1. PROJECT FOR ONE UNIT DOUBLE-STOREY SEMI
DETACHED HOUSE (TYPE A) ON LOT 1774, MUKIM
KAPAR DAERAH KLANG, SELANGOR DARUL EHSAN.
2. PROPOSED CONSTRUCTION AND COMPLETION OF ONE UNIT
DOUBLE-STOREY SEMI-DETACHED HOUSE (TYPE A)
ON LOT 1774, MUKIM KAPAR DAERAH KLANG, SELANGOR DARUL EHSAN
FOR: EN. SHAHAR SHAM MD NOR
NO. 34A, JALAN KOTA RAYA E27/E, SEKSYEN 27, HICOM TOWN CENTRE, 40400 SHAH ALAM, SELANGOR
DARUL EHSAN.
C&S ENGINEER
PERUNDING TRUSSMAJU
SDN BHD
8-2B, JALAN BOEING
PADANG E13/E, SEKSYEN
13, 40100 SHAH ALAM,
SELANGOR DARUL EHSAN.
2
ARCHITECT
ARKITEK URBANISMA
SUITE E411, EAST WING,
4TH FLOOR, WISMA
CONSPLANT 1, NO.2, JALAN
SS 16/4, 47500 SUBANG
JAYA, SELANGOR DARUL
EHSAN.
M&E ENGINEER
SIGNTECH M&E ENGINEER
SDN BHD NO.11-B, JALAN
DAYA 11, TAMAN DAYA
KEPONG, WILAYAH
PERSEKUTUAN, 52100
KUALA LUMPUR.
QUANTITY SURVEYOR
SHINE CONSULTANTS SDN
BHD
LEVEL 2, MENARA TSR 10,
JALAN PJU 7/2, MUTIARA
DAMANSARA, 47810
PETALING JAYA, SELANGOR
DARUL EHSAN.
18. FORM OF TENDER
Tenderer would insert
his tender amount and
proposed completion
time & agreement to
validity period.
Becomes a legal offer
to the employer when
signing / company
seal
21. FINAL SUMMARY OF
TENDER
Collection of all priced
bills for all sections of
the project.
The tenderer insert his
sectional summary to
arrive at a total
amount which
ultimately becomes
the ‘tender amount’.
22. PREAMBLES
Contain clauses that
serve to introduce and
explain the provisions
in the ‘Specification” &
‘Bills of Quantities’
sections & the scope
of coverage of the
rates in the BQ.
24. BILL OF QUANTITIES
BILL NO.1
PRELIMINARIES
BILL NO.2
MAIN BUILDING WORKS
BILL NO.3
PC & PROVISIONAL SUM
25. BILL NO.1
PRELIMINARIES
Employer’s requirements and
contractor’s obligation in
carrying out the works.
● Name of parties
● Description of Parties
● Facilities to be provided
by the contractor
● Application for
necessary permit &
license
● Schedule for
inspections, records
submissions etc
What is included in Preliminaries:
1. DEFINITION
2. SCOPE OF WORK
3. SITE (LOCATION)
4. TENDER AND DOCUMENTS
5. DRAWINGS
6. PLANT AND TEMPORARY WORKS
7. MATERIALS AND WORKMANSHIP
8. CONTRACT
9. INSURANCE
10. NOMINATED SUB-CONTRACTORS,SUPPLIERS & OTHERS
11. STATUTORY COMPLIANCE, CONTRACTUAL & WORKS OBLIGATION
12. PROTECTION, PRECAUTION & PREVENTION
13. CLEARING AND CLEANING
26. BILL NO.2
MAIN BUILDING WORKS
List of Element
1. PILING WORKS
2. WORK BELOW LOWEST FLOOR
FINISH (PILECAP, GROUND
BEAMS, COLUMN STUMPS,
GROUND FLOOR SLAB)
3. FRAME (COLUMNS, FLOOR
BEAMS, ROOF BEAMS)
4. UPPER FLOORS
5. ROOF (ROOF SLAB & FINISHES,
ROOF TRUSSES & COVERING,
RAINWATER PLUMBING)
6. STAIRS, HAND RAILING AND
BALUSTRADING AND FINISHES
7. EXTERNAL WALL
8. INTERNAL WALLS AND
PARTITIONS
9. WINDOW
10. DOORS AND IRONMONGERY
11. INTERNAL WALL FINISHES
12. INTERNAL FLOOR FINISHES
13. INTERNAL CEILING FINISHES
14. EXTERNAL FINISHES
15. EXTERNAL WORKS WITHIN LOT
BOUNDARY
27. BILL NO.3
PC & PROVISIONAL SUM
PC (PRIME COST)
Specialized works carried
out by nominated sub-
contractors or goods
supplied by nominated
suppliers. Prime cost
sums are exclusive of
profit and attendance.
28. BILL NO.3
PC & PROVISIONAL SUM
PROVISIONAL SUM
Provisional sums are works
that cannot be described and
quantified in accordance with
the rules of the various
standard methods of
measurement during
tendering stage. Provisional
sums should be inclusive of
profit.
29. SCHEDULE OF
DAYWORK RATES
For tenderers to fill in
daywork rates for labour and
machineries.
Daywork rates form the basis
of payment for daywork
ordered by the Architect.
Avoid protracted argument
on the reasonable rates used.
30. FORM OF BANK
GUARANTEE FOR
EARNEST MONEY
A standard form with
pre-determined
wordings for the
tenderer’s sourcing of a
bank guarantee for
earnest money in the
event of a successful
tender.
31. FORM OF BANK
GUARANTEE FOR
PERFORMANCE BOND
A standard form with
pre-determined
wordings for the
tenderer’s sourcing of a
bank
guarantee for
performance bond in
the event of a
successful tender.