I am a Senior Commissioning Engineer from ALSTOM Projects India Ltd
I have 8 + years of experience in Gas and Steam Turbine Power plants,
During my assignments with ALSTOM I have commissioned various Electrical Systems Mentioned below
 Generator and Transformer Protections ( ABB – REG 216 and MICOM – P6XX,P3XX,P1XX)
 HV/MV/LV Transformers
 LV and MV Switchgears and Relay testing (ABB)
 Air Cooled Generators
 DC and UPS System
 Generator Circuit Breaker (ALSTOM make)
I would be a great addition to your team; not only do I have vast knowledge of Electrical commissioning but I have also involved in
Site Management activities like Turn Over Package Engineer for 1000MW CCPP and I was there Still closing out of project by
coordinating with client and Subcontractor.
I would appreciate a further discussion to know more details
Thanking You,
Sincerely,
RAGHU
ENCLOSURE - RESUME
Page 1 of 7
Raghu Venukadasula
Mobile: +23326476835,00919052526395 ~ E-Mail: nanduforu@gmail.com
~ Senior Commissioning Engineer ~
ALSTOM India Ltd.
• Commissioning• Electrical Systems
An Overview
⇒ Having 8 +years of progressive experience in the fields of Projects Engineering, Erection, Testing and commissioning of power
plants including site management
⇒ Adept at recommending / implementing/ troubleshooting design issues, critical solutions as to Electrical Systems.
⇒ Coordination with engineering
Areas of Expertise
⇒ Electrical systems: Executing, Commissioning, Maintenance, and Initial Set-up of various Electrical systems, supporting
process commissioning for Electrical, Instrumentation and Control and other relevant systems.
⇒ Installation & Commissioning: Commissioning and set up of Generator and Transformer Protection systems ABB -
(REG216) and MICOMM (P6XX,P3XX), Air Cooled Generator, Generator circuit breaker (Areva make). MV boards, Battery,
DC/UPS distribution system, LV board and MV/LV Transformers. Analysing and supporting the procedural testing among others,
of the power plant processes and, day-to-day and overall commissioning activities. Co-ordinating with site-support to update
and review issues and developments on a know-how basis
⇒ Project Execution & Site Management: Coordinating relevant project activities right from the initiation of
Commissioning activities; involving, scheduling, progress monitoring, erection follow-up, testing & commissioning, in order to
enhance the smooth and proper execution of the Project. Establishing project review, monitoring and status reporting
procedures to accurately report progress of the project to the stakeholders and end user clients. Providing online and/or
requisite customer support as and when required. Developing and Training new recruits and fresh graduates and enhancing
resources.
Career Recital
Senior Electrical Commissioning Engineer and Turn Over Package Engineer for Power Plant
Commissioning with Alstom Project India Ltd., Noida Since Feb’09
Skill Set and Experience as Commissioning Engineer :
Page 2 of 7
⇒ Initial system set up for commissioning like getting the required testing kits and tools for testing and powering up Various
Electrical Systems
⇒ Preparation of drawings and Inspection and Test plan required for the Systems to Commission
⇒ Commissioning of Generator and Transformer Protection ABB - REG216 Relay, Fault Recorder
⇒ Commissioning of Generator and Transformer Protection Relay MICOMM – P633/344/123
⇒ Commissioning of ABB Medium Voltage Switchgear and Low Voltage Switchgear (ABB,COMECA and NATUS)
⇒ Commissioning of ABB REF 615 Relay
⇒ Cold Commissioning of Generator Circuit Breaker. (ALSTOM Make)
⇒ Cold and hot commissioning of Air cooled Generator and process support.
⇒ Commissioning of DC and UPS System (STATRON and GUTOR)
⇒ Testing of Step Up Transformer,Station Service Transformer,MV/LV Transformer (ALSTOM,ABB, and HYUNDAI make)
⇒ Commissioning of E-Module HVAC System.
⇒ Communication set up with ISA,OMICRON,CT Analyser and HIOKI
⇒ Kept regular follow-up with daily issues; commissioning & relevant activities
⇒ Ensuring site activities to have been carried out as per recommended EHS procedure.
⇒ Preparation, Implementation, Maintenance and final hand out of Wiring and DCS related Red correxes and relevant changes,
Software Change requirements according to PFUPs, Q-Documentations, and Hand over documentation.
⇒ Continuous integration and support of process based commissioning
⇒ Final handover of plant, and subsequent documentation.
⇒ Initial Warranty support.
⇒ Eventual summarisation and feedback of issues, findings and developments encountered during the course of the assignment.
Skill Set and Experience as Turn Over Package Engineer – Site management :
⇒ Customer and Subcontractor Training about Site specific System ALSTOM Turn Over packages.
⇒ Coordination of System Turn Overs in accordance with established commissioning sequence
⇒ Reviews Complete TOP – QA documentation before taking over by commissioning and makes updates and corrections as per
commissioning needs on site
⇒ Reviewing the Scheduled system TOP packages with Commissioning Manager, Consortium Site Manager, Planner and
Consortium Partner and keeping the updated schedule as per Commissioning Sequence
⇒ Checks together with Commissioning and Erection Leads in Site and Makes Invitations for System walk down before Start of
Commissioning at site
⇒ Compiles Individual punch list for each system and passing them to QA/AC Dept.
(i) 210 MW 2XGT11N2 GTPP – Kpone Thermal Power Plant – KTPP – Ghana – Alstom India Ltd
Senior Electrical Commissioning Engineer, Gas Turbine and Generator & Transformer protection
(MICOMM) and relevant Electrical distribution system.
⇒ Commissioning Unit Lead for GT 11N2 Electrical Systems
⇒ Initial system set up and documentation for pre commissioning.
⇒ Commissioning of Generator and Transformer protection system MICOMM Relay (P633 P344 P123)
Page 3 of 7
⇒ Commissioning of Low Voltage Switchgear
⇒ Commissioning of Generator and Neutral Point Cubicle
⇒ Commissioning of GUTOR - 220V Battery charger DC and UPS System.
⇒ commissioning of Generator Circuit Breaker (ABB Make).
⇒ Carrying out secondary injection tests for determining the effectiveness of equipment’s like testing Generator protection
function and Protection trip tests
⇒ Primary Injection test to verify the stability of various protection functions.
⇒ Final Signal checks with PFUP logic and Implementing in Controller
⇒ Preparation, Implementation, Maintenance and final hand-over of Wiring and Red correxes and relevant changes, Q-
Documentation, and Hand over documentation.
⇒ Cold and hot commissioning process support.
⇒ Continuous integration and support of process based commissioning
(ii) 700 MW 4XGT13E2 GTPP – AL Mansurya – Iraq – Alstom India Ltd
Senior Electrical Commissioning Engineer, Gas Turbine and Generator & Transformer protection
(MICOMM), Synchronising system (ABB make), and relevant Electrical distribution system.
Key Assignments undertaken:
⇒ Commissioning Unit Lead for GT 13E2 Electrical Systems
⇒ Initial system set up for cold commissioning.
⇒ Preparation of drawings and necessary documents for UNIT commissioning
⇒ Commissioning of Generator and Transformer protection system MICOMM Relay (P633 P344 P123)
⇒ Testing and commissioning of ABB synchronizing system (Synchorotact 5).
⇒ Cold and Hot Commissioning of NATUS Low Voltage Switchgear
⇒ Cold and Hot Commissioning of ABB Medium Voltage Switchgear
⇒ Testing of ABB MV Switchgear Relay REF 615
⇒ Cold and Hot Commissioning of STATRON - 220V Battery charger DC and UPS System.
⇒ Cold commissioning of Generator Circuit Breaker (ALSTOM Make).
⇒ Testing and commissioning of MV and LV transformers (ALSTOM and HYUNDAI make)
⇒ Carrying out secondary injection tests for determining the effectiveness of equipment’s like testing Generator protection
function and Protection trip tests
⇒ Primary Injection test to verify the stability of various protection functions.
⇒ Final Signal checks with PFUP logic and Implementing in Controller
⇒ Preparation, Implementation, Maintenance and final hand-over of Wiring and Red correxes and relevant changes, Q-
Documentation, and Hand over documentation.
⇒ Cold and hot commissioning process support.
⇒ Continuous integration and support of process based commissioning.
(ii) 1300 MW, Terga CCPP, Terga (Algeria) – ALSTOM Power Systems - (February 2011 to Nov 2012 ):
Electrical Commissioning Engineer, Gas Turbine and Steam Turbine generator & Transformer
protection (ABB make), and
relevant Electrical distribution system.
⇒ Initial system set up for cold commissioning.
Page 4 of 7
⇒ Preliminary signal and PFUP checks.
⇒ Commissioning of Generator and Transformer protection system REG216 (ABB)
⇒ Equipment Testing and Commissioning of MV, LV Boards
⇒ Testing and commissioning of MV and LV transformers.
⇒ Generator and REG216 No load and Load testing.
⇒ Commissioning of STATRON DC and UPS System
⇒ Preparation, Implementation, Maintenance and final hand-over of Wiring and Red correxes and relevant changes, Q-
Documentation, and Hand over documentation.
⇒ Cold and hot commissioning process support.
⇒ Continuous integration and support of process based commissioning.
(ii) SHOAIBA 1000 MW Thermal Power Plant – ALSTOM Power Systems - Saudi Arabia
Electrical Commissioning Engineer Trainee - Electrical Distribution System
⇒ Initial system set up for cold commissioning.
⇒ Commissioning of ABB Low Voltage Switchgear and MCC
⇒ Commissioning of MV/ LV Transformers ABB
⇒ Preparation, Implementation, Maintenance and final hand-over of Wiring and Red correxes and relevant changes, Q-
Documentation, and Hand over documentation.
⇒ Cold and Hot commissioning process support.
⇒ Continuous integration and support of process based commissioning.
(iii) 370 MW UTRAN Combined Cycle Power Plant - Surat –ALSTOM Projects India Ltd- Gujrath
India (Feb 2009 – May 2010)
Turn Over Package Engineer and Commissioning Support - Gas Turbine and Steam Turbine Plant
⇒ Coordination of System Turn Overs in accordance with established commissioning sequence
⇒ Conducting the weekly forecast meeting with ALSTOM Erection and Contractor and updating the Project Forecast dates
⇒ Compiling of QA/QC documentation from erection required for commissioning and Reviwing and make the corrections as per
commissioning need
⇒ Reporting the Slippage dates to Site Manager and Sub Contractor
⇒ Collection of all necessary documentation for each system in site and checking same for completeness
⇒ Checking all the Turn Over conditions are full filled.
⇒ Organizing the Site walk downs with Commissioning and Erection
⇒ Compiling and categorizing the punch list during walk downs and entering the same in to Punch list data base
⇒ Reporting System Turn Over Package related progress to Commissioning Manager
⇒ Coordinating with Engineering for Engineering Related Punch Points
⇒ Operation and Maintenance Support
⇒ Checking all Systems are ins Service which are required for plant start up
⇒ Plant Start-up and shut down activities
⇒ Over all monitoring of plant parameters during plant load
(iv) 1000 MW soha Combined Cycle Power Plant - AL HASSAN ENGINEERING CO.SAOG – OMAN (July
2007 to Jan 2009)
Turn Over Package Engineer - Gas Turbine and Steam Turbine Plant
Page 5 of 7
⇒ Coordination of System Turn Overs in accordance with established commissioning sequence
⇒ Conducting the weekly forecast meeting with ALSTOM Erection and Contractor and updating the Project Forecast dates
⇒ Compiling of QA/QC documentation from erection required for commissioning and Reviwing and make the corrections as per
commissioning need
⇒ Reporting the Slippage dates to Site Manager and Sub Contractor
⇒ Collection of all necessary documentation for each system in site and checking same for completeness
⇒ Checking all the Turn Over conditions are full filled.
⇒ Organizing the Site walk downs with Commissioning and Erection
⇒ Compiling and categorizing the punch list during walk downs and entering the same in to Punch list data base
⇒ Reporting System Turn Over Package related progress to Commissioning Manager
⇒ Coordinating with Engineering for Engineering Related Punch Points
(v) 460 MW Gautami CCPP, Samarlakota – Gujarat- (India) – ALSTOM Projects India Ltd - (Dec 2006 to
April 2007)
Turn Over Package Support Engineer and Erection Supervisor - Gas Turbine and Steam Turbine
Plant
⇒ Worked as Turn Over Package (TOP) coordinator
⇒ Collection of all QA / QC Documents required for Turn Over Package (TOP) and Checking same for completeness.
⇒ Organizing the internal inspections at site with area in charges / supervisors / Quality and raising the internal punch points.
⇒ Organizing the Final TOP Inspections with Client and Compiling and categorizing the final punch list during inspection.
As Erection Supervisor
⇒ Erection of MV and LV Switchgear Panels, Cable laying and terminations. Coordinating with Testing and Commissioning
⇒ Involved in Erection of 400KV Switchyard, Illumination and fire fighting and fire detection System.
⇒ Partly involved in instrumentation System, BOP and DCS and Erection of Transformers.
Notables
⇒ Successfully handled set up and commissioning of various Electrical Systems as a Unit Lead
⇒ Experienced in power plant process and Electrical systems, mainly Combined Cycle power plants.
⇒ Adept in troubleshooting and problem solving encountered during commissioning.
⇒ Adept in analysing, troubleshooting and maintenance of various Electrical systems such as Generators, Transformers, Electrical
Protection systems, Synchronising System, Generator cooling systems and LV/MV switchgear.
⇒ Adept in handling of various instruments and tools required for troubleshooting and commissioning (the likes of Oscilloscopes,
Maggers, Hart communicators and signal injectors, among others).
⇒ Adept in set-up, installation, maintenance and troubleshooting of various Relays.
⇒ Successfully handled multiple assignments as TOP Engineer (Site Management)
⇒ Successfully Handled 1000 MW Sohar Aluminium Power Plant as Turn Over Package Incharge
⇒ Successful coordination with Customer and Sub contractor
Education
Page 6 of 7
2004 B.Tech. in Electrical Engineering from JNTU
1999 Board of Intermediate - Andhra Pradesh
1997 ZPSS Secondary High school - Warangal
Additional Training
⇒ ASLP – ALSTOM Safety Leader Ship Programme - 2013
⇒ ALSTOM International EHS Passport – 2013
⇒ COMET (Commissioning Engr. Training) - Basic – Alstom Baden Switzerland – 2010.
⇒ COMET (Commissioning Engr. Training) – Expert (Electrical) – Alstom Baden Switzerland – 2010
⇒ STATRON DC and UPS training, Baden - Switzerland
⇒ EHS elevator level 1 – Alstom – 20009
⇒ EHS elevator level 2 – Alstom – 2010.
Personal Dossier
Date of Birth: 10-06-1982
Language Known: Telugu,English and Hindi
Passport No: G3583958
Address: 1-124 Peddavangara,Kodakandla,Warangal - AP
Page 7 of 7

More Related Content

What's hot

ETAP - Ac networks
ETAP - Ac networksETAP - Ac networks
ETAP - Ac networksHimmelstern
 
Seismic Considerations Seminar | Portland, Oregon
Seismic Considerations Seminar | Portland, OregonSeismic Considerations Seminar | Portland, Oregon
Seismic Considerations Seminar | Portland, OregonNishkianDean
 
,Article reprint from_erneuerbareenergien
,Article reprint from_erneuerbareenergien,Article reprint from_erneuerbareenergien
,Article reprint from_erneuerbareenergienManel Montesinos
 
Offshore Wind Farm Training
Offshore Wind Farm TrainingOffshore Wind Farm Training
Offshore Wind Farm TrainingTonex
 
Nyhuis_Resume_CoverLetter
Nyhuis_Resume_CoverLetterNyhuis_Resume_CoverLetter
Nyhuis_Resume_CoverLetterRobert Nyhuis
 
ETAP - Transformer mva sizing
ETAP - Transformer mva sizingETAP - Transformer mva sizing
ETAP - Transformer mva sizingHimmelstern
 
Day-to-day condition monitoring for a large fleet of wind turbines
Day-to-day condition monitoring for a large fleet of wind turbinesDay-to-day condition monitoring for a large fleet of wind turbines
Day-to-day condition monitoring for a large fleet of wind turbinesWindpower Engineering & Development
 
sayed bessat cv last rev (2)
sayed bessat cv last rev (2)sayed bessat cv last rev (2)
sayed bessat cv last rev (2)Sayed Bessat
 
ExxonMobil Job Scop
ExxonMobil Job ScopExxonMobil Job Scop
ExxonMobil Job Scopeone iwan
 
Case studies of installation inspections of a demand response program
Case studies of installation inspections of a demand response programCase studies of installation inspections of a demand response program
Case studies of installation inspections of a demand response programZondits
 
Restoration Drill & Pre-Drill Training ; System Restoration Overview
Restoration Drill & Pre-Drill Training ; System Restoration OverviewRestoration Drill & Pre-Drill Training ; System Restoration Overview
Restoration Drill & Pre-Drill Training ; System Restoration OverviewPower System Operation
 
Husam Sabbah CV2015
Husam Sabbah CV2015Husam Sabbah CV2015
Husam Sabbah CV2015Husam Sabbah
 

What's hot (19)

Nagy_CV_Docx
Nagy_CV_DocxNagy_CV_Docx
Nagy_CV_Docx
 
ETAP - Ac networks
ETAP - Ac networksETAP - Ac networks
ETAP - Ac networks
 
Matt Instr CV
Matt Instr CVMatt Instr CV
Matt Instr CV
 
CV
CVCV
CV
 
Seismic Considerations Seminar | Portland, Oregon
Seismic Considerations Seminar | Portland, OregonSeismic Considerations Seminar | Portland, Oregon
Seismic Considerations Seminar | Portland, Oregon
 
Nagy_CV_Docx
Nagy_CV_DocxNagy_CV_Docx
Nagy_CV_Docx
 
,Article reprint from_erneuerbareenergien
,Article reprint from_erneuerbareenergien,Article reprint from_erneuerbareenergien
,Article reprint from_erneuerbareenergien
 
Saif Ismail_CV
Saif Ismail_CVSaif Ismail_CV
Saif Ismail_CV
 
Offshore Wind Farm Training
Offshore Wind Farm TrainingOffshore Wind Farm Training
Offshore Wind Farm Training
 
Nyhuis_Resume_CoverLetter
Nyhuis_Resume_CoverLetterNyhuis_Resume_CoverLetter
Nyhuis_Resume_CoverLetter
 
ETAP - Transformer mva sizing
ETAP - Transformer mva sizingETAP - Transformer mva sizing
ETAP - Transformer mva sizing
 
Day-to-day condition monitoring for a large fleet of wind turbines
Day-to-day condition monitoring for a large fleet of wind turbinesDay-to-day condition monitoring for a large fleet of wind turbines
Day-to-day condition monitoring for a large fleet of wind turbines
 
sayed bessat cv last rev (2)
sayed bessat cv last rev (2)sayed bessat cv last rev (2)
sayed bessat cv last rev (2)
 
ExxonMobil Job Scop
ExxonMobil Job ScopExxonMobil Job Scop
ExxonMobil Job Scop
 
Smith, Anthony
Smith, AnthonySmith, Anthony
Smith, Anthony
 
Case studies of installation inspections of a demand response program
Case studies of installation inspections of a demand response programCase studies of installation inspections of a demand response program
Case studies of installation inspections of a demand response program
 
Restoration Drill & Pre-Drill Training ; System Restoration Overview
Restoration Drill & Pre-Drill Training ; System Restoration OverviewRestoration Drill & Pre-Drill Training ; System Restoration Overview
Restoration Drill & Pre-Drill Training ; System Restoration Overview
 
Husam Sabbah CV2015
Husam Sabbah CV2015Husam Sabbah CV2015
Husam Sabbah CV2015
 
Devang Technician
Devang TechnicianDevang Technician
Devang Technician
 

Viewers also liked

Oakmore Brochure
Oakmore BrochureOakmore Brochure
Oakmore BrochureOrla Lynch
 
Georgia Cosmetology Educators 2015 2
Georgia Cosmetology Educators 2015 2Georgia Cosmetology Educators 2015 2
Georgia Cosmetology Educators 2015 2jennygcellc
 
Geografía2016 160416194436
Geografía2016 160416194436Geografía2016 160416194436
Geografía2016 160416194436Lucas Arcamone
 
Buy Direct PPO-final
Buy Direct PPO-finalBuy Direct PPO-final
Buy Direct PPO-finalMelissa Lewis
 
BCBS Internet CSR Training
BCBS Internet CSR TrainingBCBS Internet CSR Training
BCBS Internet CSR TrainingMelissa Lewis
 
Geografía2016 160416194436
Geografía2016 160416194436Geografía2016 160416194436
Geografía2016 160416194436Lucas Arcamone
 
El TOC como problema de la atención
El TOC como problema de la atenciónEl TOC como problema de la atención
El TOC como problema de la atenciónViviana Rodriguez
 
Geografía2016 160416194436
Geografía2016 160416194436Geografía2016 160416194436
Geografía2016 160416194436Lucas Arcamone
 
Group8 presentation
Group8 presentationGroup8 presentation
Group8 presentationNilesh Raj
 
Excavation Safety Training Module 1
Excavation Safety Training Module 1Excavation Safety Training Module 1
Excavation Safety Training Module 1Melissa Lewis
 
Household waste disposal behavior of Varanasi City
Household waste disposal  behavior of Varanasi CityHousehold waste disposal  behavior of Varanasi City
Household waste disposal behavior of Varanasi CityPraveensb6
 

Viewers also liked (14)

Oakmore Brochure
Oakmore BrochureOakmore Brochure
Oakmore Brochure
 
Georgia Cosmetology Educators 2015 2
Georgia Cosmetology Educators 2015 2Georgia Cosmetology Educators 2015 2
Georgia Cosmetology Educators 2015 2
 
PCBIIFinal
PCBIIFinalPCBIIFinal
PCBIIFinal
 
Geografía2016 160416194436
Geografía2016 160416194436Geografía2016 160416194436
Geografía2016 160416194436
 
Buy Direct PPO-final
Buy Direct PPO-finalBuy Direct PPO-final
Buy Direct PPO-final
 
BCBS Internet CSR Training
BCBS Internet CSR TrainingBCBS Internet CSR Training
BCBS Internet CSR Training
 
Geografía2016 160416194436
Geografía2016 160416194436Geografía2016 160416194436
Geografía2016 160416194436
 
Soumya_S_Mukherjee_Resume
Soumya_S_Mukherjee_ResumeSoumya_S_Mukherjee_Resume
Soumya_S_Mukherjee_Resume
 
El TOC como problema de la atención
El TOC como problema de la atenciónEl TOC como problema de la atención
El TOC como problema de la atención
 
Geografía2016 160416194436
Geografía2016 160416194436Geografía2016 160416194436
Geografía2016 160416194436
 
Jatin_inst (1)
Jatin_inst (1)Jatin_inst (1)
Jatin_inst (1)
 
Group8 presentation
Group8 presentationGroup8 presentation
Group8 presentation
 
Excavation Safety Training Module 1
Excavation Safety Training Module 1Excavation Safety Training Module 1
Excavation Safety Training Module 1
 
Household waste disposal behavior of Varanasi City
Household waste disposal  behavior of Varanasi CityHousehold waste disposal  behavior of Varanasi City
Household waste disposal behavior of Varanasi City
 

Similar to Raghu Resume (20)

UPDATED CV-1
UPDATED CV-1UPDATED CV-1
UPDATED CV-1
 
Resume mohan
Resume mohanResume mohan
Resume mohan
 
Ariel Pacis CV(2016)
Ariel Pacis CV(2016)Ariel Pacis CV(2016)
Ariel Pacis CV(2016)
 
Jose_Transmission_Engineer
Jose_Transmission_EngineerJose_Transmission_Engineer
Jose_Transmission_Engineer
 
Mohamed_Saad
Mohamed_SaadMohamed_Saad
Mohamed_Saad
 
Presentation-on-NPCC-by-Salman-Gul_4.pdf
Presentation-on-NPCC-by-Salman-Gul_4.pdfPresentation-on-NPCC-by-Salman-Gul_4.pdf
Presentation-on-NPCC-by-Salman-Gul_4.pdf
 
Raju cv
Raju cv Raju cv
Raju cv
 
Resume
ResumeResume
Resume
 
bala.1
bala.1bala.1
bala.1
 
venkatCV
venkatCVvenkatCV
venkatCV
 
NAVNATH UPDATED CV
NAVNATH UPDATED CVNAVNATH UPDATED CV
NAVNATH UPDATED CV
 
ONYEJOSE CHUKWUMA CONTRL ROOM OPERATOR.
ONYEJOSE CHUKWUMA CONTRL ROOM OPERATOR.ONYEJOSE CHUKWUMA CONTRL ROOM OPERATOR.
ONYEJOSE CHUKWUMA CONTRL ROOM OPERATOR.
 
RESUME - RAKESH PATEL
RESUME - RAKESH PATELRESUME - RAKESH PATEL
RESUME - RAKESH PATEL
 
Commission resume
Commission resumeCommission resume
Commission resume
 
C18808 elc tech
C18808 elc techC18808 elc tech
C18808 elc tech
 
Rejith complete cv
Rejith complete cvRejith complete cv
Rejith complete cv
 
NESTOR-UPDATED-CV-1 ALEGA
NESTOR-UPDATED-CV-1 ALEGANESTOR-UPDATED-CV-1 ALEGA
NESTOR-UPDATED-CV-1 ALEGA
 
Noli updated Resume
Noli updated ResumeNoli updated Resume
Noli updated Resume
 
Mohamed Saad Resume
Mohamed Saad ResumeMohamed Saad Resume
Mohamed Saad Resume
 
Perwaja Steel Job Scop
Perwaja Steel Job ScopPerwaja Steel Job Scop
Perwaja Steel Job Scop
 

Raghu Resume

  • 1. RAGHU VENUKADASULA Address: H. No: 1-124, Peddavangara, Kodakandala,Warnagal - AP Mobile: +233264376835 Email: nanduforu@gmail.com nanduforu06@yahoo.com Date: 01 th April 2015 ALSTOM Projects India Ltd. Noida Dear Sir I am a Senior Commissioning Engineer from ALSTOM Projects India Ltd I have 8 + years of experience in Gas and Steam Turbine Power plants, During my assignments with ALSTOM I have commissioned various Electrical Systems Mentioned below  Generator and Transformer Protections ( ABB – REG 216 and MICOM – P6XX,P3XX,P1XX)  HV/MV/LV Transformers  LV and MV Switchgears and Relay testing (ABB)  Air Cooled Generators  DC and UPS System  Generator Circuit Breaker (ALSTOM make) I would be a great addition to your team; not only do I have vast knowledge of Electrical commissioning but I have also involved in Site Management activities like Turn Over Package Engineer for 1000MW CCPP and I was there Still closing out of project by coordinating with client and Subcontractor. I would appreciate a further discussion to know more details Thanking You, Sincerely, RAGHU ENCLOSURE - RESUME Page 1 of 7
  • 2. Raghu Venukadasula Mobile: +23326476835,00919052526395 ~ E-Mail: nanduforu@gmail.com ~ Senior Commissioning Engineer ~ ALSTOM India Ltd. • Commissioning• Electrical Systems An Overview ⇒ Having 8 +years of progressive experience in the fields of Projects Engineering, Erection, Testing and commissioning of power plants including site management ⇒ Adept at recommending / implementing/ troubleshooting design issues, critical solutions as to Electrical Systems. ⇒ Coordination with engineering Areas of Expertise ⇒ Electrical systems: Executing, Commissioning, Maintenance, and Initial Set-up of various Electrical systems, supporting process commissioning for Electrical, Instrumentation and Control and other relevant systems. ⇒ Installation & Commissioning: Commissioning and set up of Generator and Transformer Protection systems ABB - (REG216) and MICOMM (P6XX,P3XX), Air Cooled Generator, Generator circuit breaker (Areva make). MV boards, Battery, DC/UPS distribution system, LV board and MV/LV Transformers. Analysing and supporting the procedural testing among others, of the power plant processes and, day-to-day and overall commissioning activities. Co-ordinating with site-support to update and review issues and developments on a know-how basis ⇒ Project Execution & Site Management: Coordinating relevant project activities right from the initiation of Commissioning activities; involving, scheduling, progress monitoring, erection follow-up, testing & commissioning, in order to enhance the smooth and proper execution of the Project. Establishing project review, monitoring and status reporting procedures to accurately report progress of the project to the stakeholders and end user clients. Providing online and/or requisite customer support as and when required. Developing and Training new recruits and fresh graduates and enhancing resources. Career Recital Senior Electrical Commissioning Engineer and Turn Over Package Engineer for Power Plant Commissioning with Alstom Project India Ltd., Noida Since Feb’09 Skill Set and Experience as Commissioning Engineer : Page 2 of 7
  • 3. ⇒ Initial system set up for commissioning like getting the required testing kits and tools for testing and powering up Various Electrical Systems ⇒ Preparation of drawings and Inspection and Test plan required for the Systems to Commission ⇒ Commissioning of Generator and Transformer Protection ABB - REG216 Relay, Fault Recorder ⇒ Commissioning of Generator and Transformer Protection Relay MICOMM – P633/344/123 ⇒ Commissioning of ABB Medium Voltage Switchgear and Low Voltage Switchgear (ABB,COMECA and NATUS) ⇒ Commissioning of ABB REF 615 Relay ⇒ Cold Commissioning of Generator Circuit Breaker. (ALSTOM Make) ⇒ Cold and hot commissioning of Air cooled Generator and process support. ⇒ Commissioning of DC and UPS System (STATRON and GUTOR) ⇒ Testing of Step Up Transformer,Station Service Transformer,MV/LV Transformer (ALSTOM,ABB, and HYUNDAI make) ⇒ Commissioning of E-Module HVAC System. ⇒ Communication set up with ISA,OMICRON,CT Analyser and HIOKI ⇒ Kept regular follow-up with daily issues; commissioning & relevant activities ⇒ Ensuring site activities to have been carried out as per recommended EHS procedure. ⇒ Preparation, Implementation, Maintenance and final hand out of Wiring and DCS related Red correxes and relevant changes, Software Change requirements according to PFUPs, Q-Documentations, and Hand over documentation. ⇒ Continuous integration and support of process based commissioning ⇒ Final handover of plant, and subsequent documentation. ⇒ Initial Warranty support. ⇒ Eventual summarisation and feedback of issues, findings and developments encountered during the course of the assignment. Skill Set and Experience as Turn Over Package Engineer – Site management : ⇒ Customer and Subcontractor Training about Site specific System ALSTOM Turn Over packages. ⇒ Coordination of System Turn Overs in accordance with established commissioning sequence ⇒ Reviews Complete TOP – QA documentation before taking over by commissioning and makes updates and corrections as per commissioning needs on site ⇒ Reviewing the Scheduled system TOP packages with Commissioning Manager, Consortium Site Manager, Planner and Consortium Partner and keeping the updated schedule as per Commissioning Sequence ⇒ Checks together with Commissioning and Erection Leads in Site and Makes Invitations for System walk down before Start of Commissioning at site ⇒ Compiles Individual punch list for each system and passing them to QA/AC Dept. (i) 210 MW 2XGT11N2 GTPP – Kpone Thermal Power Plant – KTPP – Ghana – Alstom India Ltd Senior Electrical Commissioning Engineer, Gas Turbine and Generator & Transformer protection (MICOMM) and relevant Electrical distribution system. ⇒ Commissioning Unit Lead for GT 11N2 Electrical Systems ⇒ Initial system set up and documentation for pre commissioning. ⇒ Commissioning of Generator and Transformer protection system MICOMM Relay (P633 P344 P123) Page 3 of 7
  • 4. ⇒ Commissioning of Low Voltage Switchgear ⇒ Commissioning of Generator and Neutral Point Cubicle ⇒ Commissioning of GUTOR - 220V Battery charger DC and UPS System. ⇒ commissioning of Generator Circuit Breaker (ABB Make). ⇒ Carrying out secondary injection tests for determining the effectiveness of equipment’s like testing Generator protection function and Protection trip tests ⇒ Primary Injection test to verify the stability of various protection functions. ⇒ Final Signal checks with PFUP logic and Implementing in Controller ⇒ Preparation, Implementation, Maintenance and final hand-over of Wiring and Red correxes and relevant changes, Q- Documentation, and Hand over documentation. ⇒ Cold and hot commissioning process support. ⇒ Continuous integration and support of process based commissioning (ii) 700 MW 4XGT13E2 GTPP – AL Mansurya – Iraq – Alstom India Ltd Senior Electrical Commissioning Engineer, Gas Turbine and Generator & Transformer protection (MICOMM), Synchronising system (ABB make), and relevant Electrical distribution system. Key Assignments undertaken: ⇒ Commissioning Unit Lead for GT 13E2 Electrical Systems ⇒ Initial system set up for cold commissioning. ⇒ Preparation of drawings and necessary documents for UNIT commissioning ⇒ Commissioning of Generator and Transformer protection system MICOMM Relay (P633 P344 P123) ⇒ Testing and commissioning of ABB synchronizing system (Synchorotact 5). ⇒ Cold and Hot Commissioning of NATUS Low Voltage Switchgear ⇒ Cold and Hot Commissioning of ABB Medium Voltage Switchgear ⇒ Testing of ABB MV Switchgear Relay REF 615 ⇒ Cold and Hot Commissioning of STATRON - 220V Battery charger DC and UPS System. ⇒ Cold commissioning of Generator Circuit Breaker (ALSTOM Make). ⇒ Testing and commissioning of MV and LV transformers (ALSTOM and HYUNDAI make) ⇒ Carrying out secondary injection tests for determining the effectiveness of equipment’s like testing Generator protection function and Protection trip tests ⇒ Primary Injection test to verify the stability of various protection functions. ⇒ Final Signal checks with PFUP logic and Implementing in Controller ⇒ Preparation, Implementation, Maintenance and final hand-over of Wiring and Red correxes and relevant changes, Q- Documentation, and Hand over documentation. ⇒ Cold and hot commissioning process support. ⇒ Continuous integration and support of process based commissioning. (ii) 1300 MW, Terga CCPP, Terga (Algeria) – ALSTOM Power Systems - (February 2011 to Nov 2012 ): Electrical Commissioning Engineer, Gas Turbine and Steam Turbine generator & Transformer protection (ABB make), and relevant Electrical distribution system. ⇒ Initial system set up for cold commissioning. Page 4 of 7
  • 5. ⇒ Preliminary signal and PFUP checks. ⇒ Commissioning of Generator and Transformer protection system REG216 (ABB) ⇒ Equipment Testing and Commissioning of MV, LV Boards ⇒ Testing and commissioning of MV and LV transformers. ⇒ Generator and REG216 No load and Load testing. ⇒ Commissioning of STATRON DC and UPS System ⇒ Preparation, Implementation, Maintenance and final hand-over of Wiring and Red correxes and relevant changes, Q- Documentation, and Hand over documentation. ⇒ Cold and hot commissioning process support. ⇒ Continuous integration and support of process based commissioning. (ii) SHOAIBA 1000 MW Thermal Power Plant – ALSTOM Power Systems - Saudi Arabia Electrical Commissioning Engineer Trainee - Electrical Distribution System ⇒ Initial system set up for cold commissioning. ⇒ Commissioning of ABB Low Voltage Switchgear and MCC ⇒ Commissioning of MV/ LV Transformers ABB ⇒ Preparation, Implementation, Maintenance and final hand-over of Wiring and Red correxes and relevant changes, Q- Documentation, and Hand over documentation. ⇒ Cold and Hot commissioning process support. ⇒ Continuous integration and support of process based commissioning. (iii) 370 MW UTRAN Combined Cycle Power Plant - Surat –ALSTOM Projects India Ltd- Gujrath India (Feb 2009 – May 2010) Turn Over Package Engineer and Commissioning Support - Gas Turbine and Steam Turbine Plant ⇒ Coordination of System Turn Overs in accordance with established commissioning sequence ⇒ Conducting the weekly forecast meeting with ALSTOM Erection and Contractor and updating the Project Forecast dates ⇒ Compiling of QA/QC documentation from erection required for commissioning and Reviwing and make the corrections as per commissioning need ⇒ Reporting the Slippage dates to Site Manager and Sub Contractor ⇒ Collection of all necessary documentation for each system in site and checking same for completeness ⇒ Checking all the Turn Over conditions are full filled. ⇒ Organizing the Site walk downs with Commissioning and Erection ⇒ Compiling and categorizing the punch list during walk downs and entering the same in to Punch list data base ⇒ Reporting System Turn Over Package related progress to Commissioning Manager ⇒ Coordinating with Engineering for Engineering Related Punch Points ⇒ Operation and Maintenance Support ⇒ Checking all Systems are ins Service which are required for plant start up ⇒ Plant Start-up and shut down activities ⇒ Over all monitoring of plant parameters during plant load (iv) 1000 MW soha Combined Cycle Power Plant - AL HASSAN ENGINEERING CO.SAOG – OMAN (July 2007 to Jan 2009) Turn Over Package Engineer - Gas Turbine and Steam Turbine Plant Page 5 of 7
  • 6. ⇒ Coordination of System Turn Overs in accordance with established commissioning sequence ⇒ Conducting the weekly forecast meeting with ALSTOM Erection and Contractor and updating the Project Forecast dates ⇒ Compiling of QA/QC documentation from erection required for commissioning and Reviwing and make the corrections as per commissioning need ⇒ Reporting the Slippage dates to Site Manager and Sub Contractor ⇒ Collection of all necessary documentation for each system in site and checking same for completeness ⇒ Checking all the Turn Over conditions are full filled. ⇒ Organizing the Site walk downs with Commissioning and Erection ⇒ Compiling and categorizing the punch list during walk downs and entering the same in to Punch list data base ⇒ Reporting System Turn Over Package related progress to Commissioning Manager ⇒ Coordinating with Engineering for Engineering Related Punch Points (v) 460 MW Gautami CCPP, Samarlakota – Gujarat- (India) – ALSTOM Projects India Ltd - (Dec 2006 to April 2007) Turn Over Package Support Engineer and Erection Supervisor - Gas Turbine and Steam Turbine Plant ⇒ Worked as Turn Over Package (TOP) coordinator ⇒ Collection of all QA / QC Documents required for Turn Over Package (TOP) and Checking same for completeness. ⇒ Organizing the internal inspections at site with area in charges / supervisors / Quality and raising the internal punch points. ⇒ Organizing the Final TOP Inspections with Client and Compiling and categorizing the final punch list during inspection. As Erection Supervisor ⇒ Erection of MV and LV Switchgear Panels, Cable laying and terminations. Coordinating with Testing and Commissioning ⇒ Involved in Erection of 400KV Switchyard, Illumination and fire fighting and fire detection System. ⇒ Partly involved in instrumentation System, BOP and DCS and Erection of Transformers. Notables ⇒ Successfully handled set up and commissioning of various Electrical Systems as a Unit Lead ⇒ Experienced in power plant process and Electrical systems, mainly Combined Cycle power plants. ⇒ Adept in troubleshooting and problem solving encountered during commissioning. ⇒ Adept in analysing, troubleshooting and maintenance of various Electrical systems such as Generators, Transformers, Electrical Protection systems, Synchronising System, Generator cooling systems and LV/MV switchgear. ⇒ Adept in handling of various instruments and tools required for troubleshooting and commissioning (the likes of Oscilloscopes, Maggers, Hart communicators and signal injectors, among others). ⇒ Adept in set-up, installation, maintenance and troubleshooting of various Relays. ⇒ Successfully handled multiple assignments as TOP Engineer (Site Management) ⇒ Successfully Handled 1000 MW Sohar Aluminium Power Plant as Turn Over Package Incharge ⇒ Successful coordination with Customer and Sub contractor Education Page 6 of 7
  • 7. 2004 B.Tech. in Electrical Engineering from JNTU 1999 Board of Intermediate - Andhra Pradesh 1997 ZPSS Secondary High school - Warangal Additional Training ⇒ ASLP – ALSTOM Safety Leader Ship Programme - 2013 ⇒ ALSTOM International EHS Passport – 2013 ⇒ COMET (Commissioning Engr. Training) - Basic – Alstom Baden Switzerland – 2010. ⇒ COMET (Commissioning Engr. Training) – Expert (Electrical) – Alstom Baden Switzerland – 2010 ⇒ STATRON DC and UPS training, Baden - Switzerland ⇒ EHS elevator level 1 – Alstom – 20009 ⇒ EHS elevator level 2 – Alstom – 2010. Personal Dossier Date of Birth: 10-06-1982 Language Known: Telugu,English and Hindi Passport No: G3583958 Address: 1-124 Peddavangara,Kodakandla,Warangal - AP Page 7 of 7