SlideShare a Scribd company logo
1 of 16
Download to read offline
Factory Address
OMKAR ELECTRICALS
56, Ambica Industrial Park,
Ambica Tube Compund, Nr, Vatva GIDC Overbirdge,
Vatva, Ahmedabad – 382445
(Gujarat.) INDIA.
Cell +91 9374195235
Email: omkarelectricals1429@gmail.com
INDEX
1. Preamble
2. Scope of Work
A. Manufacturing of L.T. Distribution Panel Boards
3. Quality Assurance / Control Producer
4. Our Valued Client List
5. Project Organization and Management Team
6. Distribution Boards Manufactured Till Today
7. List Of Tools
1.Preamble
1.1. THE COMPANY
We OMKAR ELECTRICALS a fast growing firm in electrical field, for manufacturing
Power and Control Distribution Boards. We specialized in range of Power and Control
Panels with for all kind of industries. We have full facility for testing various types of
Distribution Boards. We have professionally managed team to meet most stringent quality
standard to cater to our client’s requirements.
OMKAR ELECTRICALS, also executing all types of projects works. On Turn-Key basis as
per the tender specifications. We have team of qualified and experience Engineers and in
taking care of the title things to keep costs low and performance level high.
Our Mission is to meet our customer’s expectations. To achieve this we strive to provide
innovative electrical solutions and applications through quality materials and superior
craftsmanship. Our focus is to provide services to both the customer and the company by
working together as a team.
We are working in the field of Electrical Control Panels since last more than 35 years and
got lots of progress.
B. APPROCH
OMKAR ELECTRICALS. Our approach is total service orientation. We are dedicated to
Quality and commitments. We believe that each client/project has special need and
therefore we provide special attention from beginning to end, and make economical design
to meet the needs of client. Also product innovation is a continuous at OE. We are fully
upgrade to the latest technology to provide best services of client’s requirements. We
design the projects in best economical manner. The approach of SEF is to render highly
personalized service at each stage and to attend to the need of the project.
2.Scope of Work
OMKAR ELECTRICALS. Provides wide range of services to cater to the project needs of a
cross section of clients / Architects. We are listing down the major services which are
regularly offered by SEF but we understand that each client has different needs so the
emphasis is always on tailored solutions.
A. Our Specialization in L.T Distribution Panel Board
 LT Control Panels
 Power Control Center Panel
 Motor Control Center Panel
 APFCR PANEL
 Auto mains Failure Control Panel
 Bus duct up to 6300A
 Synchronizing Panel
 Auto Battery Charger Panel
 Lighting Distribution Panel
 Power Distribution Panel
 DOL, ATS & Star - Delta Starter Control Panel
 PLC Panel
3.Quality Assurance / Control Producer
OVERVIEW
OE’s fundamental to all works to be understood is to provide quality service by
satisfying client’s requirements.
 The aim of quality management is to achieve satisfaction of the client requirements
in overall progress of each works and the services provided in selection of suitable
rating.
 The quality monitoring system will be fully integrated into the administration,
Project Management and Account Department.
A. QUALITY CONTROL PROCEDURE
 Utmost care is taken to check the quality of deliverables before they are being
issued for execution. The quality assurance programmed shall be to achieve
following objectives.
 Correctness of Documents.
 Reliability of Documents.
 To avoid unnecessary delay in the project schedule.
B. QUALITY ASSURANCE AND TESTING OF PANEL
LIST OF TEST CARRIED OUT AT OUR WORKSHOP
 100 % checking of all Branded components before use.
 Inspection of Fabrication structure for dimensions as per approved G.A.
Drawing.
 Inspection of painting / Powder Coating.
List of Machineries
1.Power Shearing Machine
Cutting-2.0MM Thick Max Lenth
2500MM
2.Hydrolic Bending Machine.
Bending Capacity-2MM Thick, Lenth
Size-2500MM, Stroke/Min.8Storks
3.Drill Machine Capacity-25MM
4. Drill Machine Capacity-20MM
5.Drill Machine Capacity-16MM
6.Drill Machine Capacity-12MM
7.Electric Welding Machine Capacity 400Amp
8. Electric Welding Machine Capacity 300Amp
9.Electric Welding Machine Capacity 250Amp
10.Spot Welding Machine 20Kva
11.Hand Press Machine 6Nos.Size
12.Hand Press Machine 10Nos.Size
13.Bending Machine 3Feet,5Feet,7Feet
14.Handing Shearing Machine 12”Lenth-2Nos.
15.Handing Shearing Machine 3Nos
16.Air Compressor Machine. 2Nos
17.Hydrolic Bending Machine For Pipe, cu,al. Patta
18.Mechanical Hackshaw Machine 1No
Routine Tests are conducted on each panel Like
 H.V Tester, Continuity Tester, Venire-Caliber, Micro Meter, Clip-on Meter,
Megger, Primary Injection Kit, Insulation Resistance Tester
4. Our Valued Client List
List of our Clients
1 Airports Authority Of India – Ahmedabad
2 Airtel – Ahmadabad
3 Ajanta Manufacture Ltd.
4 Apex Automation Pvt.Ltd
5 Arvind Mills
6 Asarwa Mills
7 Asarwa Ovreseas
8 Autonic Systems (India) Pvt.Ltd
9 Bank Of India
10 Deepkiran Foods Pvt.Ltd.
11 Hutch – Ahmedabad
12 Iffco – Kandla
13 Indian Institute Of Management (IIM)
14 Mother Darity
15 National Institute Of Design (NID)
16 National institute of Fashion Design (NIFT)
17 ONGC
18 Plasma Research Laboratory
19 Reliance Engg.Asso.Pvt.Ltd.
20 Reliance Industries Ltd
21 Parsons Electricals, Surat
22 Om Electricals, Ahmedabad
23 Soma Textiles & Indutries
24 Space Application Centre
25 Maize Products, Ahmedabad
26 G Sons Power, Ahmedabad
5. Project Organization and Management Team
OMKAR ELECTRICALS, Believes that a key element to get success in development project
depends in Project Management. In order to accomplish this, OMKAR ELECTRICALS, set
up a special team for all New Projects.
The team head, manage to keep record of telephonic discussion or Personal meeting with
the client. Same is made available to all members of team and the client. The customer has
the responsibility to approve these notes, OMKAR ELECTRICALS maintains a
comprehensive Project-Schedule for every job besides generation of written and
overall co-coordinators of the Project execution and regularly discussing for meeting
target date of completion. During project execution factory and site acceptance test are
taken project progress status is continuously monitored so that problem and deviation can
resolved.
Throughout the life of a project from start to end, There are important / special
actions that need to be taken by the client. As and when the need for such action arises
they are recorded and assigned to specific engineer with the time to complete the action.
The project coordinators on weekly basis review the list and issue alerts and
warnings when the dead line for the action approaches. This ensures timely completion
of the project
OMKAR ELECTRICALS maintains comprehensive Project schedule for every job. The
schedule is decided after first meeting with the client. Normally if is kept with project
team. The schedule shows all critical activities and include key completion dates for
project completion and for the client actions.
Besides, generation of written documentations and the overall co-ordination of project
execution it is the responsibility of the project co-ordinates to meet dead line of
project completion period.
In order to maintain quality communication, resolve issues and related questions and
review project progress. It is necessary for client and SEF to meet periodic basis. SEF
usually recommends that meetings should be held monthly basis. The frequency of
meeting can be increased or decreased depending upon the state of the project. Normally
SEF request the meetings are held at SEF’s office because of the availability of the projects
team. But these also arrange at client site.
As a part of the commencement of the Project, OMKAR ELECTRICALS entrusts the
Work to Project Co-coordinator. Project Progress is continuously Monitored so that
problems and deviations can be addressed at the earliest. Along with the client, SEF
generates periodic progress reports to documents all pertinent period issues
6. Distribution Boards Manufactured Till Today
Weatherford _L.T Panel, Vadodara Birla Collage_3200A FP Busducts
L&T Toll Palza, Rajathan Mcnally Sayaj Engg Ltd (L.T Panel)
Dudh Sager Dairy LT Panel 400kvar RTPFC Panel, Baroda
JCT Syncronizing Panel, Baroda Maize Products, (MCC Panel Ahmedabad)
Torrent D.G.N (Dahej) H.D.C.F BANK BARODA
Synchronizing 500KVAR X 2 with APFCR 400KVAR APFCR Panel (Baroda)
2 X 1000KVA & 1 X 1500KVA DG Set Synchronizing Panel
7. LIST OF TOOLS
Sr. No. Name of Tools Make Capacity/Range Qty.
1 H.V. Tester APEX 2.5 Kv 1
2 Megger Meco 1000V/200MΏ 1
3 Busbar Cutter Hitachi 3500 RPM 1
4 Multimeter Rishabh 2
5 Clamp On Meter Mastech 1
6 Hot Air Gun Hitachi 2
7 Blower Hitachi / Power 1
8 Hylem Cutter B & D 1
9 Drill Machine Hitachi 3
10 Busbar Bender Deepak 1
11 Pedestal Drill M/C Hitachi 1
12 Insulation Tester (Analogue) Meco
1000V-500M
OHMS
1
13 Hole Saw Cutter Taparia 22.5MM 2
14 Flat File Taparia 2
15 H/R File Taparia 2
16 Hacksaw Frame 1
17 Hammer Taparia 1
18 Box Spanner Set Taparia 2
19 Ring Spanner Set Taparia 2
20 Long Nose Pliers Taparia 3
21 Pliers Taparia 3
22 Screw Driver Set Taparia 3
23 Allen Key Taparia 4
24 Crimping Tools 1.5 to 50Sq.mm 2
25 End Sealing Crimping Tools 2
26 Drill Bit Set All Range 2
27 Fix Spanner Set 1
28 Welding Machine 2
29 Earth Resistance Tester 1
30 Laser Printer HP 2
31 Ferrule Machine L-MARK 2
32 FAX HP 1
33 Desktop Computer L.G 2
34 Laptop Dell / Samsung 1
8.RESUMES OF KEY PERSONNALS
Mr. Jignesh Talati
 Proposed Position for this Assignment.: Management
 Name of Person.: Jignesh Talati
 Designation: Patner
 Key Qualifications: Electrical Engineer
 Education: Diploma In Electrical
 Total No. of Years Experience 8 years
Mr. Haresh Patel
 Proposed Position for this Assignment: Management.
 Name of Person.: Haresh Patel
 Designation: Partner
 Key Qualifications: Electrical Engineer
 Total No. of Years Experience 35 years
Mr. Dhaval Patel
 Proposed Position for this Assignment.: Coordinator & Designer
 Name of Person.: Dhaval Patel
 Designation: Manager
 Key Qualifications: Electrical Engineer
 Education: B.E
 Total No. of Years Experience 2 years
Mr. Rohit Ramani
 Proposed Position for this Assignment. Production Supervisor
 Name of Person.: Rohit Ramani
 Designation: Supervisor
 Key Qualifications: Electrician
 Education: B.E
 Total No. of Years Experience 1 years
Mr. Pravin Panchal
 Proposed Position for this Assignment. Production
 Name of Person.: Pravin Panchal
 Designation: Wireman
 Key Qualifications: Wireman
 Education: I.T.I.
 Total No. of Years Experience 15 years
Mr. Sanjay Vagela
 Proposed Position for this Assignment. Production
 Name of Person.: Sanjay Vagela
 Designation: Fitter
 Key Qualifications: Fitter
 Education: I.T.I.
 Total No. of Years Experience 7 years
Mr. Vijay Prajapati
 Proposed Position for this Assignment. Production
 Name of Person.: Vijay Prajapati
 Designation: Wireman
 Key Qualifications: Wireman
 Education: I.T.I.
 Total No. of Years Experience 3 years
Mr. Naresh Pandor
 Proposed Position for this Assignment. Production
 Name of Person.: Naresh Pandor
 Designation: Helper
 Key Qualifications: -
 Education: SCC Pass
 Total No. of Years Experience 4 years
Nos. OF EMPLOYEES DATE
1 Administrative 2
2 Diploma Engineers 2
3 Supervisor / Foreman 2
4 Skilled Workers 4
5 Unskilled Workers 2
7 Draftsman 1
Design Organization
1
USE OF CAD Yes.
No. of Machine 2

More Related Content

What's hot

What's hot (19)

Mechanical Engineer – QAQC
Mechanical Engineer – QAQCMechanical Engineer – QAQC
Mechanical Engineer – QAQC
 
NEW MRP CV 2016
NEW MRP CV 2016NEW MRP CV 2016
NEW MRP CV 2016
 
Anil Deshmukh_cv_BE_Mech
Anil Deshmukh_cv_BE_MechAnil Deshmukh_cv_BE_Mech
Anil Deshmukh_cv_BE_Mech
 
Instrumentation Inspector
Instrumentation InspectorInstrumentation Inspector
Instrumentation Inspector
 
jameen new senior instrument cv
jameen new senior instrument cvjameen new senior instrument cv
jameen new senior instrument cv
 
Chandrasekar G resume - Instrument Engineer new
Chandrasekar G resume - Instrument Engineer newChandrasekar G resume - Instrument Engineer new
Chandrasekar G resume - Instrument Engineer new
 
CV- Lead Project Quality
CV- Lead Project QualityCV- Lead Project Quality
CV- Lead Project Quality
 
SHAMSHAD QAQC RESUME
SHAMSHAD QAQC RESUMESHAMSHAD QAQC RESUME
SHAMSHAD QAQC RESUME
 
QC Supervisor Saji M
QC Supervisor Saji MQC Supervisor Saji M
QC Supervisor Saji M
 
JAN 2015 CV
JAN 2015 CVJAN 2015 CV
JAN 2015 CV
 
Anish's CV
Anish's CV Anish's CV
Anish's CV
 
MANPOWER PROVIDING PRESENTATION
MANPOWER PROVIDING PRESENTATIONMANPOWER PROVIDING PRESENTATION
MANPOWER PROVIDING PRESENTATION
 
Qa QC SEPL NOV 2017
Qa QC SEPL NOV  2017Qa QC SEPL NOV  2017
Qa QC SEPL NOV 2017
 
THOWFIC AHAMED CV
THOWFIC AHAMED CVTHOWFIC AHAMED CV
THOWFIC AHAMED CV
 
AKRAM CV QC Supervisor Mechanical
AKRAM CV QC Supervisor MechanicalAKRAM CV QC Supervisor Mechanical
AKRAM CV QC Supervisor Mechanical
 
PUSPENDU UPDATED
PUSPENDU UPDATED PUSPENDU UPDATED
PUSPENDU UPDATED
 
Binukumar resume- QA-QC ENGINEER
Binukumar resume- QA-QC ENGINEERBinukumar resume- QA-QC ENGINEER
Binukumar resume- QA-QC ENGINEER
 
Harish_QA_QC_Engineer_resume
Harish_QA_QC_Engineer_resumeHarish_QA_QC_Engineer_resume
Harish_QA_QC_Engineer_resume
 
1.arun das mep resume
1.arun das mep resume  1.arun das mep resume
1.arun das mep resume
 

Viewers also liked

SNV PG-HGSF, Producer Organisations, spreads, digital
SNV PG-HGSF, Producer Organisations, spreads, digitalSNV PG-HGSF, Producer Organisations, spreads, digital
SNV PG-HGSF, Producer Organisations, spreads, digitalKatherine Casey
 
Proof of personal progress- Bart De Maere
Proof of personal progress- Bart De MaereProof of personal progress- Bart De Maere
Proof of personal progress- Bart De MaereBart De Maere
 
Oficina de Audiovisual CEFET-RJ
Oficina de Audiovisual CEFET-RJOficina de Audiovisual CEFET-RJ
Oficina de Audiovisual CEFET-RJLuciano Dias
 
A STUDY ON EMPLOYEE ATTITUDE TOWARDS ORGANIZATIONAL CHANGE - WITH SPECIAL REF...
A STUDY ON EMPLOYEE ATTITUDE TOWARDS ORGANIZATIONAL CHANGE - WITH SPECIAL REF...A STUDY ON EMPLOYEE ATTITUDE TOWARDS ORGANIZATIONAL CHANGE - WITH SPECIAL REF...
A STUDY ON EMPLOYEE ATTITUDE TOWARDS ORGANIZATIONAL CHANGE - WITH SPECIAL REF...IAEME Publication
 
Homophone game text
Homophone game textHomophone game text
Homophone game textGrace Ng
 
Healthcare IT Security And Risk Management Study
Healthcare IT Security And Risk Management StudyHealthcare IT Security And Risk Management Study
Healthcare IT Security And Risk Management StudySymantec
 

Viewers also liked (9)

SNV PG-HGSF, Producer Organisations, spreads, digital
SNV PG-HGSF, Producer Organisations, spreads, digitalSNV PG-HGSF, Producer Organisations, spreads, digital
SNV PG-HGSF, Producer Organisations, spreads, digital
 
Resume2
Resume2Resume2
Resume2
 
Proof of personal progress- Bart De Maere
Proof of personal progress- Bart De MaereProof of personal progress- Bart De Maere
Proof of personal progress- Bart De Maere
 
Oficina de Audiovisual CEFET-RJ
Oficina de Audiovisual CEFET-RJOficina de Audiovisual CEFET-RJ
Oficina de Audiovisual CEFET-RJ
 
A STUDY ON EMPLOYEE ATTITUDE TOWARDS ORGANIZATIONAL CHANGE - WITH SPECIAL REF...
A STUDY ON EMPLOYEE ATTITUDE TOWARDS ORGANIZATIONAL CHANGE - WITH SPECIAL REF...A STUDY ON EMPLOYEE ATTITUDE TOWARDS ORGANIZATIONAL CHANGE - WITH SPECIAL REF...
A STUDY ON EMPLOYEE ATTITUDE TOWARDS ORGANIZATIONAL CHANGE - WITH SPECIAL REF...
 
Homophone game text
Homophone game textHomophone game text
Homophone game text
 
Algunas Cartillas usadas en lecto escritura.
Algunas Cartillas usadas en lecto escritura.Algunas Cartillas usadas en lecto escritura.
Algunas Cartillas usadas en lecto escritura.
 
Ribozymes
RibozymesRibozymes
Ribozymes
 
Healthcare IT Security And Risk Management Study
Healthcare IT Security And Risk Management StudyHealthcare IT Security And Risk Management Study
Healthcare IT Security And Risk Management Study
 

Similar to OMKAR ELECTRICALS PROFILE

RESUME - ALOK SAXENA - CNC - ELECTRONICS ENGINEER
RESUME - ALOK SAXENA - CNC - ELECTRONICS ENGINEERRESUME - ALOK SAXENA - CNC - ELECTRONICS ENGINEER
RESUME - ALOK SAXENA - CNC - ELECTRONICS ENGINEERAlok Saxena
 
Profile Details (CV)
Profile Details (CV)Profile Details (CV)
Profile Details (CV)Kunal Saha
 
Company Profile - Div Project 2016
Company Profile - Div Project 2016Company Profile - Div Project 2016
Company Profile - Div Project 2016Riswanto DA
 
SETHUMADHAVAN SENIOR COMMISSIONING ENGINEER
SETHUMADHAVAN SENIOR  COMMISSIONING ENGINEERSETHUMADHAVAN SENIOR  COMMISSIONING ENGINEER
SETHUMADHAVAN SENIOR COMMISSIONING ENGINEERSETHU MADHAVAN
 
Barun Dutta Resume
Barun Dutta ResumeBarun Dutta Resume
Barun Dutta Resumebarun dutta
 
J Tarkeshwar Resume Electrical & Automation
J Tarkeshwar Resume Electrical & AutomationJ Tarkeshwar Resume Electrical & Automation
J Tarkeshwar Resume Electrical & AutomationTarkeshwar Jayanti
 
Dileep Kumar Kaviti
Dileep Kumar KavitiDileep Kumar Kaviti
Dileep Kumar KavitiDileep Kumar
 
Assistant manager in maintenance
Assistant manager in maintenanceAssistant manager in maintenance
Assistant manager in maintenanceDivyeshVasvelia
 
ELECTRICAL ENGINEER CV, SITE ENGINEER CV, PROJECT ENGINEER CV
ELECTRICAL ENGINEER CV, SITE ENGINEER CV, PROJECT ENGINEER CVELECTRICAL ENGINEER CV, SITE ENGINEER CV, PROJECT ENGINEER CV
ELECTRICAL ENGINEER CV, SITE ENGINEER CV, PROJECT ENGINEER CVAjith Chandramohan
 
YOGESH ELECTRICAL ENGG
YOGESH ELECTRICAL ENGG YOGESH ELECTRICAL ENGG
YOGESH ELECTRICAL ENGG yogesh kumar
 
Sr.Electrical Engineer
Sr.Electrical EngineerSr.Electrical Engineer
Sr.Electrical Engineernomanqudrat
 

Similar to OMKAR ELECTRICALS PROFILE (20)

RESUME - ALOK SAXENA - CNC - ELECTRONICS ENGINEER
RESUME - ALOK SAXENA - CNC - ELECTRONICS ENGINEERRESUME - ALOK SAXENA - CNC - ELECTRONICS ENGINEER
RESUME - ALOK SAXENA - CNC - ELECTRONICS ENGINEER
 
Profile Details (CV)
Profile Details (CV)Profile Details (CV)
Profile Details (CV)
 
Company Profile - Div Project 2016
Company Profile - Div Project 2016Company Profile - Div Project 2016
Company Profile - Div Project 2016
 
M Imran
M ImranM Imran
M Imran
 
SETHUMADHAVAN SENIOR COMMISSIONING ENGINEER
SETHUMADHAVAN SENIOR  COMMISSIONING ENGINEERSETHUMADHAVAN SENIOR  COMMISSIONING ENGINEER
SETHUMADHAVAN SENIOR COMMISSIONING ENGINEER
 
cv Rashid Tagelsir updated . -2016
cv Rashid Tagelsir   updated . -2016cv Rashid Tagelsir   updated . -2016
cv Rashid Tagelsir updated . -2016
 
ilyas-MEP CV
ilyas-MEP CVilyas-MEP CV
ilyas-MEP CV
 
Barun Dutta Resume
Barun Dutta ResumeBarun Dutta Resume
Barun Dutta Resume
 
CV
CVCV
CV
 
J Tarkeshwar Resume Electrical & Automation
J Tarkeshwar Resume Electrical & AutomationJ Tarkeshwar Resume Electrical & Automation
J Tarkeshwar Resume Electrical & Automation
 
Dileep Kumar Kaviti
Dileep Kumar KavitiDileep Kumar Kaviti
Dileep Kumar Kaviti
 
JAI RESUME
JAI RESUMEJAI RESUME
JAI RESUME
 
Company Brochure
Company BrochureCompany Brochure
Company Brochure
 
vinoth-projects
vinoth-projectsvinoth-projects
vinoth-projects
 
Assistant manager in maintenance
Assistant manager in maintenanceAssistant manager in maintenance
Assistant manager in maintenance
 
ELECTRICAL ENGINEER CV, SITE ENGINEER CV, PROJECT ENGINEER CV
ELECTRICAL ENGINEER CV, SITE ENGINEER CV, PROJECT ENGINEER CVELECTRICAL ENGINEER CV, SITE ENGINEER CV, PROJECT ENGINEER CV
ELECTRICAL ENGINEER CV, SITE ENGINEER CV, PROJECT ENGINEER CV
 
YOGESH ELECTRICAL ENGG
YOGESH ELECTRICAL ENGG YOGESH ELECTRICAL ENGG
YOGESH ELECTRICAL ENGG
 
Venkat CV
Venkat CVVenkat CV
Venkat CV
 
SNM CV NEW-1
SNM CV NEW-1SNM CV NEW-1
SNM CV NEW-1
 
Sr.Electrical Engineer
Sr.Electrical EngineerSr.Electrical Engineer
Sr.Electrical Engineer
 

OMKAR ELECTRICALS PROFILE

  • 1. Factory Address OMKAR ELECTRICALS 56, Ambica Industrial Park, Ambica Tube Compund, Nr, Vatva GIDC Overbirdge, Vatva, Ahmedabad – 382445 (Gujarat.) INDIA. Cell +91 9374195235 Email: omkarelectricals1429@gmail.com
  • 2. INDEX 1. Preamble 2. Scope of Work A. Manufacturing of L.T. Distribution Panel Boards 3. Quality Assurance / Control Producer 4. Our Valued Client List 5. Project Organization and Management Team 6. Distribution Boards Manufactured Till Today 7. List Of Tools
  • 3. 1.Preamble 1.1. THE COMPANY We OMKAR ELECTRICALS a fast growing firm in electrical field, for manufacturing Power and Control Distribution Boards. We specialized in range of Power and Control Panels with for all kind of industries. We have full facility for testing various types of Distribution Boards. We have professionally managed team to meet most stringent quality standard to cater to our client’s requirements. OMKAR ELECTRICALS, also executing all types of projects works. On Turn-Key basis as per the tender specifications. We have team of qualified and experience Engineers and in taking care of the title things to keep costs low and performance level high. Our Mission is to meet our customer’s expectations. To achieve this we strive to provide innovative electrical solutions and applications through quality materials and superior craftsmanship. Our focus is to provide services to both the customer and the company by working together as a team. We are working in the field of Electrical Control Panels since last more than 35 years and got lots of progress. B. APPROCH OMKAR ELECTRICALS. Our approach is total service orientation. We are dedicated to Quality and commitments. We believe that each client/project has special need and therefore we provide special attention from beginning to end, and make economical design to meet the needs of client. Also product innovation is a continuous at OE. We are fully upgrade to the latest technology to provide best services of client’s requirements. We design the projects in best economical manner. The approach of SEF is to render highly personalized service at each stage and to attend to the need of the project.
  • 4. 2.Scope of Work OMKAR ELECTRICALS. Provides wide range of services to cater to the project needs of a cross section of clients / Architects. We are listing down the major services which are regularly offered by SEF but we understand that each client has different needs so the emphasis is always on tailored solutions. A. Our Specialization in L.T Distribution Panel Board  LT Control Panels  Power Control Center Panel  Motor Control Center Panel  APFCR PANEL  Auto mains Failure Control Panel  Bus duct up to 6300A  Synchronizing Panel  Auto Battery Charger Panel  Lighting Distribution Panel  Power Distribution Panel  DOL, ATS & Star - Delta Starter Control Panel  PLC Panel
  • 5. 3.Quality Assurance / Control Producer OVERVIEW OE’s fundamental to all works to be understood is to provide quality service by satisfying client’s requirements.  The aim of quality management is to achieve satisfaction of the client requirements in overall progress of each works and the services provided in selection of suitable rating.  The quality monitoring system will be fully integrated into the administration, Project Management and Account Department. A. QUALITY CONTROL PROCEDURE  Utmost care is taken to check the quality of deliverables before they are being issued for execution. The quality assurance programmed shall be to achieve following objectives.  Correctness of Documents.  Reliability of Documents.  To avoid unnecessary delay in the project schedule. B. QUALITY ASSURANCE AND TESTING OF PANEL LIST OF TEST CARRIED OUT AT OUR WORKSHOP  100 % checking of all Branded components before use.  Inspection of Fabrication structure for dimensions as per approved G.A. Drawing.  Inspection of painting / Powder Coating.
  • 6. List of Machineries 1.Power Shearing Machine Cutting-2.0MM Thick Max Lenth 2500MM 2.Hydrolic Bending Machine. Bending Capacity-2MM Thick, Lenth Size-2500MM, Stroke/Min.8Storks 3.Drill Machine Capacity-25MM 4. Drill Machine Capacity-20MM 5.Drill Machine Capacity-16MM 6.Drill Machine Capacity-12MM 7.Electric Welding Machine Capacity 400Amp 8. Electric Welding Machine Capacity 300Amp 9.Electric Welding Machine Capacity 250Amp 10.Spot Welding Machine 20Kva 11.Hand Press Machine 6Nos.Size 12.Hand Press Machine 10Nos.Size 13.Bending Machine 3Feet,5Feet,7Feet 14.Handing Shearing Machine 12”Lenth-2Nos. 15.Handing Shearing Machine 3Nos 16.Air Compressor Machine. 2Nos 17.Hydrolic Bending Machine For Pipe, cu,al. Patta 18.Mechanical Hackshaw Machine 1No Routine Tests are conducted on each panel Like  H.V Tester, Continuity Tester, Venire-Caliber, Micro Meter, Clip-on Meter, Megger, Primary Injection Kit, Insulation Resistance Tester
  • 7. 4. Our Valued Client List List of our Clients 1 Airports Authority Of India – Ahmedabad 2 Airtel – Ahmadabad 3 Ajanta Manufacture Ltd. 4 Apex Automation Pvt.Ltd 5 Arvind Mills 6 Asarwa Mills 7 Asarwa Ovreseas 8 Autonic Systems (India) Pvt.Ltd 9 Bank Of India 10 Deepkiran Foods Pvt.Ltd. 11 Hutch – Ahmedabad 12 Iffco – Kandla 13 Indian Institute Of Management (IIM) 14 Mother Darity 15 National Institute Of Design (NID) 16 National institute of Fashion Design (NIFT) 17 ONGC 18 Plasma Research Laboratory 19 Reliance Engg.Asso.Pvt.Ltd. 20 Reliance Industries Ltd 21 Parsons Electricals, Surat 22 Om Electricals, Ahmedabad 23 Soma Textiles & Indutries 24 Space Application Centre 25 Maize Products, Ahmedabad 26 G Sons Power, Ahmedabad
  • 8. 5. Project Organization and Management Team OMKAR ELECTRICALS, Believes that a key element to get success in development project depends in Project Management. In order to accomplish this, OMKAR ELECTRICALS, set up a special team for all New Projects. The team head, manage to keep record of telephonic discussion or Personal meeting with the client. Same is made available to all members of team and the client. The customer has the responsibility to approve these notes, OMKAR ELECTRICALS maintains a comprehensive Project-Schedule for every job besides generation of written and overall co-coordinators of the Project execution and regularly discussing for meeting target date of completion. During project execution factory and site acceptance test are taken project progress status is continuously monitored so that problem and deviation can resolved. Throughout the life of a project from start to end, There are important / special actions that need to be taken by the client. As and when the need for such action arises they are recorded and assigned to specific engineer with the time to complete the action. The project coordinators on weekly basis review the list and issue alerts and warnings when the dead line for the action approaches. This ensures timely completion of the project OMKAR ELECTRICALS maintains comprehensive Project schedule for every job. The schedule is decided after first meeting with the client. Normally if is kept with project team. The schedule shows all critical activities and include key completion dates for project completion and for the client actions. Besides, generation of written documentations and the overall co-ordination of project execution it is the responsibility of the project co-ordinates to meet dead line of project completion period. In order to maintain quality communication, resolve issues and related questions and review project progress. It is necessary for client and SEF to meet periodic basis. SEF usually recommends that meetings should be held monthly basis. The frequency of meeting can be increased or decreased depending upon the state of the project. Normally SEF request the meetings are held at SEF’s office because of the availability of the projects team. But these also arrange at client site. As a part of the commencement of the Project, OMKAR ELECTRICALS entrusts the Work to Project Co-coordinator. Project Progress is continuously Monitored so that problems and deviations can be addressed at the earliest. Along with the client, SEF generates periodic progress reports to documents all pertinent period issues
  • 9. 6. Distribution Boards Manufactured Till Today Weatherford _L.T Panel, Vadodara Birla Collage_3200A FP Busducts L&T Toll Palza, Rajathan Mcnally Sayaj Engg Ltd (L.T Panel)
  • 10. Dudh Sager Dairy LT Panel 400kvar RTPFC Panel, Baroda JCT Syncronizing Panel, Baroda Maize Products, (MCC Panel Ahmedabad)
  • 11. Torrent D.G.N (Dahej) H.D.C.F BANK BARODA Synchronizing 500KVAR X 2 with APFCR 400KVAR APFCR Panel (Baroda)
  • 12. 2 X 1000KVA & 1 X 1500KVA DG Set Synchronizing Panel
  • 13. 7. LIST OF TOOLS Sr. No. Name of Tools Make Capacity/Range Qty. 1 H.V. Tester APEX 2.5 Kv 1 2 Megger Meco 1000V/200MΏ 1 3 Busbar Cutter Hitachi 3500 RPM 1 4 Multimeter Rishabh 2 5 Clamp On Meter Mastech 1 6 Hot Air Gun Hitachi 2 7 Blower Hitachi / Power 1 8 Hylem Cutter B & D 1 9 Drill Machine Hitachi 3 10 Busbar Bender Deepak 1 11 Pedestal Drill M/C Hitachi 1 12 Insulation Tester (Analogue) Meco 1000V-500M OHMS 1 13 Hole Saw Cutter Taparia 22.5MM 2 14 Flat File Taparia 2 15 H/R File Taparia 2 16 Hacksaw Frame 1 17 Hammer Taparia 1 18 Box Spanner Set Taparia 2 19 Ring Spanner Set Taparia 2 20 Long Nose Pliers Taparia 3 21 Pliers Taparia 3 22 Screw Driver Set Taparia 3 23 Allen Key Taparia 4 24 Crimping Tools 1.5 to 50Sq.mm 2 25 End Sealing Crimping Tools 2 26 Drill Bit Set All Range 2 27 Fix Spanner Set 1 28 Welding Machine 2 29 Earth Resistance Tester 1 30 Laser Printer HP 2 31 Ferrule Machine L-MARK 2 32 FAX HP 1 33 Desktop Computer L.G 2 34 Laptop Dell / Samsung 1
  • 14. 8.RESUMES OF KEY PERSONNALS Mr. Jignesh Talati  Proposed Position for this Assignment.: Management  Name of Person.: Jignesh Talati  Designation: Patner  Key Qualifications: Electrical Engineer  Education: Diploma In Electrical  Total No. of Years Experience 8 years Mr. Haresh Patel  Proposed Position for this Assignment: Management.  Name of Person.: Haresh Patel  Designation: Partner  Key Qualifications: Electrical Engineer  Total No. of Years Experience 35 years Mr. Dhaval Patel  Proposed Position for this Assignment.: Coordinator & Designer  Name of Person.: Dhaval Patel  Designation: Manager  Key Qualifications: Electrical Engineer  Education: B.E  Total No. of Years Experience 2 years Mr. Rohit Ramani  Proposed Position for this Assignment. Production Supervisor  Name of Person.: Rohit Ramani  Designation: Supervisor  Key Qualifications: Electrician  Education: B.E  Total No. of Years Experience 1 years
  • 15. Mr. Pravin Panchal  Proposed Position for this Assignment. Production  Name of Person.: Pravin Panchal  Designation: Wireman  Key Qualifications: Wireman  Education: I.T.I.  Total No. of Years Experience 15 years Mr. Sanjay Vagela  Proposed Position for this Assignment. Production  Name of Person.: Sanjay Vagela  Designation: Fitter  Key Qualifications: Fitter  Education: I.T.I.  Total No. of Years Experience 7 years Mr. Vijay Prajapati  Proposed Position for this Assignment. Production  Name of Person.: Vijay Prajapati  Designation: Wireman  Key Qualifications: Wireman  Education: I.T.I.  Total No. of Years Experience 3 years Mr. Naresh Pandor  Proposed Position for this Assignment. Production  Name of Person.: Naresh Pandor  Designation: Helper  Key Qualifications: -  Education: SCC Pass  Total No. of Years Experience 4 years
  • 16. Nos. OF EMPLOYEES DATE 1 Administrative 2 2 Diploma Engineers 2 3 Supervisor / Foreman 2 4 Skilled Workers 4 5 Unskilled Workers 2 7 Draftsman 1 Design Organization 1 USE OF CAD Yes. No. of Machine 2