SlideShare a Scribd company logo
1 of 18
Operational Material
A 7-sheet Survey Questionnaire
Resource Inputs and Basic Headings
Outline
Overall Validation Process
Timetable
Overall Methodology
1
3
4
5
6
2 Data Requirements
2
Classification of the Construction
Sector
Construction
and Civil
Engineering
3
3 Basic
Headings
3 Categories
of Input
Resources
50 Input Resources
Residential
Building
Civil
Engineering
Non-
Residential
Building
Machinery
Equipment
Labor
38
5
7
Materials & Products
Equipment items
Labour services
Machinery
Equipment
Labor
38
5
7
Materials & Products
Equipment items
Labour services
Machinery
Equipment
Labor
38
5
7
Materials & Products
Equipment items
Labour services
Data Requirements
Materials
Equipment
Labour
Residential Non Residential Civil Engineer.
Expenditure Value Expenditure Value Expenditure Value
1
…
38
1
…
5
1
…
7
4
Importanc
e Price
Importanc
e Price
Importanc
e Price
Importanc
e Price
Importanc
e Price
Importanc
e Price
Importanc
e Price
Importanc
e Price
Importanc
e Price
Hire Rate
Hire Rate
…
Hire Rate
Hire Rate
…
Hire Rate
Hire Rate
…
Labor Rate
Labor Rate
…
Labor Rate
Labor Rate
…
Labor Rate
Labor Rate
…
Contractor’s mark-ups
Professional Fees …
…
…
…
…
…
Resource Mix [%] Resource Mix [%] Resource Mix [%]
Resource Mix [%] Resource Mix [%] Resource Mix [%]
Resource Mix [%] Resource Mix [%] Resource Mix [%]
Calculate unweighted PPPs for the 3 sub-headings by group of
countries
Basic Heading (BH) breakdown into 3 sub-headings: Materials, Labor,
Equipment
Aggregate the PPPs for the 3 subheadings using the Resource Mixes
to obtain weighted PPPs for the 3 BHs
Combine the adjusted BH PPPs using expenditures on the BHs as
weights to obtain overall PPPs for construction
Adjust the 3 BH PPPs for mark ups, professional fees and end-user
taxes
1
3
4
5
2
Overall Methodology
5
Material
Introduction
A 7-Sheet Survey Questionnaire
Equipment
Labour
Project Prices (Optional – used as checks on
input based PPPs)
Explanatory Notes
1
2
3
4
5
6
Supporting Information
5 Technical
Survey Forms
Identification Form
7 6
Country
collect mid year national average prices
1
Currency2
Survey respondent
Name3
Employer4
Type of Employer5 Consultant academic research Govern.t Other
Contact details6
Telephone7 Email8
Purpose of the survey
Base date for prices
Please tick box9 Prices averaged over the year Mid year prices
National average price level
Geographical base10 National average factor11
1. Introduction
7
General
notes
Identify
Locally
available
Commonly
used
Identical or
equivalent to
prescribed
items
Materials
and
services
and collect
their
prices
Item
descriptions
and units
Not identical but equivalent
Proprietary products
Not metric dimensions
For materials & equipment
For labour
Other notes (materials,
equipment, labour)
If products
specs.
Columns
10
If
alternative
units of
measure.
Column 5
Column 4
Columns
10, 8 or 7
Report in
Report in
Report in
Report in
For equipment hire, if per day
or weekIf unit not
per hour
Report
For labor, if different unit
Situation
Number of
hours
In Column 5 In Column 8
In Column 4 Column 5
2. Notes – Item Descriptions
8
Types of prices
Geographical location
Local resource and distribution costs,
geographic, seismic or climatic conditions,
local market conditions, etc.
2. Notes - Prices
Labour
Actual employment
cost
Equipment hire
Rental charges
Materials
Actual purchasers’
prices
Site context Respondents should assume reasonable site
contexts with good access.
Size of projects The larger the projects, the larger the
quantities, and hence lower unit costs.
Prices can be
influenced
9
3. Material – Layout of the questionnaire
Ref Item
Specifications
Notes
Pref.
Unit
Alternati
ve. Unit
Unit
Price
Residential
Non
Residential
Civil
Engineering
Notes and Comments
01
Aggregat
e for
concrete
Clean, hard,
strong
m3 1 1 1
02 1 1
03 1
1 1
36 1
37 1
38
Electriv
ity
Typical
average
commercial..
KWhr 1 1
1 4 52 3 6 7 8 9 10
Comments
Enter “1” or “*” if important
10
4. Equipment – Layout of the questionnaire
Ref Item
Specifications
Notes
Pref.
Unit
Alternative.
Unit
Unit Price with
operator
Unit Price without
operator
Notes and comments
01
Wheeled loader and
excavator
1.0m3 loader
capacity
hour
02
03
04
05
Compact track
loader
Rated
capacity: 864
kg
hour
1 4 52 3 6 7 8
Comments
11
5. Labour – Layout of the questionnaire
Ref Item
Pref.
Unit
Alternative.
Unit
Number of
hours
Unit Price Notes and comments
01 General (unskilled) labourers hour
02
03
04
05 Structural steel worker hour
1 4 52 3 6 7
Comments
06 Electrician hour
07 Machine (equipment) operator hour
12
6. Project Prices – Layout of the questionnaire
The collection of project prices is optional as those prices are not essential for the calculation of PPPs. They
can however be used as an additional resource in the validation process.
Ref Project Type
Pref.
Unit
Alternative.
Unit
Notes and comments
01
Single storey average quality detached house masonry
(brick or block) or timber frame
m 2 floor
area
02
Two storey attached house, mass market, centre unit in terrace/
row of four units, otherwise as above
m 2 floor
area
03
04
1 4 62 3
10
Length of concrete sewer pipes, 0.5m diameter, average 2
m depth
m length
11
Length of concrete sewer pipes, 1m diameter, average 3 m
depth
m length
Unit rate
m 2 floor
area
m 2 floor
area
5
m length
m length
13
7. Supporting Information – Layout of the
questionnaire
The mix of construction resources Residential
Non
Residential
Civil
Engineering
01 Construction materials and products
02 Construction equipment
03 Construction site labour
Total project value 100% 100% 100%
Contractors’ mark-ups Residential
Non
Residential
Civil E.
01
Total mark-up of which, general site costs and
temporary works
02 Head office overheads
03 Profit
Other contractors costs04
Professional Fees
01
Overall percentage addition for professional
services
Residential
Non
Residential
Civil E.
14
E
27%
L
10%
M
63%
Residential
E
25%
L
12%
M
63%
Non-residential
E
23%
L
30%
M
47%
Civil Engineering
Example of Resource Mixes
15
Data Compilation
National Level (Intra-country Validation)
Regional Level (Inter-country Validation)
Global Level (Inter-country Validation Across Regions)
Initial data validation Finalization of data
Initial data
validation
Finalization of
Data
Analytical Tables
(QT/DT)
Temporal
Analysis
Overall Validation Process
16
2011
Timetable
Price collection will be
conducted between
July and October 2011
Jun Jul Aug Sep Oct Nov Dec
Mid year prices to be
reported
17
THANK YOU
18

More Related Content

What's hot

Construction phases
Construction phasesConstruction phases
Construction phasesMeesum Zaidi
 
Planning and Scheduling Construction Projects using Primavera Software A Case...
Planning and Scheduling Construction Projects using Primavera Software A Case...Planning and Scheduling Construction Projects using Primavera Software A Case...
Planning and Scheduling Construction Projects using Primavera Software A Case...ijtsrd
 
Controling productivity in construction projects
Controling productivity in construction projectsControling productivity in construction projects
Controling productivity in construction projectsEssam Lotffy, PMP®, CCP®
 
Effective Engineering Management in EPC Industry
Effective Engineering Management in EPC IndustryEffective Engineering Management in EPC Industry
Effective Engineering Management in EPC IndustryPMI Chennai Chapter
 
Introduction to construction management
Introduction to construction managementIntroduction to construction management
Introduction to construction managementXubitech
 
Construction Planning and Scheduling of Residential Building by MS Project by...
Construction Planning and Scheduling of Residential Building by MS Project by...Construction Planning and Scheduling of Residential Building by MS Project by...
Construction Planning and Scheduling of Residential Building by MS Project by...Shabaz Khan
 
Planning can we do with out it?
Planning can we do with out it?Planning can we do with out it?
Planning can we do with out it?Catherine Bendell
 
Construction Project Management
Construction Project ManagementConstruction Project Management
Construction Project Managementjohnkirth1898
 
Sxsw 2011 construction enviroment
Sxsw 2011 construction enviromentSxsw 2011 construction enviroment
Sxsw 2011 construction enviromentjuwes
 
Project management assignment slides
Project management assignment slidesProject management assignment slides
Project management assignment slidesDoreen Yeo
 
Stages In Construction
Stages In ConstructionStages In Construction
Stages In ConstructionAB MAKASANA
 
Cost management basics for Construction Engineers
Cost management basics for Construction EngineersCost management basics for Construction Engineers
Cost management basics for Construction EngineersAmit Kumar Senapati, PMP®
 
Improving engineering productivity_loss_zhao-dungan
Improving engineering productivity_loss_zhao-dunganImproving engineering productivity_loss_zhao-dungan
Improving engineering productivity_loss_zhao-dunganignitetribes
 
OPTIMAL PLANNING AND SCHEDULING OF HIGH RISE BUILDINGS
OPTIMAL PLANNING AND SCHEDULING OF HIGH RISE BUILDINGSOPTIMAL PLANNING AND SCHEDULING OF HIGH RISE BUILDINGS
OPTIMAL PLANNING AND SCHEDULING OF HIGH RISE BUILDINGSIAEME Publication
 
Extension of time Analysis
Extension of time AnalysisExtension of time Analysis
Extension of time AnalysisFarhan Moosa
 

What's hot (20)

Construction phases
Construction phasesConstruction phases
Construction phases
 
Planning and Scheduling Construction Projects using Primavera Software A Case...
Planning and Scheduling Construction Projects using Primavera Software A Case...Planning and Scheduling Construction Projects using Primavera Software A Case...
Planning and Scheduling Construction Projects using Primavera Software A Case...
 
Controling productivity in construction projects
Controling productivity in construction projectsControling productivity in construction projects
Controling productivity in construction projects
 
CJM Construction Consulting Presentation
CJM Construction Consulting PresentationCJM Construction Consulting Presentation
CJM Construction Consulting Presentation
 
Cost Control Process for Construction
Cost Control Process for ConstructionCost Control Process for Construction
Cost Control Process for Construction
 
Effective Engineering Management in EPC Industry
Effective Engineering Management in EPC IndustryEffective Engineering Management in EPC Industry
Effective Engineering Management in EPC Industry
 
Introduction to construction management
Introduction to construction managementIntroduction to construction management
Introduction to construction management
 
Construction Planning and Scheduling of Residential Building by MS Project by...
Construction Planning and Scheduling of Residential Building by MS Project by...Construction Planning and Scheduling of Residential Building by MS Project by...
Construction Planning and Scheduling of Residential Building by MS Project by...
 
Planning can we do with out it?
Planning can we do with out it?Planning can we do with out it?
Planning can we do with out it?
 
Construction Project Management
Construction Project ManagementConstruction Project Management
Construction Project Management
 
Sxsw 2011 construction enviroment
Sxsw 2011 construction enviromentSxsw 2011 construction enviroment
Sxsw 2011 construction enviroment
 
Project management assignment slides
Project management assignment slidesProject management assignment slides
Project management assignment slides
 
ACH 216 Lecture 06 (Pre Construction Planning)
ACH 216 Lecture 06 (Pre Construction Planning)ACH 216 Lecture 06 (Pre Construction Planning)
ACH 216 Lecture 06 (Pre Construction Planning)
 
Stages In Construction
Stages In ConstructionStages In Construction
Stages In Construction
 
Cost management basics for Construction Engineers
Cost management basics for Construction EngineersCost management basics for Construction Engineers
Cost management basics for Construction Engineers
 
Project Control System
Project Control SystemProject Control System
Project Control System
 
Improving engineering productivity_loss_zhao-dungan
Improving engineering productivity_loss_zhao-dunganImproving engineering productivity_loss_zhao-dungan
Improving engineering productivity_loss_zhao-dungan
 
OPTIMAL PLANNING AND SCHEDULING OF HIGH RISE BUILDINGS
OPTIMAL PLANNING AND SCHEDULING OF HIGH RISE BUILDINGSOPTIMAL PLANNING AND SCHEDULING OF HIGH RISE BUILDINGS
OPTIMAL PLANNING AND SCHEDULING OF HIGH RISE BUILDINGS
 
Building services planning manual 2007
Building services planning manual 2007Building services planning manual 2007
Building services planning manual 2007
 
Extension of time Analysis
Extension of time AnalysisExtension of time Analysis
Extension of time Analysis
 

Viewers also liked

Construction Project Managment Techniques
Construction Project Managment TechniquesConstruction Project Managment Techniques
Construction Project Managment Techniquesguestc8140fe
 
Introduction to construction management
Introduction to construction managementIntroduction to construction management
Introduction to construction managementAditi Shah
 
Mn dot bidding and estimating 4 16-13
Mn dot bidding and estimating 4 16-13Mn dot bidding and estimating 4 16-13
Mn dot bidding and estimating 4 16-13jpeabody
 
Arlene Barrera - AB 1484
Arlene Barrera - AB 1484Arlene Barrera - AB 1484
Arlene Barrera - AB 1484Contract Cities
 
Deconstruction Management for Optimized Material Recovery: Rota Flora
Deconstruction Management for Optimized Material Recovery: Rota FloraDeconstruction Management for Optimized Material Recovery: Rota Flora
Deconstruction Management for Optimized Material Recovery: Rota FloraHeather Troutman
 
Quality managment impacts in construction
Quality managment impacts in constructionQuality managment impacts in construction
Quality managment impacts in constructionKhaled Eid
 
Construction techniques of historical buildings
Construction techniques of historical buildingsConstruction techniques of historical buildings
Construction techniques of historical buildingsNiranjan Elavarasu
 
The Techniques Used In Project Managament
The Techniques Used In Project ManagamentThe Techniques Used In Project Managament
The Techniques Used In Project Managamentitsvineeth209
 
P07 room 2-_habibie_razak_-_indonesia_-managing_the_construction_of_lng_projects
P07 room 2-_habibie_razak_-_indonesia_-managing_the_construction_of_lng_projectsP07 room 2-_habibie_razak_-_indonesia_-managing_the_construction_of_lng_projects
P07 room 2-_habibie_razak_-_indonesia_-managing_the_construction_of_lng_projectsHabibie Razak, ACPE., AE
 
Starting a new construction company in Canada?
Starting a new construction company in Canada?Starting a new construction company in Canada?
Starting a new construction company in Canada?Ivette Chorro Fong
 
Greystone Construction | Company Brochure | MN & ND General Contractor
Greystone Construction | Company Brochure | MN & ND General ContractorGreystone Construction | Company Brochure | MN & ND General Contractor
Greystone Construction | Company Brochure | MN & ND General ContractorGreystoneConstruction
 
Axle load for Rail way - linkedin
Axle load for Rail way - linkedinAxle load for Rail way - linkedin
Axle load for Rail way - linkedinHamad Al-oqayli
 
Lp simplex method example in construction managment
Lp simplex method example in construction managmentLp simplex method example in construction managment
Lp simplex method example in construction managmentNaghamNagham
 

Viewers also liked (20)

CONSTRUCTION MANAGEMENT
CONSTRUCTION MANAGEMENTCONSTRUCTION MANAGEMENT
CONSTRUCTION MANAGEMENT
 
Presentation1
Presentation1Presentation1
Presentation1
 
Construction Project Managment Techniques
Construction Project Managment TechniquesConstruction Project Managment Techniques
Construction Project Managment Techniques
 
Introduction to construction management
Introduction to construction managementIntroduction to construction management
Introduction to construction management
 
Mn dot bidding and estimating 4 16-13
Mn dot bidding and estimating 4 16-13Mn dot bidding and estimating 4 16-13
Mn dot bidding and estimating 4 16-13
 
Arlene Barrera - AB 1484
Arlene Barrera - AB 1484Arlene Barrera - AB 1484
Arlene Barrera - AB 1484
 
Deconstruction Management for Optimized Material Recovery: Rota Flora
Deconstruction Management for Optimized Material Recovery: Rota FloraDeconstruction Management for Optimized Material Recovery: Rota Flora
Deconstruction Management for Optimized Material Recovery: Rota Flora
 
Quality managment impacts in construction
Quality managment impacts in constructionQuality managment impacts in construction
Quality managment impacts in construction
 
Revised Resume MSR
Revised Resume MSRRevised Resume MSR
Revised Resume MSR
 
Construction techniques of historical buildings
Construction techniques of historical buildingsConstruction techniques of historical buildings
Construction techniques of historical buildings
 
The Techniques Used In Project Managament
The Techniques Used In Project ManagamentThe Techniques Used In Project Managament
The Techniques Used In Project Managament
 
P07 room 2-_habibie_razak_-_indonesia_-managing_the_construction_of_lng_projects
P07 room 2-_habibie_razak_-_indonesia_-managing_the_construction_of_lng_projectsP07 room 2-_habibie_razak_-_indonesia_-managing_the_construction_of_lng_projects
P07 room 2-_habibie_razak_-_indonesia_-managing_the_construction_of_lng_projects
 
Zeno brothers construction
Zeno brothers constructionZeno brothers construction
Zeno brothers construction
 
Starting a new construction company in Canada?
Starting a new construction company in Canada?Starting a new construction company in Canada?
Starting a new construction company in Canada?
 
Greystone Construction | Company Brochure | MN & ND General Contractor
Greystone Construction | Company Brochure | MN & ND General ContractorGreystone Construction | Company Brochure | MN & ND General Contractor
Greystone Construction | Company Brochure | MN & ND General Contractor
 
Construction project manager
Construction project managerConstruction project manager
Construction project manager
 
Axle load for Rail way - linkedin
Axle load for Rail way - linkedinAxle load for Rail way - linkedin
Axle load for Rail way - linkedin
 
Prema residency
Prema residencyPrema residency
Prema residency
 
Lp simplex method example in construction managment
Lp simplex method example in construction managmentLp simplex method example in construction managment
Lp simplex method example in construction managment
 
Presentation for Investment
Presentation for InvestmentPresentation for Investment
Presentation for Investment
 

Similar to construction project managment_civileng

Construction & Civil Engineering: Operational Aspects
Construction & Civil Engineering: Operational AspectsConstruction & Civil Engineering: Operational Aspects
Construction & Civil Engineering: Operational Aspectssathish sak
 
Project cost stimating
Project cost stimatingProject cost stimating
Project cost stimatinghatim ahmed
 
UNIT - 01 INTRODUCTION
UNIT - 01 INTRODUCTION UNIT - 01 INTRODUCTION
UNIT - 01 INTRODUCTION PremanandDesai
 
Technical Analysis & Financial Analysis
Technical Analysis & Financial AnalysisTechnical Analysis & Financial Analysis
Technical Analysis & Financial Analysisanshagrawal2121
 
Project Controls Expo 13th Nov 2013 - "From Cost Plan To Bid Evaluation To Co...
Project Controls Expo 13th Nov 2013 - "From Cost Plan To Bid Evaluation To Co...Project Controls Expo 13th Nov 2013 - "From Cost Plan To Bid Evaluation To Co...
Project Controls Expo 13th Nov 2013 - "From Cost Plan To Bid Evaluation To Co...Project Controls Expo
 
Unit 9 - Measurung & Estimating & Tendering Process.pdf
Unit 9 - Measurung & Estimating & Tendering Process.pdfUnit 9 - Measurung & Estimating & Tendering Process.pdf
Unit 9 - Measurung & Estimating & Tendering Process.pdfmuhammadadli28
 
Construction equipment need and factors-nrc
Construction equipment need and factors-nrcConstruction equipment need and factors-nrc
Construction equipment need and factors-nrcnarayanch1979
 
Concept of Value Engineering with Case Study
Concept of Value Engineering with Case StudyConcept of Value Engineering with Case Study
Concept of Value Engineering with Case StudyAditya Deshpande
 
Resource Optimization in Mivan Construction Project
Resource Optimization in Mivan Construction ProjectResource Optimization in Mivan Construction Project
Resource Optimization in Mivan Construction ProjectIRJET Journal
 
Thesis presentation (wu 2016)
Thesis presentation  (wu 2016)Thesis presentation  (wu 2016)
Thesis presentation (wu 2016)Jifara Chimdi
 
IRJET- Evaluation of Rework Factors Affecting Cost and Schedule Performance i...
IRJET- Evaluation of Rework Factors Affecting Cost and Schedule Performance i...IRJET- Evaluation of Rework Factors Affecting Cost and Schedule Performance i...
IRJET- Evaluation of Rework Factors Affecting Cost and Schedule Performance i...IRJET Journal
 
IRJET- Maintenance Management of Construction Equipment on Construction P...
IRJET-  	  Maintenance Management of Construction Equipment on Construction P...IRJET-  	  Maintenance Management of Construction Equipment on Construction P...
IRJET- Maintenance Management of Construction Equipment on Construction P...IRJET Journal
 
Economic Analysis - PPT.pptx
Economic Analysis - PPT.pptxEconomic Analysis - PPT.pptx
Economic Analysis - PPT.pptxSulemanAhmad21
 
journalsresaim,+IJRESM_V3_I7_70.pdf
journalsresaim,+IJRESM_V3_I7_70.pdfjournalsresaim,+IJRESM_V3_I7_70.pdf
journalsresaim,+IJRESM_V3_I7_70.pdfKarthikeyanP288430
 
ECA Workshop - Brief
ECA Workshop - BriefECA Workshop - Brief
ECA Workshop - BriefKai Yun Pang
 
Fuzzy Analytical Hierarchy Process Method to Determine the Project Performanc...
Fuzzy Analytical Hierarchy Process Method to Determine the Project Performanc...Fuzzy Analytical Hierarchy Process Method to Determine the Project Performanc...
Fuzzy Analytical Hierarchy Process Method to Determine the Project Performanc...IRJET Journal
 
Technical analysis in project.khudshfkwjjjjjjjjjjs
Technical analysis in project.khudshfkwjjjjjjjjjjsTechnical analysis in project.khudshfkwjjjjjjjjjjs
Technical analysis in project.khudshfkwjjjjjjjjjjsMeghaSingh506383
 

Similar to construction project managment_civileng (20)

Construction & Civil Engineering: Operational Aspects
Construction & Civil Engineering: Operational AspectsConstruction & Civil Engineering: Operational Aspects
Construction & Civil Engineering: Operational Aspects
 
Project cost stimating
Project cost stimatingProject cost stimating
Project cost stimating
 
UNIT - 01 INTRODUCTION
UNIT - 01 INTRODUCTION UNIT - 01 INTRODUCTION
UNIT - 01 INTRODUCTION
 
Technical Analysis & Financial Analysis
Technical Analysis & Financial AnalysisTechnical Analysis & Financial Analysis
Technical Analysis & Financial Analysis
 
Project Controls Expo 13th Nov 2013 - "From Cost Plan To Bid Evaluation To Co...
Project Controls Expo 13th Nov 2013 - "From Cost Plan To Bid Evaluation To Co...Project Controls Expo 13th Nov 2013 - "From Cost Plan To Bid Evaluation To Co...
Project Controls Expo 13th Nov 2013 - "From Cost Plan To Bid Evaluation To Co...
 
E.c.v Introduction
E.c.v IntroductionE.c.v Introduction
E.c.v Introduction
 
Unit 9 - Measurung & Estimating & Tendering Process.pdf
Unit 9 - Measurung & Estimating & Tendering Process.pdfUnit 9 - Measurung & Estimating & Tendering Process.pdf
Unit 9 - Measurung & Estimating & Tendering Process.pdf
 
Construction equipment need and factors-nrc
Construction equipment need and factors-nrcConstruction equipment need and factors-nrc
Construction equipment need and factors-nrc
 
Concept of Value Engineering with Case Study
Concept of Value Engineering with Case StudyConcept of Value Engineering with Case Study
Concept of Value Engineering with Case Study
 
Resource Optimization in Mivan Construction Project
Resource Optimization in Mivan Construction ProjectResource Optimization in Mivan Construction Project
Resource Optimization in Mivan Construction Project
 
Thesis presentation (wu 2016)
Thesis presentation  (wu 2016)Thesis presentation  (wu 2016)
Thesis presentation (wu 2016)
 
IRJET- Evaluation of Rework Factors Affecting Cost and Schedule Performance i...
IRJET- Evaluation of Rework Factors Affecting Cost and Schedule Performance i...IRJET- Evaluation of Rework Factors Affecting Cost and Schedule Performance i...
IRJET- Evaluation of Rework Factors Affecting Cost and Schedule Performance i...
 
IRJET- Maintenance Management of Construction Equipment on Construction P...
IRJET-  	  Maintenance Management of Construction Equipment on Construction P...IRJET-  	  Maintenance Management of Construction Equipment on Construction P...
IRJET- Maintenance Management of Construction Equipment on Construction P...
 
Economic Analysis - PPT.pptx
Economic Analysis - PPT.pptxEconomic Analysis - PPT.pptx
Economic Analysis - PPT.pptx
 
PLANT LOCATION
PLANT LOCATIONPLANT LOCATION
PLANT LOCATION
 
journalsresaim,+IJRESM_V3_I7_70.pdf
journalsresaim,+IJRESM_V3_I7_70.pdfjournalsresaim,+IJRESM_V3_I7_70.pdf
journalsresaim,+IJRESM_V3_I7_70.pdf
 
ECA Workshop - Brief
ECA Workshop - BriefECA Workshop - Brief
ECA Workshop - Brief
 
Fuzzy Analytical Hierarchy Process Method to Determine the Project Performanc...
Fuzzy Analytical Hierarchy Process Method to Determine the Project Performanc...Fuzzy Analytical Hierarchy Process Method to Determine the Project Performanc...
Fuzzy Analytical Hierarchy Process Method to Determine the Project Performanc...
 
Technical analysis in project.khudshfkwjjjjjjjjjjs
Technical analysis in project.khudshfkwjjjjjjjjjjsTechnical analysis in project.khudshfkwjjjjjjjjjjs
Technical analysis in project.khudshfkwjjjjjjjjjjs
 
Eca workshop
Eca workshopEca workshop
Eca workshop
 

Recently uploaded

What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAbhinavSharma374939
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 

Recently uploaded (20)

What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog Converter
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 

construction project managment_civileng

  • 2. A 7-sheet Survey Questionnaire Resource Inputs and Basic Headings Outline Overall Validation Process Timetable Overall Methodology 1 3 4 5 6 2 Data Requirements 2
  • 3. Classification of the Construction Sector Construction and Civil Engineering 3 3 Basic Headings 3 Categories of Input Resources 50 Input Resources Residential Building Civil Engineering Non- Residential Building Machinery Equipment Labor 38 5 7 Materials & Products Equipment items Labour services Machinery Equipment Labor 38 5 7 Materials & Products Equipment items Labour services Machinery Equipment Labor 38 5 7 Materials & Products Equipment items Labour services
  • 4. Data Requirements Materials Equipment Labour Residential Non Residential Civil Engineer. Expenditure Value Expenditure Value Expenditure Value 1 … 38 1 … 5 1 … 7 4 Importanc e Price Importanc e Price Importanc e Price Importanc e Price Importanc e Price Importanc e Price Importanc e Price Importanc e Price Importanc e Price Hire Rate Hire Rate … Hire Rate Hire Rate … Hire Rate Hire Rate … Labor Rate Labor Rate … Labor Rate Labor Rate … Labor Rate Labor Rate … Contractor’s mark-ups Professional Fees … … … … … … Resource Mix [%] Resource Mix [%] Resource Mix [%] Resource Mix [%] Resource Mix [%] Resource Mix [%] Resource Mix [%] Resource Mix [%] Resource Mix [%]
  • 5. Calculate unweighted PPPs for the 3 sub-headings by group of countries Basic Heading (BH) breakdown into 3 sub-headings: Materials, Labor, Equipment Aggregate the PPPs for the 3 subheadings using the Resource Mixes to obtain weighted PPPs for the 3 BHs Combine the adjusted BH PPPs using expenditures on the BHs as weights to obtain overall PPPs for construction Adjust the 3 BH PPPs for mark ups, professional fees and end-user taxes 1 3 4 5 2 Overall Methodology 5
  • 6. Material Introduction A 7-Sheet Survey Questionnaire Equipment Labour Project Prices (Optional – used as checks on input based PPPs) Explanatory Notes 1 2 3 4 5 6 Supporting Information 5 Technical Survey Forms Identification Form 7 6
  • 7. Country collect mid year national average prices 1 Currency2 Survey respondent Name3 Employer4 Type of Employer5 Consultant academic research Govern.t Other Contact details6 Telephone7 Email8 Purpose of the survey Base date for prices Please tick box9 Prices averaged over the year Mid year prices National average price level Geographical base10 National average factor11 1. Introduction 7
  • 8. General notes Identify Locally available Commonly used Identical or equivalent to prescribed items Materials and services and collect their prices Item descriptions and units Not identical but equivalent Proprietary products Not metric dimensions For materials & equipment For labour Other notes (materials, equipment, labour) If products specs. Columns 10 If alternative units of measure. Column 5 Column 4 Columns 10, 8 or 7 Report in Report in Report in Report in For equipment hire, if per day or weekIf unit not per hour Report For labor, if different unit Situation Number of hours In Column 5 In Column 8 In Column 4 Column 5 2. Notes – Item Descriptions 8
  • 9. Types of prices Geographical location Local resource and distribution costs, geographic, seismic or climatic conditions, local market conditions, etc. 2. Notes - Prices Labour Actual employment cost Equipment hire Rental charges Materials Actual purchasers’ prices Site context Respondents should assume reasonable site contexts with good access. Size of projects The larger the projects, the larger the quantities, and hence lower unit costs. Prices can be influenced 9
  • 10. 3. Material – Layout of the questionnaire Ref Item Specifications Notes Pref. Unit Alternati ve. Unit Unit Price Residential Non Residential Civil Engineering Notes and Comments 01 Aggregat e for concrete Clean, hard, strong m3 1 1 1 02 1 1 03 1 1 1 36 1 37 1 38 Electriv ity Typical average commercial.. KWhr 1 1 1 4 52 3 6 7 8 9 10 Comments Enter “1” or “*” if important 10
  • 11. 4. Equipment – Layout of the questionnaire Ref Item Specifications Notes Pref. Unit Alternative. Unit Unit Price with operator Unit Price without operator Notes and comments 01 Wheeled loader and excavator 1.0m3 loader capacity hour 02 03 04 05 Compact track loader Rated capacity: 864 kg hour 1 4 52 3 6 7 8 Comments 11
  • 12. 5. Labour – Layout of the questionnaire Ref Item Pref. Unit Alternative. Unit Number of hours Unit Price Notes and comments 01 General (unskilled) labourers hour 02 03 04 05 Structural steel worker hour 1 4 52 3 6 7 Comments 06 Electrician hour 07 Machine (equipment) operator hour 12
  • 13. 6. Project Prices – Layout of the questionnaire The collection of project prices is optional as those prices are not essential for the calculation of PPPs. They can however be used as an additional resource in the validation process. Ref Project Type Pref. Unit Alternative. Unit Notes and comments 01 Single storey average quality detached house masonry (brick or block) or timber frame m 2 floor area 02 Two storey attached house, mass market, centre unit in terrace/ row of four units, otherwise as above m 2 floor area 03 04 1 4 62 3 10 Length of concrete sewer pipes, 0.5m diameter, average 2 m depth m length 11 Length of concrete sewer pipes, 1m diameter, average 3 m depth m length Unit rate m 2 floor area m 2 floor area 5 m length m length 13
  • 14. 7. Supporting Information – Layout of the questionnaire The mix of construction resources Residential Non Residential Civil Engineering 01 Construction materials and products 02 Construction equipment 03 Construction site labour Total project value 100% 100% 100% Contractors’ mark-ups Residential Non Residential Civil E. 01 Total mark-up of which, general site costs and temporary works 02 Head office overheads 03 Profit Other contractors costs04 Professional Fees 01 Overall percentage addition for professional services Residential Non Residential Civil E. 14
  • 16. Data Compilation National Level (Intra-country Validation) Regional Level (Inter-country Validation) Global Level (Inter-country Validation Across Regions) Initial data validation Finalization of data Initial data validation Finalization of Data Analytical Tables (QT/DT) Temporal Analysis Overall Validation Process 16
  • 17. 2011 Timetable Price collection will be conducted between July and October 2011 Jun Jul Aug Sep Oct Nov Dec Mid year prices to be reported 17