7QS Consultant Sdn. Bhd.
Taylor’s University, Lakeside Campus.
No.1, Jalan Taylors,
47500 Subang Jaya,
Selangor Darul Ehsan
Loh Mun Tong 0323680
Loo Siah Mong 0321995
Muhammad Fareez 0322961
Michelle Tung 0324175
Ng Sheng Zhe 0323830
Nicole Thain Huey Wei 0325697
Pui Chun Shian 0323470
INTRODUCTION OF PROJECT
Project title: Construction and completion 1 unit semi-detached house 2
storey high Type B (Lot Lama 1774)
Address : Jalan kapar, Taman Sri Kapar (KU13), Mukim Kapar, Klang
Bandar Diraja, Selangor Darul Ehsan
Building Purposes: Residential
Type of Project: Private
SITE CONDITION
Generally flat. All earthwork, site clearance, external infrastructure works have
already completed by others.
KEY PLAN
CONSTRUCTION SITE
LOCATION PLAN
SITE PLAN
SEMI D TYPE B
SEMI D TYPE A
SEMI D TYPE B
FLOOR PLAN - GROUND FLOOR & FIRST FLOOR
FLOOR PLAN - ROOF PLAN
ELEVATION
FRONT ELEVATION BACK ELEVATION
ELEVATION
RIGHT ELEVATION
SECTIONS
SECTION B-B SECTION A-A
FORM OF CONTRACT
PAM Contract 2006 with Quantities
Under the terms and conditions of the PAM Standard Form contract 2006,
both the employer and contractor form the contractual parties to the
contract.
To ensure that the Contract is administered fairly between both
Contractual Parties, PAM Contract 2006 places the administration under
third party, namely the Architect.
Reasons of using PAM contract 2006 with Quantities
Quality and Quantity of works
Under clause 12, where PAM with quantities mentions that Contract Bills
form the basis for quantity of the works while PAM without quantities
mentions that the Contract Sum is derived from the contractor's own
estimate of the quantity based on Drawings and Specifications.
To ensure the performance on the quantities of works, BOQ is therefore
crucial to provide accurate and sufficient information of the project.
FORM OF CONTRACT (cont’d)
Completion of work on time
Under clause 22.1, liquidated damages and certificate of non-completion,
if the contractor fails to complete the works by the completion date and it
shall be ought to be completed in the opinion of the Architect, the architect
shall issue the certificate of non-completion.
The contractor will compensate the employer from the damages or
referred to as Liquidated Damages from the sum as a debt or from the
performance bond.
FORM OF CONTRACT (cont’d)
FORM OF TENDER
Form where the tenderer insert his
“tender amount” and agreement to
other specified tender conditions by
attesting its signature or company seal
and making this form to be his legal
“offer” to the Employer
INSTRUCTIONS TO TENDERER
Served to inform the tenderer on the
general rules & procedures that they need
to comply within the entire tendering
process
CONDITIONS OF TENDERING
Conditions of tendering is a rules and terms specific to a tender, submission,
evaluation and awarding of the contract.
● Basis of Tender
Firm price tender and no claim is allowed for variation
● Tender Deposit
Fee for the tender documents, RM500.00 shall pay in cash to
“7QS CONSULTANT SDN BHD”
CONDITIONS OF TENDERING (cont’d)
● Tender Bond
- Shall made in the form of Banker’s Draft or unconditional Banker’s Guarantee
- Shall be retained and remain valid until the expiration of 90 days after the
closing of tender
● Tender Validity Period
Remain valid open for consideration for a period of 90 days from the final
closing date for the submission of Tenders
FINAL SUMMARY OF TENDER
● Summary of total amount of
every bill in bills of quantity
● Total bill will be tender sum
PREAMBLE
Contain clauses that serve to introduce
and explain the provisions in the
“Specification” and “Bills of Quantities”
sections and the scope of coverage of
the rates in the BQ
SPECIFICATIONS
Contain extensive clauses on detail
procedures to be followed in executing
the works; requirements & description
of the works to be performed
Eg: Quality & performance of materials
Bill of Quantities
BILL NO. 1 - PRELIMINARIES
The purpose of Preliminaries is to
provide information, general
obligations and liabilities of the
project.
INSURANCE
Insurance of New Building/Works -
By The Employer
BILL NO. 1 - PRELIMINARIES
PROTECTION, PRECAUTION
& PREVENTION
Safety Precaution
Maintenance & protection of
Public Property
Mosquito Prevention
Watching and Security
Fencing and Hoarding
BILL NO 2 - MAIN BUILDING WORKS
PILLING
WORK BELOW LOWEST FLOOR FINISH
FRAME
UPPER FLOORS
ROOF
STAIR AND STAIRCASE FINISHES
EXTERNAL WALLS
BILL NO 2 - MAIN BUILDING WORKS
INTERNAL WALL AND PARTITIONS
WINDOWS & DOORS
INTERNAL WALL FINISHES
INTERNAL FLOOR FINISHES
INTERNAL CEILING FINISHES
EXTERNAL FINISHES
EXTERNAL WORK WITHIN BOUNDARY
BILL NO. 3 - PC AND PROVISIONAL SUMS
Prime Cost (PC) sums
Sums included in the contract to cover specialist works and the supply of
specific materials, which entail the employment of nominated
sub-contractor or nominated supplier.
Provisional sums
Sums included in the contract for works which the full extent and character
cannot be determined precisely at the time the BQ is prepared.
APPENDICES- LIST OF DRAWINGS
SCHEDULE OF FINISHES (1st Floor)
SCHEDULE OF FINISHES (Ground Floor)
SCHEDULE OF FINISHES CONT’D (Ground Floor)
Timber Flooring
Terrazzo Tiles
Anti-Slip Ceramic
Tiles for bathrooms
Cement Render
Ceramic Tiles for Staircase
Cement Plaster
Emulsion Paint
Ceramic Wall Tiles in
Bathroom
Cement Plaster
Weathershield paint
Skim Coat Skim coat with plaster cornices
SCHEDULE OF DAYWORK RATES
SCHEDULE OF DAYWORK RATES
PRICES OF BASIC MATERIALS
FORM OF BANK GUARANTEE FOR EARNEST MONEY/ TENDER BOND
FORM OF BANK GUARANTEE FOR PERFORMANCE BOND
THANK YOU

More Related Content

Similar to Measurement 4

Measurement Assignment
Measurement AssignmentMeasurement Assignment
Measurement Assignmentashleyyeap
 
Measurement iv
Measurement ivMeasurement iv
Measurement ivtfkc1212
 
Measurement 4 presentation
Measurement 4 presentationMeasurement 4 presentation
Measurement 4 presentationLin Hui
 
Tawfig Khidir - CV
Tawfig Khidir - CVTawfig Khidir - CV
Tawfig Khidir - CVTawfig Adham
 
contract_management.ppt
contract_management.pptcontract_management.ppt
contract_management.pptssuser32da691
 
Compiled report
Compiled reportCompiled report
Compiled reportlohwenjun
 
A Course Material On Estimation And Quantity Surveying
A Course Material On Estimation And Quantity SurveyingA Course Material On Estimation And Quantity Surveying
A Course Material On Estimation And Quantity SurveyingClaire Webber
 
Project Management Assignment 1
Project Management Assignment 1Project Management Assignment 1
Project Management Assignment 1DavidJPCChai
 
QUANTITY SURVEYING
QUANTITY SURVEYINGQUANTITY SURVEYING
QUANTITY SURVEYINGlizwi nyandu
 
MEASUREMENT TENDER DOCUMENTATION
MEASUREMENT TENDER DOCUMENTATIONMEASUREMENT TENDER DOCUMENTATION
MEASUREMENT TENDER DOCUMENTATIONFarah Sham
 
3.0 Common Types of Construction Contracts & Standard Conditions of Contract ...
3.0 Common Types of Construction Contracts & Standard Conditions of Contract ...3.0 Common Types of Construction Contracts & Standard Conditions of Contract ...
3.0 Common Types of Construction Contracts & Standard Conditions of Contract ...Praveen Premkumar
 

Similar to Measurement 4 (20)

Measurement Assignment
Measurement AssignmentMeasurement Assignment
Measurement Assignment
 
M4 presentation
M4 presentationM4 presentation
M4 presentation
 
Measurement iv
Measurement ivMeasurement iv
Measurement iv
 
Measurement 4 presentation
Measurement 4 presentationMeasurement 4 presentation
Measurement 4 presentation
 
Real estate investment
Real estate investmentReal estate investment
Real estate investment
 
Tawfig Khidir - CV
Tawfig Khidir - CVTawfig Khidir - CV
Tawfig Khidir - CV
 
contract_management.ppt
contract_management.pptcontract_management.ppt
contract_management.ppt
 
Compiled report
Compiled reportCompiled report
Compiled report
 
Compiled report
Compiled reportCompiled report
Compiled report
 
A Course Material On Estimation And Quantity Surveying
A Course Material On Estimation And Quantity SurveyingA Course Material On Estimation And Quantity Surveying
A Course Material On Estimation And Quantity Surveying
 
Project Management Assignment 1
Project Management Assignment 1Project Management Assignment 1
Project Management Assignment 1
 
TENDER DOCUMENT
TENDER DOCUMENTTENDER DOCUMENT
TENDER DOCUMENT
 
QUANTITY SURVEYING
QUANTITY SURVEYINGQUANTITY SURVEYING
QUANTITY SURVEYING
 
M4ppt
M4pptM4ppt
M4ppt
 
MEASUREMENT TENDER DOCUMENTATION
MEASUREMENT TENDER DOCUMENTATIONMEASUREMENT TENDER DOCUMENTATION
MEASUREMENT TENDER DOCUMENTATION
 
ICI MAGAZINE
ICI MAGAZINE  ICI MAGAZINE
ICI MAGAZINE
 
RAVIKUMAR CV updated 08092016
RAVIKUMAR CV updated 08092016RAVIKUMAR CV updated 08092016
RAVIKUMAR CV updated 08092016
 
3.0 Common Types of Construction Contracts & Standard Conditions of Contract ...
3.0 Common Types of Construction Contracts & Standard Conditions of Contract ...3.0 Common Types of Construction Contracts & Standard Conditions of Contract ...
3.0 Common Types of Construction Contracts & Standard Conditions of Contract ...
 
CV
CVCV
CV
 
M4 presentation slides
M4 presentation slidesM4 presentation slides
M4 presentation slides
 

More from fareezsham

Building economics tutorial 1
Building economics  tutorial 1Building economics  tutorial 1
Building economics tutorial 1fareezsham
 
Pp2 assignment
Pp2 assignmentPp2 assignment
Pp2 assignmentfareezsham
 
Hubungan etnik
Hubungan etnik  Hubungan etnik
Hubungan etnik fareezsham
 
Structural assignment
Structural assignmentStructural assignment
Structural assignmentfareezsham
 
Strategic mgmt present
Strategic mgmt presentStrategic mgmt present
Strategic mgmt presentfareezsham
 
Strategic mgmt group
Strategic mgmt groupStrategic mgmt group
Strategic mgmt groupfareezsham
 
Strategic management
Strategic managementStrategic management
Strategic managementfareezsham
 
Professional practice 1 tut 2
Professional practice 1   tut 2Professional practice 1   tut 2
Professional practice 1 tut 2fareezsham
 
Pp1 group presentation
Pp1 group presentation Pp1 group presentation
Pp1 group presentation fareezsham
 
Elemental cost analysis
Elemental cost analysisElemental cost analysis
Elemental cost analysisfareezsham
 
Little things make big days
Little things make big daysLittle things make big days
Little things make big daysfareezsham
 
Building services 2
Building services 2Building services 2
Building services 2fareezsham
 
Building services 2 final (final)
Building services 2 final (final)Building services 2 final (final)
Building services 2 final (final)fareezsham
 
Ct block work system.docx
Ct block work system.docxCt block work system.docx
Ct block work system.docxfareezsham
 

More from fareezsham (20)

Building economics tutorial 1
Building economics  tutorial 1Building economics  tutorial 1
Building economics tutorial 1
 
Poster
PosterPoster
Poster
 
Pp2 p7
Pp2   p7Pp2   p7
Pp2 p7
 
Pp2 assignment
Pp2 assignmentPp2 assignment
Pp2 assignment
 
Il poster
Il posterIl poster
Il poster
 
Hubungan etnik
Hubungan etnik  Hubungan etnik
Hubungan etnik
 
Structural assignment
Structural assignmentStructural assignment
Structural assignment
 
Strategic mgmt present
Strategic mgmt presentStrategic mgmt present
Strategic mgmt present
 
Strategic mgmt group
Strategic mgmt groupStrategic mgmt group
Strategic mgmt group
 
Strategic management
Strategic managementStrategic management
Strategic management
 
Professional practice 1 tut 2
Professional practice 1   tut 2Professional practice 1   tut 2
Professional practice 1 tut 2
 
Pp1 group presentation
Pp1 group presentation Pp1 group presentation
Pp1 group presentation
 
Elemental cost analysis
Elemental cost analysisElemental cost analysis
Elemental cost analysis
 
Little things make big days
Little things make big daysLittle things make big days
Little things make big days
 
2 nd report
2 nd report2 nd report
2 nd report
 
1 st report
1 st report1 st report
1 st report
 
Building services 2
Building services 2Building services 2
Building services 2
 
Building services 2 final (final)
Building services 2 final (final)Building services 2 final (final)
Building services 2 final (final)
 
Ct block work system.docx
Ct block work system.docxCt block work system.docx
Ct block work system.docx
 
Latest ct3
Latest ct3Latest ct3
Latest ct3
 

Recently uploaded

Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfagholdier
 
fourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writingfourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writingTeacherCyreneCayanan
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdfQucHHunhnh
 
General AI for Medical Educators April 2024
General AI for Medical Educators April 2024General AI for Medical Educators April 2024
General AI for Medical Educators April 2024Janet Corral
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxVishalSingh1417
 
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...PsychoTech Services
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfAdmir Softic
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...christianmathematics
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationnomboosow
 
social pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajansocial pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajanpragatimahajan3
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAssociation for Project Management
 
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...Sapna Thakur
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfchloefrazer622
 
Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpinRaunakKeshri1
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Sapana Sha
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDThiyagu K
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Celine George
 

Recently uploaded (20)

Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
fourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writingfourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writing
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
Advance Mobile Application Development class 07
Advance Mobile Application Development class 07Advance Mobile Application Development class 07
Advance Mobile Application Development class 07
 
General AI for Medical Educators April 2024
General AI for Medical Educators April 2024General AI for Medical Educators April 2024
General AI for Medical Educators April 2024
 
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptx
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communication
 
social pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajansocial pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajan
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across Sectors
 
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdf
 
Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpin
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SD
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17
 

Measurement 4

  • 1. 7QS Consultant Sdn. Bhd. Taylor’s University, Lakeside Campus. No.1, Jalan Taylors, 47500 Subang Jaya, Selangor Darul Ehsan Loh Mun Tong 0323680 Loo Siah Mong 0321995 Muhammad Fareez 0322961 Michelle Tung 0324175 Ng Sheng Zhe 0323830 Nicole Thain Huey Wei 0325697 Pui Chun Shian 0323470
  • 2. INTRODUCTION OF PROJECT Project title: Construction and completion 1 unit semi-detached house 2 storey high Type B (Lot Lama 1774) Address : Jalan kapar, Taman Sri Kapar (KU13), Mukim Kapar, Klang Bandar Diraja, Selangor Darul Ehsan Building Purposes: Residential Type of Project: Private
  • 3. SITE CONDITION Generally flat. All earthwork, site clearance, external infrastructure works have already completed by others.
  • 6. SITE PLAN SEMI D TYPE B SEMI D TYPE A
  • 8. FLOOR PLAN - GROUND FLOOR & FIRST FLOOR
  • 9. FLOOR PLAN - ROOF PLAN
  • 13. FORM OF CONTRACT PAM Contract 2006 with Quantities Under the terms and conditions of the PAM Standard Form contract 2006, both the employer and contractor form the contractual parties to the contract. To ensure that the Contract is administered fairly between both Contractual Parties, PAM Contract 2006 places the administration under third party, namely the Architect.
  • 14. Reasons of using PAM contract 2006 with Quantities Quality and Quantity of works Under clause 12, where PAM with quantities mentions that Contract Bills form the basis for quantity of the works while PAM without quantities mentions that the Contract Sum is derived from the contractor's own estimate of the quantity based on Drawings and Specifications. To ensure the performance on the quantities of works, BOQ is therefore crucial to provide accurate and sufficient information of the project. FORM OF CONTRACT (cont’d)
  • 15. Completion of work on time Under clause 22.1, liquidated damages and certificate of non-completion, if the contractor fails to complete the works by the completion date and it shall be ought to be completed in the opinion of the Architect, the architect shall issue the certificate of non-completion. The contractor will compensate the employer from the damages or referred to as Liquidated Damages from the sum as a debt or from the performance bond. FORM OF CONTRACT (cont’d)
  • 16. FORM OF TENDER Form where the tenderer insert his “tender amount” and agreement to other specified tender conditions by attesting its signature or company seal and making this form to be his legal “offer” to the Employer
  • 17. INSTRUCTIONS TO TENDERER Served to inform the tenderer on the general rules & procedures that they need to comply within the entire tendering process
  • 18. CONDITIONS OF TENDERING Conditions of tendering is a rules and terms specific to a tender, submission, evaluation and awarding of the contract. ● Basis of Tender Firm price tender and no claim is allowed for variation ● Tender Deposit Fee for the tender documents, RM500.00 shall pay in cash to “7QS CONSULTANT SDN BHD”
  • 19. CONDITIONS OF TENDERING (cont’d) ● Tender Bond - Shall made in the form of Banker’s Draft or unconditional Banker’s Guarantee - Shall be retained and remain valid until the expiration of 90 days after the closing of tender ● Tender Validity Period Remain valid open for consideration for a period of 90 days from the final closing date for the submission of Tenders
  • 20. FINAL SUMMARY OF TENDER ● Summary of total amount of every bill in bills of quantity ● Total bill will be tender sum
  • 21. PREAMBLE Contain clauses that serve to introduce and explain the provisions in the “Specification” and “Bills of Quantities” sections and the scope of coverage of the rates in the BQ
  • 22. SPECIFICATIONS Contain extensive clauses on detail procedures to be followed in executing the works; requirements & description of the works to be performed Eg: Quality & performance of materials
  • 24. BILL NO. 1 - PRELIMINARIES The purpose of Preliminaries is to provide information, general obligations and liabilities of the project. INSURANCE Insurance of New Building/Works - By The Employer
  • 25. BILL NO. 1 - PRELIMINARIES PROTECTION, PRECAUTION & PREVENTION Safety Precaution Maintenance & protection of Public Property Mosquito Prevention Watching and Security Fencing and Hoarding
  • 26. BILL NO 2 - MAIN BUILDING WORKS PILLING WORK BELOW LOWEST FLOOR FINISH FRAME UPPER FLOORS ROOF STAIR AND STAIRCASE FINISHES EXTERNAL WALLS
  • 27. BILL NO 2 - MAIN BUILDING WORKS INTERNAL WALL AND PARTITIONS WINDOWS & DOORS INTERNAL WALL FINISHES INTERNAL FLOOR FINISHES INTERNAL CEILING FINISHES EXTERNAL FINISHES EXTERNAL WORK WITHIN BOUNDARY
  • 28. BILL NO. 3 - PC AND PROVISIONAL SUMS Prime Cost (PC) sums Sums included in the contract to cover specialist works and the supply of specific materials, which entail the employment of nominated sub-contractor or nominated supplier. Provisional sums Sums included in the contract for works which the full extent and character cannot be determined precisely at the time the BQ is prepared.
  • 30. SCHEDULE OF FINISHES (1st Floor)
  • 31. SCHEDULE OF FINISHES (Ground Floor)
  • 32. SCHEDULE OF FINISHES CONT’D (Ground Floor)
  • 33. Timber Flooring Terrazzo Tiles Anti-Slip Ceramic Tiles for bathrooms Cement Render Ceramic Tiles for Staircase
  • 34. Cement Plaster Emulsion Paint Ceramic Wall Tiles in Bathroom Cement Plaster Weathershield paint
  • 35. Skim Coat Skim coat with plaster cornices
  • 38. PRICES OF BASIC MATERIALS
  • 39. FORM OF BANK GUARANTEE FOR EARNEST MONEY/ TENDER BOND
  • 40. FORM OF BANK GUARANTEE FOR PERFORMANCE BOND