Civilverse Admin 25 July 2021
5 Must-Know Types of Concrete Testing for Civil
Engineers
civilverse.org/concrete-testing
Table of Contents for Concrete Testing-
1. What are the methods of concrete testing?
2. Test 1: Workability Tests
3. Test 2: Temperature Tests
4. Test 3: Concrete Setting Tests
5. Test 4: Compressive Strength Test
6. Test 5: Permeability Tests
7. Conclusion
2/9
What are the methods of concrete testing?
The concrete is tested for quality in the fresh state as well as the hardened state. The tests
conducted on fresh concrete are as follows-
Workability Test
Temperature Test
Setting Test
Air Content
Unit Weight
Heat Generation
Bleeding
Segregation Resistance etc.
The hardened concrete is tested for-
Compressive Strength
Modulus of Elasticity
Tensile Strength
Permeability
Absorption
Density
Shrinkage
Bond
Abrasion etc.
3/9
The quality control of concrete strictly requires tests for workability, temperature,
compressive strength etc. The necessity and frequency of other tests are determined by
the Engineer-in-charge or the organisational QA program.
The tests on fresh concrete are done at the point of production and point of placing
concrete. The fresh concrete samples are taken for testing and the results are immediately
published to evaluate the concrete quality against the standards.
The tests on hardened concrete are done after the concrete achieve sufficient strength.
These tests are generally carried out in the laboratory.
This article covers three fresh concrete tests and two hardened concrete tests that are
must-know for all Civil Engineers.
Before moving ahead, the sampling of concrete for all the tests shall be done following IS
1199.
Test 1: Workability Tests
The workability of concrete is the measure of ease of working with concrete. The term
‘working with concrete’ non-exhaustively implies preparation, mixing, transporting,
placing and compaction. The workability increases with the increase in the water-cement
ratio. Highly workable concrete is liable for shrinkage, develop lesser strength etc.
Importance of Workability Tests- The workability of concrete ensures easy
transportation, superior pumping ability, better filling and compaction. However, it also
deteriorates the strength of the concrete. Hence, it becomes necessary to keep a balance
between the workability and strength parameters.
There are five methods of testing the workability of concrete-
Slump Test
Compaction Factor Test
Flow Test
Vee Bee Time Test
Kelly Ball Test
In this article, I shall briefly explain only the first three methods and save the minute
details and the other two methods for a dedicated article on the workability of concrete.
Relevant Codes: IS 1199, ACI 318-19, ASTM C-143
1.1 Slump Test
The slump test is also known as the slump cone test. A conical frustum of base diameter
200 mm, top diameter 100 mm and height of 300 mm known as slump cone is used as
apparatus for it. It is the most common method of testing the workability of concrete at
the site. Although, it is widely accepted yet the results are not fully reliable.
4/9
The method of performing the slump test as per IS code is mentioned below-
The cone is cleaned and placed on a levelled surface generally over a metal plate.
The concrete is filled into the slump cone into three layers. Each layer is uniformly
compacted 25 times by a 16mm diameter steel rod. After filling concrete till the top
of the cone, the top surface of concrete is levelled with a trowel.
Remove the mould vertically without disturbing the concrete.
After the concrete settles down, measure the settlement of concrete. This
measurement is reported in millimeters and called ‘slump’.
Slump Test for Workability
Suitability of Slump Test- The slump test is suitable for medium workability of
concrete i.e., the slump of 20-150 mm.
Result Interpretation- The ideal slump value should be as low as possible. This
represents the lower water-cement ratio hence better strength gain and lower shrinkage.
However, due to placing and compaction limitations at the site, the slump value is
increased to increase the workability.
1.2 Compaction Factor Test
Compaction Factor Test measures the workability of concrete by self-compaction achieved
due to falling from height. The apparatus contains two hoppers over each other and a
cylinder at the bottom. Each hopper is fitted with a trap door at its’ bottom.
The method of performing the compaction factor test by IS code is mentioned below-
Fill the first hopper completely with concrete and level the top with a trowel.
Open the first hopper trap door to allow concrete to fall into the second hopper.
Now open the trap door of second hopper and let the concrete fall into the cylinder.
Weigh the concrete in the cylinder. Record it as W1.
Now, again fill the concrete directly into the cylinder in three layers with uniform
compaction of each layer by 16 mm diameter rod.
Record the weight of the compacted concrete as W2.
5/9
Calculate the compaction factor by dividing W1 by W2.
Compacting Factor Test Apparatus. Pic Credit- Civilread
Suitability of Compaction Factor Test- The compaction factor test is suitable for
concrete having very little workability. The concrete that is to be vibrated is tested by this
method.
Result Interpretation- The value of the compaction factor for normal workable
concrete lies between 0.80 – 0.92. The higher the compaction factor, the higher is the
workability.
1.3 Flow Test
Flow test of Flow Table test is done for highly workable concrete. The test checks the
consistency of concrete. The apparatus mainly contains a 70 cm x 70 cm table and a cone
of 25 cm bottom diameter, 17 cm top diameter and 30 cm height.
The method of performing the flow table test by IS code is mentioned below-
The cone is placed over the wet table and filled with concrete into two layers. Each
layer is tamped 25 times by a standard tamping rod.
The cone is lifted and the concrete is allowed to flow.
The table is lifted for some height and dropped to further allow the flow of concrete.
The flow diameter of concrete is measured in six directions and their average is
recorded as ‘D’.
The flow % is calculated as {(D-25)/25} x 100.
Suitability of Flow Table Test- The test is unsuitable for the low slump concrete.
Result Interpretation- The flow % percentage represents the consistency of the
concrete. The higher the flow %, the higher is the consistency.
6/9
Concrete Flow Table Test Apparatus. Pic
Credit- concrete.org.uk
Test 2: Temperature Test
The temperature test is relatively simpler as compared to other tests. The only equipment
required for testing is the thermometer.
Importance of Temperature Test- Thecement-water reaction is exothermic. Thus, to
aid the chemical reaction to progress positively, the concrete temperature must be kept
low. High concrete temperature also quickly evaporates the free water. Hence, it becomes
necessary to check the concrete temperature at the batching plant and the poring placing.
Relevant Code- IS 7861-1
Result Interpretation- The ideal temperature for concrete to be placed is 10-32
degrees centigrade. A lower temperature is better for strength development and lesser
pore water loss. The suitable methods shall be applied in hot regions to keep the concrete
temperature low.
Test 3: Concrete Setting Tests
The concrete sets on mixing with water. The setting of concrete is defined in terms of
initial setting time and final setting time. It should be clearly noted that the setting of
concrete is related to the plasticity of concrete and not the strength gain.
Importance of Concrete Setting Tests- The concrete setting times are useful in
determining the maximum allowed transportation time, placing time and finishing time
etc. For different conditions, the concrete can be suitably mixed with additives that alter
its’ setting time.
Relevant Codes: IS 8142, ASTM C191, ASTM C403, ASTM C266, ASTM C953
3.1 Initial & Final Setting Time
7/9
Concrete Setting Time Apparatus
The initial setting time of concrete is the time after which the concrete starts losing its’
plasticity. The final setting time of concrete is the time by which the concrete loses all of
its’ plasticity. The Penetration Resistance Apparatus is used to determine the setting time
of concrete.
The step-by-step procedure to conduct the initial setting time test by IS code is as follows-
A mortar test specimen sieved by IS 4.75 mm sieve from fresh concrete.
The mortar is filled into a container in 50 mm layers and compacted. The minimum
final height of the mortar specimen is 140 mm.
The specimen is cleared of bleeding water from the surface and placed under the
apparatus.
The needle of the apparatus is brought to the level of specimen surface and a
constant force is applied.
The force applied and the time elapsed since cement and water mixing is recorded.
For normal concrete at normal temperature, repeat the test after 3-4 hours of first
test and keep repeating after every 1 hour of it. Continue the tests until the
penetration resistance is 275 kgf/cm^2.
Result Interpretation- The setting time is
defined as the elapsed time since mixing cement
and water at which the penetration resistance is
35 kgf/cm^2. The final setting time is the
elapsed time at which the penetration resistance
is 275 kgf/cm^2. The result is reported in hours
and minutes.
Test 4: Compressive Strength Tests
The compressive strength is the key characteristic of concrete. However, it develops
cracks even if exposed to mild tension. The test can be conducted on a 150 x150 x 150 mm
sized concrete cube or concrete cylinder of 150 mm diameter and 300mm height.
Relevant Codes: IS 516 for the testing procedure and IS 456 for sampling frequency.
ACI-318.
The general steps for testing the compressive strength of concrete as per IS code is as
follows-
The oiled moulds are filled with concrete and well compacted.
The top surface of concrete is levelled with the mould and excess concrete is strike-
off by a trowel.
8/9
After 24 hours, the cube/cylinder is carefully removed from the mould and put
underwater for curing. The samples are marked with the grade of concrete and
casting date.
After completing the curing period of 7 days, half of the samples (at least 3) are
placed in compression testing machine one-by-one and the value at which sample
develops crack is noted. The average of samples is recorded as 7-day mean
compressive strength of the sample. Same procedure is repeated for 28-day mean
compressive strength.
Compressive Strength Testing Machine
Result Interpretation- The concrete is generally tested for 7 days & 28 days
compressive strength. In some cases, it can also be tested for 3 days as well. The 3 days, 7
days and 28 days strength should be equal to or more than the 50%, 66% and 99.99% of
the target mean strength respectively.
Test 5: Permeability Tests
The permeability is the property of concrete that allows the flow of water through it. The
permeability test of concrete should not be confused with the water absorption test of
concrete.
Importance of Concrete Setting Tests- The water causes corrosion to the
reinforcement. It is a well-known fact that as the steel corrodes its’ volume increases and
cracks the concrete. Hence, the permeable concrete will be susceptible to cracks and early
deterioration due to corrosion of reinforcement. Therefore, it is necessary to check for
permeability especially for underwater concrete or concrete frequently exposed to liquids.
Relevant Codes: IS 3085, ACI 228.2R
The test procedure for testing the permeability of concrete as per IS code is mentioned
below-
9/9
Three number cylindrical samples of 200 mm diameter and 120mm height re
prepared.
After 24 hours, the middle 100 mm diameter is roughened and remaining portion is
sealed with cement paste. The samples are then cured for 28 days.
After completing the curing period, the roughened portion is applied with water
pressure of 1 bar for 48 hours, 3 bars for next 24 hours and 7 bars for another 24
hours.
The samples are then split by compression machine to study the water penetration
depth and recorded for each sample.
The average of water penetration depth is recorded.
Permeability Test Appratus for Concrete
Result Interpretation- The depth of water penetration should not exceed 25 mm else;
the sample is considered to fail.
Conclusion
The five tests mentioned in the article are non-exhaustive. As already mentioned above,
these tests are essential and conducted to ascertain the quality of concrete. However,
quality assurance and control should start from purchasing material to curing and
maintaining the concrete. For complete concrete quality control, follow these five steps
that will enable you to meet the concrete quality standards.
The correction methods for the shortcomings in concrete shall be well discussed with the
Engineer- In-Charge and laid down in QAP. The standardisation of correction methods
shall ensure the overall quality control and prevent wastage of material.
Read more about the futuristic concrete types here.
The list of IS codes for all the tests can be read here.

More Related Content

What's hot

Non destructive testing of concrete
Non destructive testing of concreteNon destructive testing of concrete
Non destructive testing of concreteiamsamrat
 
CONCRETE MIX DESIGN
CONCRETE MIX DESIGNCONCRETE MIX DESIGN
CONCRETE MIX DESIGNNikul Gopani
 
Durability of concrete
Durability of concreteDurability of concrete
Durability of concreteSelva Prakash
 
Properties of fresh and Hardened Concrete
Properties of fresh and Hardened ConcreteProperties of fresh and Hardened Concrete
Properties of fresh and Hardened ConcreteVijay RAWAT
 
A presentation on concrete-Concrete Technology
A presentation on concrete-Concrete TechnologyA presentation on concrete-Concrete Technology
A presentation on concrete-Concrete TechnologyAbdul Majid
 
Hydrometer Analysis for Soil (Sedimentation)
Hydrometer Analysis for Soil (Sedimentation)Hydrometer Analysis for Soil (Sedimentation)
Hydrometer Analysis for Soil (Sedimentation)Abdul Majid
 
proctor test and compaction
 proctor test and compaction proctor test and compaction
proctor test and compactionJyoti Khatiwada
 
Detailed ppt on Curing of concrete
Detailed ppt on Curing of concreteDetailed ppt on Curing of concrete
Detailed ppt on Curing of concreteRushabh shah
 
Chemical attack in concrete
Chemical attack in concreteChemical attack in concrete
Chemical attack in concreteer_kamal
 
Test On Bitumen
Test On BitumenTest On Bitumen
Test On BitumenUjas Patel
 

What's hot (20)

Subsurface Investigation
Subsurface InvestigationSubsurface Investigation
Subsurface Investigation
 
Index properties
Index propertiesIndex properties
Index properties
 
Non destructive testing of concrete
Non destructive testing of concreteNon destructive testing of concrete
Non destructive testing of concrete
 
CONCRETE MIX DESIGN
CONCRETE MIX DESIGNCONCRETE MIX DESIGN
CONCRETE MIX DESIGN
 
Concrete
ConcreteConcrete
Concrete
 
Durability of concrete
Durability of concreteDurability of concrete
Durability of concrete
 
Fresh and harden properties of concrete
Fresh and harden properties of concreteFresh and harden properties of concrete
Fresh and harden properties of concrete
 
Bitumen
BitumenBitumen
Bitumen
 
Slump test
Slump test Slump test
Slump test
 
Properties of fresh and Hardened Concrete
Properties of fresh and Hardened ConcreteProperties of fresh and Hardened Concrete
Properties of fresh and Hardened Concrete
 
Compaction Factor Test
Compaction Factor TestCompaction Factor Test
Compaction Factor Test
 
Hardened concrete
Hardened concreteHardened concrete
Hardened concrete
 
A presentation on concrete-Concrete Technology
A presentation on concrete-Concrete TechnologyA presentation on concrete-Concrete Technology
A presentation on concrete-Concrete Technology
 
Hydrometer Analysis for Soil (Sedimentation)
Hydrometer Analysis for Soil (Sedimentation)Hydrometer Analysis for Soil (Sedimentation)
Hydrometer Analysis for Soil (Sedimentation)
 
proctor test and compaction
 proctor test and compaction proctor test and compaction
proctor test and compaction
 
Concrete
ConcreteConcrete
Concrete
 
Aggregates
AggregatesAggregates
Aggregates
 
Detailed ppt on Curing of concrete
Detailed ppt on Curing of concreteDetailed ppt on Curing of concrete
Detailed ppt on Curing of concrete
 
Chemical attack in concrete
Chemical attack in concreteChemical attack in concrete
Chemical attack in concrete
 
Test On Bitumen
Test On BitumenTest On Bitumen
Test On Bitumen
 

Similar to 5 Must Know Types of Concrete Testing for Civil Engineers

Concrete Technology
Concrete TechnologyConcrete Technology
Concrete TechnologyLove Sharma
 
Fresh concrete properties & its standard tests
Fresh concrete properties & its standard testsFresh concrete properties & its standard tests
Fresh concrete properties & its standard testsMaHmoud AliraQi
 
PDL’s Construction Development (Technical) Training Session-I_Structural.pptx
PDL’s Construction Development (Technical) Training Session-I_Structural.pptxPDL’s Construction Development (Technical) Training Session-I_Structural.pptx
PDL’s Construction Development (Technical) Training Session-I_Structural.pptxChristopherThomas578171
 
Ntpc summer training 2017
Ntpc summer training 2017Ntpc summer training 2017
Ntpc summer training 2017ktx500
 
Tests of cement in concrete technology
Tests of cement in concrete technologyTests of cement in concrete technology
Tests of cement in concrete technologySunny Saha
 
Standard test on fresh concrete
Standard test on fresh concreteStandard test on fresh concrete
Standard test on fresh concreteAbhishek Shah
 
ACT_unit1_2concrete properties_updated.pdf
ACT_unit1_2concrete properties_updated.pdfACT_unit1_2concrete properties_updated.pdf
ACT_unit1_2concrete properties_updated.pdfSwapnilGorade1
 
1.2_Basic Engineering_Day 4.pptx
1.2_Basic Engineering_Day 4.pptx1.2_Basic Engineering_Day 4.pptx
1.2_Basic Engineering_Day 4.pptxJanak82
 
A presentation on Fresh Concrete Chapter 2_Fresh-Concrete.ppt
A presentation on Fresh Concrete Chapter 2_Fresh-Concrete.pptA presentation on Fresh Concrete Chapter 2_Fresh-Concrete.ppt
A presentation on Fresh Concrete Chapter 2_Fresh-Concrete.pptRudraBasugade
 
Self compacting concrete Mix
Self compacting concrete MixSelf compacting concrete Mix
Self compacting concrete MixHafizullah Sadat
 
semi destructive tests on concrete _Imran_bk
semi destructive tests on concrete _Imran_bksemi destructive tests on concrete _Imran_bk
semi destructive tests on concrete _Imran_bkBk Imran
 
Thirsty Concrete application in Road pavement
Thirsty Concrete application in Road pavementThirsty Concrete application in Road pavement
Thirsty Concrete application in Road pavementSachinPawarUCOE
 
FRESH CONCRETE PROPERTIES.pptx
FRESH CONCRETE PROPERTIES.pptxFRESH CONCRETE PROPERTIES.pptx
FRESH CONCRETE PROPERTIES.pptxHimabindu Rudroju
 
SLUMP TEST REPORT DCC 2042
SLUMP TEST REPORT DCC 2042 SLUMP TEST REPORT DCC 2042
SLUMP TEST REPORT DCC 2042 YASMINE HASLAN
 
Self compacting concrete (scc)
Self compacting concrete (scc)Self compacting concrete (scc)
Self compacting concrete (scc)y Sahaja
 

Similar to 5 Must Know Types of Concrete Testing for Civil Engineers (20)

Concrete Technology
Concrete TechnologyConcrete Technology
Concrete Technology
 
Fresh Concrete
Fresh Concrete Fresh Concrete
Fresh Concrete
 
Test of concrete
Test of concrete Test of concrete
Test of concrete
 
Fresh concrete properties & its standard tests
Fresh concrete properties & its standard testsFresh concrete properties & its standard tests
Fresh concrete properties & its standard tests
 
PDL’s Construction Development (Technical) Training Session-I_Structural.pptx
PDL’s Construction Development (Technical) Training Session-I_Structural.pptxPDL’s Construction Development (Technical) Training Session-I_Structural.pptx
PDL’s Construction Development (Technical) Training Session-I_Structural.pptx
 
Ntpc summer training 2017
Ntpc summer training 2017Ntpc summer training 2017
Ntpc summer training 2017
 
Tests of cement in concrete technology
Tests of cement in concrete technologyTests of cement in concrete technology
Tests of cement in concrete technology
 
Group 4 (concrete)
Group 4 (concrete)Group 4 (concrete)
Group 4 (concrete)
 
Standard test on fresh concrete
Standard test on fresh concreteStandard test on fresh concrete
Standard test on fresh concrete
 
ACT_unit1_2concrete properties_updated.pdf
ACT_unit1_2concrete properties_updated.pdfACT_unit1_2concrete properties_updated.pdf
ACT_unit1_2concrete properties_updated.pdf
 
Flow test of concrete
Flow test of concreteFlow test of concrete
Flow test of concrete
 
Ct
CtCt
Ct
 
1.2_Basic Engineering_Day 4.pptx
1.2_Basic Engineering_Day 4.pptx1.2_Basic Engineering_Day 4.pptx
1.2_Basic Engineering_Day 4.pptx
 
A presentation on Fresh Concrete Chapter 2_Fresh-Concrete.ppt
A presentation on Fresh Concrete Chapter 2_Fresh-Concrete.pptA presentation on Fresh Concrete Chapter 2_Fresh-Concrete.ppt
A presentation on Fresh Concrete Chapter 2_Fresh-Concrete.ppt
 
Self compacting concrete Mix
Self compacting concrete MixSelf compacting concrete Mix
Self compacting concrete Mix
 
semi destructive tests on concrete _Imran_bk
semi destructive tests on concrete _Imran_bksemi destructive tests on concrete _Imran_bk
semi destructive tests on concrete _Imran_bk
 
Thirsty Concrete application in Road pavement
Thirsty Concrete application in Road pavementThirsty Concrete application in Road pavement
Thirsty Concrete application in Road pavement
 
FRESH CONCRETE PROPERTIES.pptx
FRESH CONCRETE PROPERTIES.pptxFRESH CONCRETE PROPERTIES.pptx
FRESH CONCRETE PROPERTIES.pptx
 
SLUMP TEST REPORT DCC 2042
SLUMP TEST REPORT DCC 2042 SLUMP TEST REPORT DCC 2042
SLUMP TEST REPORT DCC 2042
 
Self compacting concrete (scc)
Self compacting concrete (scc)Self compacting concrete (scc)
Self compacting concrete (scc)
 

More from SHAZEBALIKHAN1

Critical Path Explained With 7 Q&As and a Free Excel Template
Critical Path Explained With 7 Q&As and a Free Excel TemplateCritical Path Explained With 7 Q&As and a Free Excel Template
Critical Path Explained With 7 Q&As and a Free Excel TemplateSHAZEBALIKHAN1
 
5 Project Risk Identification Tools I Use & How You Can Use Them Too
5 Project Risk Identification Tools I Use & How You Can Use Them Too5 Project Risk Identification Tools I Use & How You Can Use Them Too
5 Project Risk Identification Tools I Use & How You Can Use Them TooSHAZEBALIKHAN1
 
Top 20 Standard Contract Clauses Every Manager Should Know
Top 20 Standard Contract Clauses Every Manager Should KnowTop 20 Standard Contract Clauses Every Manager Should Know
Top 20 Standard Contract Clauses Every Manager Should KnowSHAZEBALIKHAN1
 
Residential Building Preliminary Cost Estimate- Excel Template
Residential Building Preliminary Cost Estimate- Excel TemplateResidential Building Preliminary Cost Estimate- Excel Template
Residential Building Preliminary Cost Estimate- Excel TemplateSHAZEBALIKHAN1
 
3 Most Important In-situ Soil Tests for Construction Works
3 Most Important In-situ Soil Tests for Construction Works3 Most Important In-situ Soil Tests for Construction Works
3 Most Important In-situ Soil Tests for Construction WorksSHAZEBALIKHAN1
 
Construction Project Schedule Template- Residential Building
Construction Project Schedule Template- Residential BuildingConstruction Project Schedule Template- Residential Building
Construction Project Schedule Template- Residential BuildingSHAZEBALIKHAN1
 
All About Construction Labour Planning- Excel Template
All About Construction Labour Planning- Excel TemplateAll About Construction Labour Planning- Excel Template
All About Construction Labour Planning- Excel TemplateSHAZEBALIKHAN1
 
10 Powerful Construction Cost Estimation Steps
10 Powerful Construction Cost Estimation Steps10 Powerful Construction Cost Estimation Steps
10 Powerful Construction Cost Estimation StepsSHAZEBALIKHAN1
 
Construction Material Estimate with MS Excel file
Construction Material Estimate with MS Excel fileConstruction Material Estimate with MS Excel file
Construction Material Estimate with MS Excel fileSHAZEBALIKHAN1
 
Managing the Construction Claims Effectively
Managing the Construction Claims EffectivelyManaging the Construction Claims Effectively
Managing the Construction Claims EffectivelySHAZEBALIKHAN1
 
How Does MS Project Works 6- Task Controlling Factors
How Does MS Project Works 6- Task Controlling FactorsHow Does MS Project Works 6- Task Controlling Factors
How Does MS Project Works 6- Task Controlling FactorsSHAZEBALIKHAN1
 
Most Popular 20 Evergreen Project Management Terms
Most Popular 20 Evergreen Project Management TermsMost Popular 20 Evergreen Project Management Terms
Most Popular 20 Evergreen Project Management TermsSHAZEBALIKHAN1
 
Top 5 Concrete Quality Control Methods at Site
Top 5 Concrete Quality Control Methods at SiteTop 5 Concrete Quality Control Methods at Site
Top 5 Concrete Quality Control Methods at SiteSHAZEBALIKHAN1
 
My 5 Learnings of Waterfall Project Management
My 5 Learnings of Waterfall Project ManagementMy 5 Learnings of Waterfall Project Management
My 5 Learnings of Waterfall Project ManagementSHAZEBALIKHAN1
 
Construction Project Schedule Example- Residential Building
Construction Project Schedule Example- Residential BuildingConstruction Project Schedule Example- Residential Building
Construction Project Schedule Example- Residential BuildingSHAZEBALIKHAN1
 
5 Popular Types of Construction Contracts
5 Popular Types of Construction Contracts5 Popular Types of Construction Contracts
5 Popular Types of Construction ContractsSHAZEBALIKHAN1
 
Project Time Estimation 6 Powerful Tips & Tricks
Project Time Estimation 6 Powerful Tips & TricksProject Time Estimation 6 Powerful Tips & Tricks
Project Time Estimation 6 Powerful Tips & TricksSHAZEBALIKHAN1
 
Types of Building Foundations- Shallow and Deep
Types of Building Foundations- Shallow and DeepTypes of Building Foundations- Shallow and Deep
Types of Building Foundations- Shallow and DeepSHAZEBALIKHAN1
 
DCMA 14-Point Schedule Quality Check
DCMA 14-Point Schedule Quality CheckDCMA 14-Point Schedule Quality Check
DCMA 14-Point Schedule Quality CheckSHAZEBALIKHAN1
 
Basics of Contract Management
Basics of Contract ManagementBasics of Contract Management
Basics of Contract ManagementSHAZEBALIKHAN1
 

More from SHAZEBALIKHAN1 (20)

Critical Path Explained With 7 Q&As and a Free Excel Template
Critical Path Explained With 7 Q&As and a Free Excel TemplateCritical Path Explained With 7 Q&As and a Free Excel Template
Critical Path Explained With 7 Q&As and a Free Excel Template
 
5 Project Risk Identification Tools I Use & How You Can Use Them Too
5 Project Risk Identification Tools I Use & How You Can Use Them Too5 Project Risk Identification Tools I Use & How You Can Use Them Too
5 Project Risk Identification Tools I Use & How You Can Use Them Too
 
Top 20 Standard Contract Clauses Every Manager Should Know
Top 20 Standard Contract Clauses Every Manager Should KnowTop 20 Standard Contract Clauses Every Manager Should Know
Top 20 Standard Contract Clauses Every Manager Should Know
 
Residential Building Preliminary Cost Estimate- Excel Template
Residential Building Preliminary Cost Estimate- Excel TemplateResidential Building Preliminary Cost Estimate- Excel Template
Residential Building Preliminary Cost Estimate- Excel Template
 
3 Most Important In-situ Soil Tests for Construction Works
3 Most Important In-situ Soil Tests for Construction Works3 Most Important In-situ Soil Tests for Construction Works
3 Most Important In-situ Soil Tests for Construction Works
 
Construction Project Schedule Template- Residential Building
Construction Project Schedule Template- Residential BuildingConstruction Project Schedule Template- Residential Building
Construction Project Schedule Template- Residential Building
 
All About Construction Labour Planning- Excel Template
All About Construction Labour Planning- Excel TemplateAll About Construction Labour Planning- Excel Template
All About Construction Labour Planning- Excel Template
 
10 Powerful Construction Cost Estimation Steps
10 Powerful Construction Cost Estimation Steps10 Powerful Construction Cost Estimation Steps
10 Powerful Construction Cost Estimation Steps
 
Construction Material Estimate with MS Excel file
Construction Material Estimate with MS Excel fileConstruction Material Estimate with MS Excel file
Construction Material Estimate with MS Excel file
 
Managing the Construction Claims Effectively
Managing the Construction Claims EffectivelyManaging the Construction Claims Effectively
Managing the Construction Claims Effectively
 
How Does MS Project Works 6- Task Controlling Factors
How Does MS Project Works 6- Task Controlling FactorsHow Does MS Project Works 6- Task Controlling Factors
How Does MS Project Works 6- Task Controlling Factors
 
Most Popular 20 Evergreen Project Management Terms
Most Popular 20 Evergreen Project Management TermsMost Popular 20 Evergreen Project Management Terms
Most Popular 20 Evergreen Project Management Terms
 
Top 5 Concrete Quality Control Methods at Site
Top 5 Concrete Quality Control Methods at SiteTop 5 Concrete Quality Control Methods at Site
Top 5 Concrete Quality Control Methods at Site
 
My 5 Learnings of Waterfall Project Management
My 5 Learnings of Waterfall Project ManagementMy 5 Learnings of Waterfall Project Management
My 5 Learnings of Waterfall Project Management
 
Construction Project Schedule Example- Residential Building
Construction Project Schedule Example- Residential BuildingConstruction Project Schedule Example- Residential Building
Construction Project Schedule Example- Residential Building
 
5 Popular Types of Construction Contracts
5 Popular Types of Construction Contracts5 Popular Types of Construction Contracts
5 Popular Types of Construction Contracts
 
Project Time Estimation 6 Powerful Tips & Tricks
Project Time Estimation 6 Powerful Tips & TricksProject Time Estimation 6 Powerful Tips & Tricks
Project Time Estimation 6 Powerful Tips & Tricks
 
Types of Building Foundations- Shallow and Deep
Types of Building Foundations- Shallow and DeepTypes of Building Foundations- Shallow and Deep
Types of Building Foundations- Shallow and Deep
 
DCMA 14-Point Schedule Quality Check
DCMA 14-Point Schedule Quality CheckDCMA 14-Point Schedule Quality Check
DCMA 14-Point Schedule Quality Check
 
Basics of Contract Management
Basics of Contract ManagementBasics of Contract Management
Basics of Contract Management
 

Recently uploaded

Introduction to Geographic Information Systems
Introduction to Geographic Information SystemsIntroduction to Geographic Information Systems
Introduction to Geographic Information SystemsAnge Felix NSANZIYERA
 
Augmented Reality (AR) with Augin Software.pptx
Augmented Reality (AR) with Augin Software.pptxAugmented Reality (AR) with Augin Software.pptx
Augmented Reality (AR) with Augin Software.pptxMustafa Ahmed
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARKOUSTAV SARKAR
 
Introduction to Robotics in Mechanical Engineering.pptx
Introduction to Robotics in Mechanical Engineering.pptxIntroduction to Robotics in Mechanical Engineering.pptx
Introduction to Robotics in Mechanical Engineering.pptxhublikarsn
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiessarkmank1
 
Introduction to Data Visualization,Matplotlib.pdf
Introduction to Data Visualization,Matplotlib.pdfIntroduction to Data Visualization,Matplotlib.pdf
Introduction to Data Visualization,Matplotlib.pdfsumitt6_25730773
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaOmar Fathy
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsvanyagupta248
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...HenryBriggs2
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwaitjaanualu31
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdfKamal Acharya
 
8086 Microprocessor Architecture: 16-bit microprocessor
8086 Microprocessor Architecture: 16-bit microprocessor8086 Microprocessor Architecture: 16-bit microprocessor
8086 Microprocessor Architecture: 16-bit microprocessorAshwiniTodkar4
 
👉 Yavatmal Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top Class Call Girl S...
👉 Yavatmal Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top Class Call Girl S...👉 Yavatmal Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top Class Call Girl S...
👉 Yavatmal Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top Class Call Girl S...manju garg
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.Kamal Acharya
 
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...ronahami
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayEpec Engineered Technologies
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdfKamal Acharya
 

Recently uploaded (20)

Introduction to Geographic Information Systems
Introduction to Geographic Information SystemsIntroduction to Geographic Information Systems
Introduction to Geographic Information Systems
 
Augmented Reality (AR) with Augin Software.pptx
Augmented Reality (AR) with Augin Software.pptxAugmented Reality (AR) with Augin Software.pptx
Augmented Reality (AR) with Augin Software.pptx
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 
Introduction to Robotics in Mechanical Engineering.pptx
Introduction to Robotics in Mechanical Engineering.pptxIntroduction to Robotics in Mechanical Engineering.pptx
Introduction to Robotics in Mechanical Engineering.pptx
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and properties
 
Introduction to Data Visualization,Matplotlib.pdf
Introduction to Data Visualization,Matplotlib.pdfIntroduction to Data Visualization,Matplotlib.pdf
Introduction to Data Visualization,Matplotlib.pdf
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
8086 Microprocessor Architecture: 16-bit microprocessor
8086 Microprocessor Architecture: 16-bit microprocessor8086 Microprocessor Architecture: 16-bit microprocessor
8086 Microprocessor Architecture: 16-bit microprocessor
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
👉 Yavatmal Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top Class Call Girl S...
👉 Yavatmal Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top Class Call Girl S...👉 Yavatmal Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top Class Call Girl S...
👉 Yavatmal Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top Class Call Girl S...
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
 
Signal Processing and Linear System Analysis
Signal Processing and Linear System AnalysisSignal Processing and Linear System Analysis
Signal Processing and Linear System Analysis
 

5 Must Know Types of Concrete Testing for Civil Engineers

  • 1. 1/9 Civilverse Admin 25 July 2021 5 Must-Know Types of Concrete Testing for Civil Engineers civilverse.org/concrete-testing Table of Contents for Concrete Testing- 1. What are the methods of concrete testing? 2. Test 1: Workability Tests 3. Test 2: Temperature Tests 4. Test 3: Concrete Setting Tests 5. Test 4: Compressive Strength Test 6. Test 5: Permeability Tests 7. Conclusion
  • 2. 2/9 What are the methods of concrete testing? The concrete is tested for quality in the fresh state as well as the hardened state. The tests conducted on fresh concrete are as follows- Workability Test Temperature Test Setting Test Air Content Unit Weight Heat Generation Bleeding Segregation Resistance etc. The hardened concrete is tested for- Compressive Strength Modulus of Elasticity Tensile Strength Permeability Absorption Density Shrinkage Bond Abrasion etc.
  • 3. 3/9 The quality control of concrete strictly requires tests for workability, temperature, compressive strength etc. The necessity and frequency of other tests are determined by the Engineer-in-charge or the organisational QA program. The tests on fresh concrete are done at the point of production and point of placing concrete. The fresh concrete samples are taken for testing and the results are immediately published to evaluate the concrete quality against the standards. The tests on hardened concrete are done after the concrete achieve sufficient strength. These tests are generally carried out in the laboratory. This article covers three fresh concrete tests and two hardened concrete tests that are must-know for all Civil Engineers. Before moving ahead, the sampling of concrete for all the tests shall be done following IS 1199. Test 1: Workability Tests The workability of concrete is the measure of ease of working with concrete. The term ‘working with concrete’ non-exhaustively implies preparation, mixing, transporting, placing and compaction. The workability increases with the increase in the water-cement ratio. Highly workable concrete is liable for shrinkage, develop lesser strength etc. Importance of Workability Tests- The workability of concrete ensures easy transportation, superior pumping ability, better filling and compaction. However, it also deteriorates the strength of the concrete. Hence, it becomes necessary to keep a balance between the workability and strength parameters. There are five methods of testing the workability of concrete- Slump Test Compaction Factor Test Flow Test Vee Bee Time Test Kelly Ball Test In this article, I shall briefly explain only the first three methods and save the minute details and the other two methods for a dedicated article on the workability of concrete. Relevant Codes: IS 1199, ACI 318-19, ASTM C-143 1.1 Slump Test The slump test is also known as the slump cone test. A conical frustum of base diameter 200 mm, top diameter 100 mm and height of 300 mm known as slump cone is used as apparatus for it. It is the most common method of testing the workability of concrete at the site. Although, it is widely accepted yet the results are not fully reliable.
  • 4. 4/9 The method of performing the slump test as per IS code is mentioned below- The cone is cleaned and placed on a levelled surface generally over a metal plate. The concrete is filled into the slump cone into three layers. Each layer is uniformly compacted 25 times by a 16mm diameter steel rod. After filling concrete till the top of the cone, the top surface of concrete is levelled with a trowel. Remove the mould vertically without disturbing the concrete. After the concrete settles down, measure the settlement of concrete. This measurement is reported in millimeters and called ‘slump’. Slump Test for Workability Suitability of Slump Test- The slump test is suitable for medium workability of concrete i.e., the slump of 20-150 mm. Result Interpretation- The ideal slump value should be as low as possible. This represents the lower water-cement ratio hence better strength gain and lower shrinkage. However, due to placing and compaction limitations at the site, the slump value is increased to increase the workability. 1.2 Compaction Factor Test Compaction Factor Test measures the workability of concrete by self-compaction achieved due to falling from height. The apparatus contains two hoppers over each other and a cylinder at the bottom. Each hopper is fitted with a trap door at its’ bottom. The method of performing the compaction factor test by IS code is mentioned below- Fill the first hopper completely with concrete and level the top with a trowel. Open the first hopper trap door to allow concrete to fall into the second hopper. Now open the trap door of second hopper and let the concrete fall into the cylinder. Weigh the concrete in the cylinder. Record it as W1. Now, again fill the concrete directly into the cylinder in three layers with uniform compaction of each layer by 16 mm diameter rod. Record the weight of the compacted concrete as W2.
  • 5. 5/9 Calculate the compaction factor by dividing W1 by W2. Compacting Factor Test Apparatus. Pic Credit- Civilread Suitability of Compaction Factor Test- The compaction factor test is suitable for concrete having very little workability. The concrete that is to be vibrated is tested by this method. Result Interpretation- The value of the compaction factor for normal workable concrete lies between 0.80 – 0.92. The higher the compaction factor, the higher is the workability. 1.3 Flow Test Flow test of Flow Table test is done for highly workable concrete. The test checks the consistency of concrete. The apparatus mainly contains a 70 cm x 70 cm table and a cone of 25 cm bottom diameter, 17 cm top diameter and 30 cm height. The method of performing the flow table test by IS code is mentioned below- The cone is placed over the wet table and filled with concrete into two layers. Each layer is tamped 25 times by a standard tamping rod. The cone is lifted and the concrete is allowed to flow. The table is lifted for some height and dropped to further allow the flow of concrete. The flow diameter of concrete is measured in six directions and their average is recorded as ‘D’. The flow % is calculated as {(D-25)/25} x 100. Suitability of Flow Table Test- The test is unsuitable for the low slump concrete. Result Interpretation- The flow % percentage represents the consistency of the concrete. The higher the flow %, the higher is the consistency.
  • 6. 6/9 Concrete Flow Table Test Apparatus. Pic Credit- concrete.org.uk Test 2: Temperature Test The temperature test is relatively simpler as compared to other tests. The only equipment required for testing is the thermometer. Importance of Temperature Test- Thecement-water reaction is exothermic. Thus, to aid the chemical reaction to progress positively, the concrete temperature must be kept low. High concrete temperature also quickly evaporates the free water. Hence, it becomes necessary to check the concrete temperature at the batching plant and the poring placing. Relevant Code- IS 7861-1 Result Interpretation- The ideal temperature for concrete to be placed is 10-32 degrees centigrade. A lower temperature is better for strength development and lesser pore water loss. The suitable methods shall be applied in hot regions to keep the concrete temperature low. Test 3: Concrete Setting Tests The concrete sets on mixing with water. The setting of concrete is defined in terms of initial setting time and final setting time. It should be clearly noted that the setting of concrete is related to the plasticity of concrete and not the strength gain. Importance of Concrete Setting Tests- The concrete setting times are useful in determining the maximum allowed transportation time, placing time and finishing time etc. For different conditions, the concrete can be suitably mixed with additives that alter its’ setting time. Relevant Codes: IS 8142, ASTM C191, ASTM C403, ASTM C266, ASTM C953 3.1 Initial & Final Setting Time
  • 7. 7/9 Concrete Setting Time Apparatus The initial setting time of concrete is the time after which the concrete starts losing its’ plasticity. The final setting time of concrete is the time by which the concrete loses all of its’ plasticity. The Penetration Resistance Apparatus is used to determine the setting time of concrete. The step-by-step procedure to conduct the initial setting time test by IS code is as follows- A mortar test specimen sieved by IS 4.75 mm sieve from fresh concrete. The mortar is filled into a container in 50 mm layers and compacted. The minimum final height of the mortar specimen is 140 mm. The specimen is cleared of bleeding water from the surface and placed under the apparatus. The needle of the apparatus is brought to the level of specimen surface and a constant force is applied. The force applied and the time elapsed since cement and water mixing is recorded. For normal concrete at normal temperature, repeat the test after 3-4 hours of first test and keep repeating after every 1 hour of it. Continue the tests until the penetration resistance is 275 kgf/cm^2. Result Interpretation- The setting time is defined as the elapsed time since mixing cement and water at which the penetration resistance is 35 kgf/cm^2. The final setting time is the elapsed time at which the penetration resistance is 275 kgf/cm^2. The result is reported in hours and minutes. Test 4: Compressive Strength Tests The compressive strength is the key characteristic of concrete. However, it develops cracks even if exposed to mild tension. The test can be conducted on a 150 x150 x 150 mm sized concrete cube or concrete cylinder of 150 mm diameter and 300mm height. Relevant Codes: IS 516 for the testing procedure and IS 456 for sampling frequency. ACI-318. The general steps for testing the compressive strength of concrete as per IS code is as follows- The oiled moulds are filled with concrete and well compacted. The top surface of concrete is levelled with the mould and excess concrete is strike- off by a trowel.
  • 8. 8/9 After 24 hours, the cube/cylinder is carefully removed from the mould and put underwater for curing. The samples are marked with the grade of concrete and casting date. After completing the curing period of 7 days, half of the samples (at least 3) are placed in compression testing machine one-by-one and the value at which sample develops crack is noted. The average of samples is recorded as 7-day mean compressive strength of the sample. Same procedure is repeated for 28-day mean compressive strength. Compressive Strength Testing Machine Result Interpretation- The concrete is generally tested for 7 days & 28 days compressive strength. In some cases, it can also be tested for 3 days as well. The 3 days, 7 days and 28 days strength should be equal to or more than the 50%, 66% and 99.99% of the target mean strength respectively. Test 5: Permeability Tests The permeability is the property of concrete that allows the flow of water through it. The permeability test of concrete should not be confused with the water absorption test of concrete. Importance of Concrete Setting Tests- The water causes corrosion to the reinforcement. It is a well-known fact that as the steel corrodes its’ volume increases and cracks the concrete. Hence, the permeable concrete will be susceptible to cracks and early deterioration due to corrosion of reinforcement. Therefore, it is necessary to check for permeability especially for underwater concrete or concrete frequently exposed to liquids. Relevant Codes: IS 3085, ACI 228.2R The test procedure for testing the permeability of concrete as per IS code is mentioned below-
  • 9. 9/9 Three number cylindrical samples of 200 mm diameter and 120mm height re prepared. After 24 hours, the middle 100 mm diameter is roughened and remaining portion is sealed with cement paste. The samples are then cured for 28 days. After completing the curing period, the roughened portion is applied with water pressure of 1 bar for 48 hours, 3 bars for next 24 hours and 7 bars for another 24 hours. The samples are then split by compression machine to study the water penetration depth and recorded for each sample. The average of water penetration depth is recorded. Permeability Test Appratus for Concrete Result Interpretation- The depth of water penetration should not exceed 25 mm else; the sample is considered to fail. Conclusion The five tests mentioned in the article are non-exhaustive. As already mentioned above, these tests are essential and conducted to ascertain the quality of concrete. However, quality assurance and control should start from purchasing material to curing and maintaining the concrete. For complete concrete quality control, follow these five steps that will enable you to meet the concrete quality standards. The correction methods for the shortcomings in concrete shall be well discussed with the Engineer- In-Charge and laid down in QAP. The standardisation of correction methods shall ensure the overall quality control and prevent wastage of material. Read more about the futuristic concrete types here. The list of IS codes for all the tests can be read here.