TWO-STOREY SEMI-DETACHED HOUSE
GROUP 1
AISHATH HUSSAIN 0320429
ANDREW MAH 0318798
ERVINNA AK. ENDELA 0327508
LIU WEI QIAN 0322969
MAYBELLE WANG 0327553
PAN LEK VUN 0323164
WENDY TEO 0328242
DOCUMENTS
VOLUME 1: PROJECT CORRESPONDENCES
Showing the proof of any clarification or confirmation
of agreed deadlines, queries and approval of
outstanding details with the project team members.
VOLUME 2: MEASUREMENT DETAILS
Consists of all the taking off and dimension sheets for
the calculation of the works.
VOLUME 3: TENDER DOCUMENTS
It is the final tender document prepared with all the
information regarding the project for the use of
tender.
VOLUME 4: TENDER DRAWINGS
Comprises of all the completed drawings or sketches
used in the measurement. These drawings are
arranged in an orderly manner.
LOCATION PLAN
PROPOSED PROJECT
• Proposed development for two storey of semi-detached house, Lot
100, of Phase 1B (Stage 2) at Shantung Villa (Taman Farmosa), Jalan
Shantung (off Jalan Bundusun), Penampang, Sabah.
Client: Homesign Network Sdn Bhd
G-37-5, 5th Floor, Block G, KK Times Square, Off Coastal Highway,
88100, Kota Kinabalu, Sabah, Malaysia
Architect: Arkitek OMA Sdn Bhd
Lot 1, 1st & 2nd Floor, Taman Fortuna Shoplots,
Phase II, Lorong Seroja 1, Jalan Penampang,
88200 Kota Kinabalu
QS: PAMAWE Associates Sdn Bhd
10, Jalan Tema, 88100 Kota Kinabalu, Sabah,
Malaysia
C&S: MBM Engineering Sdn Bhd
H-5, Taman Shanti, Lorong 8C, 88200, Kota
Kinabalu, Sabah, Malaysia
M&E: MechLetric Sdn Bhd
No. 15, 1A, Springfield, Jalan Budu 2B, 88100, Kota
Kinabalu, Sabah, Malaysia.
PARTIES
LIST OF DRAWINGS
CONTENT
1. DECLARATION OF NON-COLLUSION
2. FORM OF CONTRACT
• Form of tender
• Instruction to tenderer
• Conditions of tendering
• Final summary of tender
• Preambles
• Specification
3. BILLS OF QUANTITIES
• BILL NO.1 - Preliminaries
• BILL NO.2 - Main building
• BILL NO.3 - External works
• BILL NO.4 - PC and Provisional sums
4. APPENDICES
• List of drawings
• Schedule of finishes
• Schedule of daywork rates
• Prices of basic materials
• Form of bank guarantee for earnest money
• Form of bank guarantee for performance bond
DECLARATION OF NON-COLLUSION
A form for tenderer to fill up and sign to declare that they are not
under any agreement with any other tenderers or parties to submit
any pre-determined tender amount.
FORM OF TENDER
For the tenderer to state the tender amount and proposed completion
time and making it the legal offer by attesting with signature or
company seal.
1. Fixed completion period: 9 months
2. Type of contract: Lump sum contract
3. Offer remains valid and shall not be withdrawn within 60 days from final
date of submission of tender.
INSTRUCTION TO TENDERER
• To inform tenderer on the rules and procedures to comply during the
tendering process.
1. Tender bond of RM 5,000 in the form of Bank Guarantee.
2. Tender Document fee of RM 350.
CONDITIONS OF TENDERING
Basis of tender
Firm Price Tender. No claims for fluctuation is allowed.
Tender Document Fee
Tenderer shall pay the tender deposit in cash to PAMAWE Associates Sdn Bhd.
Tender rules that governs the tender content, the submission,
evaluation and contract award process.
Tender bond
• In the form of Banker’s Draft or unconditional Banker’s Guarantee.
• Shall be retained and remain valid until the expiration of 60 days after closing of
tender.
Tender validity period
Remain valid and open for consideration for 60 days from the final closing date of
the tender submission.
Form of contract
PAM Contract 2006 (with quantities)
FINAL SUMMARY OF TENDER
• It is the summary of the total
amount of every bill in the Bills of
Quantities. The total of all the bills
will be the tender sum.
PREAMBLES
Introduce and justify the provisions in the “Specification” and scope of
coverage of the rates in the Bill of Quantities.
• Excavation
• Concrete works
• Brickworks
• Roofing and roof plumbing
• Carpentry, joinery, ironmongery
• Metalwork and structural steelwork
• Plastering and paving
• Plumbing
• Glazing
• Fencing
SPECIFICATIONS
• Detail procedures for the work to be complied relating to:-
 Quality and performance of materials
 Workmanship standard
The testing for the materials and workmanship.
PRELIMINARIES
• The employer’s requirements and contractor’s obligations to carry out
the works.
• Includes the name of parties involved.
• Description of work for the project.
• The form and type of contract.
• Application for necessary license and permits
• Schedule for inspections
PRELIMINARIES
The contractor’s requirement for temporary works shall be included
in, such as:-
• Sanitary facilities
• Hoarding
• Temporary office
• Temporary stores
SCHEDULE OF FINISHES
EXTERNAL & INTERNAL WALLS
1. Party wall:
230mm Thick common bricks in stretcherbond
2. All internal and external walls:
115mm Thick common bricks in stretcherbond
3. Stiffeners allowed to walls that exceeded 3 meter in length.
EXTERNAL WALL FINISHES
Plaster and paint:
20mm thick cement and sand (1:6) plastering with one coat of ‘ICI’ primer and two
coats of ‘ICI' weathershield paint finish to ALL the external wall surfaces.
50mm gap x 12mm depth groove line wall finish.
INTERNAL WALL FINISHES
1. Plaster and paint:
20mm thick cement and sand (1:6) plastering finish with one coat of 'ICI' primer
and two coats of 'ICI' emulsion paint to all internal walls EXCEPT bathroom and
kitchen walls.
2. Ceramic tiles :
300mmx300mmx7.5mm thick "KIMGRES" glazing ceramic tiles to ALL the walls of
kitchen and bathrooms.
EXTERNAL CEILING FINISHES
1. 1200mm x 600mm x 9mm thick 'Plastec' fibrous plaster ceiling board
with 'ICI' weathershield paint finish.
2. 4280mm x 70mm x 23mm deep aluminium strip ceiling or other
equivalent and approved design to:-
• Car porch ceiling
• First floor (balconies) and roof beam level ceilings.
INTERNAL CEILING FINISHES
1. 1200mm x 600mm x 9mm thick 'Plastec' fibrous plaster ceiling board
with 'ICI' emulsion paint finish to:-
Living, dining, guest room, dry kitchen, and bedrooms.
2. 5mm thick c&s(1:6) skim coating plaster and 'ICI' emulsion paint
finish to:-
Utility
3. 1200mm x 600mm x 9mm thick 'Plastec' anti-moisture type fibrous
plaster ceiling board with 'ICI' emulsion paint finish to:-
All the bathrooms
EXTERNAL FLOOR FINISHES
1. 20mm Thick cement and sand (1:3) cement render to all the floor.
2. Two coats "Krystol T1" cementitious concrete waterproofing at the
prepared surface and approved applied waterproofing; dressing to
concrete slab over car porch area.
INTERNAL FLOOR FINISHES
1. 20mm thick cement and sand (1:3) cement render
2. 300mm x 300mm x 7.5mm thick non-slip "KIMGRES" ceramic tiles
to:-
Bathrooms and toilet
STAIRCASE FINISHES
1. 19mm Thick cement and sand (1:3) cement render to floor.
2. One coat "DULUX" zinc phosphate primer and 2 coats of "DULUX"
supergloss paint or approved equivalent paint to handrails.
DOORS
DOORS
• D1
Hardwood door framed decorative solid
timber door panel + fixed tinted glass
fanlight above.
• D2, D10
Aluminium framed tinted glass sliding
door panel.
• D3, D3a
Aluminium framed tinted glass sliding
door panel + fixed sidelight & fanlight
above.
• D4, D6
Hardwood door framed swing marine
plywood flush door panel.
• D5, D8
Hardwood door framed swing plywood
flush door panel.
• D7
Sliding plywood flush door panel.
• D9
Frameless tempered glass swing door
panel
• D11
Frameless tempered glass swing door
panel + fixed tempered glass panel
WINDOWS
• W1
Aluminium framed tinted glass top hung
window panel + fixed tinted glass panel
• W2
Aluminium framed tinted glass top hung
window panel + sliding window panel
• W2a
Aluminium framed tinted glass top hung
window panel
• W3
Aluminium framed tinted glass sliding
window panel
• W4
Aluminium framed obscured glass top
hung window panel
• W5, W6, W8
Aluminium framed tinted glass
casement window panel + fixed tinted
glass panel
• W7, W7a, W10, W11
Aluminium framed fixed tinted glass
panel
• W9
Aluminium framed obscured glass top
hung window panel + fixed obscured
glass panel
SEWER DRAINAGE
• Manholes
WATER RETICULATION
45° bend
• Sluice valve and pit.
• Pillar hydrant valve and
chamber.
90° bend
SURFACE WATER DRAINAGE
• Cascade drain
• Reinforced concrete sump
ROAD AND PAVEMENT
• Road
• Pavement
• Kerb
APPENDICES
APPENDIX A – LIST OF DRAWINGS
APPENDIX A – LIST OF DRAWINGS
APPENDIX B – SCHEUDLE OF FINISHES
APPENDIX B – SCHEUDLE OF FINISHES
APPENDIX B – SCHEUDLE OF FINISHES
APPENDIX C – SCHEUDLE OF DAYWORKS RATES
APPENDIX C – SCHEUDLE OF DAYWORKS RATES
APPENDIX D – PRICES OF BASIC MATERIALS
APPENDIX E – FORM OF BANK GUARANTEE
FOR EARNEST MONEY
APPENDIX F – FORM OF BANK GUARANTEE
FOR PERFORMANCE BOND
THANK YOU

More Related Content

What's hot

MEASUREMENT TENDER DOCUMENTATION
MEASUREMENT TENDER DOCUMENTATIONMEASUREMENT TENDER DOCUMENTATION
MEASUREMENT TENDER DOCUMENTATIONFarah Sham
 
Measurement 4 Tender Document
Measurement 4 Tender Document Measurement 4 Tender Document
Measurement 4 Tender Document xingxin_GOh
 
Assignment ceiling finishes
Assignment ceiling finishesAssignment ceiling finishes
Assignment ceiling finishesDoreen Yeo
 
Eca presentation slides
Eca presentation slidesEca presentation slides
Eca presentation slidesahmong4
 
M3 EG BQ for timber panel door
M3 EG BQ for timber panel doorM3 EG BQ for timber panel door
M3 EG BQ for timber panel doorEst
 
ECA Workshop - Brief
ECA Workshop - BriefECA Workshop - Brief
ECA Workshop - BriefKai Yun Pang
 
Elemental cost analysis
Elemental cost analysisElemental cost analysis
Elemental cost analysisfareezsham
 
Professional practice 1 report
Professional practice 1 reportProfessional practice 1 report
Professional practice 1 reportNgo Jia Haur
 
Eca presentation
Eca presentationEca presentation
Eca presentationKailyn Lee
 
M3 EG BQ for timber roof covering
M3 EG BQ for timber roof  coveringM3 EG BQ for timber roof  covering
M3 EG BQ for timber roof coveringEst
 
Int walls finishes to list
Int walls finishes to list Int walls finishes to list
Int walls finishes to list Jeanne Hoo
 
Elemental cost analysis Presentation Slides
Elemental cost analysis Presentation SlidesElemental cost analysis Presentation Slides
Elemental cost analysis Presentation SlidesArissa Loh
 
Professional Practice 1
Professional Practice 1Professional Practice 1
Professional Practice 1Sow Wei Henn
 
Bill of Quantities ( Door and Window )
Bill of Quantities ( Door and Window )Bill of Quantities ( Door and Window )
Bill of Quantities ( Door and Window )Lee Pei Gie
 
ECA Presentation slide
ECA Presentation slideECA Presentation slide
ECA Presentation slideseenyeeyong
 
Eca presentation
Eca presentationEca presentation
Eca presentationwendyteosy
 
Sgp4813 measurement of quantities
Sgp4813 measurement of quantitiesSgp4813 measurement of quantities
Sgp4813 measurement of quantitiesalanchong88
 
SMM7 Bill of Quantities
SMM7 Bill of QuantitiesSMM7 Bill of Quantities
SMM7 Bill of QuantitiesNatalie Reid
 

What's hot (20)

MEASUREMENT TENDER DOCUMENTATION
MEASUREMENT TENDER DOCUMENTATIONMEASUREMENT TENDER DOCUMENTATION
MEASUREMENT TENDER DOCUMENTATION
 
Measurement 4 Tender Document
Measurement 4 Tender Document Measurement 4 Tender Document
Measurement 4 Tender Document
 
Assignment ceiling finishes
Assignment ceiling finishesAssignment ceiling finishes
Assignment ceiling finishes
 
Eca presentation slides
Eca presentation slidesEca presentation slides
Eca presentation slides
 
ECA presentation
ECA presentationECA presentation
ECA presentation
 
M3 EG BQ for timber panel door
M3 EG BQ for timber panel doorM3 EG BQ for timber panel door
M3 EG BQ for timber panel door
 
ECA Workshop - Brief
ECA Workshop - BriefECA Workshop - Brief
ECA Workshop - Brief
 
Elemental cost analysis
Elemental cost analysisElemental cost analysis
Elemental cost analysis
 
Professional practice 1 report
Professional practice 1 reportProfessional practice 1 report
Professional practice 1 report
 
Eca presentation
Eca presentationEca presentation
Eca presentation
 
M3 EG BQ for timber roof covering
M3 EG BQ for timber roof  coveringM3 EG BQ for timber roof  covering
M3 EG BQ for timber roof covering
 
Bq floor
Bq floorBq floor
Bq floor
 
Int walls finishes to list
Int walls finishes to list Int walls finishes to list
Int walls finishes to list
 
Elemental cost analysis Presentation Slides
Elemental cost analysis Presentation SlidesElemental cost analysis Presentation Slides
Elemental cost analysis Presentation Slides
 
Professional Practice 1
Professional Practice 1Professional Practice 1
Professional Practice 1
 
Bill of Quantities ( Door and Window )
Bill of Quantities ( Door and Window )Bill of Quantities ( Door and Window )
Bill of Quantities ( Door and Window )
 
ECA Presentation slide
ECA Presentation slideECA Presentation slide
ECA Presentation slide
 
Eca presentation
Eca presentationEca presentation
Eca presentation
 
Sgp4813 measurement of quantities
Sgp4813 measurement of quantitiesSgp4813 measurement of quantities
Sgp4813 measurement of quantities
 
SMM7 Bill of Quantities
SMM7 Bill of QuantitiesSMM7 Bill of Quantities
SMM7 Bill of Quantities
 

Similar to MEASUREMENT 4 SLIDES

Fififinalnal
FififinalnalFififinalnal
FififinalnalLai Vlyn
 
Measurement 4 presentation
Measurement 4 presentationMeasurement 4 presentation
Measurement 4 presentationLin Hui
 
PROPOSED 4BEDROOM DUPLEX & A ONE BEDROOM SEMI-DETACHED RESIDENTIAL DEVELOMENT...
PROPOSED 4BEDROOM DUPLEX & A ONE BEDROOM SEMI-DETACHED RESIDENTIAL DEVELOMENT...PROPOSED 4BEDROOM DUPLEX & A ONE BEDROOM SEMI-DETACHED RESIDENTIAL DEVELOMENT...
PROPOSED 4BEDROOM DUPLEX & A ONE BEDROOM SEMI-DETACHED RESIDENTIAL DEVELOMENT...DougDos
 
Group 6 Measurement 4
Group 6 Measurement 4Group 6 Measurement 4
Group 6 Measurement 4John Willies
 
Assignment - Tender Documentation (Presentation Slide)
Assignment - Tender Documentation (Presentation Slide)Assignment - Tender Documentation (Presentation Slide)
Assignment - Tender Documentation (Presentation Slide)Kai Yun Pang
 
Measurement 4 presentation
Measurement 4 presentation Measurement 4 presentation
Measurement 4 presentation Kailyn Lee
 
Measurement 4 presentation
Measurement 4 presentation Measurement 4 presentation
Measurement 4 presentation Shze Hwa Lee
 
Kitsen Aluminum Formwork -Monolithic Pouring
Kitsen Aluminum Formwork -Monolithic PouringKitsen Aluminum Formwork -Monolithic Pouring
Kitsen Aluminum Formwork -Monolithic PouringAshleyLiKITSEN
 
Measurement Assignment
Measurement AssignmentMeasurement Assignment
Measurement Assignmentashleyyeap
 
Specifications, reports and tenders
Specifications, reports and tendersSpecifications, reports and tenders
Specifications, reports and tendersgayu pandian
 
Measurement Presentation
Measurement PresentationMeasurement Presentation
Measurement Presentationseenyeeyong
 
Tutor construction activity documents ppt4
Tutor construction activity documents ppt4Tutor construction activity documents ppt4
Tutor construction activity documents ppt4Luke D'Arcy
 
Bill Of Quantities Issued For Construction
Bill Of Quantities Issued For ConstructionBill Of Quantities Issued For Construction
Bill Of Quantities Issued For ConstructionAhmed El Ashry
 

Similar to MEASUREMENT 4 SLIDES (20)

Fififinalnal
FififinalnalFififinalnal
Fififinalnal
 
M4ppt
M4pptM4ppt
M4ppt
 
Measurement 4 presentation
Measurement 4 presentationMeasurement 4 presentation
Measurement 4 presentation
 
M4 presentation
M4 presentationM4 presentation
M4 presentation
 
PROPOSED 4BEDROOM DUPLEX & A ONE BEDROOM SEMI-DETACHED RESIDENTIAL DEVELOMENT...
PROPOSED 4BEDROOM DUPLEX & A ONE BEDROOM SEMI-DETACHED RESIDENTIAL DEVELOMENT...PROPOSED 4BEDROOM DUPLEX & A ONE BEDROOM SEMI-DETACHED RESIDENTIAL DEVELOMENT...
PROPOSED 4BEDROOM DUPLEX & A ONE BEDROOM SEMI-DETACHED RESIDENTIAL DEVELOMENT...
 
Group 6 Measurement 4
Group 6 Measurement 4Group 6 Measurement 4
Group 6 Measurement 4
 
Assignment - Tender Documentation (Presentation Slide)
Assignment - Tender Documentation (Presentation Slide)Assignment - Tender Documentation (Presentation Slide)
Assignment - Tender Documentation (Presentation Slide)
 
Measurement 4 presentation
Measurement 4 presentation Measurement 4 presentation
Measurement 4 presentation
 
Measurement 4 presentation
Measurement 4 presentation Measurement 4 presentation
Measurement 4 presentation
 
Kitsen Aluminum Formwork -Monolithic Pouring
Kitsen Aluminum Formwork -Monolithic PouringKitsen Aluminum Formwork -Monolithic Pouring
Kitsen Aluminum Formwork -Monolithic Pouring
 
Measurement Assignment
Measurement AssignmentMeasurement Assignment
Measurement Assignment
 
Specifications, reports and tenders
Specifications, reports and tendersSpecifications, reports and tenders
Specifications, reports and tenders
 
Measurement Presentation
Measurement PresentationMeasurement Presentation
Measurement Presentation
 
SPECIFICATION
SPECIFICATIONSPECIFICATION
SPECIFICATION
 
3D
3D3D
3D
 
senthilkumar CV
senthilkumar CVsenthilkumar CV
senthilkumar CV
 
SPM.pptx
SPM.pptxSPM.pptx
SPM.pptx
 
Tutor construction activity documents ppt4
Tutor construction activity documents ppt4Tutor construction activity documents ppt4
Tutor construction activity documents ppt4
 
Mohan 3
Mohan 3Mohan 3
Mohan 3
 
Bill Of Quantities Issued For Construction
Bill Of Quantities Issued For ConstructionBill Of Quantities Issued For Construction
Bill Of Quantities Issued For Construction
 

Recently uploaded

Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Sapana Sha
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeThiyagu K
 
Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpinRaunakKeshri1
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxSayali Powar
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdfssuser54595a
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13Steve Thomason
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104misteraugie
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityGeoBlogs
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...Marc Dusseiller Dusjagr
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Krashi Coaching
 
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application ) Sakshi Ghasle
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingTechSoup
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionSafetyChain Software
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxNirmalaLoungPoorunde1
 

Recently uploaded (20)

Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 
Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpin
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application )
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory Inspection
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptx
 
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
 
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptxINDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
 

MEASUREMENT 4 SLIDES

  • 1. TWO-STOREY SEMI-DETACHED HOUSE GROUP 1 AISHATH HUSSAIN 0320429 ANDREW MAH 0318798 ERVINNA AK. ENDELA 0327508 LIU WEI QIAN 0322969 MAYBELLE WANG 0327553 PAN LEK VUN 0323164 WENDY TEO 0328242
  • 2. DOCUMENTS VOLUME 1: PROJECT CORRESPONDENCES Showing the proof of any clarification or confirmation of agreed deadlines, queries and approval of outstanding details with the project team members. VOLUME 2: MEASUREMENT DETAILS Consists of all the taking off and dimension sheets for the calculation of the works. VOLUME 3: TENDER DOCUMENTS It is the final tender document prepared with all the information regarding the project for the use of tender. VOLUME 4: TENDER DRAWINGS Comprises of all the completed drawings or sketches used in the measurement. These drawings are arranged in an orderly manner.
  • 4. PROPOSED PROJECT • Proposed development for two storey of semi-detached house, Lot 100, of Phase 1B (Stage 2) at Shantung Villa (Taman Farmosa), Jalan Shantung (off Jalan Bundusun), Penampang, Sabah. Client: Homesign Network Sdn Bhd G-37-5, 5th Floor, Block G, KK Times Square, Off Coastal Highway, 88100, Kota Kinabalu, Sabah, Malaysia
  • 5. Architect: Arkitek OMA Sdn Bhd Lot 1, 1st & 2nd Floor, Taman Fortuna Shoplots, Phase II, Lorong Seroja 1, Jalan Penampang, 88200 Kota Kinabalu QS: PAMAWE Associates Sdn Bhd 10, Jalan Tema, 88100 Kota Kinabalu, Sabah, Malaysia C&S: MBM Engineering Sdn Bhd H-5, Taman Shanti, Lorong 8C, 88200, Kota Kinabalu, Sabah, Malaysia M&E: MechLetric Sdn Bhd No. 15, 1A, Springfield, Jalan Budu 2B, 88100, Kota Kinabalu, Sabah, Malaysia. PARTIES
  • 7.
  • 8. CONTENT 1. DECLARATION OF NON-COLLUSION 2. FORM OF CONTRACT • Form of tender • Instruction to tenderer • Conditions of tendering • Final summary of tender • Preambles • Specification 3. BILLS OF QUANTITIES • BILL NO.1 - Preliminaries • BILL NO.2 - Main building • BILL NO.3 - External works • BILL NO.4 - PC and Provisional sums
  • 9. 4. APPENDICES • List of drawings • Schedule of finishes • Schedule of daywork rates • Prices of basic materials • Form of bank guarantee for earnest money • Form of bank guarantee for performance bond
  • 10. DECLARATION OF NON-COLLUSION A form for tenderer to fill up and sign to declare that they are not under any agreement with any other tenderers or parties to submit any pre-determined tender amount.
  • 11. FORM OF TENDER For the tenderer to state the tender amount and proposed completion time and making it the legal offer by attesting with signature or company seal. 1. Fixed completion period: 9 months 2. Type of contract: Lump sum contract 3. Offer remains valid and shall not be withdrawn within 60 days from final date of submission of tender.
  • 12. INSTRUCTION TO TENDERER • To inform tenderer on the rules and procedures to comply during the tendering process. 1. Tender bond of RM 5,000 in the form of Bank Guarantee. 2. Tender Document fee of RM 350.
  • 13. CONDITIONS OF TENDERING Basis of tender Firm Price Tender. No claims for fluctuation is allowed. Tender Document Fee Tenderer shall pay the tender deposit in cash to PAMAWE Associates Sdn Bhd. Tender rules that governs the tender content, the submission, evaluation and contract award process.
  • 14. Tender bond • In the form of Banker’s Draft or unconditional Banker’s Guarantee. • Shall be retained and remain valid until the expiration of 60 days after closing of tender. Tender validity period Remain valid and open for consideration for 60 days from the final closing date of the tender submission. Form of contract PAM Contract 2006 (with quantities)
  • 15. FINAL SUMMARY OF TENDER • It is the summary of the total amount of every bill in the Bills of Quantities. The total of all the bills will be the tender sum.
  • 16. PREAMBLES Introduce and justify the provisions in the “Specification” and scope of coverage of the rates in the Bill of Quantities. • Excavation • Concrete works • Brickworks • Roofing and roof plumbing • Carpentry, joinery, ironmongery • Metalwork and structural steelwork • Plastering and paving • Plumbing • Glazing • Fencing
  • 17. SPECIFICATIONS • Detail procedures for the work to be complied relating to:-  Quality and performance of materials  Workmanship standard The testing for the materials and workmanship.
  • 18. PRELIMINARIES • The employer’s requirements and contractor’s obligations to carry out the works. • Includes the name of parties involved. • Description of work for the project. • The form and type of contract. • Application for necessary license and permits • Schedule for inspections
  • 19. PRELIMINARIES The contractor’s requirement for temporary works shall be included in, such as:- • Sanitary facilities • Hoarding • Temporary office • Temporary stores
  • 21. EXTERNAL & INTERNAL WALLS 1. Party wall: 230mm Thick common bricks in stretcherbond 2. All internal and external walls: 115mm Thick common bricks in stretcherbond 3. Stiffeners allowed to walls that exceeded 3 meter in length.
  • 22. EXTERNAL WALL FINISHES Plaster and paint: 20mm thick cement and sand (1:6) plastering with one coat of ‘ICI’ primer and two coats of ‘ICI' weathershield paint finish to ALL the external wall surfaces. 50mm gap x 12mm depth groove line wall finish.
  • 23. INTERNAL WALL FINISHES 1. Plaster and paint: 20mm thick cement and sand (1:6) plastering finish with one coat of 'ICI' primer and two coats of 'ICI' emulsion paint to all internal walls EXCEPT bathroom and kitchen walls. 2. Ceramic tiles : 300mmx300mmx7.5mm thick "KIMGRES" glazing ceramic tiles to ALL the walls of kitchen and bathrooms.
  • 24. EXTERNAL CEILING FINISHES 1. 1200mm x 600mm x 9mm thick 'Plastec' fibrous plaster ceiling board with 'ICI' weathershield paint finish. 2. 4280mm x 70mm x 23mm deep aluminium strip ceiling or other equivalent and approved design to:- • Car porch ceiling • First floor (balconies) and roof beam level ceilings.
  • 25. INTERNAL CEILING FINISHES 1. 1200mm x 600mm x 9mm thick 'Plastec' fibrous plaster ceiling board with 'ICI' emulsion paint finish to:- Living, dining, guest room, dry kitchen, and bedrooms. 2. 5mm thick c&s(1:6) skim coating plaster and 'ICI' emulsion paint finish to:- Utility 3. 1200mm x 600mm x 9mm thick 'Plastec' anti-moisture type fibrous plaster ceiling board with 'ICI' emulsion paint finish to:- All the bathrooms
  • 26. EXTERNAL FLOOR FINISHES 1. 20mm Thick cement and sand (1:3) cement render to all the floor. 2. Two coats "Krystol T1" cementitious concrete waterproofing at the prepared surface and approved applied waterproofing; dressing to concrete slab over car porch area.
  • 27. INTERNAL FLOOR FINISHES 1. 20mm thick cement and sand (1:3) cement render 2. 300mm x 300mm x 7.5mm thick non-slip "KIMGRES" ceramic tiles to:- Bathrooms and toilet
  • 28. STAIRCASE FINISHES 1. 19mm Thick cement and sand (1:3) cement render to floor. 2. One coat "DULUX" zinc phosphate primer and 2 coats of "DULUX" supergloss paint or approved equivalent paint to handrails.
  • 29. DOORS
  • 30. DOORS • D1 Hardwood door framed decorative solid timber door panel + fixed tinted glass fanlight above. • D2, D10 Aluminium framed tinted glass sliding door panel.
  • 31. • D3, D3a Aluminium framed tinted glass sliding door panel + fixed sidelight & fanlight above. • D4, D6 Hardwood door framed swing marine plywood flush door panel.
  • 32. • D5, D8 Hardwood door framed swing plywood flush door panel. • D7 Sliding plywood flush door panel.
  • 33. • D9 Frameless tempered glass swing door panel • D11 Frameless tempered glass swing door panel + fixed tempered glass panel
  • 35. • W1 Aluminium framed tinted glass top hung window panel + fixed tinted glass panel • W2 Aluminium framed tinted glass top hung window panel + sliding window panel
  • 36. • W2a Aluminium framed tinted glass top hung window panel • W3 Aluminium framed tinted glass sliding window panel
  • 37. • W4 Aluminium framed obscured glass top hung window panel • W5, W6, W8 Aluminium framed tinted glass casement window panel + fixed tinted glass panel
  • 38. • W7, W7a, W10, W11 Aluminium framed fixed tinted glass panel • W9 Aluminium framed obscured glass top hung window panel + fixed obscured glass panel
  • 40. WATER RETICULATION 45° bend • Sluice valve and pit. • Pillar hydrant valve and chamber. 90° bend
  • 41. SURFACE WATER DRAINAGE • Cascade drain • Reinforced concrete sump
  • 42. ROAD AND PAVEMENT • Road • Pavement • Kerb
  • 44. APPENDIX A – LIST OF DRAWINGS
  • 45. APPENDIX A – LIST OF DRAWINGS
  • 46. APPENDIX B – SCHEUDLE OF FINISHES
  • 47. APPENDIX B – SCHEUDLE OF FINISHES
  • 48. APPENDIX B – SCHEUDLE OF FINISHES
  • 49. APPENDIX C – SCHEUDLE OF DAYWORKS RATES
  • 50. APPENDIX C – SCHEUDLE OF DAYWORKS RATES
  • 51. APPENDIX D – PRICES OF BASIC MATERIALS
  • 52. APPENDIX E – FORM OF BANK GUARANTEE FOR EARNEST MONEY
  • 53. APPENDIX F – FORM OF BANK GUARANTEE FOR PERFORMANCE BOND