SlideShare a Scribd company logo
1 of 4
PROFILE
of
Tony Hamilton
CATEGORY: Senior Site Manager ADDRESS: 41 St Julien Gardens
Cochrane Park
Newcastle Upon Tyne –
NE7 7LL
Mobile: 07939459762
Home Tel: 0191 2661917
Will work throughout UK &
overseas
D.O.B. 3
rd
January 1974 AVAILABILITY: 2 weeks notice
STATUS: Married SALARY GUIDE: Negotiable
QUALIFICATIONS:
SMSTS (5 day) Obtained 28
th
Feb 2014
First Aid Course – St Johns Ambulance (refresher September 2012
City & Guilds 1 & 2 (plus Advanced Craft in Carpentry & Joinery)
Scaffolding Awareness Course (5 day attendance at Multibuild office with independent assessor)
Asbestos Awareness Managers UKATA card 23
rd
November 13
Fire warden’s course.
Hugh Thompson Roofing
(HTR)
August 2013 to Present
Project manager
The requirement in this role is to deal mainly with the CDM coordinator and the client in all aspects to in
the build and refurb of this old factory former Rotary power part of bel valves.
The build consists of part demo of the existing factory and to renew new steels and pad foundations
including new concrete retaining wall and new bases for high-tech machines to be installed. New blockwork
thoughout along with extension to existing sub-station.
Also a complete new drainage system and replacement of the roof and external cladding using Kingspan
insulated panels throughout and mini micro
Duties is to order all materials in advance ahead of the programme ensure that the day to day running of the
site is in order with all sub-contractors and direct labour are to work to Architect and engineer drawings.
H&S requirements and RAMS construction phase plan is updated to when required along with permits.
Carried out full site inductions on site and putting together contractors reports for the fortnightly meeting
and chairing all progress meeting with all sub-contractors and client along with CDM.
March 2010– June 2013 Denizen Contracts
Senior Site Manager
Projects included the following: Working on a 148-bed hotel (Indigo) in Newcastle Upon Tyne,
refurbishment of former Eagle Star House, which is a 4-Star boutique hotel with a Marco Pierre White
restaurant. I am responsible for all day to day activities, managing all sub contractors from demolition to
final completion. Other responsibilities include dealing with the client, which was Sanguine Hospitality
Group, chairing meetings and ensuring that the project was done to the specific time on budget.
Responsible for ensuring all specific RAMS evaluation reports and all other aspects of health and safety
documents are correct and updated. Controlling the project programme and ensuring that all Sub-
contractors are working to the current drawings and designs, all building control measures are in place
I.e. fire stopping, dealing with the highways and local council for planning applications.
Also assisting the surveying team on percuments.
Hampton by Hilton Sheffield, 170 bed 4 star hotel once the building was the former police headquarters for
South Yorkshire.
The building was transformed into this hotel; duties include day to day running of the site, from start
asbestos removal to final handover, dealing with a more direct with the client and brand.
Site Manager
July 06– March 10 Speymill contracts
Senior Site Manager
Projects included the following:
Project included Newcastle (Premier Inn Hotel extension 32-bed), Ballsall Common (Premier Inn Hotel
extension 50-bed) & Chesterfield North (Premier Inn Hotel extension 27-bed). Responsible for the Site
Manager with a total project valuation of £ 4 Million. Main duties included day-to-day running of building
site, all aspects of health & safety, ordering all buildings materials, chairing meetings, working to
programmes and staff supervision including all sub-contractors. Responsible for ground works, cast slab
floors or block & beam and timber frame erection to final completion. Project also included refurbishments
of existing Premier Inn Hotels. This covered extending current number of bedrooms (bolt-ons) &
conference area. Also Building Premier inn extension in rugby, 42 bed as same spec as above.
Whilst at Speymill, all construction required a ‘can do’ approach to working. This enabled me to effectively
complete all construction work on all projects, keep within budget and motivate building site staff.
April 2004– July 2006 Multibuild
Site Manager
Projects included the following:
Working on an extension on Premier Travel Inn hotels ranging from 22 to 30 bedrooms. Duties include day
to day running of building site such as health & safety, ‘calling off’ materials for the entire project, timber
frame, all aspects of ground works (from design stage to build),ensuring project works according to the
programme spec, liaison with the client and sub contractors and chairing weekly site meetings involve
Whitbread (owner of Premier hotels). Project also included refurbishments of existing Premier Travel Inn
hotels.
May 2002– March 2004 Totty Construction
Site Manager
Projects included the following:
Luxury apartments in Newcastle with total value of £20m. Main duties included running 1 of 3 sections of
104 apartments and 3 penthouses. General Site Management duties included, for construction, curtain
wall, meseck, specialist external wall cladding, some paraton blocks. Other duties included organising
material and trades, line and balance charts, issuing delay, chairing site progress meetings, dealing with all
contractors from M&E, joinery and dry lining to final decorations and handover. Managing quality control.
Ensuring all sub-contractors are working to the current drawings and designs.
Issuing defects and non-conformance notices to the relevant contractors.
January 1999– April 2002 Dean & Bowes
Site Manager
Projects included the following:
Working on various projects around the UK fitting out JD Wetherspoons pubs. Main duties included project
management, health & safety and recruitment for all sub contractors. The main function of the role was to
ensure that structure of some of the buildings was maintained. I was responsible for ensuring that the
scope of works was carried out as per the specification and dealing directly it the client.
February 1993– December 1998 KCR Interiors
Joiner (then progressed to be Working Foreman/Supervision)
Projects included the following:
This project involved fitting out shop outlets across the country. Duties first and second fix joinery, working
on fast track fit outs to stores including Top Shop, Burtons, Littlewoods and various other high street
names. In this role, I proved to be a competent and loyal employee, which meant that I received a
promotion to become Working Foreman/Supervisor looking after my own jobs.
Up to this date, I served my time as joiner with Universal Joineries Newcastle between 1989 and 1993.
Duties included working as a bench hand and working on site. I completed a full 4-year apprenticeship.

More Related Content

What's hot

Kevin Ionta Resume 1-2016
Kevin Ionta Resume 1-2016Kevin Ionta Resume 1-2016
Kevin Ionta Resume 1-2016Kevin Ionta
 
Jeff Kreller Resume 2016
Jeff Kreller Resume 2016Jeff Kreller Resume 2016
Jeff Kreller Resume 2016Jeff Kreller
 
ERROL P. NARCISO-CV new edited
ERROL P. NARCISO-CV new editedERROL P. NARCISO-CV new edited
ERROL P. NARCISO-CV new editederrol narciso
 
Glenn Caron Resume Aug 2016
Glenn Caron Resume Aug 2016Glenn Caron Resume Aug 2016
Glenn Caron Resume Aug 2016Glenn Caron
 
Kevin Ionta Resume 1-2016
Kevin Ionta Resume 1-2016Kevin Ionta Resume 1-2016
Kevin Ionta Resume 1-2016Kevin Ionta
 
resume for john rhynold 2015 #2
resume for john rhynold 2015 #2resume for john rhynold 2015 #2
resume for john rhynold 2015 #2john rhynold
 
RobRuhlmanResume_11_16
RobRuhlmanResume_11_16RobRuhlmanResume_11_16
RobRuhlmanResume_11_16Rob Ruhlman
 
Resume New 2016- Mustapha A. Jubeily
Resume New 2016- Mustapha A. JubeilyResume New 2016- Mustapha A. Jubeily
Resume New 2016- Mustapha A. JubeilyMustapha Jubeily
 
CV Details 2016
CV Details 2016CV Details 2016
CV Details 2016Liam Henry
 

What's hot (20)

wayne prescott cv
wayne prescott cvwayne prescott cv
wayne prescott cv
 
Kevin Ionta Resume 1-2016
Kevin Ionta Resume 1-2016Kevin Ionta Resume 1-2016
Kevin Ionta Resume 1-2016
 
Jeff Kreller Resume 2016
Jeff Kreller Resume 2016Jeff Kreller Resume 2016
Jeff Kreller Resume 2016
 
ERROL P. NARCISO-CV new edited
ERROL P. NARCISO-CV new editedERROL P. NARCISO-CV new edited
ERROL P. NARCISO-CV new edited
 
Glenn Caron Resume Aug 2016
Glenn Caron Resume Aug 2016Glenn Caron Resume Aug 2016
Glenn Caron Resume Aug 2016
 
Kevin Ionta Resume 1-2016
Kevin Ionta Resume 1-2016Kevin Ionta Resume 1-2016
Kevin Ionta Resume 1-2016
 
resume for john rhynold 2015 #2
resume for john rhynold 2015 #2resume for john rhynold 2015 #2
resume for john rhynold 2015 #2
 
RobRuhlmanResume_11_16
RobRuhlmanResume_11_16RobRuhlmanResume_11_16
RobRuhlmanResume_11_16
 
Jake-Oussoren (2)
Jake-Oussoren (2)Jake-Oussoren (2)
Jake-Oussoren (2)
 
Resume
ResumeResume
Resume
 
march 16
march 16march 16
march 16
 
James Boyd resume 12.2015
James Boyd resume 12.2015James Boyd resume 12.2015
James Boyd resume 12.2015
 
rgb up to date cv
rgb up to date cvrgb up to date cv
rgb up to date cv
 
Resume New 2016- Mustapha A. Jubeily
Resume New 2016- Mustapha A. JubeilyResume New 2016- Mustapha A. Jubeily
Resume New 2016- Mustapha A. Jubeily
 
CM Resume
CM Resume CM Resume
CM Resume
 
CV Details 2016
CV Details 2016CV Details 2016
CV Details 2016
 
Stelian Dragomir-CV
Stelian Dragomir-CVStelian Dragomir-CV
Stelian Dragomir-CV
 
Rob Resume (1)
Rob Resume (1)Rob Resume (1)
Rob Resume (1)
 
MDHResume
MDHResumeMDHResume
MDHResume
 
GERRY PANTIG MANICLANG
GERRY PANTIG MANICLANGGERRY PANTIG MANICLANG
GERRY PANTIG MANICLANG
 

Similar to AnthonyCurrent HTR

CV_Andy_Coupland (1)
CV_Andy_Coupland (1)CV_Andy_Coupland (1)
CV_Andy_Coupland (1)Andy Coupland
 
cv_de jong_Andrew July 2015
cv_de jong_Andrew July 2015cv_de jong_Andrew July 2015
cv_de jong_Andrew July 2015Andrew De Jong
 
Project Portfoilio
Project PortfoilioProject Portfoilio
Project PortfoilioNavu Memafu
 
Ryan Ministrelli Resume 2016
Ryan Ministrelli Resume 2016Ryan Ministrelli Resume 2016
Ryan Ministrelli Resume 2016Ryan Ministrelli
 
James Nolan experience in Energy, renewables, Waste to Energy and Waste to Oil
James Nolan experience in Energy, renewables, Waste to Energy and Waste to OilJames Nolan experience in Energy, renewables, Waste to Energy and Waste to Oil
James Nolan experience in Energy, renewables, Waste to Energy and Waste to OilJames Nolan
 
New brochure 240311
New brochure 240311New brochure 240311
New brochure 240311weydon23
 
Tim Read CV January 2016
Tim Read CV January 2016Tim Read CV January 2016
Tim Read CV January 2016Tim Read
 
Tim Read CV January 2016
Tim Read CV January 2016Tim Read CV January 2016
Tim Read CV January 2016Tim Read
 
Resume November 2016
Resume November 2016Resume November 2016
Resume November 2016John Brennan
 
Resume of ken hagan. 1
Resume of ken hagan. 1Resume of ken hagan. 1
Resume of ken hagan. 1Kenny Hagan
 
Richard Batts CV 2017
Richard Batts CV 2017Richard Batts CV 2017
Richard Batts CV 2017Richard Batts
 
Colin Ward Surveying summary
Colin Ward Surveying summaryColin Ward Surveying summary
Colin Ward Surveying summaryColin Ward
 
Steven Castellano.resume.2016
Steven Castellano.resume.2016Steven Castellano.resume.2016
Steven Castellano.resume.2016steven castellano
 
Rodwell Murwisi CV site manager 1
Rodwell Murwisi CV site manager 1Rodwell Murwisi CV site manager 1
Rodwell Murwisi CV site manager 1Rodi Murwisi
 
Steven Castellano.resume.2016
Steven Castellano.resume.2016Steven Castellano.resume.2016
Steven Castellano.resume.2016steven castellano
 

Similar to AnthonyCurrent HTR (20)

CV_Andy_Coupland (1)
CV_Andy_Coupland (1)CV_Andy_Coupland (1)
CV_Andy_Coupland (1)
 
Steve Bailey CV
Steve Bailey CVSteve Bailey CV
Steve Bailey CV
 
cv_de jong_Andrew July 2015
cv_de jong_Andrew July 2015cv_de jong_Andrew July 2015
cv_de jong_Andrew July 2015
 
Project Portfoilio
Project PortfoilioProject Portfoilio
Project Portfoilio
 
Ryan Ministrelli Resume 2016
Ryan Ministrelli Resume 2016Ryan Ministrelli Resume 2016
Ryan Ministrelli Resume 2016
 
James Nolan experience in Energy, renewables, Waste to Energy and Waste to Oil
James Nolan experience in Energy, renewables, Waste to Energy and Waste to OilJames Nolan experience in Energy, renewables, Waste to Energy and Waste to Oil
James Nolan experience in Energy, renewables, Waste to Energy and Waste to Oil
 
New brochure 240311
New brochure 240311New brochure 240311
New brochure 240311
 
Tim Read CV January 2016
Tim Read CV January 2016Tim Read CV January 2016
Tim Read CV January 2016
 
Tim Read CV January 2016
Tim Read CV January 2016Tim Read CV January 2016
Tim Read CV January 2016
 
Resume November 2016
Resume November 2016Resume November 2016
Resume November 2016
 
resume 2014
resume 2014resume 2014
resume 2014
 
Resume of ken hagan. 1
Resume of ken hagan. 1Resume of ken hagan. 1
Resume of ken hagan. 1
 
Richard Batts CV 2017
Richard Batts CV 2017Richard Batts CV 2017
Richard Batts CV 2017
 
Colin Ward Surveying summary
Colin Ward Surveying summaryColin Ward Surveying summary
Colin Ward Surveying summary
 
Gary Affleck Ward CV
Gary Affleck Ward CVGary Affleck Ward CV
Gary Affleck Ward CV
 
CV
CVCV
CV
 
Steven Castellano.resume.2016
Steven Castellano.resume.2016Steven Castellano.resume.2016
Steven Castellano.resume.2016
 
Appendices
AppendicesAppendices
Appendices
 
Rodwell Murwisi CV site manager 1
Rodwell Murwisi CV site manager 1Rodwell Murwisi CV site manager 1
Rodwell Murwisi CV site manager 1
 
Steven Castellano.resume.2016
Steven Castellano.resume.2016Steven Castellano.resume.2016
Steven Castellano.resume.2016
 

AnthonyCurrent HTR

  • 1. PROFILE of Tony Hamilton CATEGORY: Senior Site Manager ADDRESS: 41 St Julien Gardens Cochrane Park Newcastle Upon Tyne – NE7 7LL Mobile: 07939459762 Home Tel: 0191 2661917 Will work throughout UK & overseas D.O.B. 3 rd January 1974 AVAILABILITY: 2 weeks notice STATUS: Married SALARY GUIDE: Negotiable QUALIFICATIONS: SMSTS (5 day) Obtained 28 th Feb 2014 First Aid Course – St Johns Ambulance (refresher September 2012 City & Guilds 1 & 2 (plus Advanced Craft in Carpentry & Joinery) Scaffolding Awareness Course (5 day attendance at Multibuild office with independent assessor) Asbestos Awareness Managers UKATA card 23 rd November 13 Fire warden’s course. Hugh Thompson Roofing (HTR) August 2013 to Present Project manager The requirement in this role is to deal mainly with the CDM coordinator and the client in all aspects to in the build and refurb of this old factory former Rotary power part of bel valves. The build consists of part demo of the existing factory and to renew new steels and pad foundations including new concrete retaining wall and new bases for high-tech machines to be installed. New blockwork thoughout along with extension to existing sub-station. Also a complete new drainage system and replacement of the roof and external cladding using Kingspan insulated panels throughout and mini micro Duties is to order all materials in advance ahead of the programme ensure that the day to day running of the site is in order with all sub-contractors and direct labour are to work to Architect and engineer drawings. H&S requirements and RAMS construction phase plan is updated to when required along with permits. Carried out full site inductions on site and putting together contractors reports for the fortnightly meeting and chairing all progress meeting with all sub-contractors and client along with CDM.
  • 2. March 2010– June 2013 Denizen Contracts Senior Site Manager Projects included the following: Working on a 148-bed hotel (Indigo) in Newcastle Upon Tyne, refurbishment of former Eagle Star House, which is a 4-Star boutique hotel with a Marco Pierre White restaurant. I am responsible for all day to day activities, managing all sub contractors from demolition to final completion. Other responsibilities include dealing with the client, which was Sanguine Hospitality Group, chairing meetings and ensuring that the project was done to the specific time on budget. Responsible for ensuring all specific RAMS evaluation reports and all other aspects of health and safety documents are correct and updated. Controlling the project programme and ensuring that all Sub- contractors are working to the current drawings and designs, all building control measures are in place I.e. fire stopping, dealing with the highways and local council for planning applications. Also assisting the surveying team on percuments. Hampton by Hilton Sheffield, 170 bed 4 star hotel once the building was the former police headquarters for South Yorkshire. The building was transformed into this hotel; duties include day to day running of the site, from start asbestos removal to final handover, dealing with a more direct with the client and brand. Site Manager July 06– March 10 Speymill contracts Senior Site Manager Projects included the following: Project included Newcastle (Premier Inn Hotel extension 32-bed), Ballsall Common (Premier Inn Hotel extension 50-bed) & Chesterfield North (Premier Inn Hotel extension 27-bed). Responsible for the Site Manager with a total project valuation of £ 4 Million. Main duties included day-to-day running of building site, all aspects of health & safety, ordering all buildings materials, chairing meetings, working to programmes and staff supervision including all sub-contractors. Responsible for ground works, cast slab floors or block & beam and timber frame erection to final completion. Project also included refurbishments of existing Premier Inn Hotels. This covered extending current number of bedrooms (bolt-ons) & conference area. Also Building Premier inn extension in rugby, 42 bed as same spec as above. Whilst at Speymill, all construction required a ‘can do’ approach to working. This enabled me to effectively complete all construction work on all projects, keep within budget and motivate building site staff. April 2004– July 2006 Multibuild Site Manager Projects included the following:
  • 3. Working on an extension on Premier Travel Inn hotels ranging from 22 to 30 bedrooms. Duties include day to day running of building site such as health & safety, ‘calling off’ materials for the entire project, timber frame, all aspects of ground works (from design stage to build),ensuring project works according to the programme spec, liaison with the client and sub contractors and chairing weekly site meetings involve Whitbread (owner of Premier hotels). Project also included refurbishments of existing Premier Travel Inn hotels. May 2002– March 2004 Totty Construction Site Manager Projects included the following: Luxury apartments in Newcastle with total value of £20m. Main duties included running 1 of 3 sections of 104 apartments and 3 penthouses. General Site Management duties included, for construction, curtain wall, meseck, specialist external wall cladding, some paraton blocks. Other duties included organising material and trades, line and balance charts, issuing delay, chairing site progress meetings, dealing with all contractors from M&E, joinery and dry lining to final decorations and handover. Managing quality control. Ensuring all sub-contractors are working to the current drawings and designs. Issuing defects and non-conformance notices to the relevant contractors. January 1999– April 2002 Dean & Bowes Site Manager Projects included the following: Working on various projects around the UK fitting out JD Wetherspoons pubs. Main duties included project management, health & safety and recruitment for all sub contractors. The main function of the role was to ensure that structure of some of the buildings was maintained. I was responsible for ensuring that the scope of works was carried out as per the specification and dealing directly it the client. February 1993– December 1998 KCR Interiors Joiner (then progressed to be Working Foreman/Supervision) Projects included the following: This project involved fitting out shop outlets across the country. Duties first and second fix joinery, working on fast track fit outs to stores including Top Shop, Burtons, Littlewoods and various other high street names. In this role, I proved to be a competent and loyal employee, which meant that I received a promotion to become Working Foreman/Supervisor looking after my own jobs.
  • 4. Up to this date, I served my time as joiner with Universal Joineries Newcastle between 1989 and 1993. Duties included working as a bench hand and working on site. I completed a full 4-year apprenticeship.