SlideShare a Scribd company logo
1 of 6
GERARD RICKIE CHRISTIE(14 yrs oil&gas)
Rickie_gerard@yahoo.com
Safely operate Casing/Tubing Tongs, Power Units, Tubular Handling and Cleaning
Equipment
Duties, Responsibilities & Accountabilities:
Adhere to Safety procedure and policies in accordance with safety management
system, Including:
a) Participation and contribute to specific safety initiatives in meetings.
b) Report all hazardous and unsafe acts.
c) Actively promote positive safety culture.
Adhere to quality procedure and policies in accordance with the ISO9002 (where
applicable) quality assurance system, Including:
a) Compliance to work instructions.
b) Raising corrective actions for all non-conformances.
c) Identifying areas requiring improvement and / or audit.
Adhere to main job responsibilities:
1. When on standby keep in contact with the service supervisor by means of telephone
etc.
1. To report at the advised customer work locations or airport, helicopter pad or shipyard
at the required time and in a fit state to commence work or travel.
1. Upon arrival at the location of work in collaboration with the assigned Crew Leader/Job
Supervisor, report to the customer representative and establish details of the job to be
performed.
1. At first opportunity and in collaboration with the Crew Leader/Job Supervisor check all
Weatherford service and sales items to be in satisfactory condition to fulfill the specific
job requirements.
1. Attend on location pre-job HSE meeting, if so required, on wearing Personnel Protective
Equipment (PPE) issued by Weatherford during the job and when required by the
Customer.
Follow shift arrangement and meal breaks as instructed by the Crew Leader/Job
Supervisor and to carry out the assigned duties as a social member of the team.
1. Report any operational problems, which may occur before, during and after the job to
the assigned Crew Leader /Job Supervisor as soon as possible.
1. Make recommendation for the safe execution of the job and report any unsafe acts or
near miss accidents/ incidents. Attend all HSE meetings and initiate changes to existing
HSE procedures or initiate new procedures.
1. On completion of the job rig down the equipment, clean and prepare for back loading.
1. Report any shortcoming or status of non-conformance of equipment on the Weatherford
equipment fault report.
1. If assigned as a stabber in collaboration with the crew leader, inspect the stabbing
board, safety line(s) and safety points. Before commencing the job, discuss with the
driller on signals and procedures to be used and repeat this each time the drilling crew
changes.
1. To attend HSE Training, equipment training and medical checks as required and
arranged by Weatherford.
1. Accept any reasonable base duties as required.
Education: Bachelor Of Arts
Skills:
1. Mechanical aptitude and basic understanding of Hydraulic and mechanical systems
2. QHSE procedural knowledge;
3. Good knowledge of all TRS equipment;
4. Good customer and employee interpersonal skills;
5. Good written and verbal English communication skills; Working
6. Basic knowledge of relevant computer software
Experience:
1. Weatherford 16-18 Tong
2. Weatherford 16-25 Tong
3. Weatherford 7.6-30 Tubing Tong c/w back up
4. Weatherford 5.5-15 Tubing Tong c/w back up
5. Free Floating and other style hydraulic back-ups
6. Other Makes of Tongs where applicable
7. All Diesel Power Units
8. Electric Power Units (If applicable)
9. Side Door Elevators/Single joint Elevator/Hand slips
10. 350/500 Ton spider 1 Elevator Manual and air operated stabbing guides
11. Safety clamps
12. Tubing Drifts
13. Basic knowledge on centralizers (Assembly and mounting)
14. Basic Hydraulic Torque/Power
15. Thread connections
16. Basic Fault finding
17. Safety devices of all equipment.
18. Operations and safety checks of different types of stabbing board (Theoretical).
19. Rig up of equipment before commencement of job and all pre-job checks as
required by the post service checks.
Floorman - RoustaboutPusher.
Was hired as a Floorman was then made a Roustabout Pusher.
Responsible for the safe and efficient operation of the crane (s) Was also made New Site
Supervisor for all offloading of rig Mud Tks, Rig Camp and Spotting of Trip Tk. in line with
Sub Structure.
Arrangement of all Pipe baskets, Stabilizer Racks, and Drilling Equipment. In New Location.
Also carried out measurments of New Location for Sub Structure Centering.
Ensure Drill Floor and other departments about the rig received the equipment necessary for its
efficient operation.
Conduct all lifting and deck operations in accordance with company standards and safety
procedures.
o Ensure that all items to be lifted are provided with appropriate lifting points and are
correctly rigged with certified gear (i.e. slings, straps, shackles, wire ropes, etc).
o Subsequently ensure lifted loads are clear of obstructions, balanced, and properly
controlled with tag lines.
o Provide Roustabouts with relevant instructions for current and forthcoming operations.
o Notify the Deck Pusher prior to moving gantry crane(s), lifting or transferring heavy
equipment, or moving other materials that may affect the rig's stability.
o Carry out Preventive Maintenance tasks on the cranes and other related components or
equipment. Maintain detailed log of all maintenance records
o Oversee housekeeping on pipe deck, main deck, and all spaces related to deck and cargo
operations.
o Dutifully report any unsafe practices, any incidents, potential hazards or abnormal
situation with cranes and lifting operations to supervisor
Transocean Offshore Drilling
Assistant Crane Operator
Was the best team leader for three hitches in a row.
Awarded best Crew of the Rig for Three Hitches.
Organized the day to day equipment ready for the RIG FLOOR
Offload and back load equipment from the boats, oil/cement barite, pot water transfers.
Clean and arrange the Decks Maintainance of cranes.
Made effective Think Drills to avoid Hazards and work Safe.
Ensured my Crew was Aware of the Hazards during operations.
Worked the buddy System. Looked out for each other.
Worked as a team Always to achive best safe performances at all times.
Trainee Marine Engineer
Five Star Shipping
(5th engineer)
Took care of the maintenance of Pumps, Main Engine, Generators, Compressors, Valves,
Purifiers periodically, Ballast and De-ballast of water tanks.
Also maintained the Deck Cranes. (Hydro Electric.)
Kept watch of the Engine Room at Ports as a trainee marine engineer.(5th engineer)
Carried out De-Carb of Main Engines and Generators with Supervisors
S.T.C.W. courses
PSSR/B280/03
PST/B151/04
FPFF/B94/01
EFA/B183/05
H.U.E.T.
Transocean on job training
Advance Fire Fighting
Crane Operators training
IADC RIG PASS-WEATHERFORD-SAUDI ARABIA.
o
o

More Related Content

What's hot

Job safety Analysis
Job safety Analysis Job safety Analysis
Job safety Analysis Deepu Rajan
 
Risk assessment for testing & commissioning of cranes
Risk assessment for  testing & commissioning of cranesRisk assessment for  testing & commissioning of cranes
Risk assessment for testing & commissioning of cranesAzmeel Contracting Company
 
LIFTING OPERATIONS BEST PRACTICES - SEMINAR 1
LIFTING OPERATIONS BEST PRACTICES - SEMINAR 1LIFTING OPERATIONS BEST PRACTICES - SEMINAR 1
LIFTING OPERATIONS BEST PRACTICES - SEMINAR 1Sreenath Pokkadavath
 
Simple Maintenance Tips for Multi-purpose Drilling Rigs
Simple Maintenance Tips for Multi-purpose Drilling Rigs Simple Maintenance Tips for Multi-purpose Drilling Rigs
Simple Maintenance Tips for Multi-purpose Drilling Rigs Paranthaman Exporters
 
9 lifting operations with tower crane risk assessment templates
9 lifting operations with tower crane risk assessment templates9 lifting operations with tower crane risk assessment templates
9 lifting operations with tower crane risk assessment templatesDwarika Bhushan Sharma
 
Lifting Equipment Inspection
Lifting Equipment InspectionLifting Equipment Inspection
Lifting Equipment InspectionSchilling s
 
Overhead crane risk assessment
Overhead crane risk assessmentOverhead crane risk assessment
Overhead crane risk assessmentSimba Zhao
 
8 lifting operations with mobile crane risk assessment templates
8 lifting operations with mobile crane risk assessment templates8 lifting operations with mobile crane risk assessment templates
8 lifting operations with mobile crane risk assessment templatesDwarika Bhushan Sharma
 
Safe lifting practices
Safe lifting practicesSafe lifting practices
Safe lifting practicesViktor Bily
 
Lifting plan
Lifting planLifting plan
Lifting plantnsv22
 
252113184 method-statement-for-office-container-and-equipment-mobilization (1)
252113184 method-statement-for-office-container-and-equipment-mobilization (1)252113184 method-statement-for-office-container-and-equipment-mobilization (1)
252113184 method-statement-for-office-container-and-equipment-mobilization (1)DusanJankovic8
 
Everything you need to know about lifting equipment testing, inspection and c...
Everything you need to know about lifting equipment testing, inspection and c...Everything you need to know about lifting equipment testing, inspection and c...
Everything you need to know about lifting equipment testing, inspection and c...Lifting Gear Direct Ltd
 
Overhead Crane Safety and Inspection Requirements by NPCA
Overhead Crane Safety and Inspection Requirements by NPCAOverhead Crane Safety and Inspection Requirements by NPCA
Overhead Crane Safety and Inspection Requirements by NPCAAtlantic Training, LLC.
 
A Part 6 Lifting Operations
A  Part 6 Lifting OperationsA  Part 6 Lifting Operations
A Part 6 Lifting OperationsJames McCann
 
4 cofferdams (temporary works) risk assessment templates
4 cofferdams (temporary works) risk assessment templates4 cofferdams (temporary works) risk assessment templates
4 cofferdams (temporary works) risk assessment templatesDwarika Bhushan Sharma
 

What's hot (20)

Construction safety at 071C20R new
Construction  safety at 071C20R newConstruction  safety at 071C20R new
Construction safety at 071C20R new
 
Job safety Analysis
Job safety Analysis Job safety Analysis
Job safety Analysis
 
Risk assessment for testing & commissioning of cranes
Risk assessment for  testing & commissioning of cranesRisk assessment for  testing & commissioning of cranes
Risk assessment for testing & commissioning of cranes
 
LIFTING OPERATIONS BEST PRACTICES - SEMINAR 1
LIFTING OPERATIONS BEST PRACTICES - SEMINAR 1LIFTING OPERATIONS BEST PRACTICES - SEMINAR 1
LIFTING OPERATIONS BEST PRACTICES - SEMINAR 1
 
Simple Maintenance Tips for Multi-purpose Drilling Rigs
Simple Maintenance Tips for Multi-purpose Drilling Rigs Simple Maintenance Tips for Multi-purpose Drilling Rigs
Simple Maintenance Tips for Multi-purpose Drilling Rigs
 
9 lifting operations with tower crane risk assessment templates
9 lifting operations with tower crane risk assessment templates9 lifting operations with tower crane risk assessment templates
9 lifting operations with tower crane risk assessment templates
 
Lifting Equipment Inspection
Lifting Equipment InspectionLifting Equipment Inspection
Lifting Equipment Inspection
 
Overhead crane risk assessment
Overhead crane risk assessmentOverhead crane risk assessment
Overhead crane risk assessment
 
8 lifting operations with mobile crane risk assessment templates
8 lifting operations with mobile crane risk assessment templates8 lifting operations with mobile crane risk assessment templates
8 lifting operations with mobile crane risk assessment templates
 
Safe lifting practices
Safe lifting practicesSafe lifting practices
Safe lifting practices
 
Standards Regulations
Standards RegulationsStandards Regulations
Standards Regulations
 
Liffting supervisor
Liffting supervisorLiffting supervisor
Liffting supervisor
 
Lifting plan
Lifting planLifting plan
Lifting plan
 
252113184 method-statement-for-office-container-and-equipment-mobilization (1)
252113184 method-statement-for-office-container-and-equipment-mobilization (1)252113184 method-statement-for-office-container-and-equipment-mobilization (1)
252113184 method-statement-for-office-container-and-equipment-mobilization (1)
 
Everything you need to know about lifting equipment testing, inspection and c...
Everything you need to know about lifting equipment testing, inspection and c...Everything you need to know about lifting equipment testing, inspection and c...
Everything you need to know about lifting equipment testing, inspection and c...
 
Overhead Crane Safety and Inspection Requirements by NPCA
Overhead Crane Safety and Inspection Requirements by NPCAOverhead Crane Safety and Inspection Requirements by NPCA
Overhead Crane Safety and Inspection Requirements by NPCA
 
SDV-20253 VALVE MOD 9 lift plan 1
SDV-20253 VALVE MOD 9 lift plan 1SDV-20253 VALVE MOD 9 lift plan 1
SDV-20253 VALVE MOD 9 lift plan 1
 
Crane Operation - Lifting
Crane Operation -  LiftingCrane Operation -  Lifting
Crane Operation - Lifting
 
A Part 6 Lifting Operations
A  Part 6 Lifting OperationsA  Part 6 Lifting Operations
A Part 6 Lifting Operations
 
4 cofferdams (temporary works) risk assessment templates
4 cofferdams (temporary works) risk assessment templates4 cofferdams (temporary works) risk assessment templates
4 cofferdams (temporary works) risk assessment templates
 

Viewers also liked

ревич жара и здоровье 3 2011-подписной
ревич жара и здоровье 3 2011-подписнойревич жара и здоровье 3 2011-подписной
ревич жара и здоровье 3 2011-подписнойEcolife Journal
 
Rhys Henderson Career Map 2011
Rhys Henderson Career Map 2011Rhys Henderson Career Map 2011
Rhys Henderson Career Map 2011rhenders
 
каждая капля имеет значение
каждая капля имеет значениекаждая капля имеет значение
каждая капля имеет значениеEcolife Journal
 
Eco route alexander ivanov sgem 2016 1
Eco route alexander ivanov sgem 2016 1Eco route alexander ivanov sgem 2016 1
Eco route alexander ivanov sgem 2016 1Ecolife Journal
 
Forum Giovani Ais Vi Edizione Luca Rossi
Forum Giovani Ais Vi Edizione Luca RossiForum Giovani Ais Vi Edizione Luca Rossi
Forum Giovani Ais Vi Edizione Luca RossiGiovanni Boccia Artieri
 
計算化学実習講座:第一回
計算化学実習講座:第一回計算化学実習講座:第一回
計算化学実習講座:第一回Maho Nakata
 
計算化学実習講座:第二回
 計算化学実習講座:第二回 計算化学実習講座:第二回
計算化学実習講座:第二回Maho Nakata
 

Viewers also liked (11)

ревич жара и здоровье 3 2011-подписной
ревич жара и здоровье 3 2011-подписнойревич жара и здоровье 3 2011-подписной
ревич жара и здоровье 3 2011-подписной
 
Rhys Henderson Career Map 2011
Rhys Henderson Career Map 2011Rhys Henderson Career Map 2011
Rhys Henderson Career Map 2011
 
Assum 4
Assum 4Assum 4
Assum 4
 
english CV
english CVenglish CV
english CV
 
каждая капля имеет значение
каждая капля имеет значениекаждая капля имеет значение
каждая капля имеет значение
 
Eco route alexander ivanov sgem 2016 1
Eco route alexander ivanov sgem 2016 1Eco route alexander ivanov sgem 2016 1
Eco route alexander ivanov sgem 2016 1
 
jsgreen_resume_chem
jsgreen_resume_chemjsgreen_resume_chem
jsgreen_resume_chem
 
Forum Giovani Ais Vi Edizione Luca Rossi
Forum Giovani Ais Vi Edizione Luca RossiForum Giovani Ais Vi Edizione Luca Rossi
Forum Giovani Ais Vi Edizione Luca Rossi
 
Role of the esp teacher
Role of the esp teacherRole of the esp teacher
Role of the esp teacher
 
計算化学実習講座:第一回
計算化学実習講座:第一回計算化学実習講座:第一回
計算化学実習講座:第一回
 
計算化学実習講座:第二回
 計算化学実習講座:第二回 計算化学実習講座:第二回
計算化学実習講座:第二回
 

Similar to 14 Years Oil & Gas Safety Leader

CV Oil and Gas Field Operator Nishanth P Joy
CV Oil and Gas Field Operator Nishanth P JoyCV Oil and Gas Field Operator Nishanth P Joy
CV Oil and Gas Field Operator Nishanth P JoyNISHANTH JOY
 
Joel B NMIF Operations Team Lead
Joel B NMIF Operations Team LeadJoel B NMIF Operations Team Lead
Joel B NMIF Operations Team LeadJoel Balahadia
 
008-SWMS-GENERAL-ONSITE-ACTIVITIES-AND-REPAIRS.pdf
008-SWMS-GENERAL-ONSITE-ACTIVITIES-AND-REPAIRS.pdf008-SWMS-GENERAL-ONSITE-ACTIVITIES-AND-REPAIRS.pdf
008-SWMS-GENERAL-ONSITE-ACTIVITIES-AND-REPAIRS.pdfFESTUS RICHARD SIAME
 
Michael lynn welch resume
Michael lynn welch resumeMichael lynn welch resume
Michael lynn welch resumemichael welch
 
Rig Move Management and Logistics Plan.doc
Rig Move Management and Logistics Plan.docRig Move Management and Logistics Plan.doc
Rig Move Management and Logistics Plan.docYasserAbdulkareem1
 
7 Falsework (Temporary Works) Risk Assessment Templates.docx
7 Falsework (Temporary Works) Risk Assessment Templates.docx7 Falsework (Temporary Works) Risk Assessment Templates.docx
7 Falsework (Temporary Works) Risk Assessment Templates.docxDwarika Bhushan Sharma
 
Dropped Object prevention Campaign (1).pptx
Dropped Object prevention Campaign (1).pptxDropped Object prevention Campaign (1).pptx
Dropped Object prevention Campaign (1).pptxssuser926916
 
JETTLE FRANCIS-CV Feb 2016
JETTLE FRANCIS-CV Feb 2016JETTLE FRANCIS-CV Feb 2016
JETTLE FRANCIS-CV Feb 2016Jettle Francis
 
22 Casting of concrete columns Risk Assessment Templates.docx
22 Casting of concrete columns Risk Assessment Templates.docx22 Casting of concrete columns Risk Assessment Templates.docx
22 Casting of concrete columns Risk Assessment Templates.docxDwarika Bhushan Sharma
 
Curriculum Vitae (Updated verion for Saudi Aramco)
Curriculum Vitae (Updated verion for Saudi Aramco)Curriculum Vitae (Updated verion for Saudi Aramco)
Curriculum Vitae (Updated verion for Saudi Aramco)Gary Dickson
 
7 falsework (temporary works) risk assessment templates
7 falsework (temporary works) risk assessment templates7 falsework (temporary works) risk assessment templates
7 falsework (temporary works) risk assessment templatesDwarika Bhushan Sharma
 

Similar to 14 Years Oil & Gas Safety Leader (20)

Lifting Operation Safety ppt.pptx
Lifting Operation Safety ppt.pptxLifting Operation Safety ppt.pptx
Lifting Operation Safety ppt.pptx
 
Ibrahim issa.
Ibrahim issa.Ibrahim issa.
Ibrahim issa.
 
CV Oil and Gas Field Operator Nishanth P Joy
CV Oil and Gas Field Operator Nishanth P JoyCV Oil and Gas Field Operator Nishanth P Joy
CV Oil and Gas Field Operator Nishanth P Joy
 
AHU.pdf
AHU.pdfAHU.pdf
AHU.pdf
 
Joel B NMIF Operations Team Lead
Joel B NMIF Operations Team LeadJoel B NMIF Operations Team Lead
Joel B NMIF Operations Team Lead
 
008-SWMS-GENERAL-ONSITE-ACTIVITIES-AND-REPAIRS.pdf
008-SWMS-GENERAL-ONSITE-ACTIVITIES-AND-REPAIRS.pdf008-SWMS-GENERAL-ONSITE-ACTIVITIES-AND-REPAIRS.pdf
008-SWMS-GENERAL-ONSITE-ACTIVITIES-AND-REPAIRS.pdf
 
Michael lynn welch resume
Michael lynn welch resumeMichael lynn welch resume
Michael lynn welch resume
 
Rig Move Management and Logistics Plan.doc
Rig Move Management and Logistics Plan.docRig Move Management and Logistics Plan.doc
Rig Move Management and Logistics Plan.doc
 
7 Falsework (Temporary Works) Risk Assessment Templates.docx
7 Falsework (Temporary Works) Risk Assessment Templates.docx7 Falsework (Temporary Works) Risk Assessment Templates.docx
7 Falsework (Temporary Works) Risk Assessment Templates.docx
 
Nelson CV upgrade (1)
Nelson CV upgrade (1)Nelson CV upgrade (1)
Nelson CV upgrade (1)
 
CV-HSE sayed abdallah
CV-HSE  sayed abdallahCV-HSE  sayed abdallah
CV-HSE sayed abdallah
 
MEWP TRAINING.pptx
MEWP TRAINING.pptxMEWP TRAINING.pptx
MEWP TRAINING.pptx
 
Dropped Object prevention Campaign (1).pptx
Dropped Object prevention Campaign (1).pptxDropped Object prevention Campaign (1).pptx
Dropped Object prevention Campaign (1).pptx
 
JETTLE FRANCIS-CV Feb 2016
JETTLE FRANCIS-CV Feb 2016JETTLE FRANCIS-CV Feb 2016
JETTLE FRANCIS-CV Feb 2016
 
johncv
johncvjohncv
johncv
 
CV operator Oil movement
CV operator Oil movementCV operator Oil movement
CV operator Oil movement
 
ROD
RODROD
ROD
 
22 Casting of concrete columns Risk Assessment Templates.docx
22 Casting of concrete columns Risk Assessment Templates.docx22 Casting of concrete columns Risk Assessment Templates.docx
22 Casting of concrete columns Risk Assessment Templates.docx
 
Curriculum Vitae (Updated verion for Saudi Aramco)
Curriculum Vitae (Updated verion for Saudi Aramco)Curriculum Vitae (Updated verion for Saudi Aramco)
Curriculum Vitae (Updated verion for Saudi Aramco)
 
7 falsework (temporary works) risk assessment templates
7 falsework (temporary works) risk assessment templates7 falsework (temporary works) risk assessment templates
7 falsework (temporary works) risk assessment templates
 

14 Years Oil & Gas Safety Leader

  • 1. GERARD RICKIE CHRISTIE(14 yrs oil&gas) Rickie_gerard@yahoo.com Safely operate Casing/Tubing Tongs, Power Units, Tubular Handling and Cleaning Equipment Duties, Responsibilities & Accountabilities: Adhere to Safety procedure and policies in accordance with safety management system, Including: a) Participation and contribute to specific safety initiatives in meetings. b) Report all hazardous and unsafe acts. c) Actively promote positive safety culture. Adhere to quality procedure and policies in accordance with the ISO9002 (where applicable) quality assurance system, Including: a) Compliance to work instructions. b) Raising corrective actions for all non-conformances.
  • 2. c) Identifying areas requiring improvement and / or audit. Adhere to main job responsibilities: 1. When on standby keep in contact with the service supervisor by means of telephone etc. 1. To report at the advised customer work locations or airport, helicopter pad or shipyard at the required time and in a fit state to commence work or travel. 1. Upon arrival at the location of work in collaboration with the assigned Crew Leader/Job Supervisor, report to the customer representative and establish details of the job to be performed. 1. At first opportunity and in collaboration with the Crew Leader/Job Supervisor check all Weatherford service and sales items to be in satisfactory condition to fulfill the specific job requirements. 1. Attend on location pre-job HSE meeting, if so required, on wearing Personnel Protective Equipment (PPE) issued by Weatherford during the job and when required by the Customer. Follow shift arrangement and meal breaks as instructed by the Crew Leader/Job Supervisor and to carry out the assigned duties as a social member of the team. 1. Report any operational problems, which may occur before, during and after the job to the assigned Crew Leader /Job Supervisor as soon as possible. 1. Make recommendation for the safe execution of the job and report any unsafe acts or near miss accidents/ incidents. Attend all HSE meetings and initiate changes to existing HSE procedures or initiate new procedures. 1. On completion of the job rig down the equipment, clean and prepare for back loading. 1. Report any shortcoming or status of non-conformance of equipment on the Weatherford equipment fault report. 1. If assigned as a stabber in collaboration with the crew leader, inspect the stabbing board, safety line(s) and safety points. Before commencing the job, discuss with the
  • 3. driller on signals and procedures to be used and repeat this each time the drilling crew changes. 1. To attend HSE Training, equipment training and medical checks as required and arranged by Weatherford. 1. Accept any reasonable base duties as required. Education: Bachelor Of Arts Skills: 1. Mechanical aptitude and basic understanding of Hydraulic and mechanical systems 2. QHSE procedural knowledge; 3. Good knowledge of all TRS equipment; 4. Good customer and employee interpersonal skills; 5. Good written and verbal English communication skills; Working 6. Basic knowledge of relevant computer software Experience: 1. Weatherford 16-18 Tong 2. Weatherford 16-25 Tong 3. Weatherford 7.6-30 Tubing Tong c/w back up 4. Weatherford 5.5-15 Tubing Tong c/w back up 5. Free Floating and other style hydraulic back-ups 6. Other Makes of Tongs where applicable 7. All Diesel Power Units 8. Electric Power Units (If applicable)
  • 4. 9. Side Door Elevators/Single joint Elevator/Hand slips 10. 350/500 Ton spider 1 Elevator Manual and air operated stabbing guides 11. Safety clamps 12. Tubing Drifts 13. Basic knowledge on centralizers (Assembly and mounting) 14. Basic Hydraulic Torque/Power 15. Thread connections 16. Basic Fault finding 17. Safety devices of all equipment. 18. Operations and safety checks of different types of stabbing board (Theoretical). 19. Rig up of equipment before commencement of job and all pre-job checks as required by the post service checks. Floorman - RoustaboutPusher. Was hired as a Floorman was then made a Roustabout Pusher. Responsible for the safe and efficient operation of the crane (s) Was also made New Site Supervisor for all offloading of rig Mud Tks, Rig Camp and Spotting of Trip Tk. in line with Sub Structure. Arrangement of all Pipe baskets, Stabilizer Racks, and Drilling Equipment. In New Location. Also carried out measurments of New Location for Sub Structure Centering. Ensure Drill Floor and other departments about the rig received the equipment necessary for its efficient operation. Conduct all lifting and deck operations in accordance with company standards and safety procedures.
  • 5. o Ensure that all items to be lifted are provided with appropriate lifting points and are correctly rigged with certified gear (i.e. slings, straps, shackles, wire ropes, etc). o Subsequently ensure lifted loads are clear of obstructions, balanced, and properly controlled with tag lines. o Provide Roustabouts with relevant instructions for current and forthcoming operations. o Notify the Deck Pusher prior to moving gantry crane(s), lifting or transferring heavy equipment, or moving other materials that may affect the rig's stability. o Carry out Preventive Maintenance tasks on the cranes and other related components or equipment. Maintain detailed log of all maintenance records o Oversee housekeeping on pipe deck, main deck, and all spaces related to deck and cargo operations. o Dutifully report any unsafe practices, any incidents, potential hazards or abnormal situation with cranes and lifting operations to supervisor Transocean Offshore Drilling Assistant Crane Operator Was the best team leader for three hitches in a row. Awarded best Crew of the Rig for Three Hitches. Organized the day to day equipment ready for the RIG FLOOR Offload and back load equipment from the boats, oil/cement barite, pot water transfers. Clean and arrange the Decks Maintainance of cranes. Made effective Think Drills to avoid Hazards and work Safe. Ensured my Crew was Aware of the Hazards during operations. Worked the buddy System. Looked out for each other. Worked as a team Always to achive best safe performances at all times. Trainee Marine Engineer Five Star Shipping (5th engineer) Took care of the maintenance of Pumps, Main Engine, Generators, Compressors, Valves, Purifiers periodically, Ballast and De-ballast of water tanks. Also maintained the Deck Cranes. (Hydro Electric.) Kept watch of the Engine Room at Ports as a trainee marine engineer.(5th engineer) Carried out De-Carb of Main Engines and Generators with Supervisors
  • 6. S.T.C.W. courses PSSR/B280/03 PST/B151/04 FPFF/B94/01 EFA/B183/05 H.U.E.T. Transocean on job training Advance Fire Fighting Crane Operators training IADC RIG PASS-WEATHERFORD-SAUDI ARABIA. o o