1. Ashley Officer
Position : Site Manager
Availability : Immediate
Resides : Launceston
Salary : £32 plus package
Profile:
I am an experienced Construction Professional who has spent the large part of his
career within the Construction industry. I have worked on everything from
commercial projects (1.6m) to residential development (100 units +), through to
single dwellings. I have also run my own business for a large part of my career,
joined Wainhomes a Site Manager. I am keen to look elsewhere, I have all the
relevant tickets and a Telehandler license, used to deputizing along with covering
multiple sights, I am looking to join a progressive developer with career
progression.
VocationalQualifications & Training:
SMSTS.
CSCS Managers & Professional card.
PRINCE (2) Foundation Course (started).
NEBOSH Health & Safety for Construction Professional’s (started).
First Aid.
Asbestos awareness.
Manual handling.
Working at heights.
I have been a member of The Guild of Master Craftsmen membership no X110289
N E B S Business Qualification from Plymouth University.
Telehandler ticket
2. CareerHistory:
Oversea structural constructionfor Mc carthy & Stone.
Crylon Bay St Austell.
24 High end retirement appartments.
August 15th
to 23rd
August 2016
Overse 10 Masons, 1 labourer, 1 banksman, 4 scaffolders, 1 crane driver.
Check progress against program, advise and resolve issues raised by trades, log
day to day events on company computer systems,liease with neighbours.
Reportto contrax manager along with re briefing the site manager on his return.
Hold meeting and site walk around with the NHBC inspector.
July 29th
– 13th
August 2016. Present
Site setup for Linden Homes (south west)
Sherford New Town.
Site set up!! pre Senior site manager taking over the site.
Overseaing 24 units from various stages, Ground works, services, drainage, block
and beam, First lift brick and blockwork.
Implementing Linden homes on site HSE requierments.
Scaffold set up.
Liease with Sherford Concortium on the effectiveness of the proposedprotocol
along with the overall performance of there manigment proposals.
Granby Green(Devonport Plymouth).
Inspection of 5 units, snagging and preparation for hand over to the Housing
association.
Overse Ground workers in compleating assigned street works and planting so that
street scene is ready for hand over.
Imploment HSE protocolon a daily basis.
May 2015 – Present
I have just started my PRINCE 2 Foundation Course.
along with
NEBOSH Health and Safety for Construction Professional’s
3. October2015 - Present
I am currently engaged in finishing of two of our property’s prior to them both
being sold,
“The Old Toll House”
This has been a 2+ year project as was a complete refurbishment of the whole
building
In Launceston.
“Now Sold subject to Contracts”.
Along with
The Old bank “The maisonette”
In Launceston.
Conversion of Vaulted Roofarea to form Bedroom, Dressing area and Wet room.
also outside works.
Wainhomes Aug 2014 –October2015
Site Manager
Seaview – finishing 5 to air test and CML readiness, along with 3 units up to
second floor and wall plate, oversea the start of new 9 plot phase up to pad levels.
Charlestown–3 new build apartments and one natural stone community hall
conversion along with historic snagging.
Par – Complete remaining houses to NHBC inspection standards, hand over to
customers, Track, attend to long standing snagging issues on the last 3 years of the
sight, get site ready for closedown
Shortlanes end – Cover this sight for Three weeks (120 houses 20 in build) .
Menearroad – Covered this sight as required (100 houses in build)
Porth pean – Covered this sight as required (houses in build)
Foy – Covered this sight as required (100 houses in build)
Narrowcliff- snagging on 34 apartments and the finishing of 5 town houses ready
for air test and NHBC inspection, hand over to customer.
ABACUS Design& Building Apr 2003 – Aug 2014
Owner
One off new build houses, small unit housing developments, restoration projects,
4. new build garden centre, commercial units, all sites in and around Cornwall.
Liaise with customers booking appointments, planning and ordering of stockand
materials, preparing quotations and reports.
Handling queries over designs and costings of individual projects and giving
advice where necessary.
In charge of sub-contractors, direct labour, site health and safety checks keeping a
paper based log of my day to day work.
Marine Projects Jun 1995 – Apr 2003
Charge Hand
Started as Carpenter on boat build before moving to charge hand
Supervised 50 shop floor personnel.
In charge of all in build and quality checks on Z3, Y2, Y3, Y4 crafts (Price range
from 900k-4million)
Assisted with and trained staff to improve working practices and quality of boat
build.
Provided monthly work schedules to ensure boat build times were met.
Liaised with shop floor and management to improve Health and Safety practices.
Sourced new companies and products to provide better equipment.
Built a working relationship with local fire authorities ensuring current legislation
was followed.
Logged Health and Safety checks e.g. fire alarms, fire risers, fire extinguishers.
Quarterly stocktakes.
Initiated a study into dust reduction in the preparation of laying teak decking,
resulting in an 85% reduction of dust in the working environment.
Sourced and provided the company with the bestequipment for the new working
practices.
Completed my Neb's Business Management course.
Completed my first aid course stage 1 and 2.
Extended all the above to all of marine projects boat fabrication sites in Plymouth.
H M Naval DockyardDevon Jan 1991 – Jan
1995
Builder
The refurbishment of fire walls and associated works to comply with new
regulations, The refurbishment of H.M.S Raleigh into an office complex for the
Territorial Army and Army recruitment offices.
5. A&A Renovation Jan 1991 – Jan1995
Builder
Liaise with customers booking appointments, planning and ordering of stockand
materials, preparing quotations and reports.
Handling queries over designs and costings of individual projects and giving
advice where necessary. In charge of health and safety checks keeping a paper
based log of my day to day work, Liaise with our 11 staff.
Ensured the smooth running of each project.
Providing the first portof call for staff and client requirements and any special
needs
Year Gap Jan 1989 – Jan1991
Tooka year out and went traveling through Europe
Picked Grapes in Germany.
Worked in Kitzbule Austria in a Hotel as a night porter.
Visited my brother in U.S.A.
Worked in the Howard Johnson chain of Bar Restaurant & Motels
Jul 1980 – Apr 1989
Central Heating Engineer
This was my first full time job after finishing my heating apprenticeship.
My duties were to sort all private contracted work organize stockrequirement’s
etc.
Look after the plumbing and heating, lead work, guttering etc. on Mr. Shipton's
first big house build in Oakhampton (30 units first phase) then the same duties on
phase two.
I ordered and kept records of all stockand time taken to do each property.
Co-ordinated between council inspectors and all regulatory bodies.
REFERENCES AVAILABLE UPON REQUEST
E-Mail ashley1145mj@hotmail.com.
Telephone: - Mob 07815850364.
: - Land line 01566 779809