1. 1 | P a g e
PRAJEESH KOORAKKAPADAM
Civil Engineer
Dubai, United Arab Emirates
E-mail: prajeeshcet@gmail.com
Mobile: +97155-7650953
CAREER OBJECTIVE
Self Motivated, Hardworking, Adaptable/decisive, effective learner and Team Player who is seeking a
challenging career in Construction field in a quality and productive organization environment where
my knowledge and experience can be shared and enriched.
EDUCATIONAL QUALIFICATIONS
B.Tech in Civil Engineering
College of Engineering, Trivandrum (CET) – Passed with First class in 2008
WORK EXPERIENCE
Designation : Senior Project Engineer
Period : April 2016 – Till date
Company : United Engineering Construction (UNEC)
Location : Nad Al Sheba-3, Dubai, United Arab Emirates
Project Name : Residential Development at Nad Al Shiba Third Main Land
Location : Dubai, United Arab Emirates
Contract Value : Aed 800 Million
Project Description:
The Nad Al Shiba Residential Community project is located to the West of International City
on the west side of Mohamed Bin Zayed Road. The proposed development is located on a
120 Hectare plot and is envisaged as an affordable residential community for lease. The
development consist of 4 & 5 bedrooms Mediterranean and Morroccan style 482 villas
including infrastructure.
Duties & Responsibilities :
Communicating with a range of people including consultants, subcontractors and suppliers.
Coordinator for all authority inspections.
Carrying out detailed drawings/site study and capturing additional works.
Making safety inspections of the site when work is underway and ensuring regulations
relating to health, safety and the environment (HSE) are adhered to
Preparation of letter/correspondence in response to any issues or matters related to Project
to be issued to consultant, suppliers or subcontractors
Prepare internal and external reports pertaining to Job status.
A. Planning and Management :
Developing the programme of work and strategy for making the project happen.
Updating the existing construction programme, review and restructure of resource allocation
on monthly basis.
Responsible for monitoring the progress on project.
Planning the requirement of resources from time to time based on the work load and ensure
manpower are properly distributed, activity-wise on a daily basis.
Planning and analyzing daily, weekly and monthly targets and taking corrective action in case
of slippage.
2. 2 | P a g e
B. Coordination with Consultant/Engineers :
Preparing the site and liaising with other construction professionals such as architects,
engineers before construction work commence.
Assuring coordination in weekly quality meetings with consultant for weekly progress.
Coordination with Consultant for any issues and changes in specification, drawings and
requirements related to project.
C. Coordination with Project Team :
Reporting to the Project Manager/Construction manager regarding the progress of project
and project issues.
Assuring liaison with all sub-contractors for drawings and specification.
Provide assistance to the Draftsman in preparing coordinated shop drawings.
Coordination with General Foreman and Gang leaders for the project resource management.
Coordinating MEP works on site.
Provide support to Quantity Surveyor for information on project progress, any additional
information related to technical and commercial for claim purposes.
Designation : Senior Project Engineer
Period : December 2013 – April 2016
Company : Charilaos Apostolides (CHAPO UAE – LLC)
Location : Abu Dhabi, United Arab Emirates
Project Name : Construction, Completion and Maintenance of 3-Residential Bldg.Project
Location : Rawdhat, Abu Dhabi – Plot C74,C75 & C76
Contract Value : Aed 120 Million
Project Description :
This is a 3 Residential Buildings situated in Rawdhat Abu Dhabi – Plot C74, C75 & C76 under
Reem Developers, which consists of common Basement parking (2 levels)+ Ground floor+
9 Typical floors+ Roof and Upper Roof. The approximate area of Plot C74 Building is 11,363
sq.m, Plot C75 Building is 11,461 sq.m & Plot C76 Building is 10,902sq.m.
Duties & Responsibilities :
Communicating with a range of people including client, consultants, subcontractors and
suppliers.
Coordinator for all municipality permits, inspections, WDN, LDN, ADDC, ADSSC etc.
Carrying out detailed drawings/site study and capturing additional works.
Making safety inspections of the site when work is underway and ensuring regulations
relating to health, safety and the environment (HSE) are adhered to
Preparation of letter/correspondence in response to any issues or matters related to Project
to be issued to client, consultant, suppliers or subcontractors
Prepare internal and external reports pertaining to Job status.
A. Planning and Management :
Developing the programme of work and strategy for making the project happen.
Updating the existing construction programme, review and restructure of resource allocation
on monthly basis.
Responsible for monitoring the progress on project.
Planning the requirement of resources from time to time based on the work load and ensure
manpower are properly distributed, activity-wise on a daily basis.
3. 3 | P a g e
Planning and analyzing daily, weekly and monthly targets and taking corrective action in case
of slippage.
Planning ahead to prevent problems on site before they occur, for example, planning the
delivery and storage of equipment and materials
B. Coordination with Consultant/Engineers/Client :
Preparing the site and liaising with other construction professionals such as architects,
engineers before construction work commence.
Coordination with Consultant for any issues and changes in specification, drawings and
requirements related to project and quality meeting for weekly progress updates.
C. Coordination with Vendors/Subcontractors :
Assuring liaison with all sub-contractors for drawings and specification & method statement
approval.
Assuring coordination in weekly quality meetings with sub-contractor for progress at site.
Notify the Subcontractor for commencement or any issues related to their scope.
D. Coordination with Project Team :
Reporting to the Project Manager regarding the progress of project and project issues.
Provide assistance to the Draftsman in preparing coordinated shop drawings.
Coordination with General Foreman and Gang leaders for the project resource management.
Coordinating MEP works on site.
Provide support to Quantity Surveyor for information on project progress, any additional
information related to technical and commercial for claim purposes.
Give instruction to Document Controller for Shop Drawings and Technical submittals.
Coordination with Purchaser for procurement of any miscellaneous materials, tools or
equipment required at site.
Quantifying the materials required for a job site if necessary and provide to
Procurement/purchasing officer.
Designation : Project Engineer
Period : August 2008 - December 2013
Company : Charilaos Apostolides (CHAPO BAHRAIN - WLL)
Location : Manama, Bahrain
Project Name : Gulf Residence/Amwaj Waves (Phase 1)
Location : Amwaj Islands, Bahrain
Contract Value : Aed 200 Million
Project Description :
Amwaj Waves (Phase 1) is located in the heart of the Islands and within close proximity to
the waterfront. Amwaj Waves is destined to be the single largest residential development in
Amwaj Islands. The project comprises of four Towers (Tower 1/D, Tower 2/E, Tower 3/A &
Tower4/F) with a common Basement+ Ground+ Mezzanine & Landscaped podium with
Swimming pool+ Typical floors (15 stories in towers 1& 3 and 8 stories in towers 2 & 4) with
total built up area 36,000 sq.m.
Duties & Responsibilities :
Coordinating with Client, Consultants, Subcontractors and Suppliers.
Responsible for monitoring the progress of project and preparation of in/external reports.
4. 4 | P a g e
Coordination with Site Engineers, General Foreman and Gang leaders for the project resource
management and report project progress to the Project Manager.
Planning the requirement of resources from time to time based on the work load.
Planning and analyzing daily, weekly and monthly targets and taking corrective action in case
of slippage.
Preparing manpower distribution, activity-wise on a daily basis.
Coordinating MEP works on site.
Quality control
Quantifying the materials required for a job site and give supports to the procurement team.
Carrying out detailed drawings/site study and capturing additional works
Provide assistance to the draftsman in preparing coordinated shop drawings.
Preparing Documents regarding Inspection, Materials, Drawings and BBS.
Designation : Planning/MEP Coordination Engineer
Period : May 2012 – June 2013
Company : Charilaos Apostolides (CHAPO BAHRAIN - WLL)
Location : Manama, Bahrain
Project Name : ART Rotana/Renaissance 5 Hotel
Location : Amwaj Islands, Bahrain
Contract Value : Aed 320 Million
Project Description :
ART Rotana/Renaissance is a 5 star hotel located in Amwaj Islands with basement + ground
+ mezzanine + 13 floors+ 1penthouse+ roof and upper roof etc with total built up 32,000 sq
m. Project consists of reflection & swimming pools, sauna, steam, conference, meeting
room, deluxe and super deluxe room etc.
Duties & Responsibilities :
Coordination and assurance of timely/ updating the existing construction programme, review
and restructure of resource allocation on monthly basis.
Assuring liaison with all sub-contractors for drawings, method statement approval and resolve
coordination issues.
Reporting to the Project Manager regarding the progress of project.
Coordinating with Client and Consultants
Planning the requirement of resources from time to time based on the work load
Coordinating on MEP drawings and site works.
Designation : Site Engineer
Period : June 2009 – September 2010
Company : Charilaos Apostolides (CHAPO BAHRAIN - WLL)
Location : Manama, Bahrain
Project - 02 : Construction of Kanoo Hotel
Location : Juffair, Bahrain
Contract Value : Aed 140 Million
Project Description :
The project involves construction of a 4 star hotel comprising a ground floor+ 3 parking
levels+ 14 typical floors+ 2 level penthouses+ roof and upper roof with separate gym, sauna,
steam and swimming pools , deluxe and super deluxe 252 rooms having a total built up area
of 30,000 sq.m.
5. 5 | P a g e
Duties & Responsibilities :
Responsible for monitoring the progress on project.
Coordination with General Foreman and Gang leaders for the project resource management
and report project progress to the project manager.
Planning the requirement of resources from time to time based on the work load.
Planning and analyzing daily, weekly and monthly targets and taking corrective action in case
of slippage.
Preparing manpower distribution, activity-wise on a daily basis.
Coordinating MEP works on site.
Quality control
Coordinating sub-contractor works.
Quantifying the materials required for a job site and supporting procurement team for the
delivery.
Carrying out detailed drawings/site study and capturing additional works
Provide assistance to the draftsman in preparing coordinated shop drawings.
Preparing Documents regarding Inspection, Materials, Drawings and BBS.
Designation : Site Engineer
Period : August 2008 – June 2009
Company : Charilaos Apostolides (CHAPO BAHRAIN - WLL)
Location : Manama, Bahrain
Project Name : Construction of Petal - 1,2 & 3 Villas
Location : Durrat-Al-Bahrain, Bahrain
Contract Value : Aed 100 Million
Project Description :
Durrat Al Bahrain is Kingdom’s largest planned luxury mixed-use residential, commercial and
resort development project. It consists of development of residential private villas with lot of
amenities like shopping plaza, recreational parks, gardens and private jetties etc. It consists
of creation of 11 reclaimed islands namely Petals(1-5) & Atolls(1-6) in a necklace shape & 13
bridges were constructed to join these lands to the main land & between them. The scope of
project awarded to our company involves construction of 324 residential villas in Petals 1, 2 &
3 with own swimming pools with sea view.
Duties & Responsibilities :
Responsible for monitoring the progress on project.
Coordination with Site Foreman and Gang leaders for the project resource management and
report project progress to the project engineer.
Planning the requirement of resources from time to time based on the work load.
Planning and analyzing daily, weekly and monthly targets and taking corrective action in case
of slippage.
Preparing manpower distribution, activity-wise on a daily basis.
Coordinating MEP works on site.
Quality control for all types of works.
Coordinating sub-contractor works.
Quantifying the materials required for a job site .
Carrying out detailed drawings/site study
Preparing Documents regarding Inspection, Materials, and BBS
6. 6 | P a g e
COURSE, TRAININGS & SKILLS
Design & Analysis Software – AutoCAD & STAAD. Pro 2003
Project Planning & Scheduling - Primavera 5, Microsoft Project 2007.
Programming Languages - C,C++
Applications - MS Office
Construction, Organization and Planning
Estimation, Specification and Departmental procedures
Building construction, Architecture & Town Planning
EXTRA CURRICULAR ACTIVITIES
Member of the Civil Engineering Association 2005 & 2007, College of Engineering,
Trivandrum.
First prize in the College Tech Fest Shrishti’05 regarding a talk about the topic “Engineering
Follies”.
Member of college cricket team 2005 to 2008.
Member of the Program Committee for SRISHTI’06.
Member of organizing committee for the South India tour.
Have taken various leadership positions during my under graduation and at senior secondary
school such as House Captain, Class Representative, Committee coordinator etc.
PERSONAL DETAILS
Date of Birth : 10th May1985
Gender : Male
Nationality : Indian
Languages : English, Malayalam, Hindi, Tamil
Passport No. : G8748508
Driving License : Valid UAE & Indian driving licenses
Availability : 1 month