JOB HAZARD SAFETY ANALYSIS JOB: Running Completion
RIG/ FACILITY/ SITE: Star Energy KAKAP LTD PERSONNEL INVOLVED: Drilling Crew / Weatherford
DEPARTMENT: Drilling
SUPERVISOR: Driller On Duty Valid Permit is in place before starting the Job! Yes
DATE: February 22,2006
REVIEW DATE: February 22,2006
REQUIRED PERSONAL PROTECTIVE EQUIPMENT: Standard PPE Reference Number T.B.A.
LIST ASSOCIATED PROCEDURES/ WORK INSTRUCTIONS OR TEMPORARY WORK
INSTRUCTIONS:
• 3rd
Party Equipment Checklist is completed before commencement of the operation.
Description of Task
Pick Up and Running 7’’26# WH-6 Packer and 9-5/8’’ Hydro
I Production packer
No Description of Task Hazard (Threat) Control (Barrier) Potential Incident Recovery
1. Prepare 7’’26# WH-
6 Packer and 9-5/8’’
Production Packers
• Dropped load
• Pinch points
Check all Shear Pin to set the
packer and release screw the packer
Injury to personnel
Equipment damage
Medical attention
Stop work
2. Ensure area is clean
and tools are in good
condition before
commencing job
• Pinch points
• Trip / Slip
• Equipment failure
Inspection of work area and tools to
be used
Clear signals to Crane Operator and
Driller
Injury to Personnel
Equipment damage
Medical attention
Stop work
3. Rig up handling
equipment on drill
floor and inspect
same.
• Dropped load
• Pinch points
Check all lifting gear.
Tag lines must be used.
Qualified crane signalman
Injury to Personnel
Equipment damage
Medical attention
Stop work
Page 1 of 3
JOB HAZARD SAFETY ANALYSIS JOB: Running Completion
4. Check all connection
and screw.
Move 7’’26# WH-6
Packer and 9-5/8’’
Production packer
from deck to drill
floor
• Crushed by swinging
load
• Damage to lift sub
thread.
• Dropped objects
• Equipment failure
Stay clear of loads. Always use
taglines.
Ensure thread protectors are used
after lift sub is being removed from
joint.
Beware of pinch / crush points
Ensure lifting sub is correctly
installed. Weatherford to confirm.
Injury to personnel
Equipment damage
Medical attention
Stop work
5. Hoist 7’’ Packer and
9-5/8’’ Packer and
Pup Joint Above
packer with block
and lower through
table.
• Crushed by swinging
load
• Dropped objects
• Equipment failure
Ensure no personnel stand in fall
zone on drill floor or catwalk.
Beware of pinch / crush points
Driller to have clear line of vision.
Only one man to signal crane
operator.
Injury to personnel
Equipment damage
Medical attention
Stop work
6. Make up 7’’ WH-6
packers and 9-5/8’’
Hydro I Packer as
Weatherford
Completion Engineer
instructions.
• Thread Damage
• Dropped objects
• Equipment failure
Follow instructions given by
Weatherford.
Ensure that the 7’’WH-6 packer and
9-5/8’’ Hydro I packer Element do
not rotated and place Area Power
Tong Torque
Ensure hole is covered around slips.
Injury to personnel
Equipment damage
Equipment damage with no
spares.
Medical attention
Stop work
Page 1 of 3
JOB HAZARD SAFETY ANALYSIS JOB: Running Completion
7. Running and Setting
7’’ WH-6 Packer and
9-5/8’’ Packer and 3-
1/2’’ TRSV Safety
valve
• Tag line pressure
test. Connection in
the pressure test
line
• Pinch points
• Equipment Damage
Ensure that all connection pressure
test line was checked seal and
debris. Equipment inspection prior
to and during use .Ensure that the
running tool dies not back off while
making up connection.
Checked pressure pump, ensure that
pumping for setting 7’’WH-6 and 9-
5/8’’ Hydro I Production Packer are
function properly.
Injury to personnel
Damage to Equipment
Injury to personnel
Medical attention
Stop Work
Medical attention
•
PLEASE WRITE YOUR NAME IN SIGNATURE
Page 1 of 3

More Related Content

What's hot

risk assessment - pile cap.pdf
risk assessment - pile cap.pdfrisk assessment - pile cap.pdf
risk assessment - pile cap.pdfmydl2
 
HOT WORK PERMIT Form # HSEQ - HWP Rev 7 -.docx
HOT WORK PERMIT Form # HSEQ - HWP Rev 7 -.docxHOT WORK PERMIT Form # HSEQ - HWP Rev 7 -.docx
HOT WORK PERMIT Form # HSEQ - HWP Rev 7 -.docxDwarika Bhushan Sharma
 
LIFT SHAFT ENTRY PERMIT Form # HSEQ - LSEP Rev 2 -.docx
LIFT SHAFT ENTRY PERMIT Form # HSEQ - LSEP Rev 2 -.docxLIFT SHAFT ENTRY PERMIT Form # HSEQ - LSEP Rev 2 -.docx
LIFT SHAFT ENTRY PERMIT Form # HSEQ - LSEP Rev 2 -.docxDwarika Bhushan Sharma
 
31 ndrc operations within excavations (temporary works) risk assessment templ...
31 ndrc operations within excavations (temporary works) risk assessment templ...31 ndrc operations within excavations (temporary works) risk assessment templ...
31 ndrc operations within excavations (temporary works) risk assessment templ...Dwarika Bhushan Sharma
 
Risk assessment for testing & commissioning of cranes
Risk assessment for  testing & commissioning of cranesRisk assessment for  testing & commissioning of cranes
Risk assessment for testing & commissioning of cranesAzmeel Contracting Company
 
Job safety Analysis
Job safety Analysis Job safety Analysis
Job safety Analysis Deepu Rajan
 
The Safe use of Telehandlers In Construction 110210 A
The Safe use of Telehandlers In Construction 110210 AThe Safe use of Telehandlers In Construction 110210 A
The Safe use of Telehandlers In Construction 110210 AAlan Bassett
 
10. lifting-plan-checklist-and-method-statement-2
10. lifting-plan-checklist-and-method-statement-210. lifting-plan-checklist-and-method-statement-2
10. lifting-plan-checklist-and-method-statement-2Sergio Augusto Esteves
 
SECURITY CHECKLIST Form # HSEQ - SC Rev 2 -.docx
SECURITY CHECKLIST Form # HSEQ - SC Rev 2 -.docxSECURITY CHECKLIST Form # HSEQ - SC Rev 2 -.docx
SECURITY CHECKLIST Form # HSEQ - SC Rev 2 -.docxDwarika Bhushan Sharma
 
Overhead crane risk assessment
Overhead crane risk assessmentOverhead crane risk assessment
Overhead crane risk assessmentSimba Zhao
 
Standard Operating Practices (SOPs) and Standard Maintenance Practices (SMPs)...
Standard Operating Practices (SOPs) and Standard Maintenance Practices (SMPs)...Standard Operating Practices (SOPs) and Standard Maintenance Practices (SMPs)...
Standard Operating Practices (SOPs) and Standard Maintenance Practices (SMPs)...Bimal Chandra Das
 
313440656 crane-lifting-calculation-sheet
313440656 crane-lifting-calculation-sheet313440656 crane-lifting-calculation-sheet
313440656 crane-lifting-calculation-sheetPhạm Thành
 
Ropes Access safety presentation
Ropes Access safety presentationRopes Access safety presentation
Ropes Access safety presentationAbby Ferri
 
WORK AT HEIGHT PERMIT Form # HSEQ - WHP Rev.docx
WORK AT HEIGHT PERMIT Form # HSEQ - WHP Rev.docxWORK AT HEIGHT PERMIT Form # HSEQ - WHP Rev.docx
WORK AT HEIGHT PERMIT Form # HSEQ - WHP Rev.docxDwarika Bhushan Sharma
 
Safe Equipment Operation V17
Safe Equipment Operation V17Safe Equipment Operation V17
Safe Equipment Operation V17Eric Lestock Kay
 
HSE WARNING LETTER-DISCIPLINARY NOTICE Form # HSEQ - HSEWL Rev 6.doc
HSE WARNING LETTER-DISCIPLINARY NOTICE Form # HSEQ - HSEWL Rev 6.docHSE WARNING LETTER-DISCIPLINARY NOTICE Form # HSEQ - HSEWL Rev 6.doc
HSE WARNING LETTER-DISCIPLINARY NOTICE Form # HSEQ - HSEWL Rev 6.docDwarika Bhushan Sharma
 
Dropped Object prevention Campaign (1).pptx
Dropped Object prevention Campaign (1).pptxDropped Object prevention Campaign (1).pptx
Dropped Object prevention Campaign (1).pptxssuser926916
 
273372884-Permit-To-Work.pptx
273372884-Permit-To-Work.pptx273372884-Permit-To-Work.pptx
273372884-Permit-To-Work.pptxHafizYunus6
 

What's hot (20)

risk assessment - pile cap.pdf
risk assessment - pile cap.pdfrisk assessment - pile cap.pdf
risk assessment - pile cap.pdf
 
Lifting Operation.ppt
Lifting Operation.pptLifting Operation.ppt
Lifting Operation.ppt
 
HOT WORK PERMIT Form # HSEQ - HWP Rev 7 -.docx
HOT WORK PERMIT Form # HSEQ - HWP Rev 7 -.docxHOT WORK PERMIT Form # HSEQ - HWP Rev 7 -.docx
HOT WORK PERMIT Form # HSEQ - HWP Rev 7 -.docx
 
LIFT SHAFT ENTRY PERMIT Form # HSEQ - LSEP Rev 2 -.docx
LIFT SHAFT ENTRY PERMIT Form # HSEQ - LSEP Rev 2 -.docxLIFT SHAFT ENTRY PERMIT Form # HSEQ - LSEP Rev 2 -.docx
LIFT SHAFT ENTRY PERMIT Form # HSEQ - LSEP Rev 2 -.docx
 
31 ndrc operations within excavations (temporary works) risk assessment templ...
31 ndrc operations within excavations (temporary works) risk assessment templ...31 ndrc operations within excavations (temporary works) risk assessment templ...
31 ndrc operations within excavations (temporary works) risk assessment templ...
 
Risk assessment for testing & commissioning of cranes
Risk assessment for  testing & commissioning of cranesRisk assessment for  testing & commissioning of cranes
Risk assessment for testing & commissioning of cranes
 
Job safety Analysis
Job safety Analysis Job safety Analysis
Job safety Analysis
 
The Safe use of Telehandlers In Construction 110210 A
The Safe use of Telehandlers In Construction 110210 AThe Safe use of Telehandlers In Construction 110210 A
The Safe use of Telehandlers In Construction 110210 A
 
10. lifting-plan-checklist-and-method-statement-2
10. lifting-plan-checklist-and-method-statement-210. lifting-plan-checklist-and-method-statement-2
10. lifting-plan-checklist-and-method-statement-2
 
SECURITY CHECKLIST Form # HSEQ - SC Rev 2 -.docx
SECURITY CHECKLIST Form # HSEQ - SC Rev 2 -.docxSECURITY CHECKLIST Form # HSEQ - SC Rev 2 -.docx
SECURITY CHECKLIST Form # HSEQ - SC Rev 2 -.docx
 
Overhead crane risk assessment
Overhead crane risk assessmentOverhead crane risk assessment
Overhead crane risk assessment
 
Standard Operating Practices (SOPs) and Standard Maintenance Practices (SMPs)...
Standard Operating Practices (SOPs) and Standard Maintenance Practices (SMPs)...Standard Operating Practices (SOPs) and Standard Maintenance Practices (SMPs)...
Standard Operating Practices (SOPs) and Standard Maintenance Practices (SMPs)...
 
313440656 crane-lifting-calculation-sheet
313440656 crane-lifting-calculation-sheet313440656 crane-lifting-calculation-sheet
313440656 crane-lifting-calculation-sheet
 
Ropes Access safety presentation
Ropes Access safety presentationRopes Access safety presentation
Ropes Access safety presentation
 
WORK AT HEIGHT PERMIT Form # HSEQ - WHP Rev.docx
WORK AT HEIGHT PERMIT Form # HSEQ - WHP Rev.docxWORK AT HEIGHT PERMIT Form # HSEQ - WHP Rev.docx
WORK AT HEIGHT PERMIT Form # HSEQ - WHP Rev.docx
 
Safe Equipment Operation V17
Safe Equipment Operation V17Safe Equipment Operation V17
Safe Equipment Operation V17
 
HSE WARNING LETTER-DISCIPLINARY NOTICE Form # HSEQ - HSEWL Rev 6.doc
HSE WARNING LETTER-DISCIPLINARY NOTICE Form # HSEQ - HSEWL Rev 6.docHSE WARNING LETTER-DISCIPLINARY NOTICE Form # HSEQ - HSEWL Rev 6.doc
HSE WARNING LETTER-DISCIPLINARY NOTICE Form # HSEQ - HSEWL Rev 6.doc
 
Dropped Object prevention Campaign (1).pptx
Dropped Object prevention Campaign (1).pptxDropped Object prevention Campaign (1).pptx
Dropped Object prevention Campaign (1).pptx
 
273372884-Permit-To-Work.pptx
273372884-Permit-To-Work.pptx273372884-Permit-To-Work.pptx
273372884-Permit-To-Work.pptx
 
December -15 Daily Observation Report
December -15 Daily Observation ReportDecember -15 Daily Observation Report
December -15 Daily Observation Report
 

Viewers also liked

Job Safety Analysis
Job Safety AnalysisJob Safety Analysis
Job Safety Analysisvtsiri
 
Ma 09 crane wire replacement ( boom )
Ma 09 crane wire replacement ( boom )Ma 09 crane wire replacement ( boom )
Ma 09 crane wire replacement ( boom )Yousif Fikry
 
Ra gen-engineering-12 [disused mines & tips]
Ra gen-engineering-12 [disused mines & tips]Ra gen-engineering-12 [disused mines & tips]
Ra gen-engineering-12 [disused mines & tips]bobolewis
 
Ma 033 jsa rack pup joint in the stb rack
Ma 033 jsa rack pup joint in the stb rackMa 033 jsa rack pup joint in the stb rack
Ma 033 jsa rack pup joint in the stb rackYousif Fikry
 
Job Safety Analysis Training
Job Safety Analysis TrainingJob Safety Analysis Training
Job Safety Analysis TrainingAdnan Muazzam
 
H2S awareness (Hydrogen Sulfide) its a matter of life or death.
H2S awareness (Hydrogen Sulfide) its a matter of life or death.H2S awareness (Hydrogen Sulfide) its a matter of life or death.
H2S awareness (Hydrogen Sulfide) its a matter of life or death.Gerald Gallardo
 
4th Presentation
4th Presentation4th Presentation
4th PresentationBarun
 
Construction Activities Hazards and Control 138001441427235.OS
Construction Activities Hazards and Control 138001441427235.OSConstruction Activities Hazards and Control 138001441427235.OS
Construction Activities Hazards and Control 138001441427235.OSEiyla Hamdan
 
Building Management System BMS Introduction
Building Management System BMS  IntroductionBuilding Management System BMS  Introduction
Building Management System BMS IntroductionGAUTAM KOPPALA (JORGE)
 

Viewers also liked (12)

Job Safety Analysis
Job Safety AnalysisJob Safety Analysis
Job Safety Analysis
 
Ma 09 crane wire replacement ( boom )
Ma 09 crane wire replacement ( boom )Ma 09 crane wire replacement ( boom )
Ma 09 crane wire replacement ( boom )
 
Ra gen-engineering-12 [disused mines & tips]
Ra gen-engineering-12 [disused mines & tips]Ra gen-engineering-12 [disused mines & tips]
Ra gen-engineering-12 [disused mines & tips]
 
Ma 033 jsa rack pup joint in the stb rack
Ma 033 jsa rack pup joint in the stb rackMa 033 jsa rack pup joint in the stb rack
Ma 033 jsa rack pup joint in the stb rack
 
Job Safety Analysis Training
Job Safety Analysis TrainingJob Safety Analysis Training
Job Safety Analysis Training
 
H2S awareness (Hydrogen Sulfide) its a matter of life or death.
H2S awareness (Hydrogen Sulfide) its a matter of life or death.H2S awareness (Hydrogen Sulfide) its a matter of life or death.
H2S awareness (Hydrogen Sulfide) its a matter of life or death.
 
4th Presentation
4th Presentation4th Presentation
4th Presentation
 
Aha sample-scaffolding
Aha sample-scaffoldingAha sample-scaffolding
Aha sample-scaffolding
 
Construction Activities Hazards and Control 138001441427235.OS
Construction Activities Hazards and Control 138001441427235.OSConstruction Activities Hazards and Control 138001441427235.OS
Construction Activities Hazards and Control 138001441427235.OS
 
Building Management System BMS Introduction
Building Management System BMS  IntroductionBuilding Management System BMS  Introduction
Building Management System BMS Introduction
 
H2S Safety Training by Total Safety Inc
H2S Safety Training by Total Safety IncH2S Safety Training by Total Safety Inc
H2S Safety Training by Total Safety Inc
 
Well test-procedures-manual
Well test-procedures-manualWell test-procedures-manual
Well test-procedures-manual
 

Similar to Job safety analysis

TRA%20of%20Lifting.Tail.docx
TRA%20of%20Lifting.Tail.docxTRA%20of%20Lifting.Tail.docx
TRA%20of%20Lifting.Tail.docxPriyaRavirajan
 
Ma 003 erecting & removing scaffolding in tanks
Ma 003  erecting & removing scaffolding in tanksMa 003  erecting & removing scaffolding in tanks
Ma 003 erecting & removing scaffolding in tanksYousif Fikry
 
few word abour crane..pdf
few word abour crane..pdffew word abour crane..pdf
few word abour crane..pdfconstruction
 
Crane | Crane Safety | Crane Safety Parts | Gaurav Singh Rajput
Crane | Crane Safety | Crane Safety Parts | Gaurav Singh RajputCrane | Crane Safety | Crane Safety Parts | Gaurav Singh Rajput
Crane | Crane Safety | Crane Safety Parts | Gaurav Singh RajputGaurav Singh Rajput
 
Ma 001 tanks & preloads visual inspection
Ma 001  tanks & preloads visual inspectionMa 001  tanks & preloads visual inspection
Ma 001 tanks & preloads visual inspectionYousif Fikry
 
Steven Wilson CV New
Steven Wilson CV NewSteven Wilson CV New
Steven Wilson CV NewSteven Wilson
 
RA- Pressure Testing Of Pipe Works
RA- Pressure Testing Of Pipe WorksRA- Pressure Testing Of Pipe Works
RA- Pressure Testing Of Pipe WorksSajid Ali
 
HSE-BMS-011 Crane & Lifting Safety.ppt...
HSE-BMS-011 Crane & Lifting Safety.ppt...HSE-BMS-011 Crane & Lifting Safety.ppt...
HSE-BMS-011 Crane & Lifting Safety.ppt...AhmedAliKhan38
 
HSE Risk Register | Gaurav Singh Rajput
HSE Risk Register | Gaurav Singh RajputHSE Risk Register | Gaurav Singh Rajput
HSE Risk Register | Gaurav Singh RajputGaurav Singh Rajput
 
Crane & Lifting Safety.ppt Crane lifting safety useful for construction industry
Crane & Lifting Safety.ppt Crane lifting safety useful for construction industryCrane & Lifting Safety.ppt Crane lifting safety useful for construction industry
Crane & Lifting Safety.ppt Crane lifting safety useful for construction industryRamana Reddy G
 
Excavation & Back filling work 02.docx
Excavation & Back filling work 02.docxExcavation & Back filling work 02.docx
Excavation & Back filling work 02.docxnrphsebarauni
 
Airside Observation Statement -24.12.2015.xlsx(A).xlsx01
Airside Observation Statement -24.12.2015.xlsx(A).xlsx01Airside Observation Statement -24.12.2015.xlsx(A).xlsx01
Airside Observation Statement -24.12.2015.xlsx(A).xlsx01Andrew Louis
 

Similar to Job safety analysis (20)

PA PIPE WORK 14 inch spool TH11177-06-PI-10-004-5
PA PIPE WORK 14 inch spool TH11177-06-PI-10-004-5PA PIPE WORK 14 inch spool TH11177-06-PI-10-004-5
PA PIPE WORK 14 inch spool TH11177-06-PI-10-004-5
 
SDV-20253 VALVE MOD 9 lift plan 1
SDV-20253 VALVE MOD 9 lift plan 1SDV-20253 VALVE MOD 9 lift plan 1
SDV-20253 VALVE MOD 9 lift plan 1
 
TRA%20of%20Lifting.Tail.docx
TRA%20of%20Lifting.Tail.docxTRA%20of%20Lifting.Tail.docx
TRA%20of%20Lifting.Tail.docx
 
Ma 003 erecting & removing scaffolding in tanks
Ma 003  erecting & removing scaffolding in tanksMa 003  erecting & removing scaffolding in tanks
Ma 003 erecting & removing scaffolding in tanks
 
few word abour crane..pdf
few word abour crane..pdffew word abour crane..pdf
few word abour crane..pdf
 
Crane.pdf
Crane.pdfCrane.pdf
Crane.pdf
 
Crane | Crane Safety | Crane Safety Parts | Gaurav Singh Rajput
Crane | Crane Safety | Crane Safety Parts | Gaurav Singh RajputCrane | Crane Safety | Crane Safety Parts | Gaurav Singh Rajput
Crane | Crane Safety | Crane Safety Parts | Gaurav Singh Rajput
 
Ma 001 tanks & preloads visual inspection
Ma 001  tanks & preloads visual inspectionMa 001  tanks & preloads visual inspection
Ma 001 tanks & preloads visual inspection
 
Steven Wilson CV New
Steven Wilson CV NewSteven Wilson CV New
Steven Wilson CV New
 
Rigger safety .pdf
Rigger safety                        .pdfRigger safety                        .pdf
Rigger safety .pdf
 
Rigging Course .pdf
Rigging Course                       .pdfRigging Course                       .pdf
Rigging Course .pdf
 
update 20feb1
update 20feb1update 20feb1
update 20feb1
 
RA- Pressure Testing Of Pipe Works
RA- Pressure Testing Of Pipe WorksRA- Pressure Testing Of Pipe Works
RA- Pressure Testing Of Pipe Works
 
HSE-BMS-011 Crane & Lifting Safety.ppt...
HSE-BMS-011 Crane & Lifting Safety.ppt...HSE-BMS-011 Crane & Lifting Safety.ppt...
HSE-BMS-011 Crane & Lifting Safety.ppt...
 
HSE Risk Register | Gaurav Singh Rajput
HSE Risk Register | Gaurav Singh RajputHSE Risk Register | Gaurav Singh Rajput
HSE Risk Register | Gaurav Singh Rajput
 
Crane Operation - Lifting
Crane Operation -  LiftingCrane Operation -  Lifting
Crane Operation - Lifting
 
Crane & Lifting Safety.ppt Crane lifting safety useful for construction industry
Crane & Lifting Safety.ppt Crane lifting safety useful for construction industryCrane & Lifting Safety.ppt Crane lifting safety useful for construction industry
Crane & Lifting Safety.ppt Crane lifting safety useful for construction industry
 
Aerial Lift Safety Training by ANSV
Aerial Lift Safety Training by ANSVAerial Lift Safety Training by ANSV
Aerial Lift Safety Training by ANSV
 
Excavation & Back filling work 02.docx
Excavation & Back filling work 02.docxExcavation & Back filling work 02.docx
Excavation & Back filling work 02.docx
 
Airside Observation Statement -24.12.2015.xlsx(A).xlsx01
Airside Observation Statement -24.12.2015.xlsx(A).xlsx01Airside Observation Statement -24.12.2015.xlsx(A).xlsx01
Airside Observation Statement -24.12.2015.xlsx(A).xlsx01
 

Recently uploaded

self respect is very important in this crual word where everyone in just thin...
self respect is very important in this crual word where everyone in just thin...self respect is very important in this crual word where everyone in just thin...
self respect is very important in this crual word where everyone in just thin...afaqsaeed463
 
VIP Kolkata Call Girl Rajarhat 👉 8250192130 Available With Room
VIP Kolkata Call Girl Rajarhat 👉 8250192130  Available With RoomVIP Kolkata Call Girl Rajarhat 👉 8250192130  Available With Room
VIP Kolkata Call Girl Rajarhat 👉 8250192130 Available With Roomdivyansh0kumar0
 
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...Pooja Nehwal
 
Farmer Representative Organization in Lucknow | Rashtriya Kisan Manch
Farmer Representative Organization in Lucknow | Rashtriya Kisan ManchFarmer Representative Organization in Lucknow | Rashtriya Kisan Manch
Farmer Representative Organization in Lucknow | Rashtriya Kisan ManchRashtriya Kisan Manch
 
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)jennyeacort
 
Simplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes ThinkingSimplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes ThinkingCIToolkit
 
Fifteenth Finance Commission Presentation
Fifteenth Finance Commission PresentationFifteenth Finance Commission Presentation
Fifteenth Finance Commission Presentationmintusiprd
 
Unlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency MatrixUnlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency MatrixCIToolkit
 
Measuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield MetricsMeasuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield MetricsCIToolkit
 
Reflecting, turning experience into insight
Reflecting, turning experience into insightReflecting, turning experience into insight
Reflecting, turning experience into insightWayne Abrahams
 
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证jdkhjh
 
LPC Operations Review PowerPoint | Operations Review
LPC Operations Review PowerPoint | Operations ReviewLPC Operations Review PowerPoint | Operations Review
LPC Operations Review PowerPoint | Operations Reviewthomas851723
 
LPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business SectorLPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business Sectorthomas851723
 
ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...
ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...
ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...AgileNetwork
 
Introduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-EngineeringIntroduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-Engineeringthomas851723
 
Board Diversity Initiaive Launch Presentation
Board Diversity Initiaive Launch PresentationBoard Diversity Initiaive Launch Presentation
Board Diversity Initiaive Launch Presentationcraig524401
 

Recently uploaded (17)

self respect is very important in this crual word where everyone in just thin...
self respect is very important in this crual word where everyone in just thin...self respect is very important in this crual word where everyone in just thin...
self respect is very important in this crual word where everyone in just thin...
 
VIP Kolkata Call Girl Rajarhat 👉 8250192130 Available With Room
VIP Kolkata Call Girl Rajarhat 👉 8250192130  Available With RoomVIP Kolkata Call Girl Rajarhat 👉 8250192130  Available With Room
VIP Kolkata Call Girl Rajarhat 👉 8250192130 Available With Room
 
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...
 
Farmer Representative Organization in Lucknow | Rashtriya Kisan Manch
Farmer Representative Organization in Lucknow | Rashtriya Kisan ManchFarmer Representative Organization in Lucknow | Rashtriya Kisan Manch
Farmer Representative Organization in Lucknow | Rashtriya Kisan Manch
 
sauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Service
sauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Servicesauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Service
sauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Service
 
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
 
Simplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes ThinkingSimplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes Thinking
 
Fifteenth Finance Commission Presentation
Fifteenth Finance Commission PresentationFifteenth Finance Commission Presentation
Fifteenth Finance Commission Presentation
 
Unlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency MatrixUnlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency Matrix
 
Measuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield MetricsMeasuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield Metrics
 
Reflecting, turning experience into insight
Reflecting, turning experience into insightReflecting, turning experience into insight
Reflecting, turning experience into insight
 
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
 
LPC Operations Review PowerPoint | Operations Review
LPC Operations Review PowerPoint | Operations ReviewLPC Operations Review PowerPoint | Operations Review
LPC Operations Review PowerPoint | Operations Review
 
LPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business SectorLPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business Sector
 
ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...
ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...
ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...
 
Introduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-EngineeringIntroduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-Engineering
 
Board Diversity Initiaive Launch Presentation
Board Diversity Initiaive Launch PresentationBoard Diversity Initiaive Launch Presentation
Board Diversity Initiaive Launch Presentation
 

Job safety analysis

  • 1. JOB HAZARD SAFETY ANALYSIS JOB: Running Completion RIG/ FACILITY/ SITE: Star Energy KAKAP LTD PERSONNEL INVOLVED: Drilling Crew / Weatherford DEPARTMENT: Drilling SUPERVISOR: Driller On Duty Valid Permit is in place before starting the Job! Yes DATE: February 22,2006 REVIEW DATE: February 22,2006 REQUIRED PERSONAL PROTECTIVE EQUIPMENT: Standard PPE Reference Number T.B.A. LIST ASSOCIATED PROCEDURES/ WORK INSTRUCTIONS OR TEMPORARY WORK INSTRUCTIONS: • 3rd Party Equipment Checklist is completed before commencement of the operation. Description of Task Pick Up and Running 7’’26# WH-6 Packer and 9-5/8’’ Hydro I Production packer No Description of Task Hazard (Threat) Control (Barrier) Potential Incident Recovery 1. Prepare 7’’26# WH- 6 Packer and 9-5/8’’ Production Packers • Dropped load • Pinch points Check all Shear Pin to set the packer and release screw the packer Injury to personnel Equipment damage Medical attention Stop work 2. Ensure area is clean and tools are in good condition before commencing job • Pinch points • Trip / Slip • Equipment failure Inspection of work area and tools to be used Clear signals to Crane Operator and Driller Injury to Personnel Equipment damage Medical attention Stop work 3. Rig up handling equipment on drill floor and inspect same. • Dropped load • Pinch points Check all lifting gear. Tag lines must be used. Qualified crane signalman Injury to Personnel Equipment damage Medical attention Stop work Page 1 of 3
  • 2. JOB HAZARD SAFETY ANALYSIS JOB: Running Completion 4. Check all connection and screw. Move 7’’26# WH-6 Packer and 9-5/8’’ Production packer from deck to drill floor • Crushed by swinging load • Damage to lift sub thread. • Dropped objects • Equipment failure Stay clear of loads. Always use taglines. Ensure thread protectors are used after lift sub is being removed from joint. Beware of pinch / crush points Ensure lifting sub is correctly installed. Weatherford to confirm. Injury to personnel Equipment damage Medical attention Stop work 5. Hoist 7’’ Packer and 9-5/8’’ Packer and Pup Joint Above packer with block and lower through table. • Crushed by swinging load • Dropped objects • Equipment failure Ensure no personnel stand in fall zone on drill floor or catwalk. Beware of pinch / crush points Driller to have clear line of vision. Only one man to signal crane operator. Injury to personnel Equipment damage Medical attention Stop work 6. Make up 7’’ WH-6 packers and 9-5/8’’ Hydro I Packer as Weatherford Completion Engineer instructions. • Thread Damage • Dropped objects • Equipment failure Follow instructions given by Weatherford. Ensure that the 7’’WH-6 packer and 9-5/8’’ Hydro I packer Element do not rotated and place Area Power Tong Torque Ensure hole is covered around slips. Injury to personnel Equipment damage Equipment damage with no spares. Medical attention Stop work Page 1 of 3
  • 3. JOB HAZARD SAFETY ANALYSIS JOB: Running Completion 7. Running and Setting 7’’ WH-6 Packer and 9-5/8’’ Packer and 3- 1/2’’ TRSV Safety valve • Tag line pressure test. Connection in the pressure test line • Pinch points • Equipment Damage Ensure that all connection pressure test line was checked seal and debris. Equipment inspection prior to and during use .Ensure that the running tool dies not back off while making up connection. Checked pressure pump, ensure that pumping for setting 7’’WH-6 and 9- 5/8’’ Hydro I Production Packer are function properly. Injury to personnel Damage to Equipment Injury to personnel Medical attention Stop Work Medical attention • PLEASE WRITE YOUR NAME IN SIGNATURE Page 1 of 3