SlideShare a Scribd company logo
1 of 3
ELECTRICAL ENGINEER RESUME
P a g e 1 | 3
Radheya Ravindra Karmarkar [B.E. –Electrical]
Email ID- radheya2631992@gmail.com
Hand phone- +91 9619692691
DOB:-26th March, 1992.
OBJECTIVE
Quest to work in professional atmosphere, which will help me to imbibe as well as impart knowledge about the latest technolog ies in the
world of engineering by virtue of my sincerity, diligence and dedication. I intend to contribute positively towards the growth and
prosperity of the company as I sharpen myself simultaneously.
APPLICATION ENGINNERING EXPERIENCE (Since July 2016)
TOSHIBA-MITSUBISHI ELECTRICAL INDUSTRIAL SYSTEMS INDIA PRIVATE LTD
 Selection of MV Motors and MV Drives as per application suitability.
 Preparing Technical proposal in line with selected MV Motor and MV Drives and customer specification.
 Coordinating with Client/PMC and within departments to customized the selected product or in case of development of
product technology to simplify operational & cost effective solution
 Estimates & Optimization during tendering stage to support customers in budgeting approvals.
 Preparing energy saving calculations.
 Dealing with vendors & subcontractors for brought out items like switchgears, execution contractors to finalize orders by
evaluating credentials of vendors.
 To support the project engineering and execution team in approval and commissioning stages .
 Experience in working in latest engineering software tools like Visio, Intelligent quotation systems & Oracle based
systems.
JOBS HANDLED
Sr No Clients and Enquiries Roles and Responsibilities
1 JSW Steel and Cement 1. Selection of products by defining the application requirements like
Boiler feed water pumps, condensate extraction pumps, cooling water pumps
,Induced draft fans , Forced draft fans, Centrifugal / reciprocating
compressors,sugar mills, kilns, extruders, roller press mills, crushers etc. in
Steel, Power , Oil and gas , petrochemicals , Water ,Fertilizers, Sugar & food
industry .
2. Selection & Preparation of medium voltage active front end/ diode front
end Voltage source inverter drives based on application and applying
engineering tools and evaluation. Applying energy saving calculations by
understanding processes.
3. Selection & Preparation of proposal for safe/hazardous area
horizontal/vertical medium voltage motors with water cooled/air cooled
cooling methods.
4. Experienced on working with water cooled drives selection and
proposals.
5. Experienced in engineering calculations of selections of drives as soft
starters and applying different schemes bumpless transfer, output reactor
selections and precharge requirements.
6. Well versed with selection of switchgear and applying the different
switchgears power and control schemes for MV drives.
7. Well aware about drive and motors testing methods, principles at
factory and sites.
8. Selection and calculations of transformer sizing for converter duty
transformers. Well versed with dry type /oil cooled, open delta/ phase shift
transformers constructions,testing methods etc.
9. Hands on calculating Air conditioning requirement selections.
10. Working experience on Load Commutated Inverter drives
upgradation.
2 BHEL
3 Aditya Birla
4 IOCL
5 Ultratech
6 FLSmidth
7 Linde India
8 Air Products
9
Deepak Fertilizers and Petrochemicals
Limited
10 Rashtriya Chemical Fertilizers
11 Tata Steel
12 Vikram Cement
13 Black & Vetach
14 SKS Ispat and Power co.
ELECTRICAL ENGINEER RESUME
P a g e 2 | 3
15 Bangalore water supply corporation 11. Selection and preparation for synchronous motors excitation and
protection schemes with relay co-ordination study.
12. Strategic planning experience on evaluating tender/ enquiry
performance guaranteed figures and defining them in justified formats
with comparison to competitor’s values and calculating losses in reverse
manner.
EPC EXPERIENCE
SAVAIR ENERGY LIMITED, NAVI MUMBAI (Since July 2013)
 Generating datasheets & technical documents of projects as per IS/IEC standards & its approval from client, PMC
 Preparing BOQ/MTO as per tender drawings & techno-commercial comparison by visiting the sites
 Coordinating with Client/PMC and within departments to resolve bottleneck
 Estimates & Optimization during tendering stage
 Preparing SOQ & SOR for finalizing the services
 Dealing with vendors & subcontractors to finalize orders by evaluating credentials of vendors.
 To support the drafting with technical back-up.
 Design & documentation as per ISO quality systems
PROJECTS HANDLED
Sr No Project Name Responsibilities
LSTK JOBS EXECUTED 1. Selection & Preparation of Motor (IS-325/IEC-60079), cable (IS-7098/IS-
1554), Switchboards & starter panels with type-2 co-ordination (IEC-
600947) drives datasheets.
2. Preparation of Load list & Single line diagrams.
3. Hazardous area equipment selection(OISD-113,IS-5571)
4. Preparation of Power & Control schematics along with logics.
5. Preparation of Lighting layouts & Lighting calculations.(IS-6665).
Performed lighting calculations in DIALUX.
6. Preparation of earthing layout & earthing calculations.(IS-3043)
7. Preparation of electrical cable routing (IS-1255), cable tray selection
(IS-6746, ASTM E-84) & equipment layout.
8.Preparation of purchase specifications for hazardous area equipment’s,
cables & MV feeders
9. Preparation of cable schedule & cable sizing calculations.
10. Designing of Safe area & hazardous area panels in consultation with
panel manufacturers & interfacing of panels with plant automation
system.(BIS-4941/BIS-587)
11. Preparation of electrical substation layouts (OISD-147)
12.Performed HT & LT Motor, Panels (Hazardous area/ safe area) & cable
testing(IS-10810) & commissioning at vendors place as well as at sites
during commissioning
13. Performed Feeder modifications to change existing Trafo- feeder of
6.6kV to motor –feeder so as to make it suitable for VCB at site during
commissioning.
14. Selection & Sizing of transformers (IS-10028), capacitor banks,
battery sizing,UPS (IS-7204).
15. Performed Detailed engineering on PLC.(IEC-61508/IEC-61511)
I/o selections, PLC architecture, logic diagrams & P&ID, calibration of
instruments, instrument datasheets,
16. Performed DCS interfacing for Emerson Delta-V & Siemens S7-300
PLC at ONGC Heera Platform.
1
Installation of IA/UA Screw
Compressor at ONGC Neelam &
Heera Platform
2
Installation of Centrifugal air
compressor at ONGC APU area Uran
3
Laying of fire water network at
ONGC Hazira
4
Balance of work for installation of
BOG Booster Gas Compressor at
Petronet LNG Kochi
5
Installation of BOG Booster gas
compressor at RGPPL- Dabhol
6
Installation of standby flare gas
recovery compressor at ONGC Uran
( Currently working as Lead
Electrical Engineer )
7
New Drinking water network at
ONGC Hazira ( Currently working
as Lead Electrical Engineer )
8
Supply& installation of 6.6KV HT
Motor at ONGC Hazira (As a
project –Coordinator)
COMPRESSOR PACKAGING EXPERIENCE
9
Gas compressor Packaging for HAL
offshore limited ( As a lead Electrical
Electrical Engineer for Packaging
system )
B ESTIMATIONS EXPERIENCE
1
Ahmadabad Asset Gas compressor
Package Project (Project Estimate -88
ELECTRICAL ENGINEER RESUME
P a g e 3 | 3
Cr , Electrical Estimate -12Cr) 17. Performed engineering & construction ofinterfacing the electrical &
instrumentation panels with hot & cold loop testing.
18. Performed engineering on F&G system (IS-2189) like selection
calculation, installation of F&G detectors,manual call points,PAGA
System, telephone system.
19. Experience on deciding billing weightage values of drawings, materials
& construction activities, understanding of planning schedules.
20. AS BUILT drawings dossier preparation.
21. Preparation of Enquiries during estimations, attending the pre-bid
meetings, performing the value engineering by explaining the different
value analysis to the clients.
22. Completing the BOQ’s & costing and performing optimizations by
giving counter rates to vendors & through negotiations.
23. Performed Gas compressor packaging as a lead electrical engineer &
as a company representative for authorized packager for GE- Cameron
Packager.(API-619)
24. Vendor evaluations by visiting manufacturing units, assessing quality
reports & checking documentations & credentials.
25. Played a role Project Coordinator for a small project through which
completed jobs like contract signing,Engineering approvals, vendor &
client co-ordinations, statutory requirements like CCOE &DGMS,
billing planning, accounts & insurance related jobs.
2
Replacement of Sulphur recovery unit
at ONGC Hazira(Project Estimate-
70Cr , Electrical Estimate-7Cr)
3
Up-gradation of firefighting systemat
ONGC Mehasana Asset (Project
Estimate-120Cr, Electrical Estimate-
14Cr)
MAJOR ACHIVEMENTS
 Completed & handover of Atlas Copco make Screw Air Compressor in ONGC -Offshore project, Ingersoll Rand make
Centrifugal Air compressor (ONGC-Uran) & Booster Gas compressor (Petronet LNG) as a lead electrical engineer
by involving in engineering & construction of electrical installations.
 Completed the Handover of by involving in commissioning stage
 Worked on Pre-tendering stage of Booster Gas compressor (Petronet –LNG) & Up-gradation of Drinking water network
(ONGC-Hazira) electrics for balance of services resulted in award of work.
 Completed successful commissioning of 3.3kV MV drive for FD fan application in Deepak Fertilizers and
Petrochemicals.
 Completed the technical and commercial proposal part of SKS Ispat and res olved all queriers raised by client resulting in
4 Nos 6.6kV 1200kVA MV drives order.
KEY SKILLS
 Monitoring and measuring performance
 Ability to prioritize between enquiries & projects
 Ability to pre-plan & ensure continuous input at grass root level to run a business
 An ability to build relationships and establish rapport quickly with the concerned people
 Sense of estimate, knowledge of costing & negotiation with vendor, industrial contacts
 Result oriented work methodology
 Well versed with engineering software-Visio, Oracle , Intelligent quotation systemplatforms, AUTOCAD
& Microsoft Office
DECLARATION
I hereby solemnly affirm that the particulars furnished above are true to the best of my knowledge. I will make it my earnest
endeavor to discharge competently and carefully the duties you may be pleased to entrust with me.
Date:-
Place: - Radheya R Karmarkar

More Related Content

What's hot (20)

Ambrose Elugbe - CV
Ambrose Elugbe - CVAmbrose Elugbe - CV
Ambrose Elugbe - CV
 
Pdv narasimha rao 7+
Pdv narasimha rao 7+Pdv narasimha rao 7+
Pdv narasimha rao 7+
 
RESUME - RAKESH PATEL
RESUME - RAKESH PATELRESUME - RAKESH PATEL
RESUME - RAKESH PATEL
 
ANILCV R
ANILCV RANILCV R
ANILCV R
 
RESUME_25_09_16
RESUME_25_09_16RESUME_25_09_16
RESUME_25_09_16
 
Sankar_ Vaid
Sankar_ VaidSankar_ Vaid
Sankar_ Vaid
 
Control System Engineer Resume
Control System Engineer ResumeControl System Engineer Resume
Control System Engineer Resume
 
Sr Lead Engineer - Instrumentation & control
Sr Lead Engineer - Instrumentation & controlSr Lead Engineer - Instrumentation & control
Sr Lead Engineer - Instrumentation & control
 
RESUME - AMB- N
RESUME - AMB- NRESUME - AMB- N
RESUME - AMB- N
 
Avtar_singh CV 2016
Avtar_singh  CV 2016Avtar_singh  CV 2016
Avtar_singh CV 2016
 
Ankit updated Resume
Ankit updated  ResumeAnkit updated  Resume
Ankit updated Resume
 
resume 04092015
resume 04092015resume 04092015
resume 04092015
 
PDV narasimha Rao 6+ (2)
PDV narasimha Rao 6+ (2)PDV narasimha Rao 6+ (2)
PDV narasimha Rao 6+ (2)
 
cv Rashid Tagelsir updated . -2016
cv Rashid Tagelsir   updated . -2016cv Rashid Tagelsir   updated . -2016
cv Rashid Tagelsir updated . -2016
 
Rama nand yadav cv
Rama nand yadav   cvRama nand yadav   cv
Rama nand yadav cv
 
Resume David Karbach_Feb 2015
Resume David Karbach_Feb 2015Resume David Karbach_Feb 2015
Resume David Karbach_Feb 2015
 
Solar Photovoltaic Power Plant: Best Practices
Solar Photovoltaic Power Plant: Best PracticesSolar Photovoltaic Power Plant: Best Practices
Solar Photovoltaic Power Plant: Best Practices
 
Sandeep Singh
Sandeep SinghSandeep Singh
Sandeep Singh
 
Vasanth_Electrical Engineer_CV_new
Vasanth_Electrical Engineer_CV_newVasanth_Electrical Engineer_CV_new
Vasanth_Electrical Engineer_CV_new
 
Res Sher Chauhan general est Nov 2016
Res  Sher Chauhan general est Nov 2016Res  Sher Chauhan general est Nov 2016
Res Sher Chauhan general est Nov 2016
 

Viewers also liked (14)

ORSRTS16 Built Environment Impacts
ORSRTS16 Built Environment ImpactsORSRTS16 Built Environment Impacts
ORSRTS16 Built Environment Impacts
 
property in Neemrana-Ashu Group,7503367689
property in Neemrana-Ashu Group,7503367689property in Neemrana-Ashu Group,7503367689
property in Neemrana-Ashu Group,7503367689
 
Tdg4
Tdg4Tdg4
Tdg4
 
CV_-_Rene_Campbell 2016
CV_-_Rene_Campbell 2016CV_-_Rene_Campbell 2016
CV_-_Rene_Campbell 2016
 
2 labo tubos dde friccion
2 labo tubos dde friccion2 labo tubos dde friccion
2 labo tubos dde friccion
 
exoticresume
exoticresumeexoticresume
exoticresume
 
Belegui 40%
Belegui  40%Belegui  40%
Belegui 40%
 
Slideshare
SlideshareSlideshare
Slideshare
 
PRSA Travel and Tourism Keynote
PRSA Travel and Tourism KeynotePRSA Travel and Tourism Keynote
PRSA Travel and Tourism Keynote
 
437 draft
437 draft437 draft
437 draft
 
дадаа
дадаададаа
дадаа
 
Ehff porto 2016
Ehff porto 2016Ehff porto 2016
Ehff porto 2016
 
Europrean Health Futures Forum FAN Club Presentation
Europrean Health Futures Forum FAN Club PresentationEuroprean Health Futures Forum FAN Club Presentation
Europrean Health Futures Forum FAN Club Presentation
 
Trabajo practico matematica
Trabajo practico matematicaTrabajo practico matematica
Trabajo practico matematica
 

Similar to RESUME-Radheya Karmarkar

CV-Engineering Manager-Lead Electrical Eng_RFSIASAT
CV-Engineering Manager-Lead Electrical Eng_RFSIASATCV-Engineering Manager-Lead Electrical Eng_RFSIASAT
CV-Engineering Manager-Lead Electrical Eng_RFSIASATRommel Siasat
 
Dhruv patel resume
Dhruv patel resumeDhruv patel resume
Dhruv patel resumeDHRUV PATEL
 
Senior electrical engineer resume
Senior electrical engineer    resumeSenior electrical engineer    resume
Senior electrical engineer resumeVEERABHARATHI MUNI
 
SETHUMADHAVAN SENIOR COMMISSIONING ENGINEER
SETHUMADHAVAN SENIOR  COMMISSIONING ENGINEERSETHUMADHAVAN SENIOR  COMMISSIONING ENGINEER
SETHUMADHAVAN SENIOR COMMISSIONING ENGINEERSETHU MADHAVAN
 
Amol bakane update rockstar
Amol bakane    update rockstarAmol bakane    update rockstar
Amol bakane update rockstaramol bakane
 
Khalid -cv_electrical_engineer (2)
Khalid  -cv_electrical_engineer (2)Khalid  -cv_electrical_engineer (2)
Khalid -cv_electrical_engineer (2)Khalid Eltahir
 
Resume for Electrical design engineer
Resume for Electrical design engineerResume for Electrical design engineer
Resume for Electrical design engineerNISHITKUMAR JOSHI
 
CV_Electrical and Instrumentation Engineer
CV_Electrical and Instrumentation EngineerCV_Electrical and Instrumentation Engineer
CV_Electrical and Instrumentation EngineerDeva Narayanan
 
Khubaib Khan_CV Instrument
Khubaib Khan_CV InstrumentKhubaib Khan_CV Instrument
Khubaib Khan_CV InstrumentKhubaib Khan
 
ICS ENGINEER CV WITH IMAGE (doc)
ICS ENGINEER CV WITH IMAGE (doc)ICS ENGINEER CV WITH IMAGE (doc)
ICS ENGINEER CV WITH IMAGE (doc)Vijayakumar Kumar
 
Electrical Engineer Sajid Akram N (1)
Electrical Engineer Sajid Akram N (1)Electrical Engineer Sajid Akram N (1)
Electrical Engineer Sajid Akram N (1)sajid akram
 
d premanatha reddy_original (2)
d premanatha reddy_original (2)d premanatha reddy_original (2)
d premanatha reddy_original (2)Reddy Premnath
 

Similar to RESUME-Radheya Karmarkar (20)

Resume
ResumeResume
Resume
 
CV-Engineering Manager-Lead Electrical Eng_RFSIASAT
CV-Engineering Manager-Lead Electrical Eng_RFSIASATCV-Engineering Manager-Lead Electrical Eng_RFSIASAT
CV-Engineering Manager-Lead Electrical Eng_RFSIASAT
 
RESUME october 2016 F
RESUME october 2016 FRESUME october 2016 F
RESUME october 2016 F
 
Dhruv patel resume
Dhruv patel resumeDhruv patel resume
Dhruv patel resume
 
Senior electrical engineer resume
Senior electrical engineer    resumeSenior electrical engineer    resume
Senior electrical engineer resume
 
SETHUMADHAVAN SENIOR COMMISSIONING ENGINEER
SETHUMADHAVAN SENIOR  COMMISSIONING ENGINEERSETHUMADHAVAN SENIOR  COMMISSIONING ENGINEER
SETHUMADHAVAN SENIOR COMMISSIONING ENGINEER
 
Amol bakane update rockstar
Amol bakane    update rockstarAmol bakane    update rockstar
Amol bakane update rockstar
 
Khalid -cv_electrical_engineer (2)
Khalid  -cv_electrical_engineer (2)Khalid  -cv_electrical_engineer (2)
Khalid -cv_electrical_engineer (2)
 
Resume for Electrical design engineer
Resume for Electrical design engineerResume for Electrical design engineer
Resume for Electrical design engineer
 
Ramanuja Sharma_CV
Ramanuja Sharma_CVRamanuja Sharma_CV
Ramanuja Sharma_CV
 
noorCV
noorCVnoorCV
noorCV
 
Electrical Engineer cv.PDF
Electrical Engineer cv.PDFElectrical Engineer cv.PDF
Electrical Engineer cv.PDF
 
CV_Electrical and Instrumentation Engineer
CV_Electrical and Instrumentation EngineerCV_Electrical and Instrumentation Engineer
CV_Electrical and Instrumentation Engineer
 
Khubaib Khan_CV Instrument
Khubaib Khan_CV InstrumentKhubaib Khan_CV Instrument
Khubaib Khan_CV Instrument
 
ICS ENGINEER CV WITH IMAGE (doc)
ICS ENGINEER CV WITH IMAGE (doc)ICS ENGINEER CV WITH IMAGE (doc)
ICS ENGINEER CV WITH IMAGE (doc)
 
Electrical Engineer Sajid Akram N (1)
Electrical Engineer Sajid Akram N (1)Electrical Engineer Sajid Akram N (1)
Electrical Engineer Sajid Akram N (1)
 
Amarjeet Copy
Amarjeet   CopyAmarjeet   Copy
Amarjeet Copy
 
CV for Linkedin
CV for LinkedinCV for Linkedin
CV for Linkedin
 
krishnaraj CV1
krishnaraj CV1krishnaraj CV1
krishnaraj CV1
 
d premanatha reddy_original (2)
d premanatha reddy_original (2)d premanatha reddy_original (2)
d premanatha reddy_original (2)
 

RESUME-Radheya Karmarkar

  • 1. ELECTRICAL ENGINEER RESUME P a g e 1 | 3 Radheya Ravindra Karmarkar [B.E. –Electrical] Email ID- radheya2631992@gmail.com Hand phone- +91 9619692691 DOB:-26th March, 1992. OBJECTIVE Quest to work in professional atmosphere, which will help me to imbibe as well as impart knowledge about the latest technolog ies in the world of engineering by virtue of my sincerity, diligence and dedication. I intend to contribute positively towards the growth and prosperity of the company as I sharpen myself simultaneously. APPLICATION ENGINNERING EXPERIENCE (Since July 2016) TOSHIBA-MITSUBISHI ELECTRICAL INDUSTRIAL SYSTEMS INDIA PRIVATE LTD  Selection of MV Motors and MV Drives as per application suitability.  Preparing Technical proposal in line with selected MV Motor and MV Drives and customer specification.  Coordinating with Client/PMC and within departments to customized the selected product or in case of development of product technology to simplify operational & cost effective solution  Estimates & Optimization during tendering stage to support customers in budgeting approvals.  Preparing energy saving calculations.  Dealing with vendors & subcontractors for brought out items like switchgears, execution contractors to finalize orders by evaluating credentials of vendors.  To support the project engineering and execution team in approval and commissioning stages .  Experience in working in latest engineering software tools like Visio, Intelligent quotation systems & Oracle based systems. JOBS HANDLED Sr No Clients and Enquiries Roles and Responsibilities 1 JSW Steel and Cement 1. Selection of products by defining the application requirements like Boiler feed water pumps, condensate extraction pumps, cooling water pumps ,Induced draft fans , Forced draft fans, Centrifugal / reciprocating compressors,sugar mills, kilns, extruders, roller press mills, crushers etc. in Steel, Power , Oil and gas , petrochemicals , Water ,Fertilizers, Sugar & food industry . 2. Selection & Preparation of medium voltage active front end/ diode front end Voltage source inverter drives based on application and applying engineering tools and evaluation. Applying energy saving calculations by understanding processes. 3. Selection & Preparation of proposal for safe/hazardous area horizontal/vertical medium voltage motors with water cooled/air cooled cooling methods. 4. Experienced on working with water cooled drives selection and proposals. 5. Experienced in engineering calculations of selections of drives as soft starters and applying different schemes bumpless transfer, output reactor selections and precharge requirements. 6. Well versed with selection of switchgear and applying the different switchgears power and control schemes for MV drives. 7. Well aware about drive and motors testing methods, principles at factory and sites. 8. Selection and calculations of transformer sizing for converter duty transformers. Well versed with dry type /oil cooled, open delta/ phase shift transformers constructions,testing methods etc. 9. Hands on calculating Air conditioning requirement selections. 10. Working experience on Load Commutated Inverter drives upgradation. 2 BHEL 3 Aditya Birla 4 IOCL 5 Ultratech 6 FLSmidth 7 Linde India 8 Air Products 9 Deepak Fertilizers and Petrochemicals Limited 10 Rashtriya Chemical Fertilizers 11 Tata Steel 12 Vikram Cement 13 Black & Vetach 14 SKS Ispat and Power co.
  • 2. ELECTRICAL ENGINEER RESUME P a g e 2 | 3 15 Bangalore water supply corporation 11. Selection and preparation for synchronous motors excitation and protection schemes with relay co-ordination study. 12. Strategic planning experience on evaluating tender/ enquiry performance guaranteed figures and defining them in justified formats with comparison to competitor’s values and calculating losses in reverse manner. EPC EXPERIENCE SAVAIR ENERGY LIMITED, NAVI MUMBAI (Since July 2013)  Generating datasheets & technical documents of projects as per IS/IEC standards & its approval from client, PMC  Preparing BOQ/MTO as per tender drawings & techno-commercial comparison by visiting the sites  Coordinating with Client/PMC and within departments to resolve bottleneck  Estimates & Optimization during tendering stage  Preparing SOQ & SOR for finalizing the services  Dealing with vendors & subcontractors to finalize orders by evaluating credentials of vendors.  To support the drafting with technical back-up.  Design & documentation as per ISO quality systems PROJECTS HANDLED Sr No Project Name Responsibilities LSTK JOBS EXECUTED 1. Selection & Preparation of Motor (IS-325/IEC-60079), cable (IS-7098/IS- 1554), Switchboards & starter panels with type-2 co-ordination (IEC- 600947) drives datasheets. 2. Preparation of Load list & Single line diagrams. 3. Hazardous area equipment selection(OISD-113,IS-5571) 4. Preparation of Power & Control schematics along with logics. 5. Preparation of Lighting layouts & Lighting calculations.(IS-6665). Performed lighting calculations in DIALUX. 6. Preparation of earthing layout & earthing calculations.(IS-3043) 7. Preparation of electrical cable routing (IS-1255), cable tray selection (IS-6746, ASTM E-84) & equipment layout. 8.Preparation of purchase specifications for hazardous area equipment’s, cables & MV feeders 9. Preparation of cable schedule & cable sizing calculations. 10. Designing of Safe area & hazardous area panels in consultation with panel manufacturers & interfacing of panels with plant automation system.(BIS-4941/BIS-587) 11. Preparation of electrical substation layouts (OISD-147) 12.Performed HT & LT Motor, Panels (Hazardous area/ safe area) & cable testing(IS-10810) & commissioning at vendors place as well as at sites during commissioning 13. Performed Feeder modifications to change existing Trafo- feeder of 6.6kV to motor –feeder so as to make it suitable for VCB at site during commissioning. 14. Selection & Sizing of transformers (IS-10028), capacitor banks, battery sizing,UPS (IS-7204). 15. Performed Detailed engineering on PLC.(IEC-61508/IEC-61511) I/o selections, PLC architecture, logic diagrams & P&ID, calibration of instruments, instrument datasheets, 16. Performed DCS interfacing for Emerson Delta-V & Siemens S7-300 PLC at ONGC Heera Platform. 1 Installation of IA/UA Screw Compressor at ONGC Neelam & Heera Platform 2 Installation of Centrifugal air compressor at ONGC APU area Uran 3 Laying of fire water network at ONGC Hazira 4 Balance of work for installation of BOG Booster Gas Compressor at Petronet LNG Kochi 5 Installation of BOG Booster gas compressor at RGPPL- Dabhol 6 Installation of standby flare gas recovery compressor at ONGC Uran ( Currently working as Lead Electrical Engineer ) 7 New Drinking water network at ONGC Hazira ( Currently working as Lead Electrical Engineer ) 8 Supply& installation of 6.6KV HT Motor at ONGC Hazira (As a project –Coordinator) COMPRESSOR PACKAGING EXPERIENCE 9 Gas compressor Packaging for HAL offshore limited ( As a lead Electrical Electrical Engineer for Packaging system ) B ESTIMATIONS EXPERIENCE 1 Ahmadabad Asset Gas compressor Package Project (Project Estimate -88
  • 3. ELECTRICAL ENGINEER RESUME P a g e 3 | 3 Cr , Electrical Estimate -12Cr) 17. Performed engineering & construction ofinterfacing the electrical & instrumentation panels with hot & cold loop testing. 18. Performed engineering on F&G system (IS-2189) like selection calculation, installation of F&G detectors,manual call points,PAGA System, telephone system. 19. Experience on deciding billing weightage values of drawings, materials & construction activities, understanding of planning schedules. 20. AS BUILT drawings dossier preparation. 21. Preparation of Enquiries during estimations, attending the pre-bid meetings, performing the value engineering by explaining the different value analysis to the clients. 22. Completing the BOQ’s & costing and performing optimizations by giving counter rates to vendors & through negotiations. 23. Performed Gas compressor packaging as a lead electrical engineer & as a company representative for authorized packager for GE- Cameron Packager.(API-619) 24. Vendor evaluations by visiting manufacturing units, assessing quality reports & checking documentations & credentials. 25. Played a role Project Coordinator for a small project through which completed jobs like contract signing,Engineering approvals, vendor & client co-ordinations, statutory requirements like CCOE &DGMS, billing planning, accounts & insurance related jobs. 2 Replacement of Sulphur recovery unit at ONGC Hazira(Project Estimate- 70Cr , Electrical Estimate-7Cr) 3 Up-gradation of firefighting systemat ONGC Mehasana Asset (Project Estimate-120Cr, Electrical Estimate- 14Cr) MAJOR ACHIVEMENTS  Completed & handover of Atlas Copco make Screw Air Compressor in ONGC -Offshore project, Ingersoll Rand make Centrifugal Air compressor (ONGC-Uran) & Booster Gas compressor (Petronet LNG) as a lead electrical engineer by involving in engineering & construction of electrical installations.  Completed the Handover of by involving in commissioning stage  Worked on Pre-tendering stage of Booster Gas compressor (Petronet –LNG) & Up-gradation of Drinking water network (ONGC-Hazira) electrics for balance of services resulted in award of work.  Completed successful commissioning of 3.3kV MV drive for FD fan application in Deepak Fertilizers and Petrochemicals.  Completed the technical and commercial proposal part of SKS Ispat and res olved all queriers raised by client resulting in 4 Nos 6.6kV 1200kVA MV drives order. KEY SKILLS  Monitoring and measuring performance  Ability to prioritize between enquiries & projects  Ability to pre-plan & ensure continuous input at grass root level to run a business  An ability to build relationships and establish rapport quickly with the concerned people  Sense of estimate, knowledge of costing & negotiation with vendor, industrial contacts  Result oriented work methodology  Well versed with engineering software-Visio, Oracle , Intelligent quotation systemplatforms, AUTOCAD & Microsoft Office DECLARATION I hereby solemnly affirm that the particulars furnished above are true to the best of my knowledge. I will make it my earnest endeavor to discharge competently and carefully the duties you may be pleased to entrust with me. Date:- Place: - Radheya R Karmarkar