1. JOB HAZARD SAFETY ANALYSIS JOB: Running Completion
RIG/ FACILITY/ SITE: Star Energy KAKAP LTD PERSONNEL INVOLVED: Drilling Crew / Weatherford
DEPARTMENT: Drilling
SUPERVISOR: Driller On Duty Valid Permit is in place before starting the Job! Yes
DATE: February 22,2006
REVIEW DATE: February 22,2006
REQUIRED PERSONAL PROTECTIVE EQUIPMENT: Standard PPE Reference Number T.B.A.
LIST ASSOCIATED PROCEDURES/ WORK INSTRUCTIONS OR TEMPORARY WORK
INSTRUCTIONS:
• 3rd
Party Equipment Checklist is completed before commencement of the operation.
Description of Task
Pick Up and Running 7’’26# WH-6 Packer and 9-5/8’’ Hydro
I Production packer
No Description of Task Hazard (Threat) Control (Barrier) Potential Incident Recovery
1. Prepare 7’’26# WH-
6 Packer and 9-5/8’’
Production Packers
• Dropped load
• Pinch points
Check all Shear Pin to set the
packer and release screw the packer
Injury to personnel
Equipment damage
Medical attention
Stop work
2. Ensure area is clean
and tools are in good
condition before
commencing job
• Pinch points
• Trip / Slip
• Equipment failure
Inspection of work area and tools to
be used
Clear signals to Crane Operator and
Driller
Injury to Personnel
Equipment damage
Medical attention
Stop work
3. Rig up handling
equipment on drill
floor and inspect
same.
• Dropped load
• Pinch points
Check all lifting gear.
Tag lines must be used.
Qualified crane signalman
Injury to Personnel
Equipment damage
Medical attention
Stop work
Page 1 of 3
2. JOB HAZARD SAFETY ANALYSIS JOB: Running Completion
4. Check all connection
and screw.
Move 7’’26# WH-6
Packer and 9-5/8’’
Production packer
from deck to drill
floor
• Crushed by swinging
load
• Damage to lift sub
thread.
• Dropped objects
• Equipment failure
Stay clear of loads. Always use
taglines.
Ensure thread protectors are used
after lift sub is being removed from
joint.
Beware of pinch / crush points
Ensure lifting sub is correctly
installed. Weatherford to confirm.
Injury to personnel
Equipment damage
Medical attention
Stop work
5. Hoist 7’’ Packer and
9-5/8’’ Packer and
Pup Joint Above
packer with block
and lower through
table.
• Crushed by swinging
load
• Dropped objects
• Equipment failure
Ensure no personnel stand in fall
zone on drill floor or catwalk.
Beware of pinch / crush points
Driller to have clear line of vision.
Only one man to signal crane
operator.
Injury to personnel
Equipment damage
Medical attention
Stop work
6. Make up 7’’ WH-6
packers and 9-5/8’’
Hydro I Packer as
Weatherford
Completion Engineer
instructions.
• Thread Damage
• Dropped objects
• Equipment failure
Follow instructions given by
Weatherford.
Ensure that the 7’’WH-6 packer and
9-5/8’’ Hydro I packer Element do
not rotated and place Area Power
Tong Torque
Ensure hole is covered around slips.
Injury to personnel
Equipment damage
Equipment damage with no
spares.
Medical attention
Stop work
Page 1 of 3
3. JOB HAZARD SAFETY ANALYSIS JOB: Running Completion
7. Running and Setting
7’’ WH-6 Packer and
9-5/8’’ Packer and 3-
1/2’’ TRSV Safety
valve
• Tag line pressure
test. Connection in
the pressure test
line
• Pinch points
• Equipment Damage
Ensure that all connection pressure
test line was checked seal and
debris. Equipment inspection prior
to and during use .Ensure that the
running tool dies not back off while
making up connection.
Checked pressure pump, ensure that
pumping for setting 7’’WH-6 and 9-
5/8’’ Hydro I Production Packer are
function properly.
Injury to personnel
Damage to Equipment
Injury to personnel
Medical attention
Stop Work
Medical attention
•
PLEASE WRITE YOUR NAME IN SIGNATURE