Table of Content for Design of Beam-RCC Singly Reinforced
Types of Beams
Types of Loads
Determination of beam size
Determination of Loads and Moments
Calculation of Main reinforcement
Shear or Transverse Moments
Check for Bond
Curtailment and Splicing details
A beam is a horizontal structural member subjected to the loads on the transverse
direction. The beam can be straight, curved or circular in plan. The most common beam
section used in civil works is rectangular. However, the beam can be circular, T-shaped, L-
shaped, or square in section.
The beam can also be classified on the basis of support conditions. Such as-
a. Simply Supported Beam- The beam supported on both of its ends. The ends can
be pin jointed or roller supported. The ends are allowed to rotate but not allowed to
move in the direction of the load.
b. Cantilever Beam- The cantilever beam has one end fixed and the other end free.
The fixed end is not allowed to displace or rotate. The free end of the beam can
rotate as well as displaced.
2/9
c. Fixed Beam- The beam having both ends fixed is called a fixed beam. Both of the
ends of the beam are not allowed to rotate or displace.
d. Continuous Beam- The beam supported on more than two support is called a
continuous beam.
Types of Loads-
Before starting the design of the beam, it is necessary to understand the types of loads
acting on the structure and their critical combination.
a. Dead Load (DL)- It is the self-weight of the structure, fixed equipment, flooring,
ceiling or anything that will not move during the lifetime of the structure. IS 875
(Part 1) specifies unit load for the material for dead load estimation.
b. Live Load (LL)- It is the load due to people, furniture or anything that moves or
may be moved from one place to another. IS 875 (Part 2) specifies the live load for
various types of structures.
c. Rain load (RL)- The load due to rain. It is considered for the roof only.
d. Snow Load SL)- The load due to snow. It is considered for the roof only. IS 875
(Part 4).
e. Wind Load (WL)- The load on the structure due to wind is called wind load. It
acts transverse to the structures. IS 875 (Part 3).
Earthquake Load (EL)- It is due to the earthquake. It also acts in the horizontal
direction of the structure similar to wind load. IS 1893:1984
Since all of these loads do not act at the same time and hence their critical combination is
used for the design of the beam. IS 875 (Part 5) gives a specification for load combination.
Some of these combinations are as follows-
i. 1.2 DL + 1.6 LL
ii. 1.2 DL + 1.0 EL + 0.2 SL
iii. 1.2 DL + 1.6 (SL or RL)
iv. 0.9 DL + 1.0 (WL or EL)
v. 1.2 DL + 1.0 WL + 0.5 (SL or RL)
Note-
*The Rain load and Snow load are not considered together only higher of the two is taken.
Since both of them are used for roof design thus no Live load is considered.
*Only the higher value out of Earthquake load and wind load is considered for the critical
combination of the load.
Design of Beam-
The aim of the design is the achievement of an acceptable probability that structures
being designed satisfactorily during their intended life. With an appropriate degree of
safety, they should sustain all the loads and deformations of normal construction and use
3/9
and have adequate durability and adequate resistance to the effects of misuse and fire.
Steps for Design of Beam-
In this section, we will highlight the details to design the beam as per IS 456:2000. The
steps for the same are as follows-
a. Determine the size of the section
b. Estimate the loads and moments
c. Calculate the main reinforcement
d. Check for shear and calculation of shear reinforcement
e. Check for Bond
f. Curtailment and splicing details
Determination of Beam Size-
The first step in the design of beam is to determine the size of the beam.
The depth of the beam is governed by the span to depth ratio. IS 456:200 specifies the
span-depth ratio as follows-
As per IS 13920:1993, the depth of the beam should not be more than 1/4 of the clear
span and the width to depth ratio should be more than 0.3. However, the width of the
beam should not be lesser than 200mm.
It should also be kept in mind while designing the beam that its’ width should not be
greater than the width of the columns on which it is supported.
Thumb Rule- For every 0.3m of clear span, the depth of the beam should be 25mm.
Estimation of Loads and Moments-
th
4/9
The self-weight of the dead weight of the member can be calculated after defining member
size.
Weight of Member= Volume of the member x Density of Concrete
The density of concrete can be taken as 2500 kg/cum.
The estimation of live load is done as per IS 875 (Part-II).
The maximum bending moment and shear force occurring due to the combination of
loads are determined and the beam is designed for the same.
Calculation of Main Reinforcement (Ast)-
The IS 456:2000 recommends the use of Limit State of Method. However, Working Stress
Method can be adopted where LSM is inconvenient. Thus, for the design of the beam in
this article, we will adopt the limit state method only.
RCC Rectangular Beam with Stress & Strain Diagrams as per Limit State Method
The main reinforcement for balanced section is calculated as-
Where, x (neutral axis) is 0.53d, 0.48d and 0.43d for Fe250, Fe415 and Fe500
respectively. And b is the width of the beam, d is effective depth of the beam, M is the
ultimate moment, and f is yield stress of steel.
The area of tension steel required should be checked against the minimum & maximum
requirement as follows-
u
u
y
5/9
Minimum Reinforcement-
Maximum Reinforcement– 4% of cross section of beam.
Side Face Reinforcement- Where the depth of the web in a beam exceeds 750mm,
side face reinforcement shall be provided along with the two faces. The total area of such
reinforcement shall be not less than 0.1 percent of the web area and shall be distributed
equally on two faces at a spacing not exceeding 300 mm or web thickness whichever is
less.
Selection of diameter of bar for Main reinforcement-
The diameter of main reinforcement to satisfy the minimum spacing specified between
the bars which are equal to the greater value of the following- diameter of bar or
5mm+nominal max size of aggregate.
The max spacing between the bars should be 300 mm, 180 mm and 150 mm for Fe250,
Fe415, Fe500 respectively.
Minimum Diameter of bar for Main Reinforcement- 12 mm.
Shear or Transverse Reinforcement (A )-
V is
Factored shear force.
Determine Design Shear Strength of Concrete (ꚍ ) from the following table-
sv
u
c
6/9
Shear Strength of beam, ꚍ
This value increases with an increase in the percentage of steel and grade of concrete. It
has a maximum limit (ꚍ ) as given below-
Maximum Shear Stress ꚍ
If ꚍ < ꚍ , provide minimum shear reinforcement as follows-
c
c max
c max
v c
7/9
If ꚍ <ꚍ < ꚍ , provide shear reinforcement for-
Where, V = V – ꚍ .bd and S is spacing of
stirrups.
If ꚍ < ꚍ <ꚍ , the section is to be
redesigned.
Spacing of Stirrups- It should be
greater of 0.75d or 300 mm whichever is
smaller.
Minimum diameter of bar for
Stirrup- 8 mm.
Check for Bond-
The calculated tension or compression in any bar at any section shall be developed on
each side of the section by an appropriate development length or end anchorage or by a
combination thereof.
Development Length-
c v c max
us u c
c c max v
8/9
Design Bond Stress
For deformed bars design bond stress values may be increase by 60%.
For bars in compression, the design bond stress can be increased by 25%.
Development length to be increased by 10%, 20% and 33% for two, three and four
bundled bars in contact respectively.
Curtailment and Splicing Details for Design of Beam-
1. There should be at least one bar at every corner of the stirrup.
2. For curtailment, reinforcement shall extend beyond the point at which it is no
longer required to resist flexure for a distance equal to the effective depth of the
member or 12 times the bar diameter, whichever is greater except at simple support
or end of the cantilever.
3. At least one-third the positive moment reinforcement in simple members and one
fourth the positive moment reinforcement in continuous members shall extend
along the same face of the member into the support to a length equal to L /3.
4. When a flexural member is part of the primary lateral load resisting system, the
positive reinforcement required to be extended into the support as described in (a)
shall be anchored to develop its design stress in tension at the face of the support.
d
9/9
5. Where splices are provided in the reinforcing bars they shall as far as possible be
away from the sections of maximum stress and be staggered. It is recommended
that splices in flexural member should not be at sections where the bending moment
is more than 50% of the moment of resistance; and not more than half the bars shall
be spliced at a section.
6. The spacing of shear reinforcement can be increased suitably at the middle L/6 span
of the beam.
For more on Limit State Method, read here.
For more on Reinforcement, read here.
For more on cement, read here.
Happy Engineering!

More Related Content

What's hot

Chapter 4.3 well foundation-final-ppt
Chapter 4.3   well foundation-final-pptChapter 4.3   well foundation-final-ppt
Chapter 4.3 well foundation-final-pptDYPCET
 
Design of R.C.C Beam
Design of R.C.C BeamDesign of R.C.C Beam
Design of R.C.C BeamAr. Aakansha
 
Design of rcc structures note
Design of rcc structures noteDesign of rcc structures note
Design of rcc structures noteMahendra Poudel
 
Static and Kinematic Indeterminacy of Structure.
Static and Kinematic Indeterminacy of Structure.Static and Kinematic Indeterminacy of Structure.
Static and Kinematic Indeterminacy of Structure.Pritesh Parmar
 
Design and Drawing of Reinforced concrete structures
Design and Drawing of Reinforced concrete structuresDesign and Drawing of Reinforced concrete structures
Design and Drawing of Reinforced concrete structuresSJ BASHA
 
Design of Reinforced Concrete Structure (IS 456:2000)
Design of Reinforced Concrete Structure (IS 456:2000)Design of Reinforced Concrete Structure (IS 456:2000)
Design of Reinforced Concrete Structure (IS 456:2000)MachenLink
 
SINGLY REINFORCED BEAM
SINGLY REINFORCED BEAM SINGLY REINFORCED BEAM
SINGLY REINFORCED BEAM Pavan Kumar
 
Beams design and analysis
Beams design and analysisBeams design and analysis
Beams design and analysisAman Adam
 
Plate load test ppt
Plate load test pptPlate load test ppt
Plate load test pptsayan sarkar
 
Bridge Engineering
Bridge EngineeringBridge Engineering
Bridge EngineeringKHUSHBU SHAH
 
Slabs -Design steps
Slabs -Design steps Slabs -Design steps
Slabs -Design steps rohinibjn
 
Rcc design by working stress method
Rcc design by working stress methodRcc design by working stress method
Rcc design by working stress methodJYOTIRANJAN43
 
Part (1) basics of plastic analysis
Part (1) basics of plastic analysisPart (1) basics of plastic analysis
Part (1) basics of plastic analysisAshraf Sabbagh
 
Isolated column footing
Isolated column footingIsolated column footing
Isolated column footingkamariya keyur
 

What's hot (20)

Chapter 4.3 well foundation-final-ppt
Chapter 4.3   well foundation-final-pptChapter 4.3   well foundation-final-ppt
Chapter 4.3 well foundation-final-ppt
 
Design of R.C.C Beam
Design of R.C.C BeamDesign of R.C.C Beam
Design of R.C.C Beam
 
Design of beam
Design of beamDesign of beam
Design of beam
 
Design of rcc structures note
Design of rcc structures noteDesign of rcc structures note
Design of rcc structures note
 
Static and Kinematic Indeterminacy of Structure.
Static and Kinematic Indeterminacy of Structure.Static and Kinematic Indeterminacy of Structure.
Static and Kinematic Indeterminacy of Structure.
 
Design and Drawing of Reinforced concrete structures
Design and Drawing of Reinforced concrete structuresDesign and Drawing of Reinforced concrete structures
Design and Drawing of Reinforced concrete structures
 
Design of Reinforced Concrete Structure (IS 456:2000)
Design of Reinforced Concrete Structure (IS 456:2000)Design of Reinforced Concrete Structure (IS 456:2000)
Design of Reinforced Concrete Structure (IS 456:2000)
 
SINGLY REINFORCED BEAM
SINGLY REINFORCED BEAM SINGLY REINFORCED BEAM
SINGLY REINFORCED BEAM
 
Purlins
PurlinsPurlins
Purlins
 
Design of floor slab
Design of floor slabDesign of floor slab
Design of floor slab
 
Plate load test
Plate load testPlate load test
Plate load test
 
Design of beams
Design of beamsDesign of beams
Design of beams
 
Beams design and analysis
Beams design and analysisBeams design and analysis
Beams design and analysis
 
Plate load test ppt
Plate load test pptPlate load test ppt
Plate load test ppt
 
Bridge Engineering
Bridge EngineeringBridge Engineering
Bridge Engineering
 
Bridge
BridgeBridge
Bridge
 
Slabs -Design steps
Slabs -Design steps Slabs -Design steps
Slabs -Design steps
 
Rcc design by working stress method
Rcc design by working stress methodRcc design by working stress method
Rcc design by working stress method
 
Part (1) basics of plastic analysis
Part (1) basics of plastic analysisPart (1) basics of plastic analysis
Part (1) basics of plastic analysis
 
Isolated column footing
Isolated column footingIsolated column footing
Isolated column footing
 

Similar to Design of Beam- RCC Singly Reinforced Beam

Prsesntation on Commercial building Project
Prsesntation on Commercial building ProjectPrsesntation on Commercial building Project
Prsesntation on Commercial building ProjectMD AFROZ ALAM
 
design-of-singly-reinforced-beam.ppt
design-of-singly-reinforced-beam.pptdesign-of-singly-reinforced-beam.ppt
design-of-singly-reinforced-beam.pptProfKaushalParikh
 
fdocuments.in_design-of-singly-reinforced-5681874f52c1b.ppt
fdocuments.in_design-of-singly-reinforced-5681874f52c1b.pptfdocuments.in_design-of-singly-reinforced-5681874f52c1b.ppt
fdocuments.in_design-of-singly-reinforced-5681874f52c1b.pptSuvenduMajumder
 
Lec12 Continuous Beams and One Way Slabs(2) Columns (Reinforced Concrete Desi...
Lec12 Continuous Beams and One Way Slabs(2) Columns (Reinforced Concrete Desi...Lec12 Continuous Beams and One Way Slabs(2) Columns (Reinforced Concrete Desi...
Lec12 Continuous Beams and One Way Slabs(2) Columns (Reinforced Concrete Desi...Hossam Shafiq II
 
rectangular and section analysis in bending and shear
rectangular and section analysis in bending and shearrectangular and section analysis in bending and shear
rectangular and section analysis in bending and shearqueripan
 
T-Beam Design by USD method-10.01.03.102
T-Beam Design by USD method-10.01.03.102T-Beam Design by USD method-10.01.03.102
T-Beam Design by USD method-10.01.03.102Sadia Mitu
 
Compression member
Compression memberCompression member
Compression memberVikas Mehta
 
Chapter 4 Mechanical Spring (2).pptx
Chapter 4 Mechanical Spring (2).pptxChapter 4 Mechanical Spring (2).pptx
Chapter 4 Mechanical Spring (2).pptxjeorge12
 
Design of singly reinforced concrete
Design of singly reinforced concreteDesign of singly reinforced concrete
Design of singly reinforced concreteVikas Mehta
 
Design of short columns using helical reinforcement
Design of short columns using helical reinforcementDesign of short columns using helical reinforcement
Design of short columns using helical reinforcementshivam gautam
 
Roof bar design- a case study
Roof bar design- a case studyRoof bar design- a case study
Roof bar design- a case studyTIKESHWAR MAHTO
 
column and it's types
column and it's  types column and it's  types
column and it's types Asi Mahar
 
Div_Syd_detailing_of_reinforcement_in_concrete_structures.pdf
Div_Syd_detailing_of_reinforcement_in_concrete_structures.pdfDiv_Syd_detailing_of_reinforcement_in_concrete_structures.pdf
Div_Syd_detailing_of_reinforcement_in_concrete_structures.pdfLandelSmith1
 
Chapter 6 column
Chapter 6   columnChapter 6   column
Chapter 6 columnSimon Foo
 

Similar to Design of Beam- RCC Singly Reinforced Beam (20)

Prsesntation on Commercial building Project
Prsesntation on Commercial building ProjectPrsesntation on Commercial building Project
Prsesntation on Commercial building Project
 
design-of-singly-reinforced-beam.ppt
design-of-singly-reinforced-beam.pptdesign-of-singly-reinforced-beam.ppt
design-of-singly-reinforced-beam.ppt
 
fdocuments.in_design-of-singly-reinforced-5681874f52c1b.ppt
fdocuments.in_design-of-singly-reinforced-5681874f52c1b.pptfdocuments.in_design-of-singly-reinforced-5681874f52c1b.ppt
fdocuments.in_design-of-singly-reinforced-5681874f52c1b.ppt
 
Lec12 Continuous Beams and One Way Slabs(2) Columns (Reinforced Concrete Desi...
Lec12 Continuous Beams and One Way Slabs(2) Columns (Reinforced Concrete Desi...Lec12 Continuous Beams and One Way Slabs(2) Columns (Reinforced Concrete Desi...
Lec12 Continuous Beams and One Way Slabs(2) Columns (Reinforced Concrete Desi...
 
rectangular and section analysis in bending and shear
rectangular and section analysis in bending and shearrectangular and section analysis in bending and shear
rectangular and section analysis in bending and shear
 
Building project rc column
Building project rc columnBuilding project rc column
Building project rc column
 
Design of steel structural elements
Design of steel structural elementsDesign of steel structural elements
Design of steel structural elements
 
T-Beam Design by USD method-10.01.03.102
T-Beam Design by USD method-10.01.03.102T-Beam Design by USD method-10.01.03.102
T-Beam Design by USD method-10.01.03.102
 
Steel column base44
Steel column base44Steel column base44
Steel column base44
 
Design of steel beams
Design of steel beamsDesign of steel beams
Design of steel beams
 
Compression member
Compression memberCompression member
Compression member
 
Chapter 4 Mechanical Spring (2).pptx
Chapter 4 Mechanical Spring (2).pptxChapter 4 Mechanical Spring (2).pptx
Chapter 4 Mechanical Spring (2).pptx
 
Design of singly reinforced concrete
Design of singly reinforced concreteDesign of singly reinforced concrete
Design of singly reinforced concrete
 
Final detailingpp
Final detailingppFinal detailingpp
Final detailingpp
 
Design of short columns using helical reinforcement
Design of short columns using helical reinforcementDesign of short columns using helical reinforcement
Design of short columns using helical reinforcement
 
Roof bar design- a case study
Roof bar design- a case studyRoof bar design- a case study
Roof bar design- a case study
 
Strata control
Strata control Strata control
Strata control
 
column and it's types
column and it's  types column and it's  types
column and it's types
 
Div_Syd_detailing_of_reinforcement_in_concrete_structures.pdf
Div_Syd_detailing_of_reinforcement_in_concrete_structures.pdfDiv_Syd_detailing_of_reinforcement_in_concrete_structures.pdf
Div_Syd_detailing_of_reinforcement_in_concrete_structures.pdf
 
Chapter 6 column
Chapter 6   columnChapter 6   column
Chapter 6 column
 

More from SHAZEBALIKHAN1

Critical Path Explained With 7 Q&As and a Free Excel Template
Critical Path Explained With 7 Q&As and a Free Excel TemplateCritical Path Explained With 7 Q&As and a Free Excel Template
Critical Path Explained With 7 Q&As and a Free Excel TemplateSHAZEBALIKHAN1
 
5 Project Risk Identification Tools I Use & How You Can Use Them Too
5 Project Risk Identification Tools I Use & How You Can Use Them Too5 Project Risk Identification Tools I Use & How You Can Use Them Too
5 Project Risk Identification Tools I Use & How You Can Use Them TooSHAZEBALIKHAN1
 
Top 20 Standard Contract Clauses Every Manager Should Know
Top 20 Standard Contract Clauses Every Manager Should KnowTop 20 Standard Contract Clauses Every Manager Should Know
Top 20 Standard Contract Clauses Every Manager Should KnowSHAZEBALIKHAN1
 
Residential Building Preliminary Cost Estimate- Excel Template
Residential Building Preliminary Cost Estimate- Excel TemplateResidential Building Preliminary Cost Estimate- Excel Template
Residential Building Preliminary Cost Estimate- Excel TemplateSHAZEBALIKHAN1
 
3 Most Important In-situ Soil Tests for Construction Works
3 Most Important In-situ Soil Tests for Construction Works3 Most Important In-situ Soil Tests for Construction Works
3 Most Important In-situ Soil Tests for Construction WorksSHAZEBALIKHAN1
 
5 Must Know Types of Concrete Testing for Civil Engineers
5 Must Know Types of Concrete Testing for Civil Engineers5 Must Know Types of Concrete Testing for Civil Engineers
5 Must Know Types of Concrete Testing for Civil EngineersSHAZEBALIKHAN1
 
Construction Project Schedule Template- Residential Building
Construction Project Schedule Template- Residential BuildingConstruction Project Schedule Template- Residential Building
Construction Project Schedule Template- Residential BuildingSHAZEBALIKHAN1
 
All About Construction Labour Planning- Excel Template
All About Construction Labour Planning- Excel TemplateAll About Construction Labour Planning- Excel Template
All About Construction Labour Planning- Excel TemplateSHAZEBALIKHAN1
 
10 Powerful Construction Cost Estimation Steps
10 Powerful Construction Cost Estimation Steps10 Powerful Construction Cost Estimation Steps
10 Powerful Construction Cost Estimation StepsSHAZEBALIKHAN1
 
Construction Material Estimate with MS Excel file
Construction Material Estimate with MS Excel fileConstruction Material Estimate with MS Excel file
Construction Material Estimate with MS Excel fileSHAZEBALIKHAN1
 
Managing the Construction Claims Effectively
Managing the Construction Claims EffectivelyManaging the Construction Claims Effectively
Managing the Construction Claims EffectivelySHAZEBALIKHAN1
 
How Does MS Project Works 6- Task Controlling Factors
How Does MS Project Works 6- Task Controlling FactorsHow Does MS Project Works 6- Task Controlling Factors
How Does MS Project Works 6- Task Controlling FactorsSHAZEBALIKHAN1
 
Most Popular 20 Evergreen Project Management Terms
Most Popular 20 Evergreen Project Management TermsMost Popular 20 Evergreen Project Management Terms
Most Popular 20 Evergreen Project Management TermsSHAZEBALIKHAN1
 
Top 5 Concrete Quality Control Methods at Site
Top 5 Concrete Quality Control Methods at SiteTop 5 Concrete Quality Control Methods at Site
Top 5 Concrete Quality Control Methods at SiteSHAZEBALIKHAN1
 
My 5 Learnings of Waterfall Project Management
My 5 Learnings of Waterfall Project ManagementMy 5 Learnings of Waterfall Project Management
My 5 Learnings of Waterfall Project ManagementSHAZEBALIKHAN1
 
Construction Project Schedule Example- Residential Building
Construction Project Schedule Example- Residential BuildingConstruction Project Schedule Example- Residential Building
Construction Project Schedule Example- Residential BuildingSHAZEBALIKHAN1
 
5 Popular Types of Construction Contracts
5 Popular Types of Construction Contracts5 Popular Types of Construction Contracts
5 Popular Types of Construction ContractsSHAZEBALIKHAN1
 
Project Time Estimation 6 Powerful Tips & Tricks
Project Time Estimation 6 Powerful Tips & TricksProject Time Estimation 6 Powerful Tips & Tricks
Project Time Estimation 6 Powerful Tips & TricksSHAZEBALIKHAN1
 
Types of Building Foundations- Shallow and Deep
Types of Building Foundations- Shallow and DeepTypes of Building Foundations- Shallow and Deep
Types of Building Foundations- Shallow and DeepSHAZEBALIKHAN1
 
DCMA 14-Point Schedule Quality Check
DCMA 14-Point Schedule Quality CheckDCMA 14-Point Schedule Quality Check
DCMA 14-Point Schedule Quality CheckSHAZEBALIKHAN1
 

More from SHAZEBALIKHAN1 (20)

Critical Path Explained With 7 Q&As and a Free Excel Template
Critical Path Explained With 7 Q&As and a Free Excel TemplateCritical Path Explained With 7 Q&As and a Free Excel Template
Critical Path Explained With 7 Q&As and a Free Excel Template
 
5 Project Risk Identification Tools I Use & How You Can Use Them Too
5 Project Risk Identification Tools I Use & How You Can Use Them Too5 Project Risk Identification Tools I Use & How You Can Use Them Too
5 Project Risk Identification Tools I Use & How You Can Use Them Too
 
Top 20 Standard Contract Clauses Every Manager Should Know
Top 20 Standard Contract Clauses Every Manager Should KnowTop 20 Standard Contract Clauses Every Manager Should Know
Top 20 Standard Contract Clauses Every Manager Should Know
 
Residential Building Preliminary Cost Estimate- Excel Template
Residential Building Preliminary Cost Estimate- Excel TemplateResidential Building Preliminary Cost Estimate- Excel Template
Residential Building Preliminary Cost Estimate- Excel Template
 
3 Most Important In-situ Soil Tests for Construction Works
3 Most Important In-situ Soil Tests for Construction Works3 Most Important In-situ Soil Tests for Construction Works
3 Most Important In-situ Soil Tests for Construction Works
 
5 Must Know Types of Concrete Testing for Civil Engineers
5 Must Know Types of Concrete Testing for Civil Engineers5 Must Know Types of Concrete Testing for Civil Engineers
5 Must Know Types of Concrete Testing for Civil Engineers
 
Construction Project Schedule Template- Residential Building
Construction Project Schedule Template- Residential BuildingConstruction Project Schedule Template- Residential Building
Construction Project Schedule Template- Residential Building
 
All About Construction Labour Planning- Excel Template
All About Construction Labour Planning- Excel TemplateAll About Construction Labour Planning- Excel Template
All About Construction Labour Planning- Excel Template
 
10 Powerful Construction Cost Estimation Steps
10 Powerful Construction Cost Estimation Steps10 Powerful Construction Cost Estimation Steps
10 Powerful Construction Cost Estimation Steps
 
Construction Material Estimate with MS Excel file
Construction Material Estimate with MS Excel fileConstruction Material Estimate with MS Excel file
Construction Material Estimate with MS Excel file
 
Managing the Construction Claims Effectively
Managing the Construction Claims EffectivelyManaging the Construction Claims Effectively
Managing the Construction Claims Effectively
 
How Does MS Project Works 6- Task Controlling Factors
How Does MS Project Works 6- Task Controlling FactorsHow Does MS Project Works 6- Task Controlling Factors
How Does MS Project Works 6- Task Controlling Factors
 
Most Popular 20 Evergreen Project Management Terms
Most Popular 20 Evergreen Project Management TermsMost Popular 20 Evergreen Project Management Terms
Most Popular 20 Evergreen Project Management Terms
 
Top 5 Concrete Quality Control Methods at Site
Top 5 Concrete Quality Control Methods at SiteTop 5 Concrete Quality Control Methods at Site
Top 5 Concrete Quality Control Methods at Site
 
My 5 Learnings of Waterfall Project Management
My 5 Learnings of Waterfall Project ManagementMy 5 Learnings of Waterfall Project Management
My 5 Learnings of Waterfall Project Management
 
Construction Project Schedule Example- Residential Building
Construction Project Schedule Example- Residential BuildingConstruction Project Schedule Example- Residential Building
Construction Project Schedule Example- Residential Building
 
5 Popular Types of Construction Contracts
5 Popular Types of Construction Contracts5 Popular Types of Construction Contracts
5 Popular Types of Construction Contracts
 
Project Time Estimation 6 Powerful Tips & Tricks
Project Time Estimation 6 Powerful Tips & TricksProject Time Estimation 6 Powerful Tips & Tricks
Project Time Estimation 6 Powerful Tips & Tricks
 
Types of Building Foundations- Shallow and Deep
Types of Building Foundations- Shallow and DeepTypes of Building Foundations- Shallow and Deep
Types of Building Foundations- Shallow and Deep
 
DCMA 14-Point Schedule Quality Check
DCMA 14-Point Schedule Quality CheckDCMA 14-Point Schedule Quality Check
DCMA 14-Point Schedule Quality Check
 

Recently uploaded

Digital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxDigital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxpritamlangde
 
Linux Systems Programming: Inter Process Communication (IPC) using Pipes
Linux Systems Programming: Inter Process Communication (IPC) using PipesLinux Systems Programming: Inter Process Communication (IPC) using Pipes
Linux Systems Programming: Inter Process Communication (IPC) using PipesRashidFaridChishti
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdfKamal Acharya
 
Introduction to Geographic Information Systems
Introduction to Geographic Information SystemsIntroduction to Geographic Information Systems
Introduction to Geographic Information SystemsAnge Felix NSANZIYERA
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsvanyagupta248
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXssuser89054b
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwaitjaanualu31
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdfKamal Acharya
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdfAldoGarca30
 
fitting shop and tools used in fitting shop .ppt
fitting shop and tools used in fitting shop .pptfitting shop and tools used in fitting shop .ppt
fitting shop and tools used in fitting shop .pptAfnanAhmad53
 
Electromagnetic relays used for power system .pptx
Electromagnetic relays used for power system .pptxElectromagnetic relays used for power system .pptx
Electromagnetic relays used for power system .pptxNANDHAKUMARA10
 
Introduction to Artificial Intelligence ( AI)
Introduction to Artificial Intelligence ( AI)Introduction to Artificial Intelligence ( AI)
Introduction to Artificial Intelligence ( AI)ChandrakantDivate1
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiessarkmank1
 
Computer Graphics Introduction To Curves
Computer Graphics Introduction To CurvesComputer Graphics Introduction To Curves
Computer Graphics Introduction To CurvesChandrakantDivate1
 
Ground Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth ReinforcementGround Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth ReinforcementDr. Deepak Mudgal
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxSCMS School of Architecture
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...Amil baba
 
Path loss model, OKUMURA Model, Hata Model
Path loss model, OKUMURA Model, Hata ModelPath loss model, OKUMURA Model, Hata Model
Path loss model, OKUMURA Model, Hata ModelDrAjayKumarYadav4
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptxJIT KUMAR GUPTA
 

Recently uploaded (20)

Digital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxDigital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptx
 
Linux Systems Programming: Inter Process Communication (IPC) using Pipes
Linux Systems Programming: Inter Process Communication (IPC) using PipesLinux Systems Programming: Inter Process Communication (IPC) using Pipes
Linux Systems Programming: Inter Process Communication (IPC) using Pipes
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
Introduction to Geographic Information Systems
Introduction to Geographic Information SystemsIntroduction to Geographic Information Systems
Introduction to Geographic Information Systems
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
 
fitting shop and tools used in fitting shop .ppt
fitting shop and tools used in fitting shop .pptfitting shop and tools used in fitting shop .ppt
fitting shop and tools used in fitting shop .ppt
 
Electromagnetic relays used for power system .pptx
Electromagnetic relays used for power system .pptxElectromagnetic relays used for power system .pptx
Electromagnetic relays used for power system .pptx
 
Signal Processing and Linear System Analysis
Signal Processing and Linear System AnalysisSignal Processing and Linear System Analysis
Signal Processing and Linear System Analysis
 
Introduction to Artificial Intelligence ( AI)
Introduction to Artificial Intelligence ( AI)Introduction to Artificial Intelligence ( AI)
Introduction to Artificial Intelligence ( AI)
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and properties
 
Computer Graphics Introduction To Curves
Computer Graphics Introduction To CurvesComputer Graphics Introduction To Curves
Computer Graphics Introduction To Curves
 
Ground Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth ReinforcementGround Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth Reinforcement
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
 
Path loss model, OKUMURA Model, Hata Model
Path loss model, OKUMURA Model, Hata ModelPath loss model, OKUMURA Model, Hata Model
Path loss model, OKUMURA Model, Hata Model
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 

Design of Beam- RCC Singly Reinforced Beam

  • 1. 1/9 Civilverse Admin 27 August 2020 Design of Beam- RCC Singly Reinforced civilverse.org/design-of-beam-rcc-singly-reinforced Table of Content for Design of Beam-RCC Singly Reinforced Types of Beams Types of Loads Determination of beam size Determination of Loads and Moments Calculation of Main reinforcement Shear or Transverse Moments Check for Bond Curtailment and Splicing details A beam is a horizontal structural member subjected to the loads on the transverse direction. The beam can be straight, curved or circular in plan. The most common beam section used in civil works is rectangular. However, the beam can be circular, T-shaped, L- shaped, or square in section. The beam can also be classified on the basis of support conditions. Such as- a. Simply Supported Beam- The beam supported on both of its ends. The ends can be pin jointed or roller supported. The ends are allowed to rotate but not allowed to move in the direction of the load. b. Cantilever Beam- The cantilever beam has one end fixed and the other end free. The fixed end is not allowed to displace or rotate. The free end of the beam can rotate as well as displaced.
  • 2. 2/9 c. Fixed Beam- The beam having both ends fixed is called a fixed beam. Both of the ends of the beam are not allowed to rotate or displace. d. Continuous Beam- The beam supported on more than two support is called a continuous beam. Types of Loads- Before starting the design of the beam, it is necessary to understand the types of loads acting on the structure and their critical combination. a. Dead Load (DL)- It is the self-weight of the structure, fixed equipment, flooring, ceiling or anything that will not move during the lifetime of the structure. IS 875 (Part 1) specifies unit load for the material for dead load estimation. b. Live Load (LL)- It is the load due to people, furniture or anything that moves or may be moved from one place to another. IS 875 (Part 2) specifies the live load for various types of structures. c. Rain load (RL)- The load due to rain. It is considered for the roof only. d. Snow Load SL)- The load due to snow. It is considered for the roof only. IS 875 (Part 4). e. Wind Load (WL)- The load on the structure due to wind is called wind load. It acts transverse to the structures. IS 875 (Part 3). Earthquake Load (EL)- It is due to the earthquake. It also acts in the horizontal direction of the structure similar to wind load. IS 1893:1984 Since all of these loads do not act at the same time and hence their critical combination is used for the design of the beam. IS 875 (Part 5) gives a specification for load combination. Some of these combinations are as follows- i. 1.2 DL + 1.6 LL ii. 1.2 DL + 1.0 EL + 0.2 SL iii. 1.2 DL + 1.6 (SL or RL) iv. 0.9 DL + 1.0 (WL or EL) v. 1.2 DL + 1.0 WL + 0.5 (SL or RL) Note- *The Rain load and Snow load are not considered together only higher of the two is taken. Since both of them are used for roof design thus no Live load is considered. *Only the higher value out of Earthquake load and wind load is considered for the critical combination of the load. Design of Beam- The aim of the design is the achievement of an acceptable probability that structures being designed satisfactorily during their intended life. With an appropriate degree of safety, they should sustain all the loads and deformations of normal construction and use
  • 3. 3/9 and have adequate durability and adequate resistance to the effects of misuse and fire. Steps for Design of Beam- In this section, we will highlight the details to design the beam as per IS 456:2000. The steps for the same are as follows- a. Determine the size of the section b. Estimate the loads and moments c. Calculate the main reinforcement d. Check for shear and calculation of shear reinforcement e. Check for Bond f. Curtailment and splicing details Determination of Beam Size- The first step in the design of beam is to determine the size of the beam. The depth of the beam is governed by the span to depth ratio. IS 456:200 specifies the span-depth ratio as follows- As per IS 13920:1993, the depth of the beam should not be more than 1/4 of the clear span and the width to depth ratio should be more than 0.3. However, the width of the beam should not be lesser than 200mm. It should also be kept in mind while designing the beam that its’ width should not be greater than the width of the columns on which it is supported. Thumb Rule- For every 0.3m of clear span, the depth of the beam should be 25mm. Estimation of Loads and Moments- th
  • 4. 4/9 The self-weight of the dead weight of the member can be calculated after defining member size. Weight of Member= Volume of the member x Density of Concrete The density of concrete can be taken as 2500 kg/cum. The estimation of live load is done as per IS 875 (Part-II). The maximum bending moment and shear force occurring due to the combination of loads are determined and the beam is designed for the same. Calculation of Main Reinforcement (Ast)- The IS 456:2000 recommends the use of Limit State of Method. However, Working Stress Method can be adopted where LSM is inconvenient. Thus, for the design of the beam in this article, we will adopt the limit state method only. RCC Rectangular Beam with Stress & Strain Diagrams as per Limit State Method The main reinforcement for balanced section is calculated as- Where, x (neutral axis) is 0.53d, 0.48d and 0.43d for Fe250, Fe415 and Fe500 respectively. And b is the width of the beam, d is effective depth of the beam, M is the ultimate moment, and f is yield stress of steel. The area of tension steel required should be checked against the minimum & maximum requirement as follows- u u y
  • 5. 5/9 Minimum Reinforcement- Maximum Reinforcement– 4% of cross section of beam. Side Face Reinforcement- Where the depth of the web in a beam exceeds 750mm, side face reinforcement shall be provided along with the two faces. The total area of such reinforcement shall be not less than 0.1 percent of the web area and shall be distributed equally on two faces at a spacing not exceeding 300 mm or web thickness whichever is less. Selection of diameter of bar for Main reinforcement- The diameter of main reinforcement to satisfy the minimum spacing specified between the bars which are equal to the greater value of the following- diameter of bar or 5mm+nominal max size of aggregate. The max spacing between the bars should be 300 mm, 180 mm and 150 mm for Fe250, Fe415, Fe500 respectively. Minimum Diameter of bar for Main Reinforcement- 12 mm. Shear or Transverse Reinforcement (A )- V is Factored shear force. Determine Design Shear Strength of Concrete (ꚍ ) from the following table- sv u c
  • 6. 6/9 Shear Strength of beam, ꚍ This value increases with an increase in the percentage of steel and grade of concrete. It has a maximum limit (ꚍ ) as given below- Maximum Shear Stress ꚍ If ꚍ < ꚍ , provide minimum shear reinforcement as follows- c c max c max v c
  • 7. 7/9 If ꚍ <ꚍ < ꚍ , provide shear reinforcement for- Where, V = V – ꚍ .bd and S is spacing of stirrups. If ꚍ < ꚍ <ꚍ , the section is to be redesigned. Spacing of Stirrups- It should be greater of 0.75d or 300 mm whichever is smaller. Minimum diameter of bar for Stirrup- 8 mm. Check for Bond- The calculated tension or compression in any bar at any section shall be developed on each side of the section by an appropriate development length or end anchorage or by a combination thereof. Development Length- c v c max us u c c c max v
  • 8. 8/9 Design Bond Stress For deformed bars design bond stress values may be increase by 60%. For bars in compression, the design bond stress can be increased by 25%. Development length to be increased by 10%, 20% and 33% for two, three and four bundled bars in contact respectively. Curtailment and Splicing Details for Design of Beam- 1. There should be at least one bar at every corner of the stirrup. 2. For curtailment, reinforcement shall extend beyond the point at which it is no longer required to resist flexure for a distance equal to the effective depth of the member or 12 times the bar diameter, whichever is greater except at simple support or end of the cantilever. 3. At least one-third the positive moment reinforcement in simple members and one fourth the positive moment reinforcement in continuous members shall extend along the same face of the member into the support to a length equal to L /3. 4. When a flexural member is part of the primary lateral load resisting system, the positive reinforcement required to be extended into the support as described in (a) shall be anchored to develop its design stress in tension at the face of the support. d
  • 9. 9/9 5. Where splices are provided in the reinforcing bars they shall as far as possible be away from the sections of maximum stress and be staggered. It is recommended that splices in flexural member should not be at sections where the bending moment is more than 50% of the moment of resistance; and not more than half the bars shall be spliced at a section. 6. The spacing of shear reinforcement can be increased suitably at the middle L/6 span of the beam. For more on Limit State Method, read here. For more on Reinforcement, read here. For more on cement, read here. Happy Engineering!