Rig Name/#: BENNEVIS JSA Number : Person Approving JSA: H.M
Work Activity (Job): Crane wire replacement ( Boom ) Date Raised :
Work Team (Crew Members): BE / ABE / Roustabouts / Crane-Operator
Page 1 of 3
Pyramid Drilling S.A
Manual Title: Personnel Safety Manual
Form Name: Job Safety Analysis
Issue Date
02-Sept-07
Revision No.
2
Revision Date
04-MAR 08
Prepared By
QA/HSE
Approved By
HM
Level No.
2
Safety Equipment To Do This Job(
Hard Hats x Cotton Gloves x Face Shield Fire Extinguishers
Safety Boots x Work Vest Goggles x Lockout/Tagout
Safety Glasses x Safety Harness x Barricades x Work Permit Required x
Page 2 of 3
Sequence of Basic Job Steps Potential Accidents or Hazards
Recommendation to Eliminate or Reduce Potential
Hazards
Who?
Initials
1. Hold pre-job meeting – Work-permit 1. Procedures not known or not understood by crew members-
Persons involved in task becoming injured by incorrect procedure
compliance
1. Take time to read correctly JSA . Be sure everything is
understood . If not ask your Supervisor
Supervisor
BE
2 . Preparing Tools & Spare wire drum on
support
2. Tools ( lewis snake grip – wire rope clips ) in bad
condition or not appropriate size . Cable wire not
conform . Pinch points . Wire drum support not enough
strong . Tools falling
2. Be sure of cable specifications before installing . Use
correct size tools equipment referring cable size . Prepare &
secure all tools top of crane cabin . Be sure wire drum is on
the right way
BE- ABE
Roustabouts
Crane Op
3. Disconnecting wedge socket & boom wire 3. Boom crane falling down – Wire boom pay off – Pinch points –
Wedge socket . clips . safety pin falling down
3. Be sure boom crane is positioning correctly on boom
support . Give enough slack on wire to disconnect safely .
Secure wire to a fix point to prevent any wire pay off . Secure
& remove slowly socket . clips and pin
BE- ABE
Roustabouts
Crane OP
4. Connecting old & new wire together with
lewis snake grip & send the end of new wire
to crane boom drum .
4. Wire pay off when pulling it to crane boom drum – Wire falling
down on people - Wrong signals to crane operator
4. Learn crane signals – Only one person doing signals to
crane operator – Operate the crane slowly – Signal working
area - Connect & secure correctly lewis snake grip on wires
– Dispatch crew to follow the wire during pulling operation
BE - ABE
Roustabouts
Crane Op
5. Disconnecting lewis snake grip from wires 5. Wire pay off and fall down on people - 5. Secure wire on fix point before disconnecting lewis snake
grip – Signal working area
BE– ABE
Roustabouts
Crane Op
6. Removing old cable from crane boom
drum & coiling it on main-deck
6. Hands or fingers crushed by wire – Wire fall down on people 6. Operate the crane slowly – Watch hands placement –
Slack down slowly end wire on main deck with safety line –
Signal working area
BE– ABE
Roustabouts
Crane Op
7. Connecting new wire on crane boom
drum
7. Hands or fingers crushed by wire or crane drum – Wire fall
down on people
7. Operate the crane slowly to pull & install wire on crane
drum . Install correctly wire on drum – Secure wire when
connecting on crane drum – Watch hands placement –
Dispatch crew to follow the wire during pulling operation
BE - ABE
Roustabouts
Crane Op
8 . Reconnecting wedge socket & raising
boom . Finishing job & clean up
8 . Pinch points – Tools falling down – Wire damage – Hands or
fingers crushed by wire – Hazards waste – Slips – Tools left out
creating trip hazards
8. Secure tools – Put back correctly wedge socket , clips &
pin – Watch hands placement – Operate crane slowly –
Check wire position – Clean up all areas – Put tools back to
store
BE – ABE
Roustabouts
Crane Op
Pyramid Drilling S.A
Manual Title: Personnel Safety Manual
Form Name: Job Safety Analysis
Issue Date
02-Sept-07
Revision No.
2
Revision Date
04-MAR 08
Prepared By
QA/HSE
Approved By
HM
Level No.
2
Page 3 of 3
Pyramid Drilling S.A
Manual Title: Personnel Safety Manual
Form Name: Job Safety Analysis
Issue Date
02-Sept-07
Revision No.
2
Revision Date
04-MAR 08
Prepared By
QA/HSE
Approved By
HM
Level No.
2

More Related Content

What's hot

Handbook for rigger signalman hasnizam
Handbook for rigger signalman hasnizamHandbook for rigger signalman hasnizam
Handbook for rigger signalman hasnizamHASNIZAM BIN MD SAAD
 
Overview of crane incidents
Overview of crane incidentsOverview of crane incidents
Overview of crane incidentsPrem kumar
 
LOCKOUT-TAGOUT-SAFETY PRESENTATION-CONTROL OF HAZARDOUS ENERGY
LOCKOUT-TAGOUT-SAFETY PRESENTATION-CONTROL OF HAZARDOUS ENERGYLOCKOUT-TAGOUT-SAFETY PRESENTATION-CONTROL OF HAZARDOUS ENERGY
LOCKOUT-TAGOUT-SAFETY PRESENTATION-CONTROL OF HAZARDOUS ENERGYjasonmorgan
 
(Modelo de apr análise preliminar de risco - 2)
(Modelo de apr   análise preliminar de risco - 2)(Modelo de apr   análise preliminar de risco - 2)
(Modelo de apr análise preliminar de risco - 2)Edilson Muniz
 
hot works for construction of temporary facilities
hot works for construction of temporary facilitieshot works for construction of temporary facilities
hot works for construction of temporary facilitiesFãrük Ñäzmî
 
Understanding Arc Flash
Understanding Arc FlashUnderstanding Arc Flash
Understanding Arc Flashmichaeljmack
 
Ma 029 loading & offloading tubulars from a supply boat
Ma 029 loading & offloading tubulars from a supply boatMa 029 loading & offloading tubulars from a supply boat
Ma 029 loading & offloading tubulars from a supply boatYousif Fikry
 
Line Of Fire Presentation.ppt
Line Of Fire Presentation.pptLine Of Fire Presentation.ppt
Line Of Fire Presentation.pptjulius310702
 
Electrical safety training based on osha 1910 standards sw
Electrical safety training based on osha 1910 standards swElectrical safety training based on osha 1910 standards sw
Electrical safety training based on osha 1910 standards swAniruddha Kulkarni
 
Training confined space entry holewatch man [compatibility mode]
Training confined space entry holewatch man [compatibility mode]Training confined space entry holewatch man [compatibility mode]
Training confined space entry holewatch man [compatibility mode]Azmeel Contracting Company
 
SECURITY CHECKLIST Form # HSEQ - SC Rev 2 -.docx
SECURITY CHECKLIST Form # HSEQ - SC Rev 2 -.docxSECURITY CHECKLIST Form # HSEQ - SC Rev 2 -.docx
SECURITY CHECKLIST Form # HSEQ - SC Rev 2 -.docxDwarika Bhushan Sharma
 
LIFE LINE INSPECTION RECORD Form # HSEQ - LLIR Rev 2.docx
LIFE LINE INSPECTION RECORD Form # HSEQ - LLIR Rev 2.docxLIFE LINE INSPECTION RECORD Form # HSEQ - LLIR Rev 2.docx
LIFE LINE INSPECTION RECORD Form # HSEQ - LLIR Rev 2.docxDwarika Bhushan Sharma
 
High Voltage Electrical Compliance and Safety Operating Procedures
High Voltage Electrical Compliance and Safety Operating ProceduresHigh Voltage Electrical Compliance and Safety Operating Procedures
High Voltage Electrical Compliance and Safety Operating ProceduresLiving Online
 
Hse alert 34 2018 safe use of cradles and exlusion zone
Hse alert 34 2018 safe use of cradles and exlusion zoneHse alert 34 2018 safe use of cradles and exlusion zone
Hse alert 34 2018 safe use of cradles and exlusion zoneDwarika Bhushan Sharma
 

What's hot (20)

Handbook for rigger signalman hasnizam
Handbook for rigger signalman hasnizamHandbook for rigger signalman hasnizam
Handbook for rigger signalman hasnizam
 
Jsa heat-treatment
Jsa  heat-treatmentJsa  heat-treatment
Jsa heat-treatment
 
Weekly welding machine checklist
Weekly welding machine checklistWeekly welding machine checklist
Weekly welding machine checklist
 
Overview of crane incidents
Overview of crane incidentsOverview of crane incidents
Overview of crane incidents
 
Job safety analysis
Job safety analysisJob safety analysis
Job safety analysis
 
JSA for Hydrotesting.pdf
JSA for Hydrotesting.pdfJSA for Hydrotesting.pdf
JSA for Hydrotesting.pdf
 
LOCKOUT-TAGOUT-SAFETY PRESENTATION-CONTROL OF HAZARDOUS ENERGY
LOCKOUT-TAGOUT-SAFETY PRESENTATION-CONTROL OF HAZARDOUS ENERGYLOCKOUT-TAGOUT-SAFETY PRESENTATION-CONTROL OF HAZARDOUS ENERGY
LOCKOUT-TAGOUT-SAFETY PRESENTATION-CONTROL OF HAZARDOUS ENERGY
 
(Modelo de apr análise preliminar de risco - 2)
(Modelo de apr   análise preliminar de risco - 2)(Modelo de apr   análise preliminar de risco - 2)
(Modelo de apr análise preliminar de risco - 2)
 
hot works for construction of temporary facilities
hot works for construction of temporary facilitieshot works for construction of temporary facilities
hot works for construction of temporary facilities
 
Understanding Arc Flash
Understanding Arc FlashUnderstanding Arc Flash
Understanding Arc Flash
 
Hot Works Safety Training
Hot Works Safety TrainingHot Works Safety Training
Hot Works Safety Training
 
Ma 029 loading & offloading tubulars from a supply boat
Ma 029 loading & offloading tubulars from a supply boatMa 029 loading & offloading tubulars from a supply boat
Ma 029 loading & offloading tubulars from a supply boat
 
Line Of Fire Presentation.ppt
Line Of Fire Presentation.pptLine Of Fire Presentation.ppt
Line Of Fire Presentation.ppt
 
Electrical safety training based on osha 1910 standards sw
Electrical safety training based on osha 1910 standards swElectrical safety training based on osha 1910 standards sw
Electrical safety training based on osha 1910 standards sw
 
Training confined space entry holewatch man [compatibility mode]
Training confined space entry holewatch man [compatibility mode]Training confined space entry holewatch man [compatibility mode]
Training confined space entry holewatch man [compatibility mode]
 
Hand tools and hand hazards ppt
Hand tools and hand hazards pptHand tools and hand hazards ppt
Hand tools and hand hazards ppt
 
SECURITY CHECKLIST Form # HSEQ - SC Rev 2 -.docx
SECURITY CHECKLIST Form # HSEQ - SC Rev 2 -.docxSECURITY CHECKLIST Form # HSEQ - SC Rev 2 -.docx
SECURITY CHECKLIST Form # HSEQ - SC Rev 2 -.docx
 
LIFE LINE INSPECTION RECORD Form # HSEQ - LLIR Rev 2.docx
LIFE LINE INSPECTION RECORD Form # HSEQ - LLIR Rev 2.docxLIFE LINE INSPECTION RECORD Form # HSEQ - LLIR Rev 2.docx
LIFE LINE INSPECTION RECORD Form # HSEQ - LLIR Rev 2.docx
 
High Voltage Electrical Compliance and Safety Operating Procedures
High Voltage Electrical Compliance and Safety Operating ProceduresHigh Voltage Electrical Compliance and Safety Operating Procedures
High Voltage Electrical Compliance and Safety Operating Procedures
 
Hse alert 34 2018 safe use of cradles and exlusion zone
Hse alert 34 2018 safe use of cradles and exlusion zoneHse alert 34 2018 safe use of cradles and exlusion zone
Hse alert 34 2018 safe use of cradles and exlusion zone
 

Similar to Ma 09 crane wire replacement ( boom )

Ma 011 crane wire replacement ( main hook line )
Ma 011  crane wire replacement ( main hook line )Ma 011  crane wire replacement ( main hook line )
Ma 011 crane wire replacement ( main hook line )Yousif Fikry
 
Ma 010 crane wire replacement ( whip line )
Ma 010  crane wire replacement ( whip line )Ma 010  crane wire replacement ( whip line )
Ma 010 crane wire replacement ( whip line )Yousif Fikry
 
Ma 018 changing lifeboats wires
Ma 018 changing lifeboats wiresMa 018 changing lifeboats wires
Ma 018 changing lifeboats wiresYousif Fikry
 
Ma 014 changing boom pendants on both cranes
Ma 014  changing boom pendants on both cranesMa 014  changing boom pendants on both cranes
Ma 014 changing boom pendants on both cranesYousif Fikry
 
Ma 016 unloading coiled tubing real from boat & install it on cantilever deck
Ma 016  unloading coiled tubing real from boat & install it on cantilever deckMa 016  unloading coiled tubing real from boat & install it on cantilever deck
Ma 016 unloading coiled tubing real from boat & install it on cantilever deckYousif Fikry
 
Ma 021 backload flare boom on supply-boat
Ma 021 backload flare boom on supply-boatMa 021 backload flare boom on supply-boat
Ma 021 backload flare boom on supply-boatYousif Fikry
 
Ma 017 backloading coiled tubing real on boat
Ma 017  backloading coiled tubing real on boatMa 017  backloading coiled tubing real on boat
Ma 017 backloading coiled tubing real on boatYousif Fikry
 
Ma 008 removing mooring ropes from legs
Ma 008 removing mooring ropes from legsMa 008 removing mooring ropes from legs
Ma 008 removing mooring ropes from legsYousif Fikry
 
Ma 07 installing mooring ropes on legs
Ma 07  installing mooring ropes on legsMa 07  installing mooring ropes on legs
Ma 07 installing mooring ropes on legsYousif Fikry
 
Ma 013 testing lifeboats capsules
Ma 013  testing  lifeboats  capsulesMa 013  testing  lifeboats  capsules
Ma 013 testing lifeboats capsulesYousif Fikry
 
Ma 005 cleaning front of main wall accomodations
Ma 005 cleaning front of main wall accomodationsMa 005 cleaning front of main wall accomodations
Ma 005 cleaning front of main wall accomodationsYousif Fikry
 
Ma 040 emergency lowering of personnel lifting
Ma 040  emergency lowering of personnel liftingMa 040  emergency lowering of personnel lifting
Ma 040 emergency lowering of personnel liftingYousif Fikry
 
Ma 003 erecting & removing scaffolding in tanks
Ma 003  erecting & removing scaffolding in tanksMa 003  erecting & removing scaffolding in tanks
Ma 003 erecting & removing scaffolding in tanksYousif Fikry
 
Ma 006 transfer by personnel basket
Ma 006  transfer by personnel basketMa 006  transfer by personnel basket
Ma 006 transfer by personnel basketYousif Fikry
 
Ma 012 using working personnel basket
Ma 012 using working personnel basketMa 012 using working personnel basket
Ma 012 using working personnel basketYousif Fikry
 
Ma 020 launching lifeboats to sea
Ma 020 launching lifeboats to seaMa 020 launching lifeboats to sea
Ma 020 launching lifeboats to seaYousif Fikry
 
Ma 015 boom crane paint maintenance
Ma 015  boom crane paint maintenanceMa 015  boom crane paint maintenance
Ma 015 boom crane paint maintenanceYousif Fikry
 
Ma 019 preloads dump valves maintenance
Ma 019  preloads dump valves maintenanceMa 019  preloads dump valves maintenance
Ma 019 preloads dump valves maintenanceYousif Fikry
 
Ma 001 tanks & preloads visual inspection
Ma 001  tanks & preloads visual inspectionMa 001  tanks & preloads visual inspection
Ma 001 tanks & preloads visual inspectionYousif Fikry
 
Ma 115 boom crane cable tray repair
Ma 115  boom crane cable tray repairMa 115  boom crane cable tray repair
Ma 115 boom crane cable tray repairYousif Fikry
 

Similar to Ma 09 crane wire replacement ( boom ) (20)

Ma 011 crane wire replacement ( main hook line )
Ma 011  crane wire replacement ( main hook line )Ma 011  crane wire replacement ( main hook line )
Ma 011 crane wire replacement ( main hook line )
 
Ma 010 crane wire replacement ( whip line )
Ma 010  crane wire replacement ( whip line )Ma 010  crane wire replacement ( whip line )
Ma 010 crane wire replacement ( whip line )
 
Ma 018 changing lifeboats wires
Ma 018 changing lifeboats wiresMa 018 changing lifeboats wires
Ma 018 changing lifeboats wires
 
Ma 014 changing boom pendants on both cranes
Ma 014  changing boom pendants on both cranesMa 014  changing boom pendants on both cranes
Ma 014 changing boom pendants on both cranes
 
Ma 016 unloading coiled tubing real from boat & install it on cantilever deck
Ma 016  unloading coiled tubing real from boat & install it on cantilever deckMa 016  unloading coiled tubing real from boat & install it on cantilever deck
Ma 016 unloading coiled tubing real from boat & install it on cantilever deck
 
Ma 021 backload flare boom on supply-boat
Ma 021 backload flare boom on supply-boatMa 021 backload flare boom on supply-boat
Ma 021 backload flare boom on supply-boat
 
Ma 017 backloading coiled tubing real on boat
Ma 017  backloading coiled tubing real on boatMa 017  backloading coiled tubing real on boat
Ma 017 backloading coiled tubing real on boat
 
Ma 008 removing mooring ropes from legs
Ma 008 removing mooring ropes from legsMa 008 removing mooring ropes from legs
Ma 008 removing mooring ropes from legs
 
Ma 07 installing mooring ropes on legs
Ma 07  installing mooring ropes on legsMa 07  installing mooring ropes on legs
Ma 07 installing mooring ropes on legs
 
Ma 013 testing lifeboats capsules
Ma 013  testing  lifeboats  capsulesMa 013  testing  lifeboats  capsules
Ma 013 testing lifeboats capsules
 
Ma 005 cleaning front of main wall accomodations
Ma 005 cleaning front of main wall accomodationsMa 005 cleaning front of main wall accomodations
Ma 005 cleaning front of main wall accomodations
 
Ma 040 emergency lowering of personnel lifting
Ma 040  emergency lowering of personnel liftingMa 040  emergency lowering of personnel lifting
Ma 040 emergency lowering of personnel lifting
 
Ma 003 erecting & removing scaffolding in tanks
Ma 003  erecting & removing scaffolding in tanksMa 003  erecting & removing scaffolding in tanks
Ma 003 erecting & removing scaffolding in tanks
 
Ma 006 transfer by personnel basket
Ma 006  transfer by personnel basketMa 006  transfer by personnel basket
Ma 006 transfer by personnel basket
 
Ma 012 using working personnel basket
Ma 012 using working personnel basketMa 012 using working personnel basket
Ma 012 using working personnel basket
 
Ma 020 launching lifeboats to sea
Ma 020 launching lifeboats to seaMa 020 launching lifeboats to sea
Ma 020 launching lifeboats to sea
 
Ma 015 boom crane paint maintenance
Ma 015  boom crane paint maintenanceMa 015  boom crane paint maintenance
Ma 015 boom crane paint maintenance
 
Ma 019 preloads dump valves maintenance
Ma 019  preloads dump valves maintenanceMa 019  preloads dump valves maintenance
Ma 019 preloads dump valves maintenance
 
Ma 001 tanks & preloads visual inspection
Ma 001  tanks & preloads visual inspectionMa 001  tanks & preloads visual inspection
Ma 001 tanks & preloads visual inspection
 
Ma 115 boom crane cable tray repair
Ma 115  boom crane cable tray repairMa 115  boom crane cable tray repair
Ma 115 boom crane cable tray repair
 

More from Yousif Fikry

Ma 039 jsa emergency load lowering
Ma 039 jsa emergency load loweringMa 039 jsa emergency load lowering
Ma 039 jsa emergency load loweringYousif Fikry
 
Ma 038 painting on derrick set
Ma 038 painting on derrick setMa 038 painting on derrick set
Ma 038 painting on derrick setYousif Fikry
 
Ma 037 cleaning with air brush
Ma 037 cleaning with air brushMa 037 cleaning with air brush
Ma 037 cleaning with air brushYousif Fikry
 
Ma 036 jsa check ballast 5p loading valve
Ma 036 jsa check ballast 5p loading valveMa 036 jsa check ballast 5p loading valve
Ma 036 jsa check ballast 5p loading valveYousif Fikry
 
Ma 035 jsa open seachest
Ma 035   jsa open seachestMa 035   jsa open seachest
Ma 035 jsa open seachestYousif Fikry
 
Ma 034 jsa general lifting on the deck
Ma 034   jsa general lifting on the deckMa 034   jsa general lifting on the deck
Ma 034 jsa general lifting on the deckYousif Fikry
 
Ma 033 jsa rack pup joint in the stb rack
Ma 033 jsa rack pup joint in the stb rackMa 033 jsa rack pup joint in the stb rack
Ma 033 jsa rack pup joint in the stb rackYousif Fikry
 
Ma 032 transfer water from or to supply boat
Ma 032 transfer water from or to supply boatMa 032 transfer water from or to supply boat
Ma 032 transfer water from or to supply boatYousif Fikry
 
Ma 031 transfer brine from or to supply boat
Ma 031 transfer brine from or to supply boatMa 031 transfer brine from or to supply boat
Ma 031 transfer brine from or to supply boatYousif Fikry
 
Ma 030 cleaning oil in 100 t crane
Ma 030 cleaning oil in 100 t craneMa 030 cleaning oil in 100 t crane
Ma 030 cleaning oil in 100 t craneYousif Fikry
 
Ma 028 jsa open seachest
Ma 028    jsa open seachestMa 028    jsa open seachest
Ma 028 jsa open seachestYousif Fikry
 
Ma 027 jsa general lifting on the deck
Ma 027  jsa general lifting on the deckMa 027  jsa general lifting on the deck
Ma 027 jsa general lifting on the deckYousif Fikry
 
Ma 026 offloading or backloading fuel, base oil, obm
Ma 026 offloading or backloading fuel, base oil, obmMa 026 offloading or backloading fuel, base oil, obm
Ma 026 offloading or backloading fuel, base oil, obmYousif Fikry
 
Ma 025 transfer casing
Ma 025 transfer casingMa 025 transfer casing
Ma 025 transfer casingYousif Fikry
 
Ma 024 working on ladder
Ma 024 working on ladderMa 024 working on ladder
Ma 024 working on ladderYousif Fikry
 
Ma 023 change out butter fly valve for bulk system
Ma 023  change out butter fly valve for bulk systemMa 023  change out butter fly valve for bulk system
Ma 023 change out butter fly valve for bulk systemYousif Fikry
 

More from Yousif Fikry (18)

Welding operation
Welding operationWelding operation
Welding operation
 
Ma 039 jsa emergency load lowering
Ma 039 jsa emergency load loweringMa 039 jsa emergency load lowering
Ma 039 jsa emergency load lowering
 
Ma 038 painting on derrick set
Ma 038 painting on derrick setMa 038 painting on derrick set
Ma 038 painting on derrick set
 
Ma 037 cleaning with air brush
Ma 037 cleaning with air brushMa 037 cleaning with air brush
Ma 037 cleaning with air brush
 
Ma 036 jsa check ballast 5p loading valve
Ma 036 jsa check ballast 5p loading valveMa 036 jsa check ballast 5p loading valve
Ma 036 jsa check ballast 5p loading valve
 
Ma 035 jsa open seachest
Ma 035   jsa open seachestMa 035   jsa open seachest
Ma 035 jsa open seachest
 
Ma 034 jsa general lifting on the deck
Ma 034   jsa general lifting on the deckMa 034   jsa general lifting on the deck
Ma 034 jsa general lifting on the deck
 
Ma 033 jsa rack pup joint in the stb rack
Ma 033 jsa rack pup joint in the stb rackMa 033 jsa rack pup joint in the stb rack
Ma 033 jsa rack pup joint in the stb rack
 
Ma 032 transfer water from or to supply boat
Ma 032 transfer water from or to supply boatMa 032 transfer water from or to supply boat
Ma 032 transfer water from or to supply boat
 
Ma 031 transfer brine from or to supply boat
Ma 031 transfer brine from or to supply boatMa 031 transfer brine from or to supply boat
Ma 031 transfer brine from or to supply boat
 
Ma 030 cleaning oil in 100 t crane
Ma 030 cleaning oil in 100 t craneMa 030 cleaning oil in 100 t crane
Ma 030 cleaning oil in 100 t crane
 
Ma 028 jsa open seachest
Ma 028    jsa open seachestMa 028    jsa open seachest
Ma 028 jsa open seachest
 
Ma 027 jsa general lifting on the deck
Ma 027  jsa general lifting on the deckMa 027  jsa general lifting on the deck
Ma 027 jsa general lifting on the deck
 
Ma 026 offloading or backloading fuel, base oil, obm
Ma 026 offloading or backloading fuel, base oil, obmMa 026 offloading or backloading fuel, base oil, obm
Ma 026 offloading or backloading fuel, base oil, obm
 
Ma 025 transfer casing
Ma 025 transfer casingMa 025 transfer casing
Ma 025 transfer casing
 
Ma 024 working on ladder
Ma 024 working on ladderMa 024 working on ladder
Ma 024 working on ladder
 
Ma 023 change out butter fly valve for bulk system
Ma 023  change out butter fly valve for bulk systemMa 023  change out butter fly valve for bulk system
Ma 023 change out butter fly valve for bulk system
 
Ma 022 preloading
Ma 022 preloadingMa 022 preloading
Ma 022 preloading
 

Ma 09 crane wire replacement ( boom )

  • 1. Rig Name/#: BENNEVIS JSA Number : Person Approving JSA: H.M Work Activity (Job): Crane wire replacement ( Boom ) Date Raised : Work Team (Crew Members): BE / ABE / Roustabouts / Crane-Operator Page 1 of 3 Pyramid Drilling S.A Manual Title: Personnel Safety Manual Form Name: Job Safety Analysis Issue Date 02-Sept-07 Revision No. 2 Revision Date 04-MAR 08 Prepared By QA/HSE Approved By HM Level No. 2
  • 2. Safety Equipment To Do This Job( Hard Hats x Cotton Gloves x Face Shield Fire Extinguishers Safety Boots x Work Vest Goggles x Lockout/Tagout Safety Glasses x Safety Harness x Barricades x Work Permit Required x Page 2 of 3 Sequence of Basic Job Steps Potential Accidents or Hazards Recommendation to Eliminate or Reduce Potential Hazards Who? Initials 1. Hold pre-job meeting – Work-permit 1. Procedures not known or not understood by crew members- Persons involved in task becoming injured by incorrect procedure compliance 1. Take time to read correctly JSA . Be sure everything is understood . If not ask your Supervisor Supervisor BE 2 . Preparing Tools & Spare wire drum on support 2. Tools ( lewis snake grip – wire rope clips ) in bad condition or not appropriate size . Cable wire not conform . Pinch points . Wire drum support not enough strong . Tools falling 2. Be sure of cable specifications before installing . Use correct size tools equipment referring cable size . Prepare & secure all tools top of crane cabin . Be sure wire drum is on the right way BE- ABE Roustabouts Crane Op 3. Disconnecting wedge socket & boom wire 3. Boom crane falling down – Wire boom pay off – Pinch points – Wedge socket . clips . safety pin falling down 3. Be sure boom crane is positioning correctly on boom support . Give enough slack on wire to disconnect safely . Secure wire to a fix point to prevent any wire pay off . Secure & remove slowly socket . clips and pin BE- ABE Roustabouts Crane OP 4. Connecting old & new wire together with lewis snake grip & send the end of new wire to crane boom drum . 4. Wire pay off when pulling it to crane boom drum – Wire falling down on people - Wrong signals to crane operator 4. Learn crane signals – Only one person doing signals to crane operator – Operate the crane slowly – Signal working area - Connect & secure correctly lewis snake grip on wires – Dispatch crew to follow the wire during pulling operation BE - ABE Roustabouts Crane Op 5. Disconnecting lewis snake grip from wires 5. Wire pay off and fall down on people - 5. Secure wire on fix point before disconnecting lewis snake grip – Signal working area BE– ABE Roustabouts Crane Op 6. Removing old cable from crane boom drum & coiling it on main-deck 6. Hands or fingers crushed by wire – Wire fall down on people 6. Operate the crane slowly – Watch hands placement – Slack down slowly end wire on main deck with safety line – Signal working area BE– ABE Roustabouts Crane Op 7. Connecting new wire on crane boom drum 7. Hands or fingers crushed by wire or crane drum – Wire fall down on people 7. Operate the crane slowly to pull & install wire on crane drum . Install correctly wire on drum – Secure wire when connecting on crane drum – Watch hands placement – Dispatch crew to follow the wire during pulling operation BE - ABE Roustabouts Crane Op 8 . Reconnecting wedge socket & raising boom . Finishing job & clean up 8 . Pinch points – Tools falling down – Wire damage – Hands or fingers crushed by wire – Hazards waste – Slips – Tools left out creating trip hazards 8. Secure tools – Put back correctly wedge socket , clips & pin – Watch hands placement – Operate crane slowly – Check wire position – Clean up all areas – Put tools back to store BE – ABE Roustabouts Crane Op Pyramid Drilling S.A Manual Title: Personnel Safety Manual Form Name: Job Safety Analysis Issue Date 02-Sept-07 Revision No. 2 Revision Date 04-MAR 08 Prepared By QA/HSE Approved By HM Level No. 2
  • 3. Page 3 of 3 Pyramid Drilling S.A Manual Title: Personnel Safety Manual Form Name: Job Safety Analysis Issue Date 02-Sept-07 Revision No. 2 Revision Date 04-MAR 08 Prepared By QA/HSE Approved By HM Level No. 2