
Construction material constitutesa majorcostcomponentin
any construction project. The total cost of installed material
may be 50% or more of the total cost.“Material management
is defined as the process to provide right material at right
place at right time in right quantity so as to minimize the
cost of project”. [1]
Materials Requirement Planning (MRP) referstoproduction
planning, scheduling, and inventory control soft ware
systems used tomanagemanufacturingprocesses.Namely,it
aims to enable the company’s management to plan the
product parts and control the inflow of these parts to fulfill
the service or product within the scheduled time period.[2]
Material Requirements Planning (MRP) is a time phased
priority planning technique that calculates material
requirements and schedules supply to meet demand across
all products and parts in one or more plants. In a
construction project, materials account for more than 40%
of the total project cost. A small saving in material cost
through efficient management of materials can result to a
large saving in the total project cost. One of the root causes
of improper material management is that materials are
ordered based on the information from project schedule. [5]
3. LITERATURE REVIEW
Aditya A. Pande (2015)
The author said that, Materials management is a critical
component of the construction industry. As such,
organizations need to understand the effects of proper
materials management techniques on the effectiveness of
project execution. A properly implemented materials
management program can achieve the timely flow of
materials and equipment to the jobsite, and thus facilitate
improved work face planning, increased labor productivity,
better schedules, and lower project costs. Materials
management is an important function in order to improve
productivity in construction projects. It is defined materials
management functions which include planningandmaterial
take off, vendor evaluation and selection, purchasing,
expenditure, shipping, material receiving, warehousing and
inventory, and material distribution.
It suggested that construction material constitutes a major
cost component in any construction project. Thetotal costof
material may be 52% of total cost; so that it is important for
contractor to consider that timely availability of material is
potential cause of successful completion of project. [1]
Abdallah Ali Imetieg (2015)
The author deals with the, Materials Requirements and
Planning (MRP) is a system of production planning and
inventory control, which is used to manage manufacturing
processes. Most MRP systems are software-based and are
used to ensure that the materials are available for
production, that the products are available for delivery to
customers, that the lowest possible material and product
level is maintained in store, as well as to plan delivery
schedules and purchasing activities. There is a correlation
between time and cost of each activity. If the required time
is shorter than the scheduled time of the certain activity, it
would demand more resources, which further leads to the
increase in direct costs of the given activity. Therefore, the
output of MRP is important since commands are issued
through planning in order to launch the suggested orders
with the required quantities and within the limited time
period.
The author conclude that the outcome of the propositions,
the relationship between the time needed to execute the
project and the cost is a linear relationship, so that costs can
be changed with every proportional change in the period of
implementation of each activity.[2]
Gerhard Plenert (1999)
The author deals with the successes and disappointmentsof
MRP. It studies numerous articles to determinewhatthekey
shortcomings of MRP are. Next, it investigates if these
failures are correctable, and what the consequences of not
correcting these deficiencies means. This article considers
alternatives that have been discussed in the current
literature. Last of all this article discusses whether the
improvements these alternatives suggest are sufficient to
make MRP worth salvaging, or whether MRPisa systemthat
needs to be discarded in favor of systemssuchasJIT(Just-in-
Time), Optimized Production Technology (OPT), Theory of
Constraints (TOC), and Bottleneck Allocation Methodology
(BAM).[3]
Rohit J. Mehendale (2019)
The author said that, Scheduling, material requirement plan
(MRP) and cash outflow analysis are some of the major
elements which need to work out in a construction project.
Generally, different software’s are available for each of this
task. When there is a delay in the planned schedule, itistime
consuming to get MRP and cash outflow plan updated
according to the received schedule.
The author conclude that, the use of software’s for
scheduling ,MRP, cash outflow withinterconnectingfeatures
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 07 Issue: 01 | Jan 2019 www.irjet.net p-ISSN: 2395-0072
© 2020, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 26
helped updating the schedule on delays and consequent
updating of MRP and cash outflow. Breaking a majoractivity
into smaller activities and proper sequencing in the
preparation of schedule reduce the construction time
significantly. A proper MRP and cash outflow help to avoid
delays in construction. [4]
Deepa V, Sahimol Eldhose (2018)
The author said that, in a construction project, materials
account for more than 40% of the total project cost. A small
saving in material cost through efficient management of
materials can result to a large saving in the total projectcost.
One of the root causes of improper material management is
that materials are ordered based on the information from
project schedule. Hence the study is conducted to optimize
the cost through material requirement planning for District
road construction based on site scenario. The studyinvolves
mainly three stages, namely factors identification, data
collection and its analysis. Data collection on factors which
are based on time, cost, quality, quantity and location of
various activities were acquired. These were analyzed and
optimization of cost is done through MRP. [5]
4. CONCLUSION
A very positive impact is expected in the future about the
material requirement planning. The above study provides
necessity to determine the impact of MRP on construction
projects by considering the concept of MRP ontheirlivecase
studies and analyzing the collected data.
REFERENCES
1. Aditya A. Pande, S .Sabihuddin: Study of Material
Management Techniques on Construction Project.
2. PROJECT SCHEDULING METHOD WITH TIME USING
MRP SYSTEM – A CASE STUDY: CONSTRUCTION
PROJECT IN LIBYA
Abdallah Ali Imeti eg1,*, Miroslav Lutova
3. Focusing material requirements planning (MRP)
towards performance
Gerhard Plenert
4. Scheduling, Material Requirement Plan (MRP) And
Cash Outflow Analysis: A Case study Rohit J.
Mehendale1 and Aniket s. Patil2
5. Optimization of Material Cost through MRP in Road
Construction Deepa V, Sahimol Eldhose

More Related Content

What's hot

IRJET- Application of Time Divisions Scheduling Techniques for Duration and Q...
IRJET- Application of Time Divisions Scheduling Techniques for Duration and Q...IRJET- Application of Time Divisions Scheduling Techniques for Duration and Q...
IRJET- Application of Time Divisions Scheduling Techniques for Duration and Q...IRJET Journal
 
Capacity resource planning and production scheduling
Capacity resource planning and production schedulingCapacity resource planning and production scheduling
Capacity resource planning and production schedulingdutconsult
 
IRJET-Influence of Material Management on Construction Project
IRJET-Influence of Material Management on Construction ProjectIRJET-Influence of Material Management on Construction Project
IRJET-Influence of Material Management on Construction ProjectIRJET Journal
 
Production Planning And Control
Production Planning And ControlProduction Planning And Control
Production Planning And ControlAvinash Verma
 
IRJET- Study on Economic Sustainability of Industrial Buildings
IRJET-  	  Study on Economic Sustainability of Industrial BuildingsIRJET-  	  Study on Economic Sustainability of Industrial Buildings
IRJET- Study on Economic Sustainability of Industrial BuildingsIRJET Journal
 
Production mgt lecture_4
Production mgt lecture_4Production mgt lecture_4
Production mgt lecture_4Jyoti Yadav
 
IRJET- Optimization in Construction Management
IRJET-  	  Optimization in Construction ManagementIRJET-  	  Optimization in Construction Management
IRJET- Optimization in Construction ManagementIRJET Journal
 
Production planning, routing, scheduling, Activating, Monitoring
Production planning, routing, scheduling, Activating, MonitoringProduction planning, routing, scheduling, Activating, Monitoring
Production planning, routing, scheduling, Activating, MonitoringDarshan Shah
 
Man power management or labour management.
Man power management or labour management.Man power management or labour management.
Man power management or labour management.Sumpi Tana
 
construction project managment_civileng
construction project managment_civilengconstruction project managment_civileng
construction project managment_civilengsulaiman khan
 
Master scheduling
Master schedulingMaster scheduling
Master schedulingmehrdad66
 
Activity schedule and affective control of component based project
Activity schedule and affective control of component based projectActivity schedule and affective control of component based project
Activity schedule and affective control of component based projecteSAT Journals
 
Production planning and control - Basic concepts
Production planning and control - Basic conceptsProduction planning and control - Basic concepts
Production planning and control - Basic conceptsgokulfea
 
Construction Scheduling, Work Study and Work Measurement _ Unit 2 _ Construct...
Construction Scheduling, Work Study and Work Measurement _ Unit 2 _ Construct...Construction Scheduling, Work Study and Work Measurement _ Unit 2 _ Construct...
Construction Scheduling, Work Study and Work Measurement _ Unit 2 _ Construct...Shrikant Kate
 

What's hot (20)

IRJET- Application of Time Divisions Scheduling Techniques for Duration and Q...
IRJET- Application of Time Divisions Scheduling Techniques for Duration and Q...IRJET- Application of Time Divisions Scheduling Techniques for Duration and Q...
IRJET- Application of Time Divisions Scheduling Techniques for Duration and Q...
 
Capacity resource planning and production scheduling
Capacity resource planning and production schedulingCapacity resource planning and production scheduling
Capacity resource planning and production scheduling
 
IRJET-Influence of Material Management on Construction Project
IRJET-Influence of Material Management on Construction ProjectIRJET-Influence of Material Management on Construction Project
IRJET-Influence of Material Management on Construction Project
 
Production Planning And Control
Production Planning And ControlProduction Planning And Control
Production Planning And Control
 
Production Planning Control Overview
Production Planning Control OverviewProduction Planning Control Overview
Production Planning Control Overview
 
IRJET- Study on Economic Sustainability of Industrial Buildings
IRJET-  	  Study on Economic Sustainability of Industrial BuildingsIRJET-  	  Study on Economic Sustainability of Industrial Buildings
IRJET- Study on Economic Sustainability of Industrial Buildings
 
Ppc C1
Ppc C1Ppc C1
Ppc C1
 
Production mgt lecture_4
Production mgt lecture_4Production mgt lecture_4
Production mgt lecture_4
 
Production Planning & Control
Production Planning & ControlProduction Planning & Control
Production Planning & Control
 
Erp chapter 3
Erp chapter 3Erp chapter 3
Erp chapter 3
 
IRJET- Optimization in Construction Management
IRJET-  	  Optimization in Construction ManagementIRJET-  	  Optimization in Construction Management
IRJET- Optimization in Construction Management
 
Module 2:Resource Management,Construction Equipments,Materials Inventory by D...
Module 2:Resource Management,Construction Equipments,Materials Inventory by D...Module 2:Resource Management,Construction Equipments,Materials Inventory by D...
Module 2:Resource Management,Construction Equipments,Materials Inventory by D...
 
Production planning, routing, scheduling, Activating, Monitoring
Production planning, routing, scheduling, Activating, MonitoringProduction planning, routing, scheduling, Activating, Monitoring
Production planning, routing, scheduling, Activating, Monitoring
 
Man power management or labour management.
Man power management or labour management.Man power management or labour management.
Man power management or labour management.
 
construction project managment_civileng
construction project managment_civilengconstruction project managment_civileng
construction project managment_civileng
 
Master scheduling
Master schedulingMaster scheduling
Master scheduling
 
H1303024956
H1303024956H1303024956
H1303024956
 
Activity schedule and affective control of component based project
Activity schedule and affective control of component based projectActivity schedule and affective control of component based project
Activity schedule and affective control of component based project
 
Production planning and control - Basic concepts
Production planning and control - Basic conceptsProduction planning and control - Basic concepts
Production planning and control - Basic concepts
 
Construction Scheduling, Work Study and Work Measurement _ Unit 2 _ Construct...
Construction Scheduling, Work Study and Work Measurement _ Unit 2 _ Construct...Construction Scheduling, Work Study and Work Measurement _ Unit 2 _ Construct...
Construction Scheduling, Work Study and Work Measurement _ Unit 2 _ Construct...
 

Similar to IRJET- Analysis of Material Requirement Planning for Construction Project : Case Study (Residential Building)

IRJET - A Review Paper on Effective Material Management to Minimize Probl...
IRJET -  	  A Review Paper on Effective Material Management to Minimize Probl...IRJET -  	  A Review Paper on Effective Material Management to Minimize Probl...
IRJET - A Review Paper on Effective Material Management to Minimize Probl...IRJET Journal
 
Factors Affecting Material Management on Construction Site
Factors Affecting Material Management on Construction SiteFactors Affecting Material Management on Construction Site
Factors Affecting Material Management on Construction SiteIRJET Journal
 
A STUDY ON THE QUALITATIVE ANALYSIS OF MATERIALS MANAGEMENT IN KERALA CONSTRU...
A STUDY ON THE QUALITATIVE ANALYSIS OF MATERIALS MANAGEMENT IN KERALA CONSTRU...A STUDY ON THE QUALITATIVE ANALYSIS OF MATERIALS MANAGEMENT IN KERALA CONSTRU...
A STUDY ON THE QUALITATIVE ANALYSIS OF MATERIALS MANAGEMENT IN KERALA CONSTRU...IRJET Journal
 
Assesing the various problems facing in arranging appropirate labour and qual...
Assesing the various problems facing in arranging appropirate labour and qual...Assesing the various problems facing in arranging appropirate labour and qual...
Assesing the various problems facing in arranging appropirate labour and qual...eSAT Journals
 
IRJET- Controlling and Monitoring the Construction Projects by using Earned V...
IRJET- Controlling and Monitoring the Construction Projects by using Earned V...IRJET- Controlling and Monitoring the Construction Projects by using Earned V...
IRJET- Controlling and Monitoring the Construction Projects by using Earned V...IRJET Journal
 
The role of time, cost and quality in project management
The role of time, cost and quality in project managementThe role of time, cost and quality in project management
The role of time, cost and quality in project managementIRJET Journal
 
IRJET- An Assessment of Role of Material Management in Construction Projects
IRJET- An Assessment of Role of Material Management in Construction ProjectsIRJET- An Assessment of Role of Material Management in Construction Projects
IRJET- An Assessment of Role of Material Management in Construction ProjectsIRJET Journal
 
IRJET- Optimized Project Planning and Scheduling of Multistorey Building
IRJET-  	  Optimized Project Planning and Scheduling of Multistorey BuildingIRJET-  	  Optimized Project Planning and Scheduling of Multistorey Building
IRJET- Optimized Project Planning and Scheduling of Multistorey BuildingIRJET Journal
 
IRJET- Planning and Scheduling for a Multi-Storied Building using MS-Project
IRJET-  	  Planning and Scheduling for a Multi-Storied Building using MS-ProjectIRJET-  	  Planning and Scheduling for a Multi-Storied Building using MS-Project
IRJET- Planning and Scheduling for a Multi-Storied Building using MS-ProjectIRJET Journal
 
IRJET- Implementing Time and Cost Optimization in Commercial Building using P...
IRJET- Implementing Time and Cost Optimization in Commercial Building using P...IRJET- Implementing Time and Cost Optimization in Commercial Building using P...
IRJET- Implementing Time and Cost Optimization in Commercial Building using P...IRJET Journal
 
Planning, Scheduling, Resource Allocating and Tracking of Residential (G+2) V...
Planning, Scheduling, Resource Allocating and Tracking of Residential (G+2) V...Planning, Scheduling, Resource Allocating and Tracking of Residential (G+2) V...
Planning, Scheduling, Resource Allocating and Tracking of Residential (G+2) V...IRJET Journal
 
IRJET- Planning, Scheduling, and Optimization of Labor Resources in the C...
IRJET-  	  Planning, Scheduling, and Optimization of Labor Resources in the C...IRJET-  	  Planning, Scheduling, and Optimization of Labor Resources in the C...
IRJET- Planning, Scheduling, and Optimization of Labor Resources in the C...IRJET Journal
 
Construction Project Scheduling of MK Apartment using MS Project 2013
Construction Project Scheduling of MK Apartment using MS Project 2013Construction Project Scheduling of MK Apartment using MS Project 2013
Construction Project Scheduling of MK Apartment using MS Project 2013IRJET Journal
 
IRJET- Efficient Techniques of Construction Material Management in Constr...
IRJET-  	  Efficient Techniques of Construction Material Management in Constr...IRJET-  	  Efficient Techniques of Construction Material Management in Constr...
IRJET- Efficient Techniques of Construction Material Management in Constr...IRJET Journal
 
Project management tools and techniques- tutorsindia.com
Project management tools and techniques- tutorsindia.comProject management tools and techniques- tutorsindia.com
Project management tools and techniques- tutorsindia.comTutors India
 
Planning, Scheduling and Allocation of Resources for Multi – storiedStructure...
Planning, Scheduling and Allocation of Resources for Multi – storiedStructure...Planning, Scheduling and Allocation of Resources for Multi – storiedStructure...
Planning, Scheduling and Allocation of Resources for Multi – storiedStructure...IRJET Journal
 
Efficient Planning Scheduling and Delay Analysis of Residential Project
Efficient Planning Scheduling and Delay Analysis of Residential ProjectEfficient Planning Scheduling and Delay Analysis of Residential Project
Efficient Planning Scheduling and Delay Analysis of Residential ProjectIJERA Editor
 
Project typed
Project typedProject typed
Project typedRahul
 
Project Planning, Scheduling and Preparation of Quality Assurance Control Doc...
Project Planning, Scheduling and Preparation of Quality Assurance Control Doc...Project Planning, Scheduling and Preparation of Quality Assurance Control Doc...
Project Planning, Scheduling and Preparation of Quality Assurance Control Doc...IRJET Journal
 

Similar to IRJET- Analysis of Material Requirement Planning for Construction Project : Case Study (Residential Building) (20)

IRJET - A Review Paper on Effective Material Management to Minimize Probl...
IRJET -  	  A Review Paper on Effective Material Management to Minimize Probl...IRJET -  	  A Review Paper on Effective Material Management to Minimize Probl...
IRJET - A Review Paper on Effective Material Management to Minimize Probl...
 
Factors Affecting Material Management on Construction Site
Factors Affecting Material Management on Construction SiteFactors Affecting Material Management on Construction Site
Factors Affecting Material Management on Construction Site
 
A STUDY ON THE QUALITATIVE ANALYSIS OF MATERIALS MANAGEMENT IN KERALA CONSTRU...
A STUDY ON THE QUALITATIVE ANALYSIS OF MATERIALS MANAGEMENT IN KERALA CONSTRU...A STUDY ON THE QUALITATIVE ANALYSIS OF MATERIALS MANAGEMENT IN KERALA CONSTRU...
A STUDY ON THE QUALITATIVE ANALYSIS OF MATERIALS MANAGEMENT IN KERALA CONSTRU...
 
Assesing the various problems facing in arranging appropirate labour and qual...
Assesing the various problems facing in arranging appropirate labour and qual...Assesing the various problems facing in arranging appropirate labour and qual...
Assesing the various problems facing in arranging appropirate labour and qual...
 
IRJET- Controlling and Monitoring the Construction Projects by using Earned V...
IRJET- Controlling and Monitoring the Construction Projects by using Earned V...IRJET- Controlling and Monitoring the Construction Projects by using Earned V...
IRJET- Controlling and Monitoring the Construction Projects by using Earned V...
 
The role of time, cost and quality in project management
The role of time, cost and quality in project managementThe role of time, cost and quality in project management
The role of time, cost and quality in project management
 
IRJET- An Assessment of Role of Material Management in Construction Projects
IRJET- An Assessment of Role of Material Management in Construction ProjectsIRJET- An Assessment of Role of Material Management in Construction Projects
IRJET- An Assessment of Role of Material Management in Construction Projects
 
IRJET- Optimized Project Planning and Scheduling of Multistorey Building
IRJET-  	  Optimized Project Planning and Scheduling of Multistorey BuildingIRJET-  	  Optimized Project Planning and Scheduling of Multistorey Building
IRJET- Optimized Project Planning and Scheduling of Multistorey Building
 
Ijciet 10 01_075
Ijciet 10 01_075Ijciet 10 01_075
Ijciet 10 01_075
 
IRJET- Planning and Scheduling for a Multi-Storied Building using MS-Project
IRJET-  	  Planning and Scheduling for a Multi-Storied Building using MS-ProjectIRJET-  	  Planning and Scheduling for a Multi-Storied Building using MS-Project
IRJET- Planning and Scheduling for a Multi-Storied Building using MS-Project
 
IRJET- Implementing Time and Cost Optimization in Commercial Building using P...
IRJET- Implementing Time and Cost Optimization in Commercial Building using P...IRJET- Implementing Time and Cost Optimization in Commercial Building using P...
IRJET- Implementing Time and Cost Optimization in Commercial Building using P...
 
Planning, Scheduling, Resource Allocating and Tracking of Residential (G+2) V...
Planning, Scheduling, Resource Allocating and Tracking of Residential (G+2) V...Planning, Scheduling, Resource Allocating and Tracking of Residential (G+2) V...
Planning, Scheduling, Resource Allocating and Tracking of Residential (G+2) V...
 
IRJET- Planning, Scheduling, and Optimization of Labor Resources in the C...
IRJET-  	  Planning, Scheduling, and Optimization of Labor Resources in the C...IRJET-  	  Planning, Scheduling, and Optimization of Labor Resources in the C...
IRJET- Planning, Scheduling, and Optimization of Labor Resources in the C...
 
Construction Project Scheduling of MK Apartment using MS Project 2013
Construction Project Scheduling of MK Apartment using MS Project 2013Construction Project Scheduling of MK Apartment using MS Project 2013
Construction Project Scheduling of MK Apartment using MS Project 2013
 
IRJET- Efficient Techniques of Construction Material Management in Constr...
IRJET-  	  Efficient Techniques of Construction Material Management in Constr...IRJET-  	  Efficient Techniques of Construction Material Management in Constr...
IRJET- Efficient Techniques of Construction Material Management in Constr...
 
Project management tools and techniques- tutorsindia.com
Project management tools and techniques- tutorsindia.comProject management tools and techniques- tutorsindia.com
Project management tools and techniques- tutorsindia.com
 
Planning, Scheduling and Allocation of Resources for Multi – storiedStructure...
Planning, Scheduling and Allocation of Resources for Multi – storiedStructure...Planning, Scheduling and Allocation of Resources for Multi – storiedStructure...
Planning, Scheduling and Allocation of Resources for Multi – storiedStructure...
 
Efficient Planning Scheduling and Delay Analysis of Residential Project
Efficient Planning Scheduling and Delay Analysis of Residential ProjectEfficient Planning Scheduling and Delay Analysis of Residential Project
Efficient Planning Scheduling and Delay Analysis of Residential Project
 
Project typed
Project typedProject typed
Project typed
 
Project Planning, Scheduling and Preparation of Quality Assurance Control Doc...
Project Planning, Scheduling and Preparation of Quality Assurance Control Doc...Project Planning, Scheduling and Preparation of Quality Assurance Control Doc...
Project Planning, Scheduling and Preparation of Quality Assurance Control Doc...
 

More from IRJET Journal

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...IRJET Journal
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTUREIRJET Journal
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...IRJET Journal
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsIRJET Journal
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...IRJET Journal
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...IRJET Journal
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...IRJET Journal
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...IRJET Journal
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASIRJET Journal
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...IRJET Journal
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProIRJET Journal
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...IRJET Journal
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemIRJET Journal
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesIRJET Journal
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web applicationIRJET Journal
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...IRJET Journal
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.IRJET Journal
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...IRJET Journal
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignIRJET Journal
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...IRJET Journal
 

More from IRJET Journal (20)

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web application
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
 

Recently uploaded

Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...RajaP95
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 

Recently uploaded (20)

★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 

IRJET- Analysis of Material Requirement Planning for Construction Project : Case Study (Residential Building)

  • 1. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 07 Issue: 01 | Jan 2019 www.irjet.net p-ISSN: 2395-0072 © 2020, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 24 Analysis of Material Requirement Planning for Construction Project: Case Study (Residential Building) Rupesh Hulakant Supe1, Manish D. Mata2 1M-TECH(Construction Technology & Management) Student, Dept. of Civil Engineering, Shri Sant Gadgebaba College of Engineering & Technology, Bhusawal, Maharashtra, India,425203. 2Assistant Professor , Dept. of Civil Engineering, Shri Sant Gadgebaba College of Engineering & Technology, Bhusawal, Maharashtra, India, 425203. ----------------------------------------------------------------------------***----------------------------------------------------------------------------- Abstract – Materials Requirements and Planning (MRP) is a system of production planning and inventory control, whichis used to manage manufacturing processes. Most MRP systems are software-based and are used to ensure that the materials are available for production, that the products are available for delivery to customers, thatthelowestpossible materialand product level is maintained in store, as well as to plan delivery schedules and purchasing activities. Upon completion of scheduling, begins the process of follow-up, which includesthe achievement of the project goals in terms of quantity, quality and costs in accordance with deadlines. Key Words:MaterialsRequirementPlanning(MRP),cost, project management, Material Management, scheduling process. 1. INTRODUCTION Construction material constitutesa majorcostcomponentin any construction project. The total cost of installed material may be 50% or more of the total cost. The goal of material management is to ensure that the materials are available at their point of use when needed hence, efficientprocurement of material represents a key role in the successful completion of the work. Materials management is a critical component of the construction industry. As such, organizations need to understand the effects of proper materials management techniques on the effectiveness of project execution. “Material management is defined as the process to provide right material at right place at right time in right quantity so as to minimize the cost of project”. Material management is concerned with the planning, identification, procuring, storage, receiving and distribution of material. The responsibility of Material management department for the flow of material from the time the material is ordered, received, and stored until they are used is the basic responsibilityof material management.Materials represent a major expense in construction, so minimizing procurement cost improves opportunities for reducing the overall project cost.[1] The material requirement planning (MRP) is a systematic plan to control inventory. Generally it is a procedure for planning and controlling the raw material in manufacturing a product. Materials Requirement Planning (MRP) refers to production planning, scheduling, and inventory control soft ware systems used to manage manufacturing processes. Namely, it aims to enablethe company’smanagementtoplan the product parts and control the inflow of these parts to fulfill the service or product within the scheduled time period. Material Requirements Planning (MRP) is a time phased priority planning technique that calculates material requirements and schedules supply to meet demand across all products and parts in one or more plants. In conventional methods, the project budgeted total cost is determined by the difference, between the actual cost, and planned cost. That means the project manager’s focus was on only for planned cost and expenditure cost as actual cost. In modern days many schedule properties and costparametersonlyfor planned cost and expenditure cost as actual cost. In modern days many schedule properties and cost parameters are considered. Because it is very important in every construction project, losses are due to inadequate construction management and cost performances done by the contracts in the road construction projects. So it is necessary to develop the planning technique to easy the works and risks arises in the projects. 1.1 Objectives 1. To study the concept of MRP 2. To identify the factors affecting MRP 3. To conduct case study for above studies 4. Analysis on the above same 1.2 Scope of the study: To improve material management in the construction project as well as with proper management of material reduced the tatal cost of the project. 2. STUDY OF MATERIAL REQUIREMENT PLANNING 2.1 Introduction This chapter deals with the study of material requirement planning at construction site, Basically function of the material requirement planning. It includes Planning, purchasing, transportation, storage, controlling, directing, receiving etc. To reduce duration of the projects it is important to understand the concept of material requirements at site & function of material requirement
  • 2. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 07 Issue: 01 | Jan 2019 www.irjet.net p-ISSN: 2395-0072 © 2020, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 25 planning. These chapters also study the objectiveofmaterial requirement plan. Purpose of this chapter to understand knowledge of material requirementplanning andfunctionof material requirement planning. 2.2 Concept of Material Requirement Planning Materials Management is related to planning, procuring, storing and providing the appropriate material of right quality, right quantity at right place in right time so as to co- ordinate and schedule the production activity in an integrative way for an industrial undertaking. Effective management of materials can reduce these costs and contribute significantly to the success of the project. Construction material constitutesa majorcostcomponentin any construction project. The total cost of installed material may be 50% or more of the total cost.“Material management is defined as the process to provide right material at right place at right time in right quantity so as to minimize the cost of project”. [1] Materials Requirement Planning (MRP) referstoproduction planning, scheduling, and inventory control soft ware systems used tomanagemanufacturingprocesses.Namely,it aims to enable the company’s management to plan the product parts and control the inflow of these parts to fulfill the service or product within the scheduled time period.[2] Material Requirements Planning (MRP) is a time phased priority planning technique that calculates material requirements and schedules supply to meet demand across all products and parts in one or more plants. In a construction project, materials account for more than 40% of the total project cost. A small saving in material cost through efficient management of materials can result to a large saving in the total project cost. One of the root causes of improper material management is that materials are ordered based on the information from project schedule. [5] 3. LITERATURE REVIEW Aditya A. Pande (2015) The author said that, Materials management is a critical component of the construction industry. As such, organizations need to understand the effects of proper materials management techniques on the effectiveness of project execution. A properly implemented materials management program can achieve the timely flow of materials and equipment to the jobsite, and thus facilitate improved work face planning, increased labor productivity, better schedules, and lower project costs. Materials management is an important function in order to improve productivity in construction projects. It is defined materials management functions which include planningandmaterial take off, vendor evaluation and selection, purchasing, expenditure, shipping, material receiving, warehousing and inventory, and material distribution. It suggested that construction material constitutes a major cost component in any construction project. Thetotal costof material may be 52% of total cost; so that it is important for contractor to consider that timely availability of material is potential cause of successful completion of project. [1] Abdallah Ali Imetieg (2015) The author deals with the, Materials Requirements and Planning (MRP) is a system of production planning and inventory control, which is used to manage manufacturing processes. Most MRP systems are software-based and are used to ensure that the materials are available for production, that the products are available for delivery to customers, that the lowest possible material and product level is maintained in store, as well as to plan delivery schedules and purchasing activities. There is a correlation between time and cost of each activity. If the required time is shorter than the scheduled time of the certain activity, it would demand more resources, which further leads to the increase in direct costs of the given activity. Therefore, the output of MRP is important since commands are issued through planning in order to launch the suggested orders with the required quantities and within the limited time period. The author conclude that the outcome of the propositions, the relationship between the time needed to execute the project and the cost is a linear relationship, so that costs can be changed with every proportional change in the period of implementation of each activity.[2] Gerhard Plenert (1999) The author deals with the successes and disappointmentsof MRP. It studies numerous articles to determinewhatthekey shortcomings of MRP are. Next, it investigates if these failures are correctable, and what the consequences of not correcting these deficiencies means. This article considers alternatives that have been discussed in the current literature. Last of all this article discusses whether the improvements these alternatives suggest are sufficient to make MRP worth salvaging, or whether MRPisa systemthat needs to be discarded in favor of systemssuchasJIT(Just-in- Time), Optimized Production Technology (OPT), Theory of Constraints (TOC), and Bottleneck Allocation Methodology (BAM).[3] Rohit J. Mehendale (2019) The author said that, Scheduling, material requirement plan (MRP) and cash outflow analysis are some of the major elements which need to work out in a construction project. Generally, different software’s are available for each of this task. When there is a delay in the planned schedule, itistime consuming to get MRP and cash outflow plan updated according to the received schedule. The author conclude that, the use of software’s for scheduling ,MRP, cash outflow withinterconnectingfeatures
  • 3. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 07 Issue: 01 | Jan 2019 www.irjet.net p-ISSN: 2395-0072 © 2020, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 26 helped updating the schedule on delays and consequent updating of MRP and cash outflow. Breaking a majoractivity into smaller activities and proper sequencing in the preparation of schedule reduce the construction time significantly. A proper MRP and cash outflow help to avoid delays in construction. [4] Deepa V, Sahimol Eldhose (2018) The author said that, in a construction project, materials account for more than 40% of the total project cost. A small saving in material cost through efficient management of materials can result to a large saving in the total projectcost. One of the root causes of improper material management is that materials are ordered based on the information from project schedule. Hence the study is conducted to optimize the cost through material requirement planning for District road construction based on site scenario. The studyinvolves mainly three stages, namely factors identification, data collection and its analysis. Data collection on factors which are based on time, cost, quality, quantity and location of various activities were acquired. These were analyzed and optimization of cost is done through MRP. [5] 4. CONCLUSION A very positive impact is expected in the future about the material requirement planning. The above study provides necessity to determine the impact of MRP on construction projects by considering the concept of MRP ontheirlivecase studies and analyzing the collected data. REFERENCES 1. Aditya A. Pande, S .Sabihuddin: Study of Material Management Techniques on Construction Project. 2. PROJECT SCHEDULING METHOD WITH TIME USING MRP SYSTEM – A CASE STUDY: CONSTRUCTION PROJECT IN LIBYA Abdallah Ali Imeti eg1,*, Miroslav Lutova 3. Focusing material requirements planning (MRP) towards performance Gerhard Plenert 4. Scheduling, Material Requirement Plan (MRP) And Cash Outflow Analysis: A Case study Rohit J. Mehendale1 and Aniket s. Patil2 5. Optimization of Material Cost through MRP in Road Construction Deepa V, Sahimol Eldhose