1 | P r o j e c t s P o r t f o l i o
Navu Memafu - Pacific Palms Property
1. WINDWARD EAST – Port Moresby, NCD
Project Description:
Windward East Apartments is a 14-storey executive apartments
building comprises of total of 40 units which includes 24x3
bedrooms, 12x2 bedrooms, 2x2 bedroom penthouses, 1x4
bedroom penthouse and 1x5 bedroom penthouse, all penthouses
have two levels. The apartment is enhanced with amenities
including swimming pool, gymnasium facility, tennis, pool tables,
kids’ playground, squash and BBQ area. The building has 3 levels
of basement car parking and a visitor car park at Ground Floor.
Architect:
Cullen Feng Architects (Australia)
Contractor:
China Railway Construction Group (CRCG)
Construction Cost:
K89, 648,000.00
Construction Duration:
2010 – October 2014
Roles in the Project
 Assist the superintendent (project manager) with the daily
supervision of the construction work by the main contractor
and subcontractors.
 Assist the superintendent (project manager) with the daily
project administration work.
 Carry out daily inspections on construction work to make sure
the contractor(s) comply with the approved standards and
the project requirements.
 Liaise with the project consultants (architect, consultant
engineers, etc.) to make sure their system(s) are installed
correctly and as per the engineering design.
 Coordinated the defect liability period (DLP) by liaising with
the main contractor during the defects rectification work.
2 | P r o j e c t s P o r t f o l i o
Navu Memafu - Pacific Palms Property
2. PENTHOUSE 2 REFURBISHMENT – Port Moresby, NCD
Project Description:
Major refurbishment work for the double storey Penthouse 2
suite at the top level of Windward West. The Penthouse 2
refurbishment was part of the property upgrade for the
Windward West Apartments.
Interior Designer:
Space Studio NZ (New Zealand)
Contractor:
Pacific Structure Limited
Project Cost:
K1 million
Construction Duration:
February 2014 – May 2014
Roles in the Project
 Oversaw the overall construction work and progress of the
project undertaking by the main contractor and
subcontractors.
 Liaised with interior designer (Space Studio from New
Zealand) to make sure the contractor comply with the design
requirements and standards.
 Carried out daily inspections to make sure the work is done
properly and correctly.
 Managed client supply items for the project to make sure
they are ordered and supplied in a timely manner.
 Prepared weekly progressive reports for senior management
information and update.
3 | P r o j e c t s P o r t f o l i o
Navu Memafu - Pacific Palms Property
3. WINDWARD WEST RENOVATION – Port Moresby, NCD
Project Description:
Windward West is a 14-storey Apartment building which
completed construction in 1987 by Fletcher Morobe Construction
Limited in 1985. After over 30 years, the building has gone
through it first ever major renovation. The apartment comprise of
12 x 2 bedroom unit with ensuites, 12 x 3 bedroom with ensuites
and 2 x double storey penthouses.
Architect:
Pacific Palms Property – In house
Contractor:
Pacific Palms Property – In house
Project Cost:
K8 million
Construction Duration:
October 2014 – April 2016
Roles in the Project
 Construction Manager to manage day to day operations of
the construction work on site.
 Managed and supervised a team of construction workers
including builders, carpenters, joiners, plumbers, electricians,
plasterers, painters, etc…
 Supervised all specialist contractors undertaking works with
the major renovation project.
 Managed building materials and equipment procurement
from local and overseas suppliers to make sure the materials
ordered are correct and deliver to the project site in a timely
manner.
 Prepared and submitted monthly progress status report to
the Property Development Manager for senior management
update.
4 | P r o j e c t s P o r t f o l i o
Navu Memafu - Pacific Palms Property
4. HARBOURSIDE DEVELOPMENT – Port Moresby, NCD
Project Description:
Steamships Harbourside Development project has been the first
post-industrial portside development in Port Moresby and it
consists of two, six and seven storey buildings respectively. The
buildings cater for office spaces, professional suites, basement
parking, ground floor retail as well as restaurants over the water-
edge and boat moorings. The esplanade and water front building
façade are composed of glazed curtain walls and perforated sun
shading. The building forms have the slight angular geometry
typical of the steel coastal ship hulls that have used the site for
many years.
Architect:
Cullen Feng Architect (Australia)
Construction Manager:
China Railway Construction Group (CRCG)
Project Cost:
K180 million
Construction Duration:
March 2012 – June 2015
Roles in the Project
 Assisted superintendent (project manager) with the daily
supervision of the construction work by the main contractor
and subcontractors.
 Liaised with consultants (architect, services, structural,
mechanical, etc.) to make sure their system(s) are correctly
and properly done.
 Oversaw fit-out works by tenants’ contractors to make sure
they comply with our company’s requirements and building
regulations.
 Coordinated the defect liability period by liaising with the
main contractor to fixing the defects identified.
5 | P r o j e c t s P o r t f o l i o
Navu Memafu - Pacific Palms Property
5. CASSOWAY HOTEL – Kiunga, Western Province
Project Description:
Cassowary Hotel in Kiunga, Western Province is a joint venture
project between Ok Tedi Development Foundation (OTDF)
through CMCA and Steamships Trading Company Limited (STC) in
which Pacific Palms Property (PPP) was nominated as the project
manager to manager the project from initial design to completion
of construction. The hotel is modular system manufactured in
Thailand and shipped to PNG and it comprises of 45 guest rooms,
staff accommodations, restaurant, dining, lounge and enzo’s pizza
outlet and has total of 4 levels from Ground Floor to Level 3 and
laundry at the basement area.
Architect:
Thomson Adsett Architects (Australia)
Construction Manager:
The George Group – TGG (PNG) Limited
Project Cost:
K32 million
Construction Duration:
May 2016 – April 2017 (ongoing)
Roles in the Project
 Client’s representative at construction site as the Site
Architect and Project Administrator.
 Oversee the overall construction of the hotel undertaken by
the construction manager.
 Provide contract admin work for the project (review, verify
and recommend contractor’s claims) before approval is given
by the client.
 Carry out daily site inspection to make sure the works are
done in accordance with the requirements in the contract.
 Prepare and submitted progressive site inspection reports for
the senior management and the client.

More Related Content

What's hot

Resume for tony_kettlewell
Resume for tony_kettlewellResume for tony_kettlewell
Resume for tony_kettlewellConfidential
 
David Goodwin Resume 2015 LP
David Goodwin Resume 2015 LPDavid Goodwin Resume 2015 LP
David Goodwin Resume 2015 LPDavid Goodwin
 
Oscar P. Juarez-RESUME
Oscar P. Juarez-RESUMEOscar P. Juarez-RESUME
Oscar P. Juarez-RESUMEOscar Juarez
 
20161120 Binu CV - Sr. Civil Engineer
20161120 Binu CV - Sr. Civil Engineer20161120 Binu CV - Sr. Civil Engineer
20161120 Binu CV - Sr. Civil EngineerBinu Babu
 
CV-Danilo B. Acosta. Engineer II
CV-Danilo B. Acosta. Engineer IICV-Danilo B. Acosta. Engineer II
CV-Danilo B. Acosta. Engineer IIdanilo acosta
 
Thierry Martien Resume 2015.
Thierry Martien Resume 2015.Thierry Martien Resume 2015.
Thierry Martien Resume 2015.thierry martien
 
CV Details 2016
CV Details 2016CV Details 2016
CV Details 2016Liam Henry
 
Fbs Portfolio 2011 2012
Fbs Portfolio 2011   2012Fbs Portfolio 2011   2012
Fbs Portfolio 2011 2012Tom Stack
 
Resume Oct 2015 Revision 2
Resume Oct 2015 Revision 2Resume Oct 2015 Revision 2
Resume Oct 2015 Revision 2David Seaward
 
Nabil Noshey Sadek -1
Nabil Noshey Sadek -1Nabil Noshey Sadek -1
Nabil Noshey Sadek -1Nabil Sadek
 
Vimal, Civil Engr CV
Vimal, Civil Engr CVVimal, Civil Engr CV
Vimal, Civil Engr CVvimal nc
 
Fluid Portfolio Summer 2012
Fluid Portfolio Summer 2012Fluid Portfolio Summer 2012
Fluid Portfolio Summer 2012Tom Stack
 
NATIONAL LABORATORY FOR SOIL AND BUILDING MATERIALS TESTING
NATIONAL LABORATORY FOR SOIL AND BUILDING MATERIALS TESTINGNATIONAL LABORATORY FOR SOIL AND BUILDING MATERIALS TESTING
NATIONAL LABORATORY FOR SOIL AND BUILDING MATERIALS TESTINGNationalLaboratory
 

What's hot (20)

Resume for tony_kettlewell
Resume for tony_kettlewellResume for tony_kettlewell
Resume for tony_kettlewell
 
David Goodwin Resume 2015 LP
David Goodwin Resume 2015 LPDavid Goodwin Resume 2015 LP
David Goodwin Resume 2015 LP
 
Oscar P. Juarez-RESUME
Oscar P. Juarez-RESUMEOscar P. Juarez-RESUME
Oscar P. Juarez-RESUME
 
20161120 Binu CV - Sr. Civil Engineer
20161120 Binu CV - Sr. Civil Engineer20161120 Binu CV - Sr. Civil Engineer
20161120 Binu CV - Sr. Civil Engineer
 
CV-Danilo B. Acosta. Engineer II
CV-Danilo B. Acosta. Engineer IICV-Danilo B. Acosta. Engineer II
CV-Danilo B. Acosta. Engineer II
 
Thierry Martien Resume 2015.
Thierry Martien Resume 2015.Thierry Martien Resume 2015.
Thierry Martien Resume 2015.
 
CV Details 2016
CV Details 2016CV Details 2016
CV Details 2016
 
Nabil Soliman
Nabil SolimanNabil Soliman
Nabil Soliman
 
Fbs Portfolio 2011 2012
Fbs Portfolio 2011   2012Fbs Portfolio 2011   2012
Fbs Portfolio 2011 2012
 
Resume Oct 2015 Revision 2
Resume Oct 2015 Revision 2Resume Oct 2015 Revision 2
Resume Oct 2015 Revision 2
 
Nabil Noshey Sadek -1
Nabil Noshey Sadek -1Nabil Noshey Sadek -1
Nabil Noshey Sadek -1
 
Prajeesh K. CV - Sep 2016
Prajeesh K. CV - Sep 2016Prajeesh K. CV - Sep 2016
Prajeesh K. CV - Sep 2016
 
Vimal, Civil Engr CV
Vimal, Civil Engr CVVimal, Civil Engr CV
Vimal, Civil Engr CV
 
Fluid Portfolio Summer 2012
Fluid Portfolio Summer 2012Fluid Portfolio Summer 2012
Fluid Portfolio Summer 2012
 
Anees Khan Resume from GK
Anees Khan Resume from GKAnees Khan Resume from GK
Anees Khan Resume from GK
 
Project List
Project ListProject List
Project List
 
NATIONAL LABORATORY FOR SOIL AND BUILDING MATERIALS TESTING
NATIONAL LABORATORY FOR SOIL AND BUILDING MATERIALS TESTINGNATIONAL LABORATORY FOR SOIL AND BUILDING MATERIALS TESTING
NATIONAL LABORATORY FOR SOIL AND BUILDING MATERIALS TESTING
 
CV_Oscar_Bandeira
CV_Oscar_BandeiraCV_Oscar_Bandeira
CV_Oscar_Bandeira
 
Resume -Amarnath
Resume -AmarnathResume -Amarnath
Resume -Amarnath
 
REFLetter_OMB
REFLetter_OMBREFLetter_OMB
REFLetter_OMB
 

Viewers also liked

Polling system solution using blockchain & Liferay
Polling system solution using blockchain & LiferayPolling system solution using blockchain & Liferay
Polling system solution using blockchain & LiferayDhanraj Dadhich
 
Fatturazione elettronica e CAD - CINECA 22 aprile 2015
Fatturazione elettronica e CAD - CINECA 22 aprile 2015Fatturazione elettronica e CAD - CINECA 22 aprile 2015
Fatturazione elettronica e CAD - CINECA 22 aprile 2015Fabio Massimi
 
3Com 10G XFP
3Com 10G XFP3Com 10G XFP
3Com 10G XFPsavomir
 
3Com 3C16734A
3Com 3C16734A3Com 3C16734A
3Com 3C16734Asavomir
 
3Com 1661-110-000-9
3Com 1661-110-000-93Com 1661-110-000-9
3Com 1661-110-000-9savomir
 
ASHWINI GADE- Resume
ASHWINI GADE- ResumeASHWINI GADE- Resume
ASHWINI GADE- ResumeAshwini Gade
 
Al raza may, june 2016
Al raza  may, june 2016Al raza  may, june 2016
Al raza may, june 2016sunninews92
 
Implications of Robotic Walkway Cleaning for Hoof Disorders in Dairy Cattle
Implications of Robotic Walkway Cleaning for Hoof Disorders in Dairy CattleImplications of Robotic Walkway Cleaning for Hoof Disorders in Dairy Cattle
Implications of Robotic Walkway Cleaning for Hoof Disorders in Dairy CattleIJERA Editor
 

Viewers also liked (17)

Polling system solution using blockchain & Liferay
Polling system solution using blockchain & LiferayPolling system solution using blockchain & Liferay
Polling system solution using blockchain & Liferay
 
Price list
Price listPrice list
Price list
 
Informatica 2
Informatica 2Informatica 2
Informatica 2
 
Fatturazione elettronica e CAD - CINECA 22 aprile 2015
Fatturazione elettronica e CAD - CINECA 22 aprile 2015Fatturazione elettronica e CAD - CINECA 22 aprile 2015
Fatturazione elettronica e CAD - CINECA 22 aprile 2015
 
3Com 10G XFP
3Com 10G XFP3Com 10G XFP
3Com 10G XFP
 
3Com 3C16734A
3Com 3C16734A3Com 3C16734A
3Com 3C16734A
 
RIYA (2)
RIYA (2)RIYA (2)
RIYA (2)
 
Portfolio JM
Portfolio JMPortfolio JM
Portfolio JM
 
3Com 1661-110-000-9
3Com 1661-110-000-93Com 1661-110-000-9
3Com 1661-110-000-9
 
ASHWINI GADE- Resume
ASHWINI GADE- ResumeASHWINI GADE- Resume
ASHWINI GADE- Resume
 
Nadeem's CV
Nadeem's CVNadeem's CV
Nadeem's CV
 
Sheperd Milan Moya 2017
Sheperd Milan Moya 2017Sheperd Milan Moya 2017
Sheperd Milan Moya 2017
 
3.arte papel
3.arte papel3.arte papel
3.arte papel
 
YCC
YCCYCC
YCC
 
Al raza may, june 2016
Al raza  may, june 2016Al raza  may, june 2016
Al raza may, june 2016
 
CVitae1(11)
CVitae1(11)CVitae1(11)
CVitae1(11)
 
Implications of Robotic Walkway Cleaning for Hoof Disorders in Dairy Cattle
Implications of Robotic Walkway Cleaning for Hoof Disorders in Dairy CattleImplications of Robotic Walkway Cleaning for Hoof Disorders in Dairy Cattle
Implications of Robotic Walkway Cleaning for Hoof Disorders in Dairy Cattle
 

Similar to Project Portfoilio

cv_de jong_Andrew July 2015
cv_de jong_Andrew July 2015cv_de jong_Andrew July 2015
cv_de jong_Andrew July 2015Andrew De Jong
 
25 years of Projects in a Nutshell
25 years of Projects in a Nutshell25 years of Projects in a Nutshell
25 years of Projects in a NutshellYusufDawood4
 
Mike Johnson (JEAJ) amend [57398]
Mike Johnson (JEAJ) amend [57398]Mike Johnson (JEAJ) amend [57398]
Mike Johnson (JEAJ) amend [57398]Mike Johnson
 
Project Experience Rachel Byrne
Project Experience Rachel ByrneProject Experience Rachel Byrne
Project Experience Rachel ByrneRachel Byrne
 
Resume of ken hagan. 1
Resume of ken hagan. 1Resume of ken hagan. 1
Resume of ken hagan. 1Kenny Hagan
 
resume for john rhynold 2015 #2
resume for john rhynold 2015 #2resume for john rhynold 2015 #2
resume for john rhynold 2015 #2john rhynold
 
Richard Batts CV 2017
Richard Batts CV 2017Richard Batts CV 2017
Richard Batts CV 2017Richard Batts
 
Resume November 2016
Resume November 2016Resume November 2016
Resume November 2016John Brennan
 
CV_Andy_Coupland (1)
CV_Andy_Coupland (1)CV_Andy_Coupland (1)
CV_Andy_Coupland (1)Andy Coupland
 
Tim Read CV January 2016
Tim Read CV January 2016Tim Read CV January 2016
Tim Read CV January 2016Tim Read
 
Tim Read CV January 2016
Tim Read CV January 2016Tim Read CV January 2016
Tim Read CV January 2016Tim Read
 
PLB Format CV Updated 16-03-2015
PLB Format CV Updated 16-03-2015PLB Format CV Updated 16-03-2015
PLB Format CV Updated 16-03-2015Peter Bricknell
 

Similar to Project Portfoilio (20)

AnthonyCurrent HTR
AnthonyCurrent HTRAnthonyCurrent HTR
AnthonyCurrent HTR
 
cv_de jong_Andrew July 2015
cv_de jong_Andrew July 2015cv_de jong_Andrew July 2015
cv_de jong_Andrew July 2015
 
zk resume
zk resumezk resume
zk resume
 
25 years of Projects in a Nutshell
25 years of Projects in a Nutshell25 years of Projects in a Nutshell
25 years of Projects in a Nutshell
 
Mike Johnson (JEAJ) amend [57398]
Mike Johnson (JEAJ) amend [57398]Mike Johnson (JEAJ) amend [57398]
Mike Johnson (JEAJ) amend [57398]
 
Project Experience Rachel Byrne
Project Experience Rachel ByrneProject Experience Rachel Byrne
Project Experience Rachel Byrne
 
Resume of ken hagan. 1
Resume of ken hagan. 1Resume of ken hagan. 1
Resume of ken hagan. 1
 
resume for john rhynold 2015 #2
resume for john rhynold 2015 #2resume for john rhynold 2015 #2
resume for john rhynold 2015 #2
 
Richard Batts CV 2017
Richard Batts CV 2017Richard Batts CV 2017
Richard Batts CV 2017
 
hudgensresume0915
hudgensresume0915hudgensresume0915
hudgensresume0915
 
Resume November 2016
Resume November 2016Resume November 2016
Resume November 2016
 
Ravi's CV
Ravi's CVRavi's CV
Ravi's CV
 
CV_Andy_Coupland (1)
CV_Andy_Coupland (1)CV_Andy_Coupland (1)
CV_Andy_Coupland (1)
 
Ashley cv most recent2016 7
Ashley cv most recent2016 7Ashley cv most recent2016 7
Ashley cv most recent2016 7
 
Ashley cv most recent2016 7
Ashley cv most recent2016 7Ashley cv most recent2016 7
Ashley cv most recent2016 7
 
Tim Read CV January 2016
Tim Read CV January 2016Tim Read CV January 2016
Tim Read CV January 2016
 
Tim Read CV January 2016
Tim Read CV January 2016Tim Read CV January 2016
Tim Read CV January 2016
 
John Nelson CV 29 Oct 2015
John Nelson CV 29 Oct 2015John Nelson CV 29 Oct 2015
John Nelson CV 29 Oct 2015
 
MS CV May 2016
MS CV May 2016MS CV May 2016
MS CV May 2016
 
PLB Format CV Updated 16-03-2015
PLB Format CV Updated 16-03-2015PLB Format CV Updated 16-03-2015
PLB Format CV Updated 16-03-2015
 

Project Portfoilio

  • 1. 1 | P r o j e c t s P o r t f o l i o Navu Memafu - Pacific Palms Property 1. WINDWARD EAST – Port Moresby, NCD Project Description: Windward East Apartments is a 14-storey executive apartments building comprises of total of 40 units which includes 24x3 bedrooms, 12x2 bedrooms, 2x2 bedroom penthouses, 1x4 bedroom penthouse and 1x5 bedroom penthouse, all penthouses have two levels. The apartment is enhanced with amenities including swimming pool, gymnasium facility, tennis, pool tables, kids’ playground, squash and BBQ area. The building has 3 levels of basement car parking and a visitor car park at Ground Floor. Architect: Cullen Feng Architects (Australia) Contractor: China Railway Construction Group (CRCG) Construction Cost: K89, 648,000.00 Construction Duration: 2010 – October 2014 Roles in the Project  Assist the superintendent (project manager) with the daily supervision of the construction work by the main contractor and subcontractors.  Assist the superintendent (project manager) with the daily project administration work.  Carry out daily inspections on construction work to make sure the contractor(s) comply with the approved standards and the project requirements.  Liaise with the project consultants (architect, consultant engineers, etc.) to make sure their system(s) are installed correctly and as per the engineering design.  Coordinated the defect liability period (DLP) by liaising with the main contractor during the defects rectification work.
  • 2. 2 | P r o j e c t s P o r t f o l i o Navu Memafu - Pacific Palms Property 2. PENTHOUSE 2 REFURBISHMENT – Port Moresby, NCD Project Description: Major refurbishment work for the double storey Penthouse 2 suite at the top level of Windward West. The Penthouse 2 refurbishment was part of the property upgrade for the Windward West Apartments. Interior Designer: Space Studio NZ (New Zealand) Contractor: Pacific Structure Limited Project Cost: K1 million Construction Duration: February 2014 – May 2014 Roles in the Project  Oversaw the overall construction work and progress of the project undertaking by the main contractor and subcontractors.  Liaised with interior designer (Space Studio from New Zealand) to make sure the contractor comply with the design requirements and standards.  Carried out daily inspections to make sure the work is done properly and correctly.  Managed client supply items for the project to make sure they are ordered and supplied in a timely manner.  Prepared weekly progressive reports for senior management information and update.
  • 3. 3 | P r o j e c t s P o r t f o l i o Navu Memafu - Pacific Palms Property 3. WINDWARD WEST RENOVATION – Port Moresby, NCD Project Description: Windward West is a 14-storey Apartment building which completed construction in 1987 by Fletcher Morobe Construction Limited in 1985. After over 30 years, the building has gone through it first ever major renovation. The apartment comprise of 12 x 2 bedroom unit with ensuites, 12 x 3 bedroom with ensuites and 2 x double storey penthouses. Architect: Pacific Palms Property – In house Contractor: Pacific Palms Property – In house Project Cost: K8 million Construction Duration: October 2014 – April 2016 Roles in the Project  Construction Manager to manage day to day operations of the construction work on site.  Managed and supervised a team of construction workers including builders, carpenters, joiners, plumbers, electricians, plasterers, painters, etc…  Supervised all specialist contractors undertaking works with the major renovation project.  Managed building materials and equipment procurement from local and overseas suppliers to make sure the materials ordered are correct and deliver to the project site in a timely manner.  Prepared and submitted monthly progress status report to the Property Development Manager for senior management update.
  • 4. 4 | P r o j e c t s P o r t f o l i o Navu Memafu - Pacific Palms Property 4. HARBOURSIDE DEVELOPMENT – Port Moresby, NCD Project Description: Steamships Harbourside Development project has been the first post-industrial portside development in Port Moresby and it consists of two, six and seven storey buildings respectively. The buildings cater for office spaces, professional suites, basement parking, ground floor retail as well as restaurants over the water- edge and boat moorings. The esplanade and water front building façade are composed of glazed curtain walls and perforated sun shading. The building forms have the slight angular geometry typical of the steel coastal ship hulls that have used the site for many years. Architect: Cullen Feng Architect (Australia) Construction Manager: China Railway Construction Group (CRCG) Project Cost: K180 million Construction Duration: March 2012 – June 2015 Roles in the Project  Assisted superintendent (project manager) with the daily supervision of the construction work by the main contractor and subcontractors.  Liaised with consultants (architect, services, structural, mechanical, etc.) to make sure their system(s) are correctly and properly done.  Oversaw fit-out works by tenants’ contractors to make sure they comply with our company’s requirements and building regulations.  Coordinated the defect liability period by liaising with the main contractor to fixing the defects identified.
  • 5. 5 | P r o j e c t s P o r t f o l i o Navu Memafu - Pacific Palms Property 5. CASSOWAY HOTEL – Kiunga, Western Province Project Description: Cassowary Hotel in Kiunga, Western Province is a joint venture project between Ok Tedi Development Foundation (OTDF) through CMCA and Steamships Trading Company Limited (STC) in which Pacific Palms Property (PPP) was nominated as the project manager to manager the project from initial design to completion of construction. The hotel is modular system manufactured in Thailand and shipped to PNG and it comprises of 45 guest rooms, staff accommodations, restaurant, dining, lounge and enzo’s pizza outlet and has total of 4 levels from Ground Floor to Level 3 and laundry at the basement area. Architect: Thomson Adsett Architects (Australia) Construction Manager: The George Group – TGG (PNG) Limited Project Cost: K32 million Construction Duration: May 2016 – April 2017 (ongoing) Roles in the Project  Client’s representative at construction site as the Site Architect and Project Administrator.  Oversee the overall construction of the hotel undertaken by the construction manager.  Provide contract admin work for the project (review, verify and recommend contractor’s claims) before approval is given by the client.  Carry out daily site inspection to make sure the works are done in accordance with the requirements in the contract.  Prepare and submitted progressive site inspection reports for the senior management and the client.