All About Construction Labour Planning- Excel
Template
civilverse.org/construction-labour-planning
Table of Contents for Construction Labour Planning- Excel
1. Introduction
2. Need of Construction Labour Planning
3. Steps for Construction Labour Planning
4. Measurement of Construction Labour Productivity
5. Download Construction Labour Planning Excel
6. Attrition Rate Consideration
7. Cost Consideration
8. Conclusion
Labour Calculator Excel Template- Download the excel file below on this page
1. Introduction
The construction activities are getting lean day by day. The construction manpower needs
to be planned for each type of activity to ensure maximum utilization. This will save time
and cost. The quality is also controlled by deploying skilled manpower to the job.
The construction sector is one of the biggest employers in the world. As per a 2014 report,
the construction sector employs 8.6% of the total employees across the world. Another
report indicates, India had 40 million construction sector jobs in 2013 & expected to grow
2/5
to 67 Million by 2022. With the increasing construction activities, the need for skilled
manpower will be more than ever.
In this article, I will guide you through the construction labour planning process. Starting
with the need for labour planning, moving ahead with steps for construction manpower
planning, measurement of productivity, the construction manpower planning template,
attrition rate and the cost consideration. The article will be concluded with the final
remarks on the various points explained.
2. Need of Construction Labour Planning
The construction projects operate under scope, time and cost constraints. Labour
productivity is one of the key factors governing time & cost. The time taken by an activity
is inversely proportional to the productivity of labour with a lower limit on minimum
time. The labour cost is 30-50% of the total project cost (for my current project it comes
around 35%).
The construction manpower planning has helped me ensuring the following aspects for
my projects-
a. Reduction in labour cost hence the overall project cost.
b. Better quality of work.
c. Timely completion of job, thus lesser delays, EOTs and delay claims etc.
d. Better supervision of labour.
e. Development of phase wise labour mobilization/demobilization plan.
f. Labour accommodation facility development.
3/5
g. Cash flow requirement generation for wages, incentives, food, etc.
The advantages of construction manpower planning are project-specific and depend upon
the contract type. However, the multiple benefits can’t be ignored. The advantages also
depend upon the efficiency of planning and its’ implementation.
3. Steps of Construction Labour Planning
The construction labour planning is done in conjugation with the project schedule
development. The duration for an activity is estimated based on either of these methods.
Considering the work to be done, the complexity of the job and the labour productivity the
duration can also be estimated.
The below-stated points summarize the complete process of construction labour planning.
Collection of Inputs- The input for construction manpower planning are the
types of activities, work quantities, required skills and experience of labours,
productivity standards, tentative project timeline, deadlines for the project and
organizational template, if any.
Assessment of Manpower Requirement- The manpower requirement is
assessed from the historical data of previous projects of similar nature. If such data
is unavailable, the calculations are to be made. The formula for the per day
manpower calculation is-
Sorting & Grouping- The manpower required for each of the activity is sorted as
per their category i.e., carpenter, mason, fitter, welder, helper etc. Each category
man-days are summed up.
Plotting of Man-days on Project Timeline- Category wise man-days are
plotted against the project timeline. The daily category wise requirement of
manpower is be ascertained in this step.
Manpower Levelling- The requirement of manpower for some days can be higher
than other days. Hence, it is not possible to mobilize/demobilize the manpower so
quickly. Thus, problem is tackled by preponing or postponing the non-critical
activities as such that the daily demand becomes more or less same.
Preparation of Mobilization Plan- The mobilization plan is prepared for the
week / month. The levelled manpower is arranged to be mobilized to the site in
batches as per the calculated requirement.
5. Measurement of Construction Labour Productivity
The construction labour productivity measurement is essential to monitor and control the
progress. The productivity measurement ensures if the desired output is being achieved.
If not, the corrective actions need to be implemented.
4/5
The productivity measurement is a ratio of output to input.
The output is the work done per day and the input is the number of man-days consumed
to complete the work.
The unit of productivity is the work unit per day. The work units for different types of
works are different. The concrete poured is measured in cubic-meter, shuttering in
square-meter, excavation in cubic-meter, reinforcement bars tying in kg or MT, 9” thick
brickwork in cubic-meter, 4.5” thick brickwork in square-meter etc.
6. Construction Labour Planning Excel
The construction labour planning Excel sheet attached herewith helps calculate the labour
required for the day. The various types of works like shuttering, concrete pouring,
reinforcement cutting-bending & tying, blockwork, plaster and tiling are covered. Each
type of work has been detailed into various forms like foundation, columns, beams,
soffits, slabs etc.
The input required for the construction labour calculation by the sheet is work quantity
for the day and the working hours per day. The sheet calculates the labours and divides
them into the category.
Download Labour Calculator Excel
7. Attrition Rate Consideration
The attrition rate is the turnover rate. Out of all the labourers mobilized at the site, some
do not stay back and work. There might be several reasons for them returning. Thus, the
turnover can lead to a shortfall of manpower at work and hence delay in work as they
cannot be replaced immediately (especially skilled labour).
A suitable attrition rate should be considered while mobilizing the manpower. The
labours should be mobilized in excess as per the attrition rate. For example, if 100 Nos.
manpower is required for the work and the attrition rate is 10%, the mobilization plan
should be for 110 Nos. (100 + 100 x 10%) manpower.
The formula to calculate the attrition rate is as follows-
5/5
The attrition rate depends upon various factors. For my current project, the attrition rate
is as high as 10% for the week and 25% for the month. This means 10% of the mobilized
labour return within a week and 25% labourers return within a month. The high attrition
is due to extreme weather, remote location, the higher price of commodities in the local
market, connectivity, etc.
8. Cost Consideration
The cost involved in the labour aspect depends upon the contractual terms. For unit rate
contract & lump sum contract, the client doesn’t have to worry about the labour wage, he
only has to pay for as per the work executed. The contractor pays the wage or he can
further sub-contract the work. For time & material contract, cost-plus contract and target
cost contract, the client pays for the labour as per the usage.
The additional costs that are incurred other than the wages are the labour
accommodation, transportation charges, insurances, workers’ license, food, incentives,
additional allowances, bonus etc. The scope for these costs is also mentioned in the
contract.
9. Conclusion
Construction labour planning has proved to be an essential and critical step in project
planning. The over-estimates lead to additional cost and the lower estimates cause delay
to the project. It is a key challenge for the estimator to maintain a perfect balance for
manpower estimation.
The attrition rate for the manpower should be suitably adopted. Historical data for the
similar nature of projects in the nearby locations of the project can be referred to for
better estimates. Too high or too low assumptions shows the inability of the team to find
the balance.
The direct and indirect costs for manpower are to be considered in the contract. For
lump-sum and unit price contracts, the indirect costs should be covered in prices.
Liked the article? Share your thoughts in the comments. Also, let me know your insights.
Happy Engineering!

More Related Content

What's hot

Rate analysis in civil engineering
Rate analysis in civil engineeringRate analysis in civil engineering
Rate analysis in civil engineeringKailash Chander
 
Construction contracts docuements_08092008
Construction contracts docuements_08092008Construction contracts docuements_08092008
Construction contracts docuements_08092008AYM1979
 
03 Construction Project Planning and Scheduling
03 Construction Project Planning and Scheduling03 Construction Project Planning and Scheduling
03 Construction Project Planning and Schedulingakashpadole
 
Construction Scheduling, Work Study and Work Measurement _ Unit 2 _ Construct...
Construction Scheduling, Work Study and Work Measurement _ Unit 2 _ Construct...Construction Scheduling, Work Study and Work Measurement _ Unit 2 _ Construct...
Construction Scheduling, Work Study and Work Measurement _ Unit 2 _ Construct...Shrikant Kate
 
Lecture 1 introduction to construction procurement process.
Lecture 1   introduction to construction procurement process.Lecture 1   introduction to construction procurement process.
Lecture 1 introduction to construction procurement process.Aszahari Aie
 
construction project planing
 construction project planing construction project planing
construction project planingSANJEEV Wazir
 
022 Construction Productivity (PART 1)
022 Construction Productivity (PART 1)022 Construction Productivity (PART 1)
022 Construction Productivity (PART 1)Dr Fereidoun Dejahang
 
Construction Material Management
Construction Material ManagementConstruction Material Management
Construction Material ManagementPriya Ramaraj
 
Site organization in Construction
Site organization in ConstructionSite organization in Construction
Site organization in ConstructionSamsonFemiAdesope
 
Chapter 2 construction project planning and scheduling
Chapter 2 construction project planning and schedulingChapter 2 construction project planning and scheduling
Chapter 2 construction project planning and schedulingSubash Bhattarai
 
Project scheduling and resource levelling_Construction Management
Project scheduling and resource levelling_Construction Management Project scheduling and resource levelling_Construction Management
Project scheduling and resource levelling_Construction Management A Makwana
 
Construction Project Management
Construction Project ManagementConstruction Project Management
Construction Project ManagementAravind Samala
 
Construction Management full lecture note-By Melese Mengistu.pdf
Construction Management full lecture note-By Melese Mengistu.pdfConstruction Management full lecture note-By Melese Mengistu.pdf
Construction Management full lecture note-By Melese Mengistu.pdfMeleseMengistu
 
Tenders contract -arti
Tenders contract -artiTenders contract -arti
Tenders contract -artijagadish108
 
THUMB RULE FOR CIVIL WORKS LABOUR PRODUCTIVITY
THUMB RULE FOR CIVIL WORKS LABOUR PRODUCTIVITYTHUMB RULE FOR CIVIL WORKS LABOUR PRODUCTIVITY
THUMB RULE FOR CIVIL WORKS LABOUR PRODUCTIVITYSSudhaVelan
 

What's hot (20)

Rate analysis in civil engineering
Rate analysis in civil engineeringRate analysis in civil engineering
Rate analysis in civil engineering
 
Construction contracts docuements_08092008
Construction contracts docuements_08092008Construction contracts docuements_08092008
Construction contracts docuements_08092008
 
03 Construction Project Planning and Scheduling
03 Construction Project Planning and Scheduling03 Construction Project Planning and Scheduling
03 Construction Project Planning and Scheduling
 
Construction Scheduling, Work Study and Work Measurement _ Unit 2 _ Construct...
Construction Scheduling, Work Study and Work Measurement _ Unit 2 _ Construct...Construction Scheduling, Work Study and Work Measurement _ Unit 2 _ Construct...
Construction Scheduling, Work Study and Work Measurement _ Unit 2 _ Construct...
 
Lecture 1 introduction to construction procurement process.
Lecture 1   introduction to construction procurement process.Lecture 1   introduction to construction procurement process.
Lecture 1 introduction to construction procurement process.
 
Project Scheduling & Controls
Project Scheduling & ControlsProject Scheduling & Controls
Project Scheduling & Controls
 
construction project planing
 construction project planing construction project planing
construction project planing
 
022 Construction Productivity (PART 1)
022 Construction Productivity (PART 1)022 Construction Productivity (PART 1)
022 Construction Productivity (PART 1)
 
Construction Material Management
Construction Material ManagementConstruction Material Management
Construction Material Management
 
Site organization in Construction
Site organization in ConstructionSite organization in Construction
Site organization in Construction
 
Chapter 2 construction project planning and scheduling
Chapter 2 construction project planning and schedulingChapter 2 construction project planning and scheduling
Chapter 2 construction project planning and scheduling
 
Project scheduling and resource levelling_Construction Management
Project scheduling and resource levelling_Construction Management Project scheduling and resource levelling_Construction Management
Project scheduling and resource levelling_Construction Management
 
BIM
BIMBIM
BIM
 
Cost value reconciliation (cvr)
Cost value reconciliation (cvr)Cost value reconciliation (cvr)
Cost value reconciliation (cvr)
 
Construction Project Management
Construction Project ManagementConstruction Project Management
Construction Project Management
 
Construction Management full lecture note-By Melese Mengistu.pdf
Construction Management full lecture note-By Melese Mengistu.pdfConstruction Management full lecture note-By Melese Mengistu.pdf
Construction Management full lecture note-By Melese Mengistu.pdf
 
Tenders contract -arti
Tenders contract -artiTenders contract -arti
Tenders contract -arti
 
THUMB RULE FOR CIVIL WORKS LABOUR PRODUCTIVITY
THUMB RULE FOR CIVIL WORKS LABOUR PRODUCTIVITYTHUMB RULE FOR CIVIL WORKS LABOUR PRODUCTIVITY
THUMB RULE FOR CIVIL WORKS LABOUR PRODUCTIVITY
 
Construction Planning
Construction PlanningConstruction Planning
Construction Planning
 
inventory control for construction
inventory control for constructioninventory control for construction
inventory control for construction
 

Similar to All About Construction Labour Planning- Excel Template

Evaluate the effective resource management through pert analysis
Evaluate the effective resource management through pert analysisEvaluate the effective resource management through pert analysis
Evaluate the effective resource management through pert analysiseSAT Publishing House
 
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...IRJET Journal
 
Tracking a Typical Apartment Construction using Earned Value Management
Tracking a Typical Apartment Construction using Earned Value ManagementTracking a Typical Apartment Construction using Earned Value Management
Tracking a Typical Apartment Construction using Earned Value ManagementIRJET Journal
 
IRJET- Implementing Time and Cost Optimization in Commercial Building using P...
IRJET- Implementing Time and Cost Optimization in Commercial Building using P...IRJET- Implementing Time and Cost Optimization in Commercial Building using P...
IRJET- Implementing Time and Cost Optimization in Commercial Building using P...IRJET Journal
 
Introduction of civil engineering.pdf
Introduction of civil engineering.pdfIntroduction of civil engineering.pdf
Introduction of civil engineering.pdfbkbk37
 
TIME & RESOURCE PLANNING,MANAGEMENT SOFTWARE
TIME & RESOURCE PLANNING,MANAGEMENT SOFTWARETIME & RESOURCE PLANNING,MANAGEMENT SOFTWARE
TIME & RESOURCE PLANNING,MANAGEMENT SOFTWAREKHUSHBU SHAH
 
IRJET- Application of Microsoft Project for Planning and Scheduling of a Resi...
IRJET- Application of Microsoft Project for Planning and Scheduling of a Resi...IRJET- Application of Microsoft Project for Planning and Scheduling of a Resi...
IRJET- Application of Microsoft Project for Planning and Scheduling of a Resi...IRJET Journal
 
Lec.1 Introduction to Estimation
Lec.1   Introduction to EstimationLec.1   Introduction to Estimation
Lec.1 Introduction to EstimationMuthanna Abbu
 
Industrial Engineering & Operation Research Lecture Notes
Industrial Engineering & Operation Research Lecture NotesIndustrial Engineering & Operation Research Lecture Notes
Industrial Engineering & Operation Research Lecture NotesFellowBuddy.com
 
Resource Optimization in Mivan Construction Project
Resource Optimization in Mivan Construction ProjectResource Optimization in Mivan Construction Project
Resource Optimization in Mivan Construction ProjectIRJET Journal
 
Earned value analysis for a construction project
Earned value analysis for a construction projectEarned value analysis for a construction project
Earned value analysis for a construction projectIAEME Publication
 
EARNED VALUE ANALYSIS FOR A CONSTRUCTION PROJECT
EARNED VALUE ANALYSIS FOR A CONSTRUCTION PROJECTEARNED VALUE ANALYSIS FOR A CONSTRUCTION PROJECT
EARNED VALUE ANALYSIS FOR A CONSTRUCTION PROJECTIAEME Publication
 
Critical Study, Analysis and Suggestion for Labor Productivity Improvement in...
Critical Study, Analysis and Suggestion for Labor Productivity Improvement in...Critical Study, Analysis and Suggestion for Labor Productivity Improvement in...
Critical Study, Analysis and Suggestion for Labor Productivity Improvement in...IRJET Journal
 
IDENTIFICATION OF FACTORS CAUSING TIME AND COST OVERRUN IN CONSTRUCTION PROJE...
IDENTIFICATION OF FACTORS CAUSING TIME AND COST OVERRUN IN CONSTRUCTION PROJE...IDENTIFICATION OF FACTORS CAUSING TIME AND COST OVERRUN IN CONSTRUCTION PROJE...
IDENTIFICATION OF FACTORS CAUSING TIME AND COST OVERRUN IN CONSTRUCTION PROJE...IRJET Journal
 
IIRJET-Cost Control Techniques for Construction Project
IIRJET-Cost Control Techniques for Construction ProjectIIRJET-Cost Control Techniques for Construction Project
IIRJET-Cost Control Techniques for Construction ProjectIRJET Journal
 
ACHAL_JOSHI_Academic_Profile
ACHAL_JOSHI_Academic_ProfileACHAL_JOSHI_Academic_Profile
ACHAL_JOSHI_Academic_ProfileACHAL JOSHI
 

Similar to All About Construction Labour Planning- Excel Template (20)

Evaluate the effective resource management through pert analysis
Evaluate the effective resource management through pert analysisEvaluate the effective resource management through pert analysis
Evaluate the effective resource management through pert analysis
 
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
 
Tracking a Typical Apartment Construction using Earned Value Management
Tracking a Typical Apartment Construction using Earned Value ManagementTracking a Typical Apartment Construction using Earned Value Management
Tracking a Typical Apartment Construction using Earned Value Management
 
H1303055462
H1303055462H1303055462
H1303055462
 
IRJET- Implementing Time and Cost Optimization in Commercial Building using P...
IRJET- Implementing Time and Cost Optimization in Commercial Building using P...IRJET- Implementing Time and Cost Optimization in Commercial Building using P...
IRJET- Implementing Time and Cost Optimization in Commercial Building using P...
 
Introduction of civil engineering.pdf
Introduction of civil engineering.pdfIntroduction of civil engineering.pdf
Introduction of civil engineering.pdf
 
TIME & RESOURCE PLANNING,MANAGEMENT SOFTWARE
TIME & RESOURCE PLANNING,MANAGEMENT SOFTWARETIME & RESOURCE PLANNING,MANAGEMENT SOFTWARE
TIME & RESOURCE PLANNING,MANAGEMENT SOFTWARE
 
Workforce planning model
Workforce planning modelWorkforce planning model
Workforce planning model
 
IRJET- Application of Microsoft Project for Planning and Scheduling of a Resi...
IRJET- Application of Microsoft Project for Planning and Scheduling of a Resi...IRJET- Application of Microsoft Project for Planning and Scheduling of a Resi...
IRJET- Application of Microsoft Project for Planning and Scheduling of a Resi...
 
Lec.1 Introduction to Estimation
Lec.1   Introduction to EstimationLec.1   Introduction to Estimation
Lec.1 Introduction to Estimation
 
H1303024956
H1303024956H1303024956
H1303024956
 
Industrial Engineering & Operation Research Lecture Notes
Industrial Engineering & Operation Research Lecture NotesIndustrial Engineering & Operation Research Lecture Notes
Industrial Engineering & Operation Research Lecture Notes
 
Resource Optimization in Mivan Construction Project
Resource Optimization in Mivan Construction ProjectResource Optimization in Mivan Construction Project
Resource Optimization in Mivan Construction Project
 
Earned value analysis for a construction project
Earned value analysis for a construction projectEarned value analysis for a construction project
Earned value analysis for a construction project
 
EARNED VALUE ANALYSIS FOR A CONSTRUCTION PROJECT
EARNED VALUE ANALYSIS FOR A CONSTRUCTION PROJECTEARNED VALUE ANALYSIS FOR A CONSTRUCTION PROJECT
EARNED VALUE ANALYSIS FOR A CONSTRUCTION PROJECT
 
3 estimate considerations
3 estimate considerations3 estimate considerations
3 estimate considerations
 
Critical Study, Analysis and Suggestion for Labor Productivity Improvement in...
Critical Study, Analysis and Suggestion for Labor Productivity Improvement in...Critical Study, Analysis and Suggestion for Labor Productivity Improvement in...
Critical Study, Analysis and Suggestion for Labor Productivity Improvement in...
 
IDENTIFICATION OF FACTORS CAUSING TIME AND COST OVERRUN IN CONSTRUCTION PROJE...
IDENTIFICATION OF FACTORS CAUSING TIME AND COST OVERRUN IN CONSTRUCTION PROJE...IDENTIFICATION OF FACTORS CAUSING TIME AND COST OVERRUN IN CONSTRUCTION PROJE...
IDENTIFICATION OF FACTORS CAUSING TIME AND COST OVERRUN IN CONSTRUCTION PROJE...
 
IIRJET-Cost Control Techniques for Construction Project
IIRJET-Cost Control Techniques for Construction ProjectIIRJET-Cost Control Techniques for Construction Project
IIRJET-Cost Control Techniques for Construction Project
 
ACHAL_JOSHI_Academic_Profile
ACHAL_JOSHI_Academic_ProfileACHAL_JOSHI_Academic_Profile
ACHAL_JOSHI_Academic_Profile
 

More from SHAZEBALIKHAN1

Critical Path Explained With 7 Q&As and a Free Excel Template
Critical Path Explained With 7 Q&As and a Free Excel TemplateCritical Path Explained With 7 Q&As and a Free Excel Template
Critical Path Explained With 7 Q&As and a Free Excel TemplateSHAZEBALIKHAN1
 
5 Project Risk Identification Tools I Use & How You Can Use Them Too
5 Project Risk Identification Tools I Use & How You Can Use Them Too5 Project Risk Identification Tools I Use & How You Can Use Them Too
5 Project Risk Identification Tools I Use & How You Can Use Them TooSHAZEBALIKHAN1
 
Top 20 Standard Contract Clauses Every Manager Should Know
Top 20 Standard Contract Clauses Every Manager Should KnowTop 20 Standard Contract Clauses Every Manager Should Know
Top 20 Standard Contract Clauses Every Manager Should KnowSHAZEBALIKHAN1
 
Residential Building Preliminary Cost Estimate- Excel Template
Residential Building Preliminary Cost Estimate- Excel TemplateResidential Building Preliminary Cost Estimate- Excel Template
Residential Building Preliminary Cost Estimate- Excel TemplateSHAZEBALIKHAN1
 
3 Most Important In-situ Soil Tests for Construction Works
3 Most Important In-situ Soil Tests for Construction Works3 Most Important In-situ Soil Tests for Construction Works
3 Most Important In-situ Soil Tests for Construction WorksSHAZEBALIKHAN1
 
5 Must Know Types of Concrete Testing for Civil Engineers
5 Must Know Types of Concrete Testing for Civil Engineers5 Must Know Types of Concrete Testing for Civil Engineers
5 Must Know Types of Concrete Testing for Civil EngineersSHAZEBALIKHAN1
 
Construction Project Schedule Template- Residential Building
Construction Project Schedule Template- Residential BuildingConstruction Project Schedule Template- Residential Building
Construction Project Schedule Template- Residential BuildingSHAZEBALIKHAN1
 
10 Powerful Construction Cost Estimation Steps
10 Powerful Construction Cost Estimation Steps10 Powerful Construction Cost Estimation Steps
10 Powerful Construction Cost Estimation StepsSHAZEBALIKHAN1
 
Construction Material Estimate with MS Excel file
Construction Material Estimate with MS Excel fileConstruction Material Estimate with MS Excel file
Construction Material Estimate with MS Excel fileSHAZEBALIKHAN1
 
Managing the Construction Claims Effectively
Managing the Construction Claims EffectivelyManaging the Construction Claims Effectively
Managing the Construction Claims EffectivelySHAZEBALIKHAN1
 
How Does MS Project Works 6- Task Controlling Factors
How Does MS Project Works 6- Task Controlling FactorsHow Does MS Project Works 6- Task Controlling Factors
How Does MS Project Works 6- Task Controlling FactorsSHAZEBALIKHAN1
 
Most Popular 20 Evergreen Project Management Terms
Most Popular 20 Evergreen Project Management TermsMost Popular 20 Evergreen Project Management Terms
Most Popular 20 Evergreen Project Management TermsSHAZEBALIKHAN1
 
Top 5 Concrete Quality Control Methods at Site
Top 5 Concrete Quality Control Methods at SiteTop 5 Concrete Quality Control Methods at Site
Top 5 Concrete Quality Control Methods at SiteSHAZEBALIKHAN1
 
My 5 Learnings of Waterfall Project Management
My 5 Learnings of Waterfall Project ManagementMy 5 Learnings of Waterfall Project Management
My 5 Learnings of Waterfall Project ManagementSHAZEBALIKHAN1
 
Construction Project Schedule Example- Residential Building
Construction Project Schedule Example- Residential BuildingConstruction Project Schedule Example- Residential Building
Construction Project Schedule Example- Residential BuildingSHAZEBALIKHAN1
 
5 Popular Types of Construction Contracts
5 Popular Types of Construction Contracts5 Popular Types of Construction Contracts
5 Popular Types of Construction ContractsSHAZEBALIKHAN1
 
Project Time Estimation 6 Powerful Tips & Tricks
Project Time Estimation 6 Powerful Tips & TricksProject Time Estimation 6 Powerful Tips & Tricks
Project Time Estimation 6 Powerful Tips & TricksSHAZEBALIKHAN1
 
Types of Building Foundations- Shallow and Deep
Types of Building Foundations- Shallow and DeepTypes of Building Foundations- Shallow and Deep
Types of Building Foundations- Shallow and DeepSHAZEBALIKHAN1
 
DCMA 14-Point Schedule Quality Check
DCMA 14-Point Schedule Quality CheckDCMA 14-Point Schedule Quality Check
DCMA 14-Point Schedule Quality CheckSHAZEBALIKHAN1
 
Basics of Contract Management
Basics of Contract ManagementBasics of Contract Management
Basics of Contract ManagementSHAZEBALIKHAN1
 

More from SHAZEBALIKHAN1 (20)

Critical Path Explained With 7 Q&As and a Free Excel Template
Critical Path Explained With 7 Q&As and a Free Excel TemplateCritical Path Explained With 7 Q&As and a Free Excel Template
Critical Path Explained With 7 Q&As and a Free Excel Template
 
5 Project Risk Identification Tools I Use & How You Can Use Them Too
5 Project Risk Identification Tools I Use & How You Can Use Them Too5 Project Risk Identification Tools I Use & How You Can Use Them Too
5 Project Risk Identification Tools I Use & How You Can Use Them Too
 
Top 20 Standard Contract Clauses Every Manager Should Know
Top 20 Standard Contract Clauses Every Manager Should KnowTop 20 Standard Contract Clauses Every Manager Should Know
Top 20 Standard Contract Clauses Every Manager Should Know
 
Residential Building Preliminary Cost Estimate- Excel Template
Residential Building Preliminary Cost Estimate- Excel TemplateResidential Building Preliminary Cost Estimate- Excel Template
Residential Building Preliminary Cost Estimate- Excel Template
 
3 Most Important In-situ Soil Tests for Construction Works
3 Most Important In-situ Soil Tests for Construction Works3 Most Important In-situ Soil Tests for Construction Works
3 Most Important In-situ Soil Tests for Construction Works
 
5 Must Know Types of Concrete Testing for Civil Engineers
5 Must Know Types of Concrete Testing for Civil Engineers5 Must Know Types of Concrete Testing for Civil Engineers
5 Must Know Types of Concrete Testing for Civil Engineers
 
Construction Project Schedule Template- Residential Building
Construction Project Schedule Template- Residential BuildingConstruction Project Schedule Template- Residential Building
Construction Project Schedule Template- Residential Building
 
10 Powerful Construction Cost Estimation Steps
10 Powerful Construction Cost Estimation Steps10 Powerful Construction Cost Estimation Steps
10 Powerful Construction Cost Estimation Steps
 
Construction Material Estimate with MS Excel file
Construction Material Estimate with MS Excel fileConstruction Material Estimate with MS Excel file
Construction Material Estimate with MS Excel file
 
Managing the Construction Claims Effectively
Managing the Construction Claims EffectivelyManaging the Construction Claims Effectively
Managing the Construction Claims Effectively
 
How Does MS Project Works 6- Task Controlling Factors
How Does MS Project Works 6- Task Controlling FactorsHow Does MS Project Works 6- Task Controlling Factors
How Does MS Project Works 6- Task Controlling Factors
 
Most Popular 20 Evergreen Project Management Terms
Most Popular 20 Evergreen Project Management TermsMost Popular 20 Evergreen Project Management Terms
Most Popular 20 Evergreen Project Management Terms
 
Top 5 Concrete Quality Control Methods at Site
Top 5 Concrete Quality Control Methods at SiteTop 5 Concrete Quality Control Methods at Site
Top 5 Concrete Quality Control Methods at Site
 
My 5 Learnings of Waterfall Project Management
My 5 Learnings of Waterfall Project ManagementMy 5 Learnings of Waterfall Project Management
My 5 Learnings of Waterfall Project Management
 
Construction Project Schedule Example- Residential Building
Construction Project Schedule Example- Residential BuildingConstruction Project Schedule Example- Residential Building
Construction Project Schedule Example- Residential Building
 
5 Popular Types of Construction Contracts
5 Popular Types of Construction Contracts5 Popular Types of Construction Contracts
5 Popular Types of Construction Contracts
 
Project Time Estimation 6 Powerful Tips & Tricks
Project Time Estimation 6 Powerful Tips & TricksProject Time Estimation 6 Powerful Tips & Tricks
Project Time Estimation 6 Powerful Tips & Tricks
 
Types of Building Foundations- Shallow and Deep
Types of Building Foundations- Shallow and DeepTypes of Building Foundations- Shallow and Deep
Types of Building Foundations- Shallow and Deep
 
DCMA 14-Point Schedule Quality Check
DCMA 14-Point Schedule Quality CheckDCMA 14-Point Schedule Quality Check
DCMA 14-Point Schedule Quality Check
 
Basics of Contract Management
Basics of Contract ManagementBasics of Contract Management
Basics of Contract Management
 

Recently uploaded

MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...RajaP95
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).pptssuser5c9d4b1
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 

Recently uploaded (20)

MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 

All About Construction Labour Planning- Excel Template

  • 1. 1/5 Civilverse Admin 10 July 2021 All About Construction Labour Planning- Excel Template civilverse.org/construction-labour-planning Table of Contents for Construction Labour Planning- Excel 1. Introduction 2. Need of Construction Labour Planning 3. Steps for Construction Labour Planning 4. Measurement of Construction Labour Productivity 5. Download Construction Labour Planning Excel 6. Attrition Rate Consideration 7. Cost Consideration 8. Conclusion Labour Calculator Excel Template- Download the excel file below on this page 1. Introduction The construction activities are getting lean day by day. The construction manpower needs to be planned for each type of activity to ensure maximum utilization. This will save time and cost. The quality is also controlled by deploying skilled manpower to the job. The construction sector is one of the biggest employers in the world. As per a 2014 report, the construction sector employs 8.6% of the total employees across the world. Another report indicates, India had 40 million construction sector jobs in 2013 & expected to grow
  • 2. 2/5 to 67 Million by 2022. With the increasing construction activities, the need for skilled manpower will be more than ever. In this article, I will guide you through the construction labour planning process. Starting with the need for labour planning, moving ahead with steps for construction manpower planning, measurement of productivity, the construction manpower planning template, attrition rate and the cost consideration. The article will be concluded with the final remarks on the various points explained. 2. Need of Construction Labour Planning The construction projects operate under scope, time and cost constraints. Labour productivity is one of the key factors governing time & cost. The time taken by an activity is inversely proportional to the productivity of labour with a lower limit on minimum time. The labour cost is 30-50% of the total project cost (for my current project it comes around 35%). The construction manpower planning has helped me ensuring the following aspects for my projects- a. Reduction in labour cost hence the overall project cost. b. Better quality of work. c. Timely completion of job, thus lesser delays, EOTs and delay claims etc. d. Better supervision of labour. e. Development of phase wise labour mobilization/demobilization plan. f. Labour accommodation facility development.
  • 3. 3/5 g. Cash flow requirement generation for wages, incentives, food, etc. The advantages of construction manpower planning are project-specific and depend upon the contract type. However, the multiple benefits can’t be ignored. The advantages also depend upon the efficiency of planning and its’ implementation. 3. Steps of Construction Labour Planning The construction labour planning is done in conjugation with the project schedule development. The duration for an activity is estimated based on either of these methods. Considering the work to be done, the complexity of the job and the labour productivity the duration can also be estimated. The below-stated points summarize the complete process of construction labour planning. Collection of Inputs- The input for construction manpower planning are the types of activities, work quantities, required skills and experience of labours, productivity standards, tentative project timeline, deadlines for the project and organizational template, if any. Assessment of Manpower Requirement- The manpower requirement is assessed from the historical data of previous projects of similar nature. If such data is unavailable, the calculations are to be made. The formula for the per day manpower calculation is- Sorting & Grouping- The manpower required for each of the activity is sorted as per their category i.e., carpenter, mason, fitter, welder, helper etc. Each category man-days are summed up. Plotting of Man-days on Project Timeline- Category wise man-days are plotted against the project timeline. The daily category wise requirement of manpower is be ascertained in this step. Manpower Levelling- The requirement of manpower for some days can be higher than other days. Hence, it is not possible to mobilize/demobilize the manpower so quickly. Thus, problem is tackled by preponing or postponing the non-critical activities as such that the daily demand becomes more or less same. Preparation of Mobilization Plan- The mobilization plan is prepared for the week / month. The levelled manpower is arranged to be mobilized to the site in batches as per the calculated requirement. 5. Measurement of Construction Labour Productivity The construction labour productivity measurement is essential to monitor and control the progress. The productivity measurement ensures if the desired output is being achieved. If not, the corrective actions need to be implemented.
  • 4. 4/5 The productivity measurement is a ratio of output to input. The output is the work done per day and the input is the number of man-days consumed to complete the work. The unit of productivity is the work unit per day. The work units for different types of works are different. The concrete poured is measured in cubic-meter, shuttering in square-meter, excavation in cubic-meter, reinforcement bars tying in kg or MT, 9” thick brickwork in cubic-meter, 4.5” thick brickwork in square-meter etc. 6. Construction Labour Planning Excel The construction labour planning Excel sheet attached herewith helps calculate the labour required for the day. The various types of works like shuttering, concrete pouring, reinforcement cutting-bending & tying, blockwork, plaster and tiling are covered. Each type of work has been detailed into various forms like foundation, columns, beams, soffits, slabs etc. The input required for the construction labour calculation by the sheet is work quantity for the day and the working hours per day. The sheet calculates the labours and divides them into the category. Download Labour Calculator Excel 7. Attrition Rate Consideration The attrition rate is the turnover rate. Out of all the labourers mobilized at the site, some do not stay back and work. There might be several reasons for them returning. Thus, the turnover can lead to a shortfall of manpower at work and hence delay in work as they cannot be replaced immediately (especially skilled labour). A suitable attrition rate should be considered while mobilizing the manpower. The labours should be mobilized in excess as per the attrition rate. For example, if 100 Nos. manpower is required for the work and the attrition rate is 10%, the mobilization plan should be for 110 Nos. (100 + 100 x 10%) manpower. The formula to calculate the attrition rate is as follows-
  • 5. 5/5 The attrition rate depends upon various factors. For my current project, the attrition rate is as high as 10% for the week and 25% for the month. This means 10% of the mobilized labour return within a week and 25% labourers return within a month. The high attrition is due to extreme weather, remote location, the higher price of commodities in the local market, connectivity, etc. 8. Cost Consideration The cost involved in the labour aspect depends upon the contractual terms. For unit rate contract & lump sum contract, the client doesn’t have to worry about the labour wage, he only has to pay for as per the work executed. The contractor pays the wage or he can further sub-contract the work. For time & material contract, cost-plus contract and target cost contract, the client pays for the labour as per the usage. The additional costs that are incurred other than the wages are the labour accommodation, transportation charges, insurances, workers’ license, food, incentives, additional allowances, bonus etc. The scope for these costs is also mentioned in the contract. 9. Conclusion Construction labour planning has proved to be an essential and critical step in project planning. The over-estimates lead to additional cost and the lower estimates cause delay to the project. It is a key challenge for the estimator to maintain a perfect balance for manpower estimation. The attrition rate for the manpower should be suitably adopted. Historical data for the similar nature of projects in the nearby locations of the project can be referred to for better estimates. Too high or too low assumptions shows the inability of the team to find the balance. The direct and indirect costs for manpower are to be considered in the contract. For lump-sum and unit price contracts, the indirect costs should be covered in prices. Liked the article? Share your thoughts in the comments. Also, let me know your insights. Happy Engineering!