This document outlines the group assignment for a quantity surveying course. It recommends the traditional procurement method, two stage selective tendering process, and lump sum contract using the PAM 2006 form for a proposed extension project of the Kuala Lumpur Twin Towers. The traditional method provides the client with lower cost and quality risks while allowing design control. Two stage selective tendering reduces the risk of selecting inexperienced contractors through pre-qualification. The lump sum contract and PAM 2006 form distribute risks fairly and are widely accepted in Malaysia.