JOB SAFETY ANALYSIS
Doc. No.:
Rev.: 00
Date:
Page: 1 of 2
Project: Ajyal international School Project
Project#: Area:Dist Ajyal Dammam Saudi Arabia General Comments: Proper PPE, TBT should be conducted before start the job,
Access control authority would be DEL Site Manager/Site Engineer
Date: Supervisor:
Job Description: Work at Height
Item
Detail of
Activity
Equipment &
Tools used
Risk Involved Control Measure
Responsible
Person
Severity
Rating
1
2
3
4
TRANSPORTING
SCAFFOLDING
MATERIAL AT
SITE.
UNLOADING OF
SCAFFOLDING
MATERIAL.
STORAGE OF
SCAFFOLD
MATERIAL.
ERECTION &
DISMANTLING
OF
SCAFFOLDING.
● VEHICLES.
● SCAFFOLDI
NG
MATERIALS
. (PIPES,
JOINTS,
PLANKS,
BASE
PLATE, TOE
BOARD &
etc.)
● .LEVEL
STRIP,
HAMMER,
METER TAP
& ROPE.
● MATERIAL CAN FALL.
● PERSONAL INJURY.
● UNAUTHORIZED /
UNTRAINED/
INEXPERIENCED
PERSONNEL ON THE JOB
● UNEVEN GROUND
● FAULTY/ POOR
CONDITION SCAFFOLDING
MATERIAL
● IMPROPER
SCAFFOLDING ERECTION
● TAG SYSTEM NOT
FOLLOWED.
● WRONG MATERIAL
HANDLING/ FALLING OBJECT
● PERSONNEL INJURY.
● PERSONNEL FALL.
● OBJECT FALL.
● PROPERTY LOSS
● MATERIAL WILL BE FASTENED PROPERLY BEFORE
TRANSPORTING TO SITE.
● ONLY EXPERIENCED, SKILLED AND TRAINED
PERSON SHOULD BE ALLOWED
● ALL HANDTOOLS SHOULD BE INSPECTED PRIOR TO
START OF JOB
● SCAFFOLDING PIPES WITH CORROSION SHOULD NOT
BE USED.
● MATERIAL WILL BE UNLOADED WITH BOOM TRUCK
● CERTIFIED BOOM TRUCK OPERATOR WILL CARRY
OUT THE TASK.
● MATERIAL WILL BE STORED IN A DESIGNATED AREA.
● MATERIAL WILL BE STORED ON SCAFFOLD RACKS.
● HARD BARRICADE AND SIGNAGE WILL BE PROVIDED
● GROUND SURFACE SHOULD BE LEVELED
● RED TAG MUST BE PLACED/ HANGED AT THE START
OF SCAFFOLDING
● ENSURE VERTICAL PIPES ALLIGNMENT AND CHECK
IT WITH HAND LEVEL
● ENSURE ALL JOINTS ARE PROPERLY TIGHTENED
● USE BRACING PIPES AND OUTERRIGGERS PIPES
WHERE NECESSARY.
● ONLY CERTIFIED SCAFFOLDERS WILL PERFORM THE
JOB.
● SCAFFOLDERS WILL BE TRAINED ON SAFE WORKING
AT HEIGHT.
● ABOVE 1.8M HEIGHT SAFETY HARNESS WILL BE
WITH DOUBLE LANYARD. 100%TIE OFF WILL BE
ENSURED.
● SCAFFOLD PLATFORM WILL NOT BE OVERLOADED.
● HAND RAIL AND TOE BOARDS WILL BE INSTALLED
WITH SCAFFOLDING PLATFORM.
● ALL EMPLOYEES WILL WORK WITH PROPER PPES.
Area I/C
(Authorized
Person).
3
2
3
3
3
2
3
3
3
3
● ELECTRIC SHOCK DUE
TO POWER LINE
● LADDER SHOULD BE CONSTRUCTED AT SUITABLE.
● METAL PLANKS SHOULD BE PROERLY PLACED ON
PIPES WITH HOOKS AND USE BINDING WIRE FOR
BINDIND WHERE NECESSARY
● NO PERSON SHOULD GO IN DROP ZONE.
SCAFFOLDING AREA.
● AREA SHOULD BARRICATED WHILE ERECTION OR
DISMENTLING THE PLATFORM.
● AREA MUST BE CHECKED & FREE FROM ELECTRICAL
WIRES BEFORE ASSEMBLING TO THE CRANE.
OVERHEAD
ELECTRICAL
POWER LINES
● SCAFFOLD
STRUCTUR
E
● PERSONAL INJURY
● PROPERTY LOSS
● ENSURE OVERHEAD CLEARANCE WHILE
OPERATING THE EQUIPMENT
Area
Representative
5 NIGHT WORKING
ACTIVITIES
● LIGHTS
● STANDS
Trdsssssdrttt
● HAND INJURY/EYE
INJURY
● ELECTRIC SHOCK /
ELECTROCUTION
● IMPROPER ILLUMINATION
● PERSONAL INJURY
● PROPERTY LOSS
● ENSURE WORKERS ARE COMPLYING PPE’S
REQUIRED.
● EXTINGUISHER MUST BE PRESENT AT ALL
TIME
● LIGHT SHOULD BE PROPER PRIOR TO START
THE WORK.
● ALL POWER CABLES SHOULD BE INSPECTED
AND INSULATED.
● LIGHTS SHOULD BE INSTALLED OVER HEAD
HEIGHT TO AVOID GLARING TO PERSONAL.
● IF GENERATOR USE FOR ELECTRICITY SHOULD BE
PROPERLY GROUNDED
● ALL TOWER CRANE LIGHTS SHOULD BE CHECKED
AND USE WHEREVER NECESSARY.
Area I/C
(Authorized
Person).
2
3
2
3
6
HOUSEKEEPING MANUAL CLEANING
OF AREA
● HOUSEKEEPING
● AREA BARRICADING
● PPE
● PROPERTY LOSS
● SLIP/TRIP
● FALL FROM HEIGHT
AREA IN-
CHARGE
3
2
3
Severity Rating : (1) First Aid / Minor Property Damage (2) Recordable Accident / Property Damage
(3) Lost Time Accident / Major Property Loss (4) Catastrophic Accident
Are you aware of, and do you have the correct PPE? What are the risks? How do controlled risks?
_______________________________ __________________________
AREA ENGINEER / SUPERVISOR HSE REPRESENTATIVE

More Related Content

What's hot

Step 6 hot work permit
Step 6 hot work permitStep 6 hot work permit
Step 6 hot work permit
fqf383
 
NGI-Excavation Hazards
NGI-Excavation HazardsNGI-Excavation Hazards
NGI-Excavation Hazards
lifecombo
 

What's hot (20)

12 sheet piling operations (temporary works) risk assessment templates
12 sheet piling operations (temporary works) risk assessment templates12 sheet piling operations (temporary works) risk assessment templates
12 sheet piling operations (temporary works) risk assessment templates
 
PPT ON PERMIT TO WORK, by Ekemezie E
PPT ON PERMIT TO WORK, by Ekemezie EPPT ON PERMIT TO WORK, by Ekemezie E
PPT ON PERMIT TO WORK, by Ekemezie E
 
Lifting Operation Safety ppt.pptx
Lifting Operation Safety ppt.pptxLifting Operation Safety ppt.pptx
Lifting Operation Safety ppt.pptx
 
MOVING FALLING OBJECTS SAFETY
MOVING FALLING OBJECTS SAFETYMOVING FALLING OBJECTS SAFETY
MOVING FALLING OBJECTS SAFETY
 
Hot Works Safety Training
Hot Works Safety TrainingHot Works Safety Training
Hot Works Safety Training
 
Risk assessment for testing & commissioning of cranes
Risk assessment for  testing & commissioning of cranesRisk assessment for  testing & commissioning of cranes
Risk assessment for testing & commissioning of cranes
 
Risk Assessment (Master).pdf
Risk Assessment (Master).pdfRisk Assessment (Master).pdf
Risk Assessment (Master).pdf
 
23 casting of concrete slabs risk assessment templates
23 casting of concrete slabs risk assessment templates23 casting of concrete slabs risk assessment templates
23 casting of concrete slabs risk assessment templates
 
19 use of mobile elevated work platforms risk assessment templates
19 use of mobile elevated work platforms risk assessment templates19 use of mobile elevated work platforms risk assessment templates
19 use of mobile elevated work platforms risk assessment templates
 
HSE-INDUCTION-TRAINING.ppt
HSE-INDUCTION-TRAINING.pptHSE-INDUCTION-TRAINING.ppt
HSE-INDUCTION-TRAINING.ppt
 
25 demolition of existing concrete structures risk assessment templates
25 demolition of existing concrete structures risk assessment templates25 demolition of existing concrete structures risk assessment templates
25 demolition of existing concrete structures risk assessment templates
 
Work At Height
Work At HeightWork At Height
Work At Height
 
Health and safety induction
Health and safety inductionHealth and safety induction
Health and safety induction
 
Amn safety induction j 175 - staff rev 4 - s 14
Amn safety induction  j 175 - staff rev 4 - s 14Amn safety induction  j 175 - staff rev 4 - s 14
Amn safety induction j 175 - staff rev 4 - s 14
 
29 workplace temporary lighting risk assessment templates
29 workplace temporary lighting risk assessment templates29 workplace temporary lighting risk assessment templates
29 workplace temporary lighting risk assessment templates
 
Step 6 hot work permit
Step 6 hot work permitStep 6 hot work permit
Step 6 hot work permit
 
15 formwork (temporary works) risk assessment templates
15 formwork (temporary works) risk assessment templates15 formwork (temporary works) risk assessment templates
15 formwork (temporary works) risk assessment templates
 
NGI-Excavation Hazards
NGI-Excavation HazardsNGI-Excavation Hazards
NGI-Excavation Hazards
 
A Part 6 Lifting Operations
A  Part 6 Lifting OperationsA  Part 6 Lifting Operations
A Part 6 Lifting Operations
 
Permit to Work Training
Permit to Work TrainingPermit to Work Training
Permit to Work Training
 

Similar to JSA For Work at Height.docx

MS False Ceiling Rolling shutter & Door,Window Fixing_RA.doc
MS False Ceiling Rolling shutter & Door,Window Fixing_RA.docMS False Ceiling Rolling shutter & Door,Window Fixing_RA.doc
MS False Ceiling Rolling shutter & Door,Window Fixing_RA.doc
RajuBiswas41
 
Job safety Analysis
Job safety Analysis Job safety Analysis
Job safety Analysis
Deepu Rajan
 
Ct2 presentation
Ct2 presentationCt2 presentation
Ct2 presentation
qayyum23
 
JSA01_De-Ethanizer_Foundation_Execution_Rev00.pdf
JSA01_De-Ethanizer_Foundation_Execution_Rev00.pdfJSA01_De-Ethanizer_Foundation_Execution_Rev00.pdf
JSA01_De-Ethanizer_Foundation_Execution_Rev00.pdf
JESUSBASILIOANTONIO
 
LPG Chloride treaters foundation execution_Rev.00.pdf
LPG Chloride treaters foundation execution_Rev.00.pdfLPG Chloride treaters foundation execution_Rev.00.pdf
LPG Chloride treaters foundation execution_Rev.00.pdf
JESUSBASILIOANTONIO
 
hot works for construction of temporary facilities
hot works for construction of temporary facilitieshot works for construction of temporary facilities
hot works for construction of temporary facilities
Fãrük Ñäzmî
 
TS-1 - PPT - VISHNURAJ G.ppt
TS-1 - PPT - VISHNURAJ G.pptTS-1 - PPT - VISHNURAJ G.ppt
TS-1 - PPT - VISHNURAJ G.ppt
ajith30276
 
JHA06_Installation of Transversal beams in Flare Pipe Rack_Rev00.pdf
JHA06_Installation of Transversal beams in Flare Pipe Rack_Rev00.pdfJHA06_Installation of Transversal beams in Flare Pipe Rack_Rev00.pdf
JHA06_Installation of Transversal beams in Flare Pipe Rack_Rev00.pdf
JESUSBASILIOANTONIO
 

Similar to JSA For Work at Height.docx (20)

MS False Ceiling Rolling shutter & Door,Window Fixing_RA.doc
MS False Ceiling Rolling shutter & Door,Window Fixing_RA.docMS False Ceiling Rolling shutter & Door,Window Fixing_RA.doc
MS False Ceiling Rolling shutter & Door,Window Fixing_RA.doc
 
Methodstatement welding
Methodstatement weldingMethodstatement welding
Methodstatement welding
 
Job Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh Rajput
Job Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh RajputJob Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh Rajput
Job Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh Rajput
 
Excavation & Back filling work 02.docx
Excavation & Back filling work 02.docxExcavation & Back filling work 02.docx
Excavation & Back filling work 02.docx
 
Job safety Analysis
Job safety Analysis Job safety Analysis
Job safety Analysis
 
Fire Risk Assessment.pdf
Fire Risk Assessment.pdfFire Risk Assessment.pdf
Fire Risk Assessment.pdf
 
Ct2 presentation
Ct2 presentationCt2 presentation
Ct2 presentation
 
JSA01_De-Ethanizer_Foundation_Execution_Rev00.pdf
JSA01_De-Ethanizer_Foundation_Execution_Rev00.pdfJSA01_De-Ethanizer_Foundation_Execution_Rev00.pdf
JSA01_De-Ethanizer_Foundation_Execution_Rev00.pdf
 
BUILDING CONSTRUCTION REPORT
BUILDING CONSTRUCTION REPORTBUILDING CONSTRUCTION REPORT
BUILDING CONSTRUCTION REPORT
 
Building Industrial Training report for CIVIL ENGINEERING
Building Industrial Training report for CIVIL ENGINEERINGBuilding Industrial Training report for CIVIL ENGINEERING
Building Industrial Training report for CIVIL ENGINEERING
 
SDV-20253 VALVE MOD 9 lift plan 1
SDV-20253 VALVE MOD 9 lift plan 1SDV-20253 VALVE MOD 9 lift plan 1
SDV-20253 VALVE MOD 9 lift plan 1
 
LPG Chloride treaters foundation execution_Rev.00.pdf
LPG Chloride treaters foundation execution_Rev.00.pdfLPG Chloride treaters foundation execution_Rev.00.pdf
LPG Chloride treaters foundation execution_Rev.00.pdf
 
hot works for construction of temporary facilities
hot works for construction of temporary facilitieshot works for construction of temporary facilities
hot works for construction of temporary facilities
 
Advance management for civil engineering
Advance management for civil engineeringAdvance management for civil engineering
Advance management for civil engineering
 
Job Safety Analyses For Energization of Substation..doc
Job Safety Analyses For Energization of Substation..docJob Safety Analyses For Energization of Substation..doc
Job Safety Analyses For Energization of Substation..doc
 
2 IMPORTANCE OCC SFTY & H.ppt
2 IMPORTANCE OCC SFTY & H.ppt2 IMPORTANCE OCC SFTY & H.ppt
2 IMPORTANCE OCC SFTY & H.ppt
 
HIRARC FORM (skylift).pdf
HIRARC FORM (skylift).pdfHIRARC FORM (skylift).pdf
HIRARC FORM (skylift).pdf
 
TS-1 - PPT - VISHNURAJ G.ppt
TS-1 - PPT - VISHNURAJ G.pptTS-1 - PPT - VISHNURAJ G.ppt
TS-1 - PPT - VISHNURAJ G.ppt
 
JHA06_Installation of Transversal beams in Flare Pipe Rack_Rev00.pdf
JHA06_Installation of Transversal beams in Flare Pipe Rack_Rev00.pdfJHA06_Installation of Transversal beams in Flare Pipe Rack_Rev00.pdf
JHA06_Installation of Transversal beams in Flare Pipe Rack_Rev00.pdf
 
Overhead crane
Overhead crane Overhead crane
Overhead crane
 

Recently uploaded

internship thesis pakistan aeronautical complex kamra
internship thesis pakistan aeronautical complex kamrainternship thesis pakistan aeronautical complex kamra
internship thesis pakistan aeronautical complex kamra
AllTops
 
The Psychology Of Motivation - Richard Brown
The Psychology Of Motivation - Richard BrownThe Psychology Of Motivation - Richard Brown
The Psychology Of Motivation - Richard Brown
SandaliGurusinghe2
 
Beyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable developmentBeyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable development
Nimot Muili
 

Recently uploaded (16)

Siliguri Escorts Service Girl ^ 9332606886, WhatsApp Anytime Siliguri
Siliguri Escorts Service Girl ^ 9332606886, WhatsApp Anytime SiliguriSiliguri Escorts Service Girl ^ 9332606886, WhatsApp Anytime Siliguri
Siliguri Escorts Service Girl ^ 9332606886, WhatsApp Anytime Siliguri
 
Safety T fire missions army field Artillery
Safety T fire missions army field ArtillerySafety T fire missions army field Artillery
Safety T fire missions army field Artillery
 
internship thesis pakistan aeronautical complex kamra
internship thesis pakistan aeronautical complex kamrainternship thesis pakistan aeronautical complex kamra
internship thesis pakistan aeronautical complex kamra
 
How Software Developers Destroy Business Value.pptx
How Software Developers Destroy Business Value.pptxHow Software Developers Destroy Business Value.pptx
How Software Developers Destroy Business Value.pptx
 
The Psychology Of Motivation - Richard Brown
The Psychology Of Motivation - Richard BrownThe Psychology Of Motivation - Richard Brown
The Psychology Of Motivation - Richard Brown
 
digital Human resource management presentation.pdf
digital Human resource management presentation.pdfdigital Human resource management presentation.pdf
digital Human resource management presentation.pdf
 
Information Technology Project Management, Revised 7th edition test bank.docx
Information Technology Project Management, Revised 7th edition test bank.docxInformation Technology Project Management, Revised 7th edition test bank.docx
Information Technology Project Management, Revised 7th edition test bank.docx
 
Beyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable developmentBeyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable development
 
thesis-and-viva-voce preparation for research scholars
thesis-and-viva-voce preparation for research scholarsthesis-and-viva-voce preparation for research scholars
thesis-and-viva-voce preparation for research scholars
 
Persuasive and Communication is the art of negotiation.
Persuasive and Communication is the art of negotiation.Persuasive and Communication is the art of negotiation.
Persuasive and Communication is the art of negotiation.
 
International Ocean Transportation p.pdf
International Ocean Transportation p.pdfInternational Ocean Transportation p.pdf
International Ocean Transportation p.pdf
 
Gautam Buddh Nagar Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Gautam Buddh Nagar Call Girls 🥰 8617370543 Service Offer VIP Hot ModelGautam Buddh Nagar Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Gautam Buddh Nagar Call Girls 🥰 8617370543 Service Offer VIP Hot Model
 
Marketing Management 16th edition by Philip Kotler test bank.docx
Marketing Management 16th edition by Philip Kotler test bank.docxMarketing Management 16th edition by Philip Kotler test bank.docx
Marketing Management 16th edition by Philip Kotler test bank.docx
 
Group work -meaning and definitions- Characteristics and Importance
Group work -meaning and definitions- Characteristics and ImportanceGroup work -meaning and definitions- Characteristics and Importance
Group work -meaning and definitions- Characteristics and Importance
 
Spring-2024-Priesthoods of Augustus Yale Historical Review
Spring-2024-Priesthoods of Augustus Yale Historical ReviewSpring-2024-Priesthoods of Augustus Yale Historical Review
Spring-2024-Priesthoods of Augustus Yale Historical Review
 
W.H.Bender Quote 62 - Always strive to be a Hospitality Service professional
W.H.Bender Quote 62 - Always strive to be a Hospitality Service professionalW.H.Bender Quote 62 - Always strive to be a Hospitality Service professional
W.H.Bender Quote 62 - Always strive to be a Hospitality Service professional
 

JSA For Work at Height.docx

  • 1. ● JOB SAFETY ANALYSIS Doc. No.: Rev.: 00 Date: Page: 1 of 2 Project: Ajyal international School Project Project#: Area:Dist Ajyal Dammam Saudi Arabia General Comments: Proper PPE, TBT should be conducted before start the job, Access control authority would be DEL Site Manager/Site Engineer Date: Supervisor: Job Description: Work at Height Item Detail of Activity Equipment & Tools used Risk Involved Control Measure Responsible Person Severity Rating 1 2 3 4 TRANSPORTING SCAFFOLDING MATERIAL AT SITE. UNLOADING OF SCAFFOLDING MATERIAL. STORAGE OF SCAFFOLD MATERIAL. ERECTION & DISMANTLING OF SCAFFOLDING. ● VEHICLES. ● SCAFFOLDI NG MATERIALS . (PIPES, JOINTS, PLANKS, BASE PLATE, TOE BOARD & etc.) ● .LEVEL STRIP, HAMMER, METER TAP & ROPE. ● MATERIAL CAN FALL. ● PERSONAL INJURY. ● UNAUTHORIZED / UNTRAINED/ INEXPERIENCED PERSONNEL ON THE JOB ● UNEVEN GROUND ● FAULTY/ POOR CONDITION SCAFFOLDING MATERIAL ● IMPROPER SCAFFOLDING ERECTION ● TAG SYSTEM NOT FOLLOWED. ● WRONG MATERIAL HANDLING/ FALLING OBJECT ● PERSONNEL INJURY. ● PERSONNEL FALL. ● OBJECT FALL. ● PROPERTY LOSS ● MATERIAL WILL BE FASTENED PROPERLY BEFORE TRANSPORTING TO SITE. ● ONLY EXPERIENCED, SKILLED AND TRAINED PERSON SHOULD BE ALLOWED ● ALL HANDTOOLS SHOULD BE INSPECTED PRIOR TO START OF JOB ● SCAFFOLDING PIPES WITH CORROSION SHOULD NOT BE USED. ● MATERIAL WILL BE UNLOADED WITH BOOM TRUCK ● CERTIFIED BOOM TRUCK OPERATOR WILL CARRY OUT THE TASK. ● MATERIAL WILL BE STORED IN A DESIGNATED AREA. ● MATERIAL WILL BE STORED ON SCAFFOLD RACKS. ● HARD BARRICADE AND SIGNAGE WILL BE PROVIDED ● GROUND SURFACE SHOULD BE LEVELED ● RED TAG MUST BE PLACED/ HANGED AT THE START OF SCAFFOLDING ● ENSURE VERTICAL PIPES ALLIGNMENT AND CHECK IT WITH HAND LEVEL ● ENSURE ALL JOINTS ARE PROPERLY TIGHTENED ● USE BRACING PIPES AND OUTERRIGGERS PIPES WHERE NECESSARY. ● ONLY CERTIFIED SCAFFOLDERS WILL PERFORM THE JOB. ● SCAFFOLDERS WILL BE TRAINED ON SAFE WORKING AT HEIGHT. ● ABOVE 1.8M HEIGHT SAFETY HARNESS WILL BE WITH DOUBLE LANYARD. 100%TIE OFF WILL BE ENSURED. ● SCAFFOLD PLATFORM WILL NOT BE OVERLOADED. ● HAND RAIL AND TOE BOARDS WILL BE INSTALLED WITH SCAFFOLDING PLATFORM. ● ALL EMPLOYEES WILL WORK WITH PROPER PPES. Area I/C (Authorized Person). 3 2 3 3 3 2 3 3 3 3
  • 2. ● ELECTRIC SHOCK DUE TO POWER LINE ● LADDER SHOULD BE CONSTRUCTED AT SUITABLE. ● METAL PLANKS SHOULD BE PROERLY PLACED ON PIPES WITH HOOKS AND USE BINDING WIRE FOR BINDIND WHERE NECESSARY ● NO PERSON SHOULD GO IN DROP ZONE. SCAFFOLDING AREA. ● AREA SHOULD BARRICATED WHILE ERECTION OR DISMENTLING THE PLATFORM. ● AREA MUST BE CHECKED & FREE FROM ELECTRICAL WIRES BEFORE ASSEMBLING TO THE CRANE. OVERHEAD ELECTRICAL POWER LINES ● SCAFFOLD STRUCTUR E ● PERSONAL INJURY ● PROPERTY LOSS ● ENSURE OVERHEAD CLEARANCE WHILE OPERATING THE EQUIPMENT Area Representative 5 NIGHT WORKING ACTIVITIES ● LIGHTS ● STANDS Trdsssssdrttt ● HAND INJURY/EYE INJURY ● ELECTRIC SHOCK / ELECTROCUTION ● IMPROPER ILLUMINATION ● PERSONAL INJURY ● PROPERTY LOSS ● ENSURE WORKERS ARE COMPLYING PPE’S REQUIRED. ● EXTINGUISHER MUST BE PRESENT AT ALL TIME ● LIGHT SHOULD BE PROPER PRIOR TO START THE WORK. ● ALL POWER CABLES SHOULD BE INSPECTED AND INSULATED. ● LIGHTS SHOULD BE INSTALLED OVER HEAD HEIGHT TO AVOID GLARING TO PERSONAL. ● IF GENERATOR USE FOR ELECTRICITY SHOULD BE PROPERLY GROUNDED ● ALL TOWER CRANE LIGHTS SHOULD BE CHECKED AND USE WHEREVER NECESSARY. Area I/C (Authorized Person). 2 3 2 3 6 HOUSEKEEPING MANUAL CLEANING OF AREA ● HOUSEKEEPING ● AREA BARRICADING ● PPE ● PROPERTY LOSS ● SLIP/TRIP ● FALL FROM HEIGHT AREA IN- CHARGE 3 2 3
  • 3. Severity Rating : (1) First Aid / Minor Property Damage (2) Recordable Accident / Property Damage (3) Lost Time Accident / Major Property Loss (4) Catastrophic Accident Are you aware of, and do you have the correct PPE? What are the risks? How do controlled risks? _______________________________ __________________________ AREA ENGINEER / SUPERVISOR HSE REPRESENTATIVE