Site Safety Observation
Observation Improvement Photos
Observation Correction
S/S-8254
Project Team: S/S8254
Doc no: FM.HSE – 5.41
Rev. Date:
AL - BABTAIN CONTRACTING COMPANY
Kingdom of Saudi Arabia
Unsafe Act Following workers , no
male socket
' I was informed to Worker dont do unsafe
practice , Provided male sockets
improper stocked ducting material
near Stocking area
Arranged all ducting
material storage area
improper stoked Fire Fighting Pipes I informed to workers any material
stocking in storage area

More Related Content

What's hot

Basic safety
Basic safetyBasic safety
Basic safetyLalit M
 
6 excavations (temporary works) risk assessment templates
6 excavations (temporary works) risk assessment templates6 excavations (temporary works) risk assessment templates
6 excavations (temporary works) risk assessment templatesDwarika Bhushan Sharma
 
Scaffolding safety training.ppt
Scaffolding safety training.pptScaffolding safety training.ppt
Scaffolding safety training.pptIrfanAwan25
 
Presentation working at height
Presentation working at heightPresentation working at height
Presentation working at heightsankarnagar
 
Portable tools risk assessment
Portable tools risk assessment Portable tools risk assessment
Portable tools risk assessment Nidhin Sajeevan
 
NGI-Permit to Work
NGI-Permit to WorkNGI-Permit to Work
NGI-Permit to Worklifecombo
 
EHS induction Presentation slides
EHS induction Presentation slidesEHS induction Presentation slides
EHS induction Presentation slidesMaffino
 
Basic Safety Induction .pptx
Basic Safety Induction .pptxBasic Safety Induction .pptx
Basic Safety Induction .pptxssuser1f86f6
 
New Employee Orientation 05
New Employee Orientation 05New Employee Orientation 05
New Employee Orientation 05txsafety1
 
21 confined space working risk assessment templates
21 confined space working risk assessment templates21 confined space working risk assessment templates
21 confined space working risk assessment templatesDwarika Bhushan Sharma
 
General Safety Presentationupdated 04842993 1
General Safety Presentationupdated 04842993 1General Safety Presentationupdated 04842993 1
General Safety Presentationupdated 04842993 1debandleigh
 
25 demolition of existing concrete structures risk assessment templates
25 demolition of existing concrete structures risk assessment templates25 demolition of existing concrete structures risk assessment templates
25 demolition of existing concrete structures risk assessment templatesDwarika Bhushan Sharma
 
Risk assessment for soil investigation at towers 5,6,7,8 rev01 a.dogani
Risk assessment for soil investigation at towers 5,6,7,8  rev01  a.doganiRisk assessment for soil investigation at towers 5,6,7,8  rev01  a.dogani
Risk assessment for soil investigation at towers 5,6,7,8 rev01 a.doganiArber Dogani
 
Safe work-at-heights-presentation
Safe work-at-heights-presentationSafe work-at-heights-presentation
Safe work-at-heights-presentationJulianElbu
 
Fire Risk Assessment.pdf
Fire Risk Assessment.pdfFire Risk Assessment.pdf
Fire Risk Assessment.pdfHSEXINYIPROJECT
 
Site induction uks 2007 2011
Site induction uks 2007   2011Site induction uks 2007   2011
Site induction uks 2007 2011Clive Burgess
 

What's hot (20)

Staff safety hand book
Staff   safety hand bookStaff   safety hand book
Staff safety hand book
 
Basic safety
Basic safetyBasic safety
Basic safety
 
6 excavations (temporary works) risk assessment templates
6 excavations (temporary works) risk assessment templates6 excavations (temporary works) risk assessment templates
6 excavations (temporary works) risk assessment templates
 
Scaffolding safety training.ppt
Scaffolding safety training.pptScaffolding safety training.ppt
Scaffolding safety training.ppt
 
Presentation working at height
Presentation working at heightPresentation working at height
Presentation working at height
 
Portable tools risk assessment
Portable tools risk assessment Portable tools risk assessment
Portable tools risk assessment
 
NGI-Permit to Work
NGI-Permit to WorkNGI-Permit to Work
NGI-Permit to Work
 
EHS induction Presentation slides
EHS induction Presentation slidesEHS induction Presentation slides
EHS induction Presentation slides
 
Near miss report
Near miss reportNear miss report
Near miss report
 
Basic Safety Induction .pptx
Basic Safety Induction .pptxBasic Safety Induction .pptx
Basic Safety Induction .pptx
 
New Employee Orientation 05
New Employee Orientation 05New Employee Orientation 05
New Employee Orientation 05
 
21 confined space working risk assessment templates
21 confined space working risk assessment templates21 confined space working risk assessment templates
21 confined space working risk assessment templates
 
Fire drill report
Fire drill reportFire drill report
Fire drill report
 
Working at height slides
Working at height slidesWorking at height slides
Working at height slides
 
General Safety Presentationupdated 04842993 1
General Safety Presentationupdated 04842993 1General Safety Presentationupdated 04842993 1
General Safety Presentationupdated 04842993 1
 
25 demolition of existing concrete structures risk assessment templates
25 demolition of existing concrete structures risk assessment templates25 demolition of existing concrete structures risk assessment templates
25 demolition of existing concrete structures risk assessment templates
 
Risk assessment for soil investigation at towers 5,6,7,8 rev01 a.dogani
Risk assessment for soil investigation at towers 5,6,7,8  rev01  a.doganiRisk assessment for soil investigation at towers 5,6,7,8  rev01  a.dogani
Risk assessment for soil investigation at towers 5,6,7,8 rev01 a.dogani
 
Safe work-at-heights-presentation
Safe work-at-heights-presentationSafe work-at-heights-presentation
Safe work-at-heights-presentation
 
Fire Risk Assessment.pdf
Fire Risk Assessment.pdfFire Risk Assessment.pdf
Fire Risk Assessment.pdf
 
Site induction uks 2007 2011
Site induction uks 2007   2011Site induction uks 2007   2011
Site induction uks 2007 2011
 

Viewers also liked

1.5 t sawdust pellets production line
1.5 t sawdust pellets production line1.5 t sawdust pellets production line
1.5 t sawdust pellets production lineEvita Lee
 
Automatic high level layer palletizer
Automatic high level layer palletizer Automatic high level layer palletizer
Automatic high level layer palletizer Evita Lee
 
Palletizer
PalletizerPalletizer
Palletizersyafiq81
 
Uks zone control system for safety 1
Uks zone control system for safety 1Uks zone control system for safety 1
Uks zone control system for safety 1Clive Burgess
 
Rite-Hite PitMaster Under-leveler Seal
Rite-Hite PitMaster Under-leveler SealRite-Hite PitMaster Under-leveler Seal
Rite-Hite PitMaster Under-leveler SealRite-Hite
 
summary report of inspections of clinical trials conducted from April 2004 to...
summary report of inspections of clinical trials conducted from April 2004 to...summary report of inspections of clinical trials conducted from April 2004 to...
summary report of inspections of clinical trials conducted from April 2004 to...mahmoudnasseri
 
Warehouse dock safety 2013
Warehouse dock safety 2013Warehouse dock safety 2013
Warehouse dock safety 2013John Newquist
 
Warehouse dock safety 2013
Warehouse dock safety 2013Warehouse dock safety 2013
Warehouse dock safety 2013vtsiri
 
Behaviour Observation Process
Behaviour Observation ProcessBehaviour Observation Process
Behaviour Observation ProcessWilliam Wootton
 
Observation report 20070720
Observation report 20070720Observation report 20070720
Observation report 20070720營松 林
 
Safety Audit at Workplace (Group 15)
Safety Audit at Workplace (Group 15)Safety Audit at Workplace (Group 15)
Safety Audit at Workplace (Group 15)Yvonne Chew
 
Report Industrial Training Chapter 1-6
Report Industrial Training Chapter 1-6Report Industrial Training Chapter 1-6
Report Industrial Training Chapter 1-6Cik Aisyahfitrah
 
Sample Home Inspection Report
Sample Home Inspection ReportSample Home Inspection Report
Sample Home Inspection Reporttspargo
 
Safety Audit and Safety Survey
Safety Audit and Safety SurveySafety Audit and Safety Survey
Safety Audit and Safety SurveyGagan Tanwar
 
Bridging yield gaps in Ethiopia: Field visit and observations
Bridging yield gaps in Ethiopia: Field visit and observationsBridging yield gaps in Ethiopia: Field visit and observations
Bridging yield gaps in Ethiopia: Field visit and observationsafrica-rising
 
Defining kpi in terms of unsafe acts/conditions and near miss
Defining kpi in terms of unsafe acts/conditions and near miss  Defining kpi in terms of unsafe acts/conditions and near miss
Defining kpi in terms of unsafe acts/conditions and near miss Faiz Khan
 
Monthly Safety Report- (Mr. Shekhar viset) Project M (03-2011)
Monthly Safety Report- (Mr. Shekhar viset) Project M (03-2011)Monthly Safety Report- (Mr. Shekhar viset) Project M (03-2011)
Monthly Safety Report- (Mr. Shekhar viset) Project M (03-2011)Alaa shahin
 

Viewers also liked (20)

1.5 t sawdust pellets production line
1.5 t sawdust pellets production line1.5 t sawdust pellets production line
1.5 t sawdust pellets production line
 
Automatic high level layer palletizer
Automatic high level layer palletizer Automatic high level layer palletizer
Automatic high level layer palletizer
 
Palletizer
PalletizerPalletizer
Palletizer
 
Uks zone control system for safety 1
Uks zone control system for safety 1Uks zone control system for safety 1
Uks zone control system for safety 1
 
Rite-Hite PitMaster Under-leveler Seal
Rite-Hite PitMaster Under-leveler SealRite-Hite PitMaster Under-leveler Seal
Rite-Hite PitMaster Under-leveler Seal
 
summary report of inspections of clinical trials conducted from April 2004 to...
summary report of inspections of clinical trials conducted from April 2004 to...summary report of inspections of clinical trials conducted from April 2004 to...
summary report of inspections of clinical trials conducted from April 2004 to...
 
Pedestrian Safety Assessments and Observations
Pedestrian Safety Assessments and ObservationsPedestrian Safety Assessments and Observations
Pedestrian Safety Assessments and Observations
 
Warehouse dock safety 2013
Warehouse dock safety 2013Warehouse dock safety 2013
Warehouse dock safety 2013
 
Warehouse dock safety 2013
Warehouse dock safety 2013Warehouse dock safety 2013
Warehouse dock safety 2013
 
Behaviour Observation Process
Behaviour Observation ProcessBehaviour Observation Process
Behaviour Observation Process
 
Observation report 20070720
Observation report 20070720Observation report 20070720
Observation report 20070720
 
Safety Audit at Workplace (Group 15)
Safety Audit at Workplace (Group 15)Safety Audit at Workplace (Group 15)
Safety Audit at Workplace (Group 15)
 
Safety Manager CV
Safety Manager CVSafety Manager CV
Safety Manager CV
 
Report Industrial Training Chapter 1-6
Report Industrial Training Chapter 1-6Report Industrial Training Chapter 1-6
Report Industrial Training Chapter 1-6
 
Sample Home Inspection Report
Sample Home Inspection ReportSample Home Inspection Report
Sample Home Inspection Report
 
Safety Audit and Safety Survey
Safety Audit and Safety SurveySafety Audit and Safety Survey
Safety Audit and Safety Survey
 
Bridging yield gaps in Ethiopia: Field visit and observations
Bridging yield gaps in Ethiopia: Field visit and observationsBridging yield gaps in Ethiopia: Field visit and observations
Bridging yield gaps in Ethiopia: Field visit and observations
 
Hse inspection presentation
Hse inspection presentationHse inspection presentation
Hse inspection presentation
 
Defining kpi in terms of unsafe acts/conditions and near miss
Defining kpi in terms of unsafe acts/conditions and near miss  Defining kpi in terms of unsafe acts/conditions and near miss
Defining kpi in terms of unsafe acts/conditions and near miss
 
Monthly Safety Report- (Mr. Shekhar viset) Project M (03-2011)
Monthly Safety Report- (Mr. Shekhar viset) Project M (03-2011)Monthly Safety Report- (Mr. Shekhar viset) Project M (03-2011)
Monthly Safety Report- (Mr. Shekhar viset) Project M (03-2011)
 

December -15 Daily Observation Report

  • 1. Project: Date: 15/12/2016 Report Prepared By: Mohammed Mubasheeruddin Rev No :00 Page 1 of 1 Site Safety Observation Observation Improvement Photos Observation Correction S/S-8254 Project Team: S/S8254 Doc no: FM.HSE – 5.41 Rev. Date: AL - BABTAIN CONTRACTING COMPANY Kingdom of Saudi Arabia Unsafe Act Following workers , no male socket ' I was informed to Worker dont do unsafe practice , Provided male sockets improper stocked ducting material near Stocking area Arranged all ducting material storage area improper stoked Fire Fighting Pipes I informed to workers any material stocking in storage area