YUSUF DAWOOD
PROJECT MANAGER
GENERAL BUILDING CONSTRUCTION
CIVIL & STRUCTURAL ENGINEERING
PROJECT DETAILS
20 Brighton Crescent - New Construction of 2
Storey Detached House with Attic and Basement
Contract Period : 21 Jul’17 to 20 Oct’18
Contract Sum : S$4.05Million
Overall In-charge for the construction of New Bunglow
including Basement
9 Treasure Island, Sentosa Cove - A&A to
Existing 2 Storey Detached House with Swimming Pool
Contract Period : 12 Sep’17 to 11 Mar’18
Contract Sum : S$950,549/-
Responsible for A&A works consist majority of ID and
Carpentry works
27 Garlick Avenue - Re-construction of a Detached
House with New Basement and Swimming Pool
Responsible for Defects Rectification and Handing over to
Client
NOVELTY TECH POINT
• Developer – Novelty Dept. Store Pte Ltd
• Architect – JGP Architecture (S) Pte Ltd
• Structural Consultants – TH Chuah & Partners LLP
• M&E Consultants – Elead Associates Private
• Contract Period – 26 Oct’15 to 31 Jul’17
• Contract Sum – S$28.85 Million
Proposed erection of a block of 10 storey multi-used industrial development (Total 61 units) with mezzanine
floors, multi storey carpark, Ancillary staff canteen and provision for a swimming pool at New Industrial road,
Singapore
As a Project Manager, Responsible for successful completion of the project. Responsible for effective
communication among the client, consultants, government authorities, staff, suppliers and sub-contractors.
Special features: Post-tension slabs with very light reinforcement for the slab. No external scaffold, use of
mast climbing platforms all around the building.
26 NEWTON
• Developer – Novelty Asia Pacific Pte Ltd
• Architect – JGP Architecture (S) Pte Ltd
• Structural Consultants – KH Consultants
• M&E Consultants – Elead Associates
• Interior Designer – Expression Galleries Pte Ltd
• Landscape – Coen Design International Pte Ltd
• Contract Period – 24 Jul’13 to 31 Oct’15
• Contract Sum – S$39.5 Million
Proposed erection of a block of 26-storey residential flats (Total 180 units) with 4 storey car parks and
swimming pool on 14th storey sky terrace at 26 Newton road, Singapore.
As a Project Manager, Responsible for successful completion of the project in time with Good quality and
safety.
Special features: As project is very near the underground MRT line, the close monitoring for movement of
MRT tunnel required.
PEAK - I PEAK - II
Proposed Erection of 15 Storey Flat Development (Total
52 Units) with an Attic, a Basement Mechanized Carpark
& Communal Facilities at 51 Cairnhill Circle, Singapore
Proposed Erection of 18 Storey Flat Development (Total
60 Units) with an Attic, a Basement Mechanized Carpark
& Communal Facilities at 61 Cairnhill Circle, Singapore
• Developer – TG & Tee Development Pte Ltd
• Architect – Laud Architects Pte Ltd
• Structural Consultants – Tham & Wong LLP
• M&E Consultants – Elead Associates
For Peak – I
Contract Period – 29 Dec’11 to 31 Jul’14
Contract Sum – S$20 Million
For Peak – II
Contract Period – 5 Mar’13 to 3 Jun’15
Contract Sum – S$25 Million
As a Project Manager, Overall in-charge of these 2 projects. Preparation of master program, Progress report, Bi-
weekly schedule, etc. To conduct co-ordination meetings with consultants and sub-contractors. Monitor the progress
and report to the management. To ensure good quality, site safety and house keeping.
Special features: 9m deep Basement for Mechanized Carpark for Both the Projects.
VILLA LAMBDA
• Developer – Novelty One Pte Ltd
• Architect – A. M. Architects
• Structural Consultants – PTS Consultants
• M&E Consultants – Elead Associates
• Interior Designer – Mercurio Design Lab
• Contract Period – 09 Sep’11 to 09 Sep’12
• Contract Sum – S$6.5 Million
Proposed erection of a 2 Storey Detached Dwelling House with Attic and Swimming Pool at 1 Clacton Road,
Singapore
As a Project Manager, Overall in-charge for the complete execution of project. Preparation of master program,
Progress report, Bi-weekly schedule, etc. To conduct co-ordination meetings with consultants and sub-contractors.
Monitor the progress and report to the management. To ensure good quality, site safety and house keeping.
Special features: Installation of fully Auto-mated Smart Home System
I - RESIDENCES
• Developer – Novelty Asia Pacific Pte Ltd
• Architect – JGP Architecture (S) Pte Ltd
• Structural Consultants – T H Chuah & Partners LLP
• M&E Consultants – Elead Associates
• Interior Designer – Expression Galleries Pte Ltd
• Contract Period – 24 Apr’09 to 23 Apr’11
• Contract Sum – S$23 Million
Proposed erection of a 28-storey residential apartment building (Total 70 units) with swimming pool, communal
facilities, basement & surface carparks at 20, Irrawaddy road, Singapore
As a Project Manager, Overall in-charge of the project. Preparation of master program, Progress report, Bi-
weekly schedule, etc. To conduct co-ordination meetings with consultants and sub-contractors. Monitor the
progress and report to the management. To ensure good quality, site safety and house keeping.
Special features: 9m x 9m x 2m high transfer plate at 3rd storey above the swimming pool.
THE PALM MALL
• Developer – NAKHEEL
• Project Manager – DAR
• Consultants – RSP (Middle East) FZCO
Earth work & Piling : 11 Dec’07 to 26 Jan’09
Contract Sum : AED 157 Million
Main Contract : 30 Sep’08 to 31 Oct
Contract Sum : AED 3.964 Billion
Proposed Mixed-Use Development Comprising 3 Basements + Promenade + Ground + 3 Retail Floors + Roof and 2
Residential Apartment Towers of 44 Floors + Roof on Palm Jumeirah, Dubai, U.A.E.
As a Resident Engineer, complete supervision of structural works including excavation, ground anchors and piling
works. Responsible for co-ordination with client, project manager, consultants, contractors and site supervisors. To
liaise with various department of Nakheel, includes Nakheel - Infrastructure, Nakheel - Safety, Nakheel - EHS,
Nakheel - Marine, Nakheel - Logistic, etc for site co-ordination issues to ensure smooth progress of works on site. Also
involved in reviewing and approval of material, method statements, shop drawings, etc submitted by the contractors.
Special features: 1.2km long and 1.0m thick diaphragm wall supported by 3 layers of ground anchors for 16.0m deep
excavation. (Excavation volume – 1.004Million Cubic meter)
THE SEAVIEW CONDOMINIUM
• Developer - Merview Developments Pte Ltd
(Wheelock Properties)
• Architect - RSP Architects Planners &
Engineers (Pte) Ltd
• Structural Engineer - RSP Architects Planners
& Engineers (Pte) Ltd
• M&E Engineer - Squire Mech Pte Ltd
• Quantity Surveyor - Davis Langdon & Seah
• Contract Period – 14 Mar’05 to 13 Jul’07
• Contract Sum – S$127.68 Million
Proposed Condominium Housing Development comprising 6 blocks of 23-storey residential building
(Total 546 units) with basement carparks, swimming pool, other communal facilities and conservation of
2-storey bunglow at Amber road / Marine Parade road, Singapore.
As a Senior Engineer, overall in-charge of the structural team as well as surveyors and draftsmen’s team.
Responsible for co-ordination with client, consultants, sub-contractors and supervisor. Checking of
drawings & resolve discrepancies.
Special features : Conservation of a very old bungalow as per URA’s guideline, need to provide
permanent strengthening of old structural elements.
LINC CONDOMINIUM
• Developer – Keppel Land Realty Pte Ltd
• Architect - ADDP Architects
• Structural Engineer – Engineers Partnership
• Services Engineer – United Project
Consultants Pte Ltd
• Quantity Surveyor – Rider Hunt Levett &
Bailey
• Contract Period – 03 Feb’04 to 2nd Jan’06
• Contract Sum – S$14 Million
Proposed Amendment to Approved Flat Development Comprising the Erection of 1 Block of 18-storey
& 1 Block of 9-storey Flats ( Total 51 units ) with Attic, Basement Carparks & Communal Facilities at
lincoln road Singapore.
As a Project Manager, responsible for all preliminary submission to the Authorities and consultants as
well as preparation of Master Construction Programme. To monitor and expedite piling work progress,
co-ordination of structural works for basement and M&E services, etc
Special features : As The whole development is on the marine clay, great care was needed during the
basement construction. Very high featured façade wall at roof.
EDGEWATER CONDOMINIUM
• Developer – Keppel Land Realty Pte Ltd
• Architect - James Yip & Partners Pte Ltd
• Structural Engineer – DE Consultants (S) Pte Ltd
• M & E Engineer – Beca Carter Hollins & Ferner
(S.E.Asia) Pte Ltd
• Quantity Surveyor – KPK Quantity Surveyors Pte
Ltd
• Contract Period – 12 Mar’02 to 11 Nov’03
• Contract Sum – S$11,463,769/-
Proposed Condominium Housing Development Comprising a Block of Part 4 / Part 5 storey residential
Building ( Total 53 units ) with a Basement Carpark and Swimming Pool at 31 Jalan Loyang Besar,
Singapore.
As a Project Manager, Overall in-charge of the project. Responsible for managing and execution of project
as per drawings & specifications given and handing over of the project as scheduled. Maintained very good
quality of all finishes and obtained BCA Conquas score of 81.3 points
Special Features – Spiral staircase on external façade of the building. Swimming pool just outside of
Living room and Bedroom
MAKINO ASIA FACTORY
• Client – Makino Aisa Pte Ltd
• Project Management – Jurong Consultants Pte Ltd
• Contract Period – 9th Nov’01 to 8th Aug’02
• Contract Amount – S$5,386,200/-
Proposed Addition and Alteration to existing Factory Comprising a 3 storey Technical and Training Centre
At No. 2 Gul Avenue, Singapore
As Project Manager, responsible for complete management of the project. To organize all trades’sequence, follow
up with their progress and ensure completion on time. Completed the project with very good quality and handed
Over to the client as scheduled.
Special Features – Aluminium Cladding and Curtain wall Glazing for all external façade of the building. Precise
Floor leveling for production area. Good co-ordination for M&E services for System furniture at office area.
SENOKO WAY FACTORY
• Client – Artform Wood Products Pte Ltd
• Project Management – Jurong Consultants
Pte Ltd
• Contract Period – 25 Sep’00 to 24 Jul’01
• Contract Amount – S$6,550,000/-
Proposed Erection of a 2 storey Factory Building with Mezzanine Floor and 1 storey Ancillary Office at
No. 27 Senoko Way, Singapore
As the Project was small, only two staff s were allocated. I was responsible for management of the project
As well as structural works and co-ordination of M&E services. To prepare Master Programme, Schedule of
Works, Progress report. Co-ordination with client/consultants.
Special Features – Fair face Brickwall as external elevation, required great care during finishing. Very heavy
Structural steel roof truss with a span of 32m. Installation of scissor lift.
PALM GARDENS CODOMINIUM
• Developer – Keppel Land (Palm Gardens) Pte Ltd
• Architect - Lee Sian Teck Architects Pte Ltd
• Structural Engineer – Meinhardt (S) Pte Ltd
• M & E Engineer – PCR Rngineers Pte Ltd
• Quantity Surveyor – KPK Quantity Surveyors Pte Ltd
• Contract Period – 01 Oct’97 to 15 May’00
• Contract Sum – S$147.93 Million
Proposed Condominium Housing Development Comprising of 3 Blocks of 18 storey and 1 Block of 20 storey Tower for 694
residential units, 2 Nos. of Electrical Sub-station, 2 levels of Basement Carparks,a Club House, a Swimming Pool, a Lagoon, 2 Nos.
of Tennis Court, a Bowling Alley, 701 Car parking lots and other communal facilities at Chua Chu Kang Way, Singapore.
As a Senior Project Engineer, I was responsible for structural works of 2 Nos. of Towers. Upon completion of structural works, I
was looking after the Architectural trades for 1 No. of Towers. I also, took care for finishing of Swimmimg Pool, Club House and
Authority Inspections.
Special Features – Private Lift Lobby for individual units. 2 levels of Basement carpark for 701 cars. Post tensioned Beams at 9th
storey level. Large area of Pool deck and Landscaping. Aluminium trellises over linkways.Bowling Alley. Children's Play Ground,
Fitness corner, Barbeque Pits, Fish Pond with waterfall and fountains, etc.
SPRINGSIDE ( PHASE 4 & 5 )
• Developer – Kallang Development Pte Ltd
• Architect – SAA Partnership Pte Ltd
• Structural Engineer – Loh Consultants Pte Ltd
• M & E Engineer - Kinhill (S) Pte Ltd
• Quantity Surveyor – KPK Quantity Surveyors
Pte Ltd
• Contract Period – 08 Mar’96 to 07 Nov’97
• Contract Sum – S$17,900,906.07
Proposed Conventional Housing Development Comprising of 44 units of Terrace Houses, 10 units of
Semi-Detached Houses and 2 units of Bungalows at Jln Ulu Seletar, Sembawang Road, Singapore.
As a Project Engineer, responsible for Structural works as well as Architectural works. Also played an
important role in achieving Company’s ISO 9000 Certification.
Special Features – Marble flooring for Living / Dining, Timber Parquet flooring for Bedrooms and staircase,
Toilets with marble and ceramic flooring, Longbath,Vanity counters and shower screens, Carpark and
Landscaping.
SPRINGSIDE (PHASE 1-3)
• Developer – Kallang Development Pte Ltd
• Architect – SAA Partnership Pte Ltd
• Structural Engineer – Loh Consultants Pte Ltd
• M & E Engineer - Kinhill (S) Pte Ltd
• Quantity Surveyor – KPK Quantity Surveyors
Pte Ltd
• Contract Period – 21 July’95 to 20 Mar’97
• Contract Sum – S$29,676,00491
Proposed Conventional Housing Development Comprising 1 No. of 22kv/6.6kv Electrical Sub-station, 66 units
of Terrace Houses, 12 units of Semi-Detached Houses and 7 units of Bunglows at Jln Ulu Seletar, Sembawang
Road, Singapore.
As a Project Engineer, responsible for structural works as well as Quantity Surveyor. To order materials,
Assessment of sub-contractor’s claim and Finalization of Accounts
Special Features – Pitched roof with all timber trusses, Bay windows with aluminium lattices. Major external
works for Sewer line, Water, Electrical, Gas, Telecom and Cable TV services.
OTHER PROJECTS
• SHOPPING CUM RESIDENTIAL COMPLEX
12 Storey high shopping cum residential complex with 1st and 2nd storey shop & offices and
3rd to 12th storey residential appartment at Deira, Dubai, UAE
• LUXURIOUS BUNGLOWS
4 Nos. of Luxurious Bunglows complete with exclusive fixtures and finishes at Al Maktum
Road, Dubai, UAE
• SHOPPING CENTRE
A 5 storey shopping centre with Basement & 1st storey shops and 4th to 5th storey
offices at Astodia, Ahmedabad, India.
• ROW HOUSES & BUNGLOWS
44 Units of Row Houses and 4 units of Bunglows at Satellite Road, Ahmedabad, India.

More Related Content

What's hot (19)

Survey Engr
Survey EngrSurvey Engr
Survey Engr
 
Resume Oct 2015 Revision 2
Resume Oct 2015 Revision 2Resume Oct 2015 Revision 2
Resume Oct 2015 Revision 2
 
hidayath cv 2016
hidayath cv 2016hidayath cv 2016
hidayath cv 2016
 
Mohamed sanoussi cv
Mohamed sanoussi cvMohamed sanoussi cv
Mohamed sanoussi cv
 
Resume Jamilatul Adawiah Rev.6
Resume Jamilatul Adawiah Rev.6Resume Jamilatul Adawiah Rev.6
Resume Jamilatul Adawiah Rev.6
 
SR. SITE ENGINEER
SR. SITE ENGINEERSR. SITE ENGINEER
SR. SITE ENGINEER
 
Hanin qreis 2018 cv
Hanin qreis 2018 cvHanin qreis 2018 cv
Hanin qreis 2018 cv
 
Sheikh Mohammed Muntazer- Resume - Final
Sheikh Mohammed Muntazer- Resume - FinalSheikh Mohammed Muntazer- Resume - Final
Sheikh Mohammed Muntazer- Resume - Final
 
Sheikh Mohammed Muntazer Resume
Sheikh Mohammed Muntazer Resume Sheikh Mohammed Muntazer Resume
Sheikh Mohammed Muntazer Resume
 
CV M.Ilyas - 1
CV M.Ilyas - 1CV M.Ilyas - 1
CV M.Ilyas - 1
 
20161120 Binu CV - Sr. Civil Engineer
20161120 Binu CV - Sr. Civil Engineer20161120 Binu CV - Sr. Civil Engineer
20161120 Binu CV - Sr. Civil Engineer
 
Resume -Amarnath
Resume -AmarnathResume -Amarnath
Resume -Amarnath
 
Michelle Jepp 15
Michelle Jepp 15Michelle Jepp 15
Michelle Jepp 15
 
Fady samir cv
Fady samir cvFady samir cv
Fady samir cv
 
GNA Surveyors Ltd - Company Presentation 2014
GNA Surveyors Ltd - Company Presentation 2014GNA Surveyors Ltd - Company Presentation 2014
GNA Surveyors Ltd - Company Presentation 2014
 
hdebelenjr-latest-CV
hdebelenjr-latest-CVhdebelenjr-latest-CV
hdebelenjr-latest-CV
 
CV
CVCV
CV
 
number 1 Res 2013 Rod Taylor-2
number 1 Res 2013    Rod  Taylor-2number 1 Res 2013    Rod  Taylor-2
number 1 Res 2013 Rod Taylor-2
 
Slk m india
Slk m indiaSlk m india
Slk m india
 

Similar to 25 years of Projects in a Nutshell

Similar to 25 years of Projects in a Nutshell (20)

GLL-CV JAN 2017
GLL-CV JAN 2017GLL-CV JAN 2017
GLL-CV JAN 2017
 
Project Portfoilio
Project PortfoilioProject Portfoilio
Project Portfoilio
 
Cv Thenappan
Cv ThenappanCv Thenappan
Cv Thenappan
 
Saikat 07-profile
Saikat 07-profileSaikat 07-profile
Saikat 07-profile
 
KN
KNKN
KN
 
NgSH - Professional Portfolio_DCA
NgSH - Professional Portfolio_DCANgSH - Professional Portfolio_DCA
NgSH - Professional Portfolio_DCA
 
Resume_Lead Mechanical Engineer - Static Equipment and Package Units
Resume_Lead Mechanical Engineer - Static Equipment and Package UnitsResume_Lead Mechanical Engineer - Static Equipment and Package Units
Resume_Lead Mechanical Engineer - Static Equipment and Package Units
 
CV
CVCV
CV
 
CV
CVCV
CV
 
Portfolio 2016 - Nakorn
Portfolio 2016 - NakornPortfolio 2016 - Nakorn
Portfolio 2016 - Nakorn
 
guptapranay20072016
guptapranay20072016guptapranay20072016
guptapranay20072016
 
My Resume.1
My Resume.1My Resume.1
My Resume.1
 
1 Essam CV
1 Essam CV1 Essam CV
1 Essam CV
 
Resume.Sherif
Resume.SherifResume.Sherif
Resume.Sherif
 
Construction of Primary School slides-1.pptx
Construction of Primary School slides-1.pptxConstruction of Primary School slides-1.pptx
Construction of Primary School slides-1.pptx
 
CV (aug15).Rev1
CV (aug15).Rev1CV (aug15).Rev1
CV (aug15).Rev1
 
CV OF MVV
CV OF MVVCV OF MVV
CV OF MVV
 
Allwyn Leo CV
Allwyn Leo CVAllwyn Leo CV
Allwyn Leo CV
 
Allwyn-PE-CV
Allwyn-PE-CVAllwyn-PE-CV
Allwyn-PE-CV
 
Residential apartments company brochure beglinwoods architects
Residential apartments company brochure beglinwoods architectsResidential apartments company brochure beglinwoods architects
Residential apartments company brochure beglinwoods architects
 

Recently uploaded

(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...RajaP95
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxhumanexperienceaaa
 
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...ranjana rawat
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 

Recently uploaded (20)

(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
 
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 

25 years of Projects in a Nutshell

  • 1. YUSUF DAWOOD PROJECT MANAGER GENERAL BUILDING CONSTRUCTION CIVIL & STRUCTURAL ENGINEERING PROJECT DETAILS
  • 2. 20 Brighton Crescent - New Construction of 2 Storey Detached House with Attic and Basement Contract Period : 21 Jul’17 to 20 Oct’18 Contract Sum : S$4.05Million Overall In-charge for the construction of New Bunglow including Basement 9 Treasure Island, Sentosa Cove - A&A to Existing 2 Storey Detached House with Swimming Pool Contract Period : 12 Sep’17 to 11 Mar’18 Contract Sum : S$950,549/- Responsible for A&A works consist majority of ID and Carpentry works 27 Garlick Avenue - Re-construction of a Detached House with New Basement and Swimming Pool Responsible for Defects Rectification and Handing over to Client
  • 3. NOVELTY TECH POINT • Developer – Novelty Dept. Store Pte Ltd • Architect – JGP Architecture (S) Pte Ltd • Structural Consultants – TH Chuah & Partners LLP • M&E Consultants – Elead Associates Private • Contract Period – 26 Oct’15 to 31 Jul’17 • Contract Sum – S$28.85 Million Proposed erection of a block of 10 storey multi-used industrial development (Total 61 units) with mezzanine floors, multi storey carpark, Ancillary staff canteen and provision for a swimming pool at New Industrial road, Singapore As a Project Manager, Responsible for successful completion of the project. Responsible for effective communication among the client, consultants, government authorities, staff, suppliers and sub-contractors. Special features: Post-tension slabs with very light reinforcement for the slab. No external scaffold, use of mast climbing platforms all around the building.
  • 4. 26 NEWTON • Developer – Novelty Asia Pacific Pte Ltd • Architect – JGP Architecture (S) Pte Ltd • Structural Consultants – KH Consultants • M&E Consultants – Elead Associates • Interior Designer – Expression Galleries Pte Ltd • Landscape – Coen Design International Pte Ltd • Contract Period – 24 Jul’13 to 31 Oct’15 • Contract Sum – S$39.5 Million Proposed erection of a block of 26-storey residential flats (Total 180 units) with 4 storey car parks and swimming pool on 14th storey sky terrace at 26 Newton road, Singapore. As a Project Manager, Responsible for successful completion of the project in time with Good quality and safety. Special features: As project is very near the underground MRT line, the close monitoring for movement of MRT tunnel required.
  • 5. PEAK - I PEAK - II Proposed Erection of 15 Storey Flat Development (Total 52 Units) with an Attic, a Basement Mechanized Carpark & Communal Facilities at 51 Cairnhill Circle, Singapore Proposed Erection of 18 Storey Flat Development (Total 60 Units) with an Attic, a Basement Mechanized Carpark & Communal Facilities at 61 Cairnhill Circle, Singapore • Developer – TG & Tee Development Pte Ltd • Architect – Laud Architects Pte Ltd • Structural Consultants – Tham & Wong LLP • M&E Consultants – Elead Associates For Peak – I Contract Period – 29 Dec’11 to 31 Jul’14 Contract Sum – S$20 Million For Peak – II Contract Period – 5 Mar’13 to 3 Jun’15 Contract Sum – S$25 Million As a Project Manager, Overall in-charge of these 2 projects. Preparation of master program, Progress report, Bi- weekly schedule, etc. To conduct co-ordination meetings with consultants and sub-contractors. Monitor the progress and report to the management. To ensure good quality, site safety and house keeping. Special features: 9m deep Basement for Mechanized Carpark for Both the Projects.
  • 6. VILLA LAMBDA • Developer – Novelty One Pte Ltd • Architect – A. M. Architects • Structural Consultants – PTS Consultants • M&E Consultants – Elead Associates • Interior Designer – Mercurio Design Lab • Contract Period – 09 Sep’11 to 09 Sep’12 • Contract Sum – S$6.5 Million Proposed erection of a 2 Storey Detached Dwelling House with Attic and Swimming Pool at 1 Clacton Road, Singapore As a Project Manager, Overall in-charge for the complete execution of project. Preparation of master program, Progress report, Bi-weekly schedule, etc. To conduct co-ordination meetings with consultants and sub-contractors. Monitor the progress and report to the management. To ensure good quality, site safety and house keeping. Special features: Installation of fully Auto-mated Smart Home System
  • 7. I - RESIDENCES • Developer – Novelty Asia Pacific Pte Ltd • Architect – JGP Architecture (S) Pte Ltd • Structural Consultants – T H Chuah & Partners LLP • M&E Consultants – Elead Associates • Interior Designer – Expression Galleries Pte Ltd • Contract Period – 24 Apr’09 to 23 Apr’11 • Contract Sum – S$23 Million Proposed erection of a 28-storey residential apartment building (Total 70 units) with swimming pool, communal facilities, basement & surface carparks at 20, Irrawaddy road, Singapore As a Project Manager, Overall in-charge of the project. Preparation of master program, Progress report, Bi- weekly schedule, etc. To conduct co-ordination meetings with consultants and sub-contractors. Monitor the progress and report to the management. To ensure good quality, site safety and house keeping. Special features: 9m x 9m x 2m high transfer plate at 3rd storey above the swimming pool.
  • 8. THE PALM MALL • Developer – NAKHEEL • Project Manager – DAR • Consultants – RSP (Middle East) FZCO Earth work & Piling : 11 Dec’07 to 26 Jan’09 Contract Sum : AED 157 Million Main Contract : 30 Sep’08 to 31 Oct Contract Sum : AED 3.964 Billion Proposed Mixed-Use Development Comprising 3 Basements + Promenade + Ground + 3 Retail Floors + Roof and 2 Residential Apartment Towers of 44 Floors + Roof on Palm Jumeirah, Dubai, U.A.E. As a Resident Engineer, complete supervision of structural works including excavation, ground anchors and piling works. Responsible for co-ordination with client, project manager, consultants, contractors and site supervisors. To liaise with various department of Nakheel, includes Nakheel - Infrastructure, Nakheel - Safety, Nakheel - EHS, Nakheel - Marine, Nakheel - Logistic, etc for site co-ordination issues to ensure smooth progress of works on site. Also involved in reviewing and approval of material, method statements, shop drawings, etc submitted by the contractors. Special features: 1.2km long and 1.0m thick diaphragm wall supported by 3 layers of ground anchors for 16.0m deep excavation. (Excavation volume – 1.004Million Cubic meter)
  • 9. THE SEAVIEW CONDOMINIUM • Developer - Merview Developments Pte Ltd (Wheelock Properties) • Architect - RSP Architects Planners & Engineers (Pte) Ltd • Structural Engineer - RSP Architects Planners & Engineers (Pte) Ltd • M&E Engineer - Squire Mech Pte Ltd • Quantity Surveyor - Davis Langdon & Seah • Contract Period – 14 Mar’05 to 13 Jul’07 • Contract Sum – S$127.68 Million Proposed Condominium Housing Development comprising 6 blocks of 23-storey residential building (Total 546 units) with basement carparks, swimming pool, other communal facilities and conservation of 2-storey bunglow at Amber road / Marine Parade road, Singapore. As a Senior Engineer, overall in-charge of the structural team as well as surveyors and draftsmen’s team. Responsible for co-ordination with client, consultants, sub-contractors and supervisor. Checking of drawings & resolve discrepancies. Special features : Conservation of a very old bungalow as per URA’s guideline, need to provide permanent strengthening of old structural elements.
  • 10. LINC CONDOMINIUM • Developer – Keppel Land Realty Pte Ltd • Architect - ADDP Architects • Structural Engineer – Engineers Partnership • Services Engineer – United Project Consultants Pte Ltd • Quantity Surveyor – Rider Hunt Levett & Bailey • Contract Period – 03 Feb’04 to 2nd Jan’06 • Contract Sum – S$14 Million Proposed Amendment to Approved Flat Development Comprising the Erection of 1 Block of 18-storey & 1 Block of 9-storey Flats ( Total 51 units ) with Attic, Basement Carparks & Communal Facilities at lincoln road Singapore. As a Project Manager, responsible for all preliminary submission to the Authorities and consultants as well as preparation of Master Construction Programme. To monitor and expedite piling work progress, co-ordination of structural works for basement and M&E services, etc Special features : As The whole development is on the marine clay, great care was needed during the basement construction. Very high featured façade wall at roof.
  • 11. EDGEWATER CONDOMINIUM • Developer – Keppel Land Realty Pte Ltd • Architect - James Yip & Partners Pte Ltd • Structural Engineer – DE Consultants (S) Pte Ltd • M & E Engineer – Beca Carter Hollins & Ferner (S.E.Asia) Pte Ltd • Quantity Surveyor – KPK Quantity Surveyors Pte Ltd • Contract Period – 12 Mar’02 to 11 Nov’03 • Contract Sum – S$11,463,769/- Proposed Condominium Housing Development Comprising a Block of Part 4 / Part 5 storey residential Building ( Total 53 units ) with a Basement Carpark and Swimming Pool at 31 Jalan Loyang Besar, Singapore. As a Project Manager, Overall in-charge of the project. Responsible for managing and execution of project as per drawings & specifications given and handing over of the project as scheduled. Maintained very good quality of all finishes and obtained BCA Conquas score of 81.3 points Special Features – Spiral staircase on external façade of the building. Swimming pool just outside of Living room and Bedroom
  • 12. MAKINO ASIA FACTORY • Client – Makino Aisa Pte Ltd • Project Management – Jurong Consultants Pte Ltd • Contract Period – 9th Nov’01 to 8th Aug’02 • Contract Amount – S$5,386,200/- Proposed Addition and Alteration to existing Factory Comprising a 3 storey Technical and Training Centre At No. 2 Gul Avenue, Singapore As Project Manager, responsible for complete management of the project. To organize all trades’sequence, follow up with their progress and ensure completion on time. Completed the project with very good quality and handed Over to the client as scheduled. Special Features – Aluminium Cladding and Curtain wall Glazing for all external façade of the building. Precise Floor leveling for production area. Good co-ordination for M&E services for System furniture at office area.
  • 13. SENOKO WAY FACTORY • Client – Artform Wood Products Pte Ltd • Project Management – Jurong Consultants Pte Ltd • Contract Period – 25 Sep’00 to 24 Jul’01 • Contract Amount – S$6,550,000/- Proposed Erection of a 2 storey Factory Building with Mezzanine Floor and 1 storey Ancillary Office at No. 27 Senoko Way, Singapore As the Project was small, only two staff s were allocated. I was responsible for management of the project As well as structural works and co-ordination of M&E services. To prepare Master Programme, Schedule of Works, Progress report. Co-ordination with client/consultants. Special Features – Fair face Brickwall as external elevation, required great care during finishing. Very heavy Structural steel roof truss with a span of 32m. Installation of scissor lift.
  • 14. PALM GARDENS CODOMINIUM • Developer – Keppel Land (Palm Gardens) Pte Ltd • Architect - Lee Sian Teck Architects Pte Ltd • Structural Engineer – Meinhardt (S) Pte Ltd • M & E Engineer – PCR Rngineers Pte Ltd • Quantity Surveyor – KPK Quantity Surveyors Pte Ltd • Contract Period – 01 Oct’97 to 15 May’00 • Contract Sum – S$147.93 Million Proposed Condominium Housing Development Comprising of 3 Blocks of 18 storey and 1 Block of 20 storey Tower for 694 residential units, 2 Nos. of Electrical Sub-station, 2 levels of Basement Carparks,a Club House, a Swimming Pool, a Lagoon, 2 Nos. of Tennis Court, a Bowling Alley, 701 Car parking lots and other communal facilities at Chua Chu Kang Way, Singapore. As a Senior Project Engineer, I was responsible for structural works of 2 Nos. of Towers. Upon completion of structural works, I was looking after the Architectural trades for 1 No. of Towers. I also, took care for finishing of Swimmimg Pool, Club House and Authority Inspections. Special Features – Private Lift Lobby for individual units. 2 levels of Basement carpark for 701 cars. Post tensioned Beams at 9th storey level. Large area of Pool deck and Landscaping. Aluminium trellises over linkways.Bowling Alley. Children's Play Ground, Fitness corner, Barbeque Pits, Fish Pond with waterfall and fountains, etc.
  • 15. SPRINGSIDE ( PHASE 4 & 5 ) • Developer – Kallang Development Pte Ltd • Architect – SAA Partnership Pte Ltd • Structural Engineer – Loh Consultants Pte Ltd • M & E Engineer - Kinhill (S) Pte Ltd • Quantity Surveyor – KPK Quantity Surveyors Pte Ltd • Contract Period – 08 Mar’96 to 07 Nov’97 • Contract Sum – S$17,900,906.07 Proposed Conventional Housing Development Comprising of 44 units of Terrace Houses, 10 units of Semi-Detached Houses and 2 units of Bungalows at Jln Ulu Seletar, Sembawang Road, Singapore. As a Project Engineer, responsible for Structural works as well as Architectural works. Also played an important role in achieving Company’s ISO 9000 Certification. Special Features – Marble flooring for Living / Dining, Timber Parquet flooring for Bedrooms and staircase, Toilets with marble and ceramic flooring, Longbath,Vanity counters and shower screens, Carpark and Landscaping.
  • 16. SPRINGSIDE (PHASE 1-3) • Developer – Kallang Development Pte Ltd • Architect – SAA Partnership Pte Ltd • Structural Engineer – Loh Consultants Pte Ltd • M & E Engineer - Kinhill (S) Pte Ltd • Quantity Surveyor – KPK Quantity Surveyors Pte Ltd • Contract Period – 21 July’95 to 20 Mar’97 • Contract Sum – S$29,676,00491 Proposed Conventional Housing Development Comprising 1 No. of 22kv/6.6kv Electrical Sub-station, 66 units of Terrace Houses, 12 units of Semi-Detached Houses and 7 units of Bunglows at Jln Ulu Seletar, Sembawang Road, Singapore. As a Project Engineer, responsible for structural works as well as Quantity Surveyor. To order materials, Assessment of sub-contractor’s claim and Finalization of Accounts Special Features – Pitched roof with all timber trusses, Bay windows with aluminium lattices. Major external works for Sewer line, Water, Electrical, Gas, Telecom and Cable TV services.
  • 17. OTHER PROJECTS • SHOPPING CUM RESIDENTIAL COMPLEX 12 Storey high shopping cum residential complex with 1st and 2nd storey shop & offices and 3rd to 12th storey residential appartment at Deira, Dubai, UAE • LUXURIOUS BUNGLOWS 4 Nos. of Luxurious Bunglows complete with exclusive fixtures and finishes at Al Maktum Road, Dubai, UAE • SHOPPING CENTRE A 5 storey shopping centre with Basement & 1st storey shops and 4th to 5th storey offices at Astodia, Ahmedabad, India. • ROW HOUSES & BUNGLOWS 44 Units of Row Houses and 4 units of Bunglows at Satellite Road, Ahmedabad, India.