1. Debasish Dutta
Flat no B3/1001, Ashok Tower, Military Road
Andheri (E) Mumbai 400072
Mobile: +91 9920882271, email: dynamic_offshore@yahoo.co.in
Top Management Professional Business Development,
Project Management & Execution, Pre commission, LSTK
Turnkey Projects Onshore and offshore – up stream,
midstream and down stream.
An Accomplished Technocrat with over 30 years of comprehensive experience in Oil & Gas / Process industry with top
companies in the sector and in several countries across Globe. (UAE, GCC, Australia, USA, Malaysia, Indonesia, Europe,
India)
Excellent Command on all areas of the sector with Exhaustive and comprehensive knowledge with rich experience from
Public Sector and multi national companies, doable culture, client handling, Business Development to completion of
project including procurement, fabrication, load out and transportation, installations etc.
Extensive international experience, including assignments in US,UAE, Singapore Malaysia, Australia, Indonesia and
Brunei.
Key Areas of Expertise
• Business Development & arranging JV Partner based on tender requirement
• Qualification, estimation, for EPICM project for Oil & gas Offshore and Onshore
• Project Management and execution for EPC Projects
• Cost Control of the EPICM Oil &Gas Projects
• Office administration And coordination with clients and sub contractors/ vendor
• Coordination with site and preparing MIS for top management / JV partner/ Client for review meeting.
2. Professional Track
ISSICO Abu Dhabi , UAE Period : Sep 14’ to April 15’
• Joined as a Chief Manager EPIC Project
• Promoted as a CEO and transferred to India to look after their Business as a director
of ISSICO India Pvt Ltd
GKC Projects Limited, Hyderabad
Head- Oil & Gas Division Period: Jan 12’ to may 14’
Establishment of Techno Commercial proposal team
Participation in two major turnkey tenders of on-shore projects
Dynamic Offshore & Engineering Services Pvt Ltd
Chief Executive Period: 2008 to 2012
An Offshore / on-shore Oil & Gas construction and Contracting company based in Mumbai
Executed number of oil & gas medium sized offshore projects as a sub contractor
Consultancy Services to large infra companies for getting into OIL & GAS field and assist them to get proper
qualified consortium/ JV Partners
Nafto Gas India Pvt Ltd
Senior General Manager ( Projects) Period: 2006 to 2008
• Heading NaftoGaz Indian Offshore Business and reporting to director BD Nafto Gaz India functionally
administratively and functionally reported to CEO Nafto Gaz Ukraine.
• Responsible for Business Development, contract coordination
• Closely associated with the successful bidding of
o Offshore OGIP Project
o BINA Refinery
3. Clough Engineering – Australia
Construction/ Contract Manager Period: 2004 to 2006
Worked in their ONGC G-1 / G- 15 Projects in India, B 16 Indonesia, British gas Pipeline project reporting directly to country
head and CEO
Dynamic Offshore & Engineering Services Pvt Ltd
Chief Executive Period: 2000 To 2004
Responsible for Co-ordination and Monitoring of various on-shore And Offshore oil & Gas Projects executed during that
period. Worked in association with the internationally reputed contracting Companies such as M/s Hyundai Heavy
Industries Ltd, etc
Supreme Offshore Construction & Technical Service Ltd.- Mumbai
Managing Director / Technical Director Period: 1994-2000
Successful execution of several major Oil & Gas Offshore Projects of ONGC. Upgrading the Turnover of the company
from Rs 50 Lacs to 5500 Lacs and proved that the company is one of the best performance construction company in
India.
Under my direct supervision and control the following jobs were successfully executed within the stipulated time frame.
Achievement also include the
About 90% of offshore hookups, modifications, top side underwater including engineering from a hook up
modification contractor we uplifted to an EPICM LSTKA contractor. All over the world in the Oil and Gas industry was
efficient and came for JV Partner from UAE companies like NPCC, Valentine Maritime, McDermott, Hyundai South
Korea, Narmco group Italy various US companies worked as a joint venture partner successfully we completed 80-
90% of Indian joint venture projects. For Onshore Petrofac, Manasment group KTI (Technip) etc.
During this period major Offshore project was handled by me disciplined of work underwater, top side,
transportation, sea fastening, load out, installation, and pre commission. In 2000 due to difference of opinion
between the partners I happen to move out and establish a separate company called Dynamic Offshore Engineering
Services and Private Limited.
• Replacement of 23 Nos. Air Cooled Heat Exchangers at BHS Platform of ONGCL through M/s.Bharat Heavy Plates
& Vessels Ltd – Vizag Vishakapatnam
• Refurbishment of MUD pumps for ONGCL, through M/s.Richardson & Cruddas (1972) Ltd, at Mulund Works.
• Cross Country Pipe line for IOCL Baroda – 20” Dia 30 KMS & 8” Dia 55 KMS.
• Revamping of FPU-II Vacuum Column & Furnace for M/s.Technip KT (INDIA) Ltd, at IOCL – Gujarat Refinery
4. • Reactor Coil changing for M/s.Richardson & Crudas (1972) Ltd at IPCL site
• Fabrication of Transformer at M/s. Richardson & Crudas (1972) Ltd at their Mulund Works
• Operation & Maintenance of Baiji Refinery at Iraq for M/s Oil & Gas Services Ltd - U.K.
• Hook-up, Commissioning of BCP-A & Connected modifications with existing process complex including changing
the control system for M/s Hyundai Heavy Industries Co Ltd at ONGCL Offshore Platform.
• Many more offshore and on – shore projects.
Perfect Engineering Pvt Ltd
DY. GENERAL MANAGER- PRODUCTION Period: 1989-94
Responsible for the fabrication of ONGC Offshore Platforms NL & N6 Deck and Jackets at MDL, Mangalore Yard.
ETPM- France/ McDermott
FIELD ENGINEER/ ASST. PROJECT MANAGER Period: 1983-89
Worked in various oil & Gas pipeline laying projects in North Sea, Malaysia, Qatar, Shell, Brunei & Indian Offshore.
Responsible for Laying of Sub-sea Pipelines including sore pulling, installation of Jackets, well & process plants and
project management for the same.
Excellent experience –
a. Experiment, engineering using floater technology first time all over the world. Dismantling a process complex at
North Sea
b. Transportation, installation filing of jackets
c. Transportation laying, installation pigging hydro testing and commission of various under water pipeline
including shore pulling and on shore terminals.
d. Project management and marine logistics.
Engineers India Limited
FIELD ENGINEER- MECHANICAL Period: 1981-83
Responsible for Generation of QA/QC formats and Coordination with Project Groups. Inspection and Test Plan for
various Project activities At Baroda , IPCL and IOCL refinery.
HINDUSTAN STEEL CONSTRUCTION LTD-BHILAI
CHARGE HAND Period: 1980-81
5. Educational Track
DEGREE /
EXAM.
UNIVERESITY / BOARD YEAR SCORE
DME (MECH) West Bengal council, Kolkata 1985 “A”
AMIE (MECH) Kolkata University 1985 2nd
Class
Diploma in Materials
Management
M S University , Baroda 1984 2nd
Class
DEBASISH DUTTA
6. Educational Track
DEGREE /
EXAM.
UNIVERESITY / BOARD YEAR SCORE
DME (MECH) West Bengal council, Kolkata 1985 “A”
AMIE (MECH) Kolkata University 1985 2nd
Class
Diploma in Materials
Management
M S University , Baroda 1984 2nd
Class
DEBASISH DUTTA